86
Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1

YOUR future2030Community Strategic Plan

2018-2030

Fees and Charges 2019 -2020

Page 2: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

2

ACCESSIBLE FORMATIf you need this information in an accessible format, please telephone 9911 6555 or email [email protected] document can also be found in large print format on www.canadabay.nsw.gov.au.

ENGLISHIf you do not understand this information, please come to the Council or contact the Telephone Interpreter Service (TIS) on 13 14 50 and ask them to connect you to Council on 9911 6555. We will try to answer your enquiries by using an interpreter.

ITALIANSe hai difficoltà a capire questo documento presentati direttamente all’ufficio del Comune, oppure telefona al Servizio Telefonico Interpreti (TIS, numero di telefono 13 14 50) e chiedi di essere messo in contatto con l’ufficio del Comune (numero di telefono 9911 6555). Cercheremo di rispondere alle tue domande con l’aiuto di un interprete.

GREEKΑν δεν καταλαβαίνετε αυτές τις πληροφορίες, παρακαλούμε ελάτε στο Δήμο ή επικοινωνήστε με την Τηλεφωνική Υπηρεσία Διερμηνέων (TIS) στο 13 14 50 και ζητείστε να σας συνδέσουν με τον Δήμο στον αριθμό 9911 6555. Θα προσπαθήσουμε να απαντήσουμε στις ερωτήσεις σας χρησιμοποιώντας ένα διερμηνέα.

SIMPLIFIED CHINESE如果您对这些内容不理解,请向地方议会咨询或致电13 14 50联系电话口译服务(TIS),并在他们的帮助下通过电话与9911 6555地方议会联系。h们将尽力通过口译员回答您的问题。

KOREAN이 정보내용을 잘 이해하지 못 하신다면, 심의회(Council)로 방문해 주시거나, <13 14 50>으로 전화통역서비스를 이용하셔서 심의회(9911 6555) 로 연결해 달라고 요청하시기 바랍니다. 통역사의 도움을 받아 귀하의 문의사항에 답변해 드리도록 하겠습니다.

City of Canada Bay1a Marlborough StreetDrummoyne NSW 2047Telephone: 9911 6555Email: [email protected]: canadabay.nsw.gov.au

More Information

Page 2 of 86

Page 3: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Table Of ContentsCity of Canada Bay.................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................13

1.1 Pricing Policy.....................................................................................................................................13

Price Codes............................................................................................................................................................14

Goods & Services Tax (GST)................................................................................................................................14

1.2 Access Through or Occupy Public Space......................................................................................15

Business Use of Footpaths..................................................................................................................................15

Administration of Business Use of Footpaths............................................................................................................................................15

Major Commercial Centres............................................................................................................................................................................15

Other Commercial Areas...............................................................................................................................................................................15

Public Land and Infrastructure Occupation........................................................................................................15

1.3 Administration and Governance......................................................................................................16

Financial Administration.......................................................................................................................................16

Records Management...........................................................................................................................................16

Documents, Maps & Reports.........................................................................................................................................................................16

Formal Request..............................................................................................................................................................................................17

Formal Access Application (Not Personal Information of Applicant & Personal Information of Applicant)....................................................................17

Internal Review..........................................................................................................................................................................................................................17

Informal Request............................................................................................................................................................................................17

Property Enquiries.........................................................................................................................................................................................17

Subpoena Processing....................................................................................................................................................................................17

Printing and Copying.....................................................................................................................................................................................17

E-Lodgement of Application..........................................................................................................................................................................18

GIS – House Renumbering............................................................................................................................................................................18

1.4 Animal Management.........................................................................................................................18

Impounding of Animals.........................................................................................................................................18

1.5 Asset Management............................................................................................................................19

Aus Spec 1 Guidelines..........................................................................................................................................19

Car Share Parking.................................................................................................................................................19

Civil Works in the Public Domain........................................................................................................................19

Construction Works Zone.....................................................................................................................................19

Permit to Stand Plant............................................................................................................................................19

Crane Permit (Tower or Internal) Based Crane...................................................................................................19

Damage Report......................................................................................................................................................19

Emergency Call Out Situations............................................................................................................................19

Emergency Call Out – Labour per hour........................................................................................................................................................20

Emergency Call Out – Plant Hire per hour...................................................................................................................................................20

Emergency Call Out – Materials....................................................................................................................................................................20

Barricades and Lights....................................................................................................................................................................................20

Placement of Barricades (Council to setup) During Business Hours.......................................................................................................20

Placement of Barricades (Council to setup) After Business Hours..........................................................................................................21

Flood Risk / Stormwater Assessment..........................................................................................................................................................21

Hoardings...............................................................................................................................................................21

Memorial Donations..............................................................................................................................................21

Page 3 of 86

Page 4: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

OSD Identification Plate........................................................................................................................................21

Rock Anchor Permit..............................................................................................................................................21

1.6 Building Services..............................................................................................................................22

General Information..............................................................................................................................................22

Complying Development Certificates and Exempt Development.....................................................................23

Administration of Complying Development Certificates............................................................................................................................23

Complying Development Certificates – Application...................................................................................................................................23

Other Activity Application Fees (Section 68 Of Local Government Act 1993).........................................................................................23

Compliance Levy...................................................................................................................................................23

Construction and Development Certification.....................................................................................................24

Damage Deposits...........................................................................................................................................................................................24

Construction Certificates – Class 1&10 (Refer General Note)...................................................................................................................24

Construction Certificates – Class 2-9 (Refer General Note).......................................................................................................................24

Construction Certificate Modifications........................................................................................................................................................24

Registration of Certificates Issued by Accredited Certifiers......................................................................................................................24

Transfer of PCA services to Council............................................................................................................................................................25

Construction Inspection................................................................................................................................................................................25

Fire Safety Compliance..................................................................................................................................................................................25

Building Certification (Section 149A-E)...............................................................................................................25

Building Certificates Section 149(A-E) Certificates – Classes 1 & 10 – Statutory...................................................................................25

Section 149(A-E) Certificates – Other Classes – Statutory........................................................................................................................25

1.7 Certificates.........................................................................................................................................26

Planning Certificates.............................................................................................................................................26

Outstanding Notices.............................................................................................................................................26

Occupation Certificates........................................................................................................................................26

Rates Certificates..................................................................................................................................................26

Section 54 Certificate (LGA, 1993).......................................................................................................................26

Section 88G Certificate.........................................................................................................................................26

Swimming Pool Safety Certificate.......................................................................................................................26

1.8 Compliance........................................................................................................................................27

Abandoned Articles...............................................................................................................................................27

Motor Vehicles, Trucks, Trailers and Caravans...........................................................................................................................................27

Shopping Trolleys and Sandwich Boards....................................................................................................................................................27

Other Goods....................................................................................................................................................................................................27

Public Health Inspections.....................................................................................................................................27

Protection of Environment Operations Act.........................................................................................................28

Skip Bins Roadside Placements..........................................................................................................................28

Clothing Bank Bins...............................................................................................................................................28

1.9 Community Services.........................................................................................................................28

Aged Services and Services for People with a Disability..................................................................................28

Child Care...............................................................................................................................................................28

Wellbank Children's Centre...........................................................................................................................................................................28

Victoria Avenue Children's Centre................................................................................................................................................................29

Page 4 of 86

Page 5: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Street Parties and School Fetes...........................................................................................................................29

1.10 Development Applications.............................................................................................................30

Developments Involving Erection of Buildings, Carrying out of Works, or the Demolition of Buildings or Works at Work Value – Statutory.........................................................................................................................30

Amended DA Plan Reassessment Fee................................................................................................................30

Refund of Development Application Fees...........................................................................................................30

Long Service Levy – Statutory Collected on behalf of The Long Service Payments Corporation................30

DA fees for Residential Heritage items...............................................................................................................31

Other Developments – Statutory..........................................................................................................................31

Subdivisions – Clause 249 EPA Regulations.....................................................................................................31

Linen Releases (Subdivision Certificates)..........................................................................................................31

Integrated Development and Development which Requires Concurrence – Statutory (refer Note 1)...........31

Additional fees payable for development that requires advertising.................................................................31

1.11 Development Applications – Notification.....................................................................................33

Notification of Development Applications, Planning Proposals, S4.55 Applications or S8.2-S8.5 Applications...........................................................................................................................................................33

Notification fee for amended development application plans...........................................................................33

Review of Determination Under S8.2-S8.5..........................................................................................................33

1.12 Development Applications – Modification of a Consent Under Section 4.55 and 4.56............33

1.13 Development Applications – Other Services................................................................................35

Certified Planning Documents – Statutory.........................................................................................................35

DA Pre-Lodgement Panel.....................................................................................................................................35

Design Review Panel Referrals............................................................................................................................35

Covenant Removals or Amendments..................................................................................................................35

Registration of Notice of Class 2 Remediation...................................................................................................35

1.14 Development Contributions to Services and Amenities.............................................................35

City of Canada Bay S7.11 Contributions.............................................................................................................35

City of Canada Bay S7.12 Fixed Levy Contributions Plan.................................................................................35

City of Canada Bay S7.4 Contributions...............................................................................................................35

1.15 DCP Amendments and Re-zoning.................................................................................................36

Pre-Planning Proposal Meeting...........................................................................................................................36

Planning Proposals...............................................................................................................................................36

1.16 Events...............................................................................................................................................37

Administrations of Event......................................................................................................................................37

Ferragosto and Major Festivals & Events (>40,000 attendance).......................................................................37

Concord Carnival and Minor Events (15,000 to 40,000 attendance).................................................................37

Market Event (<15,000 attendance)......................................................................................................................38

1.17 Facilities Hire and Use....................................................................................................................39

General Conditions of Facilities Hire...................................................................................................................39

Administration of Facilities Hire..........................................................................................................................39

Page 5 of 86

Page 6: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Venue Co-ordination......................................................................................................................................................................................39

Cabarita Conservatory..........................................................................................................................................40

Category 1: Cabarita Conservatory..............................................................................................................................................................40

Category 2: Cabarita Conservatory..............................................................................................................................................................40

Campbell Park Community Hall...........................................................................................................................40

Category 1: Campbell Park Community Venue...........................................................................................................................................40

Category 2: Campbell Park Community Venue...........................................................................................................................................40

Canada Bay Civic Hall...........................................................................................................................................40

Category 1: Canada Bay Civic Hall...............................................................................................................................................................40

Category 2: Canada Bay Civic Hall...............................................................................................................................................................41

Chiswick Community Centre................................................................................................................................41

Category 1: Chiswick Community Hall.........................................................................................................................................................41

Category 2: Chiswick Community Hall.........................................................................................................................................................41

Concord Library Function Room.........................................................................................................................41

Category 1: Concord Library Rooms............................................................................................................................................................41

Category 2: Concord Library Rooms............................................................................................................................................................41

Concord Community Centre.................................................................................................................................42

Concord Community Centre Function Room..............................................................................................................................................42

Category 1: Concord Community Centre Function Room....................................................................................................................................................42

Category 2: Concord Community Centre Function Room....................................................................................................................................................42

Concord Community Centre Meeting Room................................................................................................................................................42

Category 1: Concord Community Centre Meeting Room......................................................................................................................................................42

Category 2: Concord Community Centre Meeting Room......................................................................................................................................................42

Concord Memorial Hall.........................................................................................................................................42

Category 1: Concord Memorial Hall..............................................................................................................................................................42 ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................42

Category 2: Concord Memorial Hall..............................................................................................................................................................43

Concord Senior Citizens Centre..........................................................................................................................43

Concord Senior Citizens Club.......................................................................................................................................................................43

Concord Senior Citizens Centre Meeting Room..........................................................................................................................................43

Category 1: Concord Senior Citizens Centre Meeting Room...............................................................................................................................................43

Category 2: Concord Senior Citizens Centre Meeting Room...............................................................................................................................................43

Concord Senior Citizens Centre Auditorium...............................................................................................................................................43

Category 1: Concord Senior Citizens Centre Auditorium.....................................................................................................................................................43

Category 2: Concord Senior Citizens Centre Auditorium.....................................................................................................................................................43

Drummoyne Oval – Greg Davis Stand.................................................................................................................44

Five Dock Library – Bay Room.............................................................................................................................44

Category 1: Five Dock Library – Bay Room.................................................................................................................................................44

Category 2: Five Dock Library – Bay Room.................................................................................................................................................44

Rhodes Community Centre..................................................................................................................................44

Category 1: Rhodes Community Hall...........................................................................................................................................................44

Category 2: Rhodes Community Hall...........................................................................................................................................................44

Rothwell Park Community Venue........................................................................................................................45

Category 1: Rothwell Park Community Venue – Commercial Hire Charges............................................................................................45

Category 2: Rothwell Park Community Venue – Non-Profit Organisations..............................................................................................45

The Connection – Rhodes....................................................................................................................................45

The Connection – Event Space – Combined (incl. Terrace & Foyer)........................................................................................................45

Category 1: The Connection – Rhodes Event Space Combined..........................................................................................................................................45

Category 2: The Connection – Rhodes Event Space Combined..........................................................................................................................................45

Page 6 of 86

Page 7: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

The Connection – Rhodes Event Space 1....................................................................................................................................................45

Category 1: The Connection – Rhodes Event Space 1..........................................................................................................................................................45

Category 2: The Connection – Rhodes Event Space 1..........................................................................................................................................................45

The Connection – Rhodes Event Space 2....................................................................................................................................................46

Category 1: The Connection – Rhodes Event Space 2..........................................................................................................................................................46

Category 2: The Connection – Rhodes Event Space 2..........................................................................................................................................................46

The Connection – Rhodes Meeting Room 1................................................................................................................................................46

Category 1: The Connection – Rhodes Meeting Room 1......................................................................................................................................................46

Category 2: The Connection – Rhodes Meeting Room 1......................................................................................................................................................46

The Connection – Rhodes Meeting Room 2/3.............................................................................................................................................46

Category 1: The Connection – Rhodes Meeting Room 2/3...................................................................................................................................................46

Category 2: The Connection – Rhodes Meeting Room 2/3...................................................................................................................................................46

The Connection – Rhodes Activity Room....................................................................................................................................................47

Category 1: The Connection – Rhodes Activity Room..........................................................................................................................................................47

Category 2: The Connection – Rhodes Activity Room..........................................................................................................................................................47

The Connection – Deck & Amphitheatre......................................................................................................................................................47

1.18 Five Dock Leisure Centre...............................................................................................................48

Stadium..................................................................................................................................................................48

Health Club.............................................................................................................................................................50

Gymnastics............................................................................................................................................................51

Schools...................................................................................................................................................................53

Activities Room.....................................................................................................................................................53

Retail.......................................................................................................................................................................53

FDLC Sponsorship and Promotions....................................................................................................................54

1.19 Filming..............................................................................................................................................55

General Condition for Filming..............................................................................................................................55

Definitions for impact of filming/ photography:.................................................................................................55

Fee for Filming.......................................................................................................................................................55

Application Fee...............................................................................................................................................................................................55

Filming over 3 days........................................................................................................................................................................................56

Traffic Management Plan of Filming.............................................................................................................................................................56

Road Closures for Filming.............................................................................................................................................................................56

Hire of Parks and Open Space for Exclusive Use.......................................................................................................................................56

Other Fees of Filming.....................................................................................................................................................................................57

Still Photography............................................................................................................................................................................................57

1.20 Golf Courses....................................................................................................................................58

Barnwell Park Golf Course...................................................................................................................................58

BP Adults........................................................................................................................................................................................................58

BP Group Booking (Deposit required) – 18 Holes.......................................................................................................................................58

BP School Children........................................................................................................................................................................................58

BP University & TAFE Students....................................................................................................................................................................58

BP Pensioners Mon-Fri (only).......................................................................................................................................................................58

BP Twilight Golf..............................................................................................................................................................................................58

BP Club Members Casual Visit.....................................................................................................................................................................58

BP Club Members Competition Times.........................................................................................................................................................59

BP Sponsorship and Promotions.................................................................................................................................................................59

Use of Private Golf Carts...............................................................................................................................................................................59

Page 7 of 86

Page 8: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Massey Park Golf Course.....................................................................................................................................59

MP Adults........................................................................................................................................................................................................59

MP Seniors......................................................................................................................................................................................................59

MP School Children Mon-Fri.........................................................................................................................................................................59

MP University & TAFE Students Mon-Fri.....................................................................................................................................................59

MP Pensioners Mon-Fri (only).......................................................................................................................................................................60

MP Twilight Golf.............................................................................................................................................................................................60

MP Club Members Competition Times.........................................................................................................................................................60

MP Sponsorship.............................................................................................................................................................................................60

1.21 Tennis Courts..................................................................................................................................61

Cintra Park.............................................................................................................................................................61

Croker Park............................................................................................................................................................61

Five Dock Park.......................................................................................................................................................61

Greenlees...............................................................................................................................................................61

Powells Creek........................................................................................................................................................61

1.22 Graffiti Removal – Non-Council Property and Assets*................................................................61

1.23 Library..............................................................................................................................................62

Library Service Charges.......................................................................................................................................62

Overdue Items.................................................................................................................................................................................................62

Reserved Items – Miscellaneous..................................................................................................................................................................62

Printing and photocopying charges.............................................................................................................................................................62

Library Facsimile Service..............................................................................................................................................................................62

Item Sale..........................................................................................................................................................................................................62

Materials Replacement Costs...............................................................................................................................63

Local History Research.........................................................................................................................................63

Rhodes Learning Centre.......................................................................................................................................63

1.24 Parking Management......................................................................................................................64

Pay Parking............................................................................................................................................................64

Cabarita and Bayview Park Parking Permits......................................................................................................64

On-Street Parking Permit......................................................................................................................................64

Canada Bay LGA Zone...................................................................................................................................................................................64

Other Parking Fees................................................................................................................................................65

1.25 Parks Hire.........................................................................................................................................65

General Conditions of Open Space Hire.............................................................................................................65

Open Space Miscellaneous..................................................................................................................................66

Use of Parks....................................................................................................................................................................................................66

Licence Fees...................................................................................................................................................................................................66

One off Events................................................................................................................................................................................................66

Open Space Key Hire.....................................................................................................................................................................................66

Drummoyne Oval...................................................................................................................................................66

Drummoyne Oval Lights Usage....................................................................................................................................................................66

Special Events................................................................................................................................................................................................67

Concord Oval.........................................................................................................................................................67

Page 8 of 86

Page 9: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Category – Hockey................................................................................................................................................67

St Lukes Hockey Complex.............................................................................................................................................................................67

Category – Netball, Basketball, Volleyball, Archery and Dog Training............................................................67

Netball Courts – Cintra Park..........................................................................................................................................................................67

Archery – Greenlees.......................................................................................................................................................................................67

Dog Training...................................................................................................................................................................................................67

Category – Baseball..............................................................................................................................................68

Athletics St Lukes Field Oval (ONLY) (Wednesdays and Fridays)............................................................................................................68

Baseball – Timbrell Park................................................................................................................................................................................68

Baseball – Sid Richards.................................................................................................................................................................................68

Category – Cricket.................................................................................................................................................68

Synthetic Cricket Wicket................................................................................................................................................................................68

Turf Cricket Wicket.........................................................................................................................................................................................68

Senior Fields – Soccer, AFL, Aussie Rules, Rugby Union, Rugby League, etc..............................................69

Junior Fields – Mini Soccer, Rugby, AFL and Touch Football..........................................................................69

Social Recreation..................................................................................................................................................69

Bayview Park Access Management..............................................................................................................................................................69

Ceremonies & Related Photography at Cabarita Park................................................................................................................................69

Commercial Activity.......................................................................................................................................................................................70

Fishing & Other Water Based Competitions (per day)................................................................................................................................70

Private, Corporate and Community Groups, Social Recreation................................................................................................................70

Regattas – Rodd Point-Bayview Park...........................................................................................................................................................70

Event – (large scale provided to/for general community)..........................................................................................................................70

Permit Fees for Temporary Installations (site fees only)............................................................................................................................71

Parks Hire of Schools...........................................................................................................................................71

1.26 Roads and Footpaths......................................................................................................................72

General Conditions for ROADS & FOOTPATHS.................................................................................................72

Road Replacements – per m2..............................................................................................................................72

Footpath Replacements – per m2........................................................................................................................73

Specific Area per m2......................................................................................................................................................................................74

Turfing – per m2....................................................................................................................................................74

Sawcutting – per lineal metre...............................................................................................................................74

Driveway Replacements – per m2........................................................................................................................74

Kerb & Gutter Replacements – per lineal metre.................................................................................................74

Other – Linemarking..............................................................................................................................................75

Sign Posting...........................................................................................................................................................76

Stormwater Drainage............................................................................................................................................76

DRIVEWAY & ANCILLARY WORKS.....................................................................................................................76

Driveway Application.....................................................................................................................................................................................76

Driveway Inspections.....................................................................................................................................................................................77

First entry required inspection fee..........................................................................................................................................................................................77

Additional entry inspection fee (for second or more entry)..................................................................................................................................................77

Additional Inspections...................................................................................................................................................................................77

Private Contractor Security Deposit (refundable)..............................................................................................77

Road Openings......................................................................................................................................................77

Page 9 of 86

Page 10: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Road &/or Footpath Opening Application Fee* (Max $1,000).....................................................................................................................77

Road Opening Temporary Restoration Security Deposit...........................................................................................................................78

Certificate of Compliance – Driveways & Road Openings.........................................................................................................................78

Asset Integrity Charge – Road Openings (Permanent Restoration applications only)...........................................................................78

Un-Authorised road works............................................................................................................................................................................78

Provision and Administration of External Works........................................................................................................................................78

Inspection and Administration of External Works by Corporations, Contractors and / or Individuals.................................................79

Removal of Dumped Waste...........................................................................................................................................................................79

Asbestos Removal and Disposal..................................................................................................................................................................80

Survey Marks..................................................................................................................................................................................................80

Adjustment of Utility Service Assets............................................................................................................................................................80

1.27 Swimming Pools..............................................................................................................................81

Cabarita and Drummoyne Swimming Centres...................................................................................................81

General Entry..................................................................................................................................................................................................81

Multi Visit Passes...........................................................................................................................................................................................81

Season Pass...................................................................................................................................................................................................81

School Entry...................................................................................................................................................................................................81

Pool and Function Room Hire.......................................................................................................................................................................82

Water Polo Seasonal Pool Hire.....................................................................................................................................................................82

Programs.........................................................................................................................................................................................................82

Promotions......................................................................................................................................................................................................82

1.28 Traffic Management........................................................................................................................83

Administration of Traffic Management................................................................................................................83

Free Parking Agreements.....................................................................................................................................83

Road Closures.......................................................................................................................................................83

Full Closure.....................................................................................................................................................................................................83

Partial Closure................................................................................................................................................................................................83

1.29 Tree Management............................................................................................................................84

Tree Preservation..................................................................................................................................................84

1.30 Waste Management Charges.........................................................................................................85

Domestic Waste Charges.....................................................................................................................................85

Domestic Waste Management Standard Service........................................................................................................................................85

Domestic Waste Additional Services...........................................................................................................................................................85

Vacant residential lots...................................................................................................................................................................................85

Commercial Waste Charges.................................................................................................................................85

Commercial Waste Standard Service...........................................................................................................................................................86

Commercial Additional Services...................................................................................................................................................................86

Waste Services for Council Facilities, Parks & Special Events.................................................................................................................86

Other Recovery Services...............................................................................................................................................................................86

Non-rateable properties........................................................................................................................................86

Waste Services for Schools.................................................................................................................................87

Special circumstances..........................................................................................................................................87

Page 10 of 86

Page 11: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Rating Policy Rating Structure

The total income that can be raised from levying rates on property is capped by the State Government based on a determination by the Independent Pricing and Regulatory Tribunal (IPART). IPART determined that general income from rates in 2019/20 may be increased by a maximum of 2.7%.

The increase allowed by IPART relates to general income in total and not to individual ratepayer’s rates. Individual rates are also affected by other factors such as land valuations. As such, rates for individual ratepayers may vary by more or less than the percentage allowable depending on how an individual ratepayer’s land valuation has changed in a particular year compared to the land values of other ratepayers.

The following information details the rating structure for rating of land for 2019-20. Land is rated according to its use as either Residential or Business. The ad valorem rate, the minimum rate and anticipated revenue from each rating category is:

Rate Category, No of Assessments and Rateable Land Value

Basis of Rate Calculation Total Ordinary Rate Income

Residential

Residential Number: 35,764 No. Minimums: 20,232 Land Value: $25,689,047,348

Minimum Rate $710.10 Cents in the Dollar: 0.0953885 $34,288,325

Business

Business Number: 1,822 No. Minimums: 719 Land Value: $2,160,277,627

Minimum Rate $710.10 Cents in the Dollar: 0.2373346 $5,487,729

Total Rate Assessments 37,563 Total Rateable Value $27,849,324,975 $39,776,054

SMSC Category, No of Assessments Basis of Rate Calculation Total SMSC

Stormwater Management Services Charge (Residential) SMSC No. Standard 15,494 No. Strata 20,108

Standard Properties $25 Strata Properties $12.50 $638,700

Stormwater Management Services Charge (Business) SMSC No. Standard 1,008 No. Strata 808

Standard Properties Minimum $25 or $25 per 350m² Strata Properties Minimum $5 or part thereof by entitlement

$91,646

Total Stormwater Management Services Charge (SMSC) $730,346

Total Rate Revenue Ordinary & SMSC $40,506,400

Pensioner Rebate The Local Government Act 1993 provides for eligible pensioners to be able to receive a rate reduction of 50% of their total rates, up to a maximum of $250.

Interest on Overdue Rates Interest charges on unpaid rates and charges will accrue on a daily basis at the rate set by the Office of Local Government of 7.5% in accordance with Section 566 of the Local Government Act 1993.

Page 11 of 86

Page 12: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

City of Canada Bay

In accordance with Section 608 of the Local Government Act 1993 and other relevant legislation, City of CanadaBay Council charges and recovers approved fees and charges for any services it provides as contained within thedocument entitled "Fees and Charges 2019-20".

1.1 Pricing Policy

Fees and charges are generally intended to be imposed on the following services provided by Council under theLocal Government Act or any other Act or regulations:

• Supply of a product, service or commodity;• Giving of information;• Providing a service in connection with the exercise of the Council's regulatory functions, including receivingan application for approval, granting an approval, making an inspection and issuing a certificate;

• Allowing admission to any building or enclosure;• Possession, occupation or enjoyment of a rail, pipe, wire, pole, cable, tunnel or structure laid, erected,suspended, constructed or placed on, under or over a public place (s.611)

• Allowing the use or benefit from Council’s assets, possessions, etc.City of Canada Bay Council's general policy in determining the amount of fees to be charged for goods and servicesconsiders the following factors:

• The cost of providing the service• The importance of the service to the community• Prices fixed by the relevant industry body• Any factors specified in the Local Government Regulations• Equity factors• User pays principle• Financial objectives• Customer objectives• Resource use objectives• Market prices• Cross subsidisation objectives• Goods and Services Tax (GST)

In cases where the amount of fees and charges for service is determined under another Act or regulatory body,Council’s policy is not to determine an amount that is inconsistent with the amount determined under the otherAct or regulatory body.All of Council's fees and charges not subject to statutory control are reviewed on an annual basis prior to finalisationof Council's annual operating budget. However, in special circumstances, fees and charges can be reviewed andapproved by Council in accordance with the Local Government Act 1993 and Regulations.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 12 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 13: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Price CodesMarket CompetitiveCouncil provides a good / service in a competitive environment.Full Cost RecoveryCouncil intends to fully recover the direct and indirect cost of provision plus any community cost.Partial Cost RecoveryCouncil intends to partially recover the costs of delivery.Regulated and ProscribedThe price of the service is determined by Legislation, and dependent on price, may or may not recover Full Cost.Zero PricedCouncil absorbs the full cost of delivery.Bonds and DepositsRefundable deposit against possible damage to Council property.

Price Codes As listed above.

City of Canada Bay Council unequivocally reserves the right to pass on the GST imposed on some of the goodsand services provided, and where legislation is changed to remove or alter GST, council's relevant fee will beamended accordingly.

Goods & Services Tax (GST)

Goods & Services Tax (GST) As listed above.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 13 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 14: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.2 Access Through or Occupy Public Space

Application Fee – Footpath Dining $280.00 $290.00 $0.00 $290.00

Bond (less than or equal to 5m2) $500.00 $500.00 $0.00 $500.00

Bond (greater than or equal to 5m2) $1,000.00 $1,000.00 $0.00 $1,000.00

Business Use of Footpaths

Administration of Business Use of Footpaths

George Street North Strathfield Footpath Dining Approval per m2 per annum

$210.00 $215.00 $0.00 $215.00

Great North Road Five Dock Footpath Dining Approval per m2 per annum

$240.00 $245.00 $0.00 $245.00

Majors Bay Road, Concord Footpath Dining Approval per m2 per annum

$245.00 $250.00 $0.00 $250.00

Rhodes Adjacent to 1 Rider Boulevard Footpath Dining Approval per m2 per annum

$320.00 $330.00 $0.00 $330.00

Major Commercial Centres

Other Commercial Areas Footpath Dining per m2 per annum in Canada Bay

$200.00 $205.00 $0.00 $205.00

Rhodes Other Footpath Locations Footpath Dining Approval per m2 per annum

$250.00 $255.00 $0.00 $255.00

Other Commercial Areas

* Public Land and Infrastructure Occupancy Fees are subject to an onsite inspection between Assets and applicantplus a Damage Deposit based on nature of work. Minimum Damage Deposit $3,000 and up to $10,000.

Public Land and Infrastructure Occupation

# Access is likely to be across a park or reserve. Access is likely to be denied for use only in exceptional purposes.

Application Fee to Access Through or Occupy Public Space (Non Refundable)

$275.00 $285.00 $0.00 $285.00

Urgency fee for Application within three working days $370.00 $380.00 $0.00 $380.00

Refundable Bond Associated with access to private property via council land (Park/Reserve/Public Land)#

$10,000.00 $10,000.00 $0.00 $10,000.00

Public Open Space (per week) (Park, Reserves or Public Land)* $3,060.00 $3,060.00 $0.00 $3,060.00

Road Reserve (per m2 per week) (inclusive of footpaths)* $16.30 $16.30 $0.00 $16.30

Approval of Using Unused Roads Fee negotiated

Footpath Area (per m2 per week) (inclusive of Nature strips)* $16.30 $16.30 $0.00 $16.30

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 14 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 15: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.3 Administration and Governance

Note: Damage deposits / bonds / prepayments of all types, paid via cash, cheque, bank cheque, money order,credit card etc. All damage deposits / bonds / prepayments refundable, will not earn any interest while depositedwith the Council as it is considered that administration cost in managing these monies, would more than offset theinterest that would have been earned.

Financial Administration

All transactions exclude GST, Amex 1%

All transactions exclude GST, MasterCard and Visa 0.60%

All transactions include GST, Amex 1%

All transactions include GST, MasterCard and Visa 0.60%

Bank guarantees associated with Damage Deposit – Administration Charge per bank guarantee

$280.00 $254.55 $25.45 $280.00

Fee for Preparation of all Council Leases $270.00 $245.45 $24.55 $270.00

Interest Rate on Overdue Rates as Determined by the Minister for Local Government

7.5%

Per Dishonoured Cheque $65.00 $65.00 $0.00 $65.00

Per Electronic Remittance $65.00 $65.00 $0.00 $65.00

City of Canada Bay Section 7.11 Development Contributions Plan $50.00 $50.00 $0.00 $50.00

City of Canada Bay Planning Agreements Policy (each) $50.00 $50.00 $0.00 $50.00

City of Canada Bay S7.12 Fixed Development Levy Contributions Plan

$50.00 $50.00 $0.00 $50.00

City of Canada Bay LEP – Paper Copy $50.00 $50.00 $0.00 $50.00

City of Canada Bay Development Control Plan – Paper Copy – (Full) $170.00 $170.00 $0.00 $170.00

Strathfield Triangle DCP Paper Copy $50.00 $50.00 $0.00 $50.00

Paper Copy – Individual Parts of DCP (A to J) $30.00 $30.00 $0.00 $30.00

Paper Copy Site Specific & Precinct DCPs $30.00 $30.00 $0.00 $30.00

Canada Bay Comprehensive LEP Map (single map in A3 size) – hard copy

$5.00 $5.00 $0.00 $5.00

Canada Bay Comprehensive LEP Maps (full set of maps in A3 size) –hard copy

$80.00 $80.00 $0.00 $80.00

Other Planning Policies, Plans, Codes & Guidelines (each) $30.00 $30.00 $0.00 $30.00

Stormwater Management Specifications $129.00 $133.00 $0.00 $133.00

Local Environmental Study $125/hour unless otherwise agreed

Annual report, Operational Plan (Full Version – Paper Copy) $103.00 $106.00 $0.00 $106.00

Certified copy of document, map or plan referred to in Sec 150(2) of the EP&A Act

$53.00 $53.00 $0.00 $53.00

Sale of building / development approval records (per full year) $1,030.00 $1,060.00 $0.00 $1,060.00

Note: Service expanded to include combined list of all DA's, Construction Certificates and Complying Development Certificatesapproved

Records Management

Documents, Maps & Reports

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 15 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 16: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Sale of building / development approval records (per month) $103.00 $106.00 $0.00 $106.00

Note: Service expanded to include combined list of all DA's, Construction Certificates and Complying Development Certificatesapproved

Documents, Maps & Reports [continued]

GIPA Formal Application Fee $30.00 $30.00 $0.00 $30.00

GIPA Processing Charge first 20 hours $0.00 $0.00 $0.00 $0.00

GIPA Processing Charge after the first 20 hours $30 Per Hour/part thereof

Formal Request

Formal Access Application (Not Personal Information of Applicant & Personal Information of Applicant)

GIPA Internal Review Application $40.00 $40.00 $0.00 $40.00

Internal Review

GIPA Document and Production $42 Per Hour/part thereof

Photo Copying/Scanning – Plans $10.20 each

Informal Request

Own or Adjoining Property $0.00 $0.00 $0.00 $0.00

Under 15 minutes $25.00 $25.00 $0.00 $25.00

Between 15 and 60 minutes $50.00 $50.00 $0.00 $50.00

Over 60 minutes $120/hour or part thereof in excess of 1 hour

Requests for information requiring research or a written response (with owner’s consent) per hour (minimum 1 hour)

$154.00 $160.00 $0.00 $160.00

Property Enquiries

Conduct Money (upon receipt of subpoenas) $50.00 $50.00 $0.00 $50.00

Less than one hour is required to compile the information $154.00 $159.00 $0.00 $159.00

Longer than one hour is required to compile the information, and additional charges per hour or part thereof is charged

$113.00 $116.00 $0.00 $116.00

Subpoena File Retrieval Fee – after 1st file only $17.50 $17.50 $0.00 $17.50

Subpoena Processing

A3 black and white per page $0.40 $0.40 $0.00 $0.40

A3 colour per page $3.00 $3.00 $0.00 $3.00

A4 black and white per page $0.20 $0.20 $0.00 $0.20

Printing and Copying

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 16 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 17: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

A4 colour per page $2.00 $2.00 $0.00 $2.00

Per A0 copy $30.90 $31.80 $0.00 $31.80

Per A1-A2 copy $20.60 $21.20 $0.00 $21.20

Printing and Copying [continued]

E-Lodgement of Application

Scanning and Imaging Fee required when a Development Application, Pre DA, Amended Plans and Section96 IS NOT Submitted electronically AND where the estimated cost of the Development Application is:

$0– $150,000 $83.00 $85.50 $0.00 $85.50

$150,001 – $300,000 $103.00 $106.00 $0.00 $106.00

$300,001 – $500,000 $154.00 $159.00 $0.00 $159.00

$500,001 – $1,000, 000 $309.00 $318.00 $0.00 $318.00

$1,000,001 or more $620.00 $640.00 $0.00 $640.00

Request for change in house numbering – non refundable $283.00 $291.00 $0.00 $291.00

GIS – House Renumbering

Animal not desexed $207.00 $210.00 $0.00 $210.00

Animal not desexed kept by recognised breeder for breeding purposes

$57.00 $58.00 $0.00 $58.00

Certificate of compliance for dangerous or restricted dogs $150.00 $152.00 $0.00 $152.00

If the companion animal has not been desexed by the relevant desexing age and is not kept by a recognised breeder for breedingpurposes, an additional fee of $152 (from $150) is payable in addition to the applicable registration fee listed above.

Desexed animal $57.00 $58.00 $0.00 $58.00

Desexed animal owned by eligible pensioner $24.00 $25.00 $0.00 $25.00

Desexed animal sold by eligible pound or shelter $28.50 $29.00 $0.00 $29.00

Trained Seeing Eye or Hearing Dogs $0.00 $0.00 $0.00 $0.00

1.4 Animal Management

Cat Cage – Bond $100.00 $100.00 $0.00 $100.00

Cat Cage – Late Fees $25.00 $26.00 $0.00 $26.00

Cat Cage Rental per week or part thereof $25.00 $23.64 $2.36 $26.00

Animals other than dogs or cats $101.00 $104.00 $0.00 $104.00

Cat Offences, Dangerous / Restricted Dogs and Other Offences as per Schedule 1– Penalty Notice Offences

As Prescribed

Daily Holding Fee $60.50 $62.50 $0.00 $62.50

Release of Animal $60.50 $62.50 $0.00 $62.50

Surrender Dog or Cat $280.00 $288.00 $0.00 $288.00

Impounding of Animals

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 17 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 18: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.5 Asset Management

Design and Construction Guidelines for Contractors/Developers $8,400.00 $8,650.00 $0.00 $8,650.00

Aus Spec 1 Guidelines

Car share space in ticket parking area per space per year $825.00 $850.00 $0.00 $850.00

Creation of parking space for Car Share operator $1,080.00 $1,110.00 $0.00 $1,110.00

Car Share Parking

Application Fee for Civil Works in the Public Domain $1,100.00 $6,000.00 $0.00 $6,000.00

Civil works inspection $140 per inspection

Security Deposit Cost of Works

Civil Works in the Public Domain

Construction Works Zone Application Fee includes erection and removal of signage

$820 plus as per Residential or Commercial Centres below:

Commercial Centres $215/lineal metre/month or part thereof

Residential Parking Area $80.00/metre/month or part thereof

Work Zone within Parking Metre area – additional fee (over the per metre rate listed above)

80% of current Parking Rate

Easements, Build Over Easement Preparation Fee (statutory) Job as per quote

Construction Works Zone

Permit to Stand Plant (per plant per day) $436.00 $449.00 $0.00 $449.00

Permit to Stand Plant

Activity over roadway from site install crane per application $720.00 $720.00 $0.00 $720.00

Crane Permit (Tower or Internal) Based Crane

Damage ReportApplicable when submitting a Development Application so as to determine the condition of the public asset before building works commence

Administration Fee for Damage Report $376.00 $387.00 $0.00 $387.00

To set up traffic control and make site safe for pedestrians and vehicular traffic – during business hours. Establish Traffic Control Plan, provide and place signs, barricades, traffic cones as necessary and maintain site in safe condition.

$1,900.00 $1,960.00 $0.00 $1,960.00

Emergency Call Out Situations

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 18 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 19: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

To set up traffic control and make site safe for pedestrians and vehicular traffic – outside of business hours. Establish Traffic Control Plan, provide and place signs, barricades, and traffic cones as necessary and maintain site in safe condition.

$2,880.00 $2,970.00 $0.00 $2,970.00

Where Utility requests Council permission to undertake restoration works using the Utility's own contractor – per reinstatement order

$1,060.00 $1,090.00 $0.00 $1,090.00

For after-hours response (between 3:00 pm and 6:30 am) to any development related hazard (per call out)

$2,630.00 $2,710.00 $0.00 $2,710.00

For after-hours response (between 3:00 pm and 6:30 am) to any Utility related hazard (per call out)

$2,630.00 $2,710.00 $0.00 $2,710.00

Emergency Call Out Situations [continued]

Group Manager $192.00 $198.00 $0.00 $198.00

Operations Manager $150.00 $154.00 $0.00 $154.00

Supervisor $111.00 $114.00 $0.00 $114.00

Team Leader $71.00 $73.00 $0.00 $73.00

Plant Operator $62.00 $64.00 $0.00 $64.00

Driver $59.50 $61.50 $0.00 $61.50

Labourer $52.50 $54.00 $0.00 $54.00

Emergency Call Out – Labour per hour

Backhoe / Loader $79.50 $82.00 $0.00 $82.00

High Pressure Cleaner $47.40 $48.80 $0.00 $48.80

Mini Footpath Sweeper $64.00 $66.00 $0.00 $66.00

Road Sweeper $89.50 $92.00 $0.00 $92.00

Truck $33.00 $34.00 $0.00 $34.00

Ute $21.60 $22.20 $0.00 $22.20

Emergency Call Out – Plant Hire per hour

Oil Absorbent Material per bag or per m2 $99.00 $102.00 $0.00 $102.00

Sand Backfill material (per tonne) $99.00 $102.00 $0.00 $102.00

Emergency Call Out – Materials

Barricade and Light Rental per barricade (Client to pick up) $103.00 $106.00 $0.00 $106.00

Barricades and Lights

First five (5) Barricades $221.00 $228.00 $0.00 $228.00

Each additional five (5) Barricades or part thereof $103.00 $106.00 $0.00 $106.00

Placement of Barricades (Council to setup) During Business Hours

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 19 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 20: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Placement of Barricades (Council to setup) After Business Hours

First five (5) Barricades $453.00 $467.00 $0.00 $467.00

Each additional five (5) Barricades or part thereof $196.00 $202.00 $0.00 $202.00

Application to connect a private drain with a public drain under the control of a Council or with a drain which connects with such a public drain (Section 68)

$1,050.00 $1,100.00 $0.00 $1,100.00

Initial Assessment $420.00 $433.00 $0.00 $433.00

Subsequent Assessments (each) $283.00 $291.00 $0.00 $291.00

Flood Risk / Stormwater Assessment

Ground Level Hoarding – Type A (Temporary fencing, where any partof the fencing structure occupies the Public Domain. A minimum period of 6 months, paid in advance, applies. Once this period is reached, additional payments shall be made for 3 months in advance). (Periods of less than 3 months can be resolved by negotiation).

$305 plus an additional $105/metre/month (frontage) or part thereof

Overhead Hoarding – Type B (A minimum period of 6 months, paid in advance, applies. Once this period is reached, additional payments shall be made for 3 months in advance). (Periods of less than 3 months can be resolved by negotiation).

$576 plus an additional $135/metre/month (frontage) or part thereof

Urgency fee for Application within three working days $368.00 $380.00 $0.00 $380.00

EP&A Act – Cost compliance Total cost of compliance

Hoardings

Memorial Seat with Plaque $3,150.00 $2,945.45 $294.55 $3,240.00

Park Seat $2,730.00 $2,554.55 $255.45 $2,810.00

Plaque Only $475.00 $444.55 $44.45 $489.00

Memorial Donations

On-site detention (OSD) Identification Plate $62.00 $64.00 $0.00 $64.00

OSD Identification Plate

Application Fee $5,250.00 $6,000.00 $0.00 $6,000.00

Cost per anchor $210.00 $220.00 $0.00 $220.00

Refundable Holding Deposit Minimum $50,000 plus $1,000 per anchor above 50 units

Rock Anchor Permit

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 20 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 21: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.6 Building Services

BUILDERS INDEMNITY INSURANCE

General Information

Construction Certificates and Complying Development Certificates cannot be issued unless the applicant providesa certificate of insurance issued by an approved insurer under the Home Building Act 1989.Persons who wish to do building work on their own homemay apply to the Department of Fair Trading for an owner-builder permit where:

(a) the cost of the work exceeds 5,000;(b) the work relates to a single dwelling - house or dual occupancy; and(c) the work requires development consent or is complying development.

An owner-builder who sells their dwelling within 7 years of completion of the work must take out home warrantyinsurance.Works valued less than 12,000.00 value, no insurance is required when carried out by a licensed builder.LONG SERVICE LEVYFor building or subdivision works that exceed a value of 25,000, payment of the Long Service Levy to the LongService Levy Payments Corporation is required prior to Council (or an accredited certifier) issuing the Constructionor Complying Development Certificate. Council acts as an agent for collection of this levy.The amount payable is currently fixed at 0.35% of the total cost of the work and is GST exempt

General Information of Building Services As listed above.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 21 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 22: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Complying Development Certificates and Exempt Development

Application To Modify A Complying Development Certificate (S.87) – After Certificate Has Been Issued

50% of original application fee, max fee of $500

Complying Development Certificate Applications Involving A Building Code Of Australia Alternative Solution

Relevant application fee PLUS additional charges maybe levied to recover council’s costs in more complicatedassessments at the rate of $264.00/hour or part thereof.

Such charges will be as determined by the GroupManager Planning & Environment in consultation with

the applicant.

Confirmation in writing that development is exempt or complying development.

$150.00 $200.00 $0.00 $200.00

Notification for Complying Development Certificates $75.00 $75.00 $0.00 $75.00

Administration of Complying Development Certificates

Work value less than or equal to $20,000 (Class 1&10 Buildings) $368.00 $345.45 $34.55 $380.00

Work value between $20,001 and $50,000 (Class 1&10 Buildings) $525.00 $490.91 $49.09 $540.00

Work value between $50,001 and $200,000 (Class 1&10 Buildings) $945.00 $886.36 $88.64 $975.00

Work value between $200,001 and $1 million (Class 1&10 Buildings) $1,470.00 $1,372.73 $137.27 $1,510.00

Work value more than $1 million (Class 1&10 Buildings) $1,840.00 $1,727.27 $172.73 $1,900.00

Work value less than or equal to $20,000 (Class 2-9 Buildings) $525.00 $490.91 $49.09 $540.00

Work value between $20,001 and $50,000 (Class 2-9 Buildings) $790.00 $740.91 $74.09 $815.00

Work value between $50,001 and $200,000 (Class 2-9 Buildings) $1,050.00 $981.82 $98.18 $1,080.00

Work value between $200,001 and $1 million (Class 2-9 Buildings) $1,580.00 $1,481.82 $148.18 $1,630.00

Work value more than $1 million (Class 2-9 Buildings) POA

Complying Development Certificates – Application

Manufactured Home $200.00 $200.00 $0.00 $200.00

Other Activities $150.00 $200.00 $0.00 $200.00

Other Activity Application Fees (Section 68 Of Local Government Act 1993)

Compliance Levy – Development Applications 0.15% of the cost of work of DA

The fee will be charged at the time of lodgement of a Development Application. The compliance levy is consistent with the provisionsof Section 608 of the Local Government Act and provisions falling within Clause 246A (2) of the Environmental Planning andAssessment Regulations. The compliance levy will be refunded if the DA is withdrawn or refused.

Compliance Levy

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 22 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 23: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Construction and Development Certification

For alterations and additions, swimming pools, carports and light structure type works, a $5,000 cap applies. Fornew single residential dwelling homes a cap of $10,000 applies. For all other works including residential flatbuildings, commercial/industrial and mixed developments no limit or cap applies.

Damage Deposits

Damage Deposits Demolition $150 per metre frontage

Works value less than $250,000 Deposit is 5% of cost of works

Works value more than $250,000 Deposit is 5% of cost of works

General Note: Values listed in this table equate to the contract price or the cost of the building (in cases wherethere is no contract) and calculated in accordance with the Regulation. Values include the costs associated withthe construction of the building, the costs associated with the preparation of the building for the purpose for which itis to be used (such as installing plant, fittings, fixtures and equipment), other works (if any) and costs of demolition(if any).

Construction Certificates – Class 1&10 (Refer General Note)

Work value less than or equal to $25,000 $300.00 $281.82 $28.18 $310.00

Work value between $25,001 and $50,000 $410.00 $383.64 $38.36 $422.00

Work value between $50,001 and $100,000 $515.00 $481.82 $48.18 $530.00

Work value between $100,001 and $300,000 $965.00 $904.55 $90.45 $995.00

Work value between $300,001 and $1,000,000 $1,460.00 $1,363.64 $136.36 $1,500.00

Work value exceeding $1,000,001 $1,840.00 $1,727.27 $172.73 $1,900.00

General Note: Values listed in this table equate to the contract price or the cost of the building (in cases wherethere is no contract) and calculated in accordance with the Regulation. Values include the costs associated withthe construction of the building, the costs associated with the preparation of the building for the purpose for which itis to be used (such as installing plant, fittings, fixtures and equipment), other works (if any) and costs of demolition(if any).

Construction Certificates – Class 2-9 (Refer General Note)

Work value less than or equal to $25,000 $370.00 $346.36 $34.64 $381.00

Work value between $25,001 and $50,000 $525.00 $490.91 $49.09 $540.00

Work value between $50,001 and $100,000 $840.00 $786.36 $78.64 $865.00

Work value between $100,001 and $300,000 $1,260.00 $1,181.82 $118.18 $1,300.00

Work value between $300,001 and $1,000,000 $1,580.00 $1,481.82 $148.18 $1,630.00

Work value exceeding $1,000,001 POA

Construction Certificate Modifications 50% of original fee

Construction Certificate Modifications

Registration of a Complying Development Certificate $36.00 $36.00 $0.00 $36.00

Registration of Certificates Issued by Accredited Certifiers

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 23 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 24: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Registration of Construction Certificate issued by Private Certifier (NotComplying Development)

$36.00 $36.00 $0.00 $36.00

Registration of Occupation Certificate issued by Private Certifier $36.00 $36.00 $0.00 $36.00

Registration of Subdivision Certificate issued by Private Certifier (Not Complying Development)

$36.00 $36.00 $0.00 $36.00

Registration of Certificates Issued by Accredited Certifiers [continued]

Council appointed as PCA Package as determined by Council delegate

Transfer of PCA services to Council

Inspection Fee $230.00 $227.27 $22.73 $250.00

Construction Inspection

BCA Class 2-3 Effective Height <25m $630.00 $590.91 $59.09 $650.00

BCA Class 2-3 Effective Height >25m $1,260.00 $1,181.82 $118.18 $1,300.00

BCA Class 5-9 up to or equal 500m2 floor area $525.00 $490.91 $49.09 $540.00

BCA Class 5-9 >500m2 floor area $1,050.00 $981.82 $98.18 $1,080.00

Annual Administration Fee $80.00 $90.91 $9.09 $100.00

Fire Safety Compliance

Classes 1 & 10 (Dwellings), and Class 2 building containing only two dwellings

$250 per dwelling

Building Certification (Section 149A-E)

Building Certificates Section 149(A-E) Certificates – Classes 1 & 10 – Statutory

A building not exceeding 200sqm $250.00 $250.00 $0.00 $250.00

A building greater than 200sqm but not exceeding 2,000sqm $250 plus an additional 50 cents per square metre over 200 m2

A building greater than 2,000sqm $1,165 plus an additional 7.50 cents per m2 over 2,000

Additional Inspections $90.00 $90.00 $0.00 $90.00

Archive Fee for Unauthorised Works Building Certificates* $100.00 $100.00 $0.00 $100.00

*Additional fees apply for unauthorised works in accordance with the Environmental Planning & Assessment Regulation 2000.

Section 149(A-E) Certificates – Other Classes – Statutory

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 24 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 25: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.7 Certificates

Planning CertificatesNote that for strata lot applications, one fee is charged per lot applied for within that strata plan.

Section 10.7(2) Certificate Application/Reprint $53/lot

Section 10.7(2)/(5) Certificate Application/Reprint $133/lot

Fee for urgent processing of applications for Section 10.7(2)/(5) within24 hours

$100/lot (Council reserves the right not to make the service available)

Fee for urgent processing of applications for Section 10.7(2)/(5) within2 hours

$150/lot (Council reserves the right not to make the service available)

Outstanding Notice – Section 735A (per lot) $175.00 $175.00 $0.00 $175.00

Outstanding Notices

Occupation Certificates (Council as PCA) $210.00 $200.00 $20.00 $220.00

Occupation Certificates

Reprint and Post Rate Notices and Instalment Notices $22.00 $22.00 $0.00 $22.00

Section 603 certificate $80.00 $85.00 $0.00 $85.00

Urgency fee – Processed within 24 hours $165.00 $165.00 $0.00 $165.00

Rates Certificates

Application Fee $60.00 $60.00 $0.00 $60.00

Section 54 Certificate (LGA, 1993)

Section 88G Certificate(Conveyancing Act 1919)

Section 88G certificates (Section 88G of Conveyancing Act) $10.00 $10.00 $0.00 $10.00

Section 88G certificate requiring inspection $35.00 $35.00 $0.00 $35.00

Fee For Provision of Registration Information of Swimming Pool $10.00 $10.00 $0.00 $10.00

Swimming Pool Application Exemption Fee $70.00 $70.00 $0.00 $70.00

Swimming Pool Compliance Certificate $150 plus $100 for second and subsequent inspections

Swimming Pool Sign $41.20 $40.91 $4.09 $45.00

Swimming Pool Safety Certificate

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 25 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 26: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.8 Compliance

Impounding/Holding Fee $210 impounding fee plus $40/day holding fee + $190 towing fee

Abandoned Articles

Motor Vehicles, Trucks, Trailers and Caravans

Impounding Fee $140 + $15 per day per trolley

Shopping Trolleys and Sandwich Boards

Other articles $105.00 $108.00 $0.00 $108.00

Other articles (per article per day or part thereof) $45.00 $46.00 $0.00 $46.00

Other Goods

Improvement Notice Fee – Food Act $330.00 $330.00 $0.00 $330.00

Prescribed Fee – Public Health Act (Other) $270.00 $270.00 $0.00 $270.00

Prescribed Fee – Public Health Act (Regulated System) $560.00 $560.00 $0.00 $560.00

Brothel Audit $150.00 $155.00 $0.00 $155.00

Food – Pre-Occupation Inspection $150.00 $155.00 $0.00 $155.00

Food – Annual Itinerant/Mobile Food Vendor Fee (Includes Administration Fee, Approval & Inspections)

$150.00 $155.00 $0.00 $155.00

Food – Itinerant Food Vendor Inspection $85.00 $87.50 $0.00 $87.50

Food – Reinspection $150.00 $155.00 $0.00 $155.00

Food – Level Zero Inspection Fee $135.00 $140.00 $0.00 $140.00

Food – Level One Annual Business Fee (Includes Administration Fee & Routine Inspections)

$260.00 $270.00 $0.00 $270.00

Food – Level Two Annual Business Fee (Includes Administration Fee & Routine Inspections)

$540.00 $555.00 $0.00 $555.00

Food – Level Three Annual Business Fee (Includes Administration Fee & Routine Inspections)

$690.00 $750.00 $0.00 $750.00

Food – Temporary Food Stall Inspection $85.00 $87.50 $0.00 $87.50

Food – Temporary Food Event – 1-10 Food Stalls (per stall) $85.00 $87.50 $0.00 $87.50

Food – Temporary Food Event – 11-25 Food Stalls (per event) $1,050.00 $1,080.00 $0.00 $1,080.00

Food – Temporary Food Event – More than 25 Food Stalls (per event)

$2,100.00 $2,160.00 $0.00 $2,160.00

Food Sample Total cost of analysis & sampling

Mortuary/Funeral Parlour/Undertaker Audit $130.00 $135.00 $0.00 $135.00

Regulated Systems (1 or 2 Cooling Tower/Warm Water Systems) Audit

$185.00 $190.00 $0.00 $190.00

Regulated Systems (3 or more Cooling Tower/Warm Water Systems) Audit

$480.00 $495.00 $0.00 $495.00

Shared Accommodation/Boarding House Audit $155.00 $160.00 $0.00 $160.00

Public Health Inspections

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 26 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 27: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Skin Penetration Business Inspection & Administration Fee $135.00 $140.00 $0.00 $140.00

Skin Penetration Business Reinspection $115.00 $120.00 $0.00 $120.00

Skin Penetration Preoccupation Inspection Fee $105.00 $110.00 $0.00 $110.00

Swimming Pool Audit $85.00 $87.50 $0.00 $87.50

Petrol Station Audit $0.00 $350.00 $0.00 $350.00

Public Health Inspections [continued]

Environmental Audit $300.00 $310.00 $0.00 $310.00

Investigation that resulted in an Order being given (currently up to $1,000)

As Prescribed

Environmental Planning and Assessment Regulation 2000 s281C

Litter Fines and Penalty As Prescribed

POEO – Cost compliance Total cost of compliance

POEO – Notice Administration Fee $550.00 $550.00 $0.00 $550.00

Wastewater Management Facility – Approval to Install (Includes Assessment of Application and Initial Inspection)

$210.00 $216.00 $0.00 $216.00

Wastewater Management Facility – Approval to Operate (Includes Assessment of Application and Initial Inspection)

$110.00 $113.00 $0.00 $113.00

Water Sample Total cost of analysis and sampling

Protection of Environment Operations Act

Application Fee Skip Bins $400 deposit plus $400.00 per week (maximum 1 week placement)

Skip Bins Roadside Placements

Annual Permit Per Bin $385.00 $410.00 $0.00 $410.00

Initial Annual Application Fee $309.00 $320.00 $0.00 $320.00

Clothing Bank Bins

Active Adults $25.50 $24.09 $2.41 $26.50

Bay Connection $20.50 $19.55 $1.95 $21.50

1.9 Community Services

Aged Services and Services for People with a Disability

Enrolment Bond + Holding Fee One weeks worth of full fees based on childs attendance+ $70 holding fee

Fee per Day $124.00 $130.00 $0.00 $130.00

Child Care

Wellbank Children's Centre

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 27 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 28: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Victoria Avenue Children's Centre

Enrolment Bond + Holding fee One week of full fees based on childs attendance patterns + $70 holding fee

Fee per Day $124.00 $130.00 $0.00 $130.00

Traffic Management – Community Street Parties and School Fetes (all inclusive subject to council approval)

Maximum $4,000

Street Parties and School Fetes

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 28 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 29: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.10 Development ApplicationsGeneral Note:If two or more statutory fees apply to a single DA, then the amount payable shall be the sum of those fees.Note 1:These fees are additional to other fees, which may apply.Note 2:Regulations require Council to refund the amount of the fee not expended in advertising the application.

Council's collect the Planning Reform Fee (plan FIRST) on behalf of the NSWGovernment for building works orsubdivisions that are estimated to have a value greater than $50,000. The fee is calculated as a percentage ofthe estimated development cost and is payable upon lodgement of a Development Application (DA). The followingDA fees are Plan FIRST inclusive.

Developments Involving Erection of Buildings, Carrying out of Works, or the Demolition of Buildings or Works at Work Value – Statutory

DA for development up to $5,000 $110.00 $110.00 $0.00 $110.00

Between $5,001 – $50,000 $170 plus $3.00 for each $1,000 or part above $5,000

Between $50,001 – $250,000 $352 plus $3.64 for each $1,000 or part above $50,000

Between $250,001 – $500,000 $1,160 plus $2.34 for each $1,000 or part above $250,000

Between $500,001 – $1 Million $1,745 plus $1.64 for each $1,000 or part above $500,000

Greater than $1 Million less than $10 Million $2,615 plus $1.44 for each $1,000 above $1 Million

Greater than $10 Million $15,875 plus $1.19 for each $1,000 above $10 Million

Dwelling house valued under $100,000 construction cost $455.00 $455.00 $0.00 $455.00

DA not involving building work, demolition or sub division $285.00 $285.00 $0.00 $285.00

Estimated cost of works of $100,000 – $1million $250.00 $250.00 $0.00 $250.00

Estimated cost of works of between $1million and $5million $500.00 $500.00 $0.00 $500.00

Estimated cost of works between $5million and $10million $900.00 $900.00 $0.00 $900.00

Estimated cost of works in excess of $10million $1,250.00 $1,250.00 $0.00 $1,250.00

Amended DA Plan Reassessment Fee

Withdrawal of application before assessment. Maximum 75% of fees paid

Withdrawal of application after assessment but prior to assessment report preparation

Maximum 50% of fees paid

Withdrawal of application after determination No refund

Refund of Development Application Fees

Work value $25,000+ 0.35% of the value of building and construction works

Long Service Levy – Statutory Collected on behalf of The Long Service Payments Corporation

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 29 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 30: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

DA fees for Residential Heritage items

Not exceeding $10,000 No Fee

Exceeding $10,000 but not exceeding $50,000 $103.00 $106.00 $0.00 $106.00

Exceeding $50,000 but not exceeding $100,000 $100 plus Plan First

Exceeding $100,000 Refer to Development Application Table

Development Applications for the pruning or removal of a tree for Heritage Items and Properties in H.C.A

$100/application or $40/application where applicant is a pensioner

Development for the purpose of one or more advertisements. $285 plus an additional $93 per advertisement in excessof one, or the fee in accordance with the above table,

whichever is greater.

Other Developments – Statutory

Other than Strata subdivision, involving the opening of a public road. $665 plus $65 per additional lot

Other than Strata subdivision, not involving the opening of a public road.

$330 plus $53 per additional lot

Strata Units Subdivision $330 plus $65 per additional lot

Subdivisions – Clause 249 EPA Regulations

Subdivision Certificates Application $160/lot

Re-inspection Fee $80.00 $80.00 $0.00 $80.00

Linen checking (Checking of 88B instruments and Community Plans) $880.00 $880.00 $0.00 $880.00

Subdivision plans Resigned by General Manager or authorised officer $880.00 $880.00 $0.00 $880.00

Where no new lots are proposed, ie. simple common boundary adjustments and consolidation (non Legislative)

$825.00 $825.00 $0.00 $825.00

Linen Releases (Subdivision Certificates)

Development which requires concurrence $140 + $320 for each approval body to which the DA is to be forwarded

Integrated Development $140 + $320 for each approval body to which the DA is to be forwarded

Integrated Development and Development which Requires Concurrence –Statutory (refer Note 1)

In addition to any other fees payable, Council will charge up to the following maximum fees for giving of the noticerequired for the development:

Additional fees payable for development that requires advertising

a. in case of designated development $2,220.00 $2,290.00 $0.00 $2,290.00

b. in case of advertised development $1,100.00 $1,130.00 $0.00 $1,130.00

c. in case of prohibited development $1,100.00 $1,130.00 $0.00 $1,130.00

d. in case of development for which an environmental planning instrument requires notice to be given otherwise than as referred to ina, b or c above.

$1,100.00 $1,130.00 $0.00 $1,130.00

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 30 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 31: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

e. Development Application that is accompanied by a voluntary planning agreement under S7.4 of the Act.

$1,100.00 $1,130.00 $0.00 $1,130.00

f. Modification of consent (only if previously advertised or required by DCP 2017 to be notified)

$620.00 $640.00 $0.00 $640.00

g. Application to review a determination as required by Section 8.2-8.5 of the EP&A Act. (where required by DCP 2017 to be notified)

$620.00 $640.00 $0.00 $640.00

Additional fees payable for development that requires advertising [continued]

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 31 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 32: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.11 Development Applications – Notification

3D Digital Architectural Model (where Development Application is required to be referred to JRPP)

$2,160.00 $2,220.00 $0.00 $2,220.00

3D Digital Architectural Model (where required to accompany a Development Application)

$1,080.00 $1,110.00 $0.00 $1,110.00

a. Works less than $10,000 $39.10 $40.30 $0.00 $40.30

b. Works between $10,001 and $100,000 $144.00 $148.00 $0.00 $148.00

c. Works between $100,001 and $500,000 $283.00 $291.00 $0.00 $291.00

d. Works between $500,001 and $1 Million $345.00 $355.00 $0.00 $355.00

e. Works greater than $1 Million and less than $10 Million $610.00 $630.00 $0.00 $630.00

f. Works greater than $10 Million $710.00 $730.00 $0.00 $730.00

Notification of Development Applications, Planning Proposals, S4.55 Applications or S8.2-S8.5 Applications.

Notification fee for amended development application plans Refer to the notification fees for Original DA in the table above

Notification fee for amended development application plans

1. Review of determination of any other development up to $5,000. $55.00 $55.00 $0.00 $55.00

2. Review of determination of any other development with an estimated cost of $5,001 – $250,000.

$85, plus an additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost.

3. Review of determination of any other development with an estimated cost of $250,001-$500,000.

$500, plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$250,000.

4. Review of determination of any other development with an estimated cost of $500,001-$1,000,000.

$712, plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$500,000.

5. Review of determination of any other development with an estimated cost of $1,000,001-$10,000,000.

$987, plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$1,000,000.

6. Review of determination of any other development with an estimated cost more than $10,000,000.

$4,737, plus an additional $0.27 for each $1,000 (or partof $1,000) by which the estimated cost exceeds

$10,000,000.

Review of determination for a development application that does not involve the erection of a building, the carrying out of a work or the demolition of a work or building.

50% of original application fee

Review of determination for a development application that involves the erection of a dwelling house with an estimated cost of construction of $100,000 or less.

$190.00 $190.00 $0.00 $190.00

Review of Determination Under S8.2-S8.5

Section 4.55 (1) – Corrections $71 (maximum fee)

Section 4.55 (1A) – Minor modifications 50% of original application fee (maximum fee of $645)

1.12 Development Applications – Modification of a Consent Under Section 4.55 and 4.56

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 32 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 33: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

S4.55 (2) of the Act, or under section 4.56 of the Act if the fee for the original application was less than $100.

50% of the fee for the original development application

S4.55 (2) of the Act, or under section 4.56 of the Act where the fee of the original application was more than $100 but does not involve the erection of a building, the carrying out of work or the demolition of a work or building.

50% of the fee for the original development application

S4.55 (2) of the Act, or under section 4.56 of the Act where the original application was for a dwelling house with an estimated cost ofconstruction of $100,000 or less.

$190.00 $190.00 $0.00 $190.00

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of $5,000.

$55.00 $55.00 $0.00 $55.00

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of $5,001-$250,000.

$85, plus an additional $1.50 for each $1,000 (or part of $1,000) of the estimated cost.

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of $250,001-$500,000.

$500, plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$250,000.

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of $500,001-$1,000,000.

$712, plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$500,000.

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of $1,000,001-$10,000,000.

$987, plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds

$1,000,000.

S4.55 (2) of the Act, or under section 4.56 of the Act for any other development up to an estimated cost of more than $10,000,000.

$4,737, plus an additional $0.27 for each $1,000 (or partof $1,000) by which the estimated cost exceeds

$10,000,000.

Review of Section 4.55 Modification under Section 8.2(1)(b) 50% of original S96 Application Fee

2(A) An additional fee not exceeding $760 is payable for which Clause 115(3) applies

Not exceeding $760

Section 4.59 Public Notice for validity of a Development Consent $397.00 $371.82 $37.18 $409.00

Development Applications – Modification of a Consent Under Section 4.55 and 4.56 [continued]

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 33 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 34: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.13 Development Applications – Other Services

Certified copy of document or map Section 10.8(2) $54.50 $56.00 $0.00 $56.00

Copy of Standard Conditions of Development Applications $30.90 $31.80 $0.00 $31.80

Certified Planning Documents – Statutory

Type of development Fee for service DA – Meetings $0.00 $868.18 $86.82 $955.00

DA Pre-Lodgement Panel

Referral of Pre-lodgement Applications to the Design Review Panel $3,000.00 $3,000.00 $0.00 $3,000.00

Referral of amended plans to the Design Review Panel $1,500.00 $1,500.00 $0.00 $1,500.00

Design Review Panel Referrals

Application $130 plus $66 per hour or part thereof in excess of 2 hours

Covenant Removals or Amendments

Registration of notice of intention to carry out Class 2 remediation works (clause 16 – SEPP 55)

$191.00 $197.00 $0.00 $197.00

Registration of Notice of Class 2 Remediation

1.14 Development Contributions to Services and AmenitiesEnvironmental Planning and Assessment Act 1979

Section 7.11 Contributions Plan Canada Bay Charges shall be made for provision and improvement of infrastructure, including, but not limited to car parking (where applicable), open space, community facilities and

roads, in accordance with the current Section 7.11 Contributions Plan

City of Canada Bay S7.11 Contributions

Work Value From $0 to $100,000 Nil

Work Value From $100,001 to $200,000 0.50% multiplied by the Indexed development cost

Work Value Greater Than $200,000 1% multiplied by the Indexed development cost

City of Canada Bay S7.12 Fixed Levy Contributions Plan

Application for planning agreement under s 7.4 of the Environmental Planning and Assessment Act.

Negotiated with each applicant as S7.4 Agreement proposed

City of Canada Bay S7.4 Contributions

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 34 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 35: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.15 DCP Amendments and Re-zoning

Council's consultants' attendance expenses: $ for $ reimbursement At cost plus GST

Pre-Planning Proposal Meeting

AMinor LEP generally refers to a single allotment spot rezoning generated by a planning anomaly or inconsistency,or minor amendments such as the modification of a development standard. These rezoning are generally notcomplex or contentious. A Major LEP refers to all other rezoning applications submitted to Council. Fees for bothmajor and minor LEP amendments are not refundable.

Planning Proposals

Major LEP $100,000.00 $100,000.00 $0.00 $100,000.00

Major DCP $30,000.00 $30,000.00 $0.00 $30,000.00

Minor LEP or DCP $10,300.00 $10,610.00 $0.00 $10,610.00

Reimbursement of Actual Cost of required consultants (ie – planning urban design, traffic, heritage financial / economic, legal, etc).

At cost

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 35 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 36: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.16 Events

Cancellation fee (prior to 1 month before event) 50% of fee

Cancellation fee (within 1 month of event) 100% of Fee

Cool Room Share (per 1m x 1m space) $85.00 $81.82 $8.18 $90.00

Post Event – Garbage Clean-Up penalty $65.00 $63.64 $6.36 $70.00

Power connection fee (per one 15 amp connection point) $40.00 $45.00 $0.00 $45.00

Temporary Food Premises Approval Permit – Daily fee for Commercial

$85.00 $87.50 $0.00 $87.50

Temporary Food Premises Approval Permit – Daily fee for Community

$55.00 $56.50 $0.00 $56.50

Administrations of Event

* Health inspection fee is included in the fees and charges for all food and wine stalls.

Ferragosto and Major Festivals & Events (>40,000 attendance)

** To be eligible for early bird schemes, applications should be received in accordance with requirements stipulatedon the Booking Form.

Great North Road Business Stall $175.00 $159.09 $15.91 $175.00

Not-For-Profit Community Group Stall $175.00 $163.64 $16.36 $180.00

Five Dock Business – Food Stall* $480.00 $445.45 $44.55 $490.00

Five Dock Business – Merchandise Stall $345.00 $322.73 $32.27 $355.00

Food Stall* – Early Bird** $560.00 $518.18 $51.82 $570.00

Food Stall* – Standard $595.00 $550.00 $55.00 $605.00

Merchandise Stall – Early Bird** $410.00 $381.82 $38.18 $420.00

Merchandise Stall – Standard $450.00 $418.18 $41.82 $460.00

Pre-packaged Food Stall* – Early Bird** $470.00 $422.73 $42.27 $465.00

Pre-packaged Food Stall* – Standard $510.00 $454.55 $45.45 $500.00

Wine Stall* – Early Bird** $445.00 $422.73 $42.27 $465.00

Wine Stall* – Standard $485.00 $454.55 $45.45 $500.00

Amusement Hire Space $2,000.00 $1,872.73 $187.27 $2,060.00

Food Van* – Early Bird** $835.00 $781.82 $78.18 $860.00

Food Van* – Standard $885.00 $827.27 $82.73 $910.00

Not-For-Profit Community Group Stall $175.00 $163.64 $16.36 $180.00

Concord Business – Food Stall* $300.00 $281.82 $28.18 $310.00

Concord Business – Merchandise Stall $240.00 $227.27 $22.73 $250.00

Food Stall* – Early Bird** $360.00 $336.36 $33.64 $370.00

Food Stall* – Standard $410.00 $381.82 $38.18 $420.00

Merchandise Stall – Early Bird** $300.00 $281.82 $28.18 $310.00

Merchandise Stall – Standard $340.00 $318.18 $31.82 $350.00

Pre-packaged Food Stall* – Early Bird** $330.00 $309.09 $30.91 $340.00

Pre-packaged Food Stall* – Standard $380.00 $354.55 $35.45 $390.00

Concord Carnival and Minor Events (15,000 to 40,000 attendance)

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 36 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 37: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Food Van* – Early Bird** $535.00 $504.55 $50.45 $555.00

Food Van* – Standard $610.00 $572.73 $57.27 $630.00

Amusement Hire Space $1,040.00 $972.73 $97.27 $1,070.00

Concord Carnival and Minor Events (15,000 to 40,000 attendance) [continued]

Alcohol covered stall $159.00 $150.00 $15.00 $165.00

Alcohol site $113.00 $104.55 $10.45 $115.00

Alcohol van site $193.00 $181.82 $18.18 $200.00

Amusement hire space per ride $170.00 $159.09 $15.91 $175.00

Food covered stall $170.00 $190.91 $19.09 $210.00

Food site $125.00 $118.18 $11.82 $130.00

Food van site $204.00 $218.18 $21.82 $240.00

LGA business food covered stall $147.00 $159.09 $15.91 $175.00

LGA business food site $102.00 $95.45 $9.55 $105.00

LGA business merch/info covered stall $136.00 $127.27 $12.73 $140.00

LGA business merch/info site $90.50 $86.36 $8.64 $95.00

LGA business NFP food covered stall $125.00 $118.18 $11.82 $130.00

LGA business NFP food site $79.50 $81.82 $8.18 $90.00

LGA business NFP merch/info covered stall $113.00 $104.55 $10.45 $115.00

LGA business NFP merch/info site $68.00 $63.64 $6.36 $70.00

LGA business NFP van site $136.00 $127.27 $12.73 $140.00

LGA business van site $159.00 $150.00 $15.00 $165.00

Merch/info covered stall $147.00 $140.91 $14.09 $155.00

Merch/info site $102.00 $95.45 $9.55 $105.00

Merch/info van site $181.00 $172.73 $17.27 $190.00

NFP food covered stall $136.00 $127.27 $12.73 $140.00

NFP food site $90.50 $90.91 $9.09 $100.00

NFP merch/info covered stall $125.00 $118.18 $11.82 $130.00

NFP merch/info site $79.50 $81.82 $8.18 $90.00

NFP van site $147.00 $140.91 $14.09 $155.00

Market Event (<15,000 attendance)

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 37 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 38: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.17 Facilities Hire and Use

Note 1

General Conditions of Facilities Hire

The Conditions of Hire for Venues document is available on the council website or when requested by the Venuesand Facilities hire team. Groups may additionally pay:

• A bond of up to $3,000 is payable to cover Cleaning, Damage, Security and missing stock.• A Key Bond of $100 may be applicable.• Public Liability insurance to the value of $20 million at time of application for regular hirers, Council’sinsurance covers one off bookings if required.

• A fee for a security guard.

Note 2Category 1 is defined as Commercial, Federal or State Government or individuals for the purpose such asreceptions, private parties, dinner dances or weddings.Category 2 is defined as Non Profit Groups and charities. Non-profit community groups or charities must provideCouncil with a copy of their letter of Incorporation or evidence of non-profit status to obtain the reduced rate.

Note 3Hall hire rates are heavily subsidised. No further concessions are available.

Note 4Council reserves the right to revise fees and charges without notice.

General Condition of Facilities Hire As listed above.

Category 1 – Hall Bond (except Drummoyne Oval – Greg Davis Standand The Event Space) – Standard

$600.00 $600.00 $0.00 $600.00

Category 2– Hall Bond (except Drummoyne Oval – Greg Davis Stand and The Event Space) – Standard

$300.00 $300.00 $0.00 $300.00

Access Card or Key Bond if applicable $100.00 $100.00 $0.00 $100.00

Insurance– Once off Hall Hirers $25.00 $22.73 $2.27 $25.00

Key Replacement for Halls Full cost of Recovery

Replacement Cost of Access Card $50.00 $45.45 $4.55 $50.00

Fire Alarm Turn-Out Fee by NSW Fire & Rescue $1,600.00 $1,600.00 $0.00 $1,600.00

The NSW Fire Brigades ACT 1989, Sect 42 allows FRNSW to charge for attending false alarm call-outs to monitored AFA systems. Council reserves the right to pass on the charge to applicant.

Security Guard Fee Per hour Per Guard (minimum 4 hours) $75.00 $68.18 $6.82 $75.00

Alarm Call Out Fee $190.00 $90.91 $9.09 $100.00

Hall Bond – Drummoyne Oval – Greg Davis Stand $1,000.00 $1,000.00 $0.00 $1,000.00

Hall Bond – The Event Space $1,000.00 $1,000.00 $0.00 $1,000.00

Hall Bond – The Event Space (Parties) $3,000.00 $3,000.00 $0.00 $3,000.00

Hall Bond for Meeting Rooms – Category 1 $600.00 $600.00 $0.00 $600.00

Hall Bond for Meeting Rooms – Category 2 $300.00 $300.00 $0.00 $300.00

Cleaning Fee (Payable if venue requires additional cleaning) Full Cost Recovery per booking

Administration of Facilities Hire

Venue Co-ordination

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 38 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 39: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Venue Call Out Fee per hour Full Cost Recovery per booking

Audio Visual Call Outs Full Cost Recovery per booking

Event Staff Full Cost Recovery per booking

Locker Hire per month (1 month minimum) $50.00 $45.45 $4.55 $50.00

Venue Co-ordination [continued]

Cabarita Conservatory

Category 1: Cabarita Conservatory

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm (per hour) $55.00 $50.00 $5.00 $55.00

Peak Hours – Friday to Sunday 9am -11pm, PH (per hour) $125.00 $117.27 $11.73 $129.00

Category 2: Cabarita Conservatory

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm (per hour) $30.00 $27.27 $2.73 $30.00

Peak Hours – Friday to Sunday – 9am -11pm, PH (per hour) $65.00 $59.09 $5.91 $65.00

Off Peak Hours – Monday to Thursday – 9am -10pm, Friday 9am – 6pm (per hour)

$36.00 $32.73 $3.27 $36.00

Peak Hours – Saturday to Sunday 9am – 6pm, Friday – Sunday 6pm – 10pm,PH (per hour)

$70.00 $63.64 $6.36 $70.00

Campbell Park Community Hall

Category 1: Campbell Park Community Venue

Off Peak Hours – Monday to Thursday – 9am -10pm, Friday – 9am – 6pm (per hour)

$25.00 $22.73 $2.27 $25.00

Peak Hours -Saturday to Sunday 9am – 6pm, Friday – Sunday 6pm –10pm, PH (per hour)

$50.00 $45.45 $4.55 $50.00

Category 2: Campbell Park Community Venue

Canada Bay Civic Hall

Category 1: Canada Bay Civic Hall

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$51.00 $46.36 $4.64 $51.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $90.00 $81.82 $8.18 $90.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $60.00 $54.55 $5.45 $60.00

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 39 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 40: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Category 2: Canada Bay Civic Hall

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am –6pm (per hour)

$35.00 $31.82 $3.18 $35.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $67.00 $60.91 $6.09 $67.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $57.00 $51.82 $5.18 $57.00

Chiswick Community Centre

Category 1: Chiswick Community Hall

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$36.00 $32.73 $3.27 $36.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $70.00 $65.45 $6.55 $72.00

Peak Hours – (2) Saturday to Sunday – 9am – 6pm (per hour) $55.00 $51.82 $5.18 $57.00

Category 2: Chiswick Community Hall

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$28.00 $26.36 $2.64 $29.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $55.00 $51.82 $5.18 $57.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $45.00 $41.82 $4.18 $46.00

Concord Library Function Room

Category 1: Concord Library Rooms

A minimum of 4 hours will be charged

Off Peak Hours– Monday to Thursday – 9:30am -7:30pm, Friday – 9:30am -5pm (per hour)

$40.00 $37.27 $3.73 $41.00

Peak Hours – Saturday – 9:30am – 4pm, Sunday – 1pm – 5pm, PH (per hour)

$55.00 $50.91 $5.09 $56.00

Category 2: Concord Library Rooms

A minimum of 2 hours will be charged

Off Peak Hours = Monday to Thursday – 9:30am – 7:30pm, Friday – 9:30am -5pm (per hour)

$34.00 $31.82 $3.18 $35.00

Peak Hours – Saturday – 9:30am – 4pm, Sunday – 1pm – 5pm, PH (per hour)

$42.00 $39.09 $3.91 $43.00

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 40 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 41: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Concord Community Centre

Concord Community Centre Function Room

Category 1: Concord Community Centre Function Room

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$55.00 $50.91 $5.09 $56.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $90.00 $83.64 $8.36 $92.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $67.00 $62.73 $6.27 $69.00

Category 2: Concord Community Centre Function Room

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$40.00 $37.27 $3.73 $41.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $60.00 $56.36 $5.64 $62.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $55.00 $50.91 $5.09 $56.00

Concord Community Centre Meeting Room

Category 1: Concord Community Centre Meeting Room

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$40.00 $37.27 $3.73 $41.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $50.00 $46.36 $4.64 $51.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $44.00 $40.91 $4.09 $45.00

Category 2: Concord Community Centre Meeting Room

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday – 9am – 6pm (per hour)

$30.00 $28.18 $2.82 $31.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $44.00 $40.91 $4.09 $45.00

Saturday to Sunday – 9am – 6pm (per hour) $33.00 $30.91 $3.09 $34.00

Concord Memorial Hall

Category 1: Concord Memorial Hall

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am – 11pm, Friday – 9am –6pm (per hour)

$33.00 $30.00 $3.00 $33.00

Peak Hours – Friday to Sunday – 6pm – 11pm, Saturday to Sunday –9am – 6pm, PH (per hour)

$43.00 $39.09 $3.91 $43.00

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 41 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 42: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Category 2: Concord Memorial Hall

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am – 11pm, Friday – 9am –6pm (per hour)

$21.00 $19.09 $1.91 $21.00

Peak Hours – Friday to Sunday – 6pm – 11pm, Saturday to Sunday –9am – 6pm, PH (per hour)

$31.00 $28.18 $2.82 $31.00

Concord Senior Citizens Club (per hour) $5.50 $5.45 $0.55 $6.00

Concord Senior Citizens Centre

Concord Senior Citizens Club

Concord Senior Citizens Centre Meeting Room

Category 1: Concord Senior Citizens Centre Meeting Room

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Friday all hours (per hour) $30.00 $28.18 $2.82 $31.00

Peak Hours – Saturday and Sunday all hours, PH (per hour) $35.00 $32.73 $3.27 $36.00

Category 2: Concord Senior Citizens Centre Meeting Room

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Friday all hours (per hour) $15.00 $14.55 $1.45 $16.00

Peak Hours – Saturday and Sunday all hours,PH (per hour) $25.00 $23.64 $2.36 $26.00

Concord Senior Citizens Centre Auditorium

Category 1: Concord Senior Citizens Centre Auditorium

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday 9am -6pm (per hour)

$42.00 $39.09 $3.91 $43.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $55.00 $50.91 $5.09 $56.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $45.00 $41.82 $4.18 $46.00

Category 2: Concord Senior Citizens Centre Auditorium

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am -11pm, Friday 9am -6pm (per hour)

$22.00 $20.91 $2.09 $23.00

Peak Hours (1) – Friday to Sunday – 6pm -11pm, PH (per hour) $35.00 $36.00 $0.00 $36.00

Peak Hours (2) – Saturday to Sunday – 9am – 6pm (per hour) $32.00 $30.00 $3.00 $33.00

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 42 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 43: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Drummoyne Oval – Greg Davis Stand

Off Peak Hours (Sporting Groups and Private Functions) Monday – Thursday 8am-9pm, Friday – 8am – Midnight (per hour)

$75.00 $70.00 $7.00 $77.00

Peak Hours (Private Functions) Saturday – 8am -Midnight, Sunday 8am – 9pm, PH (per hour)

$135.00 $126.36 $12.64 $139.00

Peak Hours (Sporting Groups) Saturday – 8am -Midnight, Sunday 8am – 9pm, PH (per hour)

$85.00 $78.18 $7.82 $86.00

Five Dock Library – Bay Room

Category 1: Five Dock Library – Bay Room

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 10am – 8pm, Friday – 10am – 8pm (per hour)

$34.00 $31.82 $3.18 $35.00

Peak Hours – Saturday – 9:30am – 4pm, Sunday – 1pm – 5pm, PH (per hour)

$37.00 $34.55 $3.45 $38.00

Category 2: Five Dock Library – Bay Room

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 10am – 8pm, Friday – 10am – 8pm (per hour)

$26.00 $24.55 $2.45 $27.00

Peak Hours – Saturday – 9:30am – 4pm, Sunday – 1pm – 5pm, PH (per hour)

$29.00 $27.27 $2.73 $30.00

Rhodes Community Centre

Category 1: Rhodes Community Hall

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday – 9am – 11pm, Friday – 9am –6pm (per hour)

$37.00 $34.55 $3.45 $38.00

Peak Hours (1) Friday to Sunday – 6pm – 11pm, PH (per hour) $65.00 $60.91 $6.09 $67.00

Peak Hours (2) Saturday to Sunday – 9am – 6pm (per hour) $45.00 $41.82 $4.18 $46.00

Category 2: Rhodes Community Hall

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday – 9am – 11pm, Friday – 9am –6pm (per hour)

$29.00 $27.27 $2.73 $30.00

Peak Hours (1) Friday to Sunday – 6pm – 11pm, PH (per hour) $59.00 $55.45 $5.55 $61.00

Peak Hours (2) Saturday to Sunday – 9am – 6pm (per hour) $42.00 $39.09 $3.91 $43.00

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 43 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 44: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Rothwell Park Community Venue

Category 1: Rothwell Park Community Venue – Commercial Hire Charges

A minimum of 4 hours will be charged

Off Peak Hours – Monday to Thursday all hours (per hour) $30.00 $27.27 $2.73 $30.00

Peak Hours – Friday to Sunday all hours, PH (per hour) $45.00 $40.91 $4.09 $45.00

Category 2: Rothwell Park Community Venue – Non-Profit Organisations

A minimum of 2 hours will be charged

Off Peak Hours – Monday to Thursday all hours (per hour) $20.00 $18.18 $1.82 $20.00

Peak Hours – Friday to Sunday all hours, PH (per hour) $35.00 $31.82 $3.18 $35.00

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$266.00 $280.00 $28.00 $308.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$210.00 $229.09 $22.91 $252.00

The Connection – Rhodes

The Connection – Event Space – Combined (incl. Terrace & Foyer)

Category 1: The Connection – Rhodes Event Space Combined

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$163.00 $152.73 $15.27 $168.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$130.00 $118.18 $11.82 $130.00

Category 2: The Connection – Rhodes Event Space Combined

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$84.00 $76.36 $7.64 $84.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$69.00 $62.73 $6.27 $69.00

The Connection – Rhodes Event Space 1

Category 1: The Connection – Rhodes Event Space 1

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$51.00 $32.73 $3.27 $36.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$42.00 $29.09 $2.91 $32.00

Category 2: The Connection – Rhodes Event Space 1

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 44 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 45: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

The Connection – Rhodes Event Space 2

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$137.00 $133.64 $13.36 $147.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$104.00 $97.27 $9.73 $107.00

Category 1: The Connection – Rhodes Event Space 2

Peak Hours – Fri 17:00 – 23:00, Sat & Sun 07:00 – 23:00, PH 07:00 –23:00 (per hour)

$86.00 $80.00 $8.00 $88.00

Off Peak Hours – Mon – Thu 07:00 – 23:00, Fri 07:00 – 17:00 (per hour)

$66.00 $60.00 $6.00 $66.00

Category 2: The Connection – Rhodes Event Space 2

The Connection – Rhodes Meeting Room 1

Category 1: The Connection – Rhodes Meeting Room 1

A minimum of 2 hours will be charged

Peak Hours – Mon – Thurs 17:00 – 23:00, PH 07:00 – 23:00 (per hour)

$52.00 $53.64 $5.36 $59.00

Off Peak Hours – Mon – Thurs 07:00 – 17:00, Fri – Sun 07:00 – 23:00(per hour)

$48.00 $44.55 $4.45 $49.00

Category 2: The Connection – Rhodes Meeting Room 1

A minimum of 2 hours will be charged

Peak Hours – Mon –Thurs 17:00 – 23:00, PH 07:00 – 23:00 (per hour)

$21.00 $20.00 $2.00 $22.00

Off Peak Hours – Mon – Thurs 7:00 – 17:00, Fri– Sun 07:00 – 23:00 (per hour)

$19.00 $18.18 $1.82 $20.00

Peak Hours – Mon –Thurs 17:00 – 23:00, PH 07:00 – 23:00 (per hour)

$44.00 $40.00 $4.00 $44.00

Off Peak Hours – Mon – Thurs 7:00 – 17:00, Fri– Sun 07:00 – 23:00 (per hour)

$40.00 $36.36 $3.64 $40.00

The Connection – Rhodes Meeting Room 2/3

Category 1: The Connection – Rhodes Meeting Room 2/3

Peak Hours – Mon –Thurs17:00 – 23:00, PH 07:00 – 23:00 (per hour) $18.00 $16.36 $1.64 $18.00

Off Peak Hours – Mon –Thurs 07:00 – 17:00, Fri– Sun 07:00 – 23:00 (per hour)

$16.00 $14.55 $1.45 $16.00

Category 2: The Connection – Rhodes Meeting Room 2/3

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 45 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 46: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

The Connection – Rhodes Activity Room

Category 1: The Connection – Rhodes Activity Room

A minimum of 2 hours will be charged

Peak Hours – Mon –Thurs17:00 – 23:00, PH 07:00 – 23:00 (per hour) $55.00 $52.73 $5.27 $58.00

Off Peak Hours – Mon – Thurs 07:00 – 17:00, Fri– Sun 07:00 – 23:00 (per hour)

$50.00 $47.27 $4.73 $52.00

Category 2: The Connection – Rhodes Activity Room

A minimum of 2 hours will be charged

Peak Hours – Mon –Thurs 17:00 – 23:00, PH 07:00 – 23:00 (per hour)

$22.00 $20.91 $2.09 $23.00

Off Peak Hours – Mon – Thurs 07:00 – 17:00, Fri– Sun 07:00 – 23:00 (per hour)

$20.00 $19.09 $1.91 $21.00

Off Peak Hours Mon – Fri 09:00 – 17:00, Sun – Thu 17:00 – 23:00 (per hour)

$75.00 $70.00 $7.00 $77.00

Peak Hours Fri – Sat, Public Holidays 17:00 – 23:00, Sat – Sun, Public Holidays 09:00 – 17:00 (per hour)

$105.00 $98.18 $9.82 $108.00

The Connection – Deck & Amphitheatre

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 46 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 47: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.18 Five Dock Leisure Centre

Court Hire – Casual Booking – Per Half Hour – Off Peak (Monday – Friday 05:30am – 09:00am)

$33.00 $30.91 $3.09 $34.00

Court Hire – Casual Booking – Per Half Hour – Peak $50.00 $46.36 $4.64 $51.00

Court Hire – Casual Booking – per hour – Off Peak (Monday – Friday 05:30am – 09:00am)

$50.00 $46.36 $4.64 $51.00

Court Hire – Casual Booking – per hour – Peak $73.00 $68.18 $6.82 $75.00

Court Hire – Casual Booking – Weekend per hour – Peak $84.00 $78.18 $7.82 $86.00

Court Hire – Casual Booking – per hour – Non for Profit Off Peak (Monday – Friday 05:30am – 09:00am) *

$45.00 $41.82 $4.18 $46.00

Community Groups able to provide documentation of non for profit status

Court Hire – Casual Booking – per hour – Non for Profit Peak * $65.50 $60.91 $6.09 $67.00

Community Groups able to provide documentation of non for profit status

Court Hire – Casual Booking – Weekend per hour – Non for Profit Peak *

$75.50 $70.91 $7.09 $78.00

*Community Groups able to provide documentation of non for profit status

Court Hire – Casual Usage – 10 Visit Pass $65.00 $60.91 $6.09 $67.00

Court Hire – Casual Usage – Group of 5 People or Less – No Booking – Per Person

$7.50 $7.00 $0.70 $7.70

Court Hire – Commercial – Regular Hirer – 1 court – per hour More than 2 Bookings per week

$73.00 $68.18 $6.82 $75.00

Court Hire – Commercial Hire – 1 court per hour $122.00 $113.64 $11.36 $125.00

Court Hire – Commercial Hire – 2 courts per hour $211.00 $197.27 $19.73 $217.00

Court Hire – Events – 2 courts – per hour $243.00 $227.27 $22.73 $250.00

Court Hire – Events – 2 courts – per hour – After Hours $338.00 $314.55 $31.45 $346.00

Court Hire – Events – Cleaning Fee – per hour $168.00 $154.55 $15.45 $170.00

Sport Activity – Badminton – Off Peak per hour – Monday – Friday 5:30am – 9:00am / 1:00pm – 4:00pm

$18.00 $16.82 $1.68 $18.50

Sport Activity – Badminton – per hour $26.00 $24.09 $2.41 $26.50

Sport Activity – Badminton Racquet – Equipment Hire per hour $5.00 $4.55 $0.45 $5.00

Sport Activity – Pickle Ball – Per person $0.00 $7.00 $0.70 $7.70

Sport Activity – Table Tennis – Equipment Hire per hour $3.00 $2.73 $0.27 $3.00

Sport Activity – Table Tennis – Table Hire per hour $17.50 $16.36 $1.64 $18.00

Sport Activity – Table Tennis per Hour Off Peak (Mon – Fri 1pm – 4pm)

$10.00 $9.55 $0.95 $10.50

Sports Competition – Annual Registration fee – Adult Basketball $80.00 $75.00 $7.50 $82.50

Sports Competition – Basketball – Adult Upfront – per team per gamewith duties (20min halves)

$88.00 $80.00 $8.00 $88.00

Sports Competition – Basketball – Adult Upfront – per team per gamewithout duties (20min halves)

$105.00 $95.45 $9.55 $105.00

Sports Competition – Netball – Evening – Per Game – 18 Rounds $76.00 $69.09 $6.91 $76.00

Sports Competition – Netball – Morning – Per Game – 18 Rounds $62.00 $56.36 $5.64 $62.00

Sports Competition – Nomination Fee – All competitions – Per Season

$30.00 $27.27 $2.73 $30.00

Stadium

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 47 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 48: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Sports Competition – One Day Registration Fee $10.00 $9.55 $0.95 $10.50

Sports Competition – Soccer – Junior Boys – Per Game – 14 Rounds $65.00 $59.09 $5.91 $65.00

Sports Competition – Soccer – Junior Girls – Per Game – 14 Rounds $65.00 $59.09 $5.91 $65.00

Sports Competition – Soccer – Men’s – Per Game – 16 Minute Halves – 21 Rounds

$83.00 $75.45 $7.55 $83.00

Sports Competition – Soccer – Mixed – Per Game – 16 Minute Halves – 21 Rounds

$83.00 $75.45 $7.55 $83.00

Sports Competition – Soccer – Women’s – Per Game – 16 Minute Halves – 21 Rounds

$83.00 $75.45 $7.55 $83.00

Sports Competition Annual Registration Fee – Netball – 1 Jul – 30 June

$80.00 $75.00 $7.50 $82.50

Sports Competition Annual Registration Fee – Senior Futsal – 1 Sep – 31 Aug

$80.00 $75.00 $7.50 $82.50

Sports Competition Half Year Registration Fee – Netball – 1 Jan – 30 June

$55.00 $51.36 $5.14 $56.50

Sports Competition Half Year Registration Fee – Senior Futsal – 1 March – 31 Aug

$55.00 $51.36 $5.14 $56.50

Sports Competition Season Registration Fee – Junior Futsal $55.00 $51.36 $5.14 $56.50

Storage – Stadium Store Room Hire – Per Week – Per 2m2 $17.50 $16.36 $1.64 $18.00

Stadium [continued]

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 48 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 49: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Health Club

Casual Entry $26.00 $24.09 $2.41 $26.50

Casual Entry – 10 Visit Pass – 6 Month Validity $205.00 $191.82 $19.18 $211.00

Casual Entry – 10 Visit Pass Concession $118.00 $110.00 $11.00 $121.00

Casual Entry – 20 Visit Pass – 12 Month Validity $389.50 $364.55 $36.45 $401.00

Casual Entry – Concession Card / Physio / Exercise Physiologist $15.00 $14.09 $1.41 $15.50

Casual Entry – Non Member – Health & Fitness Assessment $41.00 $38.18 $3.82 $42.00

Casual Entry – Non Member – Personal Training $10.00 $9.09 $0.91 $10.00

Casual Entry – Sporting Group – Min 8 Participants – Per Person $11.00 $10.45 $1.05 $11.50

Casual Entry – Sporting Team Group Class $100.00 $93.64 $9.36 $103.00

Casual Entry – Sporting Team Group Class – Under 16yrs $80.00 $75.00 $7.50 $82.50

Health Club Hire – Group Fitness Instructor – per hour $70.00 $64.55 $6.45 $71.00

Health Club Hire – Studio 1 – per hour $72.00 $67.27 $6.73 $74.00

Health Club Program – Fit For Life – Assessment $15.50 $14.55 $1.45 $16.00

Health Club Program – Fit For Life – Casual Visit $6.70 $6.18 $0.62 $6.80

Health Club Program – Fit for Life – 10 Visit Pass $0.00 $55.64 $5.56 $61.20

Health Club Program – Group Fitness – Specialty Class $8.70 $8.00 $0.80 $8.80

Health Club Program – Teen Gym – Assessment $15.00 $13.64 $1.36 $15.00

Health Club Program – Teen Gym – Casual Visit $11.50 $10.73 $1.07 $11.80

Health Club Program – Teen Gym – Per Term – 1 Session per Week (per class)

$9.70 $8.91 $0.89 $9.80

Health Club Program – Teen Gym – Per Term – 2 Sessions per Week(per class)

$7.60 $7.00 $0.70 $7.70

Health Club Program – Teen Gym – Per Term – 3 Sessions per Week(per class)

$5.40 $5.00 $0.50 $5.50

Health Club Program – Teen Gym – Per Term – 4 Sessions per Week(per class)

$3.80 $3.55 $0.35 $3.90

Membership – Direct Debit – Adult – Weekly $22.00 $20.45 $2.05 $22.50

Membership – Direct Debit – Corporate – Weekly $18.50 $17.27 $1.73 $19.00

Membership – Direct Debit – Flexi – Weekly $15.00 $14.09 $1.41 $15.50

Membership – Direct Debit – Off Peak $15.50 $14.55 $1.45 $16.00

Membership – Direct Debit – Pension – Weekly $11.00 $10.27 $1.03 $11.30

Membership – Direct Debit – Student/Senior – Weekly $15.50 $14.55 $1.45 $16.00

Membership – Failed Payment Fee $7.20 $6.73 $0.67 $7.40

Membership – Introductory Fee $90.00 $83.18 $8.32 $91.50

Membership – Off Peak member entry during peak hours, per visit $10.00 $9.09 $0.91 $10.00

Membership – Upfront – 3 Month Rehabilitation Membership $455.00 $423.64 $42.36 $466.00

Membership – Upfront – 12 Month Rehabilitation Membership $1,638.00 $1,512.73 $151.27 $1,664.00

Membership – Upfront – Adult – 12 Months $1,010.00 $945.45 $94.55 $1,040.00

Membership – Upfront – Adult – 6 Months $520.00 $486.36 $48.64 $535.00

Membership – Upfront – Adult – 3 Months $280.00 $260.91 $26.09 $287.00

Membership – Upfront – Corporate – 12 Months $865.00 $809.09 $80.91 $890.00

Membership – Upfront – Off Peak – 12 Months $702.00 $655.00 $65.50 $720.50

Membership – Upfront – Student/Senior – 12 Months $702.00 $655.00 $65.50 $720.50

Membership – Upfront – Student/Senior – 6 Months $0.00 $327.27 $32.73 $360.00

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 49 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 50: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Membership – Upfront – Pension – 12 months $500.00 $463.64 $46.36 $510.00

Personal Training – 10 Sessions – 30 Minutes $460.00 $424.55 $42.45 $467.00

Personal Training – 10 Sessions – 45 Minutes $500.00 $463.64 $46.36 $510.00

Personal Training – 10 Sessions – 60 Minutes $650.00 $604.55 $60.45 $665.00

Personal Training – 20 Sessions – 30 Minutes $820.00 $763.64 $76.36 $840.00

Personal Training – 20 Sessions – 45 Minutes $900.00 $836.36 $83.64 $920.00

Personal Training – 20 Sessions – 60 Minutes $1,220.00 $1,136.36 $113.64 $1,250.00

Personal Training – 5 Sessions – 30 Minutes $245.00 $227.27 $22.73 $250.00

Personal Training – 5 Sessions – 45 Minutes $266.50 $247.73 $24.77 $272.50

Personal Training – 5 Sessions – 60 Minutes $340.00 $318.18 $31.82 $350.00

Personal Training – Direct Debit – 30 Minute – 1 Session per Week $50.00 $46.36 $4.64 $51.00

Personal Training – Direct Debit – 30 Minute – 2 Sessions per Week $90.00 $83.64 $8.36 $92.00

Personal Training – Direct Debit – 30 Minute – 3 Sessions per Week $130.00 $120.91 $12.09 $133.00

Personal Training – Direct Debit – 45 Minute – 1 Session per Week $55.00 $51.36 $5.14 $56.50

Personal Training – Direct Debit – 45 Minute – 2 Sessions per Week $100.00 $92.73 $9.27 $102.00

Personal Training – Direct Debit – 45 Minute – 3 Sessions per Week $145.00 $134.55 $13.45 $148.00

Personal Training – Direct Debit – 60 Minute – 1 Session per Week $70.00 $65.00 $6.50 $71.50

Personal Training – Direct Debit – 60 Minute – 2 Sessions per Week $130.00 $120.91 $12.09 $133.00

Personal Training – Direct Debit – 60 Minute – 3 Sessions per Week $190.00 $176.36 $17.64 $194.00

Personal Training – Group Session – 45 Minutes – 2 – 4 People $95.00 $88.18 $8.82 $97.00

Personal Training – Group Session – 60 Minutes – 2 – 4 People $128.00 $119.09 $11.91 $131.00

Personal Training – Single Session – 30 Minute $50.00 $46.36 $4.64 $51.00

Personal Training – Single Session – 45 Minute $55.00 $51.36 $5.14 $56.50

Personal Training – Single Session – 60 Minute $70.00 $65.45 $6.55 $72.00

Personal Training – Starter Pack – 3 X 45 Minute Sessions $100.00 $93.64 $9.36 $103.00

Health Club [continued]

Birthday Parties – Cancellation / Deposit Fee $100.00 $90.91 $9.09 $100.00

Birthday Parties – Party – Per Child $28.00 $25.91 $2.59 $28.50

Casual Usage – Adult Gym $23.50 $21.82 $2.18 $24.00

Casual Usage – Adult Gym – 10 Visit Pass $205.00 $191.82 $19.18 $211.00

Casual Usage – Adult Gym – 20 Visit Pass $390.00 $363.64 $36.36 $400.00

Casual Usage – Trial Class – Foundations $26.00 $24.09 $2.41 $26.50

Casual Usage – Trial Class – Junior Gym $20.00 $18.64 $1.86 $20.50

Casual Usage – Trial Class – MAG $30.00 $27.73 $2.77 $30.50

Casual Usage – Trial Class – Play Gym $20.00 $18.64 $1.86 $20.50

Casual Usage – Trial Class – Stages $26.00 $24.09 $2.41 $26.50

Casual Usage – Trial Class – WAG $30.00 $27.73 $2.77 $30.50

Gymnastics – Competitive – MG Level 1 – (4 Hours per Week) $36.90 $34.55 $3.45 $38.00

Gymnastics – Competitive – MG Level 2 – (6 Hours per Week) $45.85 $42.73 $4.27 $47.00

Gymnastics – Competitive – MG Level 3 – (9 Hours per Week) $75.80 $55.45 $5.55 $61.00

Gymnastics – Competitive – MG Level 4-5 – (12 Hours per Week) $75.80 $70.91 $7.09 $78.00

Gymnastics

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 50 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 51: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Gymnastics – Competitive – MG Level 6 + (12 Hours per Week) $75.80 $70.91 $7.09 $78.00

Gymnastics – Competitive – WG Junior Levels (6 Hours per Week) $87.85 $42.73 $4.27 $47.00

Gymnastics – Competitive – MG Pre Levels – (4 Hours per Week) $36.90 $34.55 $3.45 $38.00

Gymnastics – Competitive – WG Club Level 3 – 4 (4 Hours per Week) $36.90 $34.55 $3.45 $38.00

Gymnastics – Competitive – WG Club Level 5+ (6 Hours per Week) $45.85 $42.73 $4.27 $47.00

Gymnastics – Competitive – WG Club Level 6+ (9 Hours per Week) $59.20 $55.45 $5.55 $61.00

Gymnastics – Competitive – WG Level 1A – (4 Hours per Week) $36.90 $34.55 $3.45 $38.00

Gymnastics – Competitive – WG Level 2 – (6 Hours per Week) $45.85 $42.73 $4.27 $47.00

Gymnastics – Competitive – WG Level 3 – (9 Hours per Week) $59.20 $55.45 $5.55 $61.00

Gymnastics – Competitive – WG Level 4 – (12 Hours per Week) $75.80 $69.09 $6.91 $76.00

Gymnastics – Competitive – WG Level 5 – (16 Hours per Week) $87.85 $82.27 $8.23 $90.50

Gymnastics – Competitive – WG Level 6+ (16 Hours) $0.00 $82.27 $8.23 $90.50

Gymnastics – Competitive – WG Level 1B – (4 Hours per Week) $36.90 $34.55 $3.45 $38.00

Gymnastics – Recreational – Baby Gym per session $0.00 $13.64 $1.36 $15.00

Gymnastics – Recreation – Foundations – per session $22.00 $20.64 $2.06 $22.70

Gymnastics – Recreation – Junior Gym – per session $18.50 $17.27 $1.73 $19.00

Gymnastics – Recreational – Mini Gym per session $0.00 $17.27 $1.73 $19.00

Gymnastics – Recreational – Mini Levels per session $0.00 $25.00 $2.50 $27.50

Gymnastics – Recreation – Play Gym – per session $18.50 $17.27 $1.73 $19.00

Gymnastics – Recreation – Stages – per session $26.70 $25.00 $2.50 $27.50

Gymnastics – Recreation – Teen Gymnastics – per session $26.70 $25.00 $2.50 $27.50

Gymnastics Hall Hire – After Hours $323.00 $300.00 $30.00 $330.00

Gymnastics Hall Hire – Competition – Inner City Region – per hour $123.00 $113.64 $11.36 $125.00

Gymnastics Hall Hire – Competition – Other Regions – per hour $164.00 $151.82 $15.18 $167.00

Gymnastics Hall Hire – Regular Hirer – per hour More than 2 Bookings per week – Monday – Friday

$123.00 $114.55 $11.45 $126.00

Gymnastics Hall Hire – Saturday – Sunday – per hour $246.00 $230.00 $23.00 $253.00

Gymnastics Hall Hire Mon-Friday – per hour $164.00 $152.73 $15.27 $168.00

Gymnastics Program – Christmas Display – per Ticket $20.00 $18.18 $1.82 $20.00

Gymnastics Program – Competitive Testing Day $20.00 $18.18 $1.82 $20.00

Gymnastics Program – Personal Training – 30 Minutes $50.00 $46.36 $4.64 $51.00

Gymnastics Program – Personal Training – 45 Minutes $55.00 $51.36 $5.14 $56.50

Gymnastics Program – Personal Training – 60 Minutes $70.00 $65.45 $6.55 $72.00

Gymnastics Program – Personal Training – 60 Minutes (2-3 people) $130.00 $119.09 $11.91 $131.00

Gymnastics Program – Rebound Therapy – 45 Minutes – per session $8.00 $7.27 $0.73 $8.00

Gymnastics Program – Recreational Testing Day $15.00 $13.64 $1.36 $15.00

Holiday Program – Bayside Kids – Clinic Level 1 $51.00 $47.73 $4.77 $52.50

Holiday Program – Bayside Kids – Clinic Level 2 $61.00 $56.82 $5.68 $62.50

Holiday Program – Bayside Kids – Clinic Level 3 $71.00 $66.36 $6.64 $73.00

Holiday Program – Bayside Kids – Clinic Level 4 Subject to change per Excursion/Incursion cost

Holiday Program – Bayside Kids – Extended Day $69.00 $64.55 $6.45 $71.00

Holiday Program – Bayside Kids – Full Day $59.00 $55.45 $5.55 $61.00

Holiday Program – Bayside Kids – Half Day $49.00 $45.91 $4.59 $50.50

Gymnastics [continued]

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 51 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 52: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Membership – Annual Gymnastics Registration – Adult $50.00 $45.45 $4.55 $50.00

Membership – Annual Gymnastics Registration – Competitive $120.00 $112.73 $11.27 $124.00

Membership – Annual Gymnastics Registration – Recreational $80.00 $75.00 $7.50 $82.50

Membership – Term 4 Gymnastics Registration – Recreational $50.00 $45.45 $4.55 $50.00

Gymnastics [continued]

Schools – Gymnastics – Per Instructor $50.00 $46.36 $4.64 $51.00

Schools – Health Club – Per Instructor $72.00 $67.27 $6.73 $74.00

Schools – Per Student (Please refer to school bookings policy) $6.30 $5.82 $0.58 $6.40

Schools

Activities Room – Hire – per hour $60.00 $54.55 $5.45 $60.00

Crèche – Member – 90 Minutes $5.50 $5.00 $0.50 $5.50

Crèche – Non Member – 90 Minutes $9.00 $8.18 $0.82 $9.00

Crèche – 10 Visit Pass – 90 Minutes $50.00 $45.45 $4.55 $50.00

Crèche – 20 Visit Pass – 90 Minutes $100.00 $90.91 $9.09 $100.00

Crèche –1st Child Ft Direct Debit – unlimited $26.00 $23.64 $2.36 $26.00

Crèche – Additional Child Ft Direct Debit – unlimited $19.50 $17.73 $1.77 $19.50

Crèche – No Show Fee – Per 90 Minutes $5.50 $5.00 $0.50 $5.50

Activities Room

Merchandise – Backpack $11.00 $10.27 $1.03 $11.30

Merchandise – Boxing Gloves $44.00 $41.18 $4.12 $45.30

Merchandise – Boxing Inners $5.00 $4.73 $0.47 $5.20

Merchandise – Cap $11.00 $10.27 $1.03 $11.30

Merchandise – Drink Bottle $11.00 $10.27 $1.03 $11.30

Merchandise – Electrical Tape $0.00 $2.27 $0.23 $2.50

Merchandise – EzyDry Towel $2.00 $1.82 $0.18 $2.00

Merchandise – Futsal Shin Pads $22.00 $20.45 $2.05 $22.50

Merchandise – Futsal Socks $17.50 $16.36 $1.64 $18.00

Merchandise – Gym Bag $22.50 $36.36 $3.64 $40.00

Merchandise – Gym Towel $11.00 $10.27 $1.03 $11.30

Merchandise – Gymnastics Chalk $4.00 $3.77 $0.38 $4.15

Merchandise – Gymnastics Recreation T-Shirt $15.00 $14.09 $1.41 $15.50

Merchandise – Gymnastics Tracksuit $95.00 $89.09 $8.91 $98.00

Merchandise – Membership Cards $5.00 $4.55 $0.45 $5.00

Merchandise – Miscellaneous Additional items may be added throughout the year

Merchandise – Protein Shaker $11.00 $10.27 $1.03 $11.30

Merchandise – Strapping Tape $0.00 $10.91 $1.09 $12.00

Merchandise – Table Tennis – Competition Balls (6) $6.00 $5.64 $0.56 $6.20

Retail

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 52 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 53: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Merchandise – T-Shirt $34.00 $31.82 $3.18 $35.00

Retail [continued]

FDLC Promotions Available on Request

FDLC Sponsorship Available on Request

FDLC Sponsorship and Promotions

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 53 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 54: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.19 Filming

Note 1 Exclusive use of venue/open space

General Condition for Filming

When a venue or open space area is barricaded or sectioned off exclusively.Note 2 Waivers of Council FeesFeesmay bewaivered or reduced in accordancewith the Local Government Filming Protocol 2009 to be determinedby Recreation Booking Co-ordinator (Film contact officer) and approval by General Manager. All requests for feesto be waivered or reduced must be lodged 14 days’ notice to CouncilAll application must complete the Council waver form.Note 3 Changes to original applicationsMajor revisions to a filming application will incur a surcharge of 75% of original application fee.Note 4Failure to obtain Council approval may incur a fine under the relevant act.Note 5 Risk CostFee to ensure effective management of applications that are lodged with less than 7days notice to Council.

As listed above. As listed above.

• Ultra-Low: No more than 10 Crew, no disruption is caused to residents, retailers, motorists or otherevents/activities, Activities are contained to footpaths or open public space areas only, associated vehiclesare legally parked at all times and not driven onto footpaths or parks.

• Low: 11 - 25 Crew, No more than 4 trucks/vans, no construction, minimal lighting/equipment, small or nounit base, no more than 2 locations.

• Medium: 26-50 Crew, No more than 10 trucks, some construction, some equipment for example: mediumtrucks, medium sized cranes, unit base required, no more than 4 locations.

• High: >50 Crew, >10 trucks, significant construction, extensive equipment, large unit base required, > 4locations.

Definitions for impact of filming/ photography:

As listed above. As listed above.

Application Fee – Ultra low impact less than 10 crew, 1 camera, sound, 1 light, no vehicles

$0.00 $0.00 $0.00 $0.00

Application Fee – Low impact 11-25 crew, minimal vehicles, minimal equipment/lighting, small unit base

$150.00 $150.00 $0.00 $150.00

Application Fee – Medium impact 26-50 no more than 10 trucks, some equipment, unit base

$300.00 $300.00 $0.00 $300.00

Application Fee – High impact more than 50 crew, more than 10 trucks, significant construction, extensive equipment, large unit base

$500.00 $500.00 $0.00 $500.00

Application Fee – Council approval for parking when filming on privateproperty such as unit base plans or parking plans.

$150.00 $150.00 $0.00 $150.00

Major revisions to a filming application 75% of original application fee

Fee for Filming

Application Fee

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 54 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 55: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Filming over 3 days

Standard low impact filming per day $120.00 $150.00 $0.00 $150.00

Standard medium impact per day $235.00 $275.00 $0.00 $275.00

Standard high impact filming per day $376.00 $400.00 $0.00 $400.00

Administration of Traffic Management Plan low impact Stop/go traffic control on a local or council-managed road– police consultation

Refer to Traffic Management

Administration of Traffic Management Plan medium impact Stop/go traffic control on a multi-lane or state road, police consultation, RMS consultation

Refer to Traffic Management

Administration of Traffic Management Plan high impact Road closures, Police consultation, RMS consultation

Refer to Traffic Management

Traffic Management Plan of Filming

Advertising for Temporary Road Closures Refer to Traffic Management

Partial Road Closure Refer to Traffic Management

Full Road Closure Refer to Traffic Management

Road Closures for Filming

Filming Drummoyne Oval, Rothwell and Goddard Park (low impact) $1,300.00 $1,340.00 $0.00 $1,340.00

per day

Filming Golf Courses (low impact) $1,140.00 $1,170.00 $0.00 $1,170.00

per day

Passive Park (low impact) $125.00 $129.00 $0.00 $129.00

per day

Filming Drummoyne Oval, Rothwell and Goddard Park (medium impact)

$1,840.00 $1,900.00 $0.00 $1,900.00

per day

Filming Golf Courses (medium impact) $1,530.00 $1,570.00 $0.00 $1,570.00

per day

Passive Park (medium impact) $240.00 $247.00 $0.00 $247.00

per day

Filming Drummoyne Oval, Rothwell and Goddard Park (high impact) $2,300.00 $2,370.00 $0.00 $2,370.00

per day

Filming Golf Courses (high impact) $2,030.00 $2,090.00 $0.00 $2,090.00

per day

Passive Park (high impact) $360.00 $371.00 $0.00 $371.00

per day

Risk Cost – less than 3 days notification to Council $465.00 $465.00 $0.00 $465.00

Hire of Parks and Open Space for Exclusive Use

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 55 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 56: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Risk Cost – less than 7 days notification to Council $240.00 $240.00 $0.00 $240.00

Sports Field (low impact) $175.00 $180.00 $0.00 $180.00

per day

Sports Field (medium impact) $300.00 $309.00 $0.00 $309.00

per day

Sports Field (high impact) $420.00 $433.00 $0.00 $433.00

per day

Hire of Parks and Open Space for Exclusive Use [continued]

Access Fee $280.00 $288.00 $0.00 $288.00

Cleaning Fee (per hour) $86.00 $88.00 $0.00 $88.00

Location research/site inspections/supervisor (per hour) $63.00 $65.00 $0.00 $65.00

Power Access (per hour) $63.00 $65.00 $0.00 $65.00

Security Fee (minimum 4 hours) (per hour) $84.00 $87.00 $0.00 $87.00

Site Preparation (per hour) $63.00 $65.00 $0.00 $65.00

Site Remediation To be determined by location & activities

Temporary Structure – (installation of table & Chairs in parks, marquees, signage, barriers, cabling)

$425 per day per structure

Other Fees of Filming

Standard Ultra Low per hour, non-commercial (all-inclusive per application)

$0.00 $0.00 $0.00 $0.00

Standard low impact per day (all-inclusive per application) $115.00 $115.00 $0.00 $115.00

Standard medium impact per day (all-inclusive per application) $165.00 $165.00 $0.00 $165.00

Standard high impact Still Photography per day (all-inclusive per application)

$220.00 $220.00 $0.00 $220.00

Still Photography

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 56 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 57: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.20 Golf Courses

Mondays (excl. Public Holidays) – Eighteen (18) Holes $18.40 $16.82 $1.68 $18.50

Tue – Fri (excl. Public Holidays) – Eighteen (18) Holes $28.60 $25.00 $2.50 $27.50

Eighteen (18) Holes Weekends and Public Holidays $32.60 $30.00 $3.00 $33.00

Mondays (excl. Public Holidays) – Nine (9) Holes $13.30 $12.27 $1.23 $13.50

Tue – Fri (excl. Public Holidays) – Nine (9) Holes $20.40 $18.18 $1.82 $20.00

Nine (9) Holes Weekends and Public Holidays $22.50 $21.00 $2.10 $23.10

Barnwell Park Golf Course

BP Adults

Groups of >16 and <24 people (cost per person) $28.60 $25.45 $2.55 $28.00

Groups of >24 people (cost per person) $26.60 $22.73 $2.27 $25.00

BP Group Booking (Deposit required) – 18 Holes

Eighteen (18) Holes $15.00 $13.64 $1.36 $15.00

Nine (9) Holes $10.00 $9.09 $0.91 $10.00

School Programs per Child $5.00 $4.55 $0.45 $5.00

BP School Children

Eighteen (18) Holes $21.00 $19.55 $1.95 $21.50

Nine (9) Holes $16.00 $15.45 $1.55 $17.00

BP University & TAFE Students

Eighteen (18) Holes $21.00 $19.55 $1.95 $21.50

Nine (9) Holes $16.00 $15.45 $1.55 $17.00

BP Pensioners Mon-Fri (only)

Admission after 3 pm all year round $15.00 $13.64 $1.36 $15.00

BP Twilight Golf

Adult Casual Eighteen (18) Holes $21.50 $20.00 $2.00 $22.00

Pensioners/Students Casual Eighteen (18) Holes $16.00 $15.00 $1.50 $16.50

Juniors Casual Eighteen (18) Holes $12.00 $11.27 $1.13 $12.40

Adult Casual Nine (9) Holes $15.00 $14.09 $1.41 $15.50

Pensioners/Students Casual Nine (9) Holes $11.00 $10.00 $1.00 $11.00

BP Club Members Casual Visit

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 57 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 58: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Juniors Casual Nine (9) Holes $8.50 $8.00 $0.80 $8.80

BP Club Members Casual Visit [continued]

BP Club Members Annual Block Booking Fee To be negotiated by Council

Adult Competition Eighteen (18) Holes $21.50 $19.55 $1.95 $21.50

Pensioners/Students Competition Eighteen (18) Holes $16.00 $14.55 $1.45 $16.00

Juniors Competition Eighteen (18) Holes $12.00 $10.91 $1.09 $12.00

Adult Competition Nine (9) Holes $15.00 $13.64 $1.36 $15.00

Pensioners/Students Competition Nine (9) Holes $11.00 $10.00 $1.00 $11.00

Juniors Competition Nine (9) Holes $8.50 $7.73 $0.77 $8.50

BP Club Members Competition Times

BP Promotions Available on Request

Yearly course hole sponsorship Available on Request

BP Sponsorship and Promotions

Administration Fee per 3 Year Term $15.00 $13.64 $1.36 $15.00

Use of Private Golf Carts

Eighteen (18) Holes $38.00 $34.55 $3.45 $38.00

Nine (9) Holes $27.50 $25.00 $2.50 $27.50

Massey Park Golf Course

MP Adults

Eighteen (18) Holes $30.50 $27.73 $2.77 $30.50

Nine (9) Holes $24.50 $22.27 $2.23 $24.50

MP Seniors

Eighteen (18) Holes $17.50 $15.91 $1.59 $17.50

Nine (9) Holes $13.00 $11.82 $1.18 $13.00

MP School Children Mon-Fri

Eighteen (18) Holes $25.50 $23.18 $2.32 $25.50

Nine (9) Holes $20.50 $18.64 $1.86 $20.50

MP University & TAFE Students Mon-Fri

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 58 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 59: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

MP Pensioners Mon-Fri (only)

Eighteen (18) Holes $25.50 $23.18 $2.32 $25.50

Nine (9) Holes $20.50 $18.64 $1.86 $20.50

Weekend Concessions (School, University & TAFE, Pensioners) $30.50 $27.73 $2.77 $30.50

Admission after 3 pm during non-Daylight Saving Periods and after 4 pm Daylight Saving Periods

$22.50 $20.45 $2.05 $22.50

MP Twilight Golf

MP Club Members Competition Annual Block Booking Fee To be negotiated by Council

MP Club Members Competition Eighteen (18) Holes – Adults $22.00 $20.00 $2.00 $22.00

MP Club Members Competition Eighteen (18) Holes – Pensioner $18.00 $16.36 $1.64 $18.00

MP Club Members Competition Eighteen (18) Holes – Junior $15.50 $14.09 $1.41 $15.50

MP Club Members Competition Times

Yearly course hole sponsorship Available on Request

MP Sponsorship

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 59 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 60: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.21 Tennis Courts

Casual Monday – Friday (9am-5pm) per hour $20.00 $20.00 $2.00 $22.00

Casual Monday – Friday (5pm-10.30pm) & Weekends per hour $24.00 $22.73 $2.27 $25.00

Permanent Monday – Friday (9am-5pm) per hour $18.00 $17.27 $1.73 $19.00

Permanent Monday – Friday (5pm-10.30pm) & Weekends per hour $22.00 $20.91 $2.09 $23.00

Cintra Park

Monday-Friday before 5pm per hour $22.00 $20.91 $2.09 $23.00

All other times per hour $25.00 $23.64 $2.36 $26.00

Croker Park

Casual Hire $22.00 $20.91 $2.09 $23.00

Night Play Under Lights per hour $25.00 $23.64 $2.36 $26.00

Five Dock Park

Casual Hire Monday – Friday (7am-5pm) per hour $22.00 $20.91 $2.09 $23.00

Casual Hire Monday – Friday (5pm-10.30pm) & Weekends per hour $24.00 $22.73 $2.27 $25.00

Greenlees

Monday-Friday before 5pm per hour $22.00 $20.91 $2.09 $23.00

All other times $23.00 $21.82 $2.18 $24.00

Powells Creek

Note At the 15 February 2005 Council Meeting, Council endorsed to undertake removal of graffiti on an even sharedcost basis through City Services only with the consent of the owner (within legislation).

1.22 Graffiti Removal – Non-Council Property and Assets*

Cleaning Materials resident contribution (Shared Cost) At Shared Cost

Hourly charge Resident Contribution for a one man crew, vehicle and high pressure cleaner

As Quoted

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 60 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 61: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.23 Library

Overdue fee if matter referred to a collection agency $0.00 $16.36 $1.64 $18.00

Library Items Overdue – Adult & Young Adult Members for Second Notice (Capped at $20 per borrower)

$2.50 $2.50 $0.00 $2.50

Library Items Overdue – Junior Members 14 y.o. and under $0.00 $0.00 $0.00 $0.00

Library Service Charges

Overdue Items

Booking of Special Events (Author talks, etc.) Dependent on Activity

Booking of Special Events (Children’s events) Dependent on Activity

Inter-Library Loans** $5.50 plus costs

If additional charges by Library borrowed from, costs are passed onto borrower.

Reserved Items $0.00 $0.00 $0.00 $0.00

Reserved Items – Miscellaneous

Photocopying & Printing Charges – Black/White A3 $0.40/copy

Photocopying & Printing Charges – Black/White A4 $0.20/copy

Photocopying & Printing Charges – Colour A3 $3/copy

Photocopying & Printing Charges – Colour A4 $2.00/copy

Photographic reproduction POA + $6

Photographic reproduction – Commercial POA + $30

Printing and photocopying charges

Fax Charges $2/sheet

Library Facsimile Service

Earbuds $5.00 $4.55 $0.45 $5.00

Library 2nd Hand Book Sales # Minimum $0.50/per book

Price at the discretion of the Manager.

Mailing Tube (to fit A0 print) $5.00 $4.55 $0.45 $5.00

Per Cotton Bag $6.00 $5.45 $0.55 $6.00

Per Poly Bag $2.00 $1.82 $0.18 $2.00

SD cards $8.00 $7.27 $0.73 $8.00

USB stick, earphones etc Maximum $20 per item

Item Sale

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 61 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 62: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Materials Replacement Costs

CD Cases/DVD Cases (Damaged or Lost) $2.00 $2.00 $0.00 $2.00

Library Items (Damaged or Lost) * Cost of Item+$16 processing

Donated paperbacks replaced by similar item at discretion of manager.

Library Items(Replacement of Barcode Label or Tag) $2.00 $2.00 $0.00 $2.00

Membership Card Replacement $5.00 $5.00 $0.00 $5.00

Concord: A centenary history on CD Rom $34.50 $31.36 $3.14 $34.50

Drummoyne/Concord Combined history book on CD Rom $39.50 $35.91 $3.59 $39.50

Drummoyne: A western suburbs history on CD Rom $29.50 $26.82 $2.68 $29.50

Pictorial History of Canada Bay – hardback $34.95 $31.77 $3.18 $34.95

Pictorial History of Canada Bay – paperback $24.95 $22.68 $2.27 $24.95

Research First hour free then $57/hour

Research – Commercial First hour free then $105/hour

Local History Research

A0 160 gsm matte colour poster print per page $0.00 $31.82 $3.18 $35.00

A0 160gsm matte b/w plan print per page $0.00 $10.91 $1.09 $12.00

A0 200 gsm glossy colour photo print per page $0.00 $50.00 $5.00 $55.00

A1 or 50x70 cm 160gsm matte colour poster print per page $0.00 $19.09 $1.91 $21.00

A1 or 50x70 cm 200gsm glossy colour photo print per page $0.00 $30.00 $3.00 $33.00

3D Printing in ABS (acrylonitrile butadiene styrene print material included)

$5.00 per hour or part thereof

3D Printing Set Up – per print job $5.00 $4.55 $0.45 $5.00

Rhodes Learning Space – Booking of Special Events (talks, etc.) Dependent on Activity

Rhodes Learning Space – Equipment/computer Hire Dependent on Activity

Rhodes Learning Space – Informal Workshop Fee 1 $5.00 $4.55 $0.45 $5.00

Rhodes Learning Space – Informal Workshop Fee 2 $15.00 $13.64 $1.36 $15.00

Rhodes Learning Space – School Holiday Program 1 $45.00 $40.91 $4.09 $45.00

Rhodes Learning Space – School Holiday Program 2 $90.00 $81.82 $8.18 $90.00

Rhodes Learning Space – Skills Development Workshop Fee 1 $45.00 $40.91 $4.09 $45.00

Rhodes Learning Space – Skills Development Workshop Fee 2 $125.00 $113.64 $11.36 $125.00

Rhodes Learning Space – Special Workshop (including materials etc.)

Dependent on Activity

Rhodes Learning Centre

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 62 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 63: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.24 Parking Management

Cabarita Park and Bayview Park (All Days) $3.70/hr up to 3 hrs, then $1.90/hr up to 24 hrs max.

Rider Boulevard and Hospital Road (All Days) $3.70/hr

Everton Road (Weekdays) $3.70/hr

Everton Road (Weekends and public holidays) $1.90/hr

Pay Parking

1st and 2nd Park Parking Permit (Canada Bay Residents & Ratepayers)

$0.00 $0.00 $0.00 $0.00

Additional Park Parking Permit (Canada Bay Residents & Ratepayers)

$226.00 $233.00 $0.00 $233.00

Park Parking Permit (Non-Residents & Non-Ratepayers) $226.00 $233.00 $0.00 $233.00

Replacement Permit $38.00 $39.10 $0.00 $39.10

Replacement Permit – Pensioners $19.00 $19.60 $0.00 $19.60

Cabarita and Bayview Park Parking Permits

On-Street Parking PermitThe issue of street parking permits is subject to eligibility criteria. Resident pensioners are entitled a 50% reduction in fees for resident On-Street Parking Permits.

1st On-Street resident permit (for residence with no eligible onsite parking space)

$0.00 $0.00 $0.00 $0.00

2nd On-Street resident permit (for residence with no eligible onsite parking space)

$0.00 $0.00 $0.00 $0.00

3rd On-Street resident permit (for residence with no eligible onsite parking space)

$62.00 $64.00 $0.00 $64.00

1st On-Street resident permit (for residence with 1 eligible onsite parking space)

$0.00 $0.00 $0.00 $0.00

2nd On-Street resident permit (for residence with 1 eligible onsite parking space)

$62.00 $64.00 $0.00 $64.00

3rd On-Street resident permit (for residence with 1 eligible onsite parking space)

Not Eligible

1st On-Street resident permit (for residence with 2 eligible onsite parking space)

$0.00 $0.00 $0.00 $0.00

2nd and 3rd On-Street resident permit (for residence with 2 eligible onsite parking space)

Not Eligible

On-Street resident permit (for residence with 3 eligible onsite parking space)

Not Eligible

Business parking permit (permit for 1st car) $226.00 $233.00 $0.00 $233.00

Business parking permit (permit for 2nd) $447.00 $460.00 $0.00 $460.00

Visitor Annual Permit – 1 only per residence* $0.00 $0.00 $0.00 $0.00

Replacement Permit – Residential $26.00 $26.80 $0.00 $26.80

Replacement Permit – Business $31.00 $31.00 $0.00 $31.00

Replacement Permit – Pensioners $13.00 $13.40 $0.00 $13.40

Canada Bay LGA Zone

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 63 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 64: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Other Parking Fees

Car Parking on Council Parks (Special Events) Per Field at discretion of Council

Hire Fee and Possible Renovation Fee

Note 1

1.25 Parks Hire

General Conditions of Open Space Hire

Local schools (Canada Bay LGA) have free use of parks within Council boundaries - weekdays only (Booking feesstill apply, see note 10).Non-local schools shall pay 50% of the Casual Use rate as applicable - week days only. PSSA School Events arecharged at ½ the seasonal rate per field for the year, ¼ to be paid each term -weekdays only.Schools within the LGA, with prior agreement with Council, can organise Athletics Carnivals at Drummoyne Ovalas per terms and conditions during one pre allocated week of the year and apply for fee waivers.Note 2Casual Use rates apply to use of sports fields or wickets per day or per hour. Half Day use shall be charged at 50%of the Casual Use Rate. Hourly Use shall be paid on a pro-rata basis.Note 3All bookings could incur a Bond and/or a restoration fee at Council's discretion.Note 4Additional costs at cost-recovery rates shall apply to use of open space as applicable. For example, litter bins,Council Law Enforcement Officers, staffing, waste management, cleaning, utilities and line marking.Note 5Winter Season from 1st April to 31 August.Summer Season from 3rd week in September to 31 March.Grounds may not be available for matches/games during March/April due to ground preparation.Note 6Pre-season training ground hire fee is 50%of normal seasonal hire rate. Pre-seasonweekend trial/grading bookingscharged an additional casual hire fee. Pre-season facilities will not include line marking or installation of goalpostsor provision of lights.Note 7Lighting fee is additional to seasonal hire charge. (council will refund lights if council close the field, refund at endof season).Note 8Bookings in excess of 10 per year will be treated as a seasonal booking and will require private public liabilityinsurance to be purchased by the hirer.Note 9Council will consider waiving the cost of hire of parks to local, non-profit, registered charity organisations withinour Community on their merits, when requests are made. All requests must be lodged with Council 14 days priorto event.Note 10A Booking Fee will be charged to all bookings. This fee is non-refundable.Note 11Public Convenience Access fee of $250 may be applicable to sporting and training events when no other hire feesare charged. Council will require a key bond of $100.

As listed above. As listed above.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 64 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 65: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Open Space Miscellaneous

Casual Booking Fee $32.00 $30.00 $3.00 $33.00

Change to Seasonal Booking Fee $53.00 $50.00 $5.00 $55.00

Pre-Seasonal Booking Fee $53.00 $50.00 $5.00 $55.00

Seasonal Booking Fee $95.00 $89.09 $8.91 $98.00

Cancellation Fee– less than 2 days’ notice $32.00 $30.00 $3.00 $33.00

Call out fee $178.00 $166.36 $16.64 $183.00

Use of Parks

Licence Agreement Fee $315.00 $294.55 $29.45 $324.00

Alteration of Licence Agreement $630.00 $590.91 $59.09 $650.00

Minimum Charge for Lease of Council Sporting Fields As per Gazettal by Dept of lands

Licence Fees

One Off Game (subject to Council approval) $230.00 $215.45 $21.55 $237.00

Sporting Fields – additional/one off installation of goal posts $1,310.00 $1,227.27 $122.73 $1,350.00

Sporting Fields – additional/one off line marking $1,310.00 $1,227.27 $122.73 $1,350.00

Turf Wicket Preparation $1,310.00 $1,227.27 $122.73 $1,350.00

Unauthorised use of field by organised teams/clubs $405.00 $379.09 $37.91 $417.00

One off Events

Key Bond – Casual Users $100.00 $100.00 $0.00 $100.00

Key Bond – Seasonal Initial Bookings $50.00 $50.00 $0.00 $50.00

Key Replacement/Provide Additional Key $52.00 $50.00 $5.00 $55.00

Open Space Key Hire

Bond – Corporate Cricket Day $3,000.00 $3,000.00 $0.00 $3,000.00

Corporate Cricket – One day game – Wednesdays only – 8am – 4pm.Fee includes hire of oval, preparation of turf wicket, dressing rooms

$3,150.00 $2,945.45 $294.55 $3,240.00

Facility Cleaning Fee $420.00 $393.64 $39.36 $433.00

Ground Hire (per hour) $395.00 $370.00 $37.00 $407.00

Grounds staff for match day (per staff per hour) $80.00 $75.45 $7.55 $83.00

Seasonal Fee – Cleaning & Waste Management Negotiated by Council

Seasonal Fee – Leased arrangements Negotiated by Council

Drummoyne Oval

Lights at 100lux level / per hour $26.00 $24.55 $2.45 $27.00

Lights at 250lux level / per hour $79.00 $74.55 $7.45 $82.00

Drummoyne Oval Lights Usage

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 65 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 66: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Lights at 500lux level / per hour $263.00 $246.36 $24.64 $271.00

Lights at 1400lux level / per hour $580.00 $540.91 $54.09 $595.00

Drummoyne Oval Lights Usage [continued]

Special Events POA

Special Events

Seasonal Fee – Additional Cleaning for current lessees if required $630.00 $590.91 $59.09 $650.00

Seasonal Fee – Cleaning & Waste Management To be negotiated by Council

Seasonal Fee – Leased arrangements To be negotiated by Council

Seasonal Fee – Oval hire – Extra games for current lessees only $2,630.00 $2,463.64 $246.36 $2,710.00

Seasonal Fee – Waste Management for current lessees only To be negotiated by Council

Concord Oval

Schools/Juniors (full field)/hour or part there of $114.00 $106.36 $10.64 $117.00

Schools/Juniors (half field)/hour or part there of $64.00 $60.00 $6.00 $66.00

Seniors (full field)/hour or part there of $173.00 $161.82 $16.18 $178.00

Seniors (half field)/hour or part there of $99.00 $92.73 $9.27 $102.00

Category – Hockey

St Lukes Hockey Complex

Casual per hour per court $25.00 $23.64 $2.36 $26.00

Seasonal Mon-Friday per court per club per night $265.00 $248.18 $24.82 $273.00

Seasonal Saturday per court $265.00 $248.18 $24.82 $273.00

Category – Netball, Basketball, Volleyball, Archery and Dog Training

Netball Courts – Cintra Park

Seasonal (Saturday only) per season $740.00 $690.91 $69.09 $760.00

Archery – Greenlees

Yearly Fee Hire of St Lukes 1 only Sun 8am to 12pm. This does not include access to cricket nets

$660.00 $618.18 $61.82 $680.00

Yearly Hire of St Lukes Clubhouse (This does not include cricket nets)

$660.00 $618.18 $61.82 $680.00

Dog Training

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 66 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 67: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Category – Baseball

Casual per hour per field $31.00 $29.09 $2.91 $32.00

Seasonal per season per field $1,520.00 $1,427.27 $142.73 $1,570.00

Athletics St Lukes Field Oval (ONLY) (Wednesdays and Fridays)

Baseball – Timbrell Park

* Cost per field per usage rate per season. Includes training and games.

Casual per hour per field $31.00 $29.09 $2.91 $32.00

Seasonal weekends Saturday OR Sunday (max 6 hours) (per season per field)

$680.00 $636.36 $63.64 $700.00

3 nights a week plus Saturday/Sunday (or as per licence agreement) (per season per field)

$1,360.00 $1,272.73 $127.27 $1,400.00

Line marking for casual bookings (per season per field) $349.00 $326.36 $32.64 $359.00

Baseball – Sid Richards

* Cost per field per usage rate per season. Includes training and games.

Casual per hour per field $31.00 $29.09 $2.91 $32.00

Seasonal weekends Saturday OR Sunday (max 6 hours) (per season per field)

$680.00 $636.36 $63.64 $700.00

3 nights a week plus Saturday/Sunday (or as per licence agreement) (per season per field)

$1,360.00 $1,272.73 $127.27 $1,400.00

Line marking for casual bookings (per season per field) $349.00 $326.36 $32.64 $359.00

Five Dock Park, Queen Elizabeth Park Field 1, Campbell Park Fields 1&2, Edwards Park, St Lukes Fields 1&2,Timbrell Park Fields 1&2, Arthur Walker Reserve, Powells Creek Field 2, Jessie Stewart Reserve, Russell Park

Category – Cricket

Synthetic Cricket Wicket

Casual per hour per field $31.00 $29.09 $2.91 $32.00

Seasonal training week night (max 4 hours) per night $340.00 $318.18 $31.82 $350.00

Seasonal weekends Saturday OR Sunday (max 6 hours) $680.00 $636.36 $63.64 $700.00

Seasonal (3 week day training and Saturday and Sunday) (per season per field)

$1,360.00 $1,272.73 $127.27 $1,400.00

Field Lighting per field per hour $26.00 $24.55 $2.45 $27.00

Goddard Park, Ron Routley Reserve, Rothwell Reserve, St Lukes Oval, St Lukes field 2

Turf Cricket Wicket

Casual per day per field $680.00 $636.36 $63.64 $700.00

Seasonal training week night (max 4 hours per night) $423.00 $396.36 $39.64 $436.00

Seasonal weekends Saturday OR Sunday (max 6 hours) $2,240.00 $2,100.00 $210.00 $2,310.00

Seasonal (Saturday AND Sunday) per season per field $4,490.00 $4,200.00 $420.00 $4,620.00

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 67 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 68: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Field Lighting per field per hour $26.00 $24.55 $2.45 $27.00

Turf Cricket Wicket [continued]

* Cost per field per usage rate per season. Includes training and games.

Senior Fields – Soccer, AFL, Aussie Rules, Rugby Union, Rugby League, etc.

Five Dock Park, Goddard Park, Queen Elizabeth Park, Ron Routley Park, Rothwell Park, St Lukes Oval, SidRichards Park, Taplin Park, Campbell Park, Greenlees Park, Timbrell Park, Edwards Park, St Lukes Park, PowellsCreek, Nield Park, St Lukes North*

Casual per hour per field $31.00 $29.09 $2.91 $32.00

Seasonal training week night (max 4 hours) per night $340.00 $318.18 $31.82 $350.00

Seasonal weekends Saturday OR Sunday (max 6 hours) $680.00 $636.36 $63.64 $700.00

Seasonal (Max 25 hours, 3 week day training and Saturday and Sunday as per Licence Agreement) (per season per field)

$1,360.00 $1,272.73 $127.27 $1,400.00

Field Lighting per field per hour $26.00 $24.55 $2.45 $27.00

* Cost per field per usage rate per season. Includes training and games.

Junior Fields – Mini Soccer, Rugby, AFL and Touch Football

Edwards Fields 3, 4 & 5, Nield Field 2, 3 & 4, QEP Field 3, Timbrell Fields 1, 2, 3, 4 & 5, Taplin Park Field 2

Casual per hour per field $23.00 $21.82 $2.18 $24.00

Seasonal training week night (max 4 hours per night) $244.00 $228.18 $22.82 $251.00

Seasonal weekends Saturday OR Sunday (max 6 hours) $487.00 $454.55 $45.45 $500.00

Seasonal (Max 25 hours, 3 week day training and Saturday and Sunday as per Licence Agreement) (per season per field)

$975.00 $909.09 $90.91 $1,000.00

Field Lighting per field per hour $26.00 $24.55 $2.45 $27.00

Fisherman's Club Key Hire – (located at Concord Community Centre) Annual key hire

$35.00 $32.73 $3.27 $36.00

Non-Residential – Annual Key Fee $145.00 $135.45 $13.55 $149.00

Park gate locked in release fee (Security patrol call out) $113.00 $105.45 $10.55 $116.00

Replacement Key – Residential & Non-Residential $59.00 $55.45 $5.55 $61.00

Residential – Annual Key Fee $35.00 $32.73 $3.27 $36.00

Social Recreation

Bayview Park Access Management

Additional cleaning of Cabarita Park or Prince Edward Park (per hour) $226.00 $211.82 $21.18 $233.00

Booking Fee (per application, non-refundable) $32.00 $30.00 $3.00 $33.00

Ceremony/Ceremony Photography/Professional Photography (per hour)

$178.00 $166.36 $16.64 $183.00

Ceremonies & Related Photography at Cabarita Park

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 68 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 69: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Commercial Activity

Personal Trainers – Permit (Allows for up to 3 sessions per week, 1 hour per session)

$137.00 $145.00 $0.00 $145.00

Additional Sessions in excess of 3 per week (maximum of 15 sessions per week) (per session)

$70 per additional session per year in excess of 3 per week

Additional trainer on permit (Allows for up to 3 sessions per week, 1 hour per session)

$74.00 $76.00 $0.00 $76.00

Booking Fee (per application, non-refundable) $32.00 $30.00 $3.00 $33.00

Booking Fee (per application, non-refundable) $32.00 $30.00 $3.00 $33.00

<101 people $263.00 $246.36 $24.64 $271.00

>100 people $484.00 $453.64 $45.36 $499.00

Fishing & Other Water Based Competitions (per day)

Booking Fee – Corporate booking fee (per application, non-refundable)

$200.00 $187.27 $18.73 $206.00

Booking Fee – Private & Community Groups (per application, non-refundable)

$32.00 $30.00 $3.00 $33.00

Community Groups< 80 $0.00 $0.00 $0.00 $0.00

Community Groups 81-150 $238.00 $222.73 $22.27 $245.00

Community Groups > 150 Booking at Council discretion $585.00 $550.00 $55.00 $605.00

Corporate Groups< 80 $310.00 $290.00 $29.00 $319.00

Corporate Groups 81-150 $615.00 $577.27 $57.73 $635.00

Corporate Groups > 150 Booking at Council discretion, must use Rhodes Foreshore Park this figure includes park hire approval of temporary structures (such as amusement devices, marquees & stages)

$1,460.00 $1,363.64 $136.36 $1,500.00

Private, Corporate and Community Groups, Social Recreation

Booking Fee ( per application, non-refundable ) one-off Regatta $68.00 $63.64 $6.36 $70.00

Corporate Regatta – Per Regatta $1,050.00 $981.82 $98.18 $1,080.00

Corporate Regatta – Per Regatta (includes electricity costs) $1,160.00 $1,081.82 $108.18 $1,190.00

For Non Profit Community Org – Per Regatta $441.00 $412.73 $41.27 $454.00

For Seasonal Users – Regatta fee per day $895.00 $836.36 $83.64 $920.00

For Seasonal Users – Regatta fee plus electricity costs per day $1,040.00 $972.73 $97.27 $1,070.00

Regattas – Rodd Point-Bayview Park

Bond At Council Discretion

Booking Fee (per application, non-refundable) $184.00 $190.00 $0.00 $190.00

Council staff Attendance & Labour To be determined by Council

Low Impact event – inclusive park hire & temporary structure $1,110.00 $1,140.00 $0.00 $1,140.00

Medium Impact Event – inclusive park hire & temporary structure $2,220.00 $2,290.00 $0.00 $2,290.00

Event – (large scale provided to/for general community)

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 69 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 70: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

High Impact Event – inclusive park hire & temporary structure $3,330.00 $3,430.00 $0.00 $3,430.00

Power Access per hour $72.00 $67.27 $6.73 $74.00

Water Access per hour $72.00 $67.27 $6.73 $74.00

Event – (large scale provided to/for general community) [continued]

* Public Liability Insurance Policy of $20 Million dollars is required.

Permit Fees for Temporary Installations (site fees only)

* As part of Council's Risk Management procedures Safe Work Method Statements (SWMS) will be required to besubmitted to Council for temporary installations such as jumping castles, stages, large and commercial marquees.For amusement devices / rides all relevant Work Cover certification will need to be submitted to Council.

Amusement Devices Application $150.00 $150.00 $0.00 $150.00

Parks Hire of Schools* Each booking must have at least 1 school residing in LGA.

Booking Fee (per application, non-refundable) $32.00 $30.00 $3.00 $33.00

Local School (weekday only) $0.00 $0.00 $0.00 $0.00

Non Local and Private Schools (weekday only) 50% of the normal usage rate

PSSA School Events – Payment 1/2 to be paid each term – week dayonly *

1/2 seasonal rate per field for the year

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 70 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 71: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.26 Roads and FootpathsRoads & Footpaths Approvals Under S138 of The Roads Act

1. The following conditions apply to ALL fees & charges listed under the ROADS & FOOTPATHS

General Conditions for ROADS & FOOTPATHS

1.1. Other costs, such as Traffic Control, Night Work, and other costs associated with night work are subject toconfirmation at the time of pricing.1.2. Saw-cutting costs for Footpaths, Driveways, Paving apply. Refer relevant rate.1.3. RMS specific requirements, including appropriate occupancy licences, are not included in the above costs,and will be subject to pricing at the time of works and fully payable by the applicant.1.4. RMS peak period time constraints are not included in the rates above. Where these constraints are imposed,the rates will be modified to reflect the limited access periods, and will be advised to the applicant as a modifiedrate, applicable only to that works.1.5. All above prices are based on the underlying base, sub-base and sub-grade having been restored to meetAUSPEC 306 as amended. Works that do not meet 306 Specifications and are below the depth for nominateditems above will be undertaken by Council at full cost to the applicant.1.6. Areas that exceed the stated quantities will be priced as a separate lump sum to the applicant.2. For road, footpath & kerb & gutter replacements arising from Development Approval related activities, applicablefee will be determined following a site assessment and based on affected area.3. Charge for restoration work made under S101 and S102 of the Road Act within council area are not subject toGST whether charged direct to Telstra, Sydney Water etc. or charged to a contractor engaged by them.

As listed above. As listed above.

Asphalt Concrete (AC10, 50mm) – up to 15m2 $201.00 $188.18 $18.82 $207.00

Asphalt Concrete (AC10, 50mm – greater than 15m2, less than 50m2 $132.00 $123.64 $12.36 $136.00

Asphalt Concrete (AC10, 50mm – greater than 50m2, less than 100m2

$103.00 $96.36 $9.64 $106.00

Asphalt Concrete (AC14, 100mm) – up to 15m2 $272.00 $254.55 $25.45 $280.00

Asphalt Concrete (AC14, 100mm) – greater than 15m2, less than 50m2

$256.00 $240.00 $24.00 $264.00

Asphalt Concrete (AC14, 100mm) – greater than 50m2, less than 100m2

$191.00 $179.09 $17.91 $197.00

Asphaltic Concrete (AC10, 50mm) with Concrete Base (230mm, 50MPa with 2 Layers of SL81 Reinforcing Mesh on 150mm 5MPa Lean Mix sub-base) – up to 15m2

$925.00 $868.18 $86.82 $955.00

Asphaltic Concrete (AC10, 50mm) with Concrete Base (230mm, 50MPa with 2 Layers of SL81 Reinforcing Mesh on 150mm 5MPa Lean Mix sub-base) – greater than 15m2, less than 50m2

$590.00 $554.55 $55.45 $610.00

Asphaltic Concrete (AC10, 50mm) with Concrete Base (230mm, 50MPa with 2 Layers of SL81 Reinforcing Mesh on 150mm 5MPa Lean Mix sub-base) – greater than 50m2, less than 100 m2

$520.00 $486.36 $48.64 $535.00

Asphaltic Concrete (AC10, 50mm) with Concrete Base (230mm, 50MPa with 2 Layers of SL81 Reinforcing Mesh on 150mm 5MPa Lean Mix sub-base) – greater than 100m2, less than 500 m2

$500.00 $468.18 $46.82 $515.00

Asphaltic Concrete (AC10, 50mm) with Concrete Base (230mm, 50MPa with 2 Layers of SL81 Reinforcing Mesh on 150mm 5MPa Lean Mix sub-base) – greater than 500m2

Cost plus 15%

Concrete, 50MPa, 230mm with 2 layers of SL81 reinforcing mesh on 150mm 5MPa Lean Mix sub-base – up to 15m2

$705.00 $659.09 $65.91 $725.00

Road Replacements – per m2

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 71 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 72: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Concrete, 50MPa, 230mm with 2 layers of SL81 reinforcing mesh on 150mm 5MPa Lean Mix sub-base – greater than 15m2, less than 50m2

$515.00 $481.82 $48.18 $530.00

Concrete, 50MPa, 230mm with 2 layers of SL81 reinforcing mesh on 150mm 5MPa Lean Mix sub-base – greater than 50m2, less than 100m2

$473.00 $442.73 $44.27 $487.00

Concrete, 50MPa, 230mm with 2 layers of SL81 reinforcing mesh on 150mm 5MPa Lean Mix sub-base – greater than 100m2, less than 500m2

$453.00 $424.55 $42.45 $467.00

Concrete, 50MPa, 230mm with 2 layers of SL81 reinforcing mesh on 150mm 5MPa Lean Mix sub-base – greater than 500m2

Cost plus 15%

Asphalt full depth Less than 15m² $295.00 $276.36 $27.64 $304.00

Asphalt full depth Greater than 15m², less than 50m² $244.00 $228.18 $22.82 $251.00

Asphalt full depth Greater than 50m², less than 100m² $227.00 $212.73 $21.27 $234.00

Asphalt full depth Greater than 100m², less than 500m² $210.00 $196.36 $19.64 $216.00

Asphalt full depth Greater than 500m² Specific Quote

Road Replacements – per m2 [continued]

Construct a standard 1.2m Pram Ramp (billed per pram ramp) $1,810.00 $2,300.00 $230.00 $2,530.00

Asphaltic Concrete (AC5 @ 25mm with Concrete Base, 25Mpa @ 100mm) – up to 15m²

$417.00 $390.91 $39.09 $430.00

Asphaltic Concrete (AC5 @ 25mm with Concrete Base, 25Mpa @ 100mm) – greater than 15m², up to 50m²

$291.00 $272.73 $27.27 $300.00

Asphaltic Concrete (AC5 @ 25mm with Concrete Base, 25Mpa @ 100mm) – greater than 50m², up to 100m²

$242.00 $226.36 $22.64 $249.00

Asphaltic Concrete (AC5 @ 25mm with Concrete Base, 25Mpa @ 100mm) – greater than 100m²

Quote + 15%

Asphaltic Concrete (AC5 @ 25mm) – up to 15m2 $195.00 $182.73 $18.27 $201.00

Asphaltic Concrete (AC5 @ 25mm) – greater than 15m², up to 50m² $132.00 $123.64 $12.36 $136.00

Asphaltic Concrete (AC5 @ 25mm) – greater than 50m², up to 100m² $103.00 $96.36 $9.64 $106.00

Asphaltic Concrete (AC5 @ 25mm) – greater than 100m² Quote + 15%

Concrete Footpath – less than 15m² $227.00 $212.73 $21.27 $234.00

Concrete Footpath – greater than 15m², less than 50m² $193.00 $180.91 $18.09 $199.00

Concrete Footpath – greater than 50m², less than 100m² $170.00 $159.09 $15.91 $175.00

Concrete Footpath – greater than 100m², less than 500m² $147.00 $137.27 $13.73 $151.00

Concrete Footpath – greater than 500m² Quote + 15%

Footpath Paving – Standard Clay Brick Pavers – less than 15m² $600.00 $563.64 $56.36 $620.00

Footpath Paving – Standard Clay Brick Pavers – greater than 15m², less than 50m²

$520.00 $486.36 $48.64 $535.00

Footpath Paving – Standard Clay Brick Pavers – greater than 50m², less than 100m²

$408.00 $381.82 $38.18 $420.00

Footpath Paving – Standard Clay Brick Pavers – greater than 100m², less than 500m²

$385.00 $360.91 $36.09 $397.00

Footpath Paving – Standard Clay Brick Pavers – greater than 500m² Quote + 15%

Footpath Paving – Town Centre Concrete Pavers – less than 15m² $655.00 $613.64 $61.36 $675.00

Footpath Paving – Town Centre Concrete Pavers – greater than 15m², less than 50m²

$570.00 $531.82 $53.18 $585.00

Footpath Replacements – per m2

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 72 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 73: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Footpath Paving – Town Centre Concrete Pavers – greater than 50m², less than 100m²

$499.00 $468.18 $46.82 $515.00

Footpath Paving – Town Centre Concrete Pavers – greater than 100m², less than 500m²

$476.00 $445.45 $44.55 $490.00

Footpath Paving – Town Centre Concrete Pavers – greater than 500m²

Quote + 15%

Footpath Replacements – per m2 [continued]

Concord West – Main Street Pavement $585.00 $550.00 $55.00 $605.00

Five Dock – Main Street Pavement $585.00 $550.00 $55.00 $605.00

Majors Bay Road – Main Street Pavement $690.00 $645.45 $64.55 $710.00

Specific Area per m2

Turfing (supply and lay on prepared soil), rate per m2 $41.20 $38.55 $3.85 $42.40

Watering of new turf, rate per hour. $92.50 $86.82 $8.68 $95.50

Turfing – per m2

Saw cutting, asphalt, up to 100mm depth $15.50 $14.55 $1.45 $16.00

Saw cutting, asphalt, up to 250mm depth $48.40 $45.27 $4.53 $49.80

Saw cutting, concrete, up to 150mm depth $35.00 $32.73 $3.27 $36.00

Saw cutting, concrete, up to 300mm depth $74.00 $69.09 $6.91 $76.00

Saw cutting, reinforced concrete, up to 150mm depth $24.70 $23.09 $2.31 $25.40

Saw cutting, reinforced concrete, up to 300mm depth $74.00 $69.09 $6.91 $76.00

Saw cutting, site Establishment $348.00 $325.45 $32.55 $358.00

Sawcutting – per lineal metre

Concrete Driveway 150mm with SL72 Up to 15 m² $299.00 $308.00 $0.00 $308.00

Concrete Driveway 150mm with SL72 Greater than 15 m², less than 50m²

$247.00 $254.00 $0.00 $254.00

Concrete Driveway 150mm with SL72 Greater than 50 m², less than 100m²

$206.00 $212.00 $0.00 $212.00

Concrete Driveway 150mm with SL72 Greater than 100m² $185.00 $191.00 $0.00 $191.00

Concrete Driveway 200mm with SL82 Up to 15 m² $319.00 $329.00 $0.00 $329.00

Concrete Driveway 200mm with SL82 Greater than 15 m², less than 50m²

$268.00 $276.00 $0.00 $276.00

Concrete Driveway 200mm with SL82 Greater than 50 m², less than 100m²

$227.00 $234.00 $0.00 $234.00

Concrete Driveway 200mm with SL82 Greater than 100m² $206.00 $212.00 $0.00 $212.00

Driveway Replacements – per m2

Layback and Gutter – Kerb and Gutter Less than 15 lineal metres $385.00 $360.91 $36.09 $397.00

Kerb & Gutter Replacements – per lineal metre

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 73 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 74: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Layback and Gutter – Kerb and Gutter Greater than 15 and less than 50 lineal metres

$306.00 $286.36 $28.64 $315.00

Layback and Gutter – Kerb and Gutter Greater than 50 and less than 100 lineal metres

$283.00 $264.55 $26.45 $291.00

Layback and Gutter – Kerb and Gutter Greater than 100 and less than 500 lineal metres

$261.00 $244.55 $24.45 $269.00

Layback and Gutter – Kerb and Gutter Greater than 500 lineal metres Specific Quote

Layback and Gutter – Kerb Only Less than 15 lineal metres $385.00 $360.91 $36.09 $397.00

Layback and Gutter – Kerb Only Greater than 15 and less than 50 lineal metres

$317.00 $297.27 $29.73 $327.00

Layback and Gutter – Kerb Only Greater than 50 and less than 100 lineal metres

$272.00 $254.55 $25.45 $280.00

Layback and Gutter – Kerb Only Greater than 100 and less than 500 lineal metres

$249.00 $232.73 $23.27 $256.00

Layback and Gutter – Kerb Only Greater than 500 lineal metres Specific Quote

Layback and Gutter – Gutter Only Less than 15 lineal metres $408.00 $381.82 $38.18 $420.00

Layback and Gutter – Gutter Only Greater than 15 and less than 50 lineal metres

$329.00 $308.18 $30.82 $339.00

Layback and Gutter – Gutter Only Greater than 50 and less than 100 lineal metres

$272.00 $254.55 $25.45 $280.00

Layback and Gutter – Gutter Only Greater than 100 and less than 500lineal metres

$249.00 $232.73 $23.27 $256.00

Layback and Gutter – Gutter Only Greater than 500 lineal metres Specific Quote

Layback and Gutter – Concrete Layback and Gutter Less than 15 lineal metres

$487.00 $454.55 $45.45 $500.00

Layback and Gutter – Concrete Layback and Gutter Greater than 15 and less than 50 lineal metres

$431.00 $403.64 $40.36 $444.00

Layback and Gutter – Concrete Layback and Gutter Greater than 50 and less than 100 lineal metres

$374.00 $350.00 $35.00 $385.00

Layback and Gutter – Concrete Layback and Gutter Greater than 100lineal metres

$329.00 $308.18 $30.82 $339.00

Layback and Gutter – Concrete Dish Drain at intersections Less than 15 lineal metres

$545.00 $509.09 $50.91 $560.00

Layback and Gutter – Concrete Dish Drain at intersections Greater than 15 and less than 50 lineal metres

$476.00 $445.45 $44.55 $490.00

Layback and Gutter – Concrete Dish Drain at intersections Greater than 50 and less than 100 lineal metres

$431.00 $403.64 $40.36 $444.00

Layback and Gutter – Concrete Dish Drain at intersections Greater than 100 lineal metres

$374.00 $350.00 $35.00 $385.00

Gutter Bridge Crossing with Hinged Heavy Duty Steel Grating Per lineal metre (minimum of 4.5m) opening

$1,020.00 $954.55 $95.45 $1,050.00

Kerb Outlet PVC $238.00 $222.73 $22.27 $245.00

Kerb & Gutter Replacements – per lineal metre [continued]

Line marking (air-atomised or airless application) per metre $77.00 $79.50 $0.00 $79.50

Line marking (air-atomised or airless application) set-up costs $2,990.00 $3,080.00 $0.00 $3,080.00

Line marking (Thermo-plastic) per metre $124.00 $128.00 $0.00 $128.00

Line marking (Thermo-plastic) set-up costs $2,990.00 $3,080.00 $0.00 $3,080.00

Other – Linemarking

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 74 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 75: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Lines perpendicular to driveway $309.00 $150.00 $0.00 $150.00

Other – Linemarking [continued]

Directional Sign Installation (Community based, non-profit & religious organisations only)

$215.00 $221.00 $0.00 $221.00

Street signage (supply and Install) $322.00 $332.00 $0.00 $332.00

Sign Posting

Concrete Pipes 375 dia. RCP, per metre $930.00 $872.73 $87.27 $960.00

Concrete Pipes 450 dia. RCP, per metre $985.00 $918.18 $91.82 $1,010.00

Concrete Pipes 600 dia. RCP, per metre $1,100.00 $1,027.27 $102.73 $1,130.00

Concrete Pipes Greater than 600 dia. RCP, per metre Specific Quote

Final Drainage Inspection / Final Road Inspection incl. CCTV provided by applicant

$484.00 $499.00 $0.00 $499.00

Galvanised RHS pipe equivalent up to 100 dia PVC pipe, per metre $283.00 $264.55 $26.45 $291.00

Lintel Only 0.9m / 1.2m (billed per lintel) $1,810.00 $1,690.91 $169.09 $1,860.00

Lintel Only 1.8m (billed per lintel) $1,980.00 $1,854.55 $185.45 $2,040.00

Lintel Only 2.4m (billed per lintel) $2,380.00 $2,227.27 $222.73 $2,450.00

Lintel Only 3.0m (billed per lintel) $2,660.00 $2,490.91 $249.09 $2,740.00

Lintel Only 3.6m (billed per lintel) $2,660.00 $2,490.91 $249.09 $2,740.00

Pits Only Up to 1.5m x 1.5m x 1.5m in size (per pit) $5,610.00 $5,254.55 $525.45 $5,780.00

Pits Only Greater than 1.5m x 1.5m x 1.5m in size (per pit) Specific Quote

Stormwater Drainage

Urgent/emergency fee (non-refundable; excludes inspections, application fee and re-arrangement of other inspections.

$535.00 $550.00 $0.00 $550.00

Residential with single driveway (owner occupied, single dwelling, non-refundable)

$204.00 $210.00 $0.00 $210.00

Duplex/Residential up to 3 storey with single driveway, (non-refundable)

$258.00 $266.00 $0.00 $266.00

Industrial/Commercial/Residential above 3 storey or Residential requiring second entry (non-refundable)

$423.00 $436.00 $0.00 $436.00

Re-assessment of driveway approval resulting from a section 96 being lodged

$113.00 $116.00 $0.00 $116.00

Driveway & Footpath Pre-Commencement Damage Report Form Refer to Damage Report

Vehicle crossings inspection and / or estimates and quote preparationfees per 45 min

$130.00 $134.00 $0.00 $134.00

DRIVEWAY & ANCILLARY WORKS

Driveway Application

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 75 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 76: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Driveway Inspections

Residential – 2 inspections required $195 per inspection

Duplex – 3 inspections required $195 per inspection

Industrial/Commercial – 3 inspections required $195 per inspection

First entry required inspection fee

Residential – 2 inspections required $92 per inspection

Duplex – 3 inspections required $92 per inspection

Industrial/Commercial – 3 inspection required $92 per inspection

Additional entry inspection fee (for second or more entry)

Additional Inspection / Re-inspection fee $195 per inspection

Additional Inspections

Residential Installation $2,700.00 $2,700.00 $0.00 $2,700.00

Duplex/Residential up to 3 storey with single driveway Installation $3,500.00 $3,500.00 $0.00 $3,500.00

Industrial/Commercial/Residential above 3 storey $4,500.00 $4,500.00 $0.00 $4,500.00

Private Contractor Security Deposit (refundable)

If you need to open a combination of public infrastructure categories, which may include any combination of path,kerb & gutter, or Road pavement, then the highest charge units of those opening areas will apply. This will ensureapplicants are not charged multiple charge units. The charge is based on the total size of each type of openingas there are multiple types of opening within the same application.

Road Openings

Road &/or Footpath Opening Application Fee* (Max $1,000)

Road Opening Application (per 10m2 of Road Pavement) (Non-Refundable)

$195 per 10 m2

Road Opening Application (per 15 lineal meter of kerb and gutter or stormwater) (Non-Refundable)

$195 per 15 lineal meter

Road Opening Application (per 18 m2 of Footpath) (Non-Refundable) $195 per 18 m2

Additional Inspection / Re-inspection fee (Non-Refundable) $195 per inspection

Formwork Inspection – number as required (Non – Refundable) – Permanent Only

$195 per inspection

Asphalt plant opening fee – per opening $2,830.00 $3,500.00 $0.00 $3,500.00

Cartage surcharge per cubic metre of asphalt and / or concrete $56.50 $58.00 $0.00 $58.00

Concrete plant opening fee – per opening $2,830.00 $3,500.00 $0.00 $3,500.00

Cost of Works Determination Late Payment fee $980.00 $1,010.00 $0.00 $1,010.00

(Fee applies where the agreed Cost of Works is not paid to Council within 48 hours from the date of issue.)

Plus Security Deposit payable at time of permit application $1,030.00 $1,060.00 $0.00 $1,060.00

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 76 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 77: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Processing Fee (in addition to restoration charge) – non-refundable if works do not proceed

$324.00 $334.00 $0.00 $334.00

Urgent/emergency fee (non-refundable; excludes inspections, application fee and re-arrangement of other inspections.

$535.00 $550.00 $0.00 $550.00

Road &/or Footpath Opening Application Fee* (Max $1,000) [continued]

Work valued up to $2,999 45% of the value

Work valued from $3,000 and up to $7,999 30% of the value

Work valued from $8,000 25% of the value

Road Opening Temporary Restoration Security Deposit

Alignment Levels for Development Applications – for dual occupancy and medium density residential developments

$249.00 $256.00 $0.00 $256.00

Alignment Levels for Development Applications – for high density residential and commercial developments

$370.00 $381.00 $0.00 $381.00

Alignment Levels for Development Applications – for single dwelling residential developments

$125.00 $129.00 $0.00 $129.00

Certificate of Compliance – Driveways & Road Openings (subject to the provision of required information confirming correct materials, complies with current standards)*

$201.00 $207.00 $0.00 $207.00

*For a certification to be issued by Council the following must be provided as a minimum;For footpath certification, a copy of the concrete delivery docket must be provided to Council.For Road Pavement certification, a compaction test results for base and sub-base must be provided to Council.Alternatively an Engineers certificate certifying the above can be provided to Council.

Certificate of Compliance – Driveways & Road Openings

Asphalt works (as required) with No GST Cost of Works

Asphalt works (as required) with GST Cost of Works

Road Opening Permanent Restoration Security Deposit Cost of Works

Work valued up to $2,999 45% of the value

Work valued from $3,000 and up to $7,999 30% of the value

Work valued from $8,000 25% of the value

Asset Integrity Charge – Road Openings (Permanent Restoration applications only)

This fee applies to unauthorised Road &/or Footpath Openings, Driveways and all other public infrastructure worksby Private Contractor.

Un-Authorised road works

Work valued up to $5,000 $690.00 $1,000.00 $0.00 $1,000.00

Work valued from $5,001 and up to $25,000 $1,010.00 $2,000.00 $0.00 $2,000.00

Work valued from $25,001 $1,660.00 $3,000.00 $0.00 $3,000.00

Provision and Administration of External Works

Business hours are from 7am to 4pm excluding weekend and public holidays.

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 77 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 78: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Labourer $51.50 $53.00 $0.00 $53.00

Driver $67.00 $69.00 $0.00 $69.00

Plant Operator $98.00 $101.00 $0.00 $101.00

Team Leader $103.00 $106.00 $0.00 $106.00

Supervisor $113.00 $116.00 $0.00 $116.00

Manager $134.00 $138.00 $0.00 $138.00

Ute Hire $36.00 $37.10 $0.00 $37.10

Truck Hire $62.00 $64.00 $0.00 $64.00

Backhoe / Loader Hire $67.00 $69.00 $0.00 $69.00

Wood Chipper Hire $67.00 $69.00 $0.00 $69.00

Road Sweeper Hire $154.00 $159.00 $0.00 $159.00

Mini Footpath Sweeper Hire $72.00 $74.00 $0.00 $74.00

High Pressure Cleaner $72.00 $74.00 $0.00 $74.00

Oil Absorbent Material – Per bag or per m² $98.00 $101.00 $0.00 $101.00

Sand Backfill Material – per tonne $98.00 $101.00 $0.00 $101.00

Trench Temporary Sealing Material – per bucket $191.00 $197.00 $0.00 $197.00

Outside of business hours – per hour of supervision (minimum charge4 hours and billed in hourly increments thereafter)

$283.00 $291.00 $0.00 $291.00

Set up emergency traffic control and make site safe for pedestrians and vehicular traffic (during business hours). Establish Traffic control plan, provide and place signs, barricades, traffic cones as necessary and maintain site in safe condition (per day).

$2,580.00 $2,660.00 $0.00 $2,660.00

To set up emergency traffic control and make site safe for pedestriansand vehicular traffic (outside of business hours). Establish traffic control plan, provide and place signs, barricades, traffic cones as necessary and maintain site in safe condition.

$3,600.00 $3,710.00 $0.00 $3,710.00

Provision and Administration of External Works [continued]

Inspection and Administration of External Works by Corporations, Contractors and / or Individuals

Business hours are from 7am to 4pm excluding weekend and public holidays.

For afterhours response (between 3:00 pm and 6:30 am) to any development (per call out)

$2,580.00 $2,660.00 $0.00 $2,660.00

For afterhours response (between 3:00 pm and 6:30 am) to any utility (per call out)

$2,580.00 $2,660.00 $0.00 $2,660.00

During business hours – per hour of supervision (minimum charge 1 hour and billed in hourly increments)

$283.00 $195.00 $0.00 $195.00

Outside of business hours – per hour of supervision (minimum charge4 hours and billed in hourly increments thereafter)

$283.00 $291.00 $0.00 $291.00

Per reinstatement order $1,080.00 $1,110.00 $0.00 $1,110.00

Collection from site and disposal of solid waste Cost + 20%

Removal of Dumped Waste

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 78 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 79: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Asbestos Removal and Disposal

Emergency Asbestos Removal – Cost charged to Council by accredited Asbestos Removal Contractor plus 50% Council Administration Fee

Cost + 50%

Removal and disposal of damaged asbestos stormwater outlet pipes identified during restoration construction works by Council

Cost + 20%

Recovery / relocation of survey marks (State Survey Marks, Permanent Mark or Cadastral Marks) by Registered Surveyor

Cost + 15%

Survey Marks

Adjustment of service pipes to new level Cost + 15%

Adjustment of Utility service lids to new levels Cost + 15%

Relocate Utility service pits Cost + 15%

Undergrounding of overhead power lines (phase a – design by ASP), (phase b – approval by authority), (phase c – installation of underground conduits, pulling of cables, jointing, installation of property access point)

Cost + 15%

Adjustment of Utility Service Assets

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 79 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 80: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.27 Swimming Pools

Casual Adult Entry (16 years & over) $6.55 $6.18 $0.62 $6.80

Casual Child (4 -15 years) $5.00 $4.73 $0.47 $5.20

Casual Child (under 4 years) $0.00 $0.00 $0.00 $0.00

Casual Pensioner (with valid pension card) $2.50 $2.27 $0.23 $2.50

Casual Senior (with valid seniors card) $4.70 $4.45 $0.45 $4.90

Casual Student Concession $4.90 $4.45 $0.45 $4.90

Carer for a person with a disability $0.00 $0.00 $0.00 $0.00

Spectators $3.90 $3.64 $0.36 $4.00

Family Pass (2 Adults + 2 Children or 1 Adult + 3 Children) $19.15 $17.91 $1.79 $19.70

Additional Family Member $4.70 $4.36 $0.44 $4.80

Cabarita and Drummoyne Swimming Centres

General Entry

Valid for 12 months from purchase

Multi Visit Passes

10 Adult Entry Pass $58.15 $54.55 $5.45 $60.00

10 Concession Entry Passes $44.40 $41.55 $4.15 $45.70

20 Adult Entry Pass $108.10 $100.91 $10.09 $111.00

20 Concession Entry Passes $80.10 $75.45 $7.55 $83.00

50 Adult Entry Pass $229.50 $214.55 $21.45 $236.00

50 Concession Entry Passes $160.15 $150.00 $15.00 $165.00

10 Family Entry Pass $168.30 $157.27 $15.73 $173.00

20 Family Entry Pass $306.00 $286.36 $28.64 $315.00

Adult Season Pass $454.00 $425.45 $42.55 $468.00

Senior/Child/Student Season Pass $367.20 $343.64 $34.36 $378.00

Pensioner Season Pass $260.00 $243.64 $24.36 $268.00

Off Peak Season Pass (9am-3pm) Drummoyne & Cabarita $229.50 $215.45 $21.55 $237.00

Family Season Pass $1,428.00 $1,336.36 $133.64 $1,470.00

(2 Adults + 2 Children or 1 Adult + 3 Children)

Additional Family Member (Family Season Pass) $275.40 $257.27 $25.73 $283.00

Season Pass

Carnival Admission per attendee $4.00 $3.73 $0.37 $4.10

Carnival Hire per hour (LGA Schools) $200.00 $187.27 $18.73 $206.00

Carnival Hire per hour (Non LGA Schools) $220.00 $206.36 $20.64 $227.00

School Entry

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 80 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 81: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Dept of Education Special Swimming Scheme per hour $3.80 $3.55 $0.35 $3.90

General Swimming per hour $5.00 $4.73 $0.47 $5.20

Half Lane Hire (Drummoyne) – 25m per hour $15.30 $14.36 $1.44 $15.80

Half Pool Hire (Drummoyne) per hour $56.10 $52.73 $5.27 $58.00

Lane Hire – 50m per hour $28.00 $26.36 $2.64 $29.00

School Entry [continued]

Function Room (Cabarita only) per hour $31.50 $29.55 $2.95 $32.50

Half Pool Hire (Drummoyne) per hour $76.50 $71.82 $7.18 $79.00

Lane Hire – 50m per hour $43.85 $40.91 $4.09 $45.00

Olympic Pool per hour $306.00 $286.36 $28.64 $315.00

Pool and Function Room Hire

Water Polo Seasonal Pool Hire

(For usage outside agreed licensed usage)

Carnival Admission per attendee $3.35 $3.18 $0.32 $3.50

Carnival Hire per hour $168.30 $157.27 $15.73 $173.00

Half Lane Hire – 25m (Drummoyne) per hour $12.75 $12.27 $1.23 $13.50

Half Pool Hire (Drummoyne) per hour $45.90 $43.18 $4.32 $47.50

Swim Program per lesson $15.80 $15.00 $1.50 $16.50

Swimming Lessons – Private – 1:1 (30 minute) $0.00 $40.91 $4.09 $45.00

Fitness 10 classes Pass $130.00 $121.82 $12.18 $134.00

Fitness Concession 10 Classes Pass $90.00 $84.55 $8.45 $93.00

Fitness Concession per class $10.00 $9.36 $0.94 $10.30

Fitness Class per class $15.00 $14.09 $1.41 $15.50

Birthday Parties per person (with a party host) $15.00 $16.36 $1.64 $18.00

Birthday Parties deposit (to be provided 48 hour before prior to booking)

$0.00 $136.36 $13.64 $150.00

Learn to Swim Teaching (26 weeks) Direct debit or PIF option. $0.00 $390.00 $39.00 $429.00

Membership (3rd Child Discount) $0.00 $350.91 $35.09 $386.00

School Group Swim Lessons per lesson $7.65 $7.27 $0.73 $8.00

School Holiday Intensive Swim Program per lesson $15.80 $15.00 $1.50 $16.50

School Holiday Intensive Swim Program per week $61.20 $57.27 $5.73 $63.00

Squad Program per person per program (2 or more programs per week)

$7.15 $7.27 $0.73 $8.00

Teens Fitness per class $10.20 $9.55 $0.95 $10.50

Programs

Swimming Centre Promotions Available on Request

Promotions

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 81 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 82: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.28 Traffic Management

Administration of Traffic Management Plan high impact Road closures, Police consultation, RMS consultation

$845.00 $870.00 $0.00 $870.00

Administration of Traffic Management Plan low impact Stop/go traffic control on a local or council-managed road– police consultation

$258.00 $266.00 $0.00 $266.00

Administration of Traffic Management Plan medium impact Stop/go traffic control on a multi-lane or state road, police consultation, RMS consultation

$500.00 $515.00 $0.00 $515.00

Advertising for temporary road closures $950.00 $980.00 $0.00 $980.00

Parking and Regulatory Signs (per unit) $216.00 $201.82 $20.18 $222.00

Administration of Traffic Management

Less than 20 Parking Bays $515.00 $530.00 $0.00 $530.00

21 to 50 Parking Bays $1,030.00 $1,060.00 $0.00 $1,060.00

51 or More Parking Bays $1,540.00 $1,590.00 $0.00 $1,590.00

Free Parking Agreements

Application Fee $139.00 $143.00 $0.00 $143.00

Road Closures

Full road closure fees to be applied to any width of road.

Full Closure

Full road closures to be limited to the length of the property street frontage unless otherwise approved by Council.Fee is based on the length of the closure or the length of the property street frontage, whichever is the higher.Fee is based on the range of the Length of Closure (e.g. a 25m closure shall be charged at the 21m-40m fee).No additonal cost for road closures over 80 metres.

Length Of Closure (m) 0-20 $1,420.00 $1,460.00 $0.00 $1,460.00

Length Of Closure (m) 21-40 $1,730.00 $1,780.00 $0.00 $1,780.00

Length Of Closure (m) 41-60 $2,600.00 $2,680.00 $0.00 $2,680.00

Length Of Closure (m) 61-80 $2,970.00 $3,060.00 $0.00 $3,060.00

Length Of Closure (m) >80 $3,710.00 $3,820.00 $0.00 $3,820.00

Partial road closure fees shown are per lane fees. Total fee to be charged as a multiple of the number of lanesclosed (maximum of 3 lanes).

Partial Closure

Partial road closures are limited to the length of the property street frontage unless otherwise approved by Council.Fee is based on the length of the closure or the length of the property street frontage, whichever is the higher.Fee is based on the range of the Length of Closure (e.g. a 25m closure shall be charged at the 21m-40m fee).No additional cost for road closures over 80 metres.

Length Of Closure (m) 0-20 $319.00 $329.00 $0.00 $329.00

Length Of Closure (m) 21-40 $494.00 $510.00 $0.00 $510.00

Length Of Closure (m) 41-60 $680.00 $700.00 $0.00 $700.00

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 82 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 83: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Length Of Closure (m) 61-80 $865.00 $890.00 $0.00 $890.00

Length Of Closure (m) >80 $1,030.00 $1,060.00 $0.00 $1,060.00

Partial Closure [continued]

Tree Permit Application Appeal fee $0.00 $218.00 $0.00 $218.00

Tree Permit Application fee for 1-5 trees $106.00 $109.00 $0.00 $109.00

Tree Permit Application fee for 6-10 trees $159.00 $164.00 $0.00 $164.00

Tree Permit Application fee for 11-20 trees $212.00 $218.00 $0.00 $218.00

Tree Permit Application fee for more than 20 trees $318.00 $328.00 $0.00 $328.00

Application Fee (Pensioners) 50% discount for pensioners

1.29 Tree Management

Tree Preservation

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 83 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 84: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

1.30 Waste Management Charges

A Waste Management Charge will be levied on all domestic residential properties, entitling each property to:

Domestic Waste Charges

Weekly collection of 120L of general wasteFortnightly collection of 240L of co-mingled recyclablesFortnightly collection of 240L of garden organicsTwo domestic household kerbside clean-up services per year

1 x 120L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bins + 2 x Bulk Household Collections per annum

$402.50 $402.50 $0.00 $402.50

1 x 240L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bins + 2 x Bulk Household Collections per annum

$659.50 $660.00 $0.00 $660.00

Residential Lot – Demolished Premises pro-rata $101.00 $101.00 $0.00 $101.00

Residential Vacant Lot per annum $101.00 $101.00 $0.00 $101.00

Domestic Waste Management Standard Service

Upon application a Waste Management Charge (depending on type of service) will be levied on all domesticproperties and will be issued to property owners who apply in writing to Council for any additional bins. Eachapplication for an additional service will be considered separately by Council’s Coordinator Resource Recoveryand Waste Management and upon approval each property will be entitled to a weekly/fortnightly collection of thebins issued under application. These properties will be levied with one or more of the following charges dependingupon the bin type(s) applied for.

Domestic Waste Additional Services

1 x 120L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bin/s per annum

$402.50 $402.50 $0.00 $402.50

1 x 240L Garden Organics Bin per annum $46.00 $46.00 $0.00 $46.00

1 x 240L Recycling Bin per annum $0.00 $0.00 $0.00 $0.00

1 x 240L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bin/s per annum

$659.50 $660.00 $0.00 $660.00

Vacant land will be levied at $101, being approx. 25% of the Domestic Waste Management Charge of $402.50 perannum for domestic residential properties.

Vacant residential lots

Residential properties where a dwelling has been demolished for the purpose of constructing a new dwelling maybe eligible for a rebate of 75% off the Domestic Waste Management Charge.Upon application and approval this rebate will be applied for periods where the service will be removed by Council.

As listed above. As listed above.

Upon application a Waste Management Charge will be levied on all commercial (business) properties to collectthe domestic portion of waste from these properties. The service for Commercial properties is optional andowners/occupiers may utilise either Council’s waste collection service or a private collection contractor. Council’sservice entitles each property to a weekly collection of waste and fortnightly collection of recyclables issued under

Commercial Waste Charges

continued on next page ...

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 84 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 85: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

application. These premises will be levied with one or more of the following charges depending upon the bin type(s)applied for.

Commercial Waste Charges [continued]

1 x 120L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bins per annum

$450.00 $450.00 $0.00 $450.00

1 x 240L Waste + 2 x 240L Recycling + 2 x 240L Garden Organics Bins per annum

$900.00 $900.00 $0.00 $900.00

Commercial Waste Standard Service

1 x 120L Waste + 1 x 240L Recycling + 1 x 240L Garden Organics Bin/s per annum

$450.00 $450.00 $0.00 $450.00

1 x 240L Garden Organics Bin per annum $150.00 $150.00 $0.00 $150.00

1 x 240L Recycling Bin per annum $225.00 $225.00 $0.00 $225.00

1 x 240L Waste + 2 x 240L Recycling + 2 x 240L Garden Organics Bins per annum

$900.00 $900.00 $0.00 $900.00

1 x 240L Waste Bin per annum $900.00 $900.00 $0.00 $900.00

Commercial Additional Services

1 x 240L Waste + 1 x 240L Recycling Bin per set Monday to Sunday $40.00 $40.00 $0.00 $40.00

Cost of replacement bin if damage occurs (each) $116.00 $116.00 $0.00 $116.00

Waste Services for Council Facilities, Parks & Special Events

Council has Compost Bins and Worm Farms for sale, to encourage residents to reduce their waste to landfill.Payment for these items can be made at Council’s Customer Service Counter or by completing Council's CreditCard Application Form.

Other Recovery Services

Community Sharps Container $5.00 $4.55 $0.45 $5.00

Compost Aerator $20.50 $18.64 $1.86 $20.50

RELN Compost Bin (225 litre) $40.00 $36.36 $3.64 $40.00

RELN Worm Farm (worms not included) $75.00 $68.18 $6.82 $75.00

Upon application Council may provide non-rateable properties (including non-profit and/or communityorganisations) with a domestic waste service at rates identical to the commercial waste collection service listedabove.

Non-rateable properties

Standard commercial rates will apply to churches and community organisations, charities, child-care centres,schools, and all non-profit organisations.

As listed above. As listed above.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 85 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 86: Fees and Charges 2019 -2020 - City of Canada Bay · 1 Y OUR future 2030 Community Strategic Plan 2018-2030 Fees and Charges 2019 -2020

Waste Services for SchoolsPrimary and secondary schools within the Council area may be provided with up to (limit of) 5 X 240L recyclingbins, collected weekly plus 1 X 660L cardboard bin, free of charge.Any waste bins requested will be levied at a charge identical to the commercial waste collection service.

As listed above. As listed above.

In instances where Council’s General Manager is satisfied that special assistance is required, often in the caseof hardship, the elderly, or in cases of disability, the General Manager may provide one or more of the followingservices free of charge for a specified period:

Special circumstances

Additional Collection of Current Bin(s); and/orAdditional Waste BinAdditional Recycling BinAdditional Garden Organics Bin

As listed above. As listed above.

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.

Page 86 of 86

Year 18/19 Year 19/20Fee Description Fee incl. GST Fee excl. GST Fee incl.