felipe palomo - selected work
02/13 - 11/13 - THERM model - CD drafting - Struct. coord. - 3D Rendering
PENN AVE. RFP
Thoughtful Balance Inc.Request for Proposals: Build a new residential development on a site along the Penn Avenue Arts Corridor at the border between the Friendship and Garfield neighborhoods in the City of Pittsburgh. The use for this site would be a single-family, for-sale, residential development with a modern, green and energy efficient design and density appropriate for the surrounding area. Total of 6,336 sq. ft. in area. penn ave
Typ. Unit front facade
3th
2nd
1st
White PolycarbonatePanel (Semi-Translucent)
Unistrut attached toceiling w/ threaded rod
Threaded Rod
Existing HVAC duct
Dim. VariesTo Finish Floor
Varies
OPTION 3: Polycarbonate Panelling
Manual Roller Shade Header such as Mechoshade installed behind window frame
Existing HVAC duct
Manual adjustment
OPTION 1: Polycarbonate Panelling
DetailsScale: Not to scaleA6
MCKEESPORT YMCA THERM STUDIES
PENN AVE. RFP
Thermal Bridge Calculator Software ModellingThe facility renovation was designed to keep utilities andoperating costs as low as possible. A geo-thermal system will be installed to provide efficient heating and cooling. And the thermal envelope will be designed to be as efficient as the budget allows to achieve Passive House Retrofit Standard Certification. Potential Thermal bridges in the building renovation need to be studied and R-Value measured.
Southside High School ApartmentsA0Render with Policarbonate Panels covering interior HVAC Ductwork NOT visible from exterior windows
Building SectionA5 Scale: Not to scale
10th Street
Panel DetailRefer to A5
View of visible HVAC Ductworkfrom the outside
View of NO visible HVAC Ductworkfrom the outside
SSHS Feasibility StudySouthside High School Apartments Ductwork Concealment Feasibility Study which consist in various solutions to mitigate the visibility of the units ductwork from the exterior as to obtain Historic Tax Credit for the recently completed renovation the building. The solutions we considered: installation time and disturbance, cost per unit, permit requirements, additional engineering, and aesthetics.
White PolycarbonatePanel (Semi-Translucent)
Unistrut attached toceiling w/ threaded rod
Threaded Rod
Existing HVAC duct
Dim. VariesTo Finish Floor
Varies
OPTION 3: Polycarbonate Panelling
Manual Roller Shade Header such as Mechoshade installed behind window frame
Existing HVAC duct
Manual adjustment
OPTION 1: Polycarbonate Panelling
DetailsScale: Not to scaleA6
option 1: roller shade
option 2: polycarbonate panelling
Building SectionA5 Scale: Not to scale
10th Street
Panel DetailRefer to A5
View of visible HVAC Ductworkfrom the outside
View of NO visible HVAC Ductworkfrom the outside
building sightline section
56 long Wall-Slab Section Section: Isothermic view
4 Exterior Brick12 Terracota Brick2 Rigid Foam Insulation8 Closed Cell InsulationGWBExisting Concrete SlabMetal Stud
Example of thermal bridge at slab - wall section, where a large heat loss is detected but we take control of the heat loss with a new interior insulation wall wrap. Contractor to pay extra attention to perform air-tightness on these details.
WALNUT STREET
PHPP 2007, Verification 2013.10.01 PHPP REV Climate Walnut.xls
Building: Walnut Street RetrofitLocation and Climate: Pittsburgh, PA PITTSBURGH ALLEGHENY CO AP PA
Street Address: Walnut StreetCity, State, Zip: Pittsburgh, PA
Country: United States of AmericaBuilding Type: Victorian Single Family Retrofit
Home Owner(s) / Client(s): Laura NettletonStreet Address: 456 South Graham StreetCity, State, Zip: Pittsburgh, PA 15232
Architect: Thoughtful Balance, inc.Street: 456 South Graham Street
City, State, Zip: Pittsburgh, PA 15232Mechanical System:
Street Address:City, State, Zip:
Year of Construction: 2013Number of Dwelling Units: 1 Interior Temperature: 68.0 F
Gross Enclosed Volume Ve: 34636 ft3 Internal Heat Gains: 0.7 BTU/hr.ft2Number of Occupants: 6.0
Energy Demands with Reference to the Treated Floor AreaTreated Floor Area: 2258 ft2
Applied: Monthly Method PH Certificate: Fulfilled?
Specific Space Heat Demand: 4.27 kBTU/(ftyr) 4.75 kBTU/(ftyr) YesPressurization Test Result: 1.00 ACH50 0.6 ACH50 No
Specific Primary Energy Demand(DHW, Heating, Cooling, Auxiliary and Household Electricity): 36.5 kBTU/(ftyr) 38.0 kBTU/(ftyr) Yes
Specific Primary Energy Demand(DHW, Heating and Auxiliary Electricity): 23.5 kBTU/(ftyr)
Specific Primary Energy DemandEnergy Conservation by Solar Electricity: kBTU/(ftyr)
Heating Load: 3.54 BTU/(ft2hr)Frequency of Overheating: % over 77.0 F
Specific Useful Cooling Energy Demand: 0.82 kBTU/(ftyr) 4.75 kBTU/(ftyr) YesCooling Load: 2.31 BTU/(ft2hr)
We confirm that the values given herein have been Issued on:determined following the PHPP methodology and basedon the characteristic values of the building. The calculations signed: with PHPP are attached to this application.
Passive House Verification
Photo or Drawing
5724 Walnut Street Victorian House RenovationWalnut Street is the renovation of a single-family Victorian residence in the Shadyside neighborhoodin Pittsburgh. The project took the dilapidated house and put a new exterior and renovated the interior spaces. The thermal envelope was retrofitted with exterior rigid foam panels and cement board siding, and high performance windows. Zoned heating systems were installed to allow the family to condition floors separately. We are achieveing Passive House Residential Retrofit Standards.
first floor plan
COMMUNITYROOM
LAUNDRY380 SF NET
EXERCISEROOM
440 SF NET
UNIT 1011 BR
821 SF
MAILROOM
MEDIA ROOM
MGMT.OFFICE
CONFERENCE
WALK-INCLOSET
WALK-INCLOSET
VENDING
KITCHENETTE
DUMPSTERROOM
EXISTING COMMERCIAL
EXISTING COMMERCIAL
EXISTING COMMERCIAL
EXISTINGCOMMERCIAL
GAMES &LIBRARY563 SF NET
W W W W
D D D D D
W
VESTIBULE
ENTRY
LOUNGE743 SF NET
STORAGE
SOCIALWORKEROFFICE
VESTIBULESTOR.
CARTSTOR.
JAN.
TRASH/RECYCLING
TRASHCHUTE
COPY
UNIT 1021 BR
886 SF
WALK-INCLOSET
CLOSET
UNIT 1051 BR
774 SF
UNIT 1042 BR
1041 SF
UNIT 1031 BR
772 SF
STAIR A
STAIR B
PROJECT NO: 0111
DATE: OCTOBER 31, 2013
bala
ncein
c.su
stai
nabl
e ar
chite
ctur
e an
d de
sign
t h o
u g
h t
f u l
4
56 so
uth
grah
am st
reet
pitts
burg
h, p
enns
ylva
nia
1523
2t.
412.
661.
6010
f.
412
.363
.991
1
PROJ
ECT:
SHEET NO:
TITLE:
KEY PLAN:
NORTH
SEAL
:
CAST
LETO
NAP
ARTM
ENT
COMP
LEX
RETR
OFIT
FIRSTFLOORPLAN
SCALE:
FIRST FLOOR PLAN1 1/16" = 1'-0"
ELEV.LOBBY
UNIT #011 BR
738 SF
ELEC/DATA
TRASH / RECYCLEROOM
ELEC / TELECOM.ROOM
UPDN
UNIT #021 BR
776 SFUNIT #03
1 BR803 SF
UNIT #04EFF.
598 SF
UNIT #051 BR
817 SF
UNIT #061 BR
783 SF
UNIT #071 BR
764 SF
UNIT #091 BR
769 SF
UNIT #081 BR
768 SF
UNIT #102 BR
1015 SF
UNIT #111 BR
653 SF
STAIR B
STAIR A
PROJECT NO: 0111
DATE: OCTOBER 31, 2013
bala
ncein
c.su
stai
nabl
e ar
chite
ctur
e an
d de
sign
t h o
u g
h t
f u l
4
56 so
uth
grah
am st
reet
pitts
burg
h, p
enns
ylva
nia
1523
2t.
412.
661.
6010
f.
412
.363
.991
1
PROJ
ECT:
SHEET NO:
TITLE:
KEY PLAN:
NORTH
SEAL
:
CAST
LETO
NAP
ARTM
ENT
COMP
LEX
RETR
OFIT
SECOND TOSIXTHFLOOR PLANS
SCALE:
SECOND THROUGH SIXTH FLOOR PLANS1 1/16" = 1'-0"
detail wall section (typ)
CLOSET
WALK-INCLOSET
PROJECT NO: 0111
DATE: OCTOBER 31, 2013
bala
ncein
c.su
stai
nabl
e ar
chite
ctur
e an
d de
sign
t h o
u g
h t
f u l
4
56 so
uth
grah
am st
reet
pitts
burg
h, p
enns
ylva
nia
1523
2t.
412.
661.
6010
f.
412
.363
.991
1
PROJ
ECT:
SHEET NO:
TITLE:
KEY PLAN:
NORTH
SEAL
:
CAST
LETO
NAP
ARTM
ENT
COMP
LEX
RETR
OFIT
UNIT TYPES103 AND 104FLOOR PLANSSCALE:UNIT 103 (772 SF)1 1/8" = 1'-0" SCALE:UNIT 104 (1041 SF)2 1/8" = 1'-0"
unit 103 - 772 sf.
1st
2nd to 6th
north eastwest
Castleton Apartments - Deep Energy Retrofit Renovation
As part of a team, we re-designed the interior of the building to insert accesible units for rent. The renovation will include common spaces and recreational facilities. This project will apply to Housing Finance and Tax Credit. Blower door testing twice during construction, with an air tightness of 0.6 air changes per hour to be performed as part of Passive House certification.
CASTLETON
Unit BUnit C
MARKET STREET & FIRST AVENUE
Peter Margittai ArchitectsThis1845 downtown Pittsburgh historic structure redeveloped to include three independent four story townhomes, adding a total of 4,130 sq.ft. The client required preservation of historic framing while exposing the historic essence of the structure. Principal work was on construction drawings for the elaborate staircase.
09/12 - 01/13 - Stairs design - CD drafting - Struct. Coord.
MARKET STREET & FIRST AVENUE
historic
modern
third floor plan
first floor plan
OFFICE MARKETINGMarketing ideas and proposals were developed at the office. These wine labels were produced for the Market Street Residences project with real estate purposes.
SSCC WELCOME CENTER
Collaborative design and renovation of the exterior signage for the South Side Chamber of Commerce Welcome Center. The new facility will be available to community development organiza-tions asd to promote the South Side as a business-friendly neighborhood that welcomes professionals of all types
DESIGN & DRAFTING Peter Margittai Architects Complete sets of detailed architectural drawings in CAD format were produced for building permits, contractors estimates, and structural coordination.
LAXMAN RESIDENCERenovation of a 3,400 sq.ft. house and of a 2,500 sq.ft. addition. The client required a modern home with high ceilings and flat roofs. This design included minimalist materials such as cedar siding, exposed concrete and extensive glass windows.
demolition - east elevation
demolition - south elevation
10/11 - 01/13
- Arch. Design - 3D Rendering - 2D Drafting - EC Survey
privacy
mass
transparency
Laxman - proposed renovation + addition
1st floor
section 1 - A3.01Laxman - proposed renovation + addition
The renovation included the removal and complete demolition of the existing second floor and roof, as well as all brick siding. New framing will be added to the exisiting first floor walls to give the desired high ceiling and flat roof.
west
south
east
north
Architectural design, development and construction supervision of a carriage house barn style building with a 2800 sqft. main floor. The structure is made of heavy timber framing (Hemlock & Douglas Fir), with 6-1/2 SIP panels for walls and 8-1/4 SIP panels for roofing The builiding will hold space for vehicles, workshop, a micro-brewery, and an upper level loft for guest. The interior finish is made of tongue & groove.
KAERCHER CARRIAGE HOUSE
lightinginterior
Kaercher main floor plan
The Barn is located close to the existing home but hidden from the entrance, being only visible in its totality from the front of the house.
05/11 - 04/12
- Arch. Design - 3D Rendering - 2D Drafting - Const. Admin.
The guest house matches the architectural materials of the clients adjacent home. However, it keeps the simplicity of a barn style from the outside, leading into a complex structured interior.
exterior rendering
Exposed hammer beam trusses, the porch under the deck, and the gable roof give the barn a complex character while maintaining a residential look as a secondary building.
timber framing process
Located in front of an existing chemical warehouse, the architectural purpose was to create a new three story office building that will also serve as a facade for the warehouse. The corridors along the curtain wall are illuminated by the stairwell that runs vertically through the entire building, which functions as the vertical light source. The main design elements are the curtain wall and shutters, created to take full advantage of the ample natural light.
PROQUIMSA OFFICES
01/10 - 06/10 - Arch. Design - 3D Rendering - 2D Drafting
The staircase, illuminated from the front and top, becomes the spine for natural light as well as circulation for the building.
front elevation side elevation
staircase section
zeni
th lig
ht
boardroom, exterior & interior view