NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-i
ATTACHMENT 15 – CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
CONTENTS
GLOSSARY OF ABBREVIATIONS AND ACRONYMS ........................................................... J15-ii
CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) INTRODUCTION .................. J15-1 Overview ............................................................................................................................................... J15-1
SECTION 3 CWBS STRUCTURE ......................................................................................... J15-3
FIGURES
Figure A-1. ERA Business Information Framework ........................................................................... J15-1
Figure A-2. Original NARA PWBS plus one Lockheed Martin defined ‘Project Element’ ............... J15-3
Figure A–3. Level 1.5 ERA System Analysis and Design .................................................................. J15-4
Figure A–4. Level 1.7 ERA Increment 1 – IOC .................................................................................. J15-5
Figure A–5. Level 1.8 ERA Increment 2 ............................................................................................. J15-6
Figure A–6. Level 1.9 ERA Increment 3 ............................................................................................. J15-7
Figure A–6. Level 1.9 ERA Increment 3 (continued) ......................................................................... J15-8
Figure A–7. Level 1.10 ERA Increment 4 ........................................................................................... J15-9
Figure A–7. Level 1.10 ERA Increment 4 (continued) ..................................................................... J15-10
Figure A–8. Level 1.11 ERA Increment 5 ......................................................................................... J15-11
Figure A–8. Level 1.11 ERA Increment 5 (continued) ..................................................................... J15-12
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-ii
GLOSSARY OF ABBREVIATIONS AND ACRONYMS
Acronym Description
BOM Bill of Materials
CLIN Contract Line Item Numbers
CMMI Capability Maturity Model Integration
CWBS Contract Work Breakdown Structure
ERA Electronic Records Archives
FOC Final Operational Capability
IOC Initial Operational Capability
IP Integrated Plan
IPT Integrated Product Teams
IS Integrated Schedule
ISO Industry Standards Organization
LM Lockheed Martin
N/A Not Applicable
NARA National Archives and Records Administration
O&S Operations & Support
OCM Organizational Change Management
PMO Program Management Office
PWBS Program Work Breakdown Structure
PWS Performance Work Structure
QA Quality Assurance
RCM Requirements Cross Reference Matrix
SBU Sensitive but Unclassified
SEIT System Engineering Integration and Test
SH System High
SL System Low
St. Saint
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-1
CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) INTRODUCTION
The CWBS forms the foundation of the Lockheed Martin Team’s business information
framework. It aligns responsibility with accountability within the organization and establishes
the single numbering system that serves as the thread for the overall business information
framework.
Overview
This Electronic Records Archives (ERA) CWBS organizes major management and technical
activities into elements which serve as the basis for scheduling, planning and control across the
program. The CWBS was derived from the National Archives and Records Administration
(NARA) Program Work Breakdown Structure (PWBS) provided in NARA Request for Proposal
NAMA-03-R-0018. The CWBS code associated with each data element provide the linkage to
the PWBS; the numbers to the left of the hyphen are the original NARA references while the
numbers to the right of the hyphen indicate Lockheed Martin tailoring. The CWBS forms the
basis of the business information framework and provides a means of tracking and accounting
for specific work elements within the program. A CWBS Index, a data dictionary and a pictorial
representation of the CWBS structure is provided in this document.
The CWBS is one of the six management plan documents that comprise the ERA business
information framework. The framework, shown in Figure A-1, provides the means for guiding
and controlling work within the ERA program.
Figure A-1. ERA Business Information Framework
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-2
The contents of the management plan documentation is driven by the requirements and
information found within the ERA Request for Proposal (RFP). For example, the Contract Work
Breakdown Structure (CWBS) is derived from the NARA Program Work Breakdown Structure
(PWBS), and the Contract Data Requirements List (CDRL) has enhanced the ERA RFP’s CDRL
with additional Lockheed Martin Team delivery recommendations. The Performance Work
Statement (PWS) explains ‘what’ work will be performed, as organized by the CWBS work
structure, while the Award Fee Plan describes how Lockheed Martin Team performance will be
rewarded. The Integrated Plan (IP) explains ‘how’ the work described in the PWS will be
performed, and the Integrated Schedule (IS) describes ‘when’ the work will be performed. The
management plan documentation is further described in the following list. Please refer to the
individual documents for detailed information. ERA management plans include:
Contract Work Breakdown Structure (CWBS). This defines the scope of the effort and
how the team will accumulate costs. The CWBS aligns responsibility with accountability
within the team’s organization and establishes the single numbering system that serves as the
thread for the overall business information framework. The PWS, the Integrated Plan (IP)
and the Integrated Schedule (IS) all use the numbering system documented within the
CWBS.
Contract Data Requirements List (CDRL). The CDRL defines the data to be delivered to
NARA. For the ERA program, data may be defined as software, hardware, documentation, or
formal program reviews. The Lockheed Martin Team has enhanced the original NARA
CDRL with recommendations for additional data items.
Performance Work Statement (PWS). The PWS describes the work to be performed under
the ERA contract. The work is associated with the specific CWBS element which will be
used to provide accountability, along with the specific CDRL items that it produces or
modifies.
Integrated Plan. The Integrated Plan consists of two principal parts: the event tables that
define what will be achieved (i.e., the program events, significant accomplishments, and
accomplishment criteria) and the process narratives that say how the Lockheed Martin Team
will perform the effort to satisfy the program events, significant accomplishments, and
accomplishment criteria. Through the definition of the program events, the Integrated Plan
defines the capabilities that will be provided with each increment. The System Engineering
Management Plan (SEMP) is developed from the Integrated Plan and becomes the governing
Engineering Management Plan for program execution. All engineering processes map into
the SEMP. The Program Management Plan (PMP) defines the organizational structure, roles
and responsibilities that execute the processes captured within the Integrated Plan.
Integrated Schedule. The Integrated Schedule shows the dates and network relationships for
the program events, significant accomplishments, and accomplishment criteria defined in the
Integrated Plan. The Lockheed Martin Team updates the Integrated Schedule regularly to
show the status and progress toward achieving the program events, significant
accomplishments, and accomplishment criteria.
Award Fee Plan. The Award Fee Plan uses performance measures to assess the Lockheed
Martin Team performance. The measures are regularly re-evaluated and adjusted by NARA
in conjunction with the Lockheed Martin Program Management Team.
NARA Electronic Records Archives (ERA)
POOOO2 Revised the Original Contract on 11/29/04
Lockheed Martin
J15-3
SECTION 3 CWBS STRUCTURE
Figure A-2. Original NARA PWBS plus one Lockheed Martin defined ‘Project Element’
ERA_162b
1.0 - 0000 The ERA Project
ERA Increment 1 – IOC 1.7
1.7.1
1.7.2
Developer Project Management (Increment 1)
1.7.3
NARA Acceptance Test Infrastructure
(Increment 1) 1.7.4
Increment 1 Analysis
1.7.5
Increment 1 Release 1
1.7.6
Increment 1 Release 2
1.7.7
Increment 1 User Training
1.7.9
Increment 1 Release 3
1.7.8
Systems Operations & Support (Increment 1)
1.7.12.1
Systems Maintenance (Increment 1)
1.7.12.2
Facilities Operations Maintenance &
Support (Increment 1) 1.7.12.3
Operations, Support and Maintenance
(Increment 1) 1.7.12
1.7.10
ERA Change Management (Increment 1)
1.7.11
Physical Infrastructure Security (Increment 1)
1.7.12.4
1.5.1
1.5.2
Reserved
1.5.8
1.5.6
1.5.5
1.5.7
ERA System Analysis and
Design 1.5
ERA Increment 2 1.8
1.8.1
1.8.2
Developer Project Management (Increment 2)
1.8.3
NARA Acceptance Test Infrastructure
(Increment 2) 1.8.4
Increment 2 Analysis
1.8.5
Increment 2 Release 1
1.8.6
Increment 2 Release 2
1.8.7
Increment 2 User Training
1.8.8
Systems Operations & Support (Increment 2)
1.8.11.1
Systems Maintenance (Increment 2)
1.8.11.2
Facilities Operations Maintenance &
Support (Increment 2) 1.8.11.3
Operations, Support and Maintenance
(Increment 2) 1.8.11
1.8.9
ERA Change Management (Increment 2)
1.8.10
Physical Infrastructure Security (Increment 2)
1.8.11.4
ERA Increment 3 1.9
1.9.1
1.9.2
Developer Project Management (Increment 3)
1.9.3
NARA Acceptance Test Infrastructure
(Increment 3) 1.9.4
Increment 3 Analysis
1.9.5
Increment 3 Release 1
1.9.6
Increment 3 Release 2
1.9.7
Increment 3 User Training
1.9.8
Systems Operations & Support (Increment 3)
1.9.11.1
Systems Maintenance (Increment 3)
1.9.11.2
Facilities Operations Maintenance &
Support (Increment 3) 1.9.11.3
Operations, Support and Maintenance
(Increment 3) 1.9.11
1.9.9
ERA Change Management (Increment 3)
1.9.10
Physical Infrastructure Security (Increment 3)
1.9.11.4
ERA Increment 4 1.10
1.10.1
1.10.2
Developer Project Management (Increment 4)
1.10.3
NARA Acceptance Test Infrastructure
(Increment 4) 1.10.4
Increment 4 Analysis
1.10.5
Increment 4 Release 1
1.10.6
Increment 4 Release 2
1.10.7
Increment 4 User Training
1.10.8
Systems Operations & Support (Increment 4)
1.10.11.1
Systems Maintenance (Increment 4)
1.10.11.2
Facilities Operations Maintenance &
Support (Increment 4) 1.10.11.3
Operations, Support and Maintenance
(Increment 4) 1.10.11
1.10.9
ERA Change Management (Increment 4)
1.10.10
Physical Infrastructure Security (Increment 4)
1.10.11.4
ERA Increment 5 1.11
1.11.1
1.11.2
Developer Project Management (Increment 5)
1.11.3
NARA Acceptance Test Infrastructure
(Increment 5) 1.11.4
Increment 5 Analysis
1.11.5
Increment 5 Release 1
1.11.6
Increment 5 Release 2
1.11.7
Increment 5 User Training
1.11.8
Systems Operations & Support (Increment 5)
1.11.11.1
Systems Maintenance (Increment 5)
1.11.11.2
Facilities Operations Maintenance &
Support (Increment 5) 1.11.11.3
Operations, Support and Maintenance
(Increment 5) 1.11.11
1.11.9
ERA Change Management (Increment 5)
1.11.10
Physical Infrastructure Security (Increment 5)
1.11.11.4
Operations, Maintenance and Support
1.12
1.12.1
1.12.2
System Operations & Support 1.12.4
Systems Maintenance 1.12.5
Facilities Operations Maintenance &
Support 1.12.6
Operations, Maintenance &
Support Contractor Management
1.12.3
ERA Change Management (Operations,
Maintenance & Support)
1.12.8
Physical Infrastructure Security 1.12.7
1.1 1.2 1.3 1.4
Legend: Indicates an Element Reserved by NARA
Indicates an Element That Has Been Expanded by the LM Team Indicates an Original, Unexpanded NARA Element
Facilities 1.6
1.6.1
Developer Project Management (Facilities)
1.6.3
ERA Real Estate 1.6.4
ERA Facilities Infrastructure
1.6.5
1.6.2
System Analysis and Design
1.5.4
NARA Electronic Records Archives (ERA)
POOOO2 Revised the Original Contract on 11/29/04
Lockheed Martin
J15-4
Figure A–3. Level 1.5 ERA System Analysis and Design
ERA_004b
1.5.1 1.5.2 System Analysis and Design
1.5.4 Reserved 1.5.8 1.5.6 1.5.5 1.5.7
ERA System Analysis and
Design 1.5
Legend: Indicates an Element Reserved by NARA Indicates an Element That Has Been Expanded by the LM Team Indicates an Original, Unexpanded NARA Element
Facilities 1.6
Developer Project Management
(Facilities) 1.6.3
ERA Real Estate 1.6.4
ERA Facilities Infrastructure
1.6.5
Program Administration
1.5.4 - 1000
Program Management 1.5.4 - 1100
Program Control 1.5.4 - 1200
Contract & Sub Management 1.5.4 - 1300
Quality Management 1.5.4 - 1400
Supply Chain Management 1.5.4 - 1500
SEIT Tech Controls 1.5.4 - 3100
Requirements Analysis
1.5.4 - 3200
System Design 1.5.4 - 3300
System Engineering Integration & Test
1.5.4 - 3000
ERA Architecture & Evolution
1.5.4 - 2000
System Integration & Test
1.5.4 - 3400
ERA Change Management
(Analysis and Design) 1.5.4 - 3600
1.6.2 1.6.1
Site Survey 1.6.5 - 5300
Facility Buildout 1.6.5 - 5400
ERA Deployment 1.6.4 - 5000
ERA Deployment Management 1.6.4 - 5100
Facility Acquisition 1.6.4 - 5200
Mid - Atlantic SBU Site 1.6.4 - 5230
St. Louis SBU Site 1.6.4 - 5240
West Coast SBU Site 1.6.4 - 5250
Maryland Classified Site
1.6.4 - 5270
East Coast Classified Site
1.6.4 - 5280
Presidential Library 1 Site
1.6.4 – 52A0
Presidential Library 2 Site
1.6.4 – 52B0
Presidential Library 3 Site
1.6.4 – 52C0 Federal Records
Center 1 Site 1.6.4 – 52D0
Federal Records Center 2 Site 1.6.4 – 52E0
Federal Records Center 3 Site 1.6.4 – 52F0
CWBS Level 1.5, ERA System Analysis & Design CWBS Level 1.6, Facilities
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-5
ERA_005c
1.7.1 1.7.2Developer Project
Management (Increment 1)
1.7.3
NARA Acceptance Test Infrastructure
(Increment 1)1.7.4 - 3500
ERA Increment 1 – IOC1.7
Legend:
Indicates an Element Reserved by NARA
Indicates an Element That Has Been Expanded by the LM Team
Indicates an Original, Unexpanded NARA Element
Program Administration
1.7.3 - 1000
Program Management1.7.3 - 1100
Program Control1.7.3 - 1200
Contract & Sub Management1.7.3 - 1300
Quality Management1.7.3 - 1400
Supply Chain Management1.7.3 - 1500
ERA Deployment Management1.7.6 – 5100
Site and Telecommunications
Deployment1.7.6 - 5200
ERA Telecommunications
Deployment1.7.6 - 5220
Mid-Atlantic SBU Site
1.7.6 - 5230
Operations, Support and Maintenance (Increment 1)1.7.12 - 6000
Systems Operation and Support (Increment 1)1.7.12.1 - 6100
Enterprise System Management Operations Support and Maintenance
1.7.12.1 - 6110
ERA Telecommunications
1.7.12.1 - 6120
Mid-Atlantic SBU Site1.7.12.1 - 6130
St. Louis SBU Site1.7.12.1 - 6140
Systems Maintenance (Increment 1)1.7.12.2 - 6200
Increment 1 Analysis
1.7.5
ERA Arch & Evolution
1.7.5 - 2000
System Engineering Integration and Test
1.7.5 - 3000
SEIT Tech Controls1.7.5 – 3100
Requirements Analysis
1.7.5 - 3200
System Design1.7.6 - 3300
System Integration & Test
1.7.6 - 3400
Ingest Services1.7.6 - 4100
Storage Services1.7.6 - 4200
Increment 1Release 1
1.7.6
Dissemination Services
1.7.6 - 4300
Local Services and Control
1.7.6 - 4400
ERA Management1.7.6 - 4500
Release Management1.7.6 - 4600
ERA Deployment1.7.6 - 5000
ERA Deployment Management1.7.7 – 5100
Site and Telecommunications
Deployment1.7.7 - 5200
ERA Telecommunications
Deployment1.7.7 - 5220
St. Louis SBU Site
1.7.7 - 5240
System Design1.7.7 - 3300
System Integration & Test
1.7.7 - 3400
Ingest Services1.7.7 - 4100
Storage Services1.7.7 - 4200
Increment 1Release 2
1.7.7
Dissemination Services
1.7.7 - 4300
Local Services and Control
1.7.7 - 4400
ERA Management1.7.7 - 4500
Release Management1.7.7 - 4600
ERA Deployment1.7.7 - 5000
Retrofit/Expansion1.7.8 – 5300
Mid-Atlantic SBU1.7.8 - 5330
St. Louis SBU Site
1.7.8.1 - 5340
System Design1.7.8 - 3300
System Integration & Test
1.7.8 - 3400
Ingest Services1.7.8 - 4100
Storage Services1.7.8 - 4200
Increment 1Release 3
1.7.8
Dissemination Services
1.7.8 - 4300
Local Services and Control
1.7.8 - 4400
ERA Management1.7.8 - 4500
Release Management1.7.8 - 4600
Increment 1 User Training
1.7.9 - 3600
1.7.10ERA Change Management (Increment 1)1.7.11 - 3600
Enterprise System Management (Increment 1)1.7.12.2 - 6110
ERA Telecommunications
1.7.12.2 - 6120
Mid-Atlantic SBU Site1.7.12.2 - 6130
St. Louis SBU Site1.7.12.2 - 6140
Facilities Operations Maintenance &
Support (Increment 1)1.7.12.3 - 6300
Mid-Atlantic SBU Site
1.7.12.3 - 6130
St. Louis SBU Site1.7.12.3 - 6140
CWBS Level 1.7, ERA Increment 1 - IOC
Product Development1.7.6 – 4000
Product Development1.7.7 – 4000
Product Development1.7.8 – 4000
Physical Infrastructure
Security (Increment 1)1.7.12.4 - 6400
Figure A–4. Level 1.7 ERA Increment 1 – IOC
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-6
Ingest Services1.8.6 - 4100
Storage Services1.8.6 - 4200
Dissemination Services
1.8.6 - 4300
Local Services and Control
1.8.6 - 4400
ERA Management1.8.6 - 4500
Release Management1.8.6 - 4600
ERA_006c
1.8.1 1.8.2NARA Acceptance Test Infrastructure
(Increment 2)1.8.4 - 3500
Legend:
Indicates an Element Reserved by NARA
Indicates an Element That Has Been Expanded by the LM Team
Indicates an Original, Unexpanded NARA Element
Systems Operation and Support (Increment 2)1.8.11.1 - 6100
Enterprise System Management Operations Support and Maintenance
1.8.11.1 - 6110
Increment 2 User Training
1.8.8 - 3600
1.8.9ERA Change Management (Increment 2)1.8.10 - 3600
Enterprise System Management (Increment 2)1.8.11.2 - 6200
CWBS Level 1.8, ERA Increment 2
Facilities Operations Maintenance &
Support (Increment 2)1.8.11.3 - 6300
Physical Infrastructure
Security (Increment 2)1.8.11.4 - 6400
Program Administration
1.8.3 - 1000
Program Management1.8.3 - 1100
Program Control1.8.3 - 1200
Contract & Sub Management1.8.3 - 1300
Quality Management1.8.3 - 1400
Supply Chain Management1.8.3 - 1500
Developer Project Management (Increment 2)
1.8.3ERA Arch & Evolution
1.8.5 - 2000
System Engineering Integration and Test
1.8.5 - 3000
SEIT Tech Controls1.8.5 – 3100
Requirements Analysis
1.8.5 - 3200
Increment 2 Analysis
1.8.5
ERA Deployment Management1.8.6 – 5100
Site and Telecommunications
Deployment1.8.6 - 5200
ERA Telecommunications
Deployment1.8.6 - 5220
System Design1.8.6 - 3300
System Integration & Test
1.8.6 - 3400
ERA Deployment1.8.6 - 5000
Maryland Classified Site
1.8.6 - 5270
Federal Records Center Site 11.8.6 – 52D0
Product Development1.8.6 - 4000
West Coast SBU Site
1.8.6.1 - 5250
Presidential Library Site 1
1.8.6 – 52A0
Increment 2Release 1
1.8.6
Mid-Atlantic SBU1.8.7 – 5330
St. Louis SBU1.8.7 - 5340
West Coast SBU Site
1.8.7 - 5350
Maryland Classified Site
1.8.7 - 5370
System Design1.8.7 - 3300
System Integration & Test
1.8.7 - 3400
Retrofit/Expansion1.8.7 - 5300
Presidential Library Site 1
1.8.7 – 53A0
Federal Records Center Site 11.8.6 – 52D0
Product Development1.8.7 - 4000
Increment 2Release 2
1.8.7
ERA Increment 21.8
Operations, Support and Maintenance (Increment 2)1.8.11 - 6000
ERA Telecommunications
1.8.11.1 - 6120
Mid-Atlantic SBU Site1.8.11.1 - 6130
St. Louis SBU Site1.8.11.1 - 6140
West Coast SBU Site1.8.11.1 - 6150
Maryland Classified Site
1.8.11.1 - 6170
Presidential Library Site 1
1.8.11.1 – 61A0
Federal Records Center 1 Site
1.8.11.1 – 61D0
ERA Telecommunications
1.8.11.2 - 6120
Mid-Atlantic SBU Site1.8.11.2 - 6130
St. Louis SBU Site1.8.11.2 - 6140
Maryland Classified Site
1.8.11.2 - 6170
President Library Site 1
1.8.11.2 – 61A0
Federal Records Center 1 Site
1.8.11.2 – 61D0
Mid-Atlantic SBU Site1.8.11.3 - 6130
Maryland Classified Site
1.8.11.3 - 6170
President Library Site 1
1.8.11.3 – 61A0
St. Louis SBU Site1.8.11.3 - 6140
West Coast SBU Site1.8.11.3 - 6150
Federal Records Center 1 Site
1.8.11.3 – 61D0
West Coast SBU Site1.8.11.3 - 6150
Ingest Services1.8.7 - 4100
Storage Services1.8.7 - 4200
Dissemination Services
1.8.7 - 4300
Local Services and Control
1.8.7 - 4400
ERA Management1.8.7 - 4500
Release Management1.8.7 - 4600
Figure A–5. Level 1.8 ERA Increment 2
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-7
Figure A–6. Level 1.9 ERA Increment 3
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-8
Figure A–6. Level 1.9 ERA Increment 3 (continued)
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-9
ERA_008d
1.10.1 1.10.2
Legend:
Indicates an Element Reserved by NARA
Indicates an Element That Has Been Expanded by the LM Team
Indicates an Original, Unexpanded NARA Element
1.10.9
CWBS Level 1.10, ERA Increment 4
Developer Project Management (Increment 4)
1.10.3
ERA Increment 41.10
Increment 4 Analysis
1.10.5
Increment 4Release 1
1.10.6
Program Administration
1.10.3 - 1000
Program Management1.10.3 - 1100
Program Control1.10.3 - 1200
Contract & Sub Management1.10.3 - 1300
Quality Management1.10.3 - 1400
Supply Chain Management1.10.3 - 1500
ERA Telecommunications
Deployment1.10.6 - 5220
NARA Acceptance Test Infrastructure
(Increment 4)1.10.4 - 3500
Mid-Atlantic SBU Site1.10.7 - 5330
St. Louis SBU Site1.10.7 - 5340
Maryland Classified Site1.10.7 - 5370
West Coast SBU Site1.10.7 - 5350
Presidential Library Site 11.10.7 – 53A0
Federal Records Center Site 31.10.7 – 53F0
Federal Records Center Site 21.10.7 – 53E0
Federal Records Center Site 11.10.7 – 53D0
Presidential Library Site 21.10.7 – 53B0
Presidential Library Site 31.10.7 – 53C0
East Coast Classified Site1.10.7 – 5380
Presidential Library Site 21.10.11.3 – 61B0
Presidential Library Site 31.10.11.3 – 61C0
ERA Telecommunications1.10.11.1 - 6120
Mid-Atlantic SBU Site1.10.11.1- 6130
St. Louis SBU Site1.10.11.1- 6140
Maryland Classified Site1.10.11.1- 6170
West Coast SBU Site1.10.11.1 - 6150
Presidential Library Site 11.10.11.1 – 61A0
Federal Records Center Site 31.10.11.1 – 61F0
Federal Records Center Site 21.10.11.1 – 61E0
Federal Records Center Site 11.10.11.1 – 61D0
East Coast Classified Site1.10.11.1 – 5380
ERA Telecommunications1.10.11.2 - 6120
Mid-Atlantic SBU Site1.10.11.2 - 6130
St. Louis SBU Site1.10.11.2 - 6140
Maryland Classified Site1.10.11.2 - 6170
West Coast SBU Site1.10.11.2 - 6150
Presidential Library Site 11.10.11.2 – 61A0
Federal Records Center Site 31.10.11.2 – 61F0
Federal Records Center Site 21.10.11.2 – 61E0
Federal Records Center Site 11.10.11.2 – 61D0
East Coast Classified Site1.10.11.2- 6170
Operations, Support and Maintenance (Increment 4)1.10.11 - 6000
Systems Operations & Support
(Increment 4)1.10.11.1 - 6100
Increment 4 User Training
1.10.8 - 3600
ERA Change Management (Increment 4)1.10.10 - 3600
Enterprise System Management OperationsSupport & Maintenance
1.10.11.1 - 6110
Systems Maintenance (Increment 4)
1.10.11.2 - 6200
Facilities Operations Maintenance & Support
1.10.11.3 - 6300
Physical Infrastructure Security (Increment 4)
1.10.11.4 - 6400
Presidential Library Site 21.10.11.1 – 61B0
Presidential Library Site 31.10.11.1 – 61C0
Presidential Library Site 21.10.11.2 – 61B0
Presidential Library Site 31.10.11.2 – 61C0
ERA Telecommunications1.10.11.3 - 6120
Mid-Atlantic SBU Site1.10.11.3 - 6130
St. Louis SBU Site1.10.11.3 - 6140
Maryland Classified Site1.10.11.3 - 6170
West Coast SBU Site1.10.11.3 - 6150
Presidential Library Site 11.10.11.3 – 61A0
Federal Records Center Site 31.10.11.3 – 61F0
Federal Records Center Site 21.10.11.3 – 61E0
Federal Records Center Site 11.10.11.3 – 61D0
East Coast Classified Site1.10.11.3 - 6170
ERA Deployment Management1.10.6 – 5100
Site and Telecommunications
Deployment1.10.6 - 5200
Ingest Services1.10.6 - 4100
Storage Services1.10.6 - 4200
Dissemination Services
1.10.6 - 4300
Local Services and Control
1.10.6 - 4400
ERA Management1.10.6 - 4500
Release Management1.10.6 - 4600
ERA Deployment1.10.6 - 5000
System Design1.10.6 - 3300
System Integration & Test
1.10.6 - 3400
Product Development1.10.6 - 4000
ERA Arch & Evolution
1.10.5 - 2000
System Engineering Integration and Test
1.10.5 - 3000
SEIT Tech Controls1.10.5 – 3100
Requirements Analysis
1.10.5 - 3200
Retrofit/Expansion1.10.7 - 5300
Storage Services1.10.7 - 4200
Product Development1.10.6 - 4000
Increment 4Release 2
1.10.7
System Design1.10.7 - 3300
System Integration & Test
1.10.7 - 3400
Ingest Services1.10.7 - 4100
Dissemination Services
1.10.7 - 4300
Local Services and Control
1.10.7 - 4400
ERA Management1.10.7 - 4500
Release Management1.10.7 - 4600
Figure A–7. Level 1.10 ERA Increment 4
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-10
Mid-Atlantic SBU Site1.12.6 - 6130
St. Louis SBU Site1.12.6 - 6140
West Coast SBU Site1.12.6 - 6150
Maryland Classified Site
1.12.6 - 6170
East Coast Classified Site
1.12.6 - 6180
Presidential Library Site 11.12.6 – 61A0
Presidential Library Site 21.12.6 – 61B0
Federal Records Center Site 11.12.6 – 61D0
Federal Records Center Site 21.12.6 – 61E0
Presidential Library Site 31.12.6 – 61C0
Federal Records Center Site 31.12.6 – 61F0
ERA_194b
1.12.1 1.12.2
CWBS Level 1.10, ERA Increment 4
Legend:
Indicates an Element Reserved by NARA
Indicates an Element That Has Been Expanded by the LM Team
Indicates an Original, Unexpanded NARA Element
Operations Maintenance and Support
1.12
Operations, Maintenance & Support Contractor
Management1.12.3
Mid-Atlantic SBU Site1.12.5 - 6130
St. Louis SBU Site1.12.5 - 6140
West Coast SBU Site1.12.5 - 6150
Maryland Classified Site
1.12.5 - 6170
East Coast Classified Site
1.12.5 - 6180
Facilities Operations Maintenance and Support
1.12.6 - 6300
ERA Telecommunications
1.12.4 - 6120
Mid-Atlantic SBU Site1.12.4 - 6130
St. Louis SBU Site1.12.4 - 6140
West Coast SBU Site1.12.4 - 6150
Maryland Classified Site
1.12.4 - 6170
East Coast Classified Site
1.12.4 - 6180
Presidential Library Site 11.12.4 – 61A0
Presidential Library Site 21.12.4 – 61B0
Federal Records Center Site 11.12.4 – 61D0
Federal Records Center Site 21.12.4 – 61E0
Presidential Library Site 31.12.4 – 61C0
Federal Records Center Site 31.12.4 – 61F0
Enterprise System Management Operations Support and Maintenance
1.12.4 - 6110
Systems Maintenance1.12.5 - 6200
Physical Infrastructure Security (Increment 4)
1.12.7 - 6400
Systems Operations & Support
1.12.4 - 6100
ERA Change Management (Operations, Maintenance &
Support)1.12.8 - 3600
Program Administration1.1.2.3 - 1000
Program Management1.12.3 - 1100
Program Control1.12.3 - 1200
Contract & Subcontract Management1.12.3 - 1300
Quality Management1.12.3 1400
Supply Chain Management1.12.3 - 1500 Presidential Library Site 1
1.12.5 – 61A0
Presidential Library Site 21.12.5 – 61B0
Presidential Library Site 31.12.5 – 61C0
Federal Records Center Site 31.12.5 – 61F0
Federal Records Center Site 11.12.5 – 61D0
Federal Records Center Site 21.12.5 – 61E0
ERA Telecommunications
1.12.5 - 6120
Figure A–7. Level 1.10 ERA Increment 4 (continued)
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-11
Figure A–8. Level 1.11 ERA Increment 5
NARA Electronic Records Archives (ERA)
Original Contract
Lockheed Martin
J15-12
Figure A–8. Level 1.11 ERA Increment 5 (continued)