Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report (Source: JICA Study Team) Figure 10.4.5-6 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 150MW) Maha 2 PSPP Electric Power Development Co., Ltd. 10-93

Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-6 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 150MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-93

Page 2: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-7 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 200MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-95

Page 3: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-8 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 150MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-97

Page 4: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-9 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 200MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-99

Page 5: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-10 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 150MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-101

Page 6: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-11 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 200MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-103

Page 7: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Source: JICA Study Team)

Figure 10.4.5-12 Power Flow Diagram (Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 150MW)

Maha 2 PSPP

Electric Power Development Co., Ltd. 10-105

Page 8: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(2) Short Circuit Current Analysis

The three phase fault current analyses at bus conductours of Maha 2 PSPP, Kotmale P/S, and Kirindiwela are carried out for Hydro Maximum Night Peak cases and Thermal Maximum Night Peak cases, as the most severe loading cases. As shwon in Table 10.4.5-1, it is confirmed that the currents satisfies the criteria for all cases.

Table 10.4.5-1 The Three Phase Short Circuit Currents (in 2025)

Loading Scenario

Connection Unit Capacity of PSPP P/S, S/S Current

Hydro Maximum Night Peak

Kotmale P/S 200MW

Kotmale 220kV 25.6kA Maha 220kV 17.7kA

150MW Kotmale 220kV 25.5kA

Maha 220kV 17.7kA

PI Connection to T/L between Kotmale and

Kirindiwela

200MW Kotmale 220kV 25.1kA

Maha 220kV 22.1kA Kirindiwela 220kV 24.0kA

150MW Kotmale 220kV 25.0kA

Maha 220kV 22.1kA Kirindiwela 220kV 23.9kA

Thermal Maximum Night Peak

Kotmale P/S 200MW

Kotmale 220kV 21.6kA Maha 220kV 15.8kA

150MW Kotmale 220kV 21.5kA

Maha 220kV 15.8kA

PI Connection to T/L between Kotmale and

Kirindiwela

200MW Kotmale 220kV 21.0kA

Maha 220kV 19.8kA Kirindiwela 220kV 23.7kA

150MW Kotmale 220kV 22.8kA

Maha 220kV 20.2kA Kirindiwela 220kV 24.8kA

(Source: JICA Study Team)

(3) Transient Stability Analysis

1) Three phase line fault

In case of PI Connection to T/L between Kotmale P/S and KirindiwelaS/S, it is set that three phase line fault occurs at a point on T/L from Maha 2 PSPP to Kirindiwela since the load seems to be heavier than that on T/L from Maha PSPP to Kotmale for the simulation.

The results of transient stability analysis of three phase line fault are shown in Figure 10.4.5-13 to Figure 10.4.5-24.

Results show that network is stable for all cases.

Electric Power Development Co., Ltd.

10-107

Page 9: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

2) One Unit Tripping at Maha 2 PSPP

a) Frequency drop followed by loss of generator

The results of the dynamic simulation for one unit tripping Maha PSPP are shown in Figure 10.4.5-25 to Figure 10.4.5-32.

The results of study show that the system frequency did not drop to 48.75Hz which is criteria; load shedding is carried out.

In this regard, it is calculated that the system frequency dropping in Thermal maximum scenario is larger than that in Hydro maximum scenario. This is because there is difference of the number of power plants operated with free governor mode in Hydro Maximum cases (HMNP) and in Thermal Maximum cases (TMNP).

HMNP: Samanalawewa, Bowathenna, Kotmale, Upper Kotmale, Victoria, Puttalam, Ambalangoda, Sampoor

TMNP: Victoria, Kotmale, Kelanitissa

Considered the above-mentioned calculation results, it is assumed that the mumber of power plants with governor free mode has considerable impact on the power system stability. Therefore, it is suggested that free governor operation system should be considered for relatively large plants to be constructed in the future.

b) Frequency rise by loss of generator of pumping operation

The results of the dynamic simulation for one unit tripping Maha PSPP are shown in Figure 10.4.5-33 to Figure 10.4.5-36.

The results show that in very case, the system frequency does not excess 51.5Hz which is the criteria; the alarm of thermal power plants occurs for the system frequency rising.

In this regard, in the simulation, it is set that the coal power plants in the power grid (Puttalam, Ambalangoda, and Sampoor) are operated with free governor mode in the same manner as “a) Frequency drops followed by loss of generator”.

Therefore, it is suggested that free governor operation system should be considered for relatively large plants to be constructed in the future.

Electric Power Development Co., Ltd.

10-108

Page 10: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Hydro Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 200MW)

(Source: JICA Study Team)

Figure 10.4.5-13 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

(Hydro Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-14 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

-20

-10

0

10

20

30

0 5 10 15 20 25 30R

otor

Ang

le (d

eg)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

-20-10

010203040

0 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-500

50100150200250300

0 5 10 15 20 25 30

Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-109

Page 11: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Hydro Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 200MW)

(Source: JICA Study Team)

Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

(Hydro Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-16 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

-20

-10

0

10

20

0 5 10 15 20 25 30R

otor

Ang

le (d

eg)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

-20

-10

0

10

20

30

0 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-110

Page 12: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 200MW)

(Source: JICA Study Team)

Figure 10.4.5-17 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

(Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-18 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

-30

-20

-10

0

10

20

0 5 10 15 20 25 30R

otor

Ang

le (d

eg)

Time (seconds)

-500

50100150200250300

0 5 10 15 20 25 30

Bus

Vol

ateg

(kV

)

Time (seconds)

-30-20-10

0102030

0 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-500

50100150200250300

0 5 10 15 20 25 30

Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-111

Page 13: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 200MW)

(Source: JICA Study Team)

Figure 10.4.5-19 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

(Thermal Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-20 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

-30

-20

-10

0

10

0 5 10 15 20 25 30R

otor

Ang

le (d

eg)

Time (seconds)

-500

50100150200250300

0 5 10 15 20 25 30

Bus

Vol

ateg

(kV

)

Time (seconds)

-30

-20

-10

0

10

0 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-500

50100150200250300

0 5 10 15 20 25 30

Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-112

Page 14: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Off Peak in 2025, Pumping Operation, Connected to Kotmale, Maha Unit Capacity 200MW)

(Source: JICA Study Team)

Figure 10.4.5-21 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

(Off Peak in 2025, Pumping Operation, Connected to Kotmale, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-22 Three-phase Fault at Maha end of Maha-Kotmale 220kV Line-USR

-120-100

-80-60-40-20

00 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

-120-100

-80-60-40-20

00 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-113

Page 15: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Off Peak in 2025, Pumping Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 200MW) (Source: JICA Study Team)

Figure 10.4.5-23 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

(Off Peak in 2025, Pumping Operation, Connected to Kotmale and Kirindiwela, Maha Unit Capacity 150MW)

(Source: JICA Study Team)

Figure 10.4.5-24 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR

-120-100

-80-60-40-20

00 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

-120-100

-80-60-40-20

00 5 10 15 20 25 30

Rot

or A

ngle

(deg

)

Time (seconds)

-100

0

100

200

300

0 5 10 15 20 25 30Bus

Vol

ateg

(kV

)

Time (seconds)

Electric Power Development Co., Ltd.

10-114

Page 16: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Hydro Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale) (Source: JICA Study Team)

Figure 10.4.5-25 200MW Unit Tripping at Maha PSPP

(Hydro Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale) (Source: JICA Study Team)

Figure 10.4.5-26 150MW Unit Tripping at Maha PSPP

49.55

49.60

49.65

49.70

49.75

49.80

49.85

49.90

49.95

50.00

50.05

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.70

49.75

49.80

49.85

49.90

49.95

50.00

50.05

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.

10-115

Page 17: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Hydro Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale and Kirindiwela) (Source: JICA Study Team)

Figure 10.4.5-27 200MW Unit Tripping at Maha PSPP

(Hydro Maximum Night Peak in 2025, Generating Operation, Connected to Kotmale and Kirindiwela) (Source: JICA Study Team)

Figure 10.4.5-28 150MW Unit Tripping at Maha PSPP

49.55

49.60

49.65

49.70

49.75

49.80

49.85

49.90

49.95

50.00

50.05

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.75

49.80

49.85

49.90

49.95

50.00

50.05

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.

10-116

Page 18: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Thermal Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale) (Source: JICA Study Team)

Figure 10.4.5-29 200MW Unit Tripping at Maha PSPP

(Thermal Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale) (Source: JICA Study Team)

Figure 10.4.5-30 150MW Unit Tripping at Maha PSPP

49.00

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.

10-117

Page 19: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Thermal Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale and Kirindiwela) (Source: JICA Study Team)

Figure 10.4.5-31 200MW Unit Tripping at Maha PSPP

(Thermal Maximum Night Peak in 2025、Generating Operation, Connected to Kotmale and Kirindiwela) (Source: JICA Study Team)

Figure 10.4.5-32 150MW Unit Tripping at Maha PSPP

49.10

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.

10-118

Page 20: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Off Peak in 2025, Pumping Operation, Connected to Kotmale)

(Source: JICA Study Team)

Figure 10.4.5-33 200MW Unit Tripping at Maha PSPP

(Off Peak in 2025, Pumping Operation, Connected to Kotmale)

(Source: JICA Study Team)

Figure 10.4.5-34 150MW Unit Tripping at Maha PSPP

49.90

50.00

50.10

50.20

50.30

50.40

50.50

50.60

50.70

50.80

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.95

50.00

50.05

50.10

50.15

50.20

50.25

50.30

50.35

50.40

50.45

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.

10-119

Page 21: Figure 10.4.5-6 Power Flow Diagram (Thermal …Figure 10.4.5-15 Three-phase Fault at Maha end of Maha-Kirindiwela 220kV Line-USR (Hydro Maximum Night Peak in 2025, Generating Operation,

Development Planning on Optimal Power Generation for Peak Demand in Sri Lanka Final Report

(Off Peak in 2025, Pumping Operation, Connected to Kotmale and Kirindiwela)

(Source: JICA Study Team)

Figure 10.4.5-35 200MW Unit Tripping at Maha PSPP

(Off Peak in 2025, Pumping Operation, Connected to Kotmale and Kirindiwela)

(Source: JICA Study Team)

Figure 10.4.5-36 150MW Unit Tripping at Maha PSPP

49.90

50.00

50.10

50.20

50.30

50.40

50.50

50.60

50.70

50.80

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

49.95

50.00

50.05

50.10

50.15

50.20

50.25

50.30

50.35

50.40

50.45

0 10 20 30 40 50 60

Freq

uenc

y (H

z)

Time (seconds)

Electric Power Development Co., Ltd.