SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 67
Methodology for production of photomontages
Photography
Photography for the following photomontage viewpoints was captured by RLA using a Canon EOS 5D Mark III full frame camera with a focal length of 50mm. A table was supplied containing each viewpoint, image number, Eastings and Northings (WGS84) and elevation (in m AHD). Photographs were corrected for distortion using specific camera and lens profiles for the Canon EOS 5D Mark III in Adobe Photoshop. Cambium Group converted supplied viewpoint co-ordinates from WGS84 to GDA94 / MGA Zone 56 and exported these points to AutoCAD dwg format.
Photomontage 1: V33 (017A5661) – 19 February 2016, 15:54 Photomontage 2: V36 (017A5547) – 18 February 2016, 11:37 Photomontage 3: V25 (017A5569) – 18 February 2016, 12:53 Photomontage 4: V45 (017A5590) – 18 February 2016, 14:07 Photomontage 5: V16 (017A5602) – 18 February 2016, 15:11 Photomontage 6: V15 (017A5616) – 18 February 2016, 17:02
Figure B1 displays the six viewing locations and the respective angle of view for the attached photomontages.
Modelling and Photomontage Production
Orthorectified aerial photography with 10cm resolution and 0.5m contours covering 340 km2 was supplied by AAM Pty Limited and used in conjunction with mine plans and revegetation sequencing provided by R.W. Corkery & Co. Pty Limited with all data provided in GDA94 / MGA Zone 56.
Contours and mine plan data were combined to create a 3D Digital Terrain Map (DTM) and the aerial image was applied to the 3D DTM surface. Using 3D StudioMAX software, the camera viewpoint dwg was merged to the 3D DTM and virtual cameras were setup using these x,y points. The camera elevation ‘z’ relied on 0.5m contours + an eye level elevation of 1.65m.
Mine sequencing plans in combination with revegetation heights/density and texture advice where provided by RW Corkery & Co Pty Limited and Itoo software was used to distribute 3D vegetation onto the DTM. Texture mapping such as pasture, active mining and the like were then applied to the DTM as determined on the mine sequencing staging plans. Specific virtual sunlight systems were then set up to replicate time stamped photography for each photograph viewpoint.
Camera matching was undertaken using viewpoint photography and DTM, then virtual cameras and camera targets where aligned to the DTM by rotating the camera around the z axis.
Viewpoint Years 0.5, 1, 3, 7, 10, 15 and final landform were then rendered and composed using Photoshop and adjusted as required to accommodate depth haze and other environmental features. The existing view and final photomontages were exported from Photoshop as a 5760 x 3840 pixel jpg image.
Figure B1 Photomontage Locations
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 68
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 69
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 70
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 71
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 72
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 73
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 74
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 75
Photomontage 1 – V33 Kia Ora Lookout
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 76
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 77
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 78
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 79
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 80
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 81
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 82
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 83
Photomontage 2 – V36 Bucketts Walking Track
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 84
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 85
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 86
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 87
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 88
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 89
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 90
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 91
Photomontage 3 – V25 Jacks Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 92
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 93
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 94
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 95
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 96
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 97
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 98
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 99
Photomontage 4 – V45 The Bucketts Way near number 4434
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 100
Photomontage 5 – V16 – Grantham Road
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 101
Photomontage 5 – V16 – Grantham Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 102
Photomontage 5 – V16 – Grantham Road
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 103
Photomontage 5 – V16 – Grantham Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 104
Photomontage 5 – V16 – Grantham Road
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 105
Photomontage 5 – V16 – Grantham Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 106
Photomontage 5 – V16 – Grantham Road
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 107
Photomontage 5 – V16 – Grantham Road
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 108
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 109
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 110
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 111
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 112
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 113
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 114
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
SPECIALIST CONSULTANT STUDIES GLOUCESTER RESOURCES LIMITED Part 3: Visual Impacts Assessment Amended Rocky Hill Coal Project
Report No.806/14
3 - 115
Photomontage 6 – V15 – The Bucketts Way opposite number 4257
GLOUCESTER RESOURCES LIMITED SPECIALIST CONSULTANT STUDIES Amended Rocky Hill Coal Project Part 3: Visual Impacts Assessment
Report No.806/14
3 - 116
This page has intentionally been left blank