FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 2FederalGovernment–unlimitedusagerights. Version:20170630
TableofContents1BudgetFormulation-to-Execution...............................................................................................................................................................................................................3
UseCase1.4SpecialAuthorities(L3)..................................................................................................................................................................................................3
UseCase1.5ContinuingResolution(L1).............................................................................................................................................................................................62Acquire-to-Dispose....................................................................................................................................................................................................................................13
UseCase2.4RealProperty:StewardshipLand,HeritageAssets,Construction,andImpairment(L3).............................................................................................13
UseCase2.5LeaseholdImprovements(L2)......................................................................................................................................................................................27
UseCase2.7BulkPurchaseImmediatelyDistributed(L1)................................................................................................................................................................34
3Request-to-Procure...................................................................................................................................................................................................................................37
UseCase3.4ProcurementDuringContinuingResolution(L1).........................................................................................................................................................374Procure-to-Pay...........................................................................................................................................................................................................................................42
UseCase4.5LeasedProperty(L1)....................................................................................................................................................................................................42
UseCase4.6AcquiringServices(L1).................................................................................................................................................................................................55
UseCase4.7Novation(L2)................................................................................................................................................................................................................595Bill-to-Collect.............................................................................................................................................................................................................................................64
UseCase5.3AggregatedReceivablesforCustodialRevenues(L2)..................................................................................................................................................64
UseCase5.4ReceivableCollectionfromThirdPartyDebtor(L2)....................................................................................................................................................69
UseCase5.6MiscellaneousReceipts(L3).........................................................................................................................................................................................74
UseCase5.7AR/APNetting(L2).......................................................................................................................................................................................................776Record-to-Report.......................................................................................................................................................................................................................................82
UseCase6.3SupplementaryStewardshipReporting(L3)................................................................................................................................................................827Agree-to-Reimburse..................................................................................................................................................................................................................................84
UseCase7.3ReimbursableAgreementwithPrivateSectorwithPayments-in-Advance(L2)..........................................................................................................84
UseCase7.4ReimbursableAgreementfromtheBuyer’sPerspective(L1)......................................................................................................................................9010Book-to-Reimburse(Travel)....................................................................................................................................................................................................................94
UseCase10.3TravelSponsoredbyNon-GovernmentSource(L2)..................................................................................................................................................94
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 3FederalGovernment–unlimitedusagerights. Version:20170630
1BudgetFormulation-to-Execution
UseCase1.4SpecialAuthorities(L3)End-to-EndBusinessProcess:1BudgetFormulation-to-ExecutionBusinessScenario(s)Covered
• SpendingAuthorityfromOffsettingCollections(e.g.,DonationRevenues,ReimbursableRevenues)
• SpecialLimitationsfromBudgetFormulation
• DirectandGuaranteedLoanAuthority• ContractAuthority
BusinessActor(s) Primary:BudgetOffice;FinanceOffice;ProgramOfficeOther:OfficeofManagementandBudget(OMB);UnitedStatesCongress(Congress)
SynopsisBasedonappropriations,budgetapportionmentsarerequestedandreceived.Anticipatedbudgetaryresourcesfromcollections,reimbursements,andotherincomeareapportionedtotheagencyandbudgetaryresourcesareallottedbytheagencytoorganizationstoprovideservices.Asubsetofspendingauthorityfromoffsettingcollectionsfromreimbursableagreementsisrestricted,allowingthosefundstobeusedonlyforspecificpurposes.Budgetformulationnotesareincludedintheapportionmentthatreflectthislimitation.Budgetarycontrolsareestablishedtoenforcethelimitations.Directandguaranteedloanauthorityisprovidedthroughapprovedborrowingauthorityandapportionmentsthatcanbeallocatedtoappropriatefinancingaccounts,liquidatingaccounts,andprogramaccounts.Tosupportacontractthatmustbeawardedonthefirstdayofthesubsequentfiscalyear,contractauthorityisrequestedandreceivedforthethirdquarterofthebudgetyear.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovidersolutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheagencybudgethasbeenapprovedbyCongressandOMBwithoutenactmentofacontinuingresolution.8. AllloansimpactedbythedirectandguaranteedloanauthorityoccurafterenactmentoftheCreditReformAct.FFMSRIDReference(s) 1.1.2;1.3.1;2.1.1;2.1.2;2.1.3InitiatingEvent Anagencyreceivesitsbudgetapportionmentforthecomingfiscalyear.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 4FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.4SPECIALAUTHORITIESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)1 a. Requestandreceive
apportionmentandTreasuryAppropriationFundSymbol(TAFS),including:a) Spendingauthorityfrom
offsettingcollectionswithnotesonrestrictionofuse
b) Borrowingauthority,financingaccounts,liquidatingaccounts,andprogramaccounts
c) Contractauthorityb. Developbudgetoperating/spend
plancontainingorganizationallotmentsinformation
c. Requestbudgetinformationbeloadedintothefinancialsystem
(BFM.030.010BudgetOperating/SpendPlanDevelopment)
• Treasurywarrants• Restrictionsofuseofoffsettingcollectionsfromsomereimbursableagreements
• OMB-approvedapportionmentsincluding:§ Approvedbudgetauthority
fromoffsettingcollections§ Borrowingauthority,financing
accounts,liquidatingaccounts,andprogramaccounts
§ Contractauthority
• Budgetoperating/spendplanwithTAFSappropriationandapportionmentinformation,organizationallotmentinformation,including:§ Approvedbudgetauthority
fromoffsettingcollectionsrestrictedasspecifiedinbudgetformulationnotes
§ Borrowingauthority,financingaccounts,liquidatingaccounts,andprogramaccounts
§ Contractauthority• Requestforloadingofbudgetinformationintothefinancialsystem
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 5FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.4SPECIALAUTHORITIESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)2 a. Receiveandprocessrequestfor
loadingofbudgetinformationintothefinancialsystem(FFM.010.010BudgetSet-upandMaintenance)
b. Establishbudgetaryresourcereportingattributesandaccountingsegments,includingTAFSandorganization(FFM.010.010BudgetSet-upandMaintenance)
c. Setupthefundscontrolstructureandlevels(FFM.010.020FundsAllocationandControl)
• Budgetoperating/spendplanwithTAFSappropriationandapportionmentinformation,organizationallotmentinformationincluding:§ Approvedbudgetauthority
fromoffsettingcollections§ Borrowingauthority,financing
accounts,liquidatingaccounts,andprogramaccounts
§ Contractauthority• Requestforloadingofbudgetinformationintothefinancialsystem
• Appropriatefundscontrollevelsandaccountingsegmentsestablishedwithreferencetosourceinformation
• Appropriateappropriationandapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriatespendingauthorityandapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriateborrowingauthority,financingaccounts,liquidatingaccountsandprogramaccounts,andapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriatecontractauthorityentrycreatedwithreferencetosourceinformation
• Appropriateallotmentfundingentriescreatedwithreferencetosourceinformation
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(GL)(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 Providebudgetexecution-relatedfinancialmanagementinformation(e.g.,spendplanstatus,obligations)asscheduledorrequested(FFM.110.040FinancialPerformanceandOperationalReporting)
• Periodend• Budgettransactions
• Periodicbudgetexecution-relatedfinancialmanagementinformationwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 6FederalGovernment–unlimitedusagerights. Version:20170630
UseCase1.5ContinuingResolution(L1)End-to-EndBusinessProcess:1BudgetFormulation-to-ExecutionBusinessScenario(s)Covered
• ContinuingResolution
BusinessActor(s) Primary:BudgetOffice;FinanceOfficeOther:OfficeofManagementandBudget(OMB);UnitedStatesCongress(Congress)
SynopsisAContinuingResolution(CR-1)isenactedatthebeginningofthefiscalyearandthebudgetissetupaccordingtoCR-1apportionments.TheapprovedbudgetisnotinplacewhenCR-1expiresandasecondCR(CR-2)isenacted.ThebudgetissetupreflectingCR-2apportionments.ThebudgetisapprovedbeforeCR-2expires.OMBapportionmentsarerequestedandreceived.Appropriationwarrants,ifany,arereceived.Budgetset-upiscompleted.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. OMBissuesabulletintoapportionfundsavailableundertheCRs.8. NoexceptionstotheissuedOMBCRbulletins/guidanceisrequestedbytheagency.9. TheagencyreceivesnoTreasurywarrantsfortheCRs.10. Careisexercisedindeterminingwhichobligationsandexpenditurestomake(e.g.,continuationofITsecurityservicesforcriticalfinancialsystems)andno
newprogramsarestarted.FundsavailabilitychecksaremadetoensureobligationsandexpendituresdonotexceedtheamountavailableundertheCRs.Awarddocumentsaremarked“subjecttoavailabilityoffunds.”
11. ImpactofincrementalCRfundingisshowninaseparateRequest-to-Procureprocess.FundsavailabilitychecksaremadeforinvoicespaidduringtheCR.12. AgencyapportionmentsfromthebudgetpassedbyCongressaresufficienttocoverobligationsandspendingincurredduringtheCRs.FFMSRIDReference(s) 1.1.2;2.1.1;2.1.2;2.1.3InitiatingEvent AnewfiscalyearbeginsbeforeaCongressionallyapprovedbudgetissignedbythePresident.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 7FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
1 a. DevelopCR-1budgetoperating/spendplancontainingTreasuryAppropriationFundSymbol(TAFS)andProgram/Project/Activity(PPA)apportionmentinformationandorganizationallotmentandallocationinformation
b. RequestloadingofCR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
(BFM.030.010BudgetOperating/SpendPlanDevelopment)
• FundingauthorityfromCongressionalCR-1
• OMBCR-1apportionmentmemo
• CR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• RequestforloadingofCR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformationintothefinancialsystem
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 8FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
2 a. Receiveandprocessrequestforloadingofbudgetinformationintothefinancialsystem(FFM.010.010BudgetSet-upandMaintenance)
b. Establishbudgetaryresourcereportingattributesandaccountingsegments,includingTAFS/PPAandorganization(FFM.010.010BudgetSet-upandMaintenance)
c. Setupthefundscontrolstructureandlevels(FFM.010.020FundsAllocationandControl)
• CR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• RequestforloadingofCR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformationintothefinancialsystem
• LoadedCR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• AppropriateCR-1fundscontrollevelsandaccountingsegmentsestablishedwithreferencetosourceinformation
• Appropriateapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriateallotmentandallocationfundingentriescreatedwithreferencetosourceinformation
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 Requestinformationoncurrentyearspending(BFM.030.020BudgetOperating/SpendPlanMonitoringandAdjustment)
• LoadedCR-1budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• Requestforinformationoncurrentyearspending
5 Receiveandprocessrequestforinformationoncurrentyearspendandstatus(FFM.010.030BudgetaryReporting)
• Requestforinformationoncurrentyearspending
• Informationoncurrentyearspending
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 9FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
6 Monitorbudget/operatingspendplananddetermineneedforadjustment(BFM.030.020BudgetOperating/SpendPlanMonitoringandAdjustment)
• Informationoncurrentyearfunding
• Requestforadjustmenttooperating/spendplan,ifany
7 Receiveandprocessrequestforadjustmenttobudget/operatingspendplan,ifany(FFM.010.010BudgetSet-upandMaintenance)
• Requestforadjustmenttooperating/spendplan,ifany
• Appropriatebudgetset-upupdateentrieswithreferencetosourceinformation
8 a. DevelopCR-2budgetoperating/spendplancontainingTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
b. RequestloadingofCR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
(BFM.030.010BudgetOperating/SpendPlanDevelopment)
• FundingauthorityfromCongressionalCR-2
• OMBCR-2apportionmentmemo
• CR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• RequestforloadingofincrementalCR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 10FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
9 a. ReceiveandprocessrequestforloadingofCR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation(FFM.010.010BudgetSet-upandMaintenance)
b. Establishbudgetaryresourcereportingattributesandaccountingsegments,includingTAFS/PPAandorganization(FFM.010.010BudgetSet-upandMaintenance)
c. Setupthefundscontrolstructureandlevels(FFM.010.020FundsAllocationandControl)
• CR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• RequestforloadingofincrementalCR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• LoadedCR-2incrementalbudgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• AppropriateCR-2fundscontrollevelsandaccountingsegmentsestablished
• Appropriateincrementalapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriateincrementalallotmentandallocationfundingentriescreatedwithreferencetosourceinformation
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
11 Requestinformationoncurrentyearspending(BFM.030.020BudgetOperating/SpendPlanMonitoringandAdjustment)
• LoadedCR-2budgetoperating/spendplanwithTAFS/PPAapportionmentinformationandorganizationallotmentandallocationinformation
• Requestforinformationoncurrentyearspending
12 Receiveandprocessrequestforinformationoncurrentyearspendandstatus(FFM.010.030BudgetaryReporting)
• Requestforinformationoncurrentyearspending
• Informationoncurrentyearspending
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 11FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
13 Monitorbudget/operatingspendplananddetermineneedforadjustment(BFM.030.020BudgetOperating/SpendPlanMonitoringandAdjustment)
• Informationoncurrentyearfunding
• Requestforadjustmenttooperating/spendplan,ifany
14 Receiveandprocessrequestforadjustmenttobudget/operatingspendplan,ifany(FFM.010.010BudgetSet-upandMaintenance)
• Requestforadjustmenttooperating/spendplan,ifany
• Appropriatebudgetset-upupdateentrieswithreferencetosourceinformation
15 a. RequestandreceivefromOMBapprovedbudgetappropriationsandapportionmentforeachTAFS/PPA/FYQuarter
b. Developbudgetoperating/spendplancontainingTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
c. Requestloadingofbudgetoperating/spendplanwithTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
(BFM.030.010BudgetOperating/SpendPlanDevelopment)
• Enactedappropriationsbill• Appropriationwarrants(ifany)• OMB-approvedapportionments
• Incrementalbudgetoperating/spendplancontainingTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
• Requestforloadingofincrementalbudgetoperating/spendplanwithTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 12FederalGovernment–unlimitedusagerights. Version:20170630
USECASE1.5CONTINUINGRESOLUTIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
16 a. Receiveandprocessrequestforloadingofincrementalbudgetoperating/spendplanintothefinancialsystem(FFM.010.010BudgetSet-upandMaintenance)
b. Establishbudgetaryresourcereportingattributesandaccountingsegments,includingTAFS/PPA/FYQuarterandorganization(FFM.010.010BudgetSet-upandMaintenance)
c. Setupthefundscontrolstructureandlevels(FFM.010.020FundsAllocationandControl)
• Incrementalbudgetoperating/spendplancontainingTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
• Requestforloadingofincrementalbudgetoperating/spendplanwithTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
• Loadedincrementalbudgetoperating/spendplancontainingTAFS/PPA/FYQuarterappropriationandapportionmentinformationandorganizationallotmentandallocationinformation
• Appropriatefundscontrollevelsandaccountingsegmentsestablished
• Appropriateappropriationandincrementalapportionmentfundingentriescreatedwithreferencetosourceinformation
• Appropriateincrementalallotmentandallocationfundingentriescreatedwithreferencetosourceinformation
17 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 13FederalGovernment–unlimitedusagerights. Version:20170630
2Acquire-to-DisposeUseCase2.4RealProperty:StewardshipLand,HeritageAssets,Construction,andImpairment(L3)End-to-EndBusinessProcess:2Acquire-to-DisposeBusinessScenario(s)Covered
• HeritageAssets• StewardshipLand• ConstructioninProgress• CapitalizationofLaborCosts
• EnvironmentalHazardousSubstanceson/inProperty• Impairment• ConstructioninAbeyance
BusinessActor(s) Primary:PropertyManagementOffice;FinanceOffice;ProcurementOfficeOther:
SynopsisApprovaltoconstructanadditionalstructure(e.g.,giftshop)onstewardshiplandcontainingaheritageassetisreceived.Sitepreparationcostsfortheadditionalstructureareincludedascostsforthestewardshipland.Thecostofconstructioniscapitalizedasworkprogressesandinvoicesarereceived.Thecostofgovernmentlaborformanagingconstructioniscapitalizedaspartoftheoverallcostoftheadditionalstructure.Hazardoussubstancesarefoundonthepropertyduringconstruction.Astopworkorderisissued,andafterevaluationofthehazard,theconstructionisplacedinabeyance.Theassetvalueoftheincompletestructureisimpairedbecausetheassetcannotbeused.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. Theheritageassetisnotamulti-useheritageasset.8. Theconstructionvendorisproperlyregisteredingovernmentsystems,therelevantpayeeinformationhasbeensetupintheFMsystem,andinvoicesare
submittedelectronically.9. Attemptstohavethepreviousownerremediatethehazardoussubstancehavefailed.10. Thehazardoussubstanceprohibitscontinuationofconstructionandpreventsstructurefrombeingusedforitsintendedpurpose.11. Contractterminationactivitiestoplaceconstructioninabeyanceareproperlyexecutedbutarenotincludedaseventsinthisusecase.FFMSRIDReference(s) 1.1.2;1.1.3;2.1.1;2.1.2;2.2.1;2.2.2InitiatingEvent Thedecisiontodevelopanadditionalstructureonstewardshiplandcontainingaheritageassetismade.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 14FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. Developspecificationsforconstructionofadditionalstructure(PRM.020.020PropertySpaceDesignandConstruction)
b. Prepareandsubmitpurchaserequestforconstructionofadditionalstructure(ACQ.020.010ProcurementRequest(PR)Processing)
c. Requestfundsavailabilitycheck(ACQ.020.010ProcurementRequest(PR)Processing)
• Propertytitle• Additionalstructurefunctionalneeds
• Specificationsforconstructionofadditionalstructure
• Submittedpurchaserequestforconstructionofadditionalstructure
• Requestforfundsavailabilitycheck
2 Receiveandprocessrequestforstatusoffundsavailability(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck • Fundsavailabilityresponse
3 Approvepurchaserequest(ACQ.020.010ProcurementRequest(PR)Processing)
• Fundsavailabilityresponse• Submittedpurchaserequestforconstructionofadditionalstructure
• Approvedpurchaserequestforconstructionofadditionalstructure
4 Receiveapprovedpurchaserequestforconstructionofadditionalstructureandcommitfunds(FFM.030.020ObligationManagement)
• Approvedpurchaserequestforconstructionofadditionalstructure
• Appropriatecommitmententrycreatedwithreferencetosourceinformation
5 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 15FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
6 a. Developrequestforquote(RFQ)forconstructionofadditionalstructure(ACQ.020.080SolicitationDocumentationDevelopment)
b. IssueRFQ(ACQ.020.100SolicitationIssuance)
c. Receivevendors’responsestoRFQandevaluateresponses(ACQ.030.010ProposalEvaluation)
d. Selectavendor(ACQ.030.060AwardDecision)
e. Developpurchaseorderforthatvendorforconstructionofadditionalstructure(ACQ.030.070ContractAwardIssuance)
f. Requestfundsavailabilitycheck(ACQ.030.070ContractAwardIssuance)
• Specificationsforconstructionofadditionalstructure
• Approvedpurchaserequestforconstructionofadditionalstructure
• Approvedacquisitionschedule• VendorresponsestoRFQ
• RFQ• Selectedvendor• Purchaseorderinformationforconstructionofadditionalstructure
• Requestforfundsavailabilitycheck
7 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck • Fundsavailabilityresponse
8 Approveandissuepurchaseorderforconstructionofadditionalstructure(ACQ.030.070ContractAwardIssuance)
• Purchaseorderinformationforconstructionofadditionalstructure
• Fundsavailabilityresponse
• Approvedpurchaseorderforconstructionofadditionalstructure
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 16FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
9 Receiveapprovedpurchaseorderinformation,obligatefunds,andliquidatecommitment(FFM.030.020ObligationManagement)
• Approvedpurchaseorderforconstructionofadditionalstructure
• Appropriateobligationentrycreatedwithreferencetosourceinformation
• Appropriatecommitmentliquidationentrycreatedwithreferencetosourceinformation
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
11 a. ReceivevendorinvoiceinformationforsitepreparationcostsinanOMB-approvedelectronicinvoicingsolution
b. Providenotificationofvendorinvoicesubmissionforreviewandacceptanceofvendorinvoiceforsitepreparationcosts(ACQ.040.030DocumentationofDelivery/Acceptance)
• Vendorinvoiceforsitepreparationcosts
• Receivingreport• Approvedpurchaseorderforconstructionofadditionalstructure
• Notificationofvendorinvoicesubmission
• Acceptedvendorinvoiceforsitepreparationcosts
12 ReceiveandprocessacceptedvendorinvoiceforsitepreparationcostsfromOMB-approvedelectronicinvoicingsolutionandperformathree-waymatch(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedvendorinvoiceforsitepreparationcosts
• Receivingreport• Approvedpurchaseorder
• Successfulthree-waymatch• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Validatedvendorinvoiceforsitepreparationcosts
13 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedvendorinvoiceforsitepreparationcosts
• Requestforfundsavailabilitycheck
14 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck • Fundsavailabilityresponse
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 17FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
15 a. Approvevendorinvoiceforsitepreparationcosts
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedvendorinvoiceforsitepreparationcosts
• Approvedvendorinvoiceforsitepreparationcosts
• Requestfordisbursement
16 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedvendorinvoiceforsitepreparationcosts
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
17 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 18FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
18 a. Adjustedcostforstewardshiplandinformationtoreflectsitepreparation(PRM.010.050PropertyValuation)
b. Requestprocessingofstewardshiplandassetinformation(PRM.010.070PropertyAcquisitionandControlReporting)
• Stewardshiplandassetinformation• Currentstewardshiplandpropertyrecord
• Sitepreparationcosts
• Stewardshiplandassetinformation• Adjustmentstostewardshiplandassetdescription
• Updatedpropertyrecordforstewardshipland
• Requesttoprocessupdatedstewardshiplandassetinformation
19 Receiveandprocessupdatedstewardshiplandassetinformation(FFM.020.030FinancialAssetInformationProcessing-HeritageAssetsandStewardshipLand)
• Requesttoprocessupdatedstewardshiplandassetinformation
• Appropriateentriesforstewardshiplandassetinformationupdatedwithreferencetosourceinformation
20 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 19FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
21 a. Determinecapitalizationofconstructioncostsandgovernmentlaborcostsforconstructionmanagement(PRM.010.050PropertyValuation)
b. Determineassetvalueofwork-in-progressconstructionassetforadditionalstructure(PRM.010.050PropertyValuation)
c. Establishpropertyrecordforwork-in-progressconstructionassetforadditionalstructure(PRM.010.060PropertyControlandAccountability)
d. Requestestablishmentofwork-in-progressconstructionassetinformationforadditionalstructure(PRM.010.070PropertyAcquisitionandControlReporting)
• Approvedpurchaseorderforconstructionofadditionalstructure
• Estimatedgovernmentlaborcostsforconstructionmanagement
• Capitalizedconstructioncostsandconstructionmanagementlaborcostsfortheadditionalstructure
• Assetvalueofwork-in-progressconstructionassetforadditionalstructure
• Work-in-progressconstructionassetpropertyrecordforadditionalstructure
• Requesttoestablishwork-in-progressconstructionassetinformationforadditionalstructure
22 Receiveandprocessrequesttoestablishwork-in-progressconstructionassetinformationforadditionalstructure(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Requesttoestablishwork-in-progressconstructionassetinformationforadditionalstructure
• Appropriateentriesforwork-in-progressconstructionassetinformationforadditionalstructurecreatedwithreferencetosourceinformation
23 Postappropriatebudgetary,proprietaryandmemorandumentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 20FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
24 a. ReceivemonthlyvendorinvoiceinformationforconstructioncostsinanOMB-approvedelectronicinvoicingsolution
b. Providenotificationofmonthlyvendorinvoicesubmissionforreviewandacceptanceofvendorinvoiceforconstructioncosts
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Monthlyvendorinvoiceforconstructioncosts
• Receivingreport• Approvedpurchaseorderforconstructionofadditionalstructure
• Notificationofmonthlyvendorinvoicesubmission
• Acceptedmonthlyvendorinvoiceforconstructioncosts
25 a. ReceiveacceptedmonthlyvendorinvoiceforconstructioncostsfromOMB-approvedelectronicinvoicingsolutionandperformathree-waymatch(FFM.030.070PaymentProcessing-CommercialPayments)
b. Revaluework-in-progressconstructionassetinformation(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Acceptedmonthlyvendorinvoiceforconstructioncosts
• Receivingreport• Approvedpurchaseorderforconstructionofadditionalstructure
• Successfulthree-waymatch• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Appropriatework-in-progressconstructionassetinformationforadditionalstructureentrycreatedwithreferencetosourceinformation
• Validatedmonthlyvendorinvoiceforconstructioncosts
26 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedmonthlyvendorinvoiceforconstructioncosts
• Requestforfundsavailabilitycheck
27 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck • Fundsavailabilityresponse
28 a. Approvemonthlyvendorinvoiceforconstructioncosts
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedvendorinvoiceforconstructioncosts
• Approvedmonthlyvendorinvoiceforconstructioncosts
• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 21FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
29 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedmonthlyvendorinvoiceforconstructioncosts
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
30 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 22FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
31 a. Hazardoussubstancesarediscoveredonthepropertyandahazardsubstancereportisprepared.(ProgramMissionActivity)
b. Modifycontracttostopworkduetohazardousmaterials(ACQ.040.040ContractModification)
c. Requestdeobligationofremainingcontractfunds(ACQ.040.040ContractModification)
d. Completeanassetimpairmentreview(ProgramMissionActivity)
• Discoveryofhazardousmaterialsonconstructionsite
• Hazardsubstancesreport• Stopworkordercontractmodification
• Requestfordeobligationofremainingcontractfunds
• Assetimpairmentreview
32 Receiveandprocessrequestfordeobligationofremainingcontractfunds(FFM.030.020ObligationManagement)
• Requestfordeobligationofremainingcontractfunds
• Appropriatedeobligationentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 23FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
33 a. Requestvendorsubmitfinalinvoice(ACQ.040.040ContractModification)
b. ReceivefinalvendorinvoiceinformationinanOMB-approvedelectronicinvoicingsolution(ACQ.040.030DocumentationofDelivery/Acceptance)
c. Providenotificationofvendorfinalinvoicesubmissionforreviewandacceptanceoffinalvendorinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
• Finalvendorinvoice• Receivingreport• Approvedpurchaseorderforadditionalstructure
• Requestforsubmissionoffinalvendorinvoice
• Notificationofvendorfinalinvoicesubmission
• Acceptedfinalvendorinvoice
34 ReceiveacceptedfinalvendorinvoicefromOMB-approvedelectronicinvoicingsolutionandperformathree-waymatch(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedfinalvendorinvoice• Receivingreport• Approvedmodifiedpurchaseorderforadditionalstructure
• Successfulthree-waymatch• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Validatedfinalvendorinvoice
35 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedfinalvendorinvoice • Requestforfundsavailabilitycheck
36 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck • Fundsavailabilityresponse
37 a. Approvefinalvendorinvoiceb. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedfinalvendorinvoice
• Approvedfinalvendorinvoice• Requestfordisbursementforfinalinvoiceanddeobligationofremainingbalanceofpurchaseorder
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 24FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
38 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligationforamountoffinalinvoiceanddeobligatebalanceoriginallyobligatedbythepurchaseorder(FFM.030.020ObligationManagement)
c. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursementforfinalinvoiceanddeobligationofremainingbalanceofpurchaseorder
• Approvedfinalvendorinvoice
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentriescreatedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
39 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 25FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
40 a. Determineassetvalueforpartiallycompletedstructureduetoconstructionabeyance(PRM.010.050PropertyValuation)
b. Updatepropertyrecord,ifneeded,foradditionalstructureassettoreflectrevaluationfrompartialcompletion(PRM.010.060PropertyControlandAccountability)
c. Requestprocessingofrevisedassetinformationandwriteoffofdifferencebetweenpriorandimpairedassetvalueforadditionalstructure,ifadifferenceexists(PRM.010.070PropertyAcquisitionandControlReporting)
• Work-in-progressconstructionassetinformation
• Currentpropertyrecord
• Revisedassetvaluationforpartiallycompletedstructure
• Updatedpropertyrecordforadditionalstructureassettoreflectrevaluationfrompartialcompletion
• Requesttoprocessrevisedassetinformationandwriteoffofdifferencebetweenpriorandimpairedassetvalueforadditionalstructure
41 Receiveandprocessrevisedassetinformationandwriteoffofdifferencebetweenpriorandimpairedassetvalueforadditionalstructure(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Requesttoprocessrevisedassetinformationandwriteoffofdifferencebetweenpriorandimpairedassetvalueforadditionalstructure
• Appropriatepropertyassetentriesupdatedwithreferencetosourceinformation
• Appropriatelossentrycreatedwithreferencetosourceinformation
42 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 26FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.4REALPROPERTY:STEWARDSHIPLAND,HERITAGEASSETS,CONSTRUCTION,ANDIMPAIRMENTTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
43 a. Updatepropertyrecordsforstewardshiplandandheritageassettoreflectimpairmentofnewconstruction(PRM.010.060PropertyControlandAccountability)
b. Requestcaptureofupdatedstewardshiplandandheritageassetinformation(PRM.010.070PropertyAcquisitionandControlReporting)
• Propertytitle• Assetimpairmentreview• Stewardshiplandandheritageassetinformation
• Currentpropertyrecord
• Revisedstewardshiplandandheritageassetdescription
• Updatedpropertyrecordsforstewardshiplandandheritageasset
• Requesttocapturestewardshiplandandheritageassetinformation
44 Receiveandprocessrequesttocapturestewardshiplandandheritageassetinformation(FFM.020.030FinancialAssetInformationProcessing-HeritageAssetsandStewardshipLand)
• Requesttocapturestewardshiplandandheritageassetinformation
• Appropriateentriesforstewardshiplandandheritageassetinformationupdatedwithreferencetosourceinformation
45 Postappropriatebudgetary,proprietaryandmemorandumentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 27FederalGovernment–unlimitedusagerights. Version:20170630
UseCase2.5LeaseholdImprovements(L2)End-to-EndBusinessProcess:2Acquire-to-DisposeBusinessScenario(s)Covered
• LeaseholdImprovement
BusinessActor(s) Primary:PropertyManagementOffice;FinanceOffice;PrivateEntityLessor(PEL)Other:
SynopsisApropertyownedbyaPELhasbeenleasedbyagovernmentagencyforafive-yearterm.Afteroccupyingtheproperty,leaseholdimprovementsaremadeandpaidforbytheagency.Theleaseholdimprovementsaredeterminedtohaveausefullifeoftenyears,butareamortizedbasedontheremainingleaseperiod(4years).Theleaseisendedasagreedattheendoftheleaseperiod,andtheleaseholdimprovementsreverttothePEL.
AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheleasecontractrequiredtoleasethepropertyhasbeenexecutedunderpreviousRequest-to-ProcureandProcure-to-Payprocesses.8. MonthlypaymentsrelatedtotheleasearemadeundertheseparateProcure-to-Payprocess.9. Apropertyrecordhasalreadybeenestablishedfortheleasedproperty.10. Theleaseholdimprovementstobemadehavebeenidentified,andthevendorhasbeenselectedthroughapreviousRequesttoProcureprocess.11. ApurchaseorderhasbeenissuedfortheleaseholdimprovementsinapreviousRequest-to-Procureprocess.12. Theleaseholdimprovementsexceedthecapitalizationthresholdandarecompletedbytheendofthefirstyearofthelease.13. Thevendorperformingleaseholdimprovementshasbeenproperlyregisteredingovernmentsystems,therelevantpayeeinformationhasbeensetupinthe
FMsystem,andtheinvoiceissubmittedelectronically.FFMSRIDReference(s) 1.1.2;1.1.3;2.1.1;2.1.2;2.2.1;2.2.2InitiatingEvent Improvementstotheleasedpropertyhavebeencompleted.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 28FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. ReceivevendorinvoiceinformationforleaseholdimprovementsinanOMB-approvedelectronicinvoicingsolution(ACQ.040.030DocumentationofDelivery/Acceptance)
b. Providenotificationofvendorinvoicesubmissionforreviewandacceptanceofvendorinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
c. Validatethatleaseholdimprovementshavebeencompletedinaccordancewithcontract(PRM.020.020PropertySpaceDesignandConstructionManagement)
d. Requestprocessingofreceiptandacceptanceofleaseholdimprovements(ACQ.040.030DocumentationofDelivery/Acceptance)
e. Requestprocessingandmatchingofacceptedvendorinvoice(ProgramManagementActivity)
• Leaseholdimprovementdocumentation
• Finalvendorinvoiceforleaseholdimprovements
• Receivingreport• Approvedpurchaseorderforleaseholdimprovements
• Notificationofvendorinvoicesubmission
• Acceptedvendorinvoiceforleaseholdimprovements
• Receivingreport• Acceptancereport• Requestforprocessingandmatchingofacceptedvendorinvoice
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 29FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
2 Receiveandprocessrequestforprocessingandmatchingofacceptedvendorinvoiceandperformathree-waymatch(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedvendorinvoiceforleaseholdimprovements
• Receivingreport• Acceptancereport• Requestforprocessingandmatchingofacceptedvendorinvoice
• Successfulthree-waymatch• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Validatedvendorinvoiceforleaseholdimprovements
3 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedvendorinvoiceforleaseholdimprovements
• Requestforfundsavailabilitycheck
4 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
5 a. Approvevendorinvoiceforleaseholdimprovements
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedvendorinvoiceforleaseholdimprovements
• Approvedvendorinvoiceforleaseholdimprovements
• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 30FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
6 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedvendorinvoiceforleaseholdimprovements
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
7 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 31FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
8 a. Determinethebeneficialoccupancydate(PRM.010.070PropertyAcquisitionandControlReporting)
b. Determineusefullifeandvalueofleaseholdimprovements(PRM.010.050PropertyValuation)
c. Determineamortizationscheduleofleaseholdimprovements(PRM.010.050PropertyValuation)
d. Updatepropertyrecordtoreflectimprovements(PRM.010.060PropertyControlandAccountability)
e. Requestupdateofassetinformationandamortizationscheduleforleaseholdimprovements(PRM.010.070PropertyAcquisitionandControlReporting)
• Approvedpurchaseorderforleaseholdimprovements
• Vendorinvoiceforimprovements• Currentpropertyrecord
• Usefullifeofleaseholdimprovements
• BeneficialOccupancyDate• Assetvalueinformationforleaseholdimprovements
• Amortizationscheduleforleaseholdimprovements
• Updatedpropertyrecord• Requesttoupdateassetinformationandamortizationscheduleforleaseholdimprovements
9 Receiveandprocessrequesttoupdateassetinformationandamortizationscheduleforleaseholdimprovements(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Requesttoupdateassetinformationandamortizationscheduleforleaseholdimprovements
• Updatedpropertyrecord
• Appropriatepropertyassetinformationentriescreatedwithreferencetosourceinformation
• Appropriateassetamortizationentriescreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 32FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
11 Processannualamortizationofleaseholdimprovements(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Amortizationscheduleforleaseholdimprovements
• Appropriateassetamortizationentriescreatedwithreferencetosourceinformation
12 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 33FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.5LEASEHOLDIMPROVEMENTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
13 a. Documentdecisionnottorenewleaseandretireproperty(PRM.010.040PropertyTransfer,Disposal,orRetirement)
b. Validatethatleaseholdimprovementshavebeencompletelyamortized(PRM.010.050PropertyValuation)
c. Updatepropertyrecordtoreflectendofleaseandretiringofleaseholdimprovements(PRM.010.060PropertyControlandAccountability)
d. Requestupdateofassetinformationtoreflectretirement,includingcompletedamortization(PRM.010.070PropertyAcquisitionandControlReporting)
• Leaseagreement• Assetinformationforleaseholdimprovements
• Amortizationscheduleforleaseholdimprovements
• Currentpropertyrecord
• Documentationnottorenewlease• Assetretirementinformationforleaseholdimprovements
• Accruedamortizationforleaseholdimprovements
• Updatedpropertyrecord• Requesttoupdateassetinformationtoreflectretirementandzeroamortizationvalue
14 Receiveandprocessrequesttoupdateassetinformationtoreflectretirementandzeroremainingamortizationforleaseholdimprovements(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Requesttoupdateassetinformationtoreflectretirementandzeroamortizationvalue
• Appropriatepropertyassetentriesupdatedwithreferencetosourceinformation
• Appropriateamortizationentrycreatedwithreferencetosourceinformation
15 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 34FederalGovernment–unlimitedusagerights. Version:20170630
UseCase2.7BulkPurchaseImmediatelyDistributed(L1)End-to-EndBusinessProcess:2Acquire-to-DisposeBusinessScenario(s)Covered
• BulkPurchaseImmediatelyDistributed
BusinessActor(s) Primary:PropertyManagementOffice;FinanceOffice;InformationTechnology(IT)OfficeOther:ProgramOffices
SynopsisAbulkpurchaseofdesktopCommercialOfftheShelf(COTS)softwareisreceived.AllthesoftwareisimmediatelydistributedtoProgramOffices,andthepropertyrecordisestablishedwiththeProgramOfficesascustodianswiththeirlocations.TheexpenseofthesoftwareisdistributedtotheProgramOffices.AssumptionsandDependencies
1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. ThepropertywasacquiredbytheITOfficeinapreviousRequest-to-Procurebusinessprocess.8. Thesoftwareandlicenseswerereceived,recordedinthepropertymanagementsystemanddistributed.9. PP&Ehasausefullifeexceedingtwoyearsandisrecordedandtrackedinthepropertymanagementsystem.10. Thetotalcostofthebulkpurchasedoesnotmeettheagencythresholdforcapitalization.11. Costallocationbylocationisunavailablefordirectchargingattimeofacquisition,requiringpostacquisitioncostdistributionprocess.FFMSRIDReference(s) 1.1.2;1.1.3InitiatingEvent AFederalagencyITOfficereceivesabulkpurchasethatisimmediatelydistributedtovariousProgramOffices.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 35FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.7BULKPURCHASEIMMEDIATELYDISTRIBUTEDTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. Acquirephysicalcontrolofthesoftware(PRM.010.010PropertyAcquisition/Receipt)
b. Determinepropertyvalueandotherpropertyinformation(PRM.010.050PropertyValuation)
c. TransfersoftwaretoProgramOffices(PRM.010.040PropertyTransfer,Disposal,orRetirement)
d. Establishpropertyrecordsincludingcustodian,locationandvalue(PRM.010.060PropertyControlandAccountability)
e. Establishsoftwarelicenserecord(ITS.100.040SoftwareLicenseManagement)
f. RequestexpenseinformationbeupdatedtoreflectdistributionoftheexpensetotheProgramOffice(PRM.010.070PropertyAcquisitionandControlReporting)
• Softwarereceipt• Softwarecost• ListofProgramOfficestoreceivesoftware
• Softwareassetinformation
• Propertyvaluation• Propertyinformation• Propertyrecord• Softwareassetinthepropertymanagementsystem
• RequesttoupdateexpenseinformationtoreflectdistributiontotheProgramOffice
2 ReceiveandprocessrequesttoupdateexpenseinformationtoreflectdistributiontotheProgramOffices(FFM.030.070PaymentProcessing–CommercialPayments)
• RequesttoupdateexpenseinformationtoreflectdistributiontotheProgramOffice
• Appropriateexpenseadjustmententriescreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 36FederalGovernment–unlimitedusagerights. Version:20170630
USECASE2.7BULKPURCHASEIMMEDIATELYDISTRIBUTEDTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 37FederalGovernment–unlimitedusagerights. Version:20170630
3Request-to-Procure
UseCase3.4ProcurementDuringContinuingResolution(L1)End-to-EndBusinessProcess:3Request-to-ProcureBusinessScenario(s)Covered
• ProcurementDuringaContinuingResolutiononProcurement BusinessActor(s) Primary:ProcurementOffice;FinanceOffice
Other:Vendor,ProgramOfficeSynopsisArequestforthepurchaseofservices(e.g.,continuationofITsecurityservicesforcriticalfinancialsystems)issubmittedduringaContinuingResolution(CR-1).ThepurchaseorderisissuedassubjecttoavailabilityoffundsandonlyfundsallocatedinCR-1areobligated.CR-1endswithoutanapprovedbudgetandasecondCR(CR-2)isissued.ThepurchaseorderismodifiedandtheobligatedfundsareincreasedbythoseauthorizedbyCR-2lesstheamountpreviouslyobligatedinCR-1.AnapprovedbudgetisissuedattheendofCR-2.ThepurchaseorderismodifiedandfundsobligatedareincreasedbythoseauthorizedforthefiscalyearlesstheamountpreviouslyobligatedinCR-1andCR-2.FundsavailabilitychecksareperformedtoensureobligatedamountsdonotexceedtheamountsauthorizedbyCR-1,CR-2,orthebudgetyearduringeachperiodrespectively.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TherearetwoCRsandfundingislimitedtotheamountmadeavailableundertheCRs.8. Fundsarenewobligationsandno“no-year”fundingisavailable.9. DuringtheCRs,nonewprogramsarestarted.10. Thepurchaseorderisforcontinuationofaprograminitiatedinapriorfiscalyear.11. Whenthefinalbudgetisapproved,therearesufficientfundstocoverobligationsincurredduringtheCRs.12. TheAgencyhaspurchasedfromthevendorbeforeandthevendorhasalreadybeensetupintheFMsystem.13. ThepurchaserequestincludesallnecessaryinformationforcompletingfundscontrolchecksduringandsubsequenttoCR-1andCR-2.FFMSRIDReference(s) 1.1.2;2.1.2;2.2.1InitiatingEvent DuringCR-1,arequestisreceivedtoissueaPOtocontinueservices.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 38FederalGovernment–unlimitedusagerights. Version:20170630
USECASE3.4PROCUREMENTDURINGCONTINUINGRESOLUTIONTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. Receiveandprocessapurchaserequestforservices(ACQ.020.010ProcurementRequest(PR)Processing)
b. Requestfundsavailabilitycheck(ACQ.020.010ProcurementRequest(PR)Processing)
• Requirements/specificationsfortheservices
• Submittedpurchaserequest• Requestforfundsavailabilitycheck
2 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse-onlyCR-1authorizedfundsavailable
3 Approvepurchaserequestsubjecttoavailabilityoffunds(ACQ.020.010ProcurementRequest(PR)Processing)
• Fundsavailabilityresponse-onlyCR-1authorizedfundsavailable
• Submittedpurchaserequest
• Approvedpurchaserequestsubjecttoavailabilityoffunds
4 Receiveapprovedpurchaserequestandcommitfundsavailable(FFM.030.020ObligationManagement)
• Approvedpurchaserequestsubjecttoavailabilityoffunds
• Appropriatecommitmententrycreatedwithreferencetosourceinformation
5 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 39FederalGovernment–unlimitedusagerights. Version:20170630
USECASE3.4PROCUREMENTDURINGCONTINUINGRESOLUTIONTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
6 a. Developandpublisharequestforquote(RFQ)subjecttoavailabilityoffunds(ACQ.020.080SolicitationDocumentationDevelopment)
b. Receivevendors’responsestoRFQandevaluateresponses(ACQ.030.010ProposalEvaluation)
c. Selectavendor(ACQ.030.060AwardDecision)
d. Developpurchaseorderforthatvendorsubjecttoavailabilityoffunds(ACQ.030.070ContractAwardIssuance)
e. Requestfundsavailabilitycheck(ACQ.030.070ContractAwardIssuance)
• Approvedpurchaserequestsubjecttoavailabilityoffunds
• Approvedacquisitionschedule• VendorresponsestoRFQ
• RFQ• IssuedRFQ• VendorResponses• Selectedvendor• Purchaseorderinformation• Requestforfundsavailabilitycheck
7 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Purchaseorderinformation
• Fundsavailabilityresponse—onlyCR-1authorizedfundsavailable
8 Approveandissuepurchaseordersubjecttoavailabilityoffunds(ACQ.030.070ContractAwardIssuance)
• Purchaseorderinformation• Fundsavailabilityresponse
• Approvedpurchaseorder
9 Receiveapprovedpurchaseorderinformation,obligatefundsauthorizedbyCR-1,andliquidatecommitment(FFM.030.020ObligationManagement)
• Approvedpurchaseordersubjecttoavailabilityoffunds
• Appropriatecommitmentliquidationentrycreatedwithreferencetosourceinformation
• Appropriateobligationentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 40FederalGovernment–unlimitedusagerights. Version:20170630
USECASE3.4PROCUREMENTDURINGCONTINUINGRESOLUTIONTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
11 a. ModifypurchaseorderwithadditionalfundsmadeavailableduringCR-2,subjecttoavailabilityoffunds(ACQ.040.040ContractModification)
b. Requestfundsavailabilitycheck(ACQ.040.040ContractModification)
• AdditionalspendingauthorityfromCR-2
• Purchaseorder
• Requestforfundsavailabilitycheck.
• Modifiedpurchaseorder
12 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Modifiedpurchaseorderinformation
• Fundsavailabilityresponse—onlyCR-2authorizedfunds,asadjustedbyCR-1Obligations,available
13 Approvepurchaseordermodification(ACQ.040.040ContractModification)
• Fundsavailabilityresponse—onlyCR-2authorizedfunds,asadjustedbyCR-1obligations,available
• Approved,modifiedpurchaseorder
14 a. Receiveapproved,modifiedpurchaseorder(FFM.030.020ObligationManagement)
b. ObligateadditionalfundstoasauthorizedbyCR-2(FFM.030.020ObligationManagement)
• Approved,modifiedpurchaseordersubjecttoavailabilityoffunds
• Appropriateobligationentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 41FederalGovernment–unlimitedusagerights. Version:20170630
USECASE3.4PROCUREMENTDURINGCONTINUINGRESOLUTIONTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
15 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
16 a. Modifypurchaseordertoreflectadditionalfundsmadeavailablebyapprovedbudget(ACQ.040.040ContractModification)
b. Requestfundsavailabilitycheck(ACQ.040.040ContractModification)
• Additionalspendingauthorityfromapprovedbudget
• Modifiedpurchaseorder
• Requestforfundsavailabilitycheck.
• Modifiedpurchaseorder
17 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Modifiedpurchaseorderinformation
• Fundsavailabilityresponse
18 Approvepurchaseordermodification(ACQ.040.040ContractModification)
• Fundsavailabilityresponse • Approved,modifiedpurchaseorder
19 a. Receiveapproved,modifiedpurchaseorder
b. Obligatefundsasauthorizedbyapprovedbudget
(FFM.030.020ObligationManagement)
• Approved,modifiedpurchaseorder
• Appropriateobligationentrycreatedwithreferencetosourceinformation
20 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 42FederalGovernment–unlimitedusagerights. Version:20170630
4Procure-to-Pay
UseCase4.5LeasedProperty(L1)End-to-EndBusinessProcess:4Procure-to-PayBusinessScenario(s)Covered
• OperatingLease • CapitalLease
BusinessActor(s) Primary:FinanceOffice;AcquisitionOffice;PropertyOfficeOther:Vendors,ProgramOffice
SynopsisPreviouslyacquiredofficeequipmentisreceivedthroughanoperatingleasetosupportatemporaryworkforceperforminginitialactivitiesforalong-termproject.Theofficeequipmentisreturnedattheendoftheleaseperiodandtheleaseisclosedout.Asinglepaymentismadefortheoperatinglease.Inaddition,heavyequipmentneededforthelong-termprojecthasbeenacquiredthroughaRequest-to-Procureprocessusingafive-yearcapitallease.Theequipmentisputintoservice.Attheendofthecapitalleaseperiod,thefinalpaymentismadeandtheleaseisclosedout.Theequipmentisownedbythegovernmentattheendofthelease.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. EachvendorwasselectedduringaRequest-to-Procureprocess.8. Assetsbeingleasedareownedbyprivateentities.9. Analysishasbeencompletedandadeterminationmadethatoneleasemeetscriteriaforanoperatingleaseandtheotheracapitallease,perFASAB
guidelines.10. Purchaseordersandleaseagreementsforbothleaseshavebeencompletedandfundshavebeenobligated.Theobligatedamountforcapitalleaseincludes
presentvalueoftheleasepaymentsaswellasinterestatthecurrentTreasuryinterestrate.11. Theagencyhasusedthevendor(s)beforeandthevendor(s)have/hasbeensetupintheagencyfinancialsystem.12. BothvendorsuseanOMB-approvedelectronicinvoicingsolutiontoinvoicetheagency.13. ThevendorsareproperlyregisteredinFederalacquisitionsystems.14. NeithervendorisontheDoNotPaylist.15. Thepropertyrecord,whichcontainsallneededdataforeffectivepersonalpropertymanagement(e.g.,location,procurement,utilization,disposal,cost,
evaluation,andcontrol),fortheoperatingleasehasbeenestablishedandincludesallinformationrequired.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 43FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
1 a. Inspectandaccepttheoperatingleasedequipment(PRM.010.010PropertyAcquisition/Receipt)
b. Estimateliabilityaccrualforoperatingleasepayments(PRM.010.010PropertyAcquisition/Receipt)
c. Requestestimatedliabilityaccrualbeestablished(PRM.010.010PropertyAcquisition/Receipt)
d. Updatepropertyrecordsincludingcustodian,locationandvalue(PRM.010.060PropertyControlandAccountability)
• Operatingleasedequipment• Operatingleaseagreement• Propertyrecord
• Acceptedproperty• Propertyrecord• Estimatedoperatingleaseliability• Requestforestablishmentofoperatingleaseliabilityaccrual
2 Receiveandprocessrequesttoestablishoperatingleaseliabilityaccrual(FFM.090.030AccrualandLiabilityProcessing)
• Acceptedproperty• Requestforestablishmentofoperatingleaseliabilityaccrual
• Estimatedoperatingleaseliability• Propertyrecord
• Appropriateliabilityaccrualentrycreatedforoperatingleaseequipmentwithreferencetosourceinformation
• Propertyrecord
16. Thepropertyrecord,whichcontainsallneededdataforeffectivepersonalpropertymanagement(e.g.,location,procurement,utilization,disposal,cost,evaluation,andcontrol),forthecapitalleasehasbeenestablishedandincludesallinformationneededtodeterminedepreciation;includingcost,assetclass,andusefullife(10years).
17. Althoughmonthlypaymentsaremadeforthecapitallease,theusecaseincludeseventsforonlythefirstoneandthelastonesothatinitialandfinaleventscanbeshownwithoutduplication.
18. Allrequirementsforbothleaseshavebeenmet.FFMSRIDReference(s) 1.1.2;1.1.3;1.1.4;2.2.1;2.2.2;2.1.2InitiatingEvent Pertermsofpreviouslyexecutedpurchaseordersandleaseagreements,anagencyreceivesleasedequipment.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 44FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 a. Inspectandacceptthecapitalleasedequipment(PRM.010.010PropertyAcquisition/Receipt)
b. Determinepropertyvalueandotherpropertyinformation(PRM.010.050PropertyValuation)
c. Estimatedepreciationandliabilityaccrualsforcapitallease(PRM.010.050PropertyValuation)
d. Requestestimatedliabilityaccrualsbeestablished(PRM.010.050Valuation)
e. Requestestimatedpropertyvaluebeestablished(PRM.010.050PropertyValuation)
f. Updatepropertyrecordtoincludingcustodian,locationandvalue(PRM.010.060PropertyControlandAccountability)
• Capitalleasedequipment• Capitalleaseagreement• Propertyrecord
• Acceptedproperty• Propertyrecord• Estimatedcapitalleasepropertyvalue
• Estimatedcapitalleaseinterestliability
• Estimatedcapitalleaseprincipalliability
• Estimatedcapitalleasedepreciation
• Requestforestablishmentofcapitalleasedepreciationandliabilityaccruals
• Requestforestablishmentofcapitalpropertyvalue
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 45FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
5 a. Receiveandprocessrequestforestablishmentofcapitalleasedepreciationandliabilityaccruals(FFM.090.030AccrualandLiabilityProcessing)
b. Accruedepreciation(FFM.090.030AccrualandLiabilityProcessing)
c. Accrueinterestliability(FFM.090.030AccrualandLiabilityProcessing)
d. Accrueprincipalliability(FFM.090.030AccrualandLiabilityProcessing)
e. Establishpropertyvaluation(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Acceptedproperty• Requestforestablishmentofcapitalleasedepreciationandliabilityaccruals
• Estimatedcapitalleasedepreciation
• Estimatedcapitalleaseinterestliability
• Estimatedcapitalleaseprincipalliability
• Requestforestablishmentofcapitalpropertyvalue
• Estimatedcapitalleasepropertyvalue
• Appropriatedepreciationaccrualentrycreatedwithreferencetosourceinformation
• Appropriateinterestliabilityaccrualentrycreatedwithreferencetosourceinformation
• Appropriateprincipalliabilityaccrualentrycreatedwithreferencetosourceinformation
• Appropriatepropertyvaluationentrycreatedwithreferencetosourceinformation
• Propertyrecord
6 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 46FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
7 a. OperatingleasevendorenterssingleandfinalinvoiceinformationintoanOMB-approvedelectronicinvoicingsolution(ACQ.040.030DocumentationofDelivery/Acceptance)
b. ProgramOfficereceivesnotificationofoperatingleasevendorinvoicesubmissionandreviewsandacceptsvendorinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
• Operatingleasevendorinvoice• Leaseagreement
• Acceptedoperatingleasevendorinvoice
8 ReceiveacceptedoperatingleasevendorinvoicefromOMB-approvedelectronicinvoicingsolution(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedoperatingleasevendorinvoice
• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentrycreatedwithreferencetosourceinformation
• Validatedvendorinvoice9 Requestfundsavailabilitycheck
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedoperatingleasevendorinvoice
• Requestforfundsavailabilitycheck
10 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
11 a. Approveoperatingleasevendorsingleandfinalinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedoperatingleasevendorinvoice
• Approvedoperatingleasevendorinvoice
• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 47FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
12 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Reverseliabilityaccrual(FFM.090.030AccrualandLiabilityProcessing)
d. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
e. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
f. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
g. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedoperatingleasevendorinvoice
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentrymadewithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
• Propertyrecord
13 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 48FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
14 a. CapitalleasevendorentersinitialinvoiceinformationintoanOMB-approvedelectronicinvoicingsolution
b. ProgramOfficereceivesnotificationofcapitalleasevendorinvoicesubmissionandreviewsandacceptsvendorinvoice
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Capitalleasevendorinvoice• Capitalleaseagreement
• Acceptedcapitalleasevendorinvoice
15 ReceiveacceptedcapitalleasevendorinvoicefromOMB-approvedelectronicinvoicingsolution(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedcapitalleasevendorinvoice
• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentrycreatedwithreferencetosourceinformation
• Validatedvendorinvoice16 Requestfundsavailabilitycheck
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedcapitalleasevendorinvoice
• Requestforfundsavailabilitycheck
17 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
18 a. Approvecapitalleasevendorinvoice
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedcapitalleasevendorinvoice
• Approvedcapitalleasevendorinvoice
• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 49FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
19 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Reverseliabilityaccruals(FFM.090.030AccrualandLiabilityProcessing)
d. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
e. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
f. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
g. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedcapitalleasevendorinvoice
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentriescreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
• Propertyrecord
20 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 50FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
21 a. Operatingleaseendsandequipmentisreturned
b. Updatepropertyrecordc. Requestclose-outofoperating
lease(PRM.010.040PropertyTransfer,Disposal,orRetirement)
• Propertyrecord• Operatingleaseagreement• Paymentoffinaloperatingequipmentinvoice
• Returnedequipment• Requestforoperatingleaseclose-out
• Propertyrecord
22 a. Receiveandprocessrequestforclose-outofoperatinglease(FFM.010.020FundAllocationandControl)
b. Reverseremainingliabilityaccruals,asneeded(FFM.090.030AccrualandLiabilityProcessing)
c. Deobligateremainingfunds,asneeded(FFM.030.020ObligationManagement)
• Requestforoperatingleaseclose-out
• PropertyRecord• Operatingleaseagreement
• Appropriateliabilityaccrualreversalentrymadewithreferencetosourceinformation
• Appropriatedeobligationentrycreatedwithreferencetosourceinformation
• Propertyrecord
23 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
24 a. CapitalleasevendorentersfinalinvoiceinformationintoanOMB-approvedelectronicinvoicingsolution
b. ProgramOfficereceivesnotificationofcapitalleasevendorinvoicesubmissionandreviewsandacceptsvendorinvoice
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Capitalleasevendorfinalinvoice• Capitalleaseagreement
• Acceptedcapitalleasevendorfinalinvoice
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 51FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
25 ReceiveacceptedcapitalleasevendorfinalinvoicefromOMB-approvedelectronicinvoicingsolution(FFM.030.070PaymentProcessing-CommercialPayments)
• Acceptedcapitalleasevendorfinalinvoice
• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentrycreatedwithreferencetosourceinformation
• Validatedvendorinvoice26 Requestfundsavailabilitycheck
(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedcapitalleasevendorfinalinvoice
• Requestforfundsavailabilitycheck
27 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
28 a. Approvecapitalleasevendorfinalinvoice
b. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedcapitalleasevendorfinalinvoice
• Approvedcapitalleasevendorfinalinvoice
• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 52FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
29 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligation(FFM.030.020ObligationManagement)
c. Reverseliabilityaccruals(FFM.090.030AccrualandLiabilityProcessing)
d. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
e. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
f. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
g. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedcapitalleasevendorfinalinvoice
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentriescreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
• Propertyrecord
30 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 53FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
31 a. Finalcapitalleaseinvoiceispaidforheavyequipmentandequipmentbecomespropertyofgovernment(PRM.010.040PropertyTransfer,Disposal,orRetirement)
b. Recordownershipofpropertyinthepropertymanagementsystem(PRM.010.060PropertyControlandAccountability)
c. Determinevalueofcapitalequipmentadjustedbydepreciation(PRM010.050PropertyValuation)
d. Requestupdatedvaluationofpropertyandclose-outofcapitallease(PRM.010.040PropertyTransfer,Disposal,orRetirement)
• Finalcapitalleasepayment• Propertyrecord• Capitalleaseagreement• Accrueddepreciation
• Requestforclose-outofcapitallease
• Valueofcapitalequipmentadjustedbydepreciation
• Requestforupdatedvaluationofcapitalequipmentadjustedbydepreciation
• Propertyrecord
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 54FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.5LEASEDPROPERTYTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
32 a. Receiveandprocessrequestforclose-outcapitallease(FFM.010.020FundAllocationandControl)
b. Reverseanyremaininginterestandprincipalliabilityaccruals,asneeded(FFM.090.030AccrualandLiabilityProcessing)
c. Deobligateremainingfunds,asneeded(FFM.030.020ObligationManagement)
d. Receiveandprocessrequestforupdatedvaluationofcapitalequipmentadjustedbydepreciation(FFM.020.010FinancialAssetInformationProcessing-Property,Plant,andEquipment)
• Capitalleaseagreement• Propertyrecord• Requestforclose-outofcapitallease
• Valueofcapitalequipmentadjustedbydepreciation
• Requestforupdatedvaluationofcapitalequipmentadjustedbydepreciation
• Appropriateinterestandprincipalliabilityaccrualreversalentriescreatedwithreferencetosourceinformation
• Appropriatepropertyvaluationentrycreatedwithreferencetosourceinformation
• Appropriatedeobligationentriescreatedwithreferencetosourceinformation
• Propertyrecord
33 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 55FederalGovernment–unlimitedusagerights. Version:20170630
End-to-EndBusinessProcess:4Procure-to-PayBusinessScenario(s)Covered
• AcquiringServicesBusinessActor(s) Primary:ProcurementOffice;FinanceOffice;ProgramOffice
Other:VendorSynopsisServicespreviouslyorderedbyaFederalagencyarereceivedandaccepted.AninvoiceissubmittedbytheVendorandpaidbytheagency.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheagencyhaspurchasedfromthevendorbeforeandthevendorhasbeensetupintheFMsystem.8. TheFederalagencyhasorderedandreceivedtheservicesandthepurchaseorderobligationhasalreadybeenestablishedintheFMsystem.9. ThevendorusesanOMB-approvedelectronicinvoicingsolutiontoinvoicetheagency.10. Thereceivingreportisoptionalunlessrequiredformatching.11. ThevendorisnotontheDoNotPaylist.12. ThevendorisproperlyregisteredinFederalacquisitionsystems.13. Theinvoicedamountmatchestheobligationamount.FFMSRIDReference(s) 1.1.2;2.2.1;2.2.2;2.1.2InitiatingEvent TheVendordeliversservicestotherequestingFederalagency.
UseCase4.6AcquiringServices(L1)
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 56FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.6ACQUIRINGSERVICESTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
1 Receiveandacceptdeliveryofvendor'sservices(ACQ.040.030DocumentationofDelivery/Acceptance)
• Approvedpurchaseorder• Vendor’sservices
• Receiptinformation(receivingreportifused)
2 Receivereceiptinformation(receivingreportifused)informationandaccruetheexpense(FFM.090.030AccrualandLiabilityProcessing)
• Receiptinformation(receivingreportifused)
• Appropriateliabilityaccrualentrycreatedwithreferencetosourceinformation
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 a. VendorentersinvoiceinformationintoanOMB-approvedelectronicinvoicingsolution(VendorExternalActivity)
b. ProgramOfficereceivesnotificationofvendorinvoicesubmissionandreviewsandvalidatesvendorinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
• Vendorinvoice• Receiptinformation(receivingreportifused)
• Approvedpurchaseorder
• Validatedvendorinvoice
5 ReceivevalidatedvendorinvoicefromOMB-approvedelectronicinvoicingsolution(FFM.030.070PaymentProcessing-CommercialPayments)
• Validatedvendorinvoice
• Appropriatepayableentrycreatedwithreferencetosourceinformation
• Appropriateliabilityaccrualreversalentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 57FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.6ACQUIRINGSERVICESTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
6 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedvendorinvoice • Requestforfundsavailabilitycheck
7 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
8 a. Approvevendorinvoiceb. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Fundsavailabilityresponse• Validatedvendorinvoice
• Approvedvendorinvoice• Requestfordisbursement
9 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligations(FFM.030.020ObligationManagement)
c. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursement• Approvedvendorinvoice
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 58FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.6ACQUIRINGSERVICESTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 59FederalGovernment–unlimitedusagerights. Version:20170630
End-to-EndBusinessProcess:4Procure-to-PayBusinessScenario(s)Covered
• Novation
BusinessActor(s) Primary:ProcurementOffice,FinanceOfficeOther:Vendor
SynopsisVendor1ispurchasedbyVendor2.Vendor1isundercontracttothegovernmentandhasnotcompletedthecontractedwork.TheworkistobecompletedbyVendor2.AninvoiceissubmittedalongwiththenovationrequestbyVendor2.ThenovationrequestisforwardedforapprovalandtheinvoiceisreturnedtoVendor2pendingnovationapproval.Thenovationagreementanditseffectivedate,alistofallimpactedcontracts,andotherdocumentationissubmittedbyVendor1uponrequest.Uponnovationapproval,changesaremadetovendorinformationandanyopenfinancialmanagementdocumentstoreflecttheimpactofthenovation.Additionally,theinvoiceisresubmittedandpaid.AssumptionsandDependencies
1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. Thegovernmenthasdecidedthenovationisinitsbestinterest.8. TheContractOfficercompletesthenecessarycontractmodificationforthenovationandvalidatesVendor2informationwithFederalacquisition
information.9. Thenovationrequestisapprovedbywhomevertheagencyhasprovidedtheauthority.10. Bothvendorshavedoneworkfortheagencyandhavebeenset-upinthefinancialmanagementsystem.11. Bothvendorsareproperlyregisteredinallappropriategovernmentacquisitionsystems.12. NeithervendorisontheDoNotPaylist.13. Vendor2isnotifiedthatpaymentwillbedelayedpendingapprovalofthenovationwhentheinvoiceisreturned.FFMSRIDReference(s) 1.1.2;1.1.4;2.1.2;2.2.1;2.2.2InitiatingEvent ThegovernmentreceivesanovationrequestalongwithaninvoicefromVendor2.
UseCase4.7Novation(L2)
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 60FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.7NOVATIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
1
a. Returninvoicependingapprovalofnovationrequest(ACQ.040.030DocumentationofDelivery/Acceptance)
b. Identifyandrequestadditionaldocumentationandcertificationrequirementsfornovation(ACQ.040.040ContractModification)
c. Requestprocessingofaliabilityaccrualfortheinvoice(ACQ.040.030DocumentationofDelivery/Acceptance)
• Vendor2’sinvoice• Novationrequest
• Returnedinvoice• Requestforadditionaldocumentationandcertificationsfornovation
• Requestforprocessingofaliabilityaccrual
2 Receiveandprocessrequestforprocessingofaliabilityaccrual(FFM.090.030AccrualandLiabilityProcessing)
• Returnedinvoice• Requestforprocessingofaliabilityaccrual
• Appropriateliabilityaccrualentrycreatedwithreferencetosourceinformation
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 a. Receiveadditionaldocumentationandcertificationsandapprovenovationrequest(ACQ.040.040ContractModification)
b. RequestupdatetoVendor1andVendor2payeeinformation(e.g.,contractinformationforvendor2)(ACQ.040.040Contract
• Completenovationrequestdocumentation,includingVendor1’scontractlistandassociatedcontracts
• Approvednovationrequest• RequestforupdatetoVendor1andVendor2payeeinformation(e.g.,contractinformationforvendor2)
• Requesttoupdatevendor1and2financialmanagementrecordstoreflectnovation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 61FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.7NOVATIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
Modification)c. RequestforupdatetoVendor1
andVendor2financialmanagementrecordstoreflectnovation(ACQ.040.030DocumentationofDelivery/Acceptance)
5 a. ReceiveandprocessrequestforupdatetoVendor1andVendor2payeeinformation(e.g.,contractinformationforvendor2)
b. ReceiveandprocessrequesttoupdateVendor1andVendor2financialmanagementrecordstoreflectnovation
(FFM.030.010PayeeSet-upandMaintenance)
• RequestupdatestoVendor1andVendor2payeeinformation(e.g.,contractstheysupport)
• RequesttoupdateVendor1andVendor2financialmanagementrecordstoreflectnovation
• Vendor1andVendor2payeeinformationupdated
• AppropriateVendor1andVendor2financialmanagementrecordsupdatedwithreferencetosourceinformation
6 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
7 a. ReceiveVendor2invoiceb. AcceptinvoicedVendor2goods
andservices(ACQ.040.030DocumentationofDelivery/Acceptance)
• Vendor2invoiceresubmittal• Vendor2goodsandservices
• Receiptinformation(receivingreportifused)
• ValidatedVendor2invoice
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 62FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.7NOVATIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
8 a. Receivereceiptinformation(receivingreportifused)informationandreverseliabilityaccrual(FFM.090.030AccrualandLiabilityProcessing)
b. Createpayable(FFM.030.070PaymentProcessing-CommercialPayments
• Receiptinformation(receivingreportifused)
• ValidatedVendor2invoice
• Appropriateliabilityaccrualreversalentrycreatedwithreferencetosourceinformation
• Appropriatepayableentrycreatedwithreferencetosourceinformation
9 Requestfundsavailabilitycheck(ACQ.040.030DocumentationofDelivery/Acceptance)
• ValidatedVendor2invoice • Requestforfundsavailabilitycheck
10 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
11 a. Approvevendorinvoiceb. Requestdisbursement(ACQ.040.030DocumentationofDelivery/Acceptance)
• Validatedvendorinvoice• Fundsavailabilityresponse
• Approvedvendorinvoice• Requestfordisbursement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 63FederalGovernment–unlimitedusagerights. Version:20170630
USECASE4.7NOVATIONTypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
12 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Liquidateobligations(FFM.030.020ObligationManagement)
c. Initiatepayments(FFM.030.070PaymentProcessing-CommercialPayments)
d. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
e. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
f. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Approvedvendorinvoice• Requestfordisbursement
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Vendorreceivespayment• Disbursementconfirmationinformation
13 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 64FederalGovernment–unlimitedusagerights. Version:20170630
5Bill-to-CollectUseCase5.3AggregatedReceivablesforCustodialRevenues(L2)End-to-EndBusinessProcess:5Bill-to-CollectBusinessScenario(s)Covered
• UnbilledCollections• AggregatedReceivables
• CustodialRevenues
BusinessActor(s) Primary:ProgramOffice;FinanceOfficeOther:PrivateSectorEntities(PSE)
SynopsisFunds(e.g.,taxes,fees,royalties)fromPSEactivitiesareowedtoanagencymanagingacustodialaccount.PeriodicpaymentsaresubmittedusingaTreasuryprovidedelectronicpaymentsystem,andpaymentinformationisprovidedtotheagencyProgramOffice.TheaggregatedcustodialrevenueisreportedbytheagencyProgramOffice.ReportssubstantiatingthepaymentswithactivityinformationaresubmittedperiodicallytotheagencyProgramOffice.Aperiodicreconciliationofpaymentsandactivityreportinformationisperformedtodetermineifthereisapaymentdiscrepancy.Duringareview,itisdeterminedadditionalpayments,penalties,andinterestaredue.TheaggregatedreceivablesarereportedbytheagencyProgramOffice.Atfiscalyear-end,informationfortheStatementofCustodialActivityisprovidedbytheProgramOffice,andtheFinancialStatementisproducedbytheFinanceOffice.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. Theroyalties(e.g.,gasandoil),alongwithinterestandpenalties,ifany,arebeingheldfortheTreasuryGeneralFund.8. Termsandconditionsunderwhichfundsandperiodicreportsareduetotheagencyhavebeenestablished.9. Thecollectingagencyretainsadministrativefees,ifany,tocoverexpenseofreconciliationandprocessingofunderpayments.10. Theagencycollectingthecustodialrevenuesdoesnottransfertherevenuetootheragencies.11. AnIPACtransferisnotused;fundsareredirectedtotheTreasuryGeneralFundduringperiodendprocessingviaTreasuryCentralAccountingReporting
System(CARS).FFMSRIDReference(s) 1.1.2;1.1.3;1.1.4;1.1.5;1.3.1;2.3.2InitiatingEvent RoyaltypaymentsaresubmittedusingaTreasuryprovidedpaymentsystem.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 65FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.3AGGREGATEDRECEIVABLESFORCUSTODIALREVENUESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)1 a. Receiveandaggregateperiodic
reportsb. Receiveroyaltypaymentand
depositinformationc. Requestprocessingofperiodic
aggregatedroyaltypaymentanddepositinformation
(ProgramMissionActivity)
• Periodicroyaltyreports,showingroyaltyamountsandpaymentsfortheperiod
• Royaltypaymentanddepositinformation
• Aggregatedperiodicreports• Requestforprocessingofaggregatedroyaltypaymentanddepositinformation
2 a. Receiveandprocessrequestforprocessingofaggregatedroyaltypaymentanddepositinformation(FFM.060.040PublicReceiptProcessing)
b. Recognizecustodialcollectionsforothers(FFM.040.010RevenueProcessing)
c. Recognizedcustodialliability(FFM090.030AccrualandLiabilityProcessing)
d. Generateappropriateroyaltycollectionreport(FFM.040.020RevenueReporting)
• Requestforprocessingofaggregatedroyaltypaymentanddepositinformation
• Appropriatereceiptanddepositentrycreatedwithreferencetosourceinformation
• Appropriatecustodialcollectionsentrycreatedwithreferencetosourceinformation
• Appropriatecustodialliabilityentrycreatedwithreferencetosourceinformation
• Appropriateroyaltycollectionreport
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 66FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.3AGGREGATEDRECEIVABLESFORCUSTODIALREVENUESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)4 a. Reviewreportsandvalidate
accuracyofroyaltypaymentcalculations
b. Determineunderpayment,penalties,interest,andadministrativefeesandsendabill
c. Requestprocessingofbillinformationforadjustmentstoroyaltycalculationpluspenaltiesandinterest
(ProgramMissionActivity)
• Appropriaterevenuereport• Aggregatedperiodicreports
• Requestforprocessingofbillinformationforadjustmentstoroyaltycalculationpluspenalties,interest,andadministrativefees
5 a. Receiveandprocessrequestforprocessingofbillinformationforadjustmentstoroyaltycalculationpluspenalties,interest,andadministrativefees(FFM.060.020PublicReceivableSet-upandInvoicing)
b. Establishreceivable(FFM.060.020PublicReceivableSet-upandInvoicing)
c. Recognizecustodialcollectionsforothers(FFM.040.010RevenueProcessing)
d. Recognizedcustodialliability(FFM090.030AccrualandLiabilityProcessing)
e. Recognizerevenuefromadministrativefees(FFM.040.010RevenueProcessing)
• Requestforprocessingofbillinformationforadjustmentstoroyaltycalculationpluspenalties,interest,andadministrativefees
• Appropriatereceivableentrycreatedwithreferencetosourceinformation
• Appropriatecustodialcollectionsentrycreatedwithreferencetosourceinformation
• Appropriatecustodialliabilityentrycreatedwithreferencetosourceinformation
• Appropriateadministrativefeeentrycreatedwithreferencetosourceinformation
• Billsentandreceived
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 67FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.3AGGREGATEDRECEIVABLESFORCUSTODIALREVENUESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)6 Postappropriatebudgetaryand
proprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
7 a. Receiveadjustedroyaltypaymentanddepositinformation
b. Receivepenalties,interest,andadministrativefeespaymentanddepositinformation
c. Requestprocessingofadjustedroyaltypaymentanddepositinformation
d. Requestprocessingofpenalties,interest,andadministrativefeespaymentanddepositinformation
(ProgramMissionActivity)
• Paymentanddepositinformationreceived
• Requestforprocessingofadjustedroyaltypaymentanddepositinformation
• Requestforprocessingofpenalties,interest,andadministrativefeespaymentanddepositinformation
8 a. Receiveandprocessrequestforprocessingofadjustedroyaltypaymentanddepositinformation(FFM.060.040PublicReceiptProcessing)
b. Receiveandprocessrequestforprocessingofpenalties,interest,andadministrativefeespaymentanddepositinformation(FFM.060.040PublicReceiptProcessing)
• Requestforprocessingofadjustedroyaltypaymentanddepositinformation
• Requestforprocessingpenalties,interest,andadministrativefeespaymentanddepositinformation
• Appropriateroyaltyreceiptanddepositentriescreatedwithreferencetosourceinformation
• Appropriatereceivableliquidatedwithreferencetosourceinformation
• Appropriatepenalties,interest,andadministrativefeesreceiptanddepositentriescreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 68FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.3AGGREGATEDRECEIVABLESFORCUSTODIALREVENUESTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)9 Postappropriatebudgetaryand
proprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
10 a. Initiateperiodendclosing(FFM090.040PeriodEndClosing)
b. Liquidatecustodialliability(FFM090.030AccrualandLiabilityProcessing)
• Custodialcollectionandcustodialliabilityinformation
• Appropriatecustodialliabilityliquidationentrycreatedwithreferencetosourceinformation
11 ProvidefiscalyearendinformationfortheStatementofCustodialActivity(ProgramMissionActivity)
• Financialinformationassociatedwithcustodialactivity
• InformationfortheStatementofCustodialActivity
12 GenerateStatementofCustodialActivitytoincorporateintheFinancialStatement(FFM.110.020FinancialStatementPreparation)
• InformationfortheStatementofCustodialActivity
• StatementofCustodialActivity
13 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 69FederalGovernment–unlimitedusagerights. Version:20170630
UseCase5.4ReceivableCollectionfromThirdPartyDebtor(L2)End-to-EndBusinessProcess:5Bill-to-CollectBusinessScenario(s)Covered• ReceivablesAllocatedAmongMultiplePayers• ThirdPartyPayersasResponsibleDebtors
• InstallmentAgreement
BusinessActor(s) Primary:FinanceOffice;ProgramOfficeOther:PrivateSectorEntities(PSEs)
SynopsisAservice(e.g.,sitecleanup)isperformedbythegovernmentthatmustbereimbursedbymultiplePSEswhoaresubsidiariesofaparentPSE.ThecostsoftheserviceareallocatedamongthesubsidiaryPSEsandbillsaregenerated.ThepaymentfortheservicesperformedisnotreceivedfromoneofthesubsidiaryPSEs,causinginterest,penaltiesandadministrativechargestoaccrue.AparentPSEisbilledasthethirdpartyresponsibledebtor.Aspartofthecollectioneffort,aninstallmentagreementisestablishedbetweenthegovernmentandtheparentPSE.ThefirstinstallmentagreementpaymentisreceivedfromtheparentPSE.
AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheagreementsbetweenthePSEsandtheagencyhavebeenestablishedandprescribethetermsofreimbursement.8. TheProgramOfficedeterminesinterest,penalties,andadministrativecharges.9. ThesubsidiaryandparentPSEshavealreadybeenestablishedaspayersinthefinancialsystem.10. ReceiptsaredepositedthroughaTreasurymanagedservice.11. Latepaymentexpenseprocessingisoffsetbyinterest,penalty,andadministrativechargepaymentswhicharedepositedintheagency’saccount.FFMSRIDReference(s) 1.1.2;1.1.3;1.1.5;2.2.4;2.2.5;2.2.6InitiatingEvent Thegovernmentperformsservices(e.g.,sitecleanup)tobereimbursedbyPSEs.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 70FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.4RECEIVABLECOLLECTIONFROMTHIRDPARTYDEBTORTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)1 a. Determinecostallocation
amongmultiplesubsidiaryPSEsb. Requestestablishmentof
receivablesinaccordancewiththeallocation
(ProgramMissionActivity)
• Costofgovernmentservices• PSEagreements
• BillinginformationallocatedamongsubsidiaryPSEs
• Requestforestablishmentofreceivablesinaccordancewiththeallocation
2 a. Receiveandprocessrequestforestablishmentofreceivablesinaccordancewiththeallocationandset-upreceivables(FFM.060.020PublicReceivableSet-upandInvoicing)
b. Recognizeearnedrevenue(FFM.040.010RevenueProcessing)
c. GenerateandsendbillstosubsidiaryPSEs(FFM.060.020PublicReceivableSet-upandInvoicing)
• BillinginformationallocatedamongsubsidiaryPSEs
• Requestforestablishmentofreceivablesinaccordancewiththeallocation
• Appropriatereceivableentriescreatedwithreferencetosourceinformation
• Appropriaterevenuerecognitionentriescreatedwithreferencetosourceinformation
• Generatedandsentbills
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
4 a. ReceivepaymentanddepositinformationforallbutonesubsidiaryPSE
b. RequestprocessingofpaymentanddepositinformationforallbutonesubsidiaryPSE
(ProgramMissionActivity)
• PaymentanddepositinformationreceivedforallbutonesubsidiaryPSE
• RequestforprocessingofpaymentanddepositinformationforallbutonesubsidiaryPSE
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 71FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.4RECEIVABLECOLLECTIONFROMTHIRDPARTYDEBTORTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)5 a. Receiveandprocessrequestfor
processingofpaymentanddepositinformationforallbutonesubsidiaryPSE(FFM.060.040-PublicReceiptProcessing)
b. Generateagedreceivablereport(FFM.070.030DelinquentDebtReporting)
• RequestforprocessingofpaymentanddepositinformationforallbutonesubsidiaryPSE
• Appropriatereceiptanddepositentriescreatedwithreferencetosourceinformation
• Agedreceivablesreport
6 a. Monitorageofreceivablesanddetermineinterest,penalty,andadministrativechargesforlatepayment
b. Requestdunningnoticeforunpaidbalance,interest,penalty,andadministrativechargesforthirdpartyresponsibledebtor
(ProgramMissionActivity)
• Agedreceivablesreport• PSEagreements
• Unpaidbalance,interest,penaltiesandadministrativecharges
• Requestfordunningnoticeforunpaidbalance,interest,penalty,andadministrativechargesforthirdpartyresponsibledebtor
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 72FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.4RECEIVABLECOLLECTIONFROMTHIRDPARTYDEBTORTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)7 a. Receiveandprocessrequestfor
dunningnoticeforunpaidbalance,interest,penaltiesandadministrativechargesforthirdpartyresponsibledebtor(FFM.070.010DelinquentDebtCollection)
b. Adjustrevenueforunpaidreceivable(reduceunpaidbalanceforsubsidiaryPSEandcreateentryforthirdpartyresponsibledebtor)(FFM.040.010RevenueProcessing)
c. Generateandsenddunningnoticetothirdpartyresponsibledebtor(FFM.060.020PublicReceivableSet-upandInvoicing)
• Requestfordunningnoticeforunpaidbalance,interestpenalty,andadministrativechargesforthirdpartyresponsibledebtor
• Appropriatereceivableentrycreatedwithreferencetosourceinformation
• Appropriaterevenueadjustment(fromunpaidportionoforiginalbilltosubsidiaryPSE)entrycreatedwithreferencetosourceinformation
• Appropriaterevenuerecognition,forunpaidbalance,interest,penalty,andadministrativecharges(tobepaidbythirdpartyresponsibledebtor),entrycreatedwithreferencetosourceinformation
• Generateddunningnoticetothirdpartyresponsibledebtor
8 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
9 Receiverequestforinstallmentagreementfromthirdpartyresponsibledebtor(ProgramMissionActivity)
• Installmentagreementrequestbythirdpartyresponsibledebtor
• Installmentagreementandterms• Requesttoestablishinstallmentagreementwiththirdpartyresponsibledebtor
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 73FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.4RECEIVABLECOLLECTIONFROMTHIRDPARTYDEBTORTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)10 Receiveandprocessrequestto
establishinstallmentagreementwiththirdpartyresponsibledebtor(FFM.070.010DelinquentDebtCollection)
• Installmentagreementandterms• Requesttoestablishinstallmentagreementwiththirdpartyresponsibledebtor
• Appropriateupdatedreceivableentriescreatedperinstallmentagreementwithreferencetosourceinformation
• Appropriaterevenuerecognitionentriescreatedperinstallmentagreementwithreferencetosourceinformation
11 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
12 a. Receiveinstallmentpaymentanddepositinformation
b. Requestprocessingofinstallmentpaymentanddepositinformation
(ProgramMissionActivity)
• Installmentpaymentanddepositinformationreceived
• Requestforprocessingofinstallmentpaymentanddepositinformation
13 a. Receiveandprocessrequestforprocessingofinstallmentpaymentanddepositinformation
b. Adjustreceivable(FFM.060.040PublicReceiptProcessing)
• Requestforprocessingofinstallmentpaymentanddepositinformation
• Appropriatereceiptanddepositentriescreatedwithreferencetosourceinformation
• Appropriatereceivableadjustmententrycreatedwithreferencetosourceinformation
14 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 74FederalGovernment–unlimitedusagerights. Version:20170630
UseCase5.6MiscellaneousReceipts(L3)End-to-EndBusinessProcess:5Bill-to-CollectBusinessScenario(s)Covered
• MiscellaneousReceiptsBusinessActor(s) Primary:FinanceOffice;ProgramOffice
Other:Non-FederalEntity(NFE)Synopsis
MiscellaneousreceiptfundsarereceivedbycheckfromanNFEforworkanagencyperformsaspartofitsongoingmission.Theagency'sstatutoryauthorityspecifiestheportionofthefundsthatmayberetainedforuseinagencyoperationsandtheremainderofthefundsareallocatedtoaGeneralFundReceiptAccount(GFRA).AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheagencyhasbeengivenstatutoryauthorityandanexceptiontotheMiscellaneousReceiptsAct;itsdeterminationoffundstouseforitsoperationsis
withinitsstatutoryauthorityandthusdoesnotviolatetheMiscellaneousReceiptsAct.8. AnagreementwiththeNFEforworktheagencyperformshasalreadybeenestablished.9. Theword“check”mayincludeotherformsofreimbursementsuchasACHEFT,andcreditcard.10. Abill,equaltothemiscellaneousreceiptscheckreceived,hasalreadybeensent,areceivableestablished,anddeferredrevenueliabilityappropriately
recognizedfortheservicestheagencywillprovidetheNFE.11. Servicesaredeliveredperagreementwithnorefundrequired.12. AnIPACtransferisnotused;fundsareredirectedtotheTreasuryGeneralFundduringtheyearendsweepofGeneralFundReceiptAccount(GFRA)via
TreasuryCentralAccountingReportingSystem(CARS).FFMSRIDReference(s) 1.1.2;1.1.5;2.2.5InitiatingEvent TheProgramOfficereceivesacheckformiscellaneousreceipts.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 75FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.6MISCELLANEOUSRECEIPTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. Determinetheamountthatcanbeusedforoperations,perstatutoryauthority
b. ProvideNFEcheckandamounttoallocatetooperations
c. RequestdepositofcheckandallocationofproceedsbetweenoperatingandGeneralFundaccounts
(ProgramMissionActivity)
• NFEcheck• Statutoryauthorityallocationguidance
• NFEagreement
• Amountallocabletooperations• NFEcheck• RequestfordepositofcheckandallocationofproceedsbetweenoperatingandGeneralFundaccounts
2 a. ReceiveandprocessrequestfordepositofcheckandallocationofproceedsbetweenoperatingandGeneralFundaccounts(FFM.060.040PublicReceiptProcessing)
b. DepositNFEcheck(FFM.060.040PublicReceiptProcessing)
c. Allocateproceedsbetweenoperatingandgeneralfundsaccount(FFM.060.040PublicReceiptProcessing)
d. Recognizerevenue(FFM040.010RevenueProcessing)
e. Liquidatedeferredrevenueliability(FFM040.010RevenueProcessing)
f. Liquidatereceivable(FFM.060.040PublicReceiptProcessing)
• Amountallocabletooperations• NFEcheck• RequestfordepositofcheckandallocationofproceedsbetweenoperatingandGeneralFundaccounts
• Appropriaterevenuerecognitionentrycreatedforamountallocabletooperationswithreferencetosourceinformation
• Appropriategeneralfundreceiptaccountentrycreatedwithreferencetosourceinformation
• Appropriatedeferredrevenueliabilityliquidationentrycreatedwithreferencetosourceinformation
• Appropriatereceivableliquidationentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 76FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.6MISCELLANEOUSRECEIPTSTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 77FederalGovernment–unlimitedusagerights. Version:20170630
UseCase5.7AR/APNetting(L2)End-to-EndBusinessProcess:5Bill-to-CollectBusinessScenario(s)Covered
• AR/APNetting
BusinessActor(s) Primary:FinanceOffice;ProgramOfficeOther:PrivateSectorEntity(PSE)
SynopsisFunds(e.g.,fees)fromongoingPSEactivitiesareperiodicallybilledbytheagency.PaymentsaresubmittedbythePSEusingaTreasuryprovidedelectronicpaymentsystem,andpaymentinformationisprovidedtotheagencyProgramOffice.Anoverpaymentismadeonthefirstperiodicbill.ApayablereflectingarefundduetothePSEisestablishedandheld.Thebillforthesubsequentperiodisprepared.Thebillisreducedbythepayable(refund)tocovertheoverpaymentandarevisedbillispreparedandsentbytheFinanceOffice.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. ApurchaseorderfortheservicesprovidedtothePSEwereestablishedunderapreviousRequest-to-Procureprocess.8. TheagencyauthoritytocollectandspendthefeeshasbeenestablishedunderapreviousBudgetFormulation-to-Executionprocess.9. ThefeeagreementwiththePSE,permittingapplicationofcreditsandpaymentoffsetsinthebillingprocess,hasbeenestablished.10. Theoverpaymentislessthatthe“next”periodicpaymentamount.FFMSRIDReference(s) 1.1.2;1.1.5;2.2.1;2.2.2InitiatingEvent ThefirstbillingdateforPSEfeesarrives.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 78FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.7AR/APNETTINGTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. DeterminefeesduefromPSEactivityforfirstperiodicbill
b. Requestprocessingoffirstperiodicbillinformation
(ProgramMissionActivity)
• PSEactivityinformation
• Firstperiodicbillinformation• Requestforprocessingoffirstperiodicbillinformation
2 a. Receiveandprocessrequestforprocessingoffirstperiodicbillinformation(FFM.060.040PublicReceiptProcessing)
b. Establishreceivable(FFM.060.040PublicReceiptProcessing)
c. Recognizerevenue(FFM.040.010RevenueProcessing)
d. Generateandsendfirstperiodicbill(FFM.060.040PublicReceiptProcessing)
• Firstperiodicbillinformation• Requestforprocessingoffirstperiodicbillinformation
• Appropriatereceivableentrycreatedwithreferencetosourceinformation
• Appropriaterevenuerecognitionentrycreatedwithreferencetosourceinformation
• Firstperiodicbillsent
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 79FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.7AR/APNETTINGTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
4 a. Receivefirstperiodicpaymentanddepositinformation,whichreflectsanoverpayment
b. Requestprocessingoffirstperiodicpaymentanddepositinformation
c. DetermineandvalidateoverpaymentamountandrequestestablishingandholdingapayableforarefundduetoPSE
(ProgramMissionActivity)
• Firstperiodicpaymentanddepositinformation,reflectinganoverpayment
• Periodicpaymentanddepositinformation
• Requestforprocessingoffirstperiodicpaymentanddepositinformation
• Validatedrefundamountinformation
• Requesttoestablishandholdapayableforarefunddue
5 a. Receiveandprocessrequestforprocessingoffirstperiodicpaymentanddepositinformation(FFM.060.040PublicReceiptProcessing)
b. Applyportionofpaymenttoliquidatebilledreceivablebalance(FFM.030.070PaymentProcessing–CommercialPayments)
c. ReceiveandprocessrequestforestablishingandholdingapayableforrefundduetoPSE(FFM.030.070PaymentProcessing–CommercialPayments)
• Periodicpaymentanddepositinformation
• Requestforprocessingoffirstperiodicpaymentanddepositinformation
• Validatedrefundamountinformation
• Requesttoestablishandholdapayableforarefunddue
• Appropriatereceiptanddepositentriescreatedwithreferencetosourceinformation
• Appropriatebilledreceivableliquidationentrycreatedwithreferencetosourceinformation
• Appropriatepayableentrycreatedwithreferencetosourceinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 80FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.7AR/APNETTINGTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
6 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
7 a. DeterminefeesduefromPSEactivityforsubsequentperiodicbill
b. Requestprocessingofsubsequentperiodicbillinformation
(ProgramMissionActivity)
• PSEactivityinformation• AgreementwithPSE
• Subsequentbillinformation• Requestforprocessingofsubsequentperiodicbillinformation
8 a. Receiveandprocessrequestforprocessingofsubsequentperiodicbillinformation(FFM.060.040PublicReceiptProcessing)
b. Netthereceivableforthesubsequentperiodicbillandthepayablefortheoverpaymentofthefirstperiodicbill(FFM.060.040PublicReceiptProcessing)
c. Recognizerevenue(FFM.040.010RevenueProcessing)
d. Generateandsendadjustedsubsequentperiodicbill(FFM.060.040PublicReceiptProcessing)
• Subsequentbillinformation• Requestforprocessingofsubsequentperiodicbillinformation
• Appropriatereceivableentrycreatedwithreferencetosourceinformation
• Appropriatereceivableadjustmententrycreatedwithreferencetosourceinformation
• Appropriateearnedrevenueentrycreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Adjustedsubsequentperiodicbillsent
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 81FederalGovernment–unlimitedusagerights. Version:20170630
USECASE5.7AR/APNETTINGTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
9 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
10 a. Receivesubsequentperiodicpaymentanddepositinformation
b. Requestprocessingofsubsequentperiodicpaymentanddepositinformation
(ProgramMissionActivity)
• Subsequentperiodicpaymentanddepositinformation
• Subsequentperiodicpaymentanddepositinformation
• Requestforprocessingofsubsequentperiodicpaymentanddepositinformation
11 Receiveandprocessrequestforprocessingofsubsequentperiodicpaymentanddepositinformation(FFM.060.040PublicReceiptProcessing)
• Subsequentperiodicpaymentanddepositinformation
• Requestforprocessingofsubsequentperiodicpaymentanddepositinformation
• Appropriatereceiptanddepositentriescreatedwithreferencetosourceinformation
12 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 82FederalGovernment–unlimitedusagerights. Version:20170630
6Record-to-ReportUseCase6.3SupplementaryStewardshipReporting(L3)End-to-EndBusinessProcess:6Record-to-ReportBusinessScenario(s)Covered• SupplementaryStewardshipReportingBusinessActor(s) Primary:FinanceOffice;ProgramOffice
Other:SynopsisInvestmentsineducational,trainingandresearchactivities,andNon-Federalphysicalpropertyaremadebytheprogramoffice.Costsassociatedwithstewardshipinvestments(e.g.,grants,land,education,training,andresearch)arecapturedinthefinancialstatementandasupplementarystewardshipreportispreparedtodocumentthelongtermbenefitstheexpendituresyield.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheProgramOfficecollectsinformationfortheSupplementaryStewardshipReportandprovidesittotheFinanceOffice.8. GrantsfornonfederalphysicalpropertyandresearchanddevelopmentwereawardedandexecutedinpreviousApply-to-Performbusinessprocesses.9. AcquisitionsforservicestoprovidepubliceducationandtrainingwereaccomplishedinpreviousRequest-to-ProcureandProcure-to-Paybusinessprocesses.10. TheSupplementaryStewardshipreportisincludedintheFinancialStatementinasubsequentRecord-to-Reportprocess.FFMSRIDReference(s) 1.1.3;1.3.1InitiatingEvent AnagencypreparesitsfinancialstatementwhichincludesaSupplementaryStewardshipReport.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 83FederalGovernment–unlimitedusagerights. Version:20170630
USECASE6.3SUPPLEMENTARYSTEWARDSHIPREPORTINGTypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)1 Requestfinancialinformation
associatedwithstewardshipinvestments(ProgramMissionActivity)
• RequesttoproduceSupplementaryStewardshipReportinformation
• Requestforfinancialinformationassociatedwithstewardshipinvestments
2 Receiveandprocessrequestforfinancialinformationassociatedwithstewardshipinvestments(FFM.020.060FinancialAssetInformationReporting)
• Requestforfinancialinformationassociatedwithstewardshipinvestments
• Financialinformationassociatedwithstewardshipinvestments
3 a. Determinethelong-term-benefitofthestewardshipinvestment
b. ProvidetheinformationneededforSupplementaryStewardshipReport
(ProgramMissionActivity)
• Financialinformationassociatedwithstewardshipinvestments
• Long-term-benefitofstewardshipinvestment
• InformationfortheSupplementaryStewardshipReport
4 GenerateSupplementaryStewardshipReporttoincorporateintheFinancialStatement(FFM.110.020FinancialStatementPreparation)
• Long-term-benefitofstewardshipinvestment
• InformationfortheSupplementaryStewardshipReport
• SupplementaryStewardshipReport
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 84FederalGovernment–unlimitedusagerights. Version:20170630
7Agree-to-ReimburseUseCase7.3ReimbursableAgreementwithPrivateSectorwithPayments-in-Advance(L2)End-to-EndBusinessProcess:7Agree-to-ReimburseBusinessScenario(s)Covered• ReimbursableAgreementwithPrivateSector• PaymentinAdvance
• Non-GovernmentSourceFundsCollection• GovernmentPropertyLeasedtoPublic
BusinessActor(s) Primary:FinanceOfficeOther:ProgramOffice;PrivateSectorEntity(PSE)
SynopsisAreimbursableagreementisestablishedbetweenaFederalagency(lessor)andaPSE(lessee)toleaseFederalofficespace.Pertheagreement,theentireamountispaidinadvanceandrevenueisrecognizedasearnedwhenmonthlyleasepaymentsaredue.Theliabilityfortheadvancepaymentisreducedeachmonthasrevenueisrecognized.Theleaseends,andthefullamountofthesecuritydepositisrefunded.Theagreementisclosed.
AssumptionsandDependencies
1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheProgramOfficeisauthorizedtoenterintoareimbursableagreementwiththeprivatesector.8. Alltermsandconditions,aredocumentedinthereimbursableagreement.WhileOMBCircularA-11allowsforuseofworkingcapitalfundsifavailable,the
agreementwiththePSErequiresfullpaymentinadvance.9. TheagencyhasanaccountauthorizedbytheTreasurytoholdtheadvancepayments.FFMSRIDReference(s) 1.1.2;1.1.4;1.1.5;2.2.1;2.2.2;2.2.4;2.2.5InitiatingEvent TheProgramOfficeandPSEnegotiatetermsforareimbursableagreement.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 85FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.3REIMBURSABLEAGREEMENTWITHPRIVATESECTORWITHPAYMENTS-IN-ADVANCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. Requestthatthereimbursableagreementbeestablished
b. Receiveadvancepaymentperreimbursableagreement,includingsecuritydeposit
c. Requestdepositandprocessingofadvancepayment
(ProgramMissionActivity)
• Reimbursableagreementterms• Advancepaymentcheck
• Requesttoestablishthereimbursableagreement
• Requestfordepositandprocessingofadvancepayment
2 a. Receiveandprocessrequesttoestablishthereimbursableagreement(FFM.050.010ReimbursableAgreementSet-upandMaintenance)
b. Establishadvancepaymentreceivable(FFM.050.030ReimbursableInvoicing)
c. Receiveandprocessrequesttodepositandprocessadvancepayment(FFM.050.030ReimbursableInvoicing)
d. Establishliabilityfortheadvancepayment(FFM.090.030AccrualandLiabilityProcessing)
• Reimbursableagreementterms• Requesttoestablishthereimbursableagreement
• Requestfordepositandprocessingofadvancepayment
• Reimbursableagreement• Appropriatereceivableentrycreatedwithreferencetosourceinformation
• Appropriateadvancepaymentdepositinformationcreatedwithreferencetosourceinformation
• Appropriateadvancepaymentliabilityentrycreatedwithreferencetosourceinformation
3 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 86FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.3REIMBURSABLEAGREEMENTWITHPRIVATESECTORWITHPAYMENTS-IN-ADVANCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
4 a. Requestrevenuerecognitionformonthlyleasepayment
b. Requestliquidationofadvancepaymentliabilityasappropriate
(ProgramMissionActivity)
• Reimbursableagreementterms
• Requestforrevenuerecognitionformonthlyleasepayment
• Requestforliquidationofadvancepaymentliabilityasappropriate
5 a. Receiveandprocessrequesttorecognizerevenueformonthlyleasepayment(FFM.040.010RevenueProcessing)
b. Receiveandprocessrequestforliquidationofadvancepaymentliabilityasappropriate(FFM.090.030AccrualandLiabilityProcessing)
c. Adjustreceivable(FFM.050.030ReimbursableInvoicing)
• Requestforrevenuerecognitionformonthlyleasepayment
• Requestforliquidationofadvancepaymentliabilityasappropriate
• Appropriateadvancepaymentrevenuerecognitionentrycreatedwithreferencetosourceinformation
• Appropriateadvancepaymentliabilityliquidationentrycreatedwithreferencetosourceinformation
• Appropriateadvancepaymentreceivableadjustmententrycreatedwithreferencetosourceinformation
6 Postappropriatebudgetaryand
proprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
7 a. Providenoticeofleaseexpiration
b. Inspectthepropertyanddetermineafullrefundofthesecuritydepositisdue
c. Requestrefundofsecuritydeposit
(ProgramMissionActivity)
• Leasetermexpirationwithoutrenewal
• Reimbursableagreementterms
• Requestforrefundofsecuritydeposit
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 87FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.3REIMBURSABLEAGREEMENTWITHPRIVATESECTORWITHPAYMENTS-IN-ADVANCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
8 a. Receiveandprocessrequestforrefundofsecuritydeposit(FFM.050.060ReimbursableCloseout)
b. Establishrefundpayable(FFM.030.070PaymentProcessing–CommercialPayments)
c. Liquidatesecuritydepositliability(FFM.090.030AccrualandLiabilityProcessing)
• Requestforrefundofsecuritydeposit
• Reimbursableagreementterms
• Appropriatesecuritydepositrefundpayableentrycreatedwithreferencetosourceinformation
• Appropriatesecuritydepositliabilityliquidationentrycreatedwithreferencetosourceinformation
9 Requestfundsavailabilitycheck(ProgramMissionActivity)
• Validatedsecuritydepositrefund • Requestforfundsavailabilitycheck
10 Receiveandprocessrequestforfundsavailabilitycheck(FFM.030.020ObligationManagement)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
11 a. Approvesecuritydepositrefundb. Requestdisbursement(ProgramMissionActivity)
• Fundsavailabilityresponse• Validatedsecuritydepositrefund
• Approvedsecuritydepositrefund• Requestfordisbursementofapprovedsecuritydepositrefund
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 88FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.3REIMBURSABLEAGREEMENTWITHPRIVATESECTORWITHPAYMENTS-IN-ADVANCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
12 a. Receiveandprocessdisbursementrequest(FFM.030.070PaymentProcessing-CommercialPayments)
b. Initiatepayment(FFM.030.070PaymentProcessing-CommercialPayments)
c. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
d. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
e. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
f. Adjustsecuritydepositreceivable(FFM.050.030ReimbursableInvoicing)
• Reimbursable(lease)agreement• Requestfordisbursementofapprovedsecuritydepositrefund
• Appropriatedisbursemententrycreatedwithreferencetosourceinformation
• Appropriatepayableentryclearedwithreferencetosourceinformation
• Certifieddisbursementschedule• Disbursementconfirmationinformation
• Appropriatesecuritydepositreceivableadjustmententrycreatedwithreferencetosourceinformation
13 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
14 Requestcloseoutofreimbursableagreement(ProgramMissionActivity)
• Reimbursableagreementprojectcode
• Requestforcloseoutofreimbursableagreement
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 89FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.3REIMBURSABLEAGREEMENTWITHPRIVATESECTORWITHPAYMENTS-IN-ADVANCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
15 Receiveandprocessrequestforcloseoutofreimbursableagreement(FFM.050.060ReimbursableCloseout)
• Requestforcloseoutofreimbursableagreement
• Appropriatecloseorderentriescreatedwithreferencetosourceinformation
16 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 90FederalGovernment–unlimitedusagerights. Version:20170630
UseCase7.4ReimbursableAgreementfromtheBuyer’sPerspective(L1)End-to-EndBusinessProcess:7Agree-to-ReimburseBusinessScenario(s)Covered• ReimbursableAgreementfromtheBuyer’sPerspective • IPACChargeback
BusinessActor(s) Primary:FinanceOffice;ProgramOfficeOther:FederalAgencySeller;FederalAgencyBuyer
SynopsisAreimbursableagreementwaspreviouslyestablishedbetweentwoFederalagenciesforaone-timeservice.TheFederalAgencySelleristoprovidetheFederalAgencyBuyerwithservicesinsupportofanupcomingevent;theFederalAgencySellerisrequiredtobepaidinadvancefortheservicesandpullsthepayment.AnIPACisinitiatedtotransfertheagreedfundsbeforetheevent.ServicesareprovidedandtheFederalAgencyBuyerisnotsatisfiedthattheyareasagreed.AdisputeisinitiatedbytheFederalAgencyBuyer.ThedisputeisresolvedandanIPACchargebackisinitiatedtotransfertheagreedrefundfromtheFederalAgencySellertotheFederalAgencyBuyer.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. TheFederalAgencySellerhasapprovedreimbursableauthorityandsufficientfundingceilingtoprovidetheservicestotheFederalAgencyBuyer.8. TheFederalAgencyBuyerhasobligatedfundsandvalidatedfundsavailabilitytocovertheadvance.9. TheamounttransferredfromtheFederalAgencyBuyertotheFederalAgencySellerdoesnotexceedtheagreeduponamount.10. BothagenciesareproperlyregisteredintheIPACsystem.11. BothagencieshaveallpertinentinformationtomakeanIPACtransfer.12. BothagenciesfollowIPACbusinessrules.13. TheFederalAgencyBuyer’srequestfortheIPACadjustmentiswithin90daysoftheoriginalIPACtransfertotheFederalAgencyBuyer.FFMSRIDReference(s) 1.1.2;1.1.5;2.2.1;2.2.2InitiatingEvent AFederalagencyagreestoprepayforone-timereimbursableservices.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 91FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.4REIMBURSABLEAGREEMENTFROMTHEBUYER’SPERSPECTIVETypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
1
FederalAgencySellerrequestsanIPACcollectionforpaymentinadvanceforservicestobeprovided(ACQ.040.030DocumentationofDelivery/Acceptance)
• Reimbursableagreement • RequestforinitiationofIPACcollection
2 a. ReceiveandprocessrequestforinitiationofIPACcollectionfromFederalAgencyBuyer(FFM.030.030PaymentProcessing-IntragovernmentalPayments)
b. Createundeliveredorderwithadvancepayment(FFM.050.010ReimbursableAgreementSet-upandMaintenance)
c. ReceivenoticeofIPACtransfer(FFM.030.120PaymentConfirmation)
• RequestforinitiationofIPACcollection
• Reimbursableagreement
• IPACdisbursementfromFederalAgencyBuyerTreasuryAccountSymbol(TAS)/AgencyLocationCode(ALC)toFederalAgencySellerTAS/ALC
• AppropriateFederalAgencyBuyerprepaymententrycreatedwithreferencetosourceinformation
• AppropriateFederalAgencyBuyerundeliveredorderentrycreatedwithreferencetosourceinformation
• NoticeofIPACtransfer• IPACdisbursementinformation
3 ReceivenoticeofIPACtransfer(ProgramMissionActivity)
• NoticeofIPACtransfer• IPACdisbursementinformation
• Requestcaptureofadvancepaymentinformation
4 Receiveandprocessrequesttocapturepaymentforadvancepayment(FFM.030.030PaymentProcessing-IntragovernmentalPayments)
• Requestcaptureofadvancepaymentinformation
• AppropriateFederalAgencyBuyerexpenditureentrycreatedwithreferencetosourceinformation
5 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 92FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.4REIMBURSABLEAGREEMENTFROMTHEBUYER’SPERSPECTIVETypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
6 FederalAgencyBuyerreceivesservicesandrequestsprocessingofreceipt.(ProgramMissionActivity)
• Servicesreceived
• Requestforprocessingofreceiptofservices
7 Receiveandprocessreceiptofservices(FFM.050.040ReimbursableReceiptProcessing)
• Requestforprocessingofreceiptofservices
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
• Appropriateundeliveredorderliquidationentrycreatedwithreferencetosourceinformation
8 a. FederalAgencyBuyerreviewsIPACdisbursementinformation,reviewsservicesreceived,findsthatsomeservicespaidforwerenotperformed,anddisputestheIPACdisbursementamount
b. FederalAgencySellerandFederalAgencyBuyerresolvethedisputeandagreeontheamounttoberefunded
c. FederalAgencyBuyerrequestsanIPACadjustment(chargeback)
(ACQ.040.030DocumentationofDelivery/Acceptance)
• IPACdisbursementinformation• Reimbursableagreement
• DisputedIPACpayment• Disputeresolution• RequestforinitiationofIPACcollection(chargeback)
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 93FederalGovernment–unlimitedusagerights. Version:20170630
USECASE7.4REIMBURSABLEAGREEMENTFROMTHEBUYER’SPERSPECTIVETypicalFlowofEvents FMEvent Non-FMEvent Input(s) Output(s)/Outcome(s)
9 a. ReceiveandprocessinitiationofIPACcollection(chargeback)(FFM.030.030PaymentProcessing-IntragovernmentalPayments)
b. ReceivenoticeofIPACtransfer(FFM.030.120PaymentConfirmation)
c. Reverseobligationliquidationfordisputedadvancepaymentamount(FFM.030.020ObligationManagement)
d. Adjustexpenditureforamountactuallypaid(FFM.030.030PaymentProcessing-IntragovernmentalPayments)
e. DeobligateFederalAgencyBuyerdisputeddisbursement(FFM.030.020ObligationManagement)
• RequestforinitiationofIPACcollection(chargeback)
• IPACcollection(chargeback)toFederalAgencyBuyerTAS/ALCfromFederalAgencySellerTAS/ALC
• IPACcollectionconfirmationinformation
• AppropriateFederalAgencyBuyerobligationliquidationreversalentrycreatedwithreferencetosourceinformation
• AppropriateFederalAgencyBuyerexpenditureentryadjustedwithreferencetosourceinformation
• AppropriateFederalAgencyBuyerdeobligationentrycreatedwithreferencetosourceinformation
• NoticeofIPACtransfer• IPACdisbursementinformation
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 94FederalGovernment–unlimitedusagerights. Version:20170630
10Book-to-Reimburse(Travel)
End-to-EndBusinessProcess:10Book-to-Reimburse(Travel)UseCase10.3TravelSponsoredbyNon-GovernmentSource(L2)
BusinessScenario(s)Covered• TravelSponsoredbyNon-GovernmentSource • Non-GovernmentSourcePaymentIn-Kind
BusinessActor(s) Primary:TravelOffice;FinanceOfficeOther:ProgramOffice;Non-GovernmentSponsor
SynopsisArequestfortravelhasbeenmadebyaNon-GovernmentSponsorwithawrittenoffertopartiallypayin-kindforsometravelexpenses(e.g.,thehotelexpense).Therequesthasbeenacceptedbythegovernment.Atravelauthorizationwithallanticipatedtravelexpensesandanotationofwhichexpenseswillbepaidin-kindbytheNon-GovernmentSponsorispreparedandsubmitted.Theportiontobepaidin-kindisexcludedfromtheamountobligated.Traveliscompletedandatravelvoucherispreparedandsubmitted.Theexpensespaidin-kindareexcludedfromthetravelvoucher.Asplitpaymentismadetopaythetravelerforout-of-pocketexpensesandpaythetravelcardcompany.AssumptionsandDependencies1. Thereisnopresumptionastowhichactivitiesareexecutedbywhichbusinessactor.2. Thereisnopresumptionastowhichactivitiesareautomated,semi-automated,ormanual.3. Theremayormaynotbeautomated(near/real-timeorbatch)interfacesbetweenserviceareas/functions/activitiesandbetweenprovider
solutions/systems.4. SupportinginformationforGeneralLedgertransactionsincludessub-ledgerentrieswhensub-ledgersareused.5. Appropriateattributes(e.g.,objectclassandproject)areincludedaspartoftheaccountingstring.6. AllpredecessoractivitiesrequiredtotriggertheInitiatingEventhavebeencompleted.7. Theemployeehasatravelcardandisingoodstandingwiththecardcompany.8. TheTravelOfficedoesnotrequirefundsbecommittedpriortoorforthetravelrequest.9. TheobligationamountissufficienttocoverthegovernmentportionoftheTDYtravelexpenses.10. Thetravelcardcompanyhasalreadybeenestablishedinthefinancialsystem.11. TheNon-GovernmentSponsorpaysthevendor(e.g.,hoteloperator)directlyfortheirportionofthetravelexpenses.FFMSRIDReference(s) 1.1.2;1.3.1;2.1.2;2.2.1;2.2.2InitiatingEvent TheTravelOfficeprovidesaTDYtravelauthorization.
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 95FederalGovernment–unlimitedusagerights. Version:20170630
USECASE10.3TRAVELSPONSOREDBYNON-GOVERNMENTSOURCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
1 a. ReceiveandvalidateTDYtravelauthorizationfortravelpartiallypaidin-kindbyaNon-GovernmentSponsor,notingamounttobepaidin-kindintheremarkssectionoftheauthorization(thisamountisexcludedfromamountobligated)
b. Requestfundsavailabilitycheck
(TRF.010.030TemporaryDuty(TDY)andLocalTravelAuthorizationProcessing)
• TDYtravelauthorizationwithnotationofamounttobepaidin-kind
• ValidatedTDYtravelauthorization• Requestforfundsavailabilitycheck
2 Receiveandprocessrequestforfundsavailabilitycheck(authorizedamountlessportiontobepaidin-kind)(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
3 ApproveTDYtravelauthorization(TRF.010.030TemporaryDuty(TDY)andLocalTravelAuthorizationProcessing)
• ValidatedTDYtravelauthorization• Fundsavailabilityresponse
• ApprovedTDYtravelauthorization
4 ReceiveapprovedTDYtravelauthorizationandobligatefunds(authorizedamountlessportiontobepaidin-kind)(FFM.030.020ObligationManagement)
• ApprovedTDYtravelauthorization • Appropriateobligationentrycreatedwithreferencetosourceinformation
5 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 96FederalGovernment–unlimitedusagerights. Version:20170630
USECASE10.3TRAVELSPONSOREDBYNON-GOVERNMENTSOURCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
6 a. Receive,process,andauditTDYtravelexpensevoucher
b. Requestfundsavailabilitycheck
(TRF.010.060TemporaryDuty(TDY)andLocalTravelVoucherProcessingandAudit)
• TDYtravelexpensevoucher(notincludingamountpaidin-kind)
• AuditedTDYtravelvoucher• Requestforfundsavailabilitycheck
7 Receiveandprocessrequestforfundsavailabilitycheck(FFM.010.020FundAllocationandControl)
• Requestforfundsavailabilitycheck
• Fundsavailabilityresponse
8 a. ApproveTDYtravelvoucherb. RequestprocessingforTDY
voucherpayable(TRF.010.060TemporaryDuty(TDY)andLocalTravelVoucherProcessingandAudit)
• Fundsavailabilityresponse• AuditedTDYtravelvoucher
• ApprovedTDYtravelvoucher• RequestforprocessingofTDYvoucherpayable
9 ReceiveandprocessrequestforprocessingofTDYvoucherpayable(FFM.030.050PaymentProcessing-TravelTDYandLocalPayments)
• RequestforprocessingofTDYvoucherpayable
• AppropriateTDYvoucherpayablecreatedwithreferencetosourceinformation
• Appropriateobligationliquidationentrycreatedwithreferencetosourceinformation
10 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 97FederalGovernment–unlimitedusagerights. Version:20170630
USECASE10.3TRAVELSPONSOREDBYNON-GOVERNMENTSOURCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
11 a. Determinedisbursementsplitbetweencreditcardcompanyandemployee
b. Requestdisbursementtocreditcardcompanyandemployee
(TRF.010.060TemporaryDuty(TDY)andLocalTravelVoucherProcessingandAudit)
• ApprovedTDYtravelvoucher • Requestfordisbursementtocreditcardcompany
• Requestfordisbursementtoemployee
12 a. Receiveandprocessdisbursementrequesttocreditcardcompany(FFM.030.070PaymentProcessing-CommercialPayments)
b. Receiveandprocessdisbursementrequesttoemployee(FFM.030.050PaymentProcessing-TravelTDYandLocalPayments)
c. Initiatepaymenttocreditcardcompany(FFM.030.070PaymentProcessing-CommercialPayments)
d. Initiatepaymenttoemployee(FFM.030.050PaymentProcessing-TravelTDYandLocalPayments)
e. Generatedisbursementschedule(FFM.030.110PaymentDisbursement)
f. Certifypaymentofdisbursementschedule(FFM.030.110PaymentDisbursement)
g. Receiveconfirmationofdisbursement(FFM.030.120PaymentConfirmation)
• Requestfordisbursementtocreditcardcompany
• Requestfordisbursementtoemployee
• Appropriatedisbursemententriescreatedwithreferencetosourceinformation
• Appropriatepayableliquidationentriescreatedwithreferencetosourceinformation
• Certifieddisbursementschedule• Creditcardcompanyreceivespayment
• Employeereceivespayment• Disbursementconfirmationinformation
FinancialManagementPhase2BusinessUseCases
©2017TheMITRECorporation–allrightsreserved. |P a g e 98FederalGovernment–unlimitedusagerights. Version:20170630
USECASE10.3TRAVELSPONSOREDBYNON-GOVERNMENTSOURCETypicalFlowofEvents FFMEvent Non-FFMEvent Input(s) Output(s)/Outcome(s)
13 Postappropriatebudgetaryandproprietaryentriestothegeneralledger(FFM.090.020GeneralLedgerPosting)
• GLentries • AppropriateGLaccountsupdated
14 Providetravel-relatedfinancialmanagementinformation(e.g.,statusofobligationsandpayments)asscheduledorrequested(FFM.110.040FinancialPerformanceandOperationalReporting)
• Periodend• Traveltransactions
• Periodictravel-relatedfinancialmanagementinformationwithreferencetosourceinformation