Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Feather River College – Campus Site Strategy June 2017
Feather River College: Campus Facilities Board Presentation
• PurposeDevelopment of a Site Strategies Plan
• Mission & VisionStrategic Plan 2010-2013
• Opportunities & ConstraintsSite, Facilities and Educational
• Facilities Site StrategyOrganizational Plan
• Next Steps
Feather River College – Campus Site Strategy June 2017
Communication Culture Leadership
Feather River Community College
Campus Relationships
Community Relationships
Feather River College: Strategic Plan 2010 - 2013
Statement of Vision
Feather River College cultivates engaged citizens striving for a resilient, solution-based society. As a campus community, we aim to foster the values of education, service, and stewardship in our students, staff, and community. We will continue to develop our educational and co-curricular offerings to support our students’ pursuit of sustainable, fulfilling, and dynamic lives:
Develop the Mind
We believe that diversity of opinion in all issues helps develop the minds of students so
that they may make sound judgments of value in the continuing pursuit of lifelong
learning.
Celebrate the Individual
We celebrate the uniqueness of the individual by affirming that personal identity and
cultural heritage are the base from which each person may aspire to any height.
Open Doors
We pledge that the doors of opportunity and encouragement will be open to
everyone who can benefit and that our guiding principle in approaching students is to
provide accessibility to all that the College has to offer.
Nourish the Communities
As a member of our communities, we take pride in affirming an active partnership in
improving the quality of life and economic development in our area.
Strive for Excellence
We are committed to the creation of a quality learning environment, striving for
excellence at all levels, fully supported by adequate resources, so that our students will
have the best chance to learn.
Statement of Mission
Feather River College provides high-quality, comprehensive student education and opportunities for learning and workforce preparation in a small college environment. The College provides general education, Associate's Degrees, certificates, transfer programs, and life-long learning for a diverse student population by serving local, regional, national and international students through traditional face-to-face instruction as well as distance education. The College also serves as a cultural, and economic leader for all communities that lie within the District and embraces the opportunities afforded by its natural setting
Strategic Plan 2010-2013
Sustainability
Respect
Appreciation for Higher Education
Enthusiasm for Working with
Students
Institution for Higher Education
Creative Thought
Ethical Leadership
Innovation
Regional Economic Growth
Energy Self-Sufficiency
Environmental Stewardship
Social Responsibility
Page 2
Feather River College – Campus Site Strategy June 2017
Access
• Traffic circulation
• Pedestrian flow
• Community access
Sense of Place
• Campus center
• Quads
• Sustainable development
Connectivity
• Campus connectivity
• Curricular reinforcement
• Future development areas
Prior Organizational ConsiderationsPrevious planning studies revealed strategies and opportunities for consideration of future campus
growth patterns. Some of the major topics include:
Campus Facilities Site Strategy: Opportunities & Constraints
17
15
18
14
13
16
Keynotes
1. No vehicular turnaround
2. Buildings in shadow
3. Narrow road width
4. Minimal parking
5. Gym is barrier to south campus
6. Good solar access, isolated location
7. Remote parking
8. Poor way- finding at Student Center
9. Parking lot is barrier to south campus
10. Child center at campus core
11. Maintenance bldg. is barrier
12. Housing is remote, access difficult
13. Tennis separated from athletics
14. Good location for Equine program
15. Good, flat, build- able area
16. Northeast orientation best for baseball
17. Equine functions separated from main area
18. Possible location for athletics parking
1
8
3
56
7
10
11
12
2
9
4
Spring 2011
Page 3
Archeological
Site
Wetlands
Wetlands
Feather River College – Campus Site Strategy June 2017
Existing Structures
Multi-Purpose Building Modernization▪ FPP approval anticipated for Future State Spending Plan
Former Library Building / Proposed Nursing▪ Convert space to Nursing
▪ Access and parking needs to be reviewed
Campus Core (Temporary) Buildings▪ Demolish and Convert to Student Housing and Parking
▪ Alternative Uses to be considered pending State Interpretation
Remaining Existing Buildings▪ No work anticipated in remaining existing buildings; Student
Center, Library, Science, Student Housing.
Facilities M & O Building▪ New Facilities Building; construction complete
Structures to be Relocated/Replaced
AHB/Nursing – Modular Building▪ Relocate Modular Building for alternative use; location TBD
▪ Relocate program to Former Library Building
Child Development Center▪ Demo existing Building
▪ New building located out by Campus Entry
Proposed Structures
New Instructional Building and Parking Lot▪ FPP submitted Sept. 1, 2010
▪ Pending resubmittal + future state funding
Humanities / Performing Arts Building▪ Further educational program study required to
finalize facility size and needs
Student Housing▪ Locate at existing campus core area
▪ Number of residents – 40 +/-
▪ Type of accommodations – 4 student suites
Equestrian Center Expansion▪ Arena size and location
Solar Farm▪ Array size / KW / hr production
▪ Consider utilizing Arena Roof for installation
Sustainable Farm/Support Facility▪ Partnership with Feather River Land Trust
▪ Further program study required
Athletics Expansion▪ New Field House / Locker Room
Headwaters Museum▪ Part of Fish Hatchery complex
▪ Future Funding/Grant consideration
Greenhouse▪ Proposed location adjacent to Vocational
Education Bldg.
New Property – 180 Acres▪ Develop site and facility needs to support
Bachelor of Science: Equine and Ranch
Management programs.
Master Planning Elements: Provided by District
Page 4
Feather River College – Campus Site Strategy June 2017
Existing Campus: Site Plan
1. Multi-Purpose Building2. Library Building3. Student Center4. Nursing5. Science Building6. Environmental Studies7. Student Housing8. Equine Studies9. Ag/Voc Ed/Rodeo
Existing Buildings
1
23
56
7
89
4
Page 5
Feather River College – Campus Site Strategy June 2017
Campus Facilities Site Strategy: Organizational Plan
1. Multi-Purpose Building2. Library Building3. Student Center4. Nursing5. Science Building6. ORL / Art Building7. Child Development
Center8. Equine Studies9. Agriculture/Rodeo10. Facilities Maintenance
Building
A. Instructional BuildingB. Humanities/Performing
and Fine Arts BuildingC. Field House/Locker
RoomsD. Headwaters MuseumE. Solar ArenaF. TBD
Existing Buildings
Proposed New Buildings
1
23
4
F
56
A B
DC
89
P P
P
P
P10
P
P
P
PP
Upper Quad
Central Quad
Lower Quad
Emergency Vehicular Access Only
Proposed Vehicular Road
Ball Fields
Stadium
Soccer
Arena
Future Vehicular Road
Sustainable Farm/Ag
Page 6
E
7
Feather River College – Campus Site Strategy June 2017
Library
Multi-Purpose
UpperQuad
Campus Facilities Site Strategy: Upper Quad Plan
StudentCenter
Future Development
(TBD)
Nursing
Summary
Proposed- TBD▪ Demolish Temporary Structures and Convert to TBD▪ Alternative Uses of existing structures to
be considered pending State Interpretation
Nursing▪ Convert former Library to Nursing▪ Access and parking needs to be reviewed▪ Consider Secondary Effects (IPP)
Student Center & Library▪ No anticipated improvements
Key Plan
Page 7
Fire AccessTurnaround
Feather River College – Campus Site Strategy June 2017
Multi-Purpose
Science
Proposed Instructional Building
CentralQuad
Proposed Greenhouse
ORL & Art Building
Emergency Vehicular Access Only
Future Access Road
Parking
Library
(E) Pedestrian Path
Campus Facilities Site Strategy: Central Quad Plan
Key Plan
Summary
Multi-Purpose Building Modernization▪ FPP approval- Pending State Bond
Science Building▪ No anticipated improvements
ORL & Art Building▪ No anticipated improvements
Proposed Greenhouse▪ Relocate existing Modular Building▪ Location for New Greenhouse
Page 8
Feather River College – Campus Site Strategy June 2017
Campus Facilities: Multi-Purpose Building Modernization
Summary
Multi-Purpose Building Modernization▪ Size: 29,945 gross square feet▪ Status: Chancellor’s Office Approved – Awaiting
Funding▪ Funding: (Pending State Bond)
Page 9
Feather River College – Campus Site Strategy June 2017
Lower Quad
Proposed Humanities/ Performing/Fine Arts
Proposed Headwaters Museum
Campus Facilities Site Strategy: Lower Quad Plan
Proposed Instructional Building
Proposed Visitor Parking
Proposed Parking
Proposed Parking
Future Access Road
Proposed Access Road(Funding as part of Instructional Building)
Hatchery
Key Plan
Summary
Proposed Instructional Building▪ Resubmittal for FPP required▪ Includes Associated Site Access and Parking
Improvements
Proposed Humanities / Performing / Fine Arts▪ Further educational program study required to
finalize facility size and needs
Hatchery▪ No anticipated improvements
Proposed Headwaters Museum▪ Future Funding / Grant Consideration
Proposed Geo-Thermal Field
Page 10
ORL & Art Building
Feather River College – Campus Site Strategy June 2017
Campus Facilities: New Instructional Building
Summary
New Instructional Building▪ Size: 31,511 gross square feet▪ Status: Chancellor’s Office Reviewing▪ Funding: (Pending State Bond)
Page 11
Feather River College – Campus Site Strategy June 2017
Rodeo
Welding
Campus Facilities Site Strategy: Rodeo / Ag Welding Plan
Key Plan
Summary
Ag Welding▪ Relocate program to existing Records Warehouse
Rodeo▪ Further educational program study required to
finalize site and facility needs
Proposed Solar Arena▪ Arena cover with integrated photovoltaic system
Proposed Solar Covered Arena
OPTION 1
Electrical Infrastructure for PV
Page 12
Feather River College – Campus Site Strategy June 2017
Campus Facilities Site Strategy: Athletics Plan
Key Plan
Summary
Proposed Field House / Locker Room▪ Further educational program study required to
finalize site and facility needs
Athletic Fields▪ 2 softball, 1 baseball, 1 soccer, 1 football/track to
remain
Facilities Maintenance Building▪ 2016 completion.
Access Roadway• Extend north/south access roadway around
baseball field to bridge connection• Modify Parking and pedestrian river access• Modify practice soccer field as required
Page 13
Stadium
Proposed Field House/ Locker Rooms
Proposed Headwaters Museum
Soccer
Facilities
Maintenance
Soccer
Ball Fields
Ball Fields
Re-align roadway
Feather River College – Campus Site Strategy June 2017
Equine Arena
Equine Studies
Campus Facilities Site Strategy: Equine Area Plan
Key Plan
Summary
Equine Program▪ Proposed two permanent classroom buildings
Proposed Two Permanent Classrooms
Page 14
Corral
Feather River College – Campus Site Strategy June 2017
Campus Facilities Site Strategy: South Parcel
Key Plan
Summary
New Property▪ 180 acres
▪ Reviewing site and facility needs for EnvironmentalStudies
▪ Reviewing site and facility needs to support new Bachelor of Science: Equine and Ranch Management Programs
Page 15
Equine and Ranch Management Program
Environmental Studies
Feather River College – Campus Site Strategy June 2017
Campus Facilities Site Strategy: Site Analysis + Airport Overflight Review
Summary
Overflight Zone 6▪ Normally Allow
▪ Residential uses (however, noise and overflight impacts should be considered where ambient noise levels are low)
▪ Limit▪ Children’s schools, large day care centers,
hospitals and nursing homes▪ Processing and storage of bulk quantities of
highly hazardous materials▪ Avoid
▪ Outdoor stadiums and similar uses with very high intensities
▪ Prohibit
▪ none
Page 16
Feather River College
Feather River College – Campus Site Strategy June 2017
South Parcel: Overall Organization
Rodeo Corrals
Cattle Ops. / Corrals
Agriculture
Horse Pasture
Ag. / Crops
Environmental Studies
Bucks Lake Rd.
Spanish Creek.
Feather River College – Campus Site Strategy June 2017
South Parcel: East End / Campus Connection
Summary
New Bridge and Road Alignment
Perimeter road and Boundary Fencing
Horse Pasture
• Facility Needs• Supply and Feed Barn
Agriculture / Crops
• Facility Needs• Pump and Irrigation System
• Program Needs• Potential UC Extension Partnership
Key Plan
HORSE PASTURE
AG. / CROPS
Supply and Feed Barn
New Bridge
New Access
Roadway
Boundary and fencing
Perimeter Roadway
FencingSecondary Roadway
Feather River College – Campus Site Strategy June 2017
South Parcel: Ranch Management Program
Summary
Agriculture
• Facility Needs• Improved entrance from Bucks Lake Rd.• Primary Infrastructure stations:
• Electrical• Water• Sewage
• New wells• Pump and irrigation systems• Flood systems
• Program Needs
• Support Bachelor Degree Programs• Support Associate Degree Programs• Weed Control• Fertilizing• Fence Maintenance
Key PlanImprovements at existing access from Bucks Lake Rd.
AGRICULTURE
Pump, Irrigation, and Electrical infrastructure
New Bridge
Boundary and fencing
Perimeter Roadway
Primary Loop Roadway
Existing Buildings
Trail
Feather River College – Campus Site Strategy June 2017
South Parcel: Ranch Management Program
Summary
Cattle Operations / Corrals
• Facility Needs• Hay and equipment storage buildings• Livestock drinking water system• Livestock handling equipment• Corrals• Holding Pens• Squeeze chutes• Breeding stocks
• Loading chutes
• Program Needs• Support Bachelor Degree Programs• Support Associate Degree Programs• Husbandry Practices• Livestock rotational grazing
Key Plan
CATTLE OPS. / CORRALS
Improvements at existing access from Bucks Lake Rd.
Primary Loop Roadway
Primary Loop Roadway
Boundary and fencing
Secondary Roadway
Hay and Equipment Storage Buildings
Feather River College – Campus Site Strategy June 2017
South Parcel: Rodeo Program
Summary
Rodeo Program
• Facility Needs• Covered event arena• Covered practice arenas• Livestock holding pens• Livestock pasture areas• Horse boarding stalls• Hay storage• Vehicle parking• Horse trailer parking• Equipment storage• Program office• Restrooms
• Program Needs• Support Bachelor Degree Programs• Support Associate Degree Programs• Year-round practice opportunities• Host College annual rodeo event
Key Plan
RODEO CORRALS
Primary Loop Roadway
Gate
Boundary and fencing
Parking
Pa
rkin
g
New Access from Bucks Lake Rd.
Proposed Solar Covered Arena
OPTION 2
Feather River College – Campus Site Strategy June 2017
South Parcel: Environmental Studies Program
Summary
Environmental Studies Program
• Facility Needs• Loop Trail• Creek Access
• Program Needs• Support Bachelor Degree Programs• Support Associate Degree Programs
Key Plan
ENVIRONMENTAL STUDIES
Spanish Creek
Campus Trail Connection
Feather River College – Campus Site Strategy June 2017
Next Steps
▪ Review updated Educational Plan to
evaluate program Goals & Trends to
determine new facility Needs.
▪ Conduct Detail Program and Facilities
Study(s)
▪ Identify Funding & Implementation
Strategies
- Multi-Purpose Building Modernization
following Future State Bond
- Instructional Building resubmit needed.
- Discuss Development of 180 Acre Parcel▪ Stream Crossing
▪ Roads and Infrastructure
- Local Bond?▪ District Wide
▪ Selected Projects
▪ District Matching Funds
Campus Facilities Site Strategy: Next Steps
Page 17