www.dotd.la.gov Federal Funding Authorizations Brian Jones Budget Section - 38 (Federal Aid) [email protected] (225) 379-1495

Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

www.dotd.la.gov

Federal Funding Authorizations

Brian Jones

Budget Section - 38

(Federal Aid)

[email protected]

(225) 379-1495

Page 2: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Federal Aid

• Federal Aid Highway Program (FAHP)

• Federal Highway Administration (FHWA)

Financial Management Information System (FMIS 5.0)

• Stewardship & Oversight

• Over $773 million awarded and obligated in 2017

• $228,472,066.61 thru March 23, 2018

Page 3: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Federal Aid Authorizations

Types of Authorization

Initial Authorization

Modification

Project Closeout

Period of Performance

6 Phases of a Project

Feasibility

Environmental

Right of Way

Utility Relocation

Design (Engineering)

Construction

Page 4: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Initial Authorization

• The authorization of Federal funds to a project.

• Initiate Federal authorization by working with the FHWA for all

phases of a project.

Feasibility, Environmental, Right of Way, Utility, Design, and Construction.

• Verification of the submitted documentation and data entered in

LaGov begins the process.

Page 5: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Modification, Closeout, and Period of Performance

• Modification – the revision of an authorized project.

• Closeout – a closeout is the de-obligation of remaining funds

and closure of the project. A refund or release of Federal funds and project closure can occur due to non-

compliance of Federal guidelines until corrective actions take place.

• Period of Performance – the period of performance is a period

of when costs can be incurred, which includes a project

agreement start and end date.

Page 6: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Required Documents

• Project Budget Request ( All phases) Initial Authorization, Modification, Closeout, or Period of Performance

• Federal Authorization Checklist (All phases) Initial Authorization

• Cost Estimate (Phase 6 only) Initial Authorization

• Change Order Summary Report (Phase 6 only) Modification

• Task Order/Contract ( All phases) Modification

• Email (All phases) Closeout or Period of Performance

Page 7: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 8: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 9: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 10: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 11: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 12: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 13: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N
Page 14: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Prior to Working the Request

• Federal Authorization Request form (Checklist)

• Cost Estimate (Phase 6 only)

• HPP and STIP data in place

• Verify amount needed/requested

• Verify funding availability (STP>200K, FBR-OFF,

NHPP, etc) and Federal share (80/20, 90/10, 100%)

• EC date is within 3 years

• Permits have been satisfied

• Proposals are at 95%/Plans signed

• Period of Performance

Page 15: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Project Builder/CJ20N

• Funding amounts are loaded into CJ20N’s Project

Federal Funding tab.

• Several fields must be populated as well.

• CJ20N is reviewed, approved, and then saved for

the project to interface with FMIS.

• Once the Budget Request is authorized by the

FHWA, the Capital Outlay unit is notified of the

approval.

Page 16: Federal Funding Authorizations · Project Builder/CJ20N •Funding amounts are loaded into CJ20N’s Project Federal Funding tab. •Several fields must be populated as well. •CJ20N

Questions?