Feasibility study of a cogeneration plant in a supermarket
Tiago Ribeiro Franco [email protected]
Instituto Superior Técnico, Lisboa, Portugal
November 2014
Abstract
We live on a Planet that suffers daily with a high dependence on fossil fuels and with the increasing consumption often associated with low energy efficiency. Investment in more efficient and less polluting technologies is essential to prosperity. In this sense, the combined production of electricity, heat and cold contributes positively towards this objective by reducing primary energy consumption and therefore emissions of greenhouse gases. This study examines the feasibility of installing a trigeneration plant in a supermarket located in western Portugal. The suggested plant is evaluated taking into account economic, technical, environmental and legal issues in order to investigate the option of parallel operation with the existing refrigeration plant. Different technologies and operation strategies were evaluated according to the plant size, the operating schedule and the equipment load. Among several scenarios, the most favourable technology was the internal combustion engine with a total output of 40 kWelectric along with an absorption chillers pack with a total of 40 kWcoling running from 9am to 21pm during the weekdays and with half load option enable. This scenario resulted in a net present value of € 44 304 with a payback period of 10.1 years and an absolute primary energy savings of 9.8%. Keywords: Cogeneration, CHP, trigeneration, CCHP, internal combustion engine, Energy Efficiency, absolute primary energy savings.
1 Introduction
Due to its geographical location and geology, Portugal is
limited in energy resources such as oil, natural gas and
coal, but rich in renewable resources such as hydro, wind
and solar. In order to take advantage of those green
resources, Portugal has strengthened the investment in
renewable technology, according to Eurostat, in 2012
took fourth place in the European ranking, with 47.6% of
electricity generated from renewable sources [1]. These
indicators suggest Portugal is in a good way to meet the
European commitment which set strategic goals for
climate and energy changes to be met by Member States
until 2020.
CHP plays an important role in the goals to be achieved
since its concept is based on the localized production of
energy. This allows a greater independence from the
power generating plants which provides greater
efficiency by avoiding grid distribution losses.
CHP and CCHP technologies have evolved in recent years
with more manufacturers developing solutions for
different scales and application areas, this progress
coupled with "green" energy policies contribute to the
feasibility of installing this technology in areas which until
then was impossible [1].
Supermarkets are intensive consumers of electricity; in
developed countries they consume about 3% to 4% of
the total available energy. A breakdown of the energy
used in a supermarket reveals 50% is used for
refrigeration, with the remaining half divided between
equipment and lighting [2,3].
The aim of this study is to examine the feasibility of
installing a CCHP plant in a supermarket. The proposed
2
system is evaluated taking into account the economical,
technical, environmental and legal constraints in order to
investigate its suitability for parallel working with the
existing refrigeration plant.
This study evaluates the proposed scenarios by changing
the plant size and operation schedule in order to perform
an economic analysis of the trigeneration system.
2 Case Study
The proposed building is located in the Midwestern
region of Portugal. It has about 1000m2 of covered area,
of which 854m2 are dedicated to sales. The supermarket
opens to the public at 9:00 am and closes at 8:30 pm,
seven days a week.
2.1 Conventional system
Employees and vendors arrive from 7am which raises the
electricity consumption by opening the refrigeration
chambers doors and other acclimatized areas such as
loading dock.
The cooling production is divided into three areas:
Low temperature cooling plant, -30⁰C – Produces
Cooling for two frozen chambers.
Medium temperature cooling plant, -10⁰C – Produces
cooling for 11 frozen chambers, 5 acclimatized areas
and 12 cooled cabinets.
10 units of standalone frozen cabinets, -18⁰C
Due to the small size and low temperature operation,
both the low temperature plant and the standalone units
are not considered. The aim of this study is a
trigeneration plant that is able to work in parallel with
the already existing cooling plant. Heating, ventilation
and air conditioning, HVAC, is not covered by the
proposed plant, however its power consumption is
included in the building electrical loads.
2.2 Thermal and electrical loads
As first approximation building heat requirements are
neglected, this happens because both the space heating
demand and the need to heat water are low. The
continuous equipment running, lighting systems and
occupancy contributes to the building heating [3]. Thus
the heat demand of the building is not included in the
proposed solution however it can be met by the existing
HVAC equipment. This approach results in all the heat
created in cogeneration used for cooling production.
The total energy consumption is separated in electricity
for conventional use and electricity used for cooling. The
electricity used in compression chillers we can estimate
50% for day-time and 68% for night-time. The remaining
50% during day-time and 32% during night-time is
consumed by equipment and lighting [4] and [2]. This
way is possible to obtain the electrical and thermal
curves, figure 1, and also the cumulative load duration
curves of the total energy consumption, figure 2.
Figure 1 – Annual consumption of electricity for cooling.
Figure 2 – Cooling load duration.
0
10
20
30
40
50
60
Co
olin
g P
ow
er W
e
Cooling Demand during the year
Day-time Night-time Average Peak
0
10
20
30
40
50
60
Co
olin
g P
wer
kW
e
Hours
Cooling Load Duration
3
Figure 3 – Electricity demand profile.
Figure 3 shows the average profile of electricity
consumption for cooling production and for equipment
and lighting use. Obtaining these curves is extremely
important because they allow estimating prime mover
and cooling plant size, as well as the operation schedules.
Tables 1 and 2 and show the environmental impact and
the costs breakdown of electricity bill in 2013.
Table 1 – Environmental impact.
Designation Value
Primary Energy [toe/year] 116
CO2 Equivalent Emissions [tCO2eq/year] 253
Table 2 – Energy costs.
Designation Cost [€/year]
Cost of Electricity without cooling 27 221
Cost of Electricity consumed by the Compression Chiller
26 823
Cost of Electricity consumed by the Compression Chiller (Peak cost)
4 189
Total (Tax Excl.) 58 233
Total (Tax Inc.) 71 627
2.3 Proposed system
The proposed plant, figure 4, operates in parallel with
the existing cooling plant at strategic periods in order to
meet the cooling needs. In this operating scheme, the
generator produces steam and hot water which is used
to drive the absorption chillers. If the cooling demand is
higher than the amount of cooling produced by the
absorption chillers the compression chillers are activated
to fulfil the gap. The electricity produced by the prime
mover will power the absorption chiller and compressor
plus all the equipment and lighting installed in the
building. Whenever the electricity demand exceeds the
generator capacity, electricity from the grid will be
imported and whenever there’s an excess, energy will be
sold to the grid.
Figure 4 – Proposed trigeneration plant layout.
0
5
10
15
20
25
30
35
40
45
50
Po
wer
[kW
e]
Energy Demand Profile
Cooling Electricity
4
From the consumption maps and cooling plant design we
obtain values of 45 kWe, or 75 kWc for maximum loads,
then is possible to establish relationships between the
power necessary for the absorption chillers equipment
and for the prime mover. To define the absorption chiller
size equivalent electric power is used, as if it was a
compression chiller. In case A power for the minimum
load values is established, in case B a base load is defined
taking into account the average consumption in the night
time and the cases C and D are set to 70 and 80% of the
maximum load, respectively. The power is allocated in
each case taking also into account the size of the
equipment available. From the relation between kWc
kWe we obtain the minimum values for the cooling
demands of each case. Knowing the absorption units
COP, typically 0.5 on this technology scale, we find the
heat thermal power required to activate the absorption
chillers, i.e. twice the cooling power needs of the plant.
Knowing this value and the technical specifications of
generator sets is possible to reach the minimum
electrical power required in each scenario, table 3 and
Figure 5.
The plant operation schedule is divided into four options
presented in table 4 which were selected taking into
account the daily consumption profiles and billing
periods. This way the CCHP plant is activated when
electricity costs are higher, leaving the conventional
system to operate at night taking advantage of the "off
peak" costs [3].
Table 3 – Minimum power to satisfy cooling demand.
Case Power Chiller [kWe]
Chiller [kWc]
ICE [kWe] ICE [kWc] Turbine [kWe]
Turbine [kWc]
A Min. Load 15 25 25 50 21 50
B Base Load 25 40 40 80 33 80
C 70% Máx. 30 50 50 100 42 100
D 80% Máx. 35 60 60 120 50 120
Table 4 – Schedule options.
Schedule
1 00:00 – 24:00 7 days a week 2 07:00 – 21:00 7 days a week 3 09:00 – 21:00 7 days a week 4 09:00 – 21:00 Business days
Figure 5 – Different scenarios regarding electricity demand for cooling production.
0
5
10
15
20
25
30
35
40
45
50
Po
we
r [k
We
]
Hours
Cooling Demand in 24h Period
Case B
Case A
Case C
Case D
Schedule 1
Schedule 2 Schedule 3, 4
5
2.4 Absorption Chiller
Single effect absorption chillers water-ammonia was the
technology selected for cooling production. Due to the
cooling plant small size and lack of equipment with the
exact power presented in Table 3, several units must be
installed in parallel depending on the case. To perform
the study two types of absorption chillers were
considered. The equipment selected was designed to
work with direct combustion of natural gas, but it can be
re-engineered to take advantage of the exhaust gases
heat from the engine or turbine [5]. table 5 shows the
technical specifications of those two devices and Table 6
shows the number of units of each model to be installed
as well as power and total cost for each case.
Table 5 – Absorption Chiller specifications.
Specifications Robur
ACF-60LB Chillii ACC50
Cooling Power [kWc] 13.0 50.0
Electric load [kWe] 0.9 3.0
Fluid Temperature [⁰C] -10 -10
Price [€] 9 100 29 500
Price [€/kwc] 700 590
O&M [€/Kwh/year] 0.008 0.008
Table 6 – Equipment to consider in each case.
Case Equipment Total
Power [kWc]
Electrical Load
[kWe]
Price [€]
A 2 X Robur 26 1.8 18 200
B 3 X Robur 39 2.7 27 300
C 1 X Chillii 50 3.0 29 500
D 5 X Robur 65 4.5 45 500
2.5 Prime Mover
The prime mover choice lies in its ability to produce
electricity and steam. The power generator size is
defined according to the heat required to activate the
absorption chillers as suggested in literature [2]. At these
small sizes the variety of equipment is low and prices
high. The research made indicates two technologies to
be considered for the prime mover: internal combustion
engines, ICE, and microturbines, both using natural gas
as fuel.
Internal Combustion Engine
In the ICE technology, we decided to seek for complete
solutions with ready-to-install units. Thus the cost of the
installed technology is closer to reality instead of
assuming indicative values of €/kWe that commonly
duplicate when installing the equipment. Several devices
were analysed and selected those that satisfy the
requirements set at the lowest price, see table 7. The
number of units to be installed in each case, the total
power of the plant and its cost is shown in table 8.
Table 7 – ICE specifications [6].
Specifications EC Power XRGI 15
EC Power XRGI20
Electric load [kWe] 15 20
Electric efficiency [%] 30 32
Thermal efficiency [%] 60 64
Price [€] 27 750 32 750
Price [€/kwe] 1 850 1 638
O&M [€/Kwh/year] 0.0165 0.0165
Table 8 – Equipment to consider in each case.
Case Equipment Total Power
[kWe] Price [€]
A 2 x XRGI15 30 55 500
B 2 x XRGI20 40 65 500
C & D 3 x XRGI20 60 98 250
Microturbine
If ICE market variety is reduced at this level of power, in
microturbines options are further restricted. It matters
only to point out a brand, Capstone which produces
microturbines and has some documentation available on
the internet. This technology has also some ready-to-
install solutions. The power associated to the analysis of
each case is described in Table 9 and the technical
specifications and the estimated costs provided by the
manufacturer are shown in Table 10.
Table 9 – Equipment to consider in each case.
Case Equipment Total Power
[kWe] Price [€]
A & B Capstone C30 28 60 000
C & D Capstone C65 65 97 500
6
Table 10 – Microturbines specifications [7].
Specifications Capstone
C30 Capstone
C65
Electric load [kWe] 28 65
Electric efficiency [%] 25 29
Thermal efficiency [%] 60 62
Price [€] 60 000 97 500
Price [€/kwe] 2 000 1 500
O&M [€/Kwh/year] 0.006 0.006
3 Results
This section presents the results obtained through
simulations of the cases considered (A, B, C and D),
combined with the possible schedules (1, 2, 3 and 4), in a
total of sixteen different scenarios to analyse.
The scenarios considered allow both technologies to
operate with or without the partial load option. There
will be presented the most favourable solutions for each
prime mover, ICE operating with partial load mode
enable and microturbine at maximum load as the results
are the same with or without partial load mode due to
the optimal size of the plant.
3.1 ICE with Partial load mode enable
The ICE technology was analysed, using the partial load
option to 50% in order to optimize the operation of the
trigeneration plant, as shown in Figure 6. To perform a
pre-selection, indicators such as net present value and
savings in energy bills were selected.
Figure 6 – ICE economic analysis with half load enable.
Columns with values less than zero are not visible in
Figure 6, so all scenarios that do not exhibit both
columns are excluded. In the previous figure we can see
that A4, B3, B4, C4 and D4 scenarios had positive results
in both indicators. This way can show in Table 11 the
results for the best three scenarios, which contains other
economic indicators and relevant energy analysis.
Table 11 shows that the most energetic and financially
attractive scenario is B4, i.e. case B with the operation
schedule 4. It should be noted a payback of 10.1 years,
an internal rate of return of 7.7 % and a net present
value of 44 304 euros (values obtained with an interest
rate of 3%). The energy parameters are also favourable
considering primary energy savings greater than 20% and
an absolute primary energy savings of 9.8%.
Table 11 – ICE results with partial load enable.
Parameters B4 C4 D4
EBS [€/year] 9 216 10 501 11 687
Investment [€] 92 800 127 750 143 750
Payback [Years] 10.1 12.2 12.3
IRR [%] 7.7 5.3 5.2
NPV [€] 44 304 28 472 30 120
PES [%] 22.7 22.7 22.7
PESAbs [%] 9.8 11.6 12.1
TOE savings [toe/year]
35 31 31
GHG savings [tCO2eq/year]
60 47 46
EEE [%] 110.8 110.8 110.8
Electrical load [%] 22.4 27.3 29.1
Thermal Load [%] 25.9 31.1 35.7
Values obtained by the model calculation are obviously
theoretical, and in some parameters, based on data
provided by manufacturers which not always correspond
to reality. The value of the equivalent electrical
efficiency, for example, is directly influenced by the
efficiency indicated by manufacturers which results in
values greater than 100% in some scenarios.
3.2 Microturbine
Although there are differences in some scenarios in the
energy savings values for the case of the turbine
operating at maximum or partial load, the net present
value, and results are the same. Only one scenario is
favourable on both indicators and the results are the
K€
10K€
20K€
30K€
40K€
50K€
K€
2K€
4K€
6K€
8K€
10K€
12K€
14K€
A1
A2
A3
A4
B1
B2
B3
B4
C1
C2
C3
C4
D1
D2
D3
D4
Scenarios
ICE - Partial Load Enable
EBS NPV
7
same with or without load control, which is why we show
just the microturbine case at full load, see figure 7.
Figure 7 – Microturbine economic analysis at max load.
Through Figure 7 it can be concluded that B4 is the only
scenario that presents favourable results in both
economic indicators. Detailed results are represented in
Table 12. The operation result is negative in all other
scenarios because the initial investment in this
technology is high and the energy saving is reduced
which leads to a high payback and a negative NPV.
Table 12 – Microturbine analysis summary.
Parameters B4
EBS [€/year] 6 850
Investment [€] 87 300
Payback [Years] 12.7
IRR [%] 4.7
NPV [€] 14 608
PES [%] 10.8
PESAbs [%] 4.0
TOE savings [toe/year] 36
GHG savings [tCO2eq/year] 62
EEE [%] 75.0
Electrical load [%] 16.9
Thermal Load [%] 25.9
3.3 Comparative Analysis
Following the analysis in the previous sections, the most
favourable scenario for each technology can now be
elected, trough Table 13.
Table 13 – Technologies summary.
Parameters ICE Microturbine
EBS [€/year] 9 216 6 850
Investment [€] 92 800 87 300
Payback [Years] 10.1 12.7
IRR [%] 7.7 4.7
NPV [€] 44 304 14 608
PES [%] 22.7 10.8
PESAbs [%] 9.8 4.0
TOE savings [toe/year]
35 36
GHG savings [tCO2eq/year]
60 62
EEE [%] 110.8 75.0
Electrical load [%] 22.4 16.9
Thermal Load [%] 25.9 25.9
From the table above it is possible to conclude that the
ICE with load control, corresponding to the scenario B4,
is the most attractive choice.
The option includes an initial investment of € 92 800
which is estimated to be recovered in about 10 years,
and an IRR of 7.7%. At the end of equipment life, i.e.
after 20 years, the NPV of the investment is € 44,304
with an interest rate of 3% per year.
Summing up the scenario B4:
ICE with partial load mode
o 2 X Ec Power XRGI 20 – Total power 40 kwe.
Single effect Absorption Chiller water-ammonia
o 3 X Robur ACF-60LB – Total cooling power ≈40
kWc or 25 kwe
Operating schedule – Business days from 9 to 21h
Figure 8 shows the supermarket operation in a working
day of January, clearly highlighting the cooling demand,
the operating schedule of the absorption chillers pack
and the period in which the compression chillers are
active.
K€
2K€
4K€
6K€
8K€
10K€
12K€
14K€
16K€
K€
1K€
2K€
3K€
4K€
5K€
6K€
7K€
8K€
A1
A2
A3
A4
B1
B2
B3
B4
C1
C2
C3
C4
D1
D2
D3
D4
Scenarios
Microturbine Máx Load
EBS NPV
8
Figure 8 – Cooling production in January weekdays
Figure 9 shows the supermarket electricity demand, the
electricity produced by the generator and one that is
imported from the grid. Although not showed here, the
energy demand in the summer is higher than winter
because the power consumed by the compression
chillers is higher, as expected.
Figure 9 – Electricity Demand and production during August
weekdays.
Due to the selected prime mover size the amount of
energy sold to the grid is reduced, however it occurs in
the transition from daytime to night-time, representing
around 596 kWh which translates into approximately 66€
of cash flow. When analysing scenarios that consider
higher power generators and running during the entire
year, more electricity is produced in excess and sold to
the grid, generating higher cash flow however the higher
fuel costs lead to a negative balance.
4 Conclusion
When analysing a building of this type, geographically
located in a Mediterranean climate zone and taking into
account the equipment size, it is possible to draw some
conclusions.
Comparing the results obtained it appears that the most
viable solution in operating strategy is schedule 4,
weekdays from 9 to 21 hours, contributing to a
significant reduction of conventional plant operation
during the peak period. Thus the CCHP plant runs about
3048 hours or 35% of the year. Other combinations of
operation schedules and sizes were investigated in this
study, however not showing better results to the
previously presented and therefore not shown.
The ICE option achieved the best results with a total
installed capacity of 40kwelectric along with a cooling plant
with three single effect absorption chillers water-
ammonia, working in parallel to provide approximately
40kWcooling. The most favourable operating strategy
consists in running the plant from 9 AM to 21 PM during
the week days with the partial load (50%) option enable.
The economic and energetic results indicate a net
present value of € 44 304, a payback period of 10.1 years
and an absolute primary energy savings of 9.8%.
The study carried out also shows that it is not profitable
to operate the trigeneration plant during full time
because the cost of electricity during night time is about
25-30% less than the cost in daytime, as such the
proposed system should be operated only during the
daytime.
From the economic point of view and regarding the
current economic climate a payback period of about 10
years is not attractive to potential investors thus this
investment is not considered economically viable. As
stated in the literature, the most favorable scenarios for
0,05,0
10,015,020,025,030,035,040,045,050,0
Co
olin
g P
ow
er
[kW
e]
January - Weekdays
Absorption Chiller Compression Chiller
Cooling Demand
0,0
20,0
40,0
60,0
80,0
100,0
Ele
ctri
c P
ow
er
[kW
e]
August - Weekdays
Electricity imported from gridElectricity Generated by ICE unitElectric Demand
9
this type of investment reach payback periods of 4-5
years, about half the time compared to the best scenario
presented by this study.
The trigeneration technology may become profitable in
this area of application if we consider larger
supermarkets and/or placed in residential or commercial
parks with higher energy needs. Thus the equipment size
will be greater which will benefit from significant
reduction in the technology cost per electrical kilowatt. It
is also possible to obtain more economically attractive
results if the building is located in a colder climate region
such as northern Portugal where the demand for heating
is higher than the Midwest Region. Other option to make
this a profitable investment is to include in the analysis a
high school situated next to the supermarket. The school
schedule is similar to the supermarket and has both
thermal and electrical demand.
Acronyms
CCHP – Combined Cooling, Heat and Power
CHP – Combined Heat and Power
COP – Coefficient of Performance
EBS – Energy Bill Savings
EEE – Equivalent Electric Efficiency
GHG – Green House Gas
HAVAC – Heat, Ventilation and Air Conditioning
ICE – Internal Combustion Engine
IRR – Internal Return Rate
NPV – Net Present Value
O&M – Operation and Maintenance
PES – Primary Energy Savings
PESAbs – Absolute Primary Energy Savings
TOE – Tone of Oil Equivalent
5 References
[1] M. Jradi e S. Riffat, “Tri-generation systems: Energy
policies, prime movers, cooling technologies,
configurations and operation strategies.,” Renewable
and Sustainable Energy Reviews, vol. 32, p. 396–415,
2014.
[2] M. Marimón e e. al., “Integration of trigeneration in
an indirect cascade refrigeration system in
supermarkets.,” Energy and Buildings, vol. 23, p.
1427–1434, 2011.
[3] G. Maidment e e. al., “Application of combined heat-
and-power and absorption cooling in a
supermarket.,” Applied Energy, vol. 63, pp. 169-190,
1999.
[4] G. Maidment e R. Tozer, “Combined cooling heat and
power in supermarkets,” Applied thermal
engineering, vol. 22, pp. 653 -665, 2002.
[5] I. Suamir e S. Tassou, “Performance evaluation of
integrated trigeneration and CO2 refrigeration
systems,” Applied Thermal Engineering, vol. 50, pp.
1487 -1495, 2013.
[6] Sav Systems - EC Power, “LoadTracker CHP operating
efficiencies & Data Sheet,” 2012.
[7] Capstone Turbine Corporation, “Capstone Data Sheet
& specifications,” 2010.