.• . :.· ... G 9?o30\'3 "'w 11 -. F.G.E., LTD . .L'.;..:.:: .. :1 \ ... Fewell Geotechnical Engineering, Ltd. Hawaii 5 ap File 265-9 July 21, 1982 . Gentry-Waipio, Ltd. 94-539 Puahi Street Waipahu, Hawaii 96797 not to be taken from this room Attention: Mr. James C. White Subject: Final Grading Report Gentlemen: Gentry Waipio Industrial Subdivision First Increment, Phase 3 Gentry-Waipio Development Waipio, Oahu, Hawaii 'W At your request, we have provided testing and observation services for the mass grading of the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3, in Waipio, Oahu, Hawaii. Work started with a general clearing and stripping Of the entire construction area. Soft areas were overexcavated to firm ground, backfilled, and compacted prior to ·the start of fill placement. Actual grading operations then commenced using Caterpillar 631 and 621 scrapers and D-9- dozers -to cut, haul, and spread--the- fill. Compaction was accomplished using a Hyster 451 sheepsfoot. The fill was generated from. the proposed Park Site (Parcels "q" and "t") adjacent to the Puahi ·Subdivision of the Gentry-Waipio Development. The material consisted of low plasticity Clayey Silt (ML) and was placed and compacted in uniform lifts of 6 to 8 inches at moisture contents generally within 4 percent of the optimum moisture content as determined by ASTM D1557. Field density tests performed by our firm indicated that adequate compaction was being obtained. These tests, upon which acceptimce is based, show values in excess of 90 percent relative compaction as determined by the above-referenced test. Density tests taken in the upper 24 inches of the roadway embankments showed values exceeding 95 percent relative compaction •. Lots 1 through 19 and the roadways have either been cut or filled to final grade as designated by the field grade stakes and compacted to 90 percent relative compaction. The upper 24 inches of the roadways have been compacted to 95 percent. ' . MUNICIPAL N9 CENTER · , 58 S. King Street olulu, Hawaii 90013

F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

.•

. :.· ... ,,~

G 9?o30\'3 "'w 11 -.

F.G.E., LTD . t---~.Jti'\\ ~ .L'.;..:.:: .. :1 \

------------------~~--~~--------~--~---------------~- ... ~) Fewell Geotechnical Engineering, Ltd.

~ ··-~;;~w;;~~~;·· Hawaii •5ap ~·;>{;:'•7• File 265-9 July 21, 1982 .

Gentry-Waipio, Ltd. 94-539 Puahi Street Waipahu, Hawaii 96797

not to be taken from this room

Attention: Mr. James C. White

Subject: Final Grading Report

Gentlemen:

Gentry Waipio Industrial Subdivision First Increment, Phase 3 Gentry-Waipio Development Waipio, Oahu, Hawaii

'W At your request, we have provided testing and observation services for the mass grading of the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3, in Waipio, Oahu, Hawaii.

Work started with a general clearing and stripping Of the entire construction area. Soft areas were overexcavated to firm ground, backfilled, and compacted prior to ·the start of fill placement.

Actual grading operations then commenced using Caterpillar 631 and 621 scrapers and D-9- dozers -to cut, haul, and spread--the- fill. Compaction was accomplished using a Hyster 451 sheepsfoot.

The fill was generated from. the proposed Park Site (Parcels "q" and "t") adjacent to the Puahi ·Subdivision of the Gentry-Waipio Development. The material consisted of low plasticity Clayey Silt (ML) and was placed and compacted in uniform lifts of 6 to 8 inches at moisture contents generally within 4 percent of the optimum moisture content as determined by ASTM D1557.

Field density tests performed by our firm indicated that adequate compaction was being obtained. These tests, upon which acceptimce is based, show values in excess of 90 percent relative compaction as determined by the above-referenced test. Density tests taken in the upper 24 inches of the roadway embankments showed values exceeding 95 percent relative compaction •.

Lots 1 through 19 and the roadways have either been cut or filled to final grade as designated by the field grade stakes and compacted to 90 percent relative compaction. The upper 24 inches of the roadways have been compacted to 95 percent.

' .

MUNICIPAL ~EF·E·.E· N9 ~~~S CENTER Ct~~- · ~nolulu

City~l , 58 S. King Street ~ olulu, Hawaii 90013

Page 2: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

File 265-9 e July 21, 1982

In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance with . the ·Grading Ordinances of the City and County of Honolulu and the. recommendations of our SoU Investigation Report datecl November, 1976. These lots and roadways are ready for further improvements and should be grassed as soon as practicable.

The Site Plan, Figure 1, indicates the field density test locations. The location of Parcels "q'' and "t" are shown on Figure 2. The results of the laboratory and field tests performed by our firm are summarized in Tables I and II, and graphically exhibited in Figures 3 through 6.

Should you have any questions regarding this matter, please contact us at your convenience.

Respectfully submitted,

FEWELL GEOTECHNICAL ENGINEERING, L TO.

~~n~to, P.E. Project Engineer

AJS/fse

Enclosures

Page 3: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

Sample· Designation

A

B

c

Table I

Summary of Laboratory Test Results

Description

Reddish Brown Claye~ SICT (ML)

Reddish Brown Clayey SILT (ML)

Reddish Brown SILT (ML)

Maximum Dry Density (pcf)

103.0

105.4

100.0

Optimum Moisture Content %

23.3

24.5

27.0

File 265-9 Gentry Waipio Industrial Subdivision

First Increment, Phase 3 Gentry-Waipio Development

Waipio, Oahu, Hawaii

Page 4: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

•,

TABLE II

e SUMMARY OF FIELD DENSITY TEST RESULTS

Test Field Moisture Material No. Date ~cation Elevation Dens it;:£ Content Type Com.r2aption Re_marks

1.981 (pcf) (%) (%)

1 8-3 Lot #5 FG-2.0' 97 27 A 94 2 8-3 tot #2 FG-8.5' 96 26 A 93 3 8-3 Lot #6 FG-2.0~ 93 26 A 90 4 8-3 Lot #1 FG-5.5' 93 26 A 90 5 8-4 Lot #4 FG-1.0~ 94 26 A 92 6 8-4 Lot #3 FG-1.5' 95 26 A 92 7 8-4 Lot #6 FG-0.5' 93 26 A 91 8 8-5 Lot #1 FG"-5.;0 1 95 26 A 93 9 8-5 Lot #2 FG-7.0' 94 26 A 92

10 8-5 Lot #5 FG-1.0' 92 25 A 89 Accepted with ad-ditional compaction

11 8-5 Lot #4 FG-2.0' 94 27 A 91 12 8-5 Lot #3 FG--2.5' 97 23 A 94 13 8-6 Lot #7 East FG-2.0' 97 26 A 94 14 8-6 Lot #8 East FG-2.0 1 95 26 A 92 15 8-6 Lot #7 West FG-1.5' 93 26 A 90 16 8-6 Lot #8 West FG-2.0' 95 26 A 92 17 8-6 Lot #7 East FG-0.5' 94 26 A 91

-18· 8-6 Lot #8 East FG-1.5' 91 27 A 89 Accepted with ad-ditional compaction

19 8-7 Lot #1 North FG-4.0' 94 25 A 91 20 8-7 Lot #1 South FG-3.5' 96 26 A 93 21 8-7 Lot #2 North FG-6.5 1 95 27 A 92 22 8-7 Lot #2 South FG-6.0 1 94 26 A 91 23 8-7 Lot #1 South FG-3.0' 95 27 A 92 24 8~10 Lot #1 FG-2.0' 97 27 A 94 25 8,.-10 Lot #2 FG-5.0' 95 25 A 92 26 9..,10 Lot #3 FG-3.0' 94 24 A 91 27 a..,1o Lot #1 FG-1.0 I 95 26 A 92 28 8-10 Lot #2 FG-4.0 1 96 26 A 93 29 8-10 Lot #2 FG...,4.0' 98 24 A 95 30 8-11 Lot #2 FG-3.0' 96 27 A 93 31 8-11 Lot #3 FG-3.0' 96 25 A 93 32 8-11 Lot #2 FG-2.0' 94 26 A 91 33 8-11 Lot #3 FG-1.5' 95 27 A 93 34 8-11 Lot #2 FG-1.0' 99 25 A 96 35 8-11 Lot #3 FG 99 24 A 96 36 8-12 Lot #2 FG 97 26 A 94 37 8-12 Lot #5 FG-1.5 I 98 26 A 95 38 8-12 Lot #4 FG-1.0 1 100 27 A 97 39 8-12 Lot #5 FG-1.0' 94 26 A 92 40 8-12 Lot #6 FG 0.5' 98 25 A 95 41 8-12 Lot #5 FG 94 26 A 91

-42 8-12 Lot #4 FG 96 23 A 94 43 8-13 Lot #6 FG 98 25 A 95 44 8-13 Lot #5 FG ·. 93 26 A 90 45 8-13 Lot #6 FG 97 25 A 94

Page 5: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

TAaLE II (cont'd)

SUMMARY OF FIELD DENSITY TEST RESULTS

e Test Field Moisture Material No. Date Location Elevation Densitx Content Ty,J2e Com.12action. Remarks

1981 (pcf) (!is) . (\)

' 46 8-13 Lot #5 FG 100 24 A . 98

47 8-14 Lot #14 FG-5.0 1 . 96 27 A 93 48 8-14 Lot #15 FG-5.0 1 .95 25 A 92 49 8-14 Lot #13 FG-4.0 1 92 26 A 89 Accepted with ad-

'. di tiona! compactior

so 8-14 Lot #16 FG-4.0' 93 27 A 90 51 8-14 Lot #14 FG-3.0' 96 26 A 95 52 8-14 Lot #15 FG-3.0 1 99 24 A 96 53 8-17 Lot #14 FG-2.Q 1 96 25 A 93 54 8-17 Lot #16 FG-3.0 1 98 27 A '95 55. 8-17 Lot #13 FG-1~0' 97 26 B '·92

56 8-17 Lot #15 FG-2.0 1 94 27 B . 90 57 8-17 Lot #14 FG .. 102 25 B . \'97

58 8-17 Lot #13 FG 101 24 B '96

59 8-18 Lot #15 FG-1.5 1 99 25 B 94 60 8-18 Lot #16. FG-2.0 1 100 24 B 95 61 8-18 Lot #13 FG 97 25 B 92 62 8-18 Lot #14 FG 99 24 B 94 63 8-18 Lot #15 FG-0.5' 102 25 A. 98

• 8-19 Lot #16 FG-1.5 1 101 27 A 98 8-19 Lot #15 FG 97 24 A 9~

66 8-19 Lot #15 FG 96 23 A . 93 67 8-19 Lot #16 FG-1.0' 98 25 A ·. 95 68 8-19 Lot #16 FG-0.5 1 106 24 .A 100+ 69 8-19 Lot #16 FG 99 23 A 96 70 8-20 Lot #17 FG-5.0 1 97 23 .A .94

71 8-20 Lot #17 FG-4.5' 99 24 A 96 72 8-20 Lot #17 FG-3.5 1 1G2 23 A 99 73 8-20 Lot #18 FG-2.0' 97 25 A 95 74 8-20 Lot #18 FG-1.0 1 95 24 •A 92 75 8-21 Lot #18 FG 101 25 B 96 76 8-21 Lot #18 FG 97 26 B 92 77 8-21 Lot #17 FG-3.0' 100 24 A -97 78 8-21 Lot #17 FG-2.0 1 94 24 A 92 79 8-21 Lot #17 FG-1.0 1 96 23 A 93 80 8-21 Lot #17 FG-1.0' 99 25 B 94 81 8-21 Lot #17 FG 103 25 B '97 82 8-21 Lot #17 FG 101 24 B 96 83 8-25 Ukee st. Ext. FSG-1.0' 101 25 A 98 84 8-25 Ukee St. Ext. FSG-1.0'· 101 24 A 98 85 8-25 Ukee St. Ext. FSG,.,.l.S' 101 25 A 99 861r ~-1 Lot #12 FG-1.0' 99 25 A 96

Warehouse Area 87*•· . 9-1 Lot #14 FG-0.5' ,99 27 A 96

-~ Warehouse Area

.. 9.:....16' .. •.Lot.#17 FG 102 23 A 99 · Warehouse Area

Page 6: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

*Test No's 86 through 89 were taken during the individual Lot Grading of Lots 12, 14, 16, and 17 after the completion of the original mass grading of these lots.

-est No's 293, 296, and 300 were taken during the revised grading for R~ad "D" during the installation of the utilities ~d site improvements (FGE, Ltd. File 265-91).

File 265-9 Gentry Waipio Industrial Subdivision

First Increrilent, Phase 3 Ge~try-Waipio Development

Waipio, Oahu, Hawaii

Page 7: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

>­<( 3: :I: 0 :I: <( :I: w :!!: <( :I: w ~ <( ~

·'

LIGHT INDUSTRIAL

SUBDIVISION

KA UKA BOULEVARD

LELEPUA SUBDIVISION

CENTRY-WA SUBDIVISIO PHASE 3

>­<(

== w w ~ u. N I

:I:

ENT,

PENAKII CLUSTER

:PROJECT LOCATION-MAP ..

MIKILANA SUBDIVISION

~ Borrow Site Location

--~-

CRESTVIEW SUBDIVISION

GENTRY-"WAIPIO DEVELOPMENT

•'

File 265-9 Fjgure 2

Page 8: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

l:;ABORAT9R'( COMPA_CTION CURVE

110 -. ,.._ . u . Q. -> f- 100 Cl) z w c > ex: c

90

15 20 25 30

MOISTURE CONTENT - (%of Dry Weight)

Sample: Bag "A"

Description: Reddish Brown Clayey SILT (ML)

Laboratory Test Procedure: ASTM 01557

Maximum Dry Density: 103. 0 pcf

Optimum Moisture Content: 23. 3 %

File 265-9 Figure 3

Page 9: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

LABPRATORY COMP~CTION CURVE

110 -~ . u . a. ->- 100 .... (/) z IJ w c >-" c 90

15 20 25 30

MOISTURE CONTENT ,.. (%of Dry Weight)

Sample: Bag "6''

Description: Reddish Brown Clayey SILT (ML)

Laboratory Test Proc:;:edure: AS TM D 1 557

Maximum Dry Density: 105~ q pcf

Optimum Moisture Content: 24. 5 %

.,

File 265-9 Figure q

Page 10: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

. ·.

LABORATORY COMPACTION CURVE

110 -. 16-. u . a. ->

1- 100 Cl) z w c > 0::: c

90

15 20 25 30

MOISTURE CONTENT '- (%of Dry Weight)

Sample: Bag •ic••

Description: Reddish Brown SILT (ML)

Laboratory Test Procedure: ASTM 01557

Maximum Dry Density: 100.0 pcf

Optimum Moisture Content: 27. 0 %

File 265-9 Figure 5

Page 11: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

..

1-a!

c(

:I: u >-1-u 1-C

/) c(

...J a.

,, r

. &

n .... ' -

r\ \ -.

.. , c::: :J

1'\ c(

" \~

--

\ ::J: u 1'\ '

0 &n

r\. \ '\ i\ \ 1\. \ '\ d

t.n N

PL

AS

TIC

ITY

IND

EX

:I: 0 &

I)

:I: ~

<C

I\. ~~ u

\ •

l 1'\

a J c5 &I)

1\ ...J ~

\ ~

N

.....

0 0 .....

r.n .... 0 r.n

r.n N

1-~

...J

0 ::::> 0 ...J

File

~65-9

Fig

ure 6

Page 12: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

:;

i

I

'f i /') I ,

I

/

l

~~-~ n - ~-~.,.__,_--r •4 PAD 1 . -...._, . I

M .s • 19 • 24

H 0 20 023 · I 0 21

I L

o2 0 23

0 21

o28 • 9 PAD 2

0 29 0 32

0 12

o35

022

PAD 3 33

0 •6 026

031

---------------

50 .,o 11

PAD 4 °

• :46·

0 30

~NORTH -_- ~:::so•

Limit of ...--.............._~ Grading=:\

-~~.' , r"--~ I PAD 10

PAD 13 PAD 11

I 0 61

0 55

049 -'I o48

0 58 63

65e •

PAD 12 57ee 47

eB6 o54

0 39

PAD 5 37

0 044 0 10 0 41

eB7

.• 51 62 . '

• 53

060 1 ~:~ ,_.so .. /: .·. " PAD 16

0 13 015

7

45 ___ _ _ _ _ _}/1. • • ----- :------ -= ""~----I ---- -------- ---------

--- --- - - - - - - -------11 ----- -- -------90--

------- 296.

\1

--~- I "/-J - - -.r ~;.:~ ;;,.;<.- _ . _____ _. {

;;;s..- ..--- :r -- 1~

"

PAD 6 e3

0 40 0 43 91 •

0 79

'·I

il I

FEWELL GEOTECHNICAL ENGINEERING, LTD.

GENTRY-WAIPIO INDUSTRIAL SUBDIVISION FIRST INCREMENT, PHASE 3

WAIPIO, OAHU, HAWAII

Site and Field Density Test Location Plan

FILE 265-9 JULY 1982

FIGURE 1

LEGEND:

• FGE Field Density Test Location

. -

REF: Grading Plan by ·Park Engineering, Inc.

" o77 l '

072 ' \ \

\ PAD 17. 1oso

II

• 78 I :_ .. \ • 75 ' 1 . \ : PAD 18 \· ~ F~~ wide · . • 71 : 81 ' •76 . . Jme easemOn~ommun•cations

I • ' .oae~'""'•. ~·

ess----= _,,_......,-~ ~- - ~- . -----+-- _.___­I' _...,.- -I r \

PAD 19

-I• J I·

j:

., I' I I I

. ~ . . ~ . . . . \

.it ,.,..·

I

.I Ill

. :...-:...-:..: _ _:._·_·. -~~---'·~·---·-·-·-- .,_,....,..,..,..._........,._.._.,_ .. _.....,~, .. -._,..,...,.._'""'...,..,._ __ .. ~,.,..,_..,___ r----. --~~-~....-..,...,..,...,; ....... ..-"l:'.,.~"""'..,._,...,~~=z~~~~.=":.:i<:"3"~Z:"'""=::::-.::::.r.~-.....=:~~~:"·~-·~J--""?'"-~·:a-~"'~'---:""'~-'...-. ....,.,..,.,.l'..,..,... . .,..~ ,. ... l'""".""":'f<"'""· ·•..-.··" - -~'l"?"/"="1" ··~""·-ll'>•~~· .,.~- •.• ~ ..... ~-··~····ll-- ~-··- .............. ~· ~-····--·..:JI"

Page 13: F.G.E., LTD€¦ · e File 265-9 July 21, 1982 In summary, the mass grading for the Gentry-Waipio Industrial Subdivision, First Increment, Phase 3 has been completed in general accordance

.""""' ... C7l c: ·-'-z c ·-(71 c Gl

.JC '-

&.

Suite 2085, Pacific Trade Center 0 190 s: King Stre~.t,::H€1~\J)Ib Hawaii 96813 0 Telephone (808) 531-1676 ~ ,t··il~ r.~.·~.\~1 "-,l ''."-:.:! .

August 2, 1982

Dr. Michael J. Chun Director and Chief Engineer Department of Public Works City and County of Honolulu Honolulu, Hawaii 96813

.; , ·t . ,_, r- ;:. , .• , r. , 1 . ·•. r ~ ,. '1 .. ' -, ¥ - • : ' ' ~. I.' , ; . : .'

Attention: Division of Engineering

Dear Dr. Chun:

Subject: Gentry-Waipio Industrial Subdivision First Increment Phase 3 Tax Map Key: 9-4-06: 8 & 13

-i r'.J

I

This is to certify that grading within the subject subdivision have been completed and substantially conforms to elevations as shown on grading plan.

Attached is Final Grading Report by G.G.E., Ltd.

Sincerely yours,

rna

Attachment

cc: Gentry Waipio, Ltd. Royal Contracting Co., Ltd. F • G • E • , Ltd •

ENGINEERS, SURVEYORS, PLANNERS, LANDSCAPE ARCHITECTS

).:~~:·:..1 0 .::: rr. (;".) ---; (..;>_, 0 .., :;o

N -o~ c:: .... ,

.0 Cl:' :_

\.J'l r< -..,: c-~,....,

-o _,

:X: ~ 0 - ;;c

0:) ~ . ,._, en