16
Feb. 20, 2006 Diagnostics-Vacuum Overview 1 Dean R. Walters [email protected] LCLS Undulator Diagnostics and LCLS Undulator Diagnostics and Vacuum System Overview Vacuum System Overview Dean R. Walters

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Embed Size (px)

DESCRIPTION

Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 3 Overview Fabrication plan for vacuum chamber: - 33 production vacuum chambers & 7 spares - 1 mock-up chamber for single undulator test - 1 vacuum chamber for prototype Beam Position MonitorBeam Finger WireFuture Diagnostics Suite Quadrupoles Undulator 3, ,038 mm Total undulator length (x11): m

Citation preview

Page 1: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

1 Dean R. Walters

[email protected]

LCLS Undulator Diagnostics and LCLS Undulator Diagnostics and Vacuum System OverviewVacuum System Overview

Dean R. Walters

Page 2: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

2 Dean R. Walters

[email protected]

OverviewDiagnostics

Undulator Line DiagnosticsRF Beam Position MonitorsBeam Finder WireBeam Loss Monitors

Vacuum SystemUndulator Vacuum ChamberBellows Module

Single Undulator Test

Page 3: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

3 Dean R. Walters

[email protected]

OverviewOverview

Fabrication plan for vacuum chamber:- 33 production vacuum chambers & 7 spares- 1 mock-up chamber for single undulator test - 1 vacuum chamber for prototype

 

Beam Position Monitor Beam Finger Wire Future Diagnostics Suite Quadrupoles

Undulator

3,400 470 898

12,038 mmTotal undulator length (x11): 131.52 m

Page 4: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

4 Dean R. Walters

[email protected]

Overview

Short Break

Long Break

Page 5: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

5 Dean R. Walters

[email protected]

DiagnosticsDiagnostics

Undulator Line DiagnosticsRF Beam Position MonitorsBeam Finder WireBeam Loss Monitors

Vacuum SystemUndulator Vacuum ChamberBellows Module

Single Undulator Test

Page 6: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

6 Dean R. Walters

[email protected]

Diagnostics

Undulator Line DiagnosticsOptical Transition RadiationScanning Wire MonitorVacuum Chamber

ULD Team

•Bingxing Yang

•Jim Bailey

•Tom Buffington

•Pat Dombrowski

This was scheduled to be installed in the April/May shutdown on the BTX line.

Page 7: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

7 Dean R. Walters

[email protected]

RF Beam Position MonitorCavityDown Converter ElectronicsSupport

Network

Analyzer Down Converter Electronics

Cavity

Lab Test of a non-vacuum Cavity

Page 8: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

8 Dean R. Walters

[email protected]

RF Beam Position Monitor

The team is preparing two major test:

1. The ITS Single unit test -Scheduled for Feb/March 2006

2. The LEUTL tunnel three unit test –Scheduled for June 2006

RF BPM Team

•Bob Lill

•Leonard Morrison

•Randy Zabel

•Michele Givens

•Zek Salazar

Page 9: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

9 Dean R. Walters

[email protected]

Beam Finder Wire

Beam Finder Wire Team

•Jim Bailey

•Jim Morgan

•Scott Doran

Test of prototype components to

start in March 2006

Page 10: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

10 Dean R. Walters

[email protected]

Beam Loss Monitors

Beam Loss Monitors Team

•Bill Berg

•Jim Morgan

•Scott Doran

•Additional help from Northwestern

Page 11: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

11 Dean R. Walters

[email protected]

Vacuum System

DiagnosticsUndulator Line DiagnosticsRF Beam Position MonitorsBeam Finder WireBeam Loss Monitors

Vacuum SystemUndulator Vacuum ChamberBellows Module

Single Undulator Test

Page 12: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

12 Dean R. Walters

[email protected]

LCLS Vacuum Chamber Ass’yVacuum Chamber Assembly

Support Assembly

X-Adjustor

Z-Adjustor

Vacuum Chamber Team

•Soon-Hong Lee

•Jim Bailey

•Tom Buffington

•Scott Doran

Page 13: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

13 Dean R. Walters

[email protected]

Manufacturing ProcessesSST Plate (144” x 6” x 1”)

Laser Welding

Milling/Grinding

Forming

Al-Coating

Milling/Polishing

SST Sheet (144” x 2” x 0.118”)

Polishing/Grinding

Al-Coating

Page 14: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

14 Dean R. Walters

[email protected]

Vacuum Chamber Prototypes

Type 316 LN Laser Weld Specimen

1. Quotations for specialty stainless steel ( 316 LN) are in progress

2. Adjuster-Support is on order and will arrive early March 2006

3. Full chamber prototype to be complete by June 2006

Page 15: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

15 Dean R. Walters

[email protected]

Bellows Module Team

•Soon-Hong Lee

•Jim Morgan

•Scott Doran

Bellows Module

1. Prototype Bellows fabricated by April 2006

2. Bellows testing complete by June 2006

Page 16: Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters

Feb. 20, 2006Diagnostics-Vacuum Overview

16 Dean R. Walters

[email protected]

Single Undulator Test Diagnostics

RF Beam Position Monitors (mock-up)RF BPM SupportBeam Finder Wire (mock-up)Beam Loss Monitors (mock-up)

Vacuum SystemUndulator Vacuum ChamberChamber SupportVacuum PumpChamber for the BFW-BLM & Support

Diagnostics-Vacuum

SUT Team

•Soon-Hong Lee

•Jim Bailey

•Jim Morgan

•Leonard Morrison

•Scott Doran

1. Chamber and support due 1st week March 2006

2. RF BPM due end of Feb. 2006

3. Ion pump due mid Feb. 2006

4. Materials for BFW, BFW chamber, & BLM are on hand