State of Oregon Department of Environmental Quality OAR 340-045-0075 Fee Tables [Note: This document contains two sets of tables. The first set is effective from August 1, 2020, until June 30, 2021. The second set of tables takes effect on July 1, 2021.] Effective August 1, 2020 June 30, 2021 OAR 340-045-0075 Table 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1, 2020 - June 30, 2021 Application fees for new industrial permits Tier 1 Industrial Facilities $77,038 Tier 2 Industrial Facilities $15,504 Special WPCF Permits (OAR 340-045-0061) $733 Note: New permit applications must include the annual fee specified in Table 70B in addition to the new permit application fee listed above. The application fee is not required for renewal unless a modification is needed or requested. Modification Fees 1 Major Minor At Permit Renewal Prior to Expiration Tier 1 Industrial Facilities $19,355 $38,357 $1,349 Tier 2 Industrial Facilities $4,921 $7,686 $1,349 1. A new application, application fee and modification fee must accompany all requests for permit modification. DEQ may charge the environmental management plan review fee amount in Table 70F when only the environmental management plan required by the permit requires review.

Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

State of Oregon Department of Environmental Quality

OAR 340-045-0075 Fee Tables

[Note: This document contains two sets of tables. The first set is effective from August 1, 2020, until June 30, 2021. The second set of tables takes effect on July 1, 2021.]

Effective August 1, 2020 – June 30, 2021

OAR 340-045-0075 Table 70A

Industrial NPDES and WPCF Individual Permits: Application and Modification Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Application fees for new industrial permits Tier 1 Industrial Facilities $77,038 Tier 2 Industrial Facilities $15,504 Special WPCF Permits (OAR 340-045-0061) $733 Note: New permit applications must include the annual fee specified in Table 70B in addition to the new permit application fee listed above. The application fee is not required for renewal unless a modification is needed or requested.

Modification Fees1

Major Minor At Permit

Renewal Prior to

Expiration Tier 1 Industrial Facilities $19,355 $38,357 $1,349 Tier 2 Industrial Facilities $4,921 $7,686 $1,349

1. A new application, application fee and modification fee must accompany all requests for permit modification. DEQ may charge the environmental management plan review fee amount in Table 70F when only the environmental management plan required by the permit requires review.

Page 2: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70B

Industrial NPDES and WPCF Individual Permit Annual Fees Revised July 2020

Effective August 1, 2020 - June 30, 2021

Type Description NPDES Tier 1

NPDES Tier 2

WPCF Tier 1

WPCF Tier 2

B01 Pulp, paper, or other fiber pulping industry $26,937 N $25,000 N Food or beverage processing - includes produce, meat, poultry, seafood or dairy for

human, pet, or livestock consumption: B02 Washing or packing only N $3,745 N $3,447

B03 Processing – small. Flow ≤ 0.1 mgd, or 0.1 < flow < 1 mgd for less than 180 days per year N $5,599 N $5,297

B04

Processing – medium. 0.1 mgd < Flow < 1 mgd for 180 or more days per year, or flow ≥ 1 mgd for less than 180 days per year

N

$7,901

N

$7,599

B05 Processing – large. Flow ≥ 1 mgd for 180 or more days per year $26,937 $23,669 $25,000 $23,364

Primary Smelting or Refining: B06 Aluminum $26,937 $23,669 $25,000 $23,364

B07 Non-ferrous metals utilizing sand chlorination separation facilities $26,937 $23,669 $25,000 $23,364

B08 Ferrous and non-ferrous metals not elsewhere classified $13,633 $12,135 $13,468 $11,836

B09 Chemical manufacturing with discharge of process wastewater $26,937 $23,669 $25,000 $23,364

B10 Cooling water discharges in excess of 20,000 BTU per second $13,633 $12,135 $13,468 $11,836

Mining Operations – includes aggregate or ore processing:

B11 Large (over 500,000 cubic yards per year or involving chemical leaching) $26,937 $23,669 $25,000 $23,364

B12 Medium (100,000 to 500,000 cubic yards per year) N $8,287 N $7,986

B13 Small (less than 100,000 cubic yards per year) N $2,522 N $2,222 All facilities not elsewhere classified which dispose of process wastewater (includes

remediated groundwater): B14 Tier 1 sources $26,937 N $25,000 N B15 Tier 2 sources N $5,212 N $4,916

Type Description NPDES Tier 1

NPDES Tier 2

WPCF Tier 1

WPCF Tier 2

Page 3: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70B

Industrial NPDES and WPCF Individual Permit Annual Fees Revised July 2020

Effective August 1, 2020 - June 30, 2021

B16

All facilities not elsewhere classified which dispose of non-process wastewaters (for example: small cooling water discharges, boiler blowdown, filter backwash)

N

$3,489

N

$3,189

B17 Fish hatcheries and other confined feeding operations on individual permits except permits the Oregon Department of Agriculture administers.

N $3,054 N $2,755

B18

All facilities which dispose of wastewater only by evaporation from watertight ponds or basins

N

N

N

$2,025

Timber and Wood Products B19 Sawmills, log storage, instream log storage $7,556 $4,286 $5,619 $3,984

B20 Hardboard, veneer, plywood, particle board, pressboard manufacturing, wood products $77,989 $4,721 $6,056 $4,4,22

B21 Wood preserving $6,761 $3,489 $4,824 $3,189

Page 4: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70C

Domestic NPDES and WPCF Individual Permits: Application, Annual and Modification Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Description

Type

Criteria1

New

Permit App. Fee2

NPDES Annual

Fee (5yr)

WPCF Annual

Fee (10yr)

Modifications 3

Major

Minor

Non-Lagoon Treatment Systems

A1

≥ 50 mgd

$49,111

$106,35

3

$24,617

$1,349

A2 25 mgd ≤ Flow

< 50 mgd

$49,111

$62,506

$24,617

$1,349

A3 10 mgd ≤ Flow

< 25 mgd

$49,111

$29,460

$24,617

$1,349

Ba 5 mgd ≤ Flow

< 10 mgd

$49,111

$18,885

$17,649

$24,617

$1,349

C1a

2 mgd ≤ Flow < 5

mgd

$49,111

$12,699

$11,465

$24,617

$1,349

C2a

1 mgd ≤ Flow < 2

mgd

$49,111

$8,619

$7,383

$24,617

$1,349

Da

Flow < 1 mgd

$9,921

$2,729

$2,532

$5,025

$1,349

Page 5: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70C

Domestic NPDES and WPCF Individual Permits: Application, Annual and Modification Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Description

Type

Criteria1

New

Permit App. Fee2

NPDES Annual

Fee (5yr)

WPCF Annual

Fee (10yr)

Modifications 3

Major

Minor

Lagoons Discharging to Surface Waters

Bb

5 mgd ≤ Flow < 10

mgd

$49,111

$9,986

$24,617

$1,349

C1b

2 mgd ≤ Flow < 5 mgd

$49,111

$6,944

$24,617

$1,349

C2b

1 mgd ≤ Flow < 2 mgd

$49,111

$5,069

$24,617

$1,349

Db

Flow < 1 mgd

$9,921

$1,924

$5,025

$1,349

Nondischarging Lagoons

E

No discharge flow

$5,025

$1,603

$2,572

$1,349

Alkaline- stabilization

facilities

F

$1,349

$553

$594

Please see Table 70D and 70E for applicable population and pretreatment fees for the permits listed above.

Municipal Separate Storm Sewer System

MS4

See 40 C.F.R. § 122.26

$27,274 Please see

Table 70H

$2,368

$1,349

1. Based on Average Dry Weather Design Flow, or as defined in 40 C.F.R. 2. New permit applications must include the annual fee in addition to the new permit application fee. 3. DEQ may charge the environmental management plan review fee amount in Table 70F when only the environmental

management plan required by the permit requires review.

Page 6: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70D

Domestic NPDES and WPCF Annual Population Fee

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Population range Annual fee 500,000+ $142,886 400,000 to 499,999 $109,307 300,000 to 399,999 $75,731 200,000 to 299,999 $42,150 150,000 to 199,999 $34,090 100,000 to 149,999 $22,452 50,000 to 99,999 $14,081 25,000 to 49,999 $6,329 15,000 to 24,999 $3,604 10,000 to 14,999 $2,348 5,000 to 9,999 $1,427 1,000 to 4,999 $427 100 to 999 $81 0 to 99 $0

OAR 340-045-0075 Table 70E

Annual Pretreatment Fees Revised July 2020

Effective August 1, 2020 - June 30, 2021

Description

Fee

Pretreatment Fee $2,450 Significant Industrial User $817 per industry

Page 7: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70F

All NPDES and WPCF1 Permits: Technical Activity, Plan Review, and Other Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Activity Fee New or substantially modified sewage treatment facility $11,268

Minor facility or pump station modifications $1,225

Major system or pressure system expansion $859

Minor system expansion or modification $244

New or substantially modified septage alkaline stabilization facility $1,225

Site inspection and evaluation2 $1,919

Disposal system plan review2 $767

Environmental management plan review3 $767

Other Fees

Annual temporary or permanent electronic reporting requirement waiver $935

Permit transfer, legal name change. $121

1. Does not include Onsite septic systems. Please see Tables 9A-9F in OAR 340-071 for appropriate technical activity fees. 2. This fee only applies when these activities are required for DEQ’s review of a General permit application. 3. This fee is not charged to new applicants for individual NPDES and WPCF permits. Plans updated after the permit is issued are subject to plan review as specified in the permit.

Page 8: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Number Type Description New Permit App. Fee1

Annual Fee

100-J NPDES Cooling water/heat pumps $314 $714

200-J NPDES Filter backwash $314 $714

300-J NPDES Fish hatcheries $501 $714

400-J NPDES Log ponds $314 $714

500-J NPDES Boiler blowdown $314 $714

900-J NPDES Seafood processing $314 $714

1400-A

WPCF Wineries and seasonal fresh pack operations whose wastewater flow is ≤ 25,000 gallons/day and is only disposed of by land irrigation.

$314

$419

1400-B WPCF Wineries and small food processors not otherwise eligible for a 1400A general permit. $501 $714

1500-A NPDES Petroleum hydrocarbon clean-up $501 $714

1500-B WPCF Petroleum hydrocarbon clean-up $501 $714

1700-A NPDES Vehicle and equipment wash water $501 $714

1700-B WPCF Vehicle and equipment wash water $696 $714

1900-J NPDES Non-contact geothermal heat exchange $696 $714

Residential and Commercial Graywater and Industrial Reuse Water

2401

WPCF

Tier 1 graywater reuse and disposal system for residential systems: ≤ 300 gallons/day, or equivalent specific geographic area graywater reuse and disposal area permit

$52

$41

2402

WPCF

Tier 2 graywater reuse and disposal system for systems: ≤ 1,200 gallons/day, or equivalent specific geographic area graywater reuse and disposal area permit

$550

$52

2501

WPCF

Industrial reuse water free of human and animal waste suitable for reuse without secondary or advanced treatment and ≤ 25,000 gallons/day

$696

$714

Stormwater General Permits3

Number Type Description New Permit App. Fee1

Annual Fee

Page 9: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

1200-A NPDES Stormwater: Sand, gravel, and other non-metallic mining $1,223 $1,257

1200-C NPDES Stormwater: Construction activities – one acre or more $1,223 $1,257

1200-C

NPDES

Stormwater: Construction activities – less than one acre and part of a common plan of development disturbing one or more acres

$358

$0

1200-CA NPDES Stormwater: Construction activities performed by public agencies – one acre or more $1,223 $1,257

1200-Z NPDES Stormwater: Industrial $1,223 $1,257

4000-MS4

NPDES

Municipal Separate Storm Sewer System (MS4): Conveyance system owned or operated by municipality, special district, hospital, port, school district, etc.

$1,223

Please see Table 70H

Mining General Permits

600

WPCF

Offstream small scale mining – Processing < 5 cubic yds/day, or < 1,500 cubic yds/year $0 $0

Offstream small scale mining – Processing 1,500 -10,000 cubic yds/year $314 $0

700-PM NPDES Suction dredges (gravity and syphon) $0 $25

700-PM NPDES Suction dredges (motorized) $250 $250

700-PM NPDES Permit renewal fee every five years (in addition to the annual fee) $250

Page 10: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

1000 WPCF Gravel mining $314 $714

Other General Permits DOM-F WPCF Septage alkaline stabilization facilities $1,349 $553

All other permits not elsewhere classified. $696 $714

1. New permit applications must include both the new permit application fee and the first year’s annual fee. 2. Stormwater construction and industrial permits are also administered by public agencies and local districts under contract with DEQ.

Page 11: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

OAR 340-045-0075 Table 70H

Municipal Separate Storm Sewer System Permits: Annual Fees

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Population-based cost-per-person, except counties and other Annual Fee

Cost-per-person $0.119

Counties, Phase I $10,069

Counties, Phase II (non-traditional MS4s, hospitals, public universities, etc.) $2,652

Oregon Department of Transportation MS4* $42,436

*Fee for ODOT MS4 assessed only in the absence of a separate revenue agreement.

Page 12: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

12

OAR 340-045-0075 Table 70I

Underground Injection Control Permits Application Fees, Annual Fees and Surcharges

Revised July 2020 Effective August 1, 2020 - June 30, 2021

Type Description Application Fee

Annual Fee

Class of Injection

Surcharge Application Annual

Authorized By Rule1

Low Risk Stormwater Only None None Low Risk $107 None

Non-Stormwater Injection2

None None Medium Risk $134 None

All Other UIC's Draining Stormwater from Any Surface

None

None

Low Risk $107 None Medium Risk $134 None

High Risk $321 $107 1200-U General Permit3

Stormwater Injection

$616

$633

Low Risk $124 None Medium Risk $156 None

High Risk $374 $124 1900-B General Permit

Injection During Geothermal Exploration

$616

$633

Type

Description

Application

Fee

Annual

Fee

Individual WPCF Modifications

Major Minor

Individual WPCF Permit

As defined in 40 CFR parts 9, 144, 145 and 146

$15,504

$3,282

$2,572

$1,349

1. Includes facilities with less than 50 injection systems. All systems must be located over 500 feet from a water well and outside a 2 -year time of travel from a water source. 2. Includes aquifer storage and recovery, low temperature geothermal injection, remediation and other underground injection control systems that do not drain stormwater. 3. Includes facilities with less than 50 injection systems and for systems within 500 ft from a water well and within a 2-year time of travel from a water source.

Page 13: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

13

State of Oregon Department of Environmental Quality

OAR 340-045-0075 Fee Tables Effective July 1, 2021

OAR 340-045-0075 Table 70A

Industrial NPDES and WPCF Individual Permits: Application and Modification Fees

Effective July 1, 2021 Application fees for new industrial permits

Tier 1 Industrial Facilities $82,492 Tier 2 Industrial Facilities $16,601

Special WPCF Permits (OAR 340-045-0061) $785 Note: New permit applications must include the annual fee specified in Table 70B in addition to the new permit application fee listed above. The application

fee is not required for renewal unless a modification is needed or requested.

Modification Fees1

Major Minor At Permit

Renewal Prior to

Expiration Tier 1 Industrial Facilities $20,725 $41,180 $1,445 Tier 2 Industrial Facilities $5,270 $8,230 $1,445

1. A new application, application fee and modification fee must accompany all requests for permit modification. DEQ may charge the environmental management plan review fee amount in Table 70F when only the environmental management plan required by the permit

requires review.

Page 14: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

14

OAR 340-045-0075 Table 70B

Industrial NPDES and WPCF Individual Permit Annual Fees Effective July 1, 2021

Type Description NPDES Tier 1

NPDES Tier 2

WPCF Tier 1

WPCF Tier 2

B01 Pulp, paper, or other fiber pulping industry $28,844 N $26,770 N Food or beverage processing - includes produce, meat, poultry, seafood or dairy for

human, pet, or livestock consumption: B02 Washing or packing only N $4,010 N $3,691

B03 Processing – small. Flow ≤ 0.1 mgd, or 0.1 < flow < 1 mgd for less than 180 days per year N $5,996 N $5,672

B04 Processing – medium. 0.1 mgd < Flow < 1

mgd for 180 or more days per year, or flow ≥ 1 mgd for less than 180 days per year

N $8,460 N $8,137

B05 Processing – large. Flow ≥ 1 mgd for 180 or

more days per year $28,844 $25,345 $26,770 $25,018

Primary Smelting or Refining: B06 Aluminum $28,844 $25,345 $26,770 $25,018

B07 Non-ferrous metals utilizing sand chlorination

separation facilities $28,844 $25,345 $26,770 $25,018

B08 Ferrous and non-ferrous metals not elsewhere

classified $16,496 $12,994 $14,422 $12,674

B09 Chemical manufacturing with discharge of

process wastewater $28,844 $25,345 $26,770 $25,018

B10 Cooling water discharges in excess of 20,000

BTU per second $16,496 $12,994 $14,422 $12,674

Mining Operations – includes aggregate or ore processing:

B11 Large (over 500,000 cubic yards per year or

involving chemical leaching) $28,844 $25,345 $26,770 $25,018

B12 Medium (100,000 to 500,000 cubic yards per

year) N $8,874 N $8,551

B13 Small (less than 100,000 cubic yards per year) N $2,701 N $2,379 All facilities not elsewhere classified which dispose of process wastewater (includes

remediated groundwater): B14 Tier 1 sources $28,844 N $26,770 N B15 Tier 2 sources N $5,581 N $5,264

Page 15: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

15

OAR 340-045-0075 Table 70B

Industrial NPDES and WPCF Individual Permit Annual Fees Effective July 1, 2021

Type Description NPDESTier 1

NPDESTier 2

WPCFTier 1

WPCFTier 2

B16

All facilities not elsewhere classified which dispose of non-process wastewaters (for example: small cooling water discharges,

boiler blowdown, filter backwash)

N $3,736 N $3,415

B17

Fish hatcheries and other confined feeding operations on individual permits except

permits the Oregon Department of Agriculture administers.

N $3,271 N $2,950

B18 All facilities which dispose of wastewater only

by evaporation from watertight ponds or basins

N N N $2,168

Timber and Wood Products B19 Sawmills, log storage, instream log storage $8,091 $4,590 $6,017 $4,266

B20 Hardboard, veneer, plywood, particle board, pressboard manufacturing, wood products $8,555 $5,055 $6,484 $4,735

B21 Wood preserving $7,239 $3,736 $5,165 $3,415

Page 16: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

16

OAR 340-045-0075 Table 70C

Domestic NPDES and WPCF Individual Permits: Application, Annual andModification Fees

Effective July 1, 2021

Description Type Criteria1 New

Permit App. Fee2

NPDES Annual

Fee (5yr)

WPCF Annual

Fee (10yr)

Modifications3

Major Minor

Non-Lagoon Treatment Systems

A1 ≥ 50 mgd $52,588 $113,883 $26,360

$1,445

A2 gd ≤ Flow < 50 mgd $52,588 $66,931 $26,360

$1,445

A3 gd ≤ Flow < 25 mgd $52,588 $31,546 $26,360

$1,445

Ba d ≤ Flow < 10 mgd $52,588 $20,222 $18,899 $26,360

$1,445

C1a 2 mgd ≤ Flow < 5 mgd $52,588 $13,598 $12,277 $26,36

0 $1,44

5

C2a 1 mgd ≤ Flow < 2 mgd $52,588 $9,229 $7,906 $26,36

0 $1,44

5

Da Flow < 1 mgd $10,624 $2,922 $2,712 $5,381 $1,445

Page 17: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

17

OAR 340-045-0075 Table 70C

Domestic NPDES and WPCF Individual Permits: Application, Annual and

Modification Fees Effective July 1, 2021

Description

Type Criteria1 New

Permit App. Fee2

NPDES Annual

Fee (5yr)

WPCF Annual

Fee (10yr)

Modifications 3

Major Minor

Lagoons Discharging to Surface Waters

Bb 5 mgd ≤ Flow < 10 mgd $52,588 $10,693 $26,360 $1,445

C1b 2 mgd ≤ Flow < 5 mgd $52,588 $7,435 $26,360 $1,445

C2b 1 mgd ≤ Flow < 2 mgd $52,588 $5,428 $26,360 $1,445

Db Flow < 1 mgd $10,624 $2,061 $5,381 $1,445

Nondischarging Lagoons

E No discharge flow $5,381 $1,717 $2,754 $1,445

Alkaline- stabilization

facilities F $1,445 $592 $636

Please see Table 70D and 70E for applicable population and pretreatment fees for the permits listed above.

Municipal Separate Storm Sewer System

MS4 See 40 C.F.R. § 122.26 $29,205 Please see Table 70H

$2,536 $1,445

1. Based on Average Dry Weather Design Flow, or as defined in 40 C.F.R. 2. New permit applications must include the annual fee in addition to the new permit application fee. 3. DEQ may charge the environmental management plan review fee amount in Table 70F when only the environmental

management plan required by the permit requires review.

Page 18: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

18

OAR 340-045-0075 Table 70D

Domestic NPDES and WPCF Annual Population Fee

Effective July 1, 2021 Population range Annual fee

500,000+ $153,002 400,000 to 499,999 $117,046 300,000 to 399,999 $81,093 200,000 to 299,999 $45,134 150,000 to 199,999 $36,503 100,000 to 149,999 $24,041 50,000 to 99,999 $15,078 25,000 to 49,999 $6,777 15,000 to 24,999 $3,859 10,000 to 14,999 $2,514 5,000 to 9,999 $1,528 1,000 to 4,999 $457

100 to 999 $87 0 to 99 $0

OAR 340-045-0075 Table 70E

Annual Pretreatment Fees

Effective July 1, 2021

Description

Fee

Pretreatment Fee $2,623 Significant Industrial User $875 per industry

Page 19: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

19

OAR 340-045-0075 Table 70F

All NPDES and WPCF1 Permits: Technical Activity, Plan Review, and Other Fees

Effective July 1, 2021 Activity Fee

New or substantially modified sewage treatment facility $12,066

Minor facility or pump station modifications $1,312

Major system or pressure system expansion $920

Minor system expansion or modification $261

New or substantially modified septage alkaline stabilization facility $1,312

Site inspection and evaluation2 $2,055

Disposal system plan review2 $822

Environmental management plan review3 $822

Other Fees

Annual temporary or permanent electronic reporting requirement waiver $1,001

Permit transfer, legal name change. $129

1. Does not include Onsite septic systems. Please see Tables 9A-9F in OAR 340-071 for appropriate technical activity fees. 2. This fee only applies when these activities are required for DEQ’s review of a General permit application. 3. This fee is not charged to new applicants for individual NPDES and WPCF permits. Plans updated after the permit is issued are subject to plan review as specified in the permit.

Page 20: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

20

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Effective July 1, 2021

Number Type Description New Permit App. Fee1

Annual Fee

100-J NPDES Cooling water/heat pumps $336 $765

200-J NPDES Filter backwash $336 $765

300-J NPDES Fish hatcheries $536 $765

400-J NPDES Log ponds $336 $765

500-J NPDES Boiler blowdown $336 $765

900-J NPDES Seafood processing $336 $765

1400-A

WPCF Wineries and seasonal fresh pack operations

whose wastewater flow is ≤ 25,000 gallons/day and is only disposed of by land irrigation.

$336

$449

1400-B WPCF Wineries and small food processors not otherwise eligible for a 1400A general permit. $536 $765

1500-A NPDES Petroleum hydrocarbon clean-up $536 $765

1500-B WPCF Petroleum hydrocarbon clean-up $536 $765

1700-A NPDES Vehicle and equipment wash water $745 $765

1700-B WPCF Vehicle and equipment wash water $745 $765

1900-J NPDES Non-contact geothermal heat exchange $745 $765

Residential and Commercial Graywater and Industrial Reuse Water

2401

WPCF

Tier 1 graywater reuse and disposal system for residential systems: ≤ 300 gallons/day, or

equivalent specific geographic area graywater reuse and disposal area permit

$52

$41

2402

WPCF

Tier 2 graywater reuse and disposal system for systems: ≤ 1,200 gallons/day, or equivalent

specific geographic area graywater reuse and disposal area permit

$550

$52

2501

WPCF

Industrial reuse water free of human and animal waste suitable for reuse without secondary or advanced treatment and ≤ 25,000 gallons/day

$745

$765

Page 21: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

21

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Effective July 1, 2021

Number Type Description New Permit App. Fee1

Annual Fee

Stormwater General Permits3

1200-A NPDES Stormwater: Sand, gravel, and other non-metallic mining $1,309 $1,346

1200-C NPDES Stormwater: Construction activities – one acre or more $1,309 $1,346

1200-C

NPDES

Stormwater: Construction activities – less than one acre and part of a common plan of

development disturbing one or more acres

$384

$0

1200-CA NPDES Stormwater: Construction activities performed by public agencies – one acre or more $1,309 $1,346

1200-Z NPDES Stormwater: Industrial $1,309 $1,346

4000-MS4

NPDES

Municipal Separate Storm Sewer System (MS4): Conveyance system owned or operated by municipality, special district, hospital, port,

school district, etc.

$1,309

Please see Table 70H

Mining General Permits 600

WPCF

Offstream small scale mining – Processing < 5 cubic yds/day, or < 1,500 cubic yds/year $0 $0

Offstream small scale mining – Processing 1,500 -10,000 cubic yds/year $336 $0

700-PM NPDES Suction dredges (gravity and syphon) $0 $25

700-PM NPDES Suction dredges (motorized) $250 $250

700-PM NPDES Permit renewal fee every five years (in addition to

the annual fee) $250

1000 WPCF Gravel mining $336 $765

Other General Permits DOM-F WPCF Septage alkaline stabilization facilities $1,445 $592

All other permits not elsewhere classified. $745 $765

Page 22: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

22

OAR 340-045-0075 Table 70G

General NPDES and WPCF Permits: Application and Annual Fees

Effective July 1, 2021

Number Type Description New Permit App. Fee1

Annual Fee

1. New permit applications must include both the new permit application fee and the first year’s annual fee. 2. Stormwater construction and industrial permits are also administered by public agencies and local districts under contract with DEQ.

OAR 340-045-0075 Table 70H

Municipal Separate Storm Sewer System Permits: Annual Fees

Effective July 1, 2021 Population-based cost-per-person, except counties

and other Annual Fee

Cost-per-person $0.119

Counties, Phase I $10,609

Counties, Phase II (non-traditional MS4s, hospitals, public universities, etc.) $2,652

Oregon Department of Transportation MS4* $42,436

*Fee for ODOT MS4 assessed only in the absence of a separate revenue agreement.

Page 23: Fee Tables - Oregon Docs/340-045-0075WQFeeTables.pdfTable 70A Industrial NPDES and WPCF Individual Permits: Application and Modification Fees Revised July 2020 Effective August 1,

23

OAR 340-045-0075 Table 70I

Underground Injection Control Permits Application Fees, Annual Fees and

Surcharges Effective July 1, 2021

Type Description Application Fee

Annual Fee

Class of Injection

Surcharge Application Annual

Authorized By Rule1

Low Risk Stormwater Only None None Low Risk $107 None

Non-Stormwater Injection2

None None Medium Risk $134 None

All Other UIC's Draining

Stormwater from Any Surface

None

None

Low Risk $107 None Medium Risk $134 None

High Risk $321 $107

1200-U General Permit3

Stormwater

Injection

$745

$765

Low Risk $133 None Medium Risk $167 None

High Risk $401 $133

1900-B General Permit

Injection During

Geothermal Exploration

$745

$765

Type

Description

Application

Fee

Annual

Fee

Individual WPCF Modifications

Major Minor

Individual WPCF Permit

As defined in 40 CFR parts 9, 144,

145 and 146

$16,601

$3,514

$2,754

$1,445

1. Includes facilities with less than 50 injection systems. All systems must be located over 500 feet from a water well and outside a 2 -year time of travel from a water source.

2. Includes aquifer storage and recovery, low temperature geothermal injection, remediation and other underground injection control systems that do not drain stormwater.

3. Includes facilities with less than 50 injection systems and for systems within 500 ft from a water well and within a 2-year time of travel from a water source.