172
Federal Interagency Geospatial Concept of Operations (GeoCONOPS) Version 3.0 | June 2011 Final Draft

Federal Interagency Geospatial Concept of Operations ... · Federal Interagency Geospatial Concept of Operations ... Version 3.0 | June 2011 Final Draft. DHS Geospatial Concept of

  • Upload
    lyanh

  • View
    232

  • Download
    0

Embed Size (px)

Citation preview

Federal Interagency Geospatial Concept of Operations (GeoCONOPS)

Version 3.0 | June 2011

Final Draft

DHS Geospatial Concept of Operations (GeoCONOPS)

ii | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Revision RegisterPrefaceVersion Date Summary of Changes Name

1.0 06/30/09 Final Draft

2.0 06/28/10 Final Draft

3.0 06/29/2011 Final Draft

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 Table of Contents | 1

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Table of Contents

Team Members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1.0 Geospatial Concept of Operations. . . . . . . . . . . . . 7

1.1 Mission Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

1.2 Overview 8

1.3 GeoCONOPS Community . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

1.3.1 State Authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

1.3.2 Information Support Services . . . . . . . . . . . . . . . . . . . . . . . . . 11

1.3.3 Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12

1.3.4 Civil Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12

1.3.5 People . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13

1.3.6 Operations/Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . .13

1.4 Audience and Intended Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

1.5 Alignment with NIMS and NRF . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

1.6 Determination of Authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

2.0 Geospatial Requirements and Capabilities . . . . . 19

2.1 Geospatial Mission Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

2.1.1 Coordination Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . .20

2.1.2 Staf n Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21

2.1.3 echno o Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . .21

2.1.4 Geospatial Capabilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22

2.2 Geospatial Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

2.2.1 Authoritative Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22

2.2.2 Essential Elements of Information . . . . . . . . . . . . . . . . . . . . .23

2.2.3 Data Dissemination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23

2.3 Geospatial Production and Delivery . . . . . . . . . . . . . . . . . . . . . . . 23

2.3.1 Production . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23

2.3.2 Deliver . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24

. . . . . . . . . . . . . . . . . . . . . 25

3.1 Damage Assessments. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

3.1.1 Ima er and Derived Products . . . . . . . . . . . . . . . . . . . . . . . .26

3.1.2 Models . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28

3.1.3 Field Data Collection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31

3.2 Life-Saving Missions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

3.2.1 Search and Rescue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33

3.2.2 Critical Medical Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34

3.2.3 Provision of Critical Food, Shelter, and Water . . . . . . . . . . . .37

3.3 Recovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

3.3.1 Public Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38

3.3.2 Individual Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40

3.4 Mitigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

4.0 Disaster Operations . . . . . . . . . . . . . . . . . . . . . . . 45

4.1 DHS National Operations Center . . . . . . . . . . . . . . . . . . . . . . . . . . 46

4.2 DHS National Infrastructure Coordinating Center . . . . . . . . . . . 48

4.3 FEMA National Response Coordination Center . . . . . . . . . . . . . . 50

4.4 FEMA Regional Response Coordination Centers . . . . . . . . . . . . . 52

4.5 FEMA Joint Field Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

4.6 FEMA Interim Operating Facility . . . . . . . . . . . . . . . . . . . . . . . . . 58

5.0 Catastrophic Disasters. . . . . . . . . . . . . . . . . . . . . 61

5.1 Natural Events. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

5.1.1 Notice Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62

DHS Geospatial Concept of Operations (GeoCONOPS)

2 | Table of Contents Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

5.1.2 No-Notice Events . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62

5.2 The New Madrid Earthquake Scenario . . . . . . . . . . . . . . . . . . . . . 62

5.2.1 Modeled Earthquake Impacts. . . . . . . . . . . . . . . . . . . . . . . . . .62

5.2.2 GeoCONOPS Mission Area Support . . . . . . . . . . . . . . . . . . . .65

5.3 Post-Event Efforts (long-term) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

5.4 Activities Outside NMSZ Scenario . . . . . . . . . . . . . . . . . . . . . . . . . 82

5.4.1 Pre-Event Emer enc Activities . . . . . . . . . . . . . . . . . . . . . . . .82

5.4.2 Non Earthquake Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . .83

6.0 Mitigation & Preparedness. . . . . . . . . . . . . . . . . . 85

6.1 Mitigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

6.1.1 Risk Anal sis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .86

6.1.2 Risk Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .89

6.1.3 Risk Insurance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .93

6.2 Preparedness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

Appendix A: Mission Engineering Methodology Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103

Appendix B: Authoritative Data Matrix . . . . . . . . . . 105

Appendix C: Civil Support. . . . . . . . . . . . . . . . . . . . . 147

Appendix D: DHS Intelligence & Analysis – Interagency Remote Sensing Coordination Cell . . . . . . . . . . . . . . 151

Appendix E: DHS OneView . . . . . . . . . . . . . . . . . . . . 153

Appendix F: Actors . . . . . . . . . . . . . . . . . . . . . . . . . . 155

Appendix G: Referenced Documents . . . . . . . . . . . . 157

Appendix H: Related CONOPS/SOPs . . . . . . . . . . . . 159

Appendix I: Acronyms. . . . . . . . . . . . . . . . . . . . . . . . 165

List of Best Practices

Best Practices - Requests for Information . . . . . . . . . . . . . . . . . . . . . . . 24

Best Practices - FEMA Damage Polygons . . . . . . . . . . . . . . . . . . . . . . . 30

Best Practices - Disaster Clearinghouses . . . . . . . . . . . . . . . . . . . . . . . . 32

Best Practices - Search and Rescue Management. . . . . . . . . . . . . . . . . 35

Best Practices - USACE Commodities Model . . . . . . . . . . . . . . . . . . . . 39

Best Practices - FEMA Region VI Field Data Collection Tool. . . . . . . 41

Best Practices - FEMA Post Katrina Damage Assessment for Individual Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

Best Practices - Advisory Base Flood Elevations . . . . . . . . . . . . . . . . . 43

Best Practices - DHS OneView . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

Best Practices - HAZUS Concept of Operations. . . . . . . . . . . . . . . . . . 52

Best Practices - Disaster Data and Production . . . . . . . . . . . . . . . . . . . 56

Best Practices - Estimating Search and Rescue Requirements . . . . . . 69

Best Practices - USGS Earthquake Products & Situational Awareness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77

Best Practices - Modeling Socio-Economic Vulnerability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

Best Practices - ENVAS for Environmental Assessments. . . . . . . . . . . 95

Table of Contents (continued)

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 Table of Contents | 3

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Figure 1–1: GeoCONOPS Development Phases . . . . . . . . . . . . . . . . . . 8

Figure 1–2: GeoCONOPS Community Model . . . . . . . . . . . . . . . . . . . 10

Figure 1–3: State Authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Figure 1–4: Information Support Services . . . . . . . . . . . . . . . . . . . . . 11

Figure 1–5: Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Figure 1–6: Civil Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Figure 1–7: People. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Figure 1–8: Operations/Coordination . . . . . . . . . . . . . . . . . . . . . . . . . 13

Figure 1–9: Federal Response - Stafford Act Support to States . . . . . 15

Figure 3–1: Damage Assessment Maps - Nisqually Earthquake . . . . 26

Figure 3–2: TCPED Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Figure 3–3: Imagery Sample . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Figure 3–4: Imagery-Derived Data Sample . . . . . . . . . . . . . . . . . . . . . 28

Figure 4–1: Disaster Operations Reporting Structure . . . . . . . . . . . . 45

Figure 4–2: Example JFO/GIU Organizational Chart . . . . . . . . . . . . 53

Figure 4–3: Example IMAT Organizational Chart . . . . . . . . . . . . . . . 59

Figure 5–1: Regional Ground Shaking Intensity from NMSZ Earthquake Scenario. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

Figure 5–2: Total Casualties from Scenario Earthquake . . . . . . . . . . 63

Figure 5–3: Estimated Damage to General Building Stock . . . . . . . . 64

Figure 5–4: Major Damage to River Crossing Bridges in NMSZ . . . 64

Figure 5–5: Distribution of Water Outages on Day 1 in NMSZ . . . . . 64

Figure 5–6: New Madrid Geospatial Activities . . . . . . . . . . . . . . . . . . 66

Figure 5–7: New Madrid Geospatial Timeline . . . . . . . . . . . . . . . . . . . 67

Figure 5–8: Geospatial Timeline – Life-Saving . . . . . . . . . . . . . . . . . . 68

List of Figures

Figure 5–9: Geospatial Timeline – Damage Assessment . . . . . . . . . . . 72

Figure 5–10: Geospatial Timeline – Recovery . . . . . . . . . . . . . . . . . . . 76

Figure 6–1: Emergency Management Lifecycle. . . . . . . . . . . . . . . . . . 85

Figure A–1: Geospatial CONOPS Community Model . . . . . . . . . . . 104

Figure C–1: Request For Assistance Process Decision Matrix . . . . . 148

Figure E–1: DHS OneView . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154

DHS Geospatial Concept of Operations (GeoCONOPS)

4 | Table of Contents Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Table 2–1: Geospatial Roles and Responsibilities . . . . . . . . . . . . . . . . 20

Table 2–2: Federal Geospatial Teams . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Table 3–1: Authoritative Data - Damage Assessment Mission - Imagery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Table 3–2: Authoritative Data - Damage Assessment Mission - Modeling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Table 3–3: Authoritative Data - Damage Assessment Mission - Ground Truth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

Table 3–4: Authoritative Data - Life-Saving Mission - SAR. . . . . . . . 36

Table 3–5: Authoritative Data - Life-Saving Mission - Critical Medical Support. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

Table 3–6: Authoritative Data – Critical Food Shelter and Water. . . 38

Table 3–7: Authoritative Data - Recovery Mission - Public Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

Table 3–8: Authoritative Data - Recovery Mission - Individual Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

Table 3–9: Authoritative Data - Recovery Mission - Mitigation. . . . . 43

Table 4–1: Authoritative Data - Disaster Operations - NOC . . . . . . . 46

Table 4–2: Authoritative Data - Disaster Operations - NICC. . . . . . . 50

Table 4–3: Authoritative Data - Disaster Operations - NRCC . . . . . . 51

Table 4–4: Authoritative Data - Disaster Operations - RRCC . . . . . . 54

Table 4–5: Authoritative Data - Disaster Operations - JFO . . . . . . . . 57

Table 5–1: Estimate of “At Risk” and Shelter Seeking Populations: NMSZ Scenario Earthquake. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

Table 5–2: Estimated Damage to Essential Facilities in the NMSZ . . 64

Table 5–3: Sample Life-Saving EEIs by ESF . . . . . . . . . . . . . . . . . . . . 69

Table 5–4: Sample Damage Assessment EEIs by ESF. . . . . . . . . . . . . 73

Table 5–5: Sample Recovery EEIs by ESF . . . . . . . . . . . . . . . . . . . . . . 78

Table 5–6: Event-Speci c Missions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84

Table 6–1: Authoritative Data – FEMA HAZUS Program . . . . . . . . . 86

Table 6–2: Authoritative Data – FEMA Map Modernization Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

Table 6–3: Authoritative Data – FEMA Mitigation Planning. . . . . . . 88

Table 6–4: Authoritative Data – FEMA National Dam Safety Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

Table 6–5: Authoritative Data – NIST Disaster Failures and Studies Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

Table 6–6: Authoritative Data – FEMA Community Rating System 90

Table 6–7: Authoritative Data – FEMA Flood Mitigation Assistance Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Table 6–8: Authoritative Data – FEMA Hazard Mitigation Grant Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Table 6–9: Authoritative Data – FEMA National Earthquake Hazards Reduction Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

Table 6–10: Authoritative Data – FEMA Pre-Disaster Mitigation. . . 92

Table 6–11: Authoritative Data – FEMA Repetitive Flood Claims . . 93

Table 6–12: Authoritative Data – FEMA Severe Repetitive Loss. . . . 93

Table 6–13: Authoritative Data – FEMA Risk Insurance Division . . 94

Table 6–14: Authoritative Data – FEMA Chemical Stockpile Emergency Preparedness Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96

Table 6–15: Authoritative Data – FEMA Citizen Corps . . . . . . . . . . . 96

Table 6–16: Authoritative Data – FEMA Continuity of Operations Division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98

Table 6–17: Authoritative Data – FEMA Integrated Public Alert and Warning System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98

Table 6–18: Authoritative Data – FEMA Logistics Management Directorate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100

Table 6–19: Authoritative Data – FEMA Public Affairs . . . . . . . . . . 101

Table 6–20: Authoritative Data – FEMA Radiological Emergency Preparedness Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101

Table D–1: IRSCC Member Agencies and Organizations . . . . . . . . 152

List of Tables

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 Team Members | 5

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

TEAM MEMBERS

Team

M

embe

rs

DHS Geospatial Concept of Operations (GeoCONOPS)

6 | Team Members Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

GIOT Team Member List

1.

2.

3.

4.

5.

6.

7.

8.

9. Department of Homeland Security

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

Team

Mem

bers

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 7

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

1.0 GEOSPATIAL CONCEPT OF OPERATIONS

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

8 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

1.1 Mission Statement

1

1.2 Overview

1 See Annex C for a complete list of federal partners.

health protection,

conduct

of incident

Figure 1–1.

Figure 1–1: GeoCONOPS Development Phases

Intelligence and Military communities.

GeoCONOPS, incorporating all final on of any outdated content.

lifecycle to include preparedness,

Phase 1:Emergency Response

Non-CatastrophicDisasters

Phase 2:Emergency Response -

CatastrophicDisasters

Phase 3:Emergency

ManagementLifecycle

Phase 4: IntegratedGeospatialConcept of Operations

Phase 5:Maintenance

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 9

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

1.3 GeoCONOPS Community

Figure 1–2

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

10 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Geospatial CONOPS Community Model

Figure 1–2: GeoCONOPS Community Model

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 11

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

1.3.1 State Authorities 1.3.2 Information Support Services

Figure 1–3: State Authorities Figure 1–4: Information Support Services

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

12 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

1.3.3 Infrastructure 1.3.4 Civil Support

Figure 1–5: Infrastructure Figure 1–6: Civil Support

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 13

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

1.3.5 People 1.3.6 Operations/Coordination

Figure 1–7: People Figure 1–8: Operations/Coordination

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

14 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

1.4 Audience and Intended Use

1.5 Alignment with NIMS and NRF Preparedness, Pre-event Planning and

Coordination.

Resource Management.

Coordination and Management.

for information. Management and Maintenance/Standards and

Technology.

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 15

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Figure 1–9: Federal Response - Stafford Act Support to States

Support

Medical

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

16 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Social and economic community impact

implementation

Figure 1–9

1.6 Determination of Authorities

The Robert T. Stafford Disaster Relief and Emergency Assistance Act (Stafford Act)

National Response Framework (NRF), January

National Incident Management System (NIMS)

Homeland Security Act of 2002

Post-Katrina Emergency Management Reform Act (PKEMRA)

Homeland Security Presidential Directive-5 (HSPD-5), Management of Domestic Incidents,

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 1.0 Geospatial Concept of Operations | 17

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

HSPD-7, Critical Infrastructure Identi cation, Prioritization, and Protection

HSPD-8, National Preparedness

Geo

CO

NO

PS

DHS Geospatial Concept of Operations (GeoCONOPS)

18 | 1.0 Geospatial Concept of Operations Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

GeoC

ON

OPS

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 19

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

2.0 GEOSPATIAL REQUIREMENTS AND CAPABILITIES

Requ

irem

ents

&

Cap

abili

ties

DHS Geospatial Concept of Operations (GeoCONOPS)

20 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

2.1 Geospatial Mission Support

2.1.1 Coordination Requirements

Table 2–1: Geospatial Roles and Responsibilities

Position Title Responsibilities

Requirements

& C

apabilities

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 21

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

2.1.2

the future and accommodate rotation and duration

Table 2–1

2.1.3 Technology Requirements

Position Title Responsibilities

Table 2-1: Geospatial Roles and Responsibilities (Continued)

Requ

irem

ents

&

Cap

abili

ties

DHS Geospatial Concept of Operations (GeoCONOPS)

22 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

the

2.1.4 Geospatial Capabilities

Table 2–2.

2.2 Geospatial Data

2.2.1 Authoritative Data

Rational Authority.

Expert Authority.

are created.

Appendix B

Table 2–2: Federal Geospatial Teams

Team Type Location

Field

Field

Field

FieldField

Requirements

& C

apabilities

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 23

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

2.2.2 Essential Elements of Information

and inf 1

f f f f

1 More information can be obtained at http .f dc.ov participation orkin - roups-subcommittees hs

dhs- dm

2.2.3 Data Dissemination

2.3 Geospatial Production and Delivery

Fixed facilities

Field facilities are typically created rapidly to

2.3.1 Production

completion.

Requ

irem

ents

&

Cap

abili

ties

DHS Geospatial Concept of Operations (GeoCONOPS)

24 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

2.3.2 Delivery

.

Best Practices - Requests for Information

Requirements

& C

apabilities

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 25

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

3.0 SPECIFIC MISSION AREAS

Damage Assessment.

Life-Saving.

Recovery.

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

26 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

3.1 Damage Assessments

1

Figure 3-1

.

1 In the context of this GeoCONOPS, the term “post-event includes all near-term and lon -term activities supportin response and recover missions.

3.1.1 Imagery and Derived Products

(see Figure 3–1).

Areas of Expertise

(see Figure 3–2).

(see Figure 3–2) are

Tasking.

Figure 3–1: Damage Assessment Maps - Nisqually Earthquake

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 27

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Collection.

Processing.

Exploitation.

Dissemination.

Support

Authoritative Data

Figure 3–2: TCPED Process

ProcessingProcessing

Commercial(USGS)

Internal DHS

DoD (Unclassified)

Other Civil

NGB

Ana

lysi

s/Fu

sion

CollectionCollection

Real TimeDownlink

Streaming DataCommercial/Civil Agency/Internal

DHSStatic Data

Commercial, DoD, NGB, OtherCivil

Feedback

Sta

tic

Dat

aFu

ll R

es V

ideo

TCPED ProcessTaskingTasking

Timeliness

Accessibility

Security

Timeliness

Accessibility

SecurityI/CReq

uirem

ents

I/CReq

uirem

ents

Pre-ScriptedMission

Assignments

Pre-ScriptedMission

Assignments

Remote SensingTeam

Remote SensingTeam

RequirementsRequirements

FEMAJFO/RRCC/NRCC

FEMAJFO/RRCC/NRCC

I/C-NTMExploitation

I/C-NTMTasking

I/C-NTMCollectionI/C-NTMMI/C NI/C NT

ctionCollecCCollecI/C-NTM

Collection

Classified

ExploitationExploitation

FEMA MAC

Commercial (USGS)

DoD (Unclassified)

Other Civil Agency

NGB

State

Local

Feed

back

Thick Client

Thin Client

Media

FTP

Media (Zip and Ship)

HSIN

USGS Seamless/HDDS

Other Web Mapping Service

Google Earth

Authoritative Source for Damage Assessment

DisseminationDissemination

Feed

back

Feedback

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

28 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

(see Table 3–1).

Speci c Products

Raster Products

(see Figure 3–3).

Vector Products

(see Figure 3–4).

3.1.2 Models

Areas of Expertise

Hazards US-MultiHazard (HAZUS-MH).

HURRicane EVACuation (HURREVAC).

Interagency Modeling and Atmospheric Assessment Center (IMAAC).

LandScan USA.

Figure 3–3: Imagery Sample

Figure 3–4: Imagery-Derived Data Sample

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 29

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type Delay POCEmergency Services

4 day24 hour48 hour24 hour24 hour

Event Impact24 hour48 hour24 hour24 hour3 day

Video 24 hour3 day48 hour24 hour24 hour

Imagery4 day7 day4 day4 day3 day

Video 24 hour

3 day

Table 3–1: Authoritative Data - Damage Assessment Mission - Imagery

National Infrastructure Simulation and Analysis Center (NISAC).

Sea, Land, Overland, Surge from Hurricanes (SLOSH).

USACE Debris Model.

Support

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

30 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 3–2).

Speci c Products

HAZUS-MH

Best Practices - FEMA Damage Polygons

Damage Level Observed DamagesGeneral Damage Classi cations

MD

CDWild re Damage Classi cations

CD

FEMA Damage Map

FEMA Damage Classi cation

Note he above classi cations represent enerali ed expectations onl the do not exclude the possibilit of variation ithin an classi ed area. Areas that are not observed nor have no discernable dama e are left uncolored.

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 31

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

HURREVAC

IMAAC

USACE Debris

3.1.3 Field Data Collection

Sub Category Theme Type Delay POC

Event Impact

24 hour24 hour

24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour DHS24 hour24 hour24 hour24 hour

Hurricane Center24 hour24 hour DHS24 hour

24 hour

24 hour24 hour DHS24 hour24 hour DHS24 hourImmediate24 hour24 hour

Table 3–2: Authoritative Data - Damage Assessment Mission - Modeling

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

32 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Best Practices - Disaster Clearinghouses

Areas of Expertise

of data manually out of

American Red Cross (ARC).

FEMA PDA Teams.

FEMA IA Inspections.

FEMA Mitigation High Water Marks.

FEMA Mitigation Assessment Team (MAT).

FEMA Public Assistance (PA) Inspections.

Small Business Administration (SBA) Inspections.

Local Red-Tag/Yellow-Tag Reports.

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 33

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Support

Authoritative Data

(see Table 3–3).

Speci c Products 3.2 Life-Saving Missions

3.2.1 Search and Rescue

Table 3–3: Authoritative Data - Damage Assessment Mission - Ground Truth

Sub Category Theme Type Delay POC

Event Impact

5 day5 day5 day24 hour3 day48 hour

48 hour24 hour

24 hour48 hour4 day3 day3 day5 day24 hour24 hour

Specialized Response Teams

DHS 48 hour

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

34 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Areas of Expertise

Structural Collapse (Urban) Search and Rescue (US&R)Primar A enc FEMA

Waterborne Search and RescuePrimar A enc D S SCG

Inland/Wilderness Search and RescuePrimar A enc Department of the Interior DOINational Park Service NPS

Support

Authoritative Data

(see Table 3–4).

Speci c Products

Operational Management

Safety

Tactical Missions

3.2.2 Critical Medical Support

Areas of Expertise

Patient Evacuations.

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 35

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Emergency Equipment/Supplies. In addition to

Best Practices - Search and Rescue Management

Local Integration

Information tracking

Referencing points and areas

Point Reference

Area Reference

the impacted area.

Patient Care/Staf ng Medical Facilities.

Medical Needs Assessments.

Health Monitoring.

Support

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

36 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 3–5).

Speci c Products

Table 3–4: Authoritative Data - Life-Saving Mission - SAR

Sub Category Theme Type Delay POC

Agriculture/Food48 hour24 hour

Emergency Services3 day24 hour48 hour48 hour24 hour24 hour24 hour24 hour24 hour48 hourImmediate24 hour

Field Operating Locations24 hour24 hour

Specialized Response Teams

DHS

48 hour24 hour3 day24 hour24 hour48 hour24 hour

DoD48 hour48 hour

Other Federal 24 hour3 day24 hour48 hour24 hour

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 37

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

3.2.3 Provision of Critical Food, Shelter, and Water

Areas of Expertise

Feeding Operations.

Sheltering.

Bulk Distribution of Emergency Commodities.

Table 3–5: Authoritative Data - Life-Saving Mission - Critical Medical Support

Sub Category Theme Type Delay POCEmergency Services

3 day

Event Impact24 hour24 hour24 hour48 hour DHHS

Healthcare and Public Health

Healthcare3 day DHHS3 day DHHSimmediate

24 hour DHHS/CDCSpecialized Response Teams

DHHS 3 day DHHS

DHS

3 day

24 hour

24 hour48 hour3 day

3 day

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

38 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Support

Authoritative Data

(see Table 3–6).

Speci c Products

Shelter

3.3 Recovery

3.3.1 Public Assistance

Table 3–6: Authoritative Data – Critical Food Shelter and Water

Sub Category Theme Type Delay POCEmergency Services

24 hour3 day24 hour24 hour

Event Impact48 hour

Field Operating Locations24 hour24 hour

3 day24 hour

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 39

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Areas of Expertise

Support

Authoritative Data

(see Table 3–7).

Speci c Products

Field Data Collection

collection

Best Practices - USACE Commodities Model

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

40 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

3.3.2 Individual Assistance

Areas of Expertise

Support

Authoritative Data

(see Table 3–8).

Table 3–7: Authoritative Data - Recovery Mission - Public Assistance

Sub Category Theme Type Delay POCEmergency Services

10 day4 day6 day4 day12 day

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 41

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Speci c Products

3.4 Mitigation

Best Practices - FEMA Region VI Field Data Collection Tool

Table 3–8: Authoritative Data - Recovery Mission - Individual Assistance

Sub Category Requirement Type Delay POCEmergency Services

48 hour3 day

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

42 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Areas of Expertise

High Water Mark Collection.

Storm Surge Inundation Mapping. Flood

Advisory Base Flood Elevations (ABFE). In

Support

Authoritative Data

(see Table 3–9)

Best Practices - FEMA Post Katrina Damage Assessment for Individual Assistance

from Hurricane Wilma.

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 43

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Speci c Products

Table 3–9: Authoritative Data - Recovery Mission - Mitigation

Sub Category Theme Type Delay POCEvent Impact

4 day4 day4 day

Best Practices - Advisory Base Flood Elevations

M

issi

on A

reas

DHS Geospatial Concept of Operations (GeoCONOPS)

44 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

M

ission Areas

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 45

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

4.0 DISASTER OPERATIONS

direction, and coordination required at the federal

(see Figure 4–1).

Figure 4–1: Disaster Operations Reporting Structure

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

46 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

4.1 DHS National Operations CenterOverview

Roles and Responsibilities

Spatial Tagging

GIS Support

Remote Sensing

Modeling

Table 4–1: Authoritative Data - Disaster Operations - NOC

Sub Category Theme Type Delay POCEmergency Services

12 hour24 hour

Event Impact24 hour

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 47

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Operational Support

Production MethodsAuthoritative Data

(see Table 4–1).

Best Practices - DHS OneView

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

48 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Product Speci cations

NOC Message Alerts.

NOC COP.

Spot Reports.

Security, Water, Electricity, Accessibility, Telecom Charts.

4.2 DHS National Infrastructure Coordinating Center Overview

e

Roles and Responsibilities

GIS Support.

RS.

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 49

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Modeling.

Operational Support

Daily Support.

National Security Speci c Events (NSSE) Support.

Incident/Event State Support.

Quick Look

Spot Reports

location information.

Current Situation Reports

location and any CI affected in the area.

Production Methods

Authoritative Data

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

50 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

(see Table 4–2):

Product Speci cations

4.3 FEMA National Response Coordination CenterOverview

Roles and Responsibilities

GIS Support (FEMA MAC).

Table 4–2: Authoritative Data - Disaster Operations - NICC

Sub Category Theme Type Delay POCEmergency Services

3 hour3 hour24 hour24 hour

Event Impact24 hour24 hour

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 51

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

RS.

. Modeling.

Operational Support

Production Methods

Sub Category Theme Type Delay POC

Emergency Services48 hour5 day6 day12 dayimmediate24 hour

Event Impact24 hour3 day

Video 24 hour3 day24 hour

Field Operating LocationsDoD 24 hour

Specialized Response Teams

DHS

24 hour

24 hour

48 hour

Table 4–3: Authoritative Data - Disaster Operations - NRCC

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

52 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 4–3).

Product Speci cations

4.4 FEMA Regional Response Coordination Centers Overview

Roles and Responsibilities

Best Practices - HAZUS Concept of Operations

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 53

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

GIS Support.

Remote Sensing.

Modeling.

Operational Support

Production Methods

Authoritative Data

Figure 4–2: Example JFO/GIU Organizational Chart

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

54 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

(see Table 4–4).

Product Speci cations

common local feel.

4.5 FEMA Joint Field OperationsOverview

Table 4–4: Authoritative Data - Disaster Operations - RRCC

Sub Category Theme Type Delay POCEvent Impact

24 hour

24 hour24 hour24 hour24 hour

24 hour48 hour48 hour24 hour

Field Operating Locations24 hour24 hour

Man-Made Hazards24 hour24 hour24 hour24 hour24 hour24 hour24 hour

Natural Hazards24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 55

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s(see Figure 4–2)

Roles and Responsibilities

Sub Category Theme Type Delay POC24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour

24 hour

24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour24 hour

Specialized Response Teams

DHS48 hour24 hour

Table 4–4: Authoritative Data - Disaster Operations - RRCC (Continued)

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

56 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

duplication of effort.

GIS Support.

RS.

Modeling.

Operational Support

at the JFO.

Production Methods

Best Practices - Disaster Data and Production

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 57

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Authoritative Data

(see Table 4–5).

Sub Category Theme Type Delay POCEmergency Services

24 hour48 hour6 day12 day48 hour48 hour48 hour48 hour48 hour

Event Impact48 hour5 day

24 hour5 day

5 day

48 hour48 hour48 hour3 day48 hour CDC24 hour48 hour48 hour24 hour24 hour48 hour

Table 4–5: Authoritative Data - Disaster Operations - JFO

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

58 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Product Speci cations

4.6 FEMA Interim Operating FacilityOverview

Figure 4–3

Sub Category Theme Type Delay POCField Operating Locations

DoD 24 hour24 hour48 hour24 hour

Government FacilitiesDHS immediate

Man-Made Hazards24 hour

Specialized Response Teams

DHS 48 hour

Other Federal

48 hour

48 hour48 hour

48 hour48 hour

Table 4–5: Authoritative Data - Disaster Operations - JFO (Continued)

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 59

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Roles and Responsibilities

Operational Support

Production Methods

for completion.

Authoritative Data

Product Speci cations

Figure 4–3: Example IMAT Organizational Chart

Dis

aste

r O

pera

tion

s

DHS Geospatial Concept of Operations (GeoCONOPS)

60 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

Disaster

Operations

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 61

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

5.0 CATASTROPHIC DISASTERS

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

62 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

5.1 Natural Events

the country.

5.1.1 Notice Events

5.1.2 No-Notice Events

5.2 The New Madrid Earthquake Scenario

Figure 5–1

5.2.1 Modeled Earthquake Impacts

Casualties

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 63

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Figure 5–2.

Displaced Population and Shelter Requirements

Table 5–1.

Table 5-1, conducted

Building Damage

Figure 5–3,

Essential Facilities

Table 5–2

Figure 5–1: Regional Ground Shaking Intensity from NMSZ Earthquake Scenario

Figure 5–2: Total Casualties from Scenario Earthquake

Source: Mid America Earthquake Center Source: Mid America Earthquake Center

State & FEMA Region Total

Total Population

At Risk (Day 1)

Seeking Shelter (Day 1)

At Risk (Day 3)

Seeking Shelter (Day 3)

4,447,100 9,645 3,081 601,561 173,4124,041,769 53,860 14,952 850,615 233,9092,844,658 61,997 18,345 705,032 205,5075,689,283 316,681 91.103 2,072,942 562,468

12,419,293 50,285 15,588 650,247 185,139Indiana 6,080,485 9,932 2,701 579,627 153,570

2,673,400 124,730 38,827 937,518 285,8655,595,211 103,655 30,074 842,002 237,991

43,791,199 730,795 214,671 7,239,544 2,037,861

Table 5–1: Estimate of “At Risk” and Shelter Seeking Populations: NMSZ Scenario Earthquake

Source: Mid America Earthquake Center

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

64 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Transportation System Damage

Figure 5–4

Water and Power Outages

(see Figure 5–5).

Scenario Summary

Figure 5–3: Estimated Damage to General Building Stock

Figure 5–4: Major Damage to River Crossing Bridges in NMSZ

Figure 5–5: Distribution of Water Outages on Day 1 in NMSZ

Table 5–2: Estimated Damage to Essential Facilities in the NMSZ

Essential Facility

Total Facilities

At Least Moderate Damage

Complete Damage

44,288

8,958

3,984

2,615

869

1,322

729

379

129

116

277

177

136

32

44

Source: Mid America Earthquake Center

Source: Mid America Earthquake Center Source: Mid America Earthquake Center Source: Mid America Earthquake Center

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 65

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

5.2.2 GeoCONOPS Mission Area Support

Figure 5–6 and Figure 5–7

(see Figure 5–6)

(see Figure 5–7)

end time.

operational duration

platter. Support

5.3.2.1 Life-Saving Mission

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

66 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Figure 5–6: New Madrid Geospatial Activities

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 67

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Figure 5–7: New Madrid Geospatial Timeline

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

68 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

(see Figure 5–8)

Table 5–3.

Search and Rescue

Figure 5–8: Geospatial Timeline – Life-Saving

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 69

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Table 5–3: Sample Life-Saving EEIs by ESF

Essential Elements of Information

Geospatial Product/Analysis Authoritative Source

Estimated Availability

Activity Code

1 hour 261 hour 27

301383311292929831248

1 hour 2729

Information2963514

Weather 287

1 hour 27

1 hour 27

1 hour 29

Best Practices - Estimating Search and Rescue Requirements

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

70 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Critical Medical Support

are required.

Table 5–3: Sample Life-Saving EEIs by ESF (Continued)

Essential Elements of Information

Geospatial Product/Analysis Authoritative Source

Estimated Availability

Activity Code

1 hour 272931303335343342438252983210381

1 hour 1

14

1 hour 133

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 71

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Provision of Critical Food, Shelter, and Water

5.3.2.2 Damage Assessment Mission

(see Table 5–4)

(see Figure 5–9)

Essential Elements of Information

Geospatial Product/Analysis Authoritative Source

Estimated Availability

Activity Code

291213211

1 hour 5

38

2

111381

1

Table 5–3: Sample Life-Saving EEIs by ESF (Continued)

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

72 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Imagery & Derived Products

Satellite Imagery

Figure 5–9: Geospatial Timeline – Damage Assessment

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 73

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Airborne Imagery

LIDAR

IR (thermal)

Oblique

Full Motion Video

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code

1 hour 26

1 hour 27301383233

292929831248

1 hour 27

29

Information2963514

Weather 287

1 hour 27

1 hour 27

1 hour 29

Table 5–4: Sample Damage Assessment EEIs by ESF

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

74 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Mission Overlap

and the multitude of Federal, State, and local

Exploitation

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code

1 hour 27293033

3534334918243839391715

2981732101738

1

1 hour 114

Table 5–4: Sample Damage Assessment EEIs by ESF (Continued)

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 75

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Dissemination

Models

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code

1 hour 13

3

29

321

1 hour 538

2

13811

Table 5–4: Sample Damage Assessment EEIs by ESF (Continued)

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

76 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Field Data Collection

Incident Management Assistance Teams (IMAT)

Rapid Needs Assessment (RNA)

PA Inspection Teams

American Red Cross Inspection Teams

IA PDA Teams team

5.3.2.3 Recovery Mission (short-term)

Figure 5–10: Geospatial Timeline – Recovery

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 77

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

(see Figure 5–10)

Public Assistance

Best Practices - USGS Earthquake Products & Situational Awareness

USGS Earthquake Noti cation Service (ENS)

USGS ShakeMap

USGS Prompt Assessment of Global Earthquakes for Response (PAGER)

USGS Shake Map Broadcast (ShakeCAST)

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

78 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

(see Table 5–5)

Individual Assistance

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code

1 hour 26

1 hour 27301383233

1129292983120248

1 hour 27

29292991819

Information2935

Weather 287

Table 5–5: Sample Recovery EEIs by ESF

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 79

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Mitigation

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code

1 hour 27

1 hour 27

1 hour 29

1 hour 272937

3033

35363391824383939171520192540

817

Table 5–5: Sample Recovery EEIs by ESF (Continued)

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

80 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Essential Elements of Information Geospatial Product/Analysis Authoritative

SourceEstimated Availability

Activity Code223210172340

381

1 hour 11415

1 hour 1332912

21321

1 hour 138

2

1113811

Table 5–5: Sample Recovery EEIs by ESF (Continued) Best Practices - Modeling Socio-Economic Vulnerability

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 81

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

5.3 Post-Event Efforts (long-term) Community-Based Products

impact data to include economic impact and an

Project Monitoring

Transition to State and Local Governments

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

82 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

5.4 Activities Outside NMSZ Scenario

5.4.1 Pre-Event Emergency Activities

Personnel Activation

to a central location in preparation of deployment

Evacuation & ShelteringResource Deployment

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 83

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Remote Sensing Mission Planning

5.4.2 Non Earthquake Activities

Personnel Activation

Evacuation & Sheltering

Mission Planning

Table 5–6.

Cat

astr

ophi

cD

isas

ters

DHS Geospatial Concept of Operations (GeoCONOPS)

84 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Event Mission Action

Hurricane

Flood

Table 5–6: Event-Speci c Missions

CatastrophicD

isasters

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 85

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

6.0 MITIGATION & PREPAREDNESS

Figure 6–1: Emergency Management Lifecycle

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

86 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

6.1 Mitigation

6.1.1 Risk Analysis

FEMA HAZUS Program

Overview

Operational Support

Earthquake:

Hurricane:

Flood:

Authoritative Data

(see Table 6–1)

Table 6–1: Authoritative Data – FEMA HAZUS Program

Sub Category Theme Type POC

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 87

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

(Section 3.0, Table 3-2).

Speci c Products

FEMA Map Modernization Program

Overview

Operational Support

Authoritative Data

(see Table 6–2)

Speci c Products

FEMA Mitigation Planning

Overview

Table 6–2: Authoritative Data – FEMA Map Modernization Program

Sub Category Theme Type POCBase Map

Natural Hazards

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

88 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Community Profile:

Hazard Identification and Analysis and Vulnerability Assessment:

Risk Assessment:

Capability Assessment:

capacity

Mitigation Strategy:

Operational Support

Authoritative Data

(see Table 6–3)

Speci c Products

FEMA National Dam Safety Program

Overview

Operational Support

Authoritative Data

(see Table 6–4)

Table 6–3: Authoritative Data – FEMA Mitigation Planning

Sub Category Theme Type POC

Table 6–4: Authoritative Data – FEMA National Dam Safety Program

Sub Category Theme Type POCDams

Natural Hazards

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 89

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Speci c Products

NIST Disaster Failures and Studies Program

Overview

Operational Support

Authoritative Data

(see Table 6–5)

Speci c Products

6.1.2 Risk Reduction

Table 6–5: Authoritative Data – NIST Disaster Failures and Studies Program

Sub Category Theme Type POCNatural Hazards

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

90 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

FEMA Building Science

Overview

Operational Support

Authoritative Data

Speci c Products

FEMA Community Rating System

Overview

Table 6–6: Authoritative Data – FEMA Community Rating System

Sub Category Theme Type POCNatural Hazards

Table 6–7: Authoritative Data – FEMA Flood Mitigation Assistance Program

Sub Category Theme Type POCNatural Hazards

Table 6–8: Authoritative Data – FEMA Hazard Mitigation Grant Program

Sub Category Theme Type POCNatural Hazards

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 91

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Operational Support

Authoritative Data

(see Table 6–6)

Speci c Products

FEMA Flood Mitigation Assistance Program

Overview

Operational Support

Authoritative Data

(see Table 6–7)

Speci c Products

FEMA Hazard Mitigation Grant Program

Overview

Operational Support

Authoritative Data

(see Table 6–8)

Speci c Products

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

92 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

FEMA National Earthquake Hazards Reduction Program

Overview Operational Support

Authoritative Data

(see Table 6–9)

Speci c Products

FEMA Pre-Disaster Mitigation

Overview

Operational Support

Authoritative Data

(see Table 6–10)

Speci c Products

Table 6–9: Authoritative Data – FEMA National Earthquake Hazards Reduction Program

Sub Category Theme Type POCNatural Hazards

Table 6–10: Authoritative Data – FEMA Pre-Disaster Mitigation

Sub Category Theme Type POCNatural Hazards

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 93

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

6.1.3 Risk Insurance

FEMA Repetitive Flood Claims

Overview

Operational Support

Authoritative Data

(see Table 6–11)

Speci c Products

FEMA Severe Repetitive Loss

Overview

Operational Support

Authoritative Data

(see Table 6–12)

Table 6–11: Authoritative Data – FEMA Repetitive Flood Claims

Sub Category Theme Type POCNatural Hazards

Table 6–12: Authoritative Data – FEMA Severe Repetitive Loss

Sub Category Theme Type POCNatural Hazards

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

94 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Speci c Products

FEMA Risk Insurance Division

Overview

Operational Support

Authoritative Data

(see Table 6–13)

Speci c Products

6.2 Preparedness

DHS National Planning Scenarios

Overview

Operational Support

Authoritative Data

Table 6–13: Authoritative Data – FEMA Risk Insurance Division

Sub Category Theme Type POCNatural Hazards

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 95

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Speci c Products

FEMA Chemical Stockpile Emergency Preparedness Program

Overview

Operational Support

Best Practices - ENVAS for Environmental Assessments

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

96 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 6–14)

Speci c Products

FEMA Citizen Corps

Overview

Community Emergency Response Teams (CERT):

Fire Corps

Medical Reserve Corps (MRC):

Table 6–14: Authoritative Data – FEMA Chemical Stockpile Emergency Preparedness Program

Sub Category Theme Type POCEmergency Services

Man-Made Hazards

Table 6–15: Authoritative Data – FEMA Citizen Corps

Sub Category Theme Type POCEmergency ServicesM

itigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 97

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

USAonWatch:

Volunteers in Police Service (VIPS):

Operational Support

Fire Corps

MRC

USAonWatch

VIPS

Authoritative Data

(see Table 6–15)

Speci c Products

FEMA Continuity of Operations Division

Overview

Operational Support

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

98 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 6–16)

Speci c Products

FEMA Homeland Security Exercise and Evaluation Program

Overview

Operational Support

Authoritative Data

Speci c Products

FEMA Integrated Public Alert and Warning System

OverviewTable 6–17: Authoritative Data – FEMA Integrated Public Alert and Warning System

Sub Category Theme Type POCTelecommunications

Table 6–16: Authoritative Data – FEMA Continuity of Operations Division

Sub Category Theme Type POCSpecialized Response Teams

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 99

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Department of Homeland Security to implement

Operational Support

Authoritative Data

(see Table 6–17)

Speci c Products

FEMA Logistics Management Directorate

Overview

Logistics Operations -

Logistics Plans and Exercises -

Distribution Management -

Property Management -

Operational Support

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

100 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Authoritative Data

(see Table 6–18)

Speci c Products

FEMA National Exercise Division

Overview

Operational Support

Authoritative Data

Speci c Products

FEMA Public Affairs

Overview

Operational Support

Table 6–18: Authoritative Data – FEMA Logistics Management Directorate

Sub Category Theme Type POCField Operation Locations

Government Facilities

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 6.0 Mitigation & Preparedness | 101

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Authoritative Data

(see Table 6–19)

Speci c Products

FEMA Radiological Emergency Preparedness Program

Overview

Operational Support

Authoritative Data

(see Table 6–20)

Speci c Products

Table 6–19: Authoritative Data – FEMA Public Affairs

Sub Category Theme Type POCEvent Damage

Table 6–20: Authoritative Data – FEMA Radiological Emergency Preparedness Program

Sub Category Theme Type POCEvent Impact

Man-Made Hazards

Mit

igat

ion

&

Prep

ared

ness

DHS Geospatial Concept of Operations (GeoCONOPS)

102 | 6.0 Mitigation & Preparedness Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

Mitigation &

Preparedness

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 103

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX A: MISSION ENGINEERING METHODOLOGY OVERVIEW

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

104 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Community Analysis

(see Figure A–1)

Operations Analysis

Information Transaction Inventory (ITI)

Figure A–1: Geospatial CONOPS Community Model

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 105

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX B: AUTHORITATIVE DATA MATRIX

Sub Category Theme Type POC Restrictions URLAgriculture/Food

n/a

n/an/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

106 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/a

n/an/a

n/an/a

n/an/a

n/an/a

n/an/an/an/an/an/a

Supply

n/a

n/an/a

n/a

n/a

n/aDocumentation.htm

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 107

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/a

n/an/an/a

Banking/Finance

Credit

n/an/a

FDIC

n/a

FDIC n/a

FDICn/a

n/an/a

n/a

n/an/an/a

FDIC n/a

n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

108 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

Financial n/an/an/an/a

Base Map

n/an/a

Water

n/an/a

n/a

n/a

n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 109

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

n/ahtml

n/a

n/an/a

n/an/a

n/a

n/an/a

n/a

n/a

n/a

n/an/a

n/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

110 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

n/a

Soil n/an/an/a

n/a

n/an/a

DHS n/a

n/an/a

n/an/a

n/an/a

n/an/an/an/an/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 111

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/a

n/an/a

n/a

VideoVideo DHS n/aVideo DHS n/a

Cadastren/a

n/a

Chemical and Hazardous Materialsn/a

Dept of State n/a

n/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

112 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLCommercial Assets

n/an/an/an/an/a

DOC n/a

n/a

n/an/an/a

DOC n/an/an/a

DoD

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 113

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/a

DHS n/a

n/a

DHSDOC n/a

DOC n/a

DHS n/an/a

n/an/a

n/a

n/aDOC

n/aDOCDOC n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

114 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLDams

n/a

n/a

Defense Industrial Basen/a

Emergency Servicesn/an/an/an/an/a

n/an/an/a

n/a

n/an/an/an/an/an/an/an/an/a

n/an/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 115

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

FCC n/an/an/an/a

n/an/an/an/a

State Homeland Security Contact n/an/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

116 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/an/an/an/an/a

n/an/an/a

Fire

n/an/a

n/an/an/a

n/an/an/an/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 117

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/a

DHSDOIDOIDOI

DOI/FWS DOIDOI

n/a

DOJ n/aDOJ n/a

n/a

DOJ n/aDHHS n/a

n/a

DHHS n/a

n/an/an/a

DHHS n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

118 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLEnergy

n/a

n/a

n/an/a

n/a

n/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 119

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/an/an/a

n/a

n/a

n/an/an/an/a

n/a

n/a

n/a

n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

120 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

n/an/an/a

n/a

n/a

n/an/a

n/a

n/a

n/a

n/a

n/an/a

DHS

n/a

n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 121

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLEvent Impact

CDC n/an/an/a

n/an/an/a

n/an/an/an/a

n/a

n/an/an/an/an/a

n/a

n/an/a

DHHS n/a

n/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

122 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/an/a

phpn/an/an/an/an/an/an/a

CDC n/an/an/an/an/a

n/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 123

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/a

n/an/a

n/an/a

n/an/an/an/an/a

n/an/an/an/a

Video n/an/an/an/an/a

htmn/an/an/an/an/an/an/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

124 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/an/an/an/an/an/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/an/an/an/an/an/an/a

DHS n/an/an/an/a

Centern/a

n/aDHS n/a

n/an/an/an/a

DHS n/an/a

DHS n/an/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 125

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/an/an/a

Field Operating Locations

DoDn/an/an/a

n/an/a

n/an/an/an/a

n/an/an/an/a

Government Facilitiesn/a

DHHSn/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

126 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

DHS

n/an/an/a

n/an/a

n/a

n/an/an/an/an/an/an/an/an/an/an/an/a

n/an/a

htmn/an/a

DHS n/aDHS n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 127

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

DHS

DHS n/an/an/an/an/a

n/an/an/an/an/an/a

n/a

n/an/a

n/a

n/a

n/an/an/a

n/a

Dept of State n/a

Dept of State n/a

Dept of State n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

128 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/a

n/an/an/an/a

Judicial DOJ n/aDOJ n/aDOJ n/aDOJ n/a

Military n/a

n/an/a

n/an/an/a

n/aDoD/DISDI

DoD/DISDIDoD/DISDI

n/an/an/an/an/a

Other n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 129

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLOther Federal n/a

n/an/an/an/a

DHS

n/a

n/an/an/an/an/a

htmln/a

n/a

n/aState Senate n/a

n/aHealthcare and Public Health

Healthcare

DHHS n/an/a

n/a

n/an/a

DHHS n/aDHHS n/aDHHS n/a

n/aDHHS n/a

n/a App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

130 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

n/a

n/a

Health

n/an/a

DHHSDHHS n/a

DHHSDHHS n/aDHHS n/aDHHS n/aDHHS

n/an/a

DHHS n/a

DHHS/CDC n/a

DHHSn/an/an/an/an/an/a

DHHS n/aDHHS n/aDHHS n/aDHHS/CDC n/aDHHS/CDC n/aDHHS n/aDHHS/CDCDHHS n/a

n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 131

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLImagery

n/an/an/an/an/a

n/a

n/an/a

Video n/a

n/an/an/a

n/an/a

International Charter

n/a

n/an/a

n/an/an/an/a

Man-Made HazardsDHS n/a

Chemical n/an/an/an/an/an/an/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

132 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLDHS n/a

DHS n/aDHS n/aDHS n/a

n/an/an/an/an/an/an/an/an/an/a

n/an/an/an/an/an/an/an/an/an/an/an/a

DHS n/an/an/an/an/an/an/an/an/a

DHS n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 133

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLNational Monuments & Icons

DOI n/a

DOC n/aDHS n/a

n/aDOI

DOI

Natural Hazardsn/an/an/an/an/an/an/an/an/an/an/a

n/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

134 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/a

Fault

n/an/an/a

n/an/a

Weather

n/an/an/a

n/an/an/an/a

n/a

n/a

n/ahtml

n/an/a

n/an/an/a

n/an/an/an/an/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 135

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

Weather

Storm Corridor n/an/a

n/aphp

n/a

n/an/a

Fire Detection n/a

n/a

n/aFire Weather Watch n/a

n/a

Nuclear Facilitiesn/a

n/an/a

uranium/n/an/an/an/an/a

n/an/a

n/an/a

n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

136 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/a

n/a

n/a

n/a

n/an/an/a

n/a

n/a

n/a

Population/Demographicsn/an/an/a

n/ahtml

n/an/a

Crime

DOJ n/aDOJ n/aDOJ n/aDOJ n/aDOJ n/aDOJ n/aDOJ n/aDOJ n/a

n/an/a

DOC n/aincome.html

n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 137

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLPostal/Shipping

Courier

DHSDHS

DHS

n/a

n/a

Specialized Response Teams

DHHS

DHHS n/an/a

DHHS/SOC n/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

138 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

DHS

n/a

n/an/a

n/an/an/a

n/a

n/an/an/a

n/an/an/an/an/a

n/an/a

n/a

n/an/an/an/a

n/a

n/an/an/a

DoD n/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 139

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

Other Federal

n/an/a

n/an/an/an/an/a

n/an/an/an/an/an/an/an/a

n/an/an/a

n/aTelecommunications

FCCFCCFCC n/aFCC n/aFCC n/a

FCC FM FCC n/aFCC n/aFCCFCC n/aFCC n/a

FCC n/aFCC n/aFCCFCC

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

140 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URL

DHSFCCFCCFCC

DoD n/a

Internet

FCC n/aFCC n/aFCC n/aFCC n/aFCC n/aFCC n/aDHS n/aDHSFCC n/aDHS n/aDHS

n/an/a

n/a

n/a

n/a

Satelliten/a

FCC n/aFCC n/aFCC n/aA

ppendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 141

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

Wired

FCCn/an/an/an/an/an/a

FCC n/a

n/an/a

n/aThreat/Suspicious Activity

n/an/an/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

142 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLTransportation

n/a

n/an/an/a

n/a

n/a

n/an/an/an/a

n/an/a

n/a

n/an/an/an/a

n/a

n/an/a

n/a

n/an/a

Intermodal n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 143

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URL

Maritime

n/a

n/a

n/an/an/a

n/a

n/a

n/an/an/a

n/a

n/an/a

n/a

Maritime

n/adatappor.htm

n/an/a

datamile.htmn/a

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

144 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/a

n/a

n/an/an/a

n/a

n/a

n/a

n/a

n/adatamile.htm

n/a

n/a

n/a

n/a

n/an/a

n/a

n/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 145

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Sub Category Theme Type POC Restrictions URLn/an/an/an/a

n/a

n/a

Video n/an/an/an/a

n/an/an/an/an/an/a

Watern/a

Supply

n/a

n/an/an/a

Surface Water n/an/an/an/an/a A

ppen

dice

s

DHS Geospatial Concept of Operations (GeoCONOPS)

146 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Sub Category Theme Type POC Restrictions URLn/an/a

n/an/an/an/a

n/a

n/a

n/an/a

n/an/an/a

n/an/a

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 147

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX C: CIVIL SUPPORT

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

148 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

SecDef

Figure C–1: Request For Assistance Process Decision Matrix

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 149

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

1

2

1 Joint Publication 3-28, Civil Support, September 14, 2007.

2 DOD Support to Domestic Incidents, Januar 2008. Prepared b he Of ce of the Assistant Secretar of Defense omeland Defense and America s Securit Affairs. A

ppen

dice

s

DHS Geospatial Concept of Operations (GeoCONOPS)

150 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

3 (see Figure C–1).

3 Joint Publication 3-28, Civil Support , September 14, 2007, p II-5.

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 151

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

Overview

APPENDIX D: DHS INTELLIGENCE & ANALYSIS – INTERAGENCY REMOTE SENSING COORDINATION CELL

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

152 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Operational Support

The IRSCC supports the emergency management community in response to an event with awareness of remote sensing activities and capabilities. The

IRSCC does not task organizations to collect data but assists the remote sensing community with planning and coordination activities in support of federally declared disaster events.

IRSCC activities include daily remote sensing reports and imagery collection and requirements coordination support. These activities take place prior to, during, and after events have taken place. In response to a request for assistance following a natural or man-made disaster, the IRSCC compiles details on available imagery in support of requested areas of interest and

priority targets (e.g. affected infrastructure). Member organizations listed in Table 4-2 provide information on available imagery products to the remote sensing community.

Production and Products

T

Department

Department of Homeland Security

Department of Commerce

Department of the Interior

Table D–1: IRSCC Member Agencies and Organizations

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 153

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX E: DHS ONEVIEW

https://ii.dhs. ov/onevie .

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

154 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Figure E–1: DHS OneView

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 155

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX F: ACTORS

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

156 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 157

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX G: REFERENCED DOCUMENTS

National Incident Management System (NIMS),

National Infrastructure Protection Plan (NIPP),

National Response Framework (NRF), January

Defense Production Act App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

158 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

Homeland Security Act of 2002

The Robert T. Stafford Disaster Relief and Emergency Assistance Act (Stafford Act), as amended

HSPD-5, Management of Domestic Incidents,

HSPD-7, Critical Infrastructure Identi cation, Prioritization, and Protection

CI and to protect them.

HSPD-8, National Preparedness

national domestic all-hazards preparedness goal

HSPD-20/National Security Presidential Directive-51 National Continuity Policy, May

Civil Support, Joint Publication 3-28

Homeland Defense, Joint Publication 3-27, July

Department of Defense (DoD) Support to Domestic Incidents

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 159

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX H: RELATED CONOPS/SOPS

National Response FrameworkESF 1 ESF 2 ESF 3 ESF 4 ESF 5 ESF 6 ESF 7 ESF 8 ESF 9 ESF 10 ESF 11 ESF 12

DHS

DOI

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

160 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

National Response FrameworkESF 1 ESF 2 ESF 3 ESF 4 ESF 5 ESF 6 ESF 7 ESF 8 ESF 9 ESF 10 ESF 11 ESF 12

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 161

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

National Response FrameworkESF 1 ESF 2 ESF 3 ESF 4 ESF 5 ESF 6 ESF 7 ESF 8 ESF 9 ESF 10 ESF 11 ESF 12

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

162 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

National Response FrameworkESF 1 ESF 2 ESF 3 ESF 4 ESF 5 ESF 6 ESF 7 ESF 8 ESF 9 ESF 10 ESF 11 ESF 12

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 163

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

National Response FrameworkESF 1 ESF 2 ESF 3 ESF 4 ESF 5 ESF 6 ESF 7 ESF 8 ESF 9 ESF 10 ESF 11 ESF 12

HHS

Color Scheme

Standard Operational Information

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

164 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 165

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

APPENDIX I: ACRONYMS

ABFE

AFO AFRCC

CenterARC

CA CAT CBP CBRN

CDC

CFDA

CI CIMS A

ppen

dice

s

DHS Geospatial Concept of Operations (GeoCONOPS)

166 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

CIO CIR Critical Information

CM Community ModelCMHIS

COI CONPLAN CONUS COP COOP CPIMD

CRS CSEPP

CS CST

CWIN

DASC Center

DCE DCO DEGS

DHHS Department of Health and

DHS Department of Homeland Security

DMAT

DMORT DoD DOE DOI Department of InteriorDOJ DOL DOS Department of StateDOT DPO-MA

DRG DRTS

DSCA

EA EAS EEI

informationEMG EMIMS

EMS ENS EOC EPA

ESF ESFLG

FAA

FBI FCO FEMA

FGDC

FIRM FOC FOUO

GA GeoCONOPS

GDM GIS GISC

GIU GMO GPR GSA

HAS HazMat HAZUS-MH HD HLT HM HQ

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 167

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

HSDN Homeland Secure Data

HSIN Homeland Security Information

HSIN-I Homeland Security Information

HSIP Homeland Security

HSPD

HUD

HURREVAC

I&A IA IASD

IAP IAS iCAV

ICEPP

ICG

ICP ICPACC

CommitteeICS IDP IGA

IICD

IIPG IMAAC

CenterIMAT

IMC IMPT

IOC IOF IP IRSCC

Coordination CellISS International Situation

SummaryIST ITT

JFO JFLCC

CommandJIC Joint Information CenterJOC JRIES

JTF JWICS

KMO

LANL

LIDAR LSA

MAA MA MAC MACC

CenterMACD

MAT ME MERS

SupportMIGS

MIL Military MOA MOU Memorandum of

MWCL

NASA

NCC

NCS

NDMS

NEF App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

168 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

NEFRLS

NFIP

NGA

NGB NGO

NHC NICC

NICCL

NIMS

NIPP

NISAC

NJIC Center

NMSZ NOAA

NOC NPPD

NPS NRC

NRCC Coordination Center

NRF

NSS NSSE

NST NVOAD

NWS

OCONUS

OD ODP

OLA OPA OPM

OPLAN OPORDER Operational OrderORNL OSHA Occupational Safety and Health

OSHE Occupational Safety, Health,

PA PDA

PFO PHT PICCL

PIO

PKEMRA

PODs POS

PPDR

PSA PSMA

RDA REPP

RFA RFI RMIS

RRCC Coordination Center

RS

SAR SBA SCO SFO SHIRA

SICCL

SLFC SLOSH

SME

Appendices

DHS Geospatial Concept of Operations (GeoCONOPS)

June 2011 | Version 3.0 | 169

Team

M

embe

rsG

eoC

ON

OPS

Requ

irem

ents

&

Cap

abili

ties

M

issi

on A

reas

Dis

aste

r O

pera

tion

sC

atas

trop

hic

Dis

aste

rsM

itig

atio

n &

Pr

epar

edne

ssA

ppen

dice

s

SNL SNS SOP SOC SWAT SWO

TAC

TEMP TCPED

TSA

UCS USACE

USAF USAID

U.S.C. USCG USDA

USFS USGS

USNORTHCOM Command

USPACOM US&R

VAL VA-NPSC

Support CenterVMWG

VOAD

VOLAG VTC

WFO WMD

App

endi

ces

DHS Geospatial Concept of Operations (GeoCONOPS)

170 | Version 3.0 | June 2011

Team

Mem

bersG

eoCO

NO

PSRequirem

ents &

Capabilities

M

ission Areas

Disaster

Operations

CatastrophicD

isastersM

itigation &

PreparednessA

ppendices

This page intentionally left blank.

Appendices