    Transactions to Capture PURP

    In order to calculate PURP

    CO-PA will be used as Intercompany Sales datasource since Net Revenue and

    Actual COGS are required to capture PURP

    CO-PA 3.rd party sales to calculate stock outputs

    Goods Movements (Production transaction) will be used to move PURP from

    issued material to Producted ones

    Transfer Posting from Material to Material (309 movement type)

    Manual Adjustment can be done in BW system to do any kind of adjustment

    which can be in Units as well as Contribution

  • Page 2

    PURP Master Data view

  • PURP Master Calculation logic

    Page 3

    In order to calculate PURP for a period

    Openning + Inputs Contribution for the period

    Unit Contribution * Outputs Output Values

    Total Contribution of the period / Total Quantity of the period Unit PURP

    Contribution of the period

  • Product Mapping Master

    Page 4

    Product

    code

    Mapping

    In order to capture which Material codes are related to PURP

    intercompany sales as well as mapping for Non-SAP companies

    Mapping table defined above will be created in BW system.

  • Assumptions on Intercompany Sales

    Goods in Transit

    -If Invoice is issued stock will be assumed as received by

    Intercompany

    Pros

    -Do not need to reconcile Sender and Receiver

    -If Good Received and Invoice is not is not an issue

    Cons

    -How to solve stock value issue w/o knowing if it is received

    Page 5

  • Capturing PURP on IC Sales

    Page 6

    Intercompany

    Sales Transaction

    Product

    code

    MappingPURP

    Master

    Firstly calculate Price for the period;

    Average of Period Opening, Inputs from IC Procurement and Production

  • Calculating Average PURP

    Page 7

    Intercompany

    Sales Transaction

    Product

    code

    MappingPURP

    Master

  • Moving (Transferring) PURP with Production

    Page 8

    Production

    Transaction

    PURP

    Master

    Weighted Average Price calculation from the inputs is

    used for Outputs transaction;

    Production Issues IC Sales 3.rd Party SalesAs a result Closing will be calculated

  • PURP Master Example

    Page 9

    PURP

    Master

  • PURP Prototype v.01

    What we have done?

    Application on an example scenario

    Points to develop

  • PURP Prototype v0.1

    Page 11

    Intercompany Sales Data (PA)

    3rd Party Sales Data (PA)

    Issued to Production Data (MM)

    Output from Production Data (MM)

    PURP

    RESULT

  • PURP Prototype v0.1

    Page 12

    Scenario 1:

    Company Code Material

    Jazeera

    Pharmaceutical7LEXT106J-ALG

    Hikma Free Zone -

    Jordan 7LEXT106J-ALG

    3LEXF1G12-ALGREG

    Sarl Hikma Pharma

    Algeria3LEXF1G12-ALGREG

    3rd Party

    Intercompany Sales (PA)

    Intercompany Sales (PA)

    Production (MM)

    3rd Party Sales (PA)

  • PURP Prototype v0.1

    Page 13

    Scenario 1:

    Company Code Material

    Jazeera Pharmaceutical 7LEXT106J-ALG

    Hikma Free Zone - Jordan

    Intercompany Sales (PA)

    7LEXT106J-ALG

  • PURP Prototype v0.1

    Page 14

    Scenario 1:

    Company Code Material

    Hikma Free Zone - Jordan

    7LEXT106J-ALG

    3LEXF1G12-ALGREG

    Production (MM)

  • Scenario 1:

    Company Code Material

    3LEXF1G12-ALGREG

    Sarl Hikma Pharma

    Algeria3LEXF1G12-ALGREG

    Intercompany Sales (PA)

    Hikma Free Zone -

    Jordan

    *Contribution on PA transaction: $644.339,80 ($2,626 per unit)

    PURP Prototype v0.1

  • Scenario 1:

    Company Code Material

    Sarl Hikma Pharma Algeria 3LEXF1G12-ALGREG

    3rd Party

    3rd Party Sales (PA)

    PURP Prototype v0.1

  • 9NPFDSCR

    Scenario 2:

    Company Code Material

    Hikma Pharmaceuticals3NOPFDSB1-ALG

    Sarl Hikma Pharma Algeria

    3NOPFDSB1-ALG

    3LEXF1G12-ALGREG

    3rd Party

    Intercompany Sales (PA)

    Production (MM)

    3rd Party Sales (PA)

    9NOPFDS

    3NOPF5510

    Production (MM)

    Production (MM)

    Production (MM)

    PURP Prototype v0.1

  • Scenario 2:

    PURP Prototype v0.1

  • Planned vs Developped

  • To be covered in next prototypes..

    Corrections in Prototype 1

    Work in Process

    Reporting

  • WIP Solution

    Release PURP with Production Quantity Issue

    Pros

    Similar to WIP in ECC

    Cons

    If Production quantity is not equal to Issued quantity when

    Technically Completed is marked rest of PURP released to the

    period

  • Production WIP

    For the Production order that is created in the first month

    First month all the good issues will be done and only Partial Production

    happens Therefore 400 PURP contribution goes to WIP

    Second month only portion of the production goes from WIP to target product as

    unit and PURP contribution

    In the third month there is no production but TECO marked therefore the amount

    in the WIP as PURP contribution goes to target product w/o quantity