Upload
ethel-shanna-price
View
212
Download
0
Tags:
Embed Size (px)
Citation preview
Federal AviationAdministration
FOR OFFICIAL USE ONLY(Public availability to be determined under 5USC 552)
Data Communications Program
DCL Benefits Modeling
Presented To: Data Communications Implementation Team (DCIT)
Date: January 20, 2011
2Data Communications Program
January 2011
Agenda
• FLL DCL TAAM Modeling– Background
– Modeling
– Preliminary Results
– Next Steps
• D-BEST: DCL Benefits Estimator Tool– Background
– Outreach
– Demo
3Data Communications Program
January 2011
FLL Background• FLL is representative of a high impact airport with a mix of
major airlines for demonstration of DCL benefits.• FLL is ranked 19th nationwide in on-time performance.• Data Comm program has FLL SME expertise available.
Source: Bureau of Transportation Statistics
4Data Communications Program
January 2011
FLL Modeling Assumptions• Simulations created using Total Airport and Airspace Modeler• Model includes En Route, TRACON and surface operations
– ETMS city pair routing– FLL terminal airspace SID/STAR procedures– Terminal airspace spacing, vectoring, separation, wake turbulence– Airport gate usage, taxi, departure line up queuing at runway threshold– East and West flow operations examined
• Traffic: 90th percentile day by operations (FY10)• Wx: FLL north departures impacted by simulated reroutes for
afternoon convective weather, en route capacity is not constrained • Voice reroute clearance time is randomly assigned by TAAM
– 2.5 to 4.5 minutes per aircraft, includes clearance and pilot read back– Verified per SME input and Data Comm Benefits Team
• Data Comm reroute clearance time is randomly assigned by TAAM– 10 to 20 seconds per equipped aircraft– Assigned at the gate
5Data Communications Program
January 2011
FLL Operations and Delays
Date
To
tal
Da
ily
Op
erat
ion
s To
tal De
lay (m
inu
tes)
10th Percentile
90th Percentile
Carrier and Air Taxi Operations
6Data Communications Program
January 2011
FLL Departure Traffic Demand
Simulated Weather11:00 - 23:00 local
Local Hour
Ho
url
y D
epar
ture
Rat
eE
n R
ou
te W
ITI V
alu
e
10Data Communications Program
January 2011
FLL Simulation Matrix
Data CommData CommEquipage PlanEquipage Plan
Scenarios based on anticipated aircraft types
per user inventory
FLL Simulation MatrixFLL Simulation Matrix
Simulation Traffic FileSimulation Traffic File
East Flow East Flow
West Flow West Flow
N
11Data Communications Program
January 2011
FLL Departure Routes Impacted by Weather
Case 1: All North Departures Case 2: North Overland Departures
Case 4: ARKES Departures Case 5: ZAPPA (Ocean) DeparturesCase 3: THUNDR Departures
12Data Communications Program
January 2011
Case 1: Clearance Delivery Comparison [14:00-16:00] local
Current Capability Data Communications Capability
13Data Communications Program
January 2011
FLL PreliminaryPreliminary Results: Departure Delay Benefits
97 Total Weather Impacted Days in FY10 for Potential Savings97 Total Weather Impacted Days in FY10 for Potential Savings
Annual FLL Airport Data Comm Impact:Annual FLL Airport Data Comm Impact: • Estimates do not include 17 days of mixed runway configurations • Savings for 80 days using DCL Service with 2016 Equipage Scenario A is estimated at 32,122 minutes 32,122 minutes.• Savings for 80 days using DCL Service with 2016 Equipage Scenario B is estimated at 53,049 minutes 53,049 minutes..
14Data Communications Program
January 2011
Discussion
• Modeling DCL services shows significant savings.• The higher the equipage, the higher the savings.• Non-Equipped aircraft will receive a residual benefit as
a result of the equipped aircraft.• Increased traffic levels will result in higher savings.• Next Steps
– FLL Mixed Runway Simulations– Access Arrival Benefits– Enhanced Benefits Methodology– Expand Analysis to other Airports