1
---- ---- ---- ---- ---- COMPREHENSIVE ENVIRONMENTAL INCORPORATED 225 CEDAR HILL STREET MARLBOROUGH, MA 01752 r Figure 2: GATEWAY MARINA BMP, SUBSURFACE GRAVEL WETLAND South Street and Pleasant '--Street, Barnstable MA " Project No.: 677-2 Date: FEBRUARY 201 5 Drawn By: NC 1,,. Checked By: ML LEGEND LIMIT OF WORK (LOW) APPROX. ORDINARY HIGH WATER MARK 50' SETBACK 100' SETBACK FLOOD ZONE AE, LAND SUBJECT TO COASTAL STORM FLOWAGE (VELOCITY ZONE) Note: Aerial scales are approximate

Figure 2: Gateway Marina BMP, Subsurface Gravel Wetland ......GATEWAY MARINA BMP, SUBSURFACE GRAVEL WETLAND South Street and Pleasant Street, Barnstable MA Project No.: 677-2 Date:

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Figure 2: Gateway Marina BMP, Subsurface Gravel Wetland ......GATEWAY MARINA BMP, SUBSURFACE GRAVEL WETLAND South Street and Pleasant Street, Barnstable MA Project No.: 677-2 Date:

----

----

----

--------

COMPREHENSIVE ENVIRONMENTAL INCORPORATED

225 CEDAR HILL STREET MARLBOROUGH, MA 01752

r Figure 2:

GATEWAY MARINA BMP, SUBSURFACE GRAVEL

WETLAND

South Street and Pleasant '--Street, Barnstable MA "

~ Project No.: 677-2 Date: FEBRUARY 201 5

Drawn By: NC 1,,. Checked By: ML

LEGEND LIMIT OF WORK (LOW)

APPROX. ORDINARY HIGH WATER MARK

50' SETBACK

100' SETBACK FLOOD ZONE AE, LAND SUBJECT TO COASTAL STORM FLOWAGE (VELOCITY ZONE)

Note: Aerial scales are approximate