35
0 Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017 fib Model Code 2020 Shear and punching provisions, needs for improvements with respect to new and existing structures Aurelio Muttoni Workshop fib Sao Paulo, 29.9.2017 École Polytechnique Fédérale de Lausanne, Switzerland

fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

Embed Size (px)

Citation preview

Page 1: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

0Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib Model Code 2020Shear and punching provisions,

needs for improvements with respect to new and existing structures

Aurelio Muttoni Workshop fibSao Paulo, 29.9.2017

École Polytechnique Fédérale de Lausanne, Switzerland

Page 2: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

1Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Development of CEB – FIP – fib Model Codes

2010 2020

EN 1992-1-1:2023 ?SIA 262:2013

UNESCO International Code (joint project CEB + ACI)

EN 1992-1-1:2004NBR 6118:2003, 2014SIA 262:2003

?

ENV 1992-1-1:1991NBR 6118:1980

1964

1978

1990

1970

Several national codes

Page 3: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

2Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Introduction: shear aand punching shear

1) shear in girders

(with shear reinforcement)

3) punching

2) shear in slabs

(without shear reinforcement)

Page 4: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

3Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

MC2010 for members with shear reinforcement (girders): stirrup design

q z

z∙cotq

Page 5: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

4Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

MC2010 for members with shear reinforcement (girders): compression strut strength

Brittleness effect

EN 1992-1-1:2004: 1-fck/250

NBR 6118:2014: av2 =1-fck/250

MC2010: hfc =(30/fck)1/3≤1

Strain effect

EN 1992-1-1:2004: 0.6

NBR 6118:2014: 0.54

MC2010 LoA I: ke = 0.55

Page 6: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

5Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Effective concrete strength in webs

EN 1992-1-1:2004 , Efficiency factor n1

31

1

MPa 3055.0

ckfn

1

MC 2010, LoA I

MPa 25016.01

ckfn

=> Larger reduction for higher fc due to more brittle behaviour

Page 7: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

6Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

The levels-of-Approximation approach (qmin and kc)

Preliminary design, non governing failure modes

Typical design

Assessment of critical existing structures, design of special cases

Page 8: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

7Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

The levels-of-Approximation approach: shear in girders with transverse reinforcement

Level I

Level II

Level III

Level IV

Page 9: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

8Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.1 Shear in Beams

Topics where there is a need to improve MC2010 (1/3)

1) Provisions regarding cyclic loading should be improved for the verification of columns and walls subjected to seismic actions.

2) Improve provisions for points loadings near supports (girders)

3) Combined actions – Shear, torsion, bending; interaction with torsion in solid sections; shear forces not parallel to the principal axes of the cross sections (Bi-axial shear in columns)

4) Simplified provisions to account for interaction with transversal bending (important for box girders or flanged beams)

Page 10: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

9Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.1 Shear in Beams

Topics where there is a need to improve MC2010 (2/3)

5) Shear in members with bent-up-bars and/or plain reinforcement

6) Shear in prestressed members with poor longitudinal reinforcement at end supports

7) Shear of members where the transverse reinforcement is poorly anchored

8) Shear in members where the constructive rules are not fulfilled (spacing of the transverse reinforcement, or less than minimum shear reinforcement for instance)

9) Sustained loading? (acc)

Sustained loading (“Rüsch effect”)

=> acc ≈ 0.85 ???

or strength reduction factor of 0.85 has another justification (NBR 6118:2014 and UK NDP) ??

Rüsch, H., “Research toward a general flexural theory for structural concrete.” ACI Journal, 1960

Page 11: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

10Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.1 Shear in Beams

Topics where there is a need to improve MC2010 (3/3)

10) Influence of flanges (considerations should be included e.g. LoA II or III)

11) Shear fatigue considerations

12) Reliability & safety evaluation (TG 3.1): shear resistance functions

13) Bar cutoff effect overestimated?

Page 12: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

11Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Shear in slabs

Shear in slabs, or members not requiring shear reinforcement

Page 13: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

12Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Provisions for members without shear reinforcement: MC 90 and EC2:2004 approach

VR,c = C∙b∙d∙k∙r1/3∙fck1/3+ Cp∙b∙d∙scp

Prestressing (EC2:2004)

Concrete strength

Reinforcement ratio

Size effect

Area of cross section

MC 90 and EC2:2004 approach

Page 14: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

13Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

One-way shear in MC 2010: MCFT as theoretical basis

Sigrist V., Bentz E., Fernández Ruiz M., Foster S., Muttoni A., Background to the fib Model Code 2010 shear provisions – part I: beams and slabs, Structural Concrete, 2013

Strain effect Size effect

Level I

Level II

s

yd

xE

f

2e

s

yd

E

fe

Page 15: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

14Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

One-way shear in NBR 6118:2014 : inspired by MC1978

Page 16: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

15Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Fernández Ruiz M. , Muttoni A., Sagaseta J., (2015) Shear strength of concrete members without transversereinforcement: A mechanical approach to consistently account for size and strain effects, Engineering Structures

Development of closed-form equation for the 2nd generation of EN 1992-1-1

Page 17: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

16Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

2/1

,

v

dgc

cRd

dfk

e

sl

cscR

sl

cscR

sl

csE

ss

Ev

Ez

a

Edbz

adb

Edbz

aV

EAz

M

r

r

re ,,

2/1

,

,

zE

ad

dfk sl

cscR

dgc

cR r

3/1

32

,

d

z

a

dfEk

cs

dg

cslcR r

c

dgv

cR fkd

e

1

3.0,

3/1

, 1000.1

cs

dg

clcRa

dfr

Development of closed-form equation for the 2nd generation of EN 1992-1-1

now replaced

by:

dg

v

d

de

c

cR

f

,

d/2

acsinfluence of

aggregate size

size and slenderness effects combined

VE

ss

csE

ss

Ev

EAz

aV

EAz

M

e

Muttoni, Fernández Ruiz, Cavagnis, fib Bulletin 2018

Page 18: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

17Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

06

d

V

N

V

Ma

E

E

E

Ecs

In presence of normal forces, the effective shear span acs shall be adapted as follows:

NE<0 : compressive normal forces

Development of closed-form equation for the 2nd generation of EN 1992-1-1

3/1

,

, 1001

cs

dg

ckl

cw

cRd

cRda

df

db

Vr

Muttoni, Fernández Ruiz, Cavagnis, fib Bulletin 2018

Page 19: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

18Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3, Shear in slabs

fib MC2010 MC1990 EC2:2023?EC2:2004

3/1

,

, 1001

cs

dg

ckl

cw

cRd

cRda

df

db

Vr

NBR 6118:2014 ACI 318

????

Page 20: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

19Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Shear in slabs

Topics where there is a need to improve MC2010

1) provisions regarding distributed loads

2) account for variable depth

3) provisions for loadings near supports

4) provisions for points loadings near linear supports

Page 21: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

20Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching

Bluche, Switzerland, 1981 Cagliari, Italy, 2004

Vitoria, Brazil, 2016 Tel Aviv, Israel, 2016

Page 22: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

21Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching

EC2:2004NBR 6118:2014

Page 23: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

22Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching

fib MC2010

Page 24: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

23Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching

fib MC2010

Muttoni A., Fernández Ruiz M., Bentz E., Foster S., Sigrist V., Background to fib Model Code 2010 shear provisions – part II:

punching shear, Structural Concrete, 2013

Page 25: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

24Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Development of closed-form equation for the 2nd generation of EN 1992-1-1

ck

Cp

dg

ckl

C

bcRd f

a

df

k

r

6.0100

31

,

3810

b

dkb

Page 26: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

25Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

The MC2010 model already suitably addresses needs related to assessment and strengthening

a) Influence of slab continuity and compressive membrane action (important for assessment)

Einpaul J., Fernández Ruiz M., Muttoni A., Influence of moment redistribution and compressive membrane action on punching strength of flat slabs, Engineering Structures , 2015)

Einpaul J., Ospina C. E., Fernández Ruiz M., Muttoni A., Punching Shear Capacity of Continuous Slabs, ACI, Structural Journal, 2016

3

1

, toalproportion rcRV

hidden safety

Page 27: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

26Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

b) Strengthening

• Retrofitting using externally bonded FRP’s

• Retrofitting using post-installed reinforcement

D. M. V. Faria D., Einpaul J., M. P. Ramos A., Fernández Ruiz M., Muttoni A., 2014, On the efficiency of flat slabs strengthening against punching using externally bonded FRP’s, Construction and Building Materials, 2014

Fernández Ruiz M., Muttoni A., Kunz J., 2010, Strengthening of flat slabs against punching shear using post-installed shear reinforcement, ACI Structural Journal

The MC2010 model already suitably addresses needs related to assessment and strengthening

Page 28: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

27Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching and shear in slabs

Topics where there is a need to improve MC2010 (1/2)

1) Provisions regarding cyclic loading (flat slabs subjected to seismic actions).

2) Shear in slabs with bent-up-bars and/or plain reinforcement

3) Shear of slabs where the transverse/longitudinal reinforcement is poorly anchored

4) Shear in slabs where the constructive rules are not fulfilled (spacing of the transverse reinforcement for instance)

5) Influence of compressive membrane action (account for slab continuity ) -> explicit formulation

6) Verify/adjust level of safety (parameters to be adjusted according to a reliability analysis)

7) Better define the aim of LoA I (not a simplified design tool, but a first check to verify whether shear is a concern)

Page 29: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

28Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching and shear in slabs

Topics where there is a need to improve MC2010 (2/2)

8) Simplified expressions / closed-form expressions?

9) Influence of imposed deformations (columns settlements)

10) Update expressions where recent knowledge indicates a need. For instance: (i) ke for edge and corner columns; (ii) expression for transverse reinforcement based on recent improvements of the mechanical model (footings for instance); (iii) Provisions for integrity reinforcement

11) Tailored design methods for strengthening of slabs against punching

12) Punching with medium - low slenderness: between 1 and 2 (e.g. pile caps)

13) Redistribution of shear in asymmetrical cases (𝜓𝑚𝑎𝑥 versus 𝜓𝑥 and 𝜓𝑦)

14) Performance and safety on different LoAA

15) Role of integrity reinforcement (although further work is needed)

16) Structural robustness of flat slab structures (new & existing structures)

Page 30: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

29Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

fib MC2020, WP 2.2.3 Punching and shear in slabs

New Bulletins

1) fib Bulletin on “Seismic behaviour of flat slabs”

2) fib Bulletin on “Strengthening of flat slabs against punching”

3) fib Bulletin on “Robustness of flat slabs”

4) fib Bulletin on “Design and assessment of slabs using linear and nonlinear analysis”

Page 31: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

30Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

MC 2010 -> MC2020, Stress distribution in the compression zones

Stress distributions according to EN 1992-1-1:2004MC 2010NBR 6118:2014

ENV 1992-1-1:1991(unchanged since CEB 1964)

acc∙fck

Page 32: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

31Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Effective concrete strength in columns

?fc

Page 33: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

32Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Similarities between the effective concrete strength in webs and in columns

(30/fck)1/3 ≤ 1

Columns Webs

1-fck/250

Page 34: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

33Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Comparison between columns tests and code calculation

EN 1992-1-1:2004

Unreduced concrete strength in the column

reduced concrete strength in the column: (30/fck)

1/3 ≤ 1

Page 35: fib Model Code 2020 Shear and punching provisions, needs ... 2017-09-29_Sao_Paulo... · Shear and punching provisions, needs for improvements with respect to new and existing structures

34Aurelio Muttoni, fib Workshop, Sao Paulo, 29.9.2017

Stress distribution in the compression zones may potentially be simplified

same parabola-rectangle distribution (CEB 1964) may be

used also for fck > 50 MPa

acc = (30/fck)1/3 ≤ 1