1
! ! ! ! Thermalito Afterbay PEASE SUBSTATION BOGUE SUBSTATION RIO OSO SUBSTATION Project Location Graphics... 00441.15 (6/7/16) AB SUT T E R C O YU B A C O YU B A C O YU B A C O BUT T E C O AUBU RN CO P L A C E R C O PLACER CO S U T T E R C O S U T T E R C O COLUSA CO BUTTE CO SUTTER CO PALERMO SUBSTATION Legend 0 5.0 2.5 Phase 2 Phase 1 Phase 3 Anticipated Construction Phasing South of Palermo 115kV Power Line Reinforcement Project East Nicolaus Miles Note: The sequencing of these phases will depend on many factors, including the timing of permitting approvals, line clearance approvals, weather, and landowner preferences. Certain portions of one phase (e.g. site restoration) may overlap with the start of another phase (e.g. site preparation). Attachment D

Fig 2 8-2 Const Phasing2€¦ · COLUSA CO.!!!! Thermalito Afterbay PEASE SUBSTATION BOGUE SUBSTATION RIO OSO SUBSTATION Project Location Graphics... 00441.15 (6/7/16) AB S U T …

Embed Size (px)

Citation preview

CO

LUSA

CO

.!

!

!

!

ThermalitoAfterbay

PEASESUBSTATION

BOGUESUBSTATION

RIO OSOSUBSTATION

Project Location

Gra

phic

s... 0

0441

.15

(6/7

/16)

AB

SUT

TE

R C

O

YUB

A CO

YUBA C

O

YUBA C

O BUTTE

CO

AUBURN CO

PLAC

ER C

O

PLACER CO

SUT

TER

CO

SUT

TER

CO

CO

LUSA

CO

BUT

TE

CO

SUTTER CO

PALERMOSUBSTATION

Legend

0 5.02.5

Phase 2

Phase 1

Phase 3

Anticipated Construction PhasingSouth of Palermo 115kV Power Line Reinforcement Project

East Nicolaus

MilesNote: The sequencing of these phases will depend on many factors, including the timing of permitting approvals, line clearance approvals, weather, and landowner preferences. Certain portions of one phase (e.g. site restoration) may overlap with the start of another phase (e.g. site preparation).