Michael Pacholok, Chief Purchasing Official and Director
Purchasing & Materials Management City Hall 19th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2
Joanne Kehoe, Manager Construction Services
February 16, 2017 Via E-mail (75 pages)
Addendum No. 2
TENDER No. 345-2016
Closing: 12:00 NOON (LOCAL TIME), February 28, 2017 (REVISED)
For: the supply of all materials, equipment, labour and supervision necessary for the
construction of the Wellesley Community Centre Phase 2 Indoor Pool Addition.
Please refer to the above Tender Call document in your possession and be advised of the
following:
1.0 REVISED - Closing Date:
The closing date has been extended from February 21 to 12:00 Noon, Local Time,
February 28, 2017
The last day for questions is 1:00 pm., February 21, 2017
Additional information will follow shortly.
2.0 CLARIFICATIONS & REVISIONS, Section 4, Scope of Work:
Please refer to Architectural Addendum No. 2 dated February 15, 2017 (71 pages total)
which also includes:
Electrical Addendum ADD-E01 dated February 14, 2017 (5 pages), and
Mechanical Addendum ADD-M01 dated February 14, 2017 (1 page) and be governed accordingly.
3.0 RESPONSES TO QUESTIONS
The following are responses to questions received during the call period:
Q1. Regarding sidewalk along Bleecker Street:
1. Site Plan & Grading Plan show: Existing Sidewalk;
1 of 75
Addendum No. 2
TENDER No. 345-2016 2
2. Removal Plan shows: Remove Conc. Paving – Retain Sub-base; but it looks like the existing sidewalk at the new addition side keeps untouched;
3. Layout & Material Plan: the whole sidewalk looks all new. The illustrations above conflict. Please advise.
A1. This has been addressed in this addendum as part of ARCHITECTURAL DRAWING REVISIONS + CLARIFICATIONS.
Q2. Please note that several areas have indicated to remove existing concrete and asphalt; however no make-ups are provided for the existing assembly. Please
advise on the make-up breaking out the thickness of the different asphalt or
concrete make-ups with the granular bases.
A2. This has been addressed in this addendum as part of ARCHITECTURAL DRAWING REVISIONS + CLARIFICATIONS.
Q3. Please confirm addition F.F. elevation due to the following discrepancies:
Regarding the Finished Floor Elevation:
Grading Plan C-01 shows 111.55;
Drawing S101 says (Note 1): The Ground floor datum (+0.0) corresponds
to the finished floor of the existing building, denoted as geo. Elevation
110.95 in the SR;
Drawing A301 shows 110.95;
Survey Plan A001 shows 110.97
A3. There is a discrepancy between the as-built architectural drawings which note the ground floor FFE as 110.95 and the survey which indicates 110.97. Contractor to
verify existing FFE on site prior to the start of construction. C-01 to be corrected
to match verified FFE prior to construction. Noted revision of FFE on C-01 does
not affect the current grading or storm water management plan.
Also note that 111.55 is the correct elevation for the north-west end (existing gym
and change rooms) of the building.
Q4. Please refer to both Structural and Architectural plans and sections relating to the exterior foundation wall running along Gridline X from 10x to 16z, you are
currently showing installation of weeping tile and insulation on the exterior of the
wall; however, there are no details showing how this foundation wall will relate
to the shoring wall built directly in front. With the proximity of the wall to the
property line we believe that the foundation wall will have to be poured against
the shoring. Please review and advise.
A4. The line of shoring is indicated on plan S101 and is outboard of the property line. Refer to specification section 31 41 00 1.4.2.1 regarding lagging tolerances.
Weepers and insulation should be able to be installed in this configuration with
the noted tolerances. Contractors can propose to set the formwork directly against
2 of 75
Addendum No. 2
TENDER No. 345-2016 3
the lagging if this proves more cost effective with the understanding that details
and specifications would change to suit.
Q5. Please confirm the base material for the area of unit pavers that must be removed.
A5. As-built drawing detail 7/L-400 (not issued) indicates unit pavers on 150mm compacted granular ‘A’, 200mm compacted granular ‘B’ on compacted subgrade.
Contractor to site verify as-built conditions.
Q6. Re: Door Schedule
1) Please provide details of door types D2F, D-2G not shown with other door elevations, but is indicated on door schedule.
2) Please confirm if door ST-A2 is to have frame type F-05 as noted which is Alum or F-03 which is HM. The finish is noted as PTD so wasn't sure what
the frame material would be.
3) Door ST-1A is shown to have frame type F-03 which is shown to have a transom panel, however there is no information regarding transom in the
column "Transom", possibly this frame is to be F-01.
4) Material Type is not indicated for door 164A, please advise. 5) Door 167A references HM Doors with WD Transom, please confirm if this is
correct, possibly should be a HM Transom Panel
A6. Please note the following responses
1. D2F-D2G were mislabeled and replaced. Refer to reissued sheet A801
2. F-03 is correct. Refer to reissued sheet A801
3. F-01 is correct. Refer to reissued sheet A801
4. Door Material type is HM. Refer to reissued sheet A801
5. HM Transom Panel is correct. Refer to reissued sheet A801
Q7. Please provide specification for wood doors noted on door schedule.
A7. New specification section 08 14 00 issued with Addendum 2.
Q8. With reference to the experience and qualifications forms for the Mechanical and Electrical contractors, we noticed the requirements has been revised to
experience with indoor pool projects or Community Centres projects but the
explanation paragraph still requires indoor pool projects as a component within
a larger centre Please review and clarify
A8. The intent of the change is to recognize the experience of either having:
1. completed an indoor pool as described in the Tender documents, (pool can be stand alone or part of a larger centre – but the pool doesn't have to be part of a
larger centre), or
3 of 75
Addendum No. 2
TENDER No. 345-2016 4
2. completed a community centre with a minimum 50,000 sq. foot GFA - The community centre doesn't need to have a pool in it.
Should you have any questions regarding this addendum, please contact Mike Voelker at
Please attach this addendum to your RFT document and be governed accordingly. Bidders must
acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per
the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document.
All other aspects of the Tender remain the same.
Yours truly,
Joanne Kehoe,
Manager, Construction Services
Purchasing and Materials Management
4 of 75
mailto:[email protected]
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 1Project No. 1311 February 15, 2017
General ADD2
Addendum 02Issued February 15, 2017
Project: Wellesley Community Centre Phase 2 – Pool AdditionOwner: City of TorontoConsultant: MacLennan Jaunkalns Miller Architects
1. GENERAL
.1 This Addendum shall be attached to the front of the specifications and shall be brought to the attention of all concerned.
.2 This Addendum shall form an integral part and shall be read in conjunction with Specifications and Drawings. This Addendum shall take precedence over all requirements to the aforementioned specifications with which it may prove to be at variance.
.3 Receipt of this Addendum shall be acknowledged on the Bid Form. Failure to do so may subject the Proponent to disqualification.
.4 This Addendum Contains:
.1 Part 1: GENERAL – 1 page
.2 Part 2: ARCHITECTURAL SPECIFICATION REVISIONS + CLARIFICATIONS – 1 page
.3 Part 3: ARCHITECTURAL DRAWING REVISIONS + CLARIFICATIONS – 9 pages of Architectural Drawing Revisions and Clarifications, 21 sketches with prefix “ADD2” and 3 full size sheets (A406, A600, A801)
.4 RFI RESPONSES – Refer to the City of Toronto addendum documents
.5 Electrical Addendum ADD-E01 dated February 14, 2017 (5 pages)
.6 Mechanical Addendum ADD-M01 dated February 14, 2017 (1 page)
.7 FULL SIZE drawings reissued as included or noted in the individual addendums listed above.
5 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 1Project No. 1311 February 15, 2017
Architectural Specifications ADD2
2. ARCHITECTURAL SPECIFICATION REVISIONS + CLARIFICATIONS
A. Section 08 14 00 – Flush Wood DoorsADD new specification section contained herein (7 pages)
B. Section 08 71 00 – Finish HardwareREVISE hardware schedule with updated version dated February 10 217 contained herein (23 pages)
C. Section 08 80 00 – Glass and GlazingADD paragraph 2.2.9:
.9 Back painted glass (GL-BP):
.1 Tempered, low-iron glass meeting requirements of ASTM C1048-12e1, kind HS, kind FT coated and uncoated, 6 mm (1/4") thick, minimum, epoxy coating on No. 2 surface, ‘MagiCoat’, by Imagic Glass.
.1 Colour: to later selection by Consultant
.2 Low iron glass acceptable Products:
.1 AGC ‘Krystal Klear’.
.2 Guardian ‘Ultraclear’.
.3 Pilkington ‘Opti-White’.
.4 PPG ‘Starphire’.
.5 Saint-Gobain ‘Diamente’.
.3 Acceptable manufacturers:
.1 Central Canadian Glass.
.2 Imagic Glass.
.4 Supply and install adhesive compatible with coating and suitable for adhering glassto substrates, as recommended by glass manufacturer.
D. Section 09 31 01 – Tiling Schedule
ADD to paragraph 1.2: (Speciality Tiles) Provide tile stair treads with custom radius edge and continuous safety strip routed into tile (both by manufacturer). Provide tile stair risers cut to suit.
END OF ARCHITECTURAL SPECIFICATION REVISIONS + CLARIFICATIONS.
6 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 1Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
PART 1 - GENERAL
1.1 Summary
.1 Section includes:
.1 Solid core doors with wood veneer.
.2 Factory finishing wood doors.
.3 Fire rated wood doors.
1.2 Submittals
.1 Submit required submittals in accordance with Section 01 33 00.
.2 Product data sheets:
.1 Submit manufacturer’s Product data sheets for Products proposed for use in thework of this section.
.3 Shop drawings:
.1 Indicate door location using numbering system per door schedule, size, and handof each door, elevation of each door type; undercuts, bevelling, construction typecore and edge construction not covered in product data; and special blockingrequirements.
.2 Indicate dimensions and locations of factory machining criteria for hardware, extentof hardware blocking.
.3 Indicate dimensions and locations of cut-outs including trim for openings.
.4 Indicate door face finish requirements including veneer matching.
.5 Indicate doors to be factory finished and finish requirements.
.6 Indicate fire ratings for fire rated doors.
.7 Indicate electrified hardware requirements and preparations.
.4 Verification samples:
.1 Submit cut-away sample of each type of door, to show stile and rail construction,core, cross banding, door face finish and edges.
.2 Submit solid lumber frames for light openings, minimum 150 mm (6") long, for eachmaterial, type and finish required.
1.3 Quality Assurance
.1 Quality standard:
.1 Work shall be in accordance with the Architectural Woodwork Standards Edition2-2014, Premium Grade.
1.4 Delivery, Storage, and Handling
.1 Door numbers shall be marked with door numbers used on shop drawings in the top hingecavity created by the machining for hinges.
7 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 2Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.2 Identify doors with labels. Package with resilient packaging.
.3 Store doors flat at the Place of the Work in piles with bottom face on bottom of pile. Protectfrom moisture by placing water resistant material under skids supporting piles. Cover topof piles and provide air at sides of piles.
.4 Deliver the wood doors only after the building is closed and dry and HVAC system isoperating and maintaining ambient temperature and humidity conditions at occupancylevels during the remainder of the construction period. Do not receive the doors in a damparea. Do not drag the doors on the ground, floor or across one another.
PART 2- PRODUCTS
2.1 Manufacturer
.1 Algoma Hardwoods, Inc.
.2 Baillargeon Doors, Inc.
.3 DoorLam Manufacturing.
.4 Eggers Industries.
.5 JWS Manufacturing Inc.
.6 Lambton Doors.
.7 Marshfield Door Systems.
.8 Mohawk Flush Doors, Inc.
.9 Substitutions: in accordance with Section 01 25 00.
2.2 Performance/Design Requirements – Fire Rating Requirements
.1 Fire rated doors shall be fabricated, labelled and listed by an organization accredited byStandards Council of Canada in conformance with CAN/ULC-S104-10 and CAN/ULC-S105-09 for fire protection ratings as scheduled.
.2 Install fire rated doors in accordance with NFPA 80-2010.
2.3 General
.1 Single-source manufacturing and fabrication responsibility: Engage a qualifiedManufacturer to assume undivided responsibility for wood doors specified in this section,including fabrication and finishing except where site finishing is specified.
2.4 Fabrication – Door Construction
.1 Performance duty level:
.1 Doors shall meet the requirements of ANSI/WDMA I.S. 1A-13 for Heavy DutyPerformance Level unless otherwise indicated or scheduled.
.2 Solid particleboard core, veneer faced, non fire rated and 20 minute fire rated wood doorconstruction to Architectural Woodwork Standards Manual, Section 9 and as follows:
.1 Type PC-5, particle board core to ANSI A208.1-2009 LD-2 (minimum 529 kg/m3(33 lbs/ft3) density).
8 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 3Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.3 Solid fire resistant core; veneer faced, construction to Architectural Woodwork StandardsManual, Section 9 and as follows:
.1 45, 60 and 90 minute rated doors; Type FD-5, non-combustible mineral core.
.4 Bonding:
.1 Bond stiles and rails to core; abrasive sand core assembly to achieve uniformthickness prior to lamination of door faces.
.5 Panel edge types:
.1 Wood veneer faced doors for transparent finish:
.1 For vertical edges (stiles) and exposed horizontal edges (rails). (Exposedhorizontal edges are those edges that can be viewed from floors above.):
.1 Edge Type A: Minimum 11 mm (7/16") thick solid hardwood, species tomatch face veneer, and referenced quality standard.
.2 Inset solid wood edging shall have consistent moisture content as panelcore material, be glued securely, and calibrated with panel core thicknessprior to being laminated with wood veneer on both sides.
.3 Non rated or 20 minute fire rated doors: Solid hardwood edge to belaminated to minimum 25.4 mm (1") structural composite lumber backer.
.4 45, 60, or 90 minute fire rated doors: Solid hardwood edge to be laminatedto Tectonite or manufacturer’s standard fire rated material for fire rateddoors
.2 For unexposed horizontal edges (rails):
.1 Non rated or 20 minute fire rated doors: Minimum 25 mm (1") structuralcomposite lumber.
.2 45, 60, or 90 minute fire rated doors: Tectonite or manufacturer’s standardfire rated material for fire rated doors.
.3 Minimum 11 mm (7/16") thick, closed grain, solid hardwood edge.
.1 Wood edge transparent finish to match face.
.4 Non-rated or 20 minute fire rated doors: Solid hardwood edge to be laminatedto minimum 25.4 mm (1") structural composite lumber backer.
.5 For 45, 60, or 90 minutes fire rated doors: Solid hardwood edge to belaminated to Tectonite or manufacturer’s standard fire rated material for firerated doors
.6 Blocking:
.1 Provide hardware blocking for doors as follows:
.1 Non-rated or 20 minute fire rated doors: Structural composite lumber forhardware blocking.
.2 45, 60, and 90 minute fire rated doors: Tectonite or manufacturer’s standardfire rated material for hardware blocking.
9 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 4Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.3 HB-1, minimum 125 mm (5") wide, full door width, top-rail blocking for closuredevices or flush bolts or for sliding door hardware.
.4 HB-2, minimum 125 mm (5") wide, full door width, bottom-rail blocking fordoors with protection plates, concealed door seals, automatic bottoms, pivotsor floor bolts.
.5 HB-4, minimum 125 mm (5") wide x 250 mm (10") high blocking for doors withmortise locks and pockets.
.6 HB-5, minimum 125 mm (5") wide x 250 mm (10") high blocking for hinges.
.7 HB-6, minimum 125 mm (5") wide, full door width, mid-rail blocking for exitdevices.
.8 HB-7, minimum 125 mm (5") wide, full door height, for doors with continuoustype hinges.
.7 Thickness:
.1 45 mm (1-3/4") minimum unless otherwise indicated or scheduled.
2.5 Veneer Faced Doors For Transparent Finish
.1 Veneer face grade: Allowable wood veneer face grade characteristics shall comply withArchitectural Woodwork Standards, Edition 1, 2009 referenced grade and referencedstandards.
.1 AA.
.2 Veneer thickness: Minimum 1.02 mm (0.040") thick after sanding.
.3 Veneer species: Maple.
.4 Veneer cut: Quarter.
.5 Veneer leaf matching: Book.
.6 Veneer assembly matching: Balance.
2.6 Accessories
.1 Wood glass stops: Solid hardwood, species to match face finish, and referenced qualitystandard.
.2 Finishing hardware: in accordance with Section 08 71 00.
2.7 Fabrication
.1 Fire rated doors shall be fabricated, labelled and listed by an organization accredited byStandards Council of Canada in conformance with CAN/ULC-S104-10 and CAN/ULC-S105-09 for fire protection ratings as scheduled.
.2 Align and fit doors in frames with uniform clearances and bevels as indicated below; donot trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rateddoors. Seal edges of doors, edges of cutouts, and mortises after fitting and machining.
.1 Clearances: Refer to Part 3 for clearance tolerances.
.2 Fit doors for automatic door bottoms.
10 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 5Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.3 Comply with NFPA 80-2010 for fire-rated doors.
.4 Bevel non-fire-rated doors 3-1/2 degrees (1/8 inch in 2 inches) at lock and hingeedges.
.5 Bevel fire-rated doors 3-1/2 degrees (1/8 inch in 2 inches) at lock edge; trim stilesand rails only to extent permitted by labelling agency.
.3 Fabricate doors with hardware blocking as specified in Part 2 of this Section.
.4 Factory machine doors for finish hardware that is not surface applied. Do not machine forsurface hardware. Locate hardware to comply with Door and Hardware Institute (DHI)“Recommended Locations for Architectural Hardware for Flush Wood Doors (latestedition). Comply with final reviewed hardware schedules, door and frame shop drawingsand hardware templates.
.1 Coordinate with hardware mortises in metal frames to verify dimensions andalignment before factory machining.
.2 Metal astragals: Factory machine astragals and formed-steel edges for hardwarefor pairs of fire rated doors.
.5 Electrified hardware: Where electrically or electronically operated hardware is specifiedon the schedules or details or the final approved schedule and templates provided by thehardware supplier, doors with electrified devices shall be manufactured to include wireraceway in door panel to accommodate electrified devices, such as electric hinge, powertransfer units, electrified locks, electrified door closures and electrified exit devices.Construction of raceways shall provide a continuous conduit or channel between entryand exit points to accommodate wire installation after door manufacture.
.6 Factory cut and trim openings.
.1 Glazing: Factory install glazing in doors indicated to be factory finished.
.7 Transom and side panels:
.1 Fabricate matching panels with same construction, exposed surfaces, and finishas specified for associated doors. Finish bottom edges of transoms and top edgesof rabbeted doors same as door stiles.
2.8 Factory Finishing
.1 Finish work in factory in accordance with Architectural Woodwork Standards Manual,Section 9 and referenced quality standard.
.2 Prior to finishing, handling marks or effects of exposure to moisture removed with athorough final sanding over surfaces of the exposed portions, using appropriate gritsandpaper, and shall be cleaned prior to applying sealer or finish. Sanding shall becompleted just prior to stain or finishing application.
.3 Comply with requirements indicated below for finish system, staining, and sheen.
.1 Sheen; Sheen range measurements in accordance with Architectural WoodworkStandards, Edition 2, 2014:
.1 Satin.
11 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 6Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.2 Factory finish with transparent, Post Catalyzed Lacquer in accordance with theArchitectural Woodwork Standards, Edition 1, 2009, Section 5.
.1 Transparent finish:
.1 Clear (natural).
.2 Stain: Stain colour as selected by Consultant.
.4 Seal top and bottom door edges.
PART 3 - EXECUTION
3.1 Examination
.1 Provide necessary grounds, bracing and strapping for fitting and adequate for securing ofthe work.
.2 Cooperate with work of other sections to ensure fastenings set by others are provided andlocated, their work is installed to their specifications and that those responsible for backpriming are notified in sufficient time for them to schedule work.
3.2 Installation - General
.1 Execute installation and assembly at the Place of the Work using skilled forces undersupervision of a competent joinery foreperson.
.2 Install work plumb, level and straight, and fasten it securely to backing to support itselfand anticipated superimposed loads.
.3 Build into construction as indicated, or specified in other sections of this specification, orboth.
.4 Adequately fasten units and secure in place with concealed fixings wherever possible.Include grounds and furring where required.
3.3 Installation – Doors/Frames
.1 Install fire rated doors in accordance with NFPA 80-2010.
.2 Install wood doors after finishing of walls.
.3 Align and fit doors in frames with uniform clearances as indicated below; do not trim stilesand rails in excess of limits set by manufacturer or permitted for fire-rated doors. Machinedoors for hardware. Seal edges of doors, edges of cutouts, and mortises after fitting andmachining.
.1 Clearances:
.1 Provide 3.2 mm (1/8") maximum clearance between door and frame at heads,jambs, and between pairs of doors.
.2 Provide minimum 3.2 mm (1/8") maximum clearance from bottom of door totop of decorative floor finish or covering unless otherwise indicated..
.3 Where threshold is shown or scheduled, 6.4 mm (1/4") minimum from bottomof door to top of threshold unless otherwise indicated and a maximum of12.7 mm (1/2").
12 of 75
Wellesley Community Centre Phase 2: Pool Addition Section 08 14 00City of Toronto Page 7Project No. 1311 February 15, 2017
Flush Wood DoorsSection issued by Addendum No. 02
.2 Comply with NFPA 80 for fire-rated doors.
.4 Seal top and bottom edges of wood doors if they are cut to fit, in accordance with doormanufacturer’s warranty requirements.
.5 Pilot drill screw and bolt holes.
.6 Coordinate installation of doors with installation of frames specified in Section 08 11 13,and hardware specified in Section 08 71 00.
3.4 Installation - Finishing Hardware
.1 Install finishing hardware in accordance with Section 08 71 00.
3.5 Adjusting and Cleaning
.1 Adjust doors to swing freely, smoothly and easily, to remain stationary at any point, toclose evenly and tightly against stops without binding, and to latch positively when doorsare closed with moderate force.
.2 Adjust hardware so that latches and locks operate smoothly and without binding, andclosers act positively with the least possible resistance in use. Lubricate hardware ifrequired by Supplier’s instructions.
.3 Ensure that doors equipped with closers operate to close doors firmly against anticipatedwind and building air pressure, and to enable doors to be readily opened as suitable forfunction, location and traffic.
.4 Clean hardware after installation in accordance with Supplier’s instructions.
END OF SECTION
13 of 75
Page 12/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Wellesley Community CentrePhase 2 - Pool Addition
ArchitectMacLennan Jaunkalns Miller Architects
425 Adelaide Street WestLevel 6
Toronto, OntarioM5V 3C1
Tel: 416-593-6796
CoordinatorMark Di Plama
Tel: 905-940-8358 Ext: 205Fax: 905-940-8362
Email: [email protected]
Consultant-----------------
Brian Hughes Tel: 647-502-7955Fax: 905-940-8362
E-Mail: [email protected]
Submittal Date: February 10, 2017
14 of 75
Page 22/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Openings Schedule
HardwareGroup Qty
OpeningNumber(s) Location 1
To/From Location 2 Hand
DoorType
NominalWidth
NominalHeight
DoorThickness
DoorMat'l
FrameMat'l Label
001 1 B61 CORRIDOR B60 FROM STORAGE B61 LHR/RHRA D2/F02 900, 900 2350 45 HM HM
002 1 B62 STORAGE B61 FROM HOISTWAY ACCESS B62 LHR/RHRA D2/F02 900, 900 2350 45 HM HM 45 MIN
003 1 B63 CORRIDOR B60 FROM MECHANICAL B63 LHR/RHRA D2/F02 900, 900 2150 45 HM HM 45 MIN
004 1 B68 FILTRATION RM B65 TO GROUND HEAT EXCHANGE B68 RH D1/F01 1000 2350 45 HM HM 45 MIN
005 1 STA-O STAIR FROM CORRIDOR B60 RHR D3/F01 1000 2350 45 HM HM 45 MIN
006 1 060A ATHLETIC CORRIDOR 031 TO ENTRY 060 SLIDER D11 3020 3000 WD -
007 1 060B ENTRY 060 TO UNIVERSAL CHANGE ROOM 064 SLIDER D5 2134 2352 AL AL
008 1 060C ENTRY 060 TO UNIVERSAL CHANGE ROOM 077 SLIDER D5 2134 2352 AL AL
009 1 061B ENTRY 060 TO RECEPTION 061 LH D1/F01 1000 2350 45 HM HM
010 1 062 STAFF KITCHEN 062 TO AQUATIC STAFF 063 LH D1/F01 1000 2350 45 HM HM
011 1 062A STAFF KITCHEN 061 FROM ELECT CLOSET 062A LHR/RHRA D2/F02 900, 900 2350 45 HM HM
012 1 063 POOL HALL 072 TO AQUATIC STAFF 063 RH D4/F05 1000 2350 45 AL AL
012A 1 064A EXIST ATHLETIC CORRIDOR 031 FROM UNIVERSAL CHANGE ROOM B 064 RHR D6 1050 2245 45 AL AL
012B 1 064B UNIVERSAL CHANGE ROOM B 064 TO SHOWER 069 O/H D10 1210 2400 45 AL AL
013 1 065 UNIVERSAL CHANGE ROOM 064 TO UNIVERSAL TOILET/CHANGE 065 RH D1/F01 1000 2350 45 HM HM
014 1 067 CORRIDOR 066 FROM ACCESSIBLE W/C 067 LHR D1/F01 950 2350 45 HM HM
015 1 068 CORRIDOR 066 FROM ACCESSIBLE W/C 068 LHR D1/F01 950 2350 45 HM HM
016 1 069A UNIVERSAL CHANGE ROOM 064 FROM SHOWER 069 O/H D10 1200 3200 AL -
017 1 069 POOL HALL 072 FROM SHOWER 069 O/H D10 1610 3200 AL -
018 1 070 EXTERIOR TO CHOLRINE STORAGE 070 RH D1/F01 900 2350 45 HM HM
019 1 071 EXTERIOR FROM HOISTWAY SHAFT 071 LHR/RHRA D2/F02 900, 900 2350 45 HM HM
020 1 072 ENTRY 006 FROM VIEW IN AREA 072 RHR D4/F05 900, 900 2650 45 AL AL
020A 1 072B POOL HALL FROM STAIR B RH 915 1800 13 GL -
021 1 073A POOL HALL 072 FROM POOL STORAGE 073 RHR D1/F01 1210 2150 45 HM HM
022 1 073B POOL HALL 072 FROM POOL STORAGE 073 LHR D1/F01 1210 2150 45 HM HM
023 1 075 POOL HALL 072 FROM POOL STORAGE 075 RHR D2A/F06 800 2350 45 AL AL
024 1 076 POOL HALL 072 TO STEAM ROOM 076 RH D4/F05 1000 2350 45 AL AL
024A 1 077A EXIST ATHLETIC CORRIDOR 031 FROM UNIVERSAL CHANGE ROOM A 077 LHR D6 1050 2845 45 AL AL
024B 1 077B UNIVERSAL CHANGE ROOM A 077 TO SHOWER 082 O/H D-10 1210 2400 45 AL -
025 1 078 UNIVERSAL CHANGE ROOM 077 TO UNIVERSAL TOILET/CHANGE 078 LH D1/F01 1000 2150 45 HM HM
026 1 080 CORRIDOR 079 FROM ACCESSIBLE W/C 080 RHR D1/F01 950 2350 45 HM HM
027 1 081 CORRIDOR 079 FROM ACCESSIBLE W/C 081 RHR D1/F01 950 2350 45 HM HM
028 1 082A UNIVERSAL CHANGE ROOM 077 FROM SHOWER 082 O/H D10 1200 2400 AL -
029 1 082B POOL HALL 072 FROM SHOWER 082 O/H D10 1550 3200 AL -
030 1 083 NEW VESTIBULE EXIT 083 FROM POOL HALL 072 LHR D4/F05 1000 2650 45 AL AL
031 1 083B EXTERIOR FROM NEW VESTIBULE EXIT 083 LHR D3A/F04 1048 2660 45 WD HM
032 1 ST-A1 STAIR A1 FROM POOL HALL 072 RHR D3 1000 2350 45 HM HM 45 MIN
033 1 ST-A1B EXTERIOR FROM STAIR A1 RHR D1 1000 2350 45 HM HM
034 1 160A CORRIDOR 160 FROM MECHANICAL LHR D2A/F03 1000 2250 45 HM HM
035 1 160B MECHANCIAL TO GREEN ROOF RH D1/F01 1000 2350 45 HM HM
036 1 161 CORRIDOR 160 TO ELECTRICAL 161 RH D2A/F03 1000 2250 45 HM HM 45 MIN
037 1 162 CORRIDOR 160 FROM OFFICE 162 LHR D2A/F05 1000 2250 45 WD AL
038 1 163 OFFICE 162 TO LAN ROOM 163 LH D1/F01 1000 2350 45 HM HM
039 1 164 CORRIDOR 160 FROM MULTI-PURPOSE 164 LHR D2A/F05 1000 2250 45 WD AL
039A 1 164A MULTI-PURPOSE 164 FROM STORAGE 164A RHR D2A/F3 1000 2250 45 HM HM
039B 1 165 2ND FLOOR CORRIDOR 160 TO UNISEX WC 165 RH D2A/F3 1000 2250 45 WD WD
15 of 75
Page 32/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
HardwareGroup Qty
OpeningNumber(s) Location 1
To/From Location 2 Hand
DoorType
NominalWidth
NominalHeight
DoorThickness
DoorMat'l
FrameMat'l Label
040 1 165A MULTI-PURPOSE 164 FROM STORAGE 165 LHR/RHRA D2A/F04 900, 900 2250 45 HM HM
041 1 165B MULTI-PURPOSE 166 FROM STORAGE 163 LHR/RHRA D2B/F04 900, 900 2350 45 WD HM
042 1 166A CORRIDOR 160 FROM MULTI-PURPOSE 166 LHR D2A/F05 1000 2250 45 WD AL
043 1 166B CORRIDOR 160 FROM MULTI-PURPOSE 166 LHR D2A/F05 1000 2250 45 WD AL
044 1 167A MULTI-PURPOSE 166 FROM STORAGE 167 LHR/RHRA D2B/F04 900, 900 2250 45 HM HM
045 1 168 CORRIDOR 160 TO ACCESSIBLE W/C 168 RH D2A/F03 1000 2250 45 HM HM
046 1 168A 1 - -
047 1 ST-A2 STAIR A2 FROM CORRIDOR 160 LHR D3/F05 900 2250 45 HM HM 45 MIN
16 of 75
Page 42/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Hardware Schedule
Heading #001
1 Pair of doors B61, CORRIDOR B60 FROM STORAGE B61 LHR/RHRA
Type: D2/F02, 900, 900 x 2350 x 45 - HM DR x HM FR
8 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System2 Flush Bolt GSH 401-12" C26D C26D1 Surface Closer 4050 PA AL DEL AL2 Kick Plate GSH 80A C32D (200 X 876) RC TM C32D2 Wall Door Stop GSH 240B C32D C32D
Heading #002
1 Pair of doors B62, STORAGE B61 FROM HOISTWAY ACCESS B62 LHR/RHRA
Type: D2/F02, 900, 900 x 2350 x 45 - HM DR x HM FR - 45 MIN
8 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Latchset L9010 07B 630 RHR 6302 Flush Bolt FB458-24 ULC C26D C26D1 Surface Closer 4050 PA AL DEL AL1 Overhead Door Stop 904S C32D (110 Deg.) C32D
(Inactive leaf)2 Kick Plate GSH 80A C32D (200 X 876) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
(Active leaf)
17 of 75
Page 52/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #003
1 Pair of doors B63, CORRIDOR B60 FROM MECHANICAL B63 LHR/RHRA
Type: D2/F02, 900, 900 x 2150 x 45 - HM DR x HM FR - 45 MIN
6 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System2 Flush Bolt FB458-24 ULC C26D C26D1 Surface Closer 4050 PA AL DEL AL1 Overhead Door Stop 904S C32D (110 Deg.) C32D
(Inactive leaf)2 Kick Plate GSH 80A C32D (200 X 876) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
(Active leaf)
Heading #004
1 Single door B68, FILTRATION RM B65 TO GROUND HEAT EXCHANGE B68 RH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR - 45 MIN
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 REG AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
18 of 75
Page 62/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #005
1 Single door STA-O, STAIR FROM CORRIDOR B60 RHR
Type: D3/F01, 1000 x 2350 x 45 - HM DR x HM FR - 45 MIN
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Exit Device 98-L-NL-F C26D 996L-NL-R C26D RHR #07 Lever 1000 x 2350 Door C26D/C26D1 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Rim Cylinder 80-159 6261 Surface Closer 4050 REG AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D1 Door Contact 1078-1 BRN BRN
Heading #006
1 Single door 060A, ATHLETIC CORRIDOR 031 TO ENTRY 060 SLIDER
Type: D11, 3020 x 3000 x __ - WD DR x - FR
DOOR DELETED
Heading #007
1 Single door 060B, ENTRY 060 TO UNIVERSAL CHANGE ROOM 064 SLIDER
Type: D5, 2134 x 2352 x __ - AL DR x AL FR
COMPLETE BY MANUFACTURER
Heading #008
1 Single door 060C, ENTRY 060 TO UNIVERSAL CHANGE ROOM 077 SLIDER
Type: D5, 2134 x 2352 x __ - AL DR x AL FR
COMPLETE BY MANUFACTURER
19 of 75
Page 72/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #009
1 Single door 061B, ENTRY 060 TO RECEPTION 061 LH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 PA AL DEL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D1 Door Contact 1078-1 BRN BRN
Heading #010
1 Single door 062, STAFF KITCHEN 062 TO AQUATIC STAFF 063 LH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 PA AL DEL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #011
1 Pair of doors 062A, STAFF KITCHEN 061 FROM ELECT CLOSET 062A LHR/RHRA
Type: D2/F02, 900, 900 x 2350 x 45 - HM DR x HM FR
8 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System2 Flush Bolt FB458-24 ULC C26D C26D2 Overhead Door Stop 452S C32D (110 Deg,) C32D
20 of 75
Page 82/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #012
1 Single door 063, POOL HALL 072 TO AQUATIC STAFF 063 RH
Type: D4/F05, 1000 x 2350 x 45 - AL DR x AL FR
1 Continuous Hinge SL11 CL HD x 2350 CL1 Set Door Pull GSH 1180-2 BTB C32D C32D1 Dead Lock MS1850S-210-628 - RH 6281 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Mortise Cylinder 80-113 6261 Thumb Turn Cylinder 4066-01-130 1301 Surface Closer 4050 REG AL AL1 Mounting Plate 4050-18 AL AL1 Wall Door Stop GSH 240B C32D C32D1 Door Contact 1078-1 BRN BRN
Heading #012A
1 Single door 064A, EXIST ATHLETIC CORRIDOR 031 FROM UNIVERSAL CHANGE ROOM B 064 RHR
Type: D6, 1050 x 2245 x 45 - AL DR x AL FR
1 Continuous Hinge SL40 BLACK HD x 2220 BLACK1 Exit Device 35A-EO C26D RHR 4' Bar 1050 x 2245 Door C26D1 Door Closer 4050 S CUSH x 61 Spacer AL AL
NOTE:HARDWARE TO BE REVIEWED AND CONFIRM.
Heading #012B
1 Single door 064B, UNIVERSAL CHANGE ROOM B 064 TO SHOWER 069 O/H
Type: D10, 1210 x 2400 x 45 - AL DR x AL FR
OVERHEAD DOOR
ALL HARDWARE COMPLETE BY DOOR SUPPLIER
21 of 75
Page 92/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #013
1 Single door 065, UNIVERSAL CHANGE ROOM 064 TO UNIVERSAL TOILET/CHANGE 065 RH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR
3 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Electric Strike 4500C-FS-24VDC-630-LBM 630-LBM1 Auto Door Operator 8500 628 (Pull Side) 6282 Actuator 6R3 630 6301 Indicator CM-AF5001 Push-to-Lock Button CM-400/81 Relay CX-EMF-21 LED Annunciator CM-AF501501 Assistance Requied Light CM-AF140501 Emergency Sign CM-SE21A1 Emergency Strip Nexgen Emerg Strip x 610mm1 Relay TA-2871 - For Emergency Strip1 Power Supply CX-PS313 V31 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #014
1 Single door 067, CORRIDOR 066 FROM ACCESSIBLE W/C 067 LHR
Type: D1/F01, 950 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 LHR 6301 Overhead Door Stop 905S C32D C32D1 Kick Plate GSH 80A C32D (200 x 912) RCTM C32D
22 of 75
Page 102/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #015
1 Single door 068, CORRIDOR 066 FROM ACCESSIBLE W/C 068 LHR
Type: D1/F01, 950 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 LHR 6301 Overhead Door Stop 905S C32D C32D1 Kick Plate GSH 80A C32D (200 x 912) RCTM C32D
Heading #016
1 Single door 069A, UNIVERSAL CHANGE ROOM 064 FROM SHOWER 069 O/H
Type: D10, 1200 x 3200 x __ - AL DR x - FR
DOOR DELETED
Heading #017
1 Single door 069, POOL HALL 072 FROM SHOWER 069 O/H
Type: D10, 1610 x 3200 x __ - AL DR x - FR
OVERHEAD DOOR
COMPELTE BY DOOR SUPPLIER
23 of 75
Page 112/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #018
1 Single door 070, EXTERIOR TO CHOLRINE STORAGE 070 RH
Type: D1/F01, 900 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 REG AL AL1 Floor Door Stop GSH 209 C26D C26D1 Door Sweep W-24S-CA x 900 CA1 Threshold CT-45 x 9001 Weatherstripping W-20S-CA 1 x 900 + 2 x 2350 CA1 Door Contact 1078-1 BRN BRN
Heading #019
1 Pair of doors 071, EXTERIOR FROM HOISTWAY SHAFT 071 LHR/RHRA
Type: D2/F02, 900, 900 x 2350 x 45 - HM DR x HM FR
8 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System2 Flush Bolt GSH 401-12" C26D C26D1 Surface Closer 4050 S CUSH AL AL2 Kick Plate GSH 80A C32D (200 X 876) RC TM C32D1 Threshold CT-45 x 18001 Weatherstripping W-20S-CA 1 @ 1800 + 2 @ 2350 CA2 Door Sweep W-24S-CA x 900 CA1 Astragal W-5 x 23502 Door Contact 1078-1 BRN BRN
24 of 75
Page 122/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #020
1 Single door 072, ENTRY 006 FROM VIEW IN AREA 072 RHR
Type: D4/F05, 900, 900 x 2650 x 45 - AL DR x AL FR
2 Continuous Hinge SL11 CL HD x 26251 Dead Lock MS1850S-210-628 6281 Thumb Turn Cylinder 4066-01-130 1301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Mortise Cylinder 80-113 6261 Set Door Pull GSH 1180-2 BTB C32D C32D2 Surface Closer 4050 PA AL DEL AL1 Flush Bolts Flush Bolts - By Door Supplier2 Mounting Plate 4050-18TJ AL AL1 Wall Door Stop GSH 240B C32D C32D2 Door Contact 1078-1 BRN BRN
Heading #020A
1 Elevation 072B, POOL HALL FROM STAIR B RH
915 x 1800 x 13 - GL DR x - FR
1 Hinge Tensor 812.520.1141 Patch Lock S104 B C32D C32D1 Mortise Cylinder 80-131 x B520-296 6261 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Strike GSH Custom ASA Strike w/ Stop
Heading #021
1 Single door 073A, POOL HALL 072 FROM POOL STORAGE 073 RHR
Type: D1/F01, 1210 x 2150 x 45 - HM DR x HM FR
1 Continuous Hinge SL11 CL HD x 21251 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Overhead Door Stop 906S C32D C32D
25 of 75
Page 132/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #022
1 Single door 073B, POOL HALL 072 FROM POOL STORAGE 073 LHR
Type: D1/F01, 1210 x 2150 x 45 - HM DR x HM FR
1 Continuous Hinge SL11 CL HD x 21251 Lockset L9080HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Overhead Door Stop 906S C32D C32D
Heading #023
1 Single door 075, POOL HALL 072 FROM POOL STORAGE 075 RHR
Type: D2A/F06, 800 x 2350 x 45 - AL DR x AL FR
1 Continuous Hinge SL11 CL HD x 21251 Lockset L9080HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Overhead Door Stop 905S C32D C32D
Heading #024
1 Single door 076, POOL HALL 072 TO STEAM ROOM 076 RH
Type: D4/F05, 1000 x 2350 x 45 - AL DR x AL FR
1 Continuous Hinge SL11 CL HD x 2350 CL1 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Mortise Cylinder 80-113 6261 Dead Lock MS1850S-210-628 - RH 6281 THUMBTURN CYLINDER 09-900 X AR CAM 626 6261 Set Door Pulls GSH 165F x 165F Wood BTB Oak OAK1 Roller Latch GSH 404H S C32D S C32D
NOTE:WEATHER SEAL COMPLETE BY DOOR MANUFACTURER
26 of 75
Page 142/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #024A
1 Single door 077A, EXIST ATHLETIC CORRIDOR 031 FROM UNIVERSAL CHANGE ROOM A 077 LHR
Type: D6, 1050 x 2845 x 45 - AL DR x AL FR
1 Continuous Hinge SL40 BLACK HD x 2820 BLACK1 Exit Device 35A-EO C26D LHR 4' Bar 1050 x 2845 Door C26D1 Door Closer 4050 S CUSH x 61 Spacer AL AL
NOTE:HARDWARE TO BE REVIEWED AND CONFIRM.
Heading #024B
1 Single door 077B, UNIVERSAL CHANGE ROOM A 077 TO SHOWER 082 O/H
Type: D-10, 1210 x 2400 x 45 - AL DR x - FR
OVERHEAD DOOR
ALL HARDWARE COMPLETE BY DOOR SUPPLIER
27 of 75
Page 152/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #025
1 Single door 078, UNIVERSAL CHANGE ROOM 077 TO UNIVERSAL TOILET/CHANGE 078 LH
Type: D1/F01, 1000 x 2150 x 45 - HM DR x HM FR
3 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 LH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Electric Strike 4500C-FS-24VDC-630-LBM 630-LBM1 Auto Door Operator 8500 628 (Pull Side) 6282 Actuator 6R3 630 6301 Indicator CM-AF5001 Push-to-Lock Button CM-400/81 Relay CX-EMF-21 LED Annunciator CM-AF501501 Assistance Requied Light CM-AF140501 Emergency Sign CM-SE21A1 Emergency Strip Nexgen Emerg Strip x 610mm1 Relay TA-2871 - For Emergency Strip1 Power Supply CX-PS313 V31 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #026
1 Single door 080, CORRIDOR 079 FROM ACCESSIBLE W/C 080 RHR
Type: D1/F01, 950 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 RHR 6301 Overhead Door Stop 905S C32D C32D1 Kick Plate GSH 80A C32D (200 x 912) RCTM C32D
28 of 75
Page 162/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #027
1 Single door 081, CORRIDOR 079 FROM ACCESSIBLE W/C 081 RHR
Type: D1/F01, 950 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 RHR 6301 Overhead Door Stop 905S C32D C32D1 Kick Plate GSH 80A C32D (200 x 912) RCTM C32D
Heading #028
1 Single door 082A, UNIVERSAL CHANGE ROOM 077 FROM SHOWER 082 O/H
Type: D10, 1200 x 2400 x __ - AL DR x - FR
DOOR DELETED
Heading #029
1 Single door 082B, POOL HALL 072 FROM SHOWER 082 O/H
Type: D10, 1550 x 3200 x __ - AL DR x - FR
OVERHEAD DOOR
COMPELTE BY DOOR SUPPLIER
29 of 75
Page 172/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #030
1 Single door 083, NEW VESTIBULE EXIT 083 FROM POOL HALL 072 LHR
Type: D4/F05, 1000 x 2650 x 45 - AL DR x AL FR
1 Continuous Hinge SL11 CL HD x 26251 Exit Device 98EO C32D x 98ALK - LHR C32D1 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Mortise Cylinder 80-132 6261 Surface Closer 4050 REG AL AL1 Mounting Plate 4050-18TJ AL AL1 Floor Door Stop GSH 209 C26D C26D1 Door Contact 1078-1 BRN BRN
NOTE:ALARM KIT BUILT INTO EXIT DEVICE.
Heading #031
1 Single door 083B, EXTERIOR FROM NEW VESTIBULE EXIT 083 LHR
Type: D3A/F04, 1048 x 2660 x 45 - WD DR x HM FR
1 Continuous Hinge SL11 CL HD x 26251 Exit Device 98EO C32D LHR 1048 x 2660 Door C32D1 Surface Closer 4050 TJ AL AL1 Drop Plate 4050-18G AL AL1 Overhead Door Stop 905S C32D C32D1 Threshold CT-45 x 10001 Door Sweep W-24S-CA x 1000 CA1 Door Contact 1078-1 BRN BRN
BALANCE OF WEATHER SEAL BY DOOR SUPPLIER
30 of 75
Page 182/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #032
1 Single door ST-A1, STAIR A1 FROM POOL HALL 072 RHR
Type: D3, 1000 x 2350 x 45 - HM DR x HM FR - 45 MIN
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D2 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Rim Cylinder 80-159 6261 Mortise Cylinder 80-132 6261 Exit Device 98L-F C32D 996L-NL ALK C26D #07 Lever - RHR C26D/C32D1 Surface Closer 4050 REG AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D1 Door Sweep W-24S-CA x 900 CA1 Door Contact 1078-1 BRN BRN
NOTE:ALARM KIT BUILT INTO EXIT DEVICE.
Heading #033
1 Single door ST-A1B, EXTERIOR FROM STAIR A1 RHR
Type: D1, 1000 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Exit Device 98EO C32D RHR 1000 x 2350 Door C32D1 Surface Closer 4050 S CUSH AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Threshold CT-45 x 9001 Weatherstripping W-20S-CA 1 x 900 + 2 x 2350 CA1 Door Sweep W-24S-CA x 900 CA1 Door Contact 1078-1 BRN BRN
31 of 75
Page 192/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #034
1 Single door 160A, CORRIDOR 160 FROM MECHANICAL LHR
Type: D2A/F03, 1000 x 2250 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 1450 S CUSH AL AL1 Wall Door Stop GSH 240B C32D C32D1 Threshold CT-45 x 10001 Door Sweep W-24S-CA x 1000 CA1 Weatherstripping W-20S-CA 1 x 1000 + 2 x 2350 CA1 Door Contact 1078-1 BRN BRN
Heading #035
1 Single door 160B, MECHANCIAL TO GREEN ROOF RH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 S CUSH AL AL1 Threshold CT-45 x 1000
Heading #036
1 Single door 161, CORRIDOR 160 TO ELECTRICAL 161 RH
Type: D2A/F03, 1000 x 2250 x 45 - HM DR x HM FR - 45 MIN
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 RH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 1450 Rw/PA AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
32 of 75
Page 202/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #037
1 Single door 162, CORRIDOR 160 FROM OFFICE 162 LHR
Type: D2A/F05, 1000 x 2250 x 45 - WD DR x AL FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 TJ DEL AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #038
1 Single door 163, OFFICE 162 TO LAN ROOM 163 LH
Type: D1/F01, 1000 x 2350 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Lockset L9080HD 07B 630 LH 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Wall Door Stop GSH 240B C32D C32D1 Door Contact 1078-1 BRN BRN
Heading #039
1 Single door 164, CORRIDOR 160 FROM MULTI-PURPOSE 164 LHR
Type: D2A/F05, 1000 x 2250 x 45 - WD DR x AL FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 TJ DEL AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
33 of 75
Page 212/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #039A
1 Single door 164A, MULTI-PURPOSE 164 FROM STORAGE 164A RHR
Type: D2A/F3, 1000 x 2250 x 45 - HM DR x HM FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Wall Door Stop GSH 240B C32D C32D
Heading #039B
1 Single door 165, 2ND FLOOR CORRIDOR 160 TO UNISEX WC 165 RH
Type: D2A/F3, 1000 x 2250 x 45 - WD DR x WD FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 RH 6301 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #040
1 Pair of doors 165A, MULTI-PURPOSE 164 FROM STORAGE 165 LHR/RHRA
Type: D2A/F04, 900, 900 x 2250 x 45 - HM DR x HM FR
DOOR DELETED
Heading #041
1 Pair of doors 165B, MULTI-PURPOSE 166 FROM STORAGE 163 LHR/RHRA
Type: D2B/F04, 900, 900 x 2350 x 45 - WD DR x HM FR
DOOR DELETED
34 of 75
Page 222/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #042
1 Single door 166A, CORRIDOR 160 FROM MULTI-PURPOSE 166 LHR
Type: D2A/F05, 1000 x 2250 x 45 - WD DR x AL FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 TJ DEL AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #043
1 Single door 166B, CORRIDOR 160 FROM MULTI-PURPOSE 166 LHR
Type: D2A/F05, 1000 x 2250 x 45 - WD DR x AL FR
3 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 LHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 TJ DEL AL AL1 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #044
1 Pair of doors 167A, MULTI-PURPOSE 166 FROM STORAGE 167 LHR/RHRA
Type: D2B/F04, 900, 900 x 2250 x 45 - HM DR x HM FR
8 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Lockset L9070HD 07B 630 RHR 6301 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Bolt GSH 72 x 24" C26D C26D2 Overhead Door Stop 454S C32D (90 Deg.) C32D
35 of 75
Page 232/10/17
Upper Canada Specialty Hardware7100 Warden Ave.Unit 1Markham, Ontario, L3R 8B5
Wellesley Community CentrePhase 2 - Pool Addition
Submittal Date: February 10, 2017
Heading #045
1 Single door 168, CORRIDOR 160 TO ACCESSIBLE W/C 168 RH
Type: D2A/F03, 1000 x 2250 x 45 - HM DR x HM FR
4 Standard Hinge STSCB1391 114 x 101 NRP 32D 32D1 Privacy Set L9040 07B 630 RH 6301 Kick Plate GSH 80A C32D (200 X 965) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D
Heading #046
1 Single door 168A
1 x __ x __ - - DR x - FR
DELETE - RESERVE HEADING FOR FUTURE USE
Heading #047
1 Single door ST-A2, STAIR A2 FROM CORRIDOR 160 LHR
Type: D3/F05, 900 x 2250 x 45 - HM DR x HM FR - 45 MIN
4 Standard Hinge STSCB1399 114 X 101 NRP 32D 32D1 Exit Device 98-L-NL-F C26D 996L-NL-R C26D LHR #07 Lever 900 x 2250 Door C26D/C26D1 Rim Cylinder 80-159 6261 Cylinder Cyl. Schlage Everest B123 Keyed to Exist. MK System1 Surface Closer 4050 REG AL AL1 Kick Plate GSH 80A C32D (200 X 876) RC TM C32D1 Wall Door Stop GSH 240B C32D C32D1 Weatherstripping W-22-BL x 5600 BL1 Door Contact 1078-1 BRN BRN
36 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 1Project No. 1311 February 15, 2017
Architectural Drawings ADD2
3a. LANDSCAPE DRAWING REVISIONS + CLARIFICATIONS
Drawing L100-A LANDSCAPE REMOVALS PLAN - A.1
a) ADD the following note to the drawing legend: Where sub—base is to be retained under the removal of paving contractor shall verify depth of sub-base materials to comply with details 6, 7, & 8/L500. (No sketch issued)
b) ADD the following note to the drawing legend: Existing pedestrian concrete to remain damaged by construction activities to be repaired or replaced in kind. (No sketch issued)
c) ADD the following note to the drawing legend: Removals plan to be read in conjunction with L101A & B. (No sketch issued)
d) DELETE duplicate note.REFER TO ADD2-010
Drawing L100-B LANDSCAPE REMOVALS PLAN - B.1
a) Refer comments .1 & .2 above.
b) ADD hatch and note.REFER TO ADD2-010
Drawing L101-A LAYOUT AND MATERIALS PLAN – A & Drawing L101-B LAYOUT AND MATERIALS PLAN
.1 L101-A, L101-B
a) ADD notes.REFER TO ADD2-011
Drawing L102-B GRADING PLAN – B .1
a) REVISE hatch to show existing concrete.b) ADD markers showing where new meets existing.c) DELETE marker showing where new meets existing.REFER TO ADD2-012
Drawing L500 LANDSCAPE DETAILS .8/L500
a) ADD new detail on existing sheet.REFER TO ADD2-0113
37 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 2Project No. 1311 February 15, 2017
Architectural Drawings ADD2
3b. ARCHITECTURAL DRAWING REVISIONS + CLARIFICATIONS
Drawing A002– SITE PLAN.1 4/A002
a) REVISE note to indicate existing sidewalk to be removed and replacedREFER TO ADD2-014
Drawing A102– GROUND FLOOR PLAN.1 1/A102
a) DELETE elevation tag reference to 1/zA325NO SKETCH ISSUE
Drawing A103– SECOND FLOOR PLAN.1 1/A103
a) DELETE elevation tag reference to 1/zA325NO SKETCH ISSUE
Drawing A104– ROOF PLAN.1 1/A104
a) DELETE elevation tag reference to 1/zA325b) DELETE elevation tag reference to 1/CofA-A010c) DELETE elevation tag reference to C1Fa_8.5x11_A010d) REVISE south scupper width to 400e) REVISE north scupper location and width to 400f) ADD reference tag 6/A323 north of GL-12y across GL-HNO SKETCH ISSUE FOR ITEMS a) b) and c) above
REFER TO ADD2-009 FOR ITEMS d) e) and f) above
Drawing A111– RCP BASEMENT & GROUND FLOOR, DEMO RCP GROUND FLOOR.1 5/A111
a) ADD furring type F1 at north and south wall of Entry Rm 060.b) REVISE slot for OH coiling door as indicated and dimensionedc) ADD reference to 3/A113 as indicatedd) ADD dimension to locate speaker
38 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 3Project No. 1311 February 15, 2017
Architectural Drawings ADD2
e) REVISE dimension b/w diffuser and light fixture as notedf) REVISE dimension for wood ceiling to “EQ” at both ends in Entry Rm 060g) ADD note regarding wall finish to extent above ceilingh) REVISE further as indicatedREFER TO ADD2-001
Drawing A401– CHANGE ROOMS - LOCKERS AND CHANGE STALLS.1 1/A401
a) ADD furring type F1 at north and south wall of Entry Rm 060.b) REVISE partition type from P3 to PG2T near door # 061Bc) ADD plan detail 8/A406d) REVISE dimensions as notede) REVISE further as indicatedREFER TO ADD2-002
Drawing A402– CHANGE ROOMS – UNIVERSAL WC AND ACCESSIBLE WC.1 10/A402
a) DELETE reference tag 10/A412 for clarityNO SKETCH ISSUE
Drawing A406 – ADMIN AREAREFER TO RE-ISSSUED SHEET A406.1 1/A406 and 2/A406
a) ADD note and dimension for furring partition to extent above ceilingb) ADD dash line to indicate door frame beyond for clarityc) REVISE “TL-10 BEHIND GLASS DOOR” to “BACK PAINTED GLASS BEHIND GLASS
DOOR”
d) ADD vertical dimension of clear opening for clarity.2 3/A406
a) ADD furring type F1 at north and south wall of Entry Rm 060.b) ADD note “TILE FINISH ON” above furring tag “F1” at north and south wall of Entry Rm
060.
c) ADD “ON RETURN” below finish tag “TL-15”d) REVISE “SSF-1” extent above opening as noted
.3 4/406
39 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 4Project No. 1311 February 15, 2017
Architectural Drawings ADD2
a) ADD furring type F1 at north and south wall of Entry Rm 060 w/ note “TILE FINISH ON” above furring tag
b) ADD note for furring partition to extent above ceilingc) ADD note “SIMILAR SSF LAYOUT ON EITHER SIDE AND ABOVE ON WEST SIDE
OF DOOR”
.4 5/A406
a) DELETE notes (2) “WALL EXPANSION JOINT COVER”b) REVISE floor expansion joint as indicatedc) REVISE note “25mm EXPANSION JOINT” to ”EXPANSION JOINT IN TILE” d) DELETE note “REMOVEABLE TACKBOARD”e) ADD arrow from “TYPICAL REMOVABLE SOLID SURFACE” pointing to the middle
panel
f) REVISE notes (2) “TILE FINISH” to “BACK PAINTED GLASS ON 13mm EXTERIOR GRADE PLYWOOD”
g) REVISE further as noted.5 6/A406
a) DELETE expansion joint coverb) REVISE note “TILE TO TILE FLOOR EXPANSION JOINT” to “EXPANSION JOINT IN
TILE”
.6 8/A406
a) ADD new detail 8/A406.7 9/A406
a) ADD new detail 9/A406
Drawing A410– POOL HALL PARTIAL PLANS & SECTIONS.1 1/A410
a) ADD door number 072Bb) REVISE glass door to a single doorREFER TO ADD2-007
Drawing A450 – INTERIOR DETAILS.1 5/A450
c) REVISE partition type from “P3” to “PG2T”d) ADD fire proofing around columne) ADD align note b/w tile and face of door framef) ADD “SSF-1” finish east of “PG2T” partition and jamb returng) ADD blocking for door frames
40 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 5Project No. 1311 February 15, 2017
Architectural Drawings ADD2
h) ADD furring partition type “F1” beside door framei) REVISE further as notedREFER TO ADD2-003
.2 9/A450
a) DELETE note “RATED VERTICAL EXPANSION JOINT?”b) DELETE note “CONTINUE RATED TILE BACKER BOARD FOR COLUMN
PROTECTION”
c) ADD fire proofing around column and note “FIRE RATED COL”d) REVISE note “ALU COVER JOINT W/ RUBBER INSERT. COLOUR TO MATCH WALL”
to “TILE JOINT AT TRANSITION B/W NEW AND EXISTING CONCRETE STRUCTURE. EXPANSION JOINT IN TILE”
e) REVISE note “EXPANSION JOINT COLOUR TO MATCH FLOOR FINISH” to “EXPANSION JOINT IN FLOOR TILE”
f) REVISE detail over expansion joint as indicatedREFER TO ADD2-004
.3 15/A450
a) REVISE note “EXPANSION JOINT” to “EXPANSION JOINT IN TILE IN FLOOR AND WALL”
b) REVISE EXPANSION JOINT AS INDICATEc) REVISE further as indicatedREFER TO ADD2-005
.4 16/A450
a) REVISE note “EXPANSION JOINT” to “EXPANSION JOINT IN TILE IN FLOOR AND WALL”
b) REVISE EXPANSION JOINT AS INDICATE
c) REVISE further as indicatedREFER TO ADD2-006
Drawing A451 – INTERIOR DETAILS.1 1/A451
a) ADD alignment lines between east and west side of guard.b) ADD note “GAPS TO ALIGN ON BOTH SIDES”c) REVISE dimensions from “4 EQ. PANELS W/ 50mm GAP” to “4 EQ. PANELS W/ GAPS
AS INDICATED”
d) ADD note “EXPANSION JOINT IN TILE” at south end of bridgee) REVISE dimension for bridge as indicatedf) ADD notes (2) “ALIGN INTERIOR FACE OF STEEL GUARD WITH WALL FINISH”
41 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 6Project No. 1311 February 15, 2017
Architectural Drawings ADD2
g) DELETE notes (2) “WORKING PLANE INSIDE FACE OF STEEL GUARD”h) ADD note “EXPANSION JOINT W/ COVER” at north end of bridgei) REVISE further as indicated.REFER TO ADD2-018
.2 2/A451
a) REVISE drawing as indicatedREFER TO ADD2-019
.3 3/A451
a) ADD dimensions as noted.REFER TO ADD2-020
.4 4/A451
a) REVISE note “EXPANSION JOINT” to “EXPANSION JOINT IN TILE” at ceilingb) ADD note “EXPANSION JOINT W/ COVER”
REFER TO ADD2-021
Drawing A600 – STAIRREFER TO RE-ISSSUED SHEET A600.1 1/A600
a) REVISE dimensions.b) ADD new section detail reference.
.2 2/A600
a) REVISE stair guard.b) REVISE stair riser height.c) REVISE riser breakdown and landing height.d) ADD guard height dimensions.
.3 3/A600
a) REVISE landing and stair set out dimensions.b) ADD new section detail and reference.c) ADD dimensions.
.4 4/A600
a) ADD new section detail and reference.b) ADD door reference ST-A1B.c) ADD dimensions.d) REVISE integral dome reference.
.5 5/A600
42 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 7Project No. 1311 February 15, 2017
Architectural Drawings ADD2
a) ADD new section detail and reference.b) ADD dimensions.c) REVISE landing height.d) REVISE dimensions.
.6 5b/A600
a) ADD new section 5b/A600..7 6/A600
a) ADD dimensions.b) REVISE expansion joint note.c) REVISE dimensions.
.8 6/A600
a) ADD dimensions.b) REVISE dimensions.c) DELETE nosing at steel pan stair.d) ADD new detail and reference 9/A902.e) ADD new detail and reference 19/A600.f) CLARIFICATION: Spray applied AB cross referenced to spec as INS-28 with thermal
barrier (as noted in ADD1 issued February 10 2017)
.8 10/A600a) ADD note regarding picket spacing.b) ADD note regarding guard construction.c) ADD dimension.d) REVISE steel support location.e) CLARIFICATION dashed line of stringer beyond.
.9 11/A600
f) ADD note: contractor to coordinate door header location w/ stair landing..10 13/A600
a) ADD handrail supports.b) ADD dimensions.c) ADD new detail and reference 7/A902.d) CLARIFICATION note describing handrail as SST-POWDER added.
.11 15/A600
a) ADD south handrail.b) ADD dimensions.c) REVISE dimensions
43 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 8Project No. 1311 February 15, 2017
Architectural Drawings ADD2
d) REVISE detail reference for detectable warning surface.e) DELETE reference to expansion joint.
.12 16/A600
a) ADD new detail and reference 19/A600.b) ADD dimensions.c) REVISE handrail.d) REVISE dimensions.e) CLARIFICATION finish outline shifted to align with stair.
.13 17/A600
a) ADD reinforcement to concrete masonry units as required to support ladder..14 16/A600
a) ADD new detail and reference 19/A600..15 19/A600
a) ADD new detail 19/A600..16 20/A600
a) ADD new detail 20/A600.
Drawing A701– EXTERIOR AND INTERIOR SCREEN .1 31/A701
a) REVISE as indicatedREFER TO ADD2-007
.2 GLASS AND FRAME TYPES
a) ADD notes 7,8 and 9 as indicated to “GENERAL NOTES:”b) ADD note 4 as indicated to “CURTAIN WALL NOTES:”REFER TO ADD2-008
Drawing A801 – DOOR SCHEDULE & DETAILSREFER TO RE-ISSSUED SHEET A406.1 DOOR SCHEDULE
a) REVISE as indicated.2 1/A801
a) REVISE note “PREFINISHED ALUM CLOSER BY GLAZING CONTRACTOR SHIM AS REQ’D” to “PREFINISHED ALUM CLOSER ON BOTH SIDES BY GLAZING CONTRACTOR BLOCKING AS REQ'D”
b) ADD notes (2) “ALIGN” on both side of door frame.c) REVISE further as noted
44 of 75
Wellesley Community Centre Phase 2 – Pool Addition Addendum 02MacLennan Jaunkalns Miller Architects Page 9Project No. 1311 February 15, 2017
Architectural Drawings ADD2
Drawing A902 – FINISH SCHEDULE, RB SCHEDULE & TYP. FLOOR FINISH DETAILS.1 7/A902
a) ADD new section detail 7/A902.REFER TO ADD2-015
.2 8/A902
a) ADD new section detail 8/A902.REFER TO ADD2-016
.3 9/A902
a) ADD new section detail 9/A902.REFER TO ADD2-017
END OF ARCHITECTURAL DRAWING REVISIONS + CLARIFICATIONS.
45 of 75
N
Q
13x
P7
A406
3
A350 13y
OS
sp
av
152
305 2440 305
152
550
1105
750
216
EQ. EQ.
SLOT FOR OH
COILING DOOR
SPRINKLER IN BLANK OFF
PANEL. SEE CHANGER OOM
CLG FOR DETAIL
2440
os
64 25
114
25
EQ
EQ
3 ADD2
3 A113
Sim
3 A113
Sim
3 A113
Sim
WALL FINISH TO EXTENT
ABOVE CEILING HEIGHT.
TYP
3 ADD2
F1
F1
/REF 5 A111
3 ADD2
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 8:34:14 AM
1 : 50
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-001
ADDENDUM 2
1 : 50
ENTRY / RECEPTION CEILING - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
46 of 75
13
H
N
Q
A406
4
21
3
ENTRY
060
F1C
FD1
P060B
5
A406
410
3609
7
A406
3
A350
P3P3
1
A501
13y
5
A450
PG2T
FEC
F1C
PG2T
3211
061B
12
A501PG2TPG2T
8
A406
1200
683
F1
FL-2A
F1
3 ADD2
/REF 1 A401
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 8:34:39 AM
1 : 50
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-002
ADDENDUM 2
1 : 50
PARTIAL OF CHANGE ROOM - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
47 of 75
Q
P
13y
FIRE PROOFED
COL
GLAZED SLIDING ALUM
DOOR
REFER TO SCHEDULE
REFER TO A406 FOR
ADDITIONAL DETAIL
PG2T
TILE FINISH
TILE FINISH
PROVIDE BLOCKING
AT DOOR FRAME
HM DOOR FRAME
295
SSF-1
TILE FINISH
F1
SSF-1
ALIGN
PG2T
CAULKING B/W FINISH
AND DOOR FRAME
/REF 5 A450
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 8:34:57 AM
1 : 10
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-003
ADDENDUM 2
1 : 10
PLAN DETAIL - RATED COLUMN @ 13y & Q - ADD2
REV. DESCRIPTION DATE
2 ADDENDUM 1 02 10 2017
48 of 75
H
N
10y9y
800
150
TILE FINISH
LARGE FORMAT PORCELAIN TILE
F1C
F1C
F1C
CORNER METAL TRIM
LARGE FORMAT PORCELAIN TILECORNER METAL
TRIM
VERIFY DIMENSIONS &
LOCATIONS OF EXISTING
STRUCTURE ON SITEEXIST.LOBBY002
EXPANSION JOINT
IN FLOOR TILETILE JOINT AT TRANSITION B/W NEW AND EXISTING
CONCRETE STRUCTURE. EXPANSION JOINT IN TILE
550
74
287
PROVIDE BLOCKING AS
REQ'D FOR GRAB BAR
FIRE RATED COL
3 ADD2
/REF 9 A450
3 ADD2
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 8:35:21 AM
1 : 10
1311
AuthorADD2-004
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 10
GROUND FLOOR PLAN DETAIL @ GL-H/10y - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
49 of 75
15
H
N
15y15x
470 817 745
Sc-064a
EXIST. ATHLETIC CORRIDOR
031
UNIVERSAL CHANGE ROOM B
064
1000 518 9
12mm LAMINATED GLASS W/
COLOURED INTERLAYER ON
19mm PLY ON
STUDS
LARGE FORMAT TILE FINISH
EXPANSION JOINT IN TILE IN
FLOOR AND WALL
TILE TO MATCH FLOOR TILE IN
CHANGE ROOM
TL
TL
TILE TRANSITION
REFER TO FINISH PLAN FOR TILE
TYPE
29
A701
30
A70128
A701
3 ADD2
/REF 15 A450
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 8:35:40 AM
1 : 10
1311
AuthorADD2-005
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 10
PLAN DETAIL SC-064A - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
50 of 75
11
H
N
11x 11y2 A351
12mm LAMINATED GLASS W/
COLOURED INTERLAYER ON
19mm PLY ON
STUDS
LARGE FORMAT TILE FINISH
Sc-077a
EXIST. ATHLETIC CORRIDOR
031
28
A701
30
A701
EXPANSION JOINT IN TILE IN
FLOOR AND WALL
TILE TO MATCH FLOOR TILE IN
CHANGE ROOM
TL
TL
TILE TRANSITION
REFER TO FINISH PLAN FOR TILE
TYPE
12mm LAMINATED GLASS W/
COLOURED INTERLAYER ON
19mm PLY ON
STUDS
3 ADD2
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 8:36:04 AM
1 : 10
1311
AuthorADD2-006
WELLESLEY COMMUNITY CENTER
ADDENDUM 2REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
1 : 10
PLAN DETAIL SC-077a - ADD2
51 of 75
X
16z
STAIR
B
TDA701
31
GLASS DOOR
F1C
FEC
TH
15 A402
Sim
3 ADD2
/REF 1 A410
072B
LEVEL 1 (+110.95)
+0
Pool Platform
+2660
13
A600
SS HINGES W/ HOLD
OPEN AT 90 DEG
SS KEYED LOCK TO
RELEASE LATCH.
1000
GL-7
200
SS WALL MOUNTED
LATCH CATCHER
TILE FINISH ON CMU
REFER TO HARDWARE SCHEDULE.
GC TO COORD WITH GLASS AND
HARDWARE SUPPLIER
FINAL WIDTH OF
GLASS TBC ON SITE
1800
3 ADD2
/REF 31 A701
Scale:
Drawn By:
Project No: Drawing No:
SEAL
2/15/2017 8:36:48 AM
1 : 50
1311
AuthorADD2-007
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 50
LEVEL 1 - POOL HALL - ADD2
1 : 50
POOL STAIR DOOR ELEVATION - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
52 of 75
GLASS TYPES:
GL3 POOL LOWER: INSULATED GLASS UNIT - CLEAR - FRIT
OUTER LITE: 8MM CLEAR TEMPERED GLASS
CERAMIC FRIT PATTERN - 5MM DIA. DOTS @ 100MM O.C ON SURFACE 2
LOW E COATING ON SURFACE 3
13MM THERMAL SPACER BAR
INNER LITE: 10MM (2x5MM) CLEAR TEMPERED LAMINATED GLASS W/
CLEAR INTERLAYER
GL1 POOL UPPER AND MULTI PURPOSE BLOCK: INSULATED GLASS UNIT - CLEAR - FRIT
OUTER LITE: 6MM CLEAR HEAT STRENGTHENED GLASS
CERAMIC FRIT PATTERN - 5MM DIA. DOTS @ 100MM O.C ON SURFACE 2
LOW E COATING ON SURFACE 3
13MM THERMAL SPACER BAR
INNER LITE: 6MM CLEAR HEAT STRENGTHENED GLASS
GL2 POOL UPPER (CLERESTORY): INSULATED GLASS UNIT - CLEAR - FRIT
OUTER LITE: 6MM CLEAR TEMPERED GLASS
CERAMIC FRIT PATTERN - 5MM DIA. DOTS @ 100MM O.C ON SURFACE 2
LOW E COATING ON SURFACE 3
13MM THERMAL SPACER BAR
INNER LITE: 12MM (2x6MM) CLEAR HEAT STRENGTHENED LAMINATED GLASS W/
CLEAR INTERLAYER
GL6 RESERVED
GL7 INTERIOR SCREENS (POOL): 12MM (2x6MM) CLEAR TEMPERED LAMINATED GLASS W/
CLEAR INTERLAYER TYPICAL
GL8 GLASS BALUSTRADE: 16MM (8MM+8MM) CLEAR HEAT STRENGTHENED LAMINATED GLASS W/
CLEAR INTERLAYER
FRAME TYPES:
EXTERIOR GLAZING
CW1 CURTAIN WALL, HIGH SPAN
63.5mm X 203mm PTD ALUM BACK SECTIONS
4 SIDED SSG (INCLUDES NO PERIMETER CAPS)
GLASS: VARIES (REF. A200 SERIES BUILDING ELEVATIONS)
CW2 CURTAIN WALL, LOW SPAN
63.5mm X 133mm PTD ALUM BACK SECTIONS
4 SIDED SSG (INCLUDES NO PERIMETER CAPS)
GLASS: VARIES (REF. A200 SERIES BUILDING ELEVATIONS)
SL-1 42mm ALUM. CHANNEL FRAMING (TOP & BOTTOM)
GL4 POOL LOWER: INSULATED GLASS UNIT - CLEAR - FRIT
OUTER LITE: 6MM CLEAR TEMPERED GLASS
CERAMIC FRIT PATTERN - 5MM DIA. DOTS @ 100MM O.C ON SURFACE 2
LOW E COATING ON SURFACE 3
13MM THERMAL SPACER BAR
INNER LITE: 6MM CLEAR TEMPERED GLASS
GL7a INTERIOR SCREENS (POOL): 12MM (2x6MM) CLEAR TEMPERED LAMINATED GLASS W/
TRANSLUCENT INTERLAYER TO DESK HEIGHT
GL5 INTERIOR SCREENS (STEAM ROOM): INSULATED GLASS UNIT - CLEAR - NO FRIT
OUTER LITE: 6MM (3MM+3MM) CLEAR TEMPERED LAMINATED GLASS W/
CLEAR INTERLAYER
13MM THERMAL SPACER BAR
INNER LITE: 6MM (3MM+3MM) CLEAR TEMPERED LAMINATED GLASS W/
CLEAR INTERLAYER
GL9 INTERIOR SCREENS: 12MM CLEAR TEMPERED GLASS
AL-1 THERMALLY BROKEN ALUM CHANNEL FRAME FOR IGU. (TOP & BOTTOM)
GENERAL NOTES:
1. SCREEN SYSTEM TYPES ARE NOTED ON SCHEDULE. REFER TO PROJECT MANUAL.
2. SCHEDULE INDICATES MINIMUM GLASS THICKNESSES, INCREASE GLASS THICKNESS TO MEET
ALL APPLICABLE CODES AND SAFTY STRENGTH AND DEFLECTION REQUIREMENTS FOR LOAD AND SIZE
BASED ON ASTM E 1300.
3. ALL EXTERIOR IGU IS TO HAVE 5MM DIA CERAMIC FRIT PATTERN @ 100 X 100mm O.C.
TO MEET TORONTO GREEN STANDARDS FOR MIGRATORY BIRDS TYP.
4. PROVIDE CONTINUOUS STEEL SUPPORTS AND BRACING BACK TO PRIMARY STRUCTURE AS NECESSARY-
CONCEALED ABOVE CEILING AND ACROSS HEAD OF ALL FULL HEIGHT GLASS PARTITION: TO BE DESIGNED
UNDER DIRECT SUPERVISION OF REGISTERED PROFESSIONAL STRUCTURAL ENGINEERS,
BRACES AT SCREENS REQUIRED TO ACT AS GUARDS SHOULD BE DESIGNED ACCORDINGLY
TO MEET REQUIREMENTS.
5. SITE VERIFY ALL GLAZED OPENING DIMENSIONS.
6. INTERMEDIATE DIMENSIONS ARE GENERALLY TO THE CENTERLINE OF THE FRAME.
7. REFER TO DOOR SCHEDULE FOR DOOR TYPES.
8. REFER TO JAMB SCHEDULE FOR JAMB TYPES.
9. FOR MIRRORS AND BACKPAINTED GLASS: COORDINATE OPENINGS REQUIRED FOR WALL MOUNTED FIXTURES,
ACCESSORIES AND RECEPTACLES AS REQUIRED.
CW3 RESERVED
CLEAR GLASS, ALL TYPES SHADOW BOXsb CLOSURE PANELcp
SF-1
SF-2
45 x115mm INTERIOR ALUM. STOREFRONT FRAME FOR SINGLE GLASS,
PAINTED ALUM. BACK SECTIONS.
50 x115mm INTERIOR ALUM. THERMALLY BROKEN STOREFRONT FRAME FOR IGU,
PAINTED ALUM.BACK SECTION.
GL8a INTERIOR SCREENS: 12MM (2x6MM) CLEAR TEMPERED LAMINATED GLASS W/
COLORED INTERLAYER
Determine if existing mulllion profile could be used
CURTAIN WALL NOTES:
1. ALL ALUMINUM SCREENS IN OR OPENING INTO AQUATIC HALL AND CHANGE ROOMS
TO HAVE FASTENERS AND STEEL COMPONENTS ALL TO BE STAINLESS STEEL.
2. DIMENSIONS INDICATED ARE NOMINAL. ALL DIMENSIONS TO BE SITE VERIFIED.
3. SEE PROJECT MANUALL FOR GLAZED ALUMINUM DOORS.
4. ALL FRAMES TO RECEIVE DURANAR XL PAINTED FINISH UNLESS OTHERWISE NOTED.
SF-3 50x115 ALUM. PHANTOM DOOR FRAME FOR LAMINATED GLASS,
PAINTED ALUM.BACK SECTION.
GL8b GLASS BALUSTRADE: 16MM (8MM+8MM) CLEAR HEAT STRENGTHENED LAMINATED GLASS W/
COLORED INTERLAYER
3
3
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
1 : 20
2/15/2017 2:39:33 PM
1311
AuthorADD2-008
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 20
GLASS AND FRAME TYPES ADD2
REV. DESCRIPTION DATE
53 of 75
E/A3000CFM
+100
RD
11
H
N
Q
11y
SLO
PE
D S
TRU
CTU
RE
CFD
A201 4
4.1
%
R
P
2%
120.75 m
5
120.13 m
SCUPPER5
A323
3460
400
CROSS HATCHED AREA DENOTES
LOCATION WHERE FASTENING RATE
NEED TO BE INCREASED AT CORNERS.
SEE SPEC FOR DIMENSIONS AND FM
GLOBAL DATA SHEET 1-29.
TYP FOR R1 ROOF
3 ADD2
18
N
Q
17z17x
R
P
17y
2.3
%
120.75 m
120.75 m
1500
SCUPPER
100
400
3 ADD2
12 13
G
H
N
Q
12y1
A301
1
A301
A210
3
CFD
P
13y
5
A310
6
A323
3 ADD2
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 2:40:02 PM
1 : 100
1311
AuthorADD2-009
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 100
Partial Roof Plan - ADD2a
1 : 100
Partial Roof Plan - ADD2b
1 : 100
Partial Roof Plan - ADD2c
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
54 of 75
55 of 75
56 of 75
57 of 75
58 of 75
20 500
22 400
200
161
300 STORM20 500
22 400
200
161
300 STORM20 500
22 400
200
161
300 STORM
111.4
3
111.2
0
111.0
1
MH
110.6
5
110.7
8110.8
0
110.7
7
110.4
7
110.6
2
110.7
6
C
110.7
5
110.5
0
110.7
8
111.1
2
111.3
7
111.1
8
110.9
8
110.8
2
110.6
2
111.1
9
111.2
5
111.1
8
111.2
0
111.3
4
111.3
3111.3
8
111.3
7
110.4
5
110.5
0
110.7
3
111.0
3
111.2
7
111.4
8
111.3
6
111.5
3
111.7
2
111.3
2 111.3
0
111.5
7
111.7
9111.5
3
111.7
9
110.7
0
110.8
8
CB
MH
111.1
1
111.3
4
111.3
9
111.4
3
110.6
2
110.8
8
111.1
1
111.3
8
111.6
3
0.15 ∅ 0.20 ∅
0.10 ∅
0.40 ∅
0.20 ∅
0.30 ∅
0.90 ∅
0.10 ∅
0.15 ∅
EXIST. RETAINING
WALL TO BE REMOVED
EXISTING
WHEEL TRANS
STOP
EXISTING SOD
EXIST. CONC
TO BE REMOVED & REPLACED
PROPERTY LINE
DASHED LINE OF EXIST. BIKE RENTAL
STATIONS TO BE RELOCATED
EXIST ARMOUR STONE &
LOG BENCHES TO BE REMOVED &
RELOCATED
EXIST. ENTRANCE SIGNAGE
TO BE RELOCATED
3268
DASHED LINE OF TREE
PROTECTION
REFER TO ARBORIST REPORT
PROPOSED LOCATION
OF EXIST. ENTRANCE
SIGNAGE
PROPOSED LOCATION OF
6 EXISTING BIKE RACKS
(12 SPACES)
DASHED LINE OF
EXISTING STAIRS TO
BE CUT BACK &
REMOVED
PROPOSED LOCATION OF
EXISTING BIKE RENTAL STATION
500017756
DASHED LINE OF TREE
PROTECTION
REFER TO ARBORIST REPORT
5000
TY
P
1650
TO BE REMOVED & REPLACED
EXISTING SIDEWALK
3 ADD2
/REF 4 A002
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 2:46:38 PM
1 : 200
1311
AuthorADD2-014
WELLESLEY COMMUNITY CENTER
ADDENDUM 2
1 : 200
Site Plan (PART) - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
59 of 75
Pool Platform
+2660
C.I.P
.
ST
RU
CT
UR
AL C
ON
C. S
LA
B
STL HAND RAIL BEYOND
CAST IN PLACE
CONCRETE STAIR
DETECTABLE WARNING SURFACE
TILE W/ INTEGRAL DOMES
CONTRASTING TILE
NOSING
REFER TO PLAN
TREAD
CONTRASTING TILE COLOUR
SCHLUTER TRIM AS PER
SPECIFICATIONS
STRETCHER TILE
3ADD2/REF 7 A902
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 2:47:18 PM
1 : 5
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-015
ADDENDUM 2
1 : 5
SECTION DETAIL - TILE NOSING AT POOL HALL STAIR - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
60 of 75
Level 1 Gym
+600
SAFETY TREAD
INSERT @ EACH
TREAD (TYP.)
STRETCHER TILE
SCHLUTER TRIM
AS PER
SPECIFICATIONS
REFER TO PLAN
TREAD
DETECTABLE
WARNING
SURFACE TILE
3 ADD2
/REF 8 A902
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 2:47:47 PM
1 : 5
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-016
ADDENDUM 2
1 : 5
SECTION DETAIL - TILE NOSING AT CHANGE ROOM STAIR - ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
61 of 75
LEVEL 2
+5000
REFER TO PLAN
TREAD
RE
FE
R T
O S
EC
TIO
N
RIS
ER
TREAD
SCHLUTER TRIM AS PER SPECIFICIATIONS
DETECTABLE WARNING SURFACE
TILE FINISH AS PER TILE SCHEDULE
SAFETY STRIP ROUTERED INTO TILE BY
MANUFACTURER
EDGE OF TILE TO BE RADIUSED 6mm BY TILE
MANUFACTURER
TILE FINISH AS PER TILE SCHEDULE
CONCRETE ON STEEL PAN STAIR
INS-28 WITH THERMAL BARRIER
REFER TO WALL SECTION DETAILS
3ADD2
/REF 9 A902
Scale:
Drawn By:
Project No: Drawing No:
2/15/2017 2:48:05 PM
1 : 5
WELLESLEY COMMUNITY CENTER
1311
AuthorADD2-017
ADDENDUM 2
1 : 5
SECTION DETAIL - TILE NOSING AT STAIR 11 -ADD2
REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
62 of 75
N
Q
P
2
A451
4
A451
800
15
1883
15
15
185
A451
3
4 EQ PANELS W/ GAPS AS INDICATED
4960 TBC ON SITE
122520
122520
122520
1225
25 25
FACE OF WALL FINISH
25 305 25
GA
PS
TO
ALIG
N O
N
BO
TH
SID
ES
ALIGN INTERIOR
FACE OF STEEL
GUARD WITH WALL
FINISH
ALIGN INTERIOR
FACE OF STEEL
GUARD WITH WALL
FINISH
EXPANSION JOINT
W/ COVER
3ADD2
3ADD2
3ADD2
3ADD2
3ADD2
3ADD2
3ADD2
3ADD2
EXPANSION JOINT IN TILE
3ADD2
1
ADD2-019
/REF 1 A451
ADD2-020
1
1
ADD2-021
Scale:
Drawn By:
Project No: Drawing No:
NORTH ARROW
2/15/2017 2:40:44 PM
1 : 20
1311
AuthorADD2-018
WELLESLEY COMMUNITY CENTER
ADDENDUM 2REV. DESCRIPTION DATE
3 ADDENDUM 2 02 15 2017
1 : 20
BRIDGE ENLARGED PLAN - ADD2
63 of