FDP First Review Rev1.ppt

Embed Size (px)

Citation preview

  • 8/10/2019 FDP First Review Rev1.ppt

    1/27

    Initial Data

    Assessment of

    I-FiledTeam 6

  • 8/10/2019 FDP First Review Rev1.ppt

    2/27

    OUTLINE

    Team Introduction

    Project Objective

    Gantt Chart & Current Status

    Summary of Available Data

    Geological Description

    Petrophysical Analysis

    Mobility Analysis

    Fluid Properties Analysis

    STOIIP Estimation & Reserve Calculation

  • 8/10/2019 FDP First Review Rev1.ppt

    3/27

    TEAMINTRODUCTION

    Highly skilled petroleum professionals invarious industry aspects:

    HSS&E Technical Economical

    Swarjit Samajpati Moutaz Saleh Vishnu Anand Sarath Vincent

    Abdul SaboorCesar PinoargoteOnyeka Chukwudum

  • 8/10/2019 FDP First Review Rev1.ppt

    4/27

    PROJECTOBJECTIVE

    Develop the OPTIMUM full Field Development Plan forI-Field

    Covering all stages from Appraisal until Abandonment

  • 8/10/2019 FDP First Review Rev1.ppt

    5/27

    GANTTCHART& CURRENTSTATUS

    Data Collection

    Geological Description

    Petrophysical Analysis

    Fluid Properties

    STOIIP & ReserveEstimation

    1st Milestone

    Reservoir Modelling

    Drilling Plan

    Production Facilities

    Economic Analysis

    2nd Milestone

    HSSE Strategy

    Final Presentation &Report

    Project Submission

    0 7 14 21 28 35 42 49 56Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8

  • 8/10/2019 FDP First Review Rev1.ppt

    6/27

    Located in UK sector of North Sea, Block 56

    6 Appraisal Wells

    I-FIELDOVERVIEW

    I

    Coordinates

    51o4700N

    01o4400E

  • 8/10/2019 FDP First Review Rev1.ppt

    7/27

    X1 X2 X3 X4 X5 X6

    MapsTop structure map with well locations + Digital Contours

    Single seismic line passing through well X1

    Logs

    RFT

    Well Test

    Core Data

    PVT

    SUMMARYOFAVAILABLEDATA

  • 8/10/2019 FDP First Review Rev1.ppt

    8/27

    Geological Description Contour Map

    Top Structure Map

    1 2 Kms

    N

    1

    2

    6

    3

    45

    Exploration Well Top

    Reservoir Location

    9800 Depth to Top Reservoir

    (Feet Subsea)

    A

    A

    X

    X

    Y

    Y

  • 8/10/2019 FDP First Review Rev1.ppt

    9/27

    GEOLOGICALDESCRIPTION

    Structurally: A faulted anticline plunging in SE

    Stratigraphically: Shaly SandLimestone Chalk

  • 8/10/2019 FDP First Review Rev1.ppt

    10/27

    PETROPHYSICALANALYSIS

    X-Xcross section

    1

    2

    3

    4

    X2 X1 X6 X5

  • 8/10/2019 FDP First Review Rev1.ppt

    11/27

    PETROPHYSICALANALYSIS

    Y-Ycross section

    1

    2

    3

    4

    X3 X6 X4

  • 8/10/2019 FDP First Review Rev1.ppt

    12/27

    MOBILITYANALYSIS

    1

    2

    6

    3

    4 5

    To determine WOC

    Connectivity / Discontinuity

    X1

    X2

    X3

    X5

    Oil

    Water Main

    Water East

    WOC =

    10580

    WOC = 10850

    Oil Gradient =

    0.295 psi/ft

    Water Gradient =

    0.459 psi/ft

  • 8/10/2019 FDP First Review Rev1.ppt

    13/27

    FLUIDPROPERTIESANALYSIS

    Under-saturated oil

    Initial Pressure = 5700 psia > Pb = 1785 psia

    Tr = 260 F

    Over-pressurized 0.54 psi/ft

    bo= 1.32 rbbl/stb

    Rs= 500 scf/stb

    Oil Gravity = 40 API

  • 8/10/2019 FDP First Review Rev1.ppt

    14/27

    WELLTESTANALYSIS

    High Wells Production Rate:

    High PI:

    Good Permeability:

    Boundary Detected

    KH (well test) comparable with

    KH (core)

    8,000 25,000 BOPD

    35 65 BOPD/psi

    300 750 mD

    Sealing Fault

    Layer Cake Reservoir

  • 8/10/2019 FDP First Review Rev1.ppt

    15/27

    STOOIP & RESERVEESTIMATION

    Net to Gross Ration:

    LOGS

    Gross Rock Volume:

    Contour Map + RFT

    Porosity:

    LOGS

    Initial Water Saturation:

    LOGS

    BoSwiONTGGRVSTOOIP /)1(***

    Formation Volume Factor:

    PVT Reports

    RFSTOOIPRESERVES *

    Recovery Factor:

    Drive Mechanism

    Probabilistic

    for STOOIP Calculation

    Deterministic

    for Reserve Calculation

  • 8/10/2019 FDP First Review Rev1.ppt

    16/27

    DETERMINISTICMETHOD

  • 8/10/2019 FDP First Review Rev1.ppt

    17/27

    PROBABILISTICMETHOD

  • 8/10/2019 FDP First Review Rev1.ppt

    18/27

  • 8/10/2019 FDP First Review Rev1.ppt

    19/27

    Back-Up

  • 8/10/2019 FDP First Review Rev1.ppt

    20/27

    PROPERTIESSUMMARY

    Wells H NTG Sw Porosity VShale

    X-1 26 0.855 0.528 0.205 0.029

    X-2 117 0.84 0.175 0.297 0.059

    X-1 576 0.947 0.142 0.247 0.023

    X-3 586 0.999 0.2 0.226 0.069

    X-4 609 0.975 0.178 0.253 0.038

    X-5 433 0.823 0.334 0.223 0.091

    X-6 440 0.955 0.339 0.201 0.087

  • 8/10/2019 FDP First Review Rev1.ppt

    21/27

    PARAMETERSENSITIVITIES

    Property Distribution Minimum Mean Maximum

    GVR(acre-ft)

    623792 951716 1436845

    NTG 0.195 0.455 0.716

    12.7% 17.05% 21.4%

    Sw 0.563 0.388 0.214

    Bo 1.44 1.39 1.34

  • 8/10/2019 FDP First Review Rev1.ppt

    22/27

    VOLUMECALCULATIONS

  • 8/10/2019 FDP First Review Rev1.ppt

    23/27

    ADDITIONALDATALIST

    well X1 well X2 well X3 well X4 well X5 well X6

    lab report DST core analysis DST well test report

    core analysis pvt reportpressure test

    analysiscore analysis

    oil test

    evaluation

    fluid analysisproduction well

    test report

    pressure gaugereport may 29

    1983

    pressure gauge

    report prod test

    precision

    pressure gauge

    survey jun 17th

    high accuracy

    pressure measu

    magnetic

    recording

    pressure gauge

    bottom hole

    pressure report

    precision

    pressure gauge

    survey jun 23rd

    static pressuresurvey

    static pressuresurvey

    static pressuresurvey

    RFT BHP survey RFT RFT deviation report

    production

    summary

    rel

    pemeabilities

  • 8/10/2019 FDP First Review Rev1.ppt

    24/27

    AVAILABLELOGS

    well X1 well X2 well X3 well X4 well X5 well X6

    sonic log density log

    neutron

    density log

    neutron

    density log

    neutron

    density log

    neutron

    density log

    neutron

    density log

    neutron

    density log

    ISF/sonic log sonic log ISF/sonic log ISF/sonic loginduction

    sonic log

    dual laterolog dual laterolog dual laterolog dual laterolog dual laterolog

    formation

    testerGR log

    microlaterolog microlaterolog microlaterolog microlaterolog

  • 8/10/2019 FDP First Review Rev1.ppt

    25/27

    0.0

    0.1

    1.0

    10.0

    100.0

    1,000.0

    10,000.0

    - 5.0 10.0 15.0 20.0 25.0 30.0 35.0

    HorizontalPer

    meability,md

    Inerconnected Porosity

    Horizontal Permeability vs Porosity

    X 1 X 4 X 5 Expon. (X 1) Expon. (X 4) Expon. (X 5)

    Horizontal Permeability Distribution Horizontal Permeability Log-LogDistribution

  • 8/10/2019 FDP First Review Rev1.ppt

    26/27

    10,200

    10,400

    10,600

    10,800

    11,000

    11,200

    11,400

    11,600

    11,800

    12,000

    12,200

    12,400

    0 1000 2000 3000 4000 5000

    MeasuredDepth,

    ft

    Horizontal Permeablility, md

    Horizontal Permeability Distribution

    0.1 1 10 100 1000 10000

    Horizontal Permeablility, md

    Horizontal Permeability Log LogDistribution

    X 1

    X 5

    X 4

  • 8/10/2019 FDP First Review Rev1.ppt

    27/27

    Permeability(

    md)Skin q(STB/day) B(RB/STB) m* Ct(psi-1) h(feet) Area (ft2)

    well X2 213.19 1.032 3781 1.41 0.27 0.97878 1.26E-05 130 2.14E+06

    Well X3 188.4 -4.006 1.50E+04 1.34 0.25 1.86 1.22E-05 130 7.02E+06

    Well X5 552.20 13.7 1.56E+04 1.44 0.23 0.0322 1.30E-05 295 4.96E+06

    Well X6 177.8 34.62 1.50E+04 1.34 0.23 3.8352 1.08E-05 467 1.18E+06

    DRAWDOWN ANALYSIS

    BUILDUP ANALYSIS

    m m* P1hr P*Shape

    factor(CA)

    Horner

    timetp(hrs) LTR Slope LTR/MTR PDMBH Pav(psia)

    Distance

    to fault

    Well X2 13.823 1.313 5663 5681 3.219 3.436 24.361 36.47 2.638 0.310 5679 457.48

    Well X3 115.95 1.69 5107 5251 21.489 3.893 26.83 69.38 0.598 0.941 5203 403.33

    Well X5 9.709 1.202 4291 4303 2.326 4.012 14.81 35.048 3.609 -0.246 4304 557.19

    Well X6 32.56 3.454 4191 4227 3.936 2.190 12.06 227.64 6.990 0.400 4221 458.95