Coup previously underLISS management.
This is now a clearfell coupe as the research
trial has ended.
Adjacency between coupes is unavoidable due to coupes
felled after DNB infection.
Hilltop to be felled in first phase to fit wider landscape.
Phase three coupe that will be restocked with 12ha of broadleaves as the site conditions are more favourable. This
along with 2.7ha of open ground will allow this plan area to meet minimum UKFS standards for broadleaves and open
space within a woodland.
There is a weight and volume restriction on this section ofpublic road. Consultation will take place with Moray council
road engineers before any harvesting operation is undertaken.
Reproduced by permission of Ordnance Survey on behalf ofHMSO. © Crown copyright and database right [2020]. All rightsreserved. Ordnance Survey Licence number [100021242].© Getmapping Plc and Bluesky International Limited 2020.
0 500 1000 1500 2000Meters
Phase Years Volume from thinning and clearfell (m3 / year)
1 2020 - 2024 4440 2 2025 - 2029 4788
Road restrictionForest Roads - ClassificationFelledQuarryOpenPhase 1 (2020 - 2024) Phase 2 (2025 - 2029)
Phase 3 (2030 - 2034)Phase 4 (2035 - 2039)Phase 5 (2040 - 2044)Phase 6 (2045 - 2049)After 2054Long term retention
Scale 1:15,000 @ A3
East Region
Date May 2020O.S. Grid reference NJ 456 627
Maud and CarnochMap 4 Mangement