Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
5100 Brookshire BoulevardCharlotte, NC 28216
Sign up for mobile text notificationsWe are now offering text alert notifications for those interested in receiving up-to-date information throughout the project. To sign up for these alerts, text littlehopecreek to 844-753-0614.
Field Work Is Coming to Your Area SoonLittle Hope Creek
Wastewater Improvement Project
JaNuary 2021
Geotechnical Investigation Methods
Drill RigThe standard method for geotechnical investigations, a machine is used to drill below the ground surface to determine the presence of rock. This process involves drilling a hole roughly 4 inches in diameter and upward of 30 feet deep.
Refraction Microtremor (ReMi)This alternative method uses seismic vibrations to generate a profile of the subsurface conditions.
PRSRT STDUS POSTAGE
PAIDPERMIT NO. 29 CHARLOTTE, NC
Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org
Operated by the City of Charlotte
January 14, 2021
SUBJECT: Surveying and Field Work as Part of Upcoming Wastewater Project (Little Hope Creek Wastewater Improvement Project)
Dear Customer:
Charlotte Water is conducting preliminary engineering work in your area for an important wastewater pipe replacement project that will expand the future capacity of the wastewater system in your area.
Beginning in late January/early February, subcontractors for Charlotte Water will be surveying and conducting field work along Phase 3A and a portion of Phase 3C of the Little Hope Creek Wastewater Improvement Project (see map). This letter is to notify you that crews may be working on or near your property on one or more occasions. During this time, it may be necessary for Charlotte Water and its subcontractors to be on your property to visually confirm the location of some underground utilities. Their activities should not inconvenience you in any way. All field crew are instructed to wear identifying clothing (i.e., companies’ logo or a safety vest) to identify themselves.
In addition to personnel, residents could see minor clearing activities in the area, survey stakes/flags, paint markings on the ground and machinery used for geotechnical borings. These borings involve drilling a hole roughly 4 inches in diameter, and upward of 30 feet deep to determine the presence of rock in the area. In areas inaccessible for the drill rig, the refraction microtremor (ReMi) method will be used (see reverse side). We also ask that residents do not remove the survey stakes and flags as they are critical to completing the design of this project. A list of companies that are involved with this project is included below:
• Black & Veatch International Company• Park Construction of NC• Capstone Civil Group• Tidemark Land Services• Summit Environmental• Carolina Wetlands Services• Gulf Coast Property Acquisitions
This work is expected to begin in late January/early February and take 1-2 months to complete. Additional information on the project can be found on Charlotte Water’s website at: www.charlottewater.org, click on projects, then construction (or by visiting bit.ly/LittleHopeCreek). Additionally, we are now offering text alert notifications on project progress (see reverse side for details).
I am your source of information for this project. Please call me at 980-219-9488 if you have questions. If we determine that this project will have any direct impact on your property, we will notify you further as the project progresses.
Regards,
Stephen Scott, PEProject Manager
Charlotte Water [email protected]
Cooper Dr
Ebb Pl
Seac
roft
Rd
Brockbank Rd
Rockfo
rd C
t
Seneca Pl
Milford Rd
Gle
nham
Dr
E Woodlawn Rd
Stacy Blvd
Manhasse Rd
Lochridge Rd Scaleybark Rd
Waterbury D
r
Shadow
Elm Dr
Scaleybark Rd
Conw
ay A
ve
Wim
bledon
Rd
Little Hope Creek
Ashcraft Ln
Bevis Dr
HolmesDr
SewickleyDr
Marsh Rd
Cambridge Rd
Selw
ynFa
rms L
n
Jersey Ln
Heather Ln
Heather Ln
Drexel Pl
Drexmore
Ave
Universi
ty Dr
Reynolds Dr
Moultrie St
Park Rd
Park Rd
Yale Pl
Idle
woo
d Ci
r
Annlin Ave
Webster Pl
Hollis RdAuburn
Ave
May
field
Ave
Weo
na A
ve Anso
n St
Darw
in Cir
E Woodlawn Rd
E Woodlawn Rd
Northgate Ave
Montford Dr
Montford Dr
Murrayhill Rd
Furman Pl
Stanfield Dr
Tyvola Rd
Tyvola Rd
Seneca Pl
Murrayhill Rd
Lam
ont Dr
Barkley Rd
Mockingbird LnWedgewood Dr
Longwood D
r
Tyvo
la D
r
Kentland Ln
Tamworth Dr
Camborne Pl
Chedworth D
rValley Forge Rd
Wed
gewoo
d Dr
Farm
broo
k Dr
Londonder
ry Rd
Burnley
Rd
Fairbanks Dr
Baylor Dr
White Oak Rd
Sandridge Rd
Currituck Dr
Gentry Pl
Zephyr
Ln
Mur
rayh
ill Rd
Sout
h Bl
vd
Sout
h Bl
vdSo
uth
Blvd
Madison Park
Phase3A
Phase3A
Phase3A
Phase3B
Phase3A
Phase3C
Collingwood
Ashbrook /ClawsonVillage
CollinswoodElementary
Montclaire /Madison Park
Marion DiehlCommunity Park
VillageShopping
Center
SedgefieldElementary
Colonial Village
Halstead D
r
Abbey Pl
Legend Phase 1 Phase 2 Phase 3 Creek