89
STS-130/20A FD 08 Execute Package MSG Page(s) Title 088C 1 - 14 FD08 Flight Plan Revision 089A 15 - 16 FD08 Mission Summary 090A 17 - 22 FD08 Transfer Message 091 23 FD08 Crew Choice Downlink 092 24 - 47 Stowage Locations for FD08 (GMT 046) 093 48 - 50 Cupola Vestibule Outfitting Matrix 094 --- Daily Summary (Electronic Only) 095 51 - 56 Descent Sample Transfer from MELFI to GLACIER 096 57 CGBA Swap Overview 097 --- FD08 PAO Event Summary - WOR RADIO, KTVI-TV AND WREG-TV (Electronic Only) 098A --- FD08 PAO EVENT SUMMARY MESSAGE - EXPLORER SCHOOLS EDUCATION EVENT (Electronic Only) 099 --- IMMT Results - 2/14/10 (Electronic Only) 100 58 - 66 NH3 Jumper MLI Closeout Photo Details 102 67 FD08 EVA Deltas 103 68 - 71 20A CGBA Swap - Unpowered 104 72 - 84 SSRMS Cupola Return to N3 Port 105 85 - 87 Reference Data for Contingency Cupola Return Approved by FAO: R. Smith Last Updated: Feb 14 2010 9:11 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

  • Upload
    leduong

  • View
    243

  • Download
    4

Embed Size (px)

Citation preview

Page 1: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

STS-130/20A FD 08 Execute Package MSG Page(s) Title

088C 1 - 14 FD08 Flight Plan Revision

089A 15 - 16 FD08 Mission Summary

090A 17 - 22 FD08 Transfer Message

091 23 FD08 Crew Choice Downlink

092 24 - 47 Stowage Locations for FD08 (GMT 046)

093 48 - 50 Cupola Vestibule Outfitting Matrix

094 --- Daily Summary (Electronic Only)

095 51 - 56 Descent Sample Transfer from MELFI to GLACIER

096 57 CGBA Swap Overview

097 --- FD08 PAO Event Summary - WOR RADIO, KTVI-TV AND WREG-TV (Electronic Only)

098A --- FD08 PAO EVENT SUMMARY MESSAGE - EXPLORER SCHOOLS EDUCATION EVENT (Electronic Only)

099 --- IMMT Results - 2/14/10 (Electronic Only)

100 58 - 66 NH3 Jumper MLI Closeout Photo Details

102 67 FD08 EVA Deltas

103 68 - 71 20A CGBA Swap - Unpowered

104 72 - 84 SSRMS Cupola Return to N3 Port

105 85 - 87 Reference Data for Contingency Cupola Return Approved by FAO: R. Smith Last Updated: Feb 14 2010 9:11 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

Page 2: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

THIS PAGE INTENTIONALLY BLANK

1

Page 3: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 088C (22-0710) - FD08 FLIGHT PLAN REVISION

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

MSG-088 FD08 Flight Plan Revision MSG-089 FD08 Mission Summary MSG-090 FD08 Transfer Message MSG-091 FD08 Crew Choice Downlink MSG-092 Stowage Locations for FD08 (GMT 046) MSG-093 Cupola Vestibule Outfitting Matrix MSG-094 Daily Summary MSG-095 Descent Sample Transfer from MELFI to GLACIER MSG-096 CGBA Swap Overview MSG-097 FD08 PAO Event Summary - WOR Radio, KTVI-TV And WREG-TV MSG-098 FD08 PAO Event Summary Message - Explorer Schools Education Event MSG-099 IMMT Results - 2/14/10 MSG-100 NH3 Jumper MLI Closeout Photo Details MSG-102 FD08 EVA Deltas MSG-103 20A CGBA Swap - Unpowered MSG-104 SSRMS Cupola Return to N3 Port MSG-105 Ref Data for Contingency Cupola Return 1. Post-Sleep Cryo Config 25

26

27

28 29

30 31 32 33 34

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

For today's Post-Sleep cryo config, O2 tanks 2, 3, and 4 and H2 tanks 2 and 4 will be active. R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) O2 TK3 HTR A - AUTO A11 CRYO TK4 HTR O2 A - AUTO A15 CRYO TK5 HTR O2 A - OFF

END OF PAGE 1 OF 14, MSG 088C (22-0710) 2

Page 4: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 088C (22-0710) - FD08 FLIGHT PLAN REVISION

END OF PAGE 2 OF 14, MSG 088C (22-0710)

1 Pre-Sleep Cryo Config 2

3

4 5

6

7 8

9 10

11

12

13

14

15

16

17 18

20 21 22 23 24 25 26 27 28 29 30

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 1 will be closed with O2 tanks 1 and 5 and H2 tanks 1 and 4 active. A15 CRYO TK5 HTR O2 A - AUTO A11 CRYO TK4 HTR O2 A - OFF R1 O2 TK1 HTR A - AUTO H2 TK1 HTRS A,B (two) - AUTO O2,H2 TK2 HTRS A,B (four) - OFF O2 TK3 HTR A - OFF O2,H2 MANF VLV TK1 (two) - CL (tb-CL)

2. Zambo & Steve, 19

We have a minor delta to the N3 POT BUS VENT/FILL activity scheduled at MET 6/18:05. In Assy Ops procedure {1.109 NODE 1 AND NODE 3 POTABLE WATER AND URINE BUS PURGE WITH VACUUM BACKFILL OF POTABLE WATER BUS}, step 11.5, rather than using a PWR, you will need to use CWC-I S/N 2009. The PWRs available will have too much gas. To connect the CWC-I, you will need a R-Y adapter. Ask TJ for that R-Y adapter when you're ready for it and then return it to him when you're done. Thank you!

3. REPLACE PAGES 2-26 THROUGH 2-29 and 3-80 THROUGH 3-87. 31

3

Page 5: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

GROUND BOLTING

NO EXERCISE

[FROM 3RD SET OF BOLTS RELEASED UNTIL A-BOLTS COMPLETE]

FD08

REPLANNED

2-26

S T S - 1 3 0 S T S ISS

22

2302/15

0102

0304

0506

0708

09GMT 02/

14/10 (045)

12

1314

1516

1718

1920

2122

23007/00

MET

Day 006

CDR

POST

SLE

EPI M U

C W C

I N I T # 3

C W C

X F E R

C W C

T E R M

N 2 - I

N 2 - T

N3 POT BUS

VENT/FILL

L O GMEAL

EXERCISE

I L L U M - O

N3URIN/POT

BUS VENT

N3URINE

BUS

FILL

C O N D

C H G / O

XFER OPS

PLT

POST

SLE

EPCBCS

MOVE

N3N

N3P

MNVR TO CPLA &

GRPL

CUPOLA

UNBTH

&RELOC

CUPOLA

DEPRESS

PART1

D P R S P 2

C U P O L A

D E P R E S S

P A R T 3

L I M P

B R A K E

R E L O C

N O D 3

E L P S

E N A B L E

PFC

OCA

L O GMEAL

CUP VEST

OUTFIT PT1

PAO

POST

SLE

EP

N 3 P *

N 3 N *

NOD3O4 RACK

OUTFIT

EXERCISE

SSRMS

CONT

PROC

RVW

MS1

POST

SLE

EPCUPOLA

UNBTH

&RELOC

MNVR TO CPLA &

GRPL

CUPOLA

DEPRESS

PART1

CBCS

S/U

CUPOLA CBM

DEMATE

D P R S P 2

C U P O L A

D E P R E S S

P A R T 3

1ST

STG

CAP

2ND

STG

CAP

V E R F Y

S T A N D

S P I N A L

R E L O C

L I M P

B R A K E

MEAL

EXERCISE

PAO

STBD

DECK

IMV

C/O

SSRMS

CONT

PROC

RVW

CUP VEST

OUTFIT PT1

MS2

N3 NAD

MPEV

INSTL

POST

SLE

EPEXERCISE

EVA

TOOL

CONFIG

S T A N D

S P I N A L

PFC

OCA

MEAL

N3URIN/POT

BUS VENT

N3URINE

BUS

FILL

N3 POT BUS

VENT/FILL

X F E R

U P D A T E

XFER OPS

P O S T

S L E E P

XFER OPS

N O D 3 @

MS3

POST

SLE

EPE_LK PREP

EVA TOOL CONFIG

TOOL

AUDIT

A S P I R I N

S T A N D

S P I N A L

G L C R

P / T V 0 9

PFC

OCA

L O GMEAL

EXERCISE

P/TV06 R

OBO OPS

P / T V 0 6

S / UCGBA

UNIT SWAP

POST

SLE

EP

G A L L E Y #

G A L L E Y @

MS4

G L C R

POST

SLE

EPE_LK PREP

EVA TOOL CONFIG

TOOL

AUDIT

A S P I R I N

S T A N D

S P I N A L

MLF

GLCR

20A

SMP

XFR

B S A - T

I N S T L ^

MEAL

E X E R

E M U S W P

SMP

XFR

RVW

DAY/NIGHT

ORBIT

103

104

105

106

107

108

109

110

111

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

♣N3 STBD MPEV INSTL

*HATCH UNLATCH

*HATCH LATCH

@NADIR HATCH OPEN

#MORNING CONFIG

@OVERNIGHT CONFIG

^METOX & BATTERY

NOTES

2-26

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

GROUND BOLTING

NO EXERCISE

[FROM 3RD SET OF BOLTS RELEASED UNTIL A-BOLTS COMPLETE]

FD08

REPLANNED

S T S - 1 3 0 S T S ISS

22

2302/15

0102

0304

0506

0708

09GMT 02/

14/10 (045)

12

1314

1516

1718

1920

2122

23007/00

MET

Day 006

CDR

POST

SLE

EPI M U

C W C

I N I T # 3

C W C

X F E R

C W C

T E R M

N 2 - I

N 2 - T

N3 POT BUS

VENT/FILL

L O GMEAL

EXERCISE

I L L U M - O

N3URIN/POT

BUS VENT

N3URINE

BUS

FILL

C O N D

C H G / O

XFER OPS

PLT

POST

SLE

EPCBCS

MOVE

N3N

N3P

MNVR TO CPLA &

GRPL

CUPOLA

UNBTH

&RELOC

CUPOLA

DEPRESS

PART1

D P R S P 2

C U P O L A

D E P R E S S

P A R T 3

L I M P

B R A K E

R E L O C

N O D 3

E L P S

E N A B L E

PFC

OCA

L O GMEAL

CUP VEST

OUTFIT PT1

PAO

POST

SLE

EP

N 3 P *

N 3 N *

NOD3O4 RACK

OUTFIT

EXERCISE

SSRMS

CONT

PROC

RVW

MS1

POST

SLE

EPCUPOLA

UNBTH

&RELOC

MNVR TO CPLA &

GRPL

CUPOLA

DEPRESS

PART1

CBCS

S/U

CUPOLA CBM

DEMATE

D P R S P 2

C U P O L A

D E P R E S S

P A R T 3

1ST

STG

CAP

2ND

STG

CAP

V E R F Y

S T A N D

S P I N A L

R E L O C

L I M P

B R A K E

MEAL

EXERCISE

PAO

STBD

DECK

IMV

C/O

SSRMS

CONT

PROC

RVW

CUP VEST

OUTFIT PT1

MS2

N3 NAD

MPEV

INSTL

POST

SLE

EPEXERCISE

EVA

TOOL

CONFIG

S T A N D

S P I N A L

PFC

OCA

MEAL

N3URIN/POT

BUS VENT

N3URINE

BUS

FILL

N3 POT BUS

VENT/FILL

X F E R

U P D A T E

XFER OPS

P O S T

S L E E P

XFER OPS

N O D 3 @

MS3

POST

SLE

EPE_LK PREP

EVA TOOL CONFIG

TOOL

AUDIT

A S P I R I N

S T A N D

S P I N A L

G L C R

P / T V 0 9

PFC

OCA

L O GMEAL

EXERCISE

P/TV06 R

OBO OPS

P / T V 0 6

S / UCGBA

UNIT SWAP

POST

SLE

EP

G A L L E Y #

G A L L E Y @

MS4

G L C R

POST

SLE

EPE_LK PREP

EVA TOOL CONFIG

TOOL

AUDIT

A S P I R I N

S T A N D

S P I N A L

MLF

GLCR

20A

SMP

XFR

B S A - T

I N S T L ^

MEAL

E X E R

E M U S W P

SMP

XFR

RVW

DAY/NIGHT

ORBIT

103

104

105

106

107

108

109

110

111

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

♣N3 STBD MPEV INSTL

*HATCH UNLATCH

*HATCH LATCH

@NADIR HATCH OPEN

#MORNING CONFIG

@OVERNIGHT CONFIG

^METOX & BATTERY

4

Page 6: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

FD08

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD08

REPLANNED

GROUND BOLTING

NO EXERCISE

[FROM 3RD SET OF BOLTS RELEASED UNTIL A-BOLTS COMPLETE]

2-27

I S S E X P 2 2 STS

22

2302/15

0102

0304

0506

0708

09GMT 02/

14/10 (045)

12

1314

1516

1718

1920

2122

23007/00

MET

Day 006

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

1516

12

34

56

7114

132

TLM FORMAT

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

POST

SLEE

PPO

STSL

EEP

PFC

DPC

♣⊕ F

FQCEVIS

T2

C B C S *

CUPOLA CBM

DEMATE

V E R F Y

1ST

STG

CAP

2ND

STG

CAP

MEAL

SMP

XFR

RVW

MLF

GLCR

20A

SMP

XFR

SPINAL DATA CLCT OPR

S T A N D

S P I N A L

FE-1

POST

SLE

EPP WDP

CТЕ

Х-15

DLN3-LAUNCH

BOLT-RMV

N3-LAUNCH BOLT-RMV

MEAL

VELO

СОЖ-MNT

TVIS

FE-4

POST

SLE

EP♥ D

PCPW

И П - 1

TVIS

СМО-INV

MEAL

СГО-АСУ-Е-К-REPL

♠СВ-А-MNT

VELO

FE-5

POST

SLE

EPPO

STSL

EEP

D 2 X S

D 2 X S

DPC

φ•SODI-DSC-H/W SETUP

∇CEVIS

H T C S U

FFQ

◊MEAL

EVA

CAMERA

CNFG

∗CBEF-FAN

REPAIR-1G

S T A N D

S P I N A L

NOD3

AFT

HATCH

COVR

♣T2

FE-6

POST

SLE

EPP WDP

CT2

C W C I

F I L L 1

N3 LTL

SMPL

TOOL

INS

ND3

LTL

SMPL

N D 3 L T L

C L S O U T

C W C I

F I L L 2

⊕HD SU

S T A N D *

C W C I

F I L L 4

♦SPINAL

S/U

MEAL

P A OFFQ

VEST PRESS LK CK

S T A N D

S P I N A L

CEVIS

♣UPA

FIL

L⊕TH

C-IMV-LABEL

♦CMS-ARED RLCT-CLNUP

R-PAO-TV

♥СОГ

С-ЭЛ

ЕК-А

Ф-БЖ-MON

∆IMS-EDIT

♠СГО-АСУ-МП-ФВ-MNT1

φWHC

-HARDWAR-RETRIEVE

•MSG

-FACILITY-ACT

∇MSG-FACILITY-PWR DN

◊WHC-UR/IF-CHGOU

T∗EVA CAMR

♣HTC DEAC

⊕CWCI FILL 2

♦CMS-ARED RLCT

-CLNUP

CUPOLA-PRESS-S/U

♥SPNL DATA CLCT OPR

*POWER UP*S/U

NOTES

2-27

FD08

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD08

REPLANNED

GROUND BOLTING

NO EXERCISE

[FROM 3RD SET OF BOLTS RELEASED UNTIL A-BOLTS COMPLETE]

I S S E X P 2 2 STS

22

2302/15

0102

0304

0506

0708

09GMT 02/

14/10 (045)

12

1314

1516

1718

1920

2122

23007/00

MET

Day 006

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

1516

12

34

56

7TLM FORMAT

114

132

ATTITUDE

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

POST

SLEE

PPO

STSL

EEP

PFC

DPC

♣⊕ F

FQCEVIS

T2

C B C S *

CUPOLA CBM

DEMATE

V E R F Y

1ST

STG

CAP

2ND

STG

CAP

MEAL

SMP

XFR

RVW

MLF

GLCR

20A

SMP

XFR

SPINAL DATA CLCT OPR

S T A N D

S P I N A L

FE-1

POST

SLE

EPP WDP

CТЕ

Х-15

DLN3-LAUNCH

BOLT-RMV

N3-LAUNCH BOLT-RMV

MEAL

VELO

СОЖ-MNT

TVIS

FE-4

POST

SLE

EP♥ D

PCPW

И П - 1

TVIS

СМО-INV

MEAL

СГО-АСУ-Е-К-REPL

♠СВ-А-MNT

VELO

FE-5

POST

SLE

EPPO

STSL

EEP

D 2 X S

D 2 X S

DPC

φ•SODI-DSC-H/W SETUP

∇CEVIS

H T C S U

FFQ

◊MEAL

EVA

CAMERA

CNFG

∗CBEF-FAN

REPAIR-1G

S T A N D

S P I N A L

NOD3

AFT

HATCH

COVR

♣T2

FE-6

POST

SLE

EPP WDP

CT2

C W C I

F I L L 1

N3 LTL

SMPL

TOOL

INS

ND3

LTL

SMPL

N D 3 L T L

C L S O U T

C W C I

F I L L 2

⊕HD SU

S T A N D *

C W C I

F I L L 4

♦SPINAL

S/U

MEAL

P A OFFQ

VEST PRESS LK CK

S T A N D

S P I N A L

CEVIS

NOTES

♣UPA

FIL

L⊕TH

C-IMV-LABEL

♦CMS-ARED RLCT-CLNUP

R-PAO-TV

♥СОГ

С-ЭЛ

ЕК-А

Ф-БЖ-MON

∆IMS-EDIT

♠СГО-АСУ-МП-ФВ-MNT1

φWHC

-HARDWAR-RETRIEVE

•MSG

-FACILITY-ACT

∇MSG-FACILITY-PWR DN

◊WHC-UR/IF-CHGOU

T∗EVA CAMR

♣HTC DEAC

⊕CWCI FILL 2

♦CMS-ARED RLCT

-CLNUP

CUPOLA-PRESS-S/U

♥SPNL DATA CLCT OPR

*POWER UP*S/U

5

Page 7: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

FD08

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

ISS EXTERNAL SURVEY

BEHN

KEN

FD08

REPLANNED

2-28

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

15/10 (046)

007/00

0102

0304

0506

0708

0910

1112

MET

Day 007

CDR

I L L U M - I

PMC

A/G

FLTR

CLN

- IN

SPEC

T

F D C O N F

PRE SLEEP

SLEEP

X F E R

O P S

PLT

PAO

SLEEP

PRE SLEEP

C&W

PNL

CUP

VEST

OUTF

ITPT

1

PRE

SLEE

P

MS1

CUPO

LA F

NLK

CK

INIT

PRE SLEEP

SLEEP

CUP

VEST

OUTF

ITPT

1

MS2

SLEEP

DPC

PRE SLEEP

X F E R

T A G U P

X F E R

B R I E F

MS3

PMA3

GRPL

PRE SLEEP

SLEEP

P R E

S L E E P

MS4

M D D K C K

SLEEP

PRE SLEEP

PMA3

GRPL

EXER

PAO

PRE

SLEE

P

DAY/NIGHT

ORBIT

111

112

113

114

115

116

117

118

119

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

♣N3

STBD

MPE

V IN

STL

NOTES

2-28

FD08

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

ISS EXTERNAL SURVEY

BEHN

KEN

FD08

REPLANNED

S T S - 1 3 0 S T S ISS

10

1112

1314

1516

1718

1920

21GMT 02/

15/10 (046)

007/00

0102

0304

0506

0708

0910

1112

MET

Day 007

CDR

I L L U M - I

PMC

A/G

FLTR

CLN

- IN

SPEC

T

F D C O N F

PRE SLEEP

SLEEP

X F E R

O P S

PLT

PAO

SLEEP

PRE SLEEP

C&W

PNL

CUP

VEST

OUTF

ITPT

1

PRE

SLEE

P

MS1

CUPO

LA F

NLK

CK

INIT

PRE SLEEP

SLEEP

CUP

VEST

OUTF

ITPT

1

MS2

SLEEP

DPC

PRE SLEEP

X F E R

T A G U P

X F E R

B R I E F

MS3

PMA3

GRPL

PRE SLEEP

SLEEP

P R E

S L E E P

MS4

M D D K C K

SLEEP

PRE SLEEP

PMA3

GRPL

EXER

PAO

PRE

SLEE

P

DAY/NIGHT

ORBIT

111

112

113

114

115

116

117

118

119

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

♣N3

STBD

MPE

V IN

STL

6

Page 8: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

FD08

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD08

ISS EXTERNAL SURVEY

REPLANNED

2-29

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

15/10 (046)

007/00

0102

0304

0506

0708

0910

1112

MET

Day 007

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

78

910

1112

1314

1513

211

2114

112

TLM FORMAT

-XVV +ZLV TEA

ATTITUDE

ALL VHF

TDRS

W E ZBIAS -XLV -ZVV

ORB ATT

ISS

CDR

S P I N A L

SPIN

ALH/

WST

OWPW

PWDP

CPR

E SL

EEP-ISS

SLEEP

FE-1

TVIS

DPC

PWPR

E SL

EEP-ISS

SLEEP

FE-4

VELO

Э Л К Т

DPC

PWPR

E SL

EEP-ISS

SLEEP

FE-5

T2DP

C♣PW

PRE

SLEEP-ISS

SLEEP

FE-6

⊕HD SU

DPC

H A MPW

♦PR

E SLEEP-ISS

P A OSLEEP

♣UPA

FIL

L⊕SP

NL D

ATA

CLCT

OPR

♦PRE

SLE

EP-ISS

NOTES

2-29

FD08

WILL

IAMS

SURA

EV

KOTO

V

CREA

MER

NOGU

CHI

FD08

ISS EXTERNAL SURVEY

REPLANNED

I S S E X P 2 2 STS

10

1112

1314

1516

1718

1920

21GMT 02/

15/10 (046)

007/00

0102

0304

0506

0708

0910

1112

MET

Day 007

TDRS

AVAIL

DAY/NIGHT

DAILY ORBIT

78

910

1112

1314

15TLM FORMAT

132

112

114

112

ATTITUDE

-XVV +ZLV TEA

ALL VHF

TDRS

W E ZORB ATT

BIAS -XLV -ZVV

ISS

CDR

S P I N A L

SPIN

ALH/

WST

OWPW

PWDP

CPR

E SL

EEP-ISS

SLEEP

FE-1

TVIS

DPC

PWPR

E SL

EEP-ISS

SLEEP

FE-4

VELO

Э Л К Т

DPC

PWPR

E SL

EEP-ISS

SLEEP

FE-5

T2DP

C♣PW

PRE

SLEEP-ISS

SLEEP

FE-6

⊕HD SU

DPC

H A MPW

♦PR

E SLEEP-ISS

P A OSLEEP

NOTES

♣UPA

FIL

L⊕SP

NL D

ATA

CLCT

OPR

♦PRE

SLE

EP-ISS

7

Page 9: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

08

FD08 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDD

K DU

CT S

CREE

N

TEPC

(ST

ATUS

CHE

CK)

(

ORB

OPS,

CRE

W SY

S) HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

& O

CA R

OUTE

R.

Return all Shuttle IFM tools

used on ISS, per MSG 052, to

End

eavo

ur p

rior

to

slee

p.

A Omit steps 1.2 and 3

Use A/G 2 for audio

Inform MCC which PGS

C will be used

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

B N2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS) Step

s 1-6;

MCC will TMBU S/W FD

A in Step 1.

On MCC go, perform S

tep 7.

Work the ()s for all

steps performed

3-80

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/14

(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

6W

EZ

T D R S

~

~

~

D / N

O R B 1 0 3 1 0 4 1 0 5 1 0 6

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

CWC

FILL (

ORB

OPS,

CWC

OPS)

Ini

t Fi

ll #

3 R

ef.

MSG

027

CWC

TRAN

SFER

Tra

nsfe

r CW

C to

ISS

~

CWC

FILL (

ORB

OPS,

CWC

OPS)

Per

form

FIL

L TE

RMIN

ATIO

N

N2 R

EPRE

SS I

NIT B

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

EXER

CISE

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA

(ASSY OPS, ACT&C/O)

Steps 1-6.3

1.182 CUPOLA DEPRESS(N3 PORT) WITH N3 PCA

(ASSY OPS,ACT&C/O) Steps 6.5-7.3

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC )

Private Family Conference

KU TDRE (13:28-14:06) A Gimbal Flip:13:53

SLEEP LOGBOOK (ORB OPS, SDBI)

SSRMS CONTINGENCY PROC REVIEW

Ref. MSG 104 & MSG 105

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA

(ASSY OPS, ACT&C/O)

Steps 1-6.3

1.178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS, ACT&C/O) Steps 1-5

~

1.182 CUPOLA DEPRESS(N3 PORT) WITH N3 PCA

(ASSY OPS,ACT&C/O) Steps 6.5-7.3

SSRMS CONTINGENCY PROC REVIEW

Ref. MSG 104 & MSG 105

Notes

3-80

ZAMK

AVI

RTS

HIRE

08

FD08 EZ ACTIVITIES:

√O

CAC

FILT

ER &

MDD

K DU

CT S

CREE

N

TEPC

(ST

ATUS

CHE

CK)

(

ORB

OPS,

CRE

W SY

S) HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

& O

CA R

OUTE

R.

Return all Shuttle IFM tools

used on ISS, per MSG 052, to

End

eavo

ur p

rior

to

slee

p.

A Omit steps 1.2 and 3

Use A/G 2 for audio

Inform MCC which PGS

C will be used

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

B N2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS) Step

s 1-6;

MCC will TMBU S/W FD

A in Step 1.

On MCC go, perform S

tep 7.

Work the ()s for all

steps performed

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/14

(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 3 1 0 4 1 0 5 1 0 6

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

CWC

FILL (

ORB

OPS,

CWC

OPS)

Ini

t Fi

ll #

3 R

ef.

MSG

027

~CW

C TR

ANSF

ER T

rans

fer

CWC

to I

SS

CWC

FILL (

ORB

OPS,

CWC

OPS)

Per

form

FIL

L TE

RMIN

ATIO

N

N2 R

EPRE

SS I

NIT B

SLEE

P LO

GBOO

K (O

RB O

PS,

SDBI)

EXER

CISE

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA

(ASSY OPS, ACT&C/O)

Steps 1-6.3

1.182 CUPOLA DEPRESS(N3 PORT) WITH N3 PCA

(ASSY OPS,ACT&C/O) Steps 6.5-7.3

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC )

Private Family Conference

KU TDRE (13:28-14:06) A Gimbal Flip:13:53

SLEEP LOGBOOK (ORB OPS, SDBI)

SSRMS CONTINGENCY PROC REVIEW

Ref. MSG 104 & MSG 105

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA

(ASSY OPS, ACT&C/O)

Steps 1-6.3

~

1.178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS, ACT&C/O) Steps 1-5

1.182 CUPOLA DEPRESS(N3 PORT) WITH N3 PCA

(ASSY OPS,ACT&C/O) Steps 6.5-7.3

SSRMS CONTINGENCY PROC REVIEW

Ref. MSG 104 & MSG 105

Notes

8

Page 10: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

08

A Omit steps 1.2 and 3

Use A/G 2 for audio

Inform MCC which PGSC will be used

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

3-81

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/14

(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

6W

EZ

T D R S

~

~

~

D / N

O R B 1 0 3 1 0 4 1 0 5 1 0 6

~ ~B I A S - X L V - Z V VS T S A T T

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS) EXER

CISE

~

L9 P

AYLO

AD S

TATI

ON A

UDIO

A/G (two) - OFF

NETM

EETI

NG V

IDEO

CON

FERE

NCING

(OR

B OP

S, P

GSC )

Pri

vate

Family Conference

KU

TDRE

(14

:24-

14:5

6) A

TRAN

SFER

UPD

ATE

Ref

. Tr

ansf

er L

ist

& MS

G 090

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

KU TDRW (12:57-13:21) A

SLEEP LOGBOOK (ORB OPS, SDBI)

EXERCISE

MS4

GLACIER RECORD QUICK DIAGNOSTICS DATA (NOM)

(ASSY OPS, P/L), page 705

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

Notes

3-81

ROBI

NSON

PATR

ICK

BEHN

KEN

08

A Omit steps 1.2 and 3

Use A/G 2 for audio

Inform MCC which PGSC will be used

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/14

(045)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 3 1 0 4 1 0 5 1 0 6

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

EXER

CISE

L9 P

AYLO

AD S

TATI

ON A

UDIO

A/G (two) - OFF

NETM

EETI

NG V

IDEO

CON

FERE

NCING

(OR

B OP

S, P

GSC )

Pri

vate

Family Conference

KU

TDRE

(14

:24-

14:5

6) A

TRAN

SFER

UPD

ATE

Ref

. Tr

ansf

er L

ist

& MS

G 090

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

EVA CREW: TAKE 1 ASPIRIN (325mg)

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

KU TDRW (12:57-13:21) A

SLEEP LOGBOOK (ORB OPS, SDBI)

EXERCISE

MS4

GLACIER RECORD QUICK DIAGNOSTICS DATA (NOM)

(ASSY OPS, P/L), page 705

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

EVA CREW: TAKE 1 ASPIRIN (325mg)

Notes

9

Page 11: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

08

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

REPLANNED

C N2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS) on MCC GO,

perform Steps 8-13

MCC will TMBU S/W FDA in Step 13

Work the ()s for all steps performed

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.5-4.8

EXERCISE CONSTRAINT

3-82

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/15

(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

6W

EZ

T D R S

~ ~~

~

D / N

O R B 1 0 6 1 0 7 1 0 8

~ ~B I A S - X L V - Z V VS T S A T T

CDR

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

CWC

TRAN

SFER

Tra

nsfe

r CW

C to

ISS

~

N2 R

EPRE

SS T

ERM (O

n MC

C GO) C

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 9

.19-

end

Ste

p 12

:Tem

p st

ow I

SA/V

AJ setup for CUP

rep

ress

. 35

' VA

J can be stowed.

Ref

. MS

G 08

8, I

tem

2 R

ef.

MSG

092

MEAL ~

TV (

ILLU

MINA

TOR

OPS) (

PHOTO/TV, CC)

ILL

UMIN

ATOR

S OF

F -

A &

D

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 1

-9.1

8 S

tep

5.7:

use

NOD3

PCA

, sk

ip step 5.9

1.11

3 NO

DE 3

URI

NE B

US F

ILL

(AS

SY O

PS,

ACT&

C/O)

PLT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 1-4

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 5-9

EXERCISE CONSTRAINT

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA (ASSY OPS, ACT&C/O)

Steps 7.5-end. Step 9, remove VAJ/ISA

setup from NOD3 Port hatch MPEV when

complete and temp stow VAJ/ISA setup

for Urine/Potable bus vent ops.

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 11 EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 10 EXERCISE CONSTRAINT

MEAL

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 18:05-18:46

Ref. MSG 098

S&M:1.606 HTCH LTCH POSN TO HDSTP, N3 PORT

MS1

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 5-9

EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 1-4

1.178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS, ACT&C/O) Steps 1-5

~

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Step 1

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA (ASSY OPS, ACT&C/O)

Steps 7.5-end. Step 9, remove VAJ/ISA

setup from NOD3 Port hatch MPEV when

complete and temp stow VAJ/ISA setup

for Urine/Potable bus vent ops.

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.1-4.4 EXERCISE CONSTRAINT

S&M:1.539 CBM CUP RELO:N3 PORT/NAD Step 3

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 10 EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 11 EXERCISE CONSTRAINT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 18:05-18:46

Ref. MSG 098

Notes

3-82

ZAMK

AVI

RTS

HIRE

08

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

REPLANNED

C N2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS) on MCC GO,

perform Steps 8-13

MCC will TMBU S/W FDA in Step 13

Work the ()s for all steps performed

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.5-4.8

EXERCISE CONSTRAINT

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/15

(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 6 1 0 7 1 0 8

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

~CW

C TR

ANSF

ER T

rans

fer

CWC

to I

SS

N2 R

EPRE

SS T

ERM (O

n MC

C GO) C

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 9

.19-

end

Ste

p 12

:Tem

p st

ow I

SA/V

AJ setup for CUP

rep

ress

. 35

' VA

J can be stowed.

Ref

. MS

G 08

8, I

tem

2 R

ef.

MSG

092

~

MEAL

TV (

ILLU

MINA

TOR

OPS) (

PHOTO/TV, CC)

ILL

UMIN

ATOR

S OF

F -

A &

D

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 1

-9.1

8 S

tep

5.7:

use

NOD3

PCA

, sk

ip step 5.9

1.11

3 NO

DE 3

URI

NE B

US F

ILL

(AS

SY O

PS,

ACT&

C/O)

PLT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 1-4

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 5-9

EXERCISE CONSTRAINT

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA (ASSY OPS, ACT&C/O)

Steps 7.5-end. Step 9, remove VAJ/ISA

setup from NOD3 Port hatch MPEV when

complete and temp stow VAJ/ISA setup

for Urine/Potable bus vent ops.

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 11 EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 10 EXERCISE CONSTRAINT

MEAL

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 18:05-18:46

Ref. MSG 098

S&M:1.606 HTCH LTCH POSN TO HDSTP, N3 PORT

MS1

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 5-9

EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Steps 1-4

~1.

178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS, ACT&C/O) Steps 1-5

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Step 1

1.182 CUPOLA DEPRESSURIZATION(NODE 3 PORT)

WITH NODE 3 PCA (ASSY OPS, ACT&C/O)

Steps 7.5-end. Step 9, remove VAJ/ISA

setup from NOD3 Port hatch MPEV when

complete and temp stow VAJ/ISA setup

for Urine/Potable bus vent ops.

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.1-4.4 EXERCISE CONSTRAINT

S&M:1.539 CBM CUP RELO:N3 PORT/NAD Step 3

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 10 EXERCISE CONSTRAINT

ROBO: 1.410 SSRMS CUPOLA RELOCATE

Step 11 EXERCISE CONSTRAINT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 18:05-18:46

Ref. MSG 098

Notes

10

Page 12: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

08 REPLANNED

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~3-83

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/15

(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

6W

EZ

T D R S

~ ~~

~

D / N

O R B 1 0 6 1 0 7 1 0 8

~ ~B I A S - X L V - Z V VS T S A T T

MS2

EXER

CISE

~

EVA

3 TO

OL C

ONFI

G (

EVA,

TIM

ELIN

ES)

Ref

. MS

G 10

2

MEAL ~

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 1

-9.1

8 S

tep

5.7:

use

NOD3

PCA

, sk

ip step 5.9

1.11

3 NO

DE 3

URI

NE B

US F

ILL

(AS

SY O

PS,

ACT&

C/O)

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 9

.19-

end

Ste

p 12

:Tem

p st

ow I

SA/V

AJ setup for CUP

rep

ress

. 35

' VA

J can be stowed.

Ref

. MS

G 08

8, I

tem

2 R

ef.

MSG

092

MS3

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Retrieve both WI1 Comm Cap (s/n 1199)

& WI2 Comm Cap (s/n 1205) from WI ECOK

in NOD1D2 and stow in E/Lk. Fill 2

Drink Bags with cold H2O(1 per EVA crew)

In step 27,use Vacuum Manometer s/n 13.

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

~

EVA TOOL AUDIT

Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

Ref. MSG 102

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

~

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Perform SETUP

√All EVA drink bag fills complete,THEN:

GALLEY MORNING CONFIG (ORB OPS,ECLS)

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

MS4

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Retrieve both WI1 Comm Cap (s/n 1199)

& WI2 Comm Cap (s/n 1205) from WI ECOK

in NOD1D2 and stow in E/Lk. Fill 2

Drink Bags with cold H2O(1 per EVA crew)

In step 27,use Vacuum Manometer s/n 13.

EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

~

EVA TOOL AUDIT

Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

Ref. MSG 102

Notes

3-83

ROBI

NSON

PATR

ICK

BEHN

KEN

08 REPLANNED

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/15

(046)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 6 1 0 7 1 0 8

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

~

EXER

CISE

EVA

3 TO

OL C

ONFI

G (

EVA,

TIM

ELIN

ES)

Ref

. MS

G 10

2

~

MEAL

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 1

-9.1

8 S

tep

5.7:

use

NOD3

PCA

, sk

ip step 5.9

1.11

3 NO

DE 3

URI

NE B

US F

ILL

(AS

SY O

PS,

ACT&

C/O)

1.10

9 NO

DE1

& NO

DE3

POTA

BLE WATER BUS PRG

AND

VACU

UM B

ACKF

ILL

OF P

OTABLE WATER BUS

(AS

SY O

PS,

ACT&

C/O)

Ste

ps 9

.19-

end

Ste

p 12

:Tem

p st

ow I

SA/V

AJ setup for CUP

rep

ress

. 35

' VA

J can be stowed.

Ref

. MS

G 08

8, I

tem

2 R

ef.

MSG

092

MS3

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Retrieve both WI1 Comm Cap (s/n 1199)

& WI2 Comm Cap (s/n 1205) from WI ECOK

in NOD1D2 and stow in E/Lk. Fill 2

Drink Bags with cold H2O(1 per EVA crew)

In step 27,use Vacuum Manometer s/n 13.

~EVA 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

EVA TOOL AUDIT

Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

Ref. MSG 102

~

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Perform SETUP

√All EVA drink bag fills complete,THEN:

GALLEY MORNING CONFIG (ORB OPS,ECLS)

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

MS4

EVA SYSTEMS: 1.305 EQUIPMENT LOCK PREP

Retrieve both WI1 Comm Cap (s/n 1199)

& WI2 Comm Cap (s/n 1205) from WI ECOK

in NOD1D2 and stow in E/Lk. Fill 2

Drink Bags with cold H2O(1 per EVA crew)

In step 27,use Vacuum Manometer s/n 13.

~EV

A 3 TOOL CONFIG

(EVA, TIMELINES)

Ref. MSG 102

EVA TOOL AUDIT

Ref. EVA 3 TOOL CONFIG (EVA, TIMELINES)

Ref. MSG 102

Notes

11

Page 13: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

08

D 1.

Verify Node 3 Nadir Hatch Ratchet in

LATCH Position.

2.

Engage Crank Handle.

3.

Turn Crank Handle in LATCH direction

until fully latched.

4.

Stow Crank Handle.

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

REPLANNED

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.5-4.8 EXERCISE CONSTRAINT

3-84

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/15

(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

6W

EZ

T D R S

~~

~

D / N

O R B 1 0 9 1 1 0 1 1 1

~ ~B I A S - X L V - Z V VS T S A T T

CDR

MEAL~

SHUT

TLE

COND

ENSA

TE C

OLLE

CTION(ORB OPS,ECLS)

Per

form

CHA

NGEO

UT.

Use

ISS CWC S/N 1070.

Ask

ISS

cre

w fo

r CW

C lo

cation. Transfer

Orb

iter

CWC

S/N

503

0 to

NOD2O2 for

pro

cess

ing.

Not

ify

MCC

when complete.

~

PLT

1.178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS,

ACT&C/O)

Steps 8-10

ROBO: 1.410 SSRMS CUPOLA RELOCATE Step 12

1.126 NODE 3 ELPS ENABLE POWER SENSING

(ASSY OPS, ACT&C/O)

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

~

N3N HATCH LATCH D

1.144 NODE 3 AVIONICS RACKS OUTFITTING

(ASSY OPS, ACT&C/O)

Perform for NOD3O4 only.

EXERCISE

MS1

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

ROBO: 1.410 SSRMS CUPOLA RELOCATE Step 12

MEAL

EXERCISE

1.118 NODE 3 STBD DECK NPRV RMVL &

IMV VLV INSTL

(ASSY OPS, ACT&C/O)

Step 6

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

~

Notes

3-84

ZAMK

AVI

RTS

HIRE

08

D 1.

Verify Node 3 Nadir Hatch Ratchet in

LATCH Position.

2.

Engage Crank Handle.

3.

Turn Crank Handle in LATCH direction

until fully latched.

4.

Stow Crank Handle.

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

REPLANNED

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

S&M: 1.539 CBM CUPOLA RELOCATE:

NODE 3 PORT TO NODE 3 NADIR

Steps 4.5-4.8 EXERCISE CONSTRAINT

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/15

(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 9 1 1 0 1 1 1

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

MEAL

SHUT

TLE

COND

ENSA

TE C

OLLE

CTION(ORB OPS,ECLS)

Per

form

CHA

NGEO

UT.

Use

ISS CWC S/N 1070.

Ask

ISS

cre

w fo

r CW

C lo

cation. Transfer

Orb

iter

CWC

S/N

503

0 to

NOD2O2 for

pro

cess

ing.

Not

ify

MCC

when complete.

~

PLT

1.178 20A CBCS INSTL/RMVL-CUPOLA INSTL

(ASSY OPS,

ACT&C/O)

Steps 8-10

ROBO: 1.410 SSRMS CUPOLA RELOCATE Step 12

1.126 NODE 3 ELPS ENABLE POWER SENSING

(ASSY OPS, ACT&C/O)

~

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

N3N HATCH LATCH D

1.144 NODE 3 AVIONICS RACKS OUTFITTING

(ASSY OPS, ACT&C/O)

Perform for NOD3O4 only.

EXERCISE

MS1

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

ROBO: 1.410 SSRMS CUPOLA RELOCATE Step 12

MEAL

EXERCISE

1.118 NODE 3 STBD DECK NPRV RMVL &

IMV VLV INSTL

(ASSY OPS, ACT&C/O)

Step 6

~

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

Notes

12

Page 14: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

08

E Re

f. STS-130 Consumables Tracking CC(EVA)

Re

f. STS-130 Battery Recharge Plan (EVA)

REPLANNED

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

3-85

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/15

(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

6W

EZ

T D R S

~~

~

D / N

O R B 1 0 9 1 1 0 1 1 1

~ ~B I A S - X L V - Z V VS T S A T T

MS2

1.12

2 NO

DE 3

PPR

V RE

MOVA

L & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Nadi

r Hatch

SPIN

AL S

TAND

HEI

GHT

SUBJ

ECT

SPIN

AL E

LONG

CRE

W DA

TA C

LCT

MEAL~

1.12

2 NO

DE 3

PPR

V RE

MOVA

L & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Stbd

Hatch

~

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

1.15

6 VE

ST O

/F N

3-CU

P(AS

SYOPS,ACT&C/O)Stp1

MS3

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

P/TV09 GLACIER

(PHOTO/TV, SCENES)

Perform SETUP & OPSME

AL

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

~

20A CGBA SWAP - UNPOWERED

Ref. MSG 096 & MSG 103

Ref. Transfer List: Items 29,706

MS4

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

20A DESCENT SAMPLE TRANSFER FROM MELFI

TO GLACIER

Ref. MSG 095

Ref. Transfer List: Item 721

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

TERMINATE E

EMU METOX & BATTERY INSTALL E

Ref EVA SYS:1.515 EMU METX/LIOH/BAT REPLCE

MEAL

EXERCISE

~

EMU SWAP FOR EVA3: MOVE EMU 3004 to AFT

EDDA, EMU 3018 to FWD EDDA

20A DESCENT SAMPLE TRANSFER FROM MELFI

TO GLACIER

REVIEW ONLY and Ref. MSG 095

Notes

3-85

ROBI

NSON

PATR

ICK

BEHN

KEN

08

E Re

f. STS-130 Consumables Tracking CC(EVA)

Re

f. STS-130 Battery Recharge Plan (EVA)

REPLANNED

NO EXERCISE

FROM 3RD SET

OF BOLTS UNTIL

A-BOLTS

COMPLETE

~

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/15

(046)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

6W

EZ

T D R SD / N

O R B 1 0 9 1 1 0 1 1 1

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

1.12

2 NO

DE 3

PPR

V RE

MOVA

L & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Nadi

r Hatch

SPIN

AL S

TAND

HEI

GHT

SUBJ

ECT

SPIN

AL E

LONG

CRE

W DA

TA C

LCT

~

MEAL ~

1.12

2 NO

DE 3

PPR

V RE

MOVA

L & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Stbd

Hatch

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

1.15

6 VE

ST O

/F N

3-CU

P(AS

SYOPS,ACT&C/O)Stp1

MS3

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

P/TV09 GLACIER

(PHOTO/TV, SCENES)

Perform SETUP & OPSME

AL~P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

20A CGBA SWAP - UNPOWERED

Ref. MSG 096 & MSG 103

Ref. Transfer List: Items 29,706

MS4

SPINAL STAND HEIGHT SUBJECT

SPINAL ELONG CREW DATA CLCT

20A DESCENT SAMPLE TRANSFER FROM MELFI

TO GLACIER

Ref. MSG 095

Ref. Transfer List: Item 721

EVA SYSTEMS: 1.605 BSA BATTERY RECHARGE

TERMINATE E

EMU METOX & BATTERY INSTALL E

Ref EVA SYS:1.515 EMU METX/LIOH/BAT REPLCE

MEAL ~

EXERCISE

EMU SWAP FOR EVA3: MOVE EMU 3004 to AFT

EDDA, EMU 3018 to FWD EDDA

20A DESCENT SAMPLE TRANSFER FROM MELFI

TO GLACIER

REVIEW ONLY and Ref. MSG 095

Notes

13

Page 15: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

08

CREW WAKE AT 07/12:00

REPLANNED

F C&W COVER PANEL DEPLOY

Install the C&W Panel Emergency

Button Cover (Part #528-21469-1)

on the Node 3 C&W panel and the

COL Starboard C&W Panel. Replace

the current Lab C&W panel shield

with this new part also. The old

Lab cover should be placed in a

ziplock bag and the front of the

bag labeled "P/N:UHW-CW,Part Name

INC1C&W PANEL" for return.

3-86

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/15

(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

7W

EZ

T D R S

~~

~

D / N

O R B 1 1 1 1 1 2 1 1 3 1 1 4

~ ~B I A S - X L V - Z V VS T S A T T

CDR

TV (

ILLU

MINA

TOR

OPS) (

PHOTO/TV, CC)

ILL

UMIN

ATOR

S ON

- A

& D

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

FILT

ER C

LEAN

ING

(IF

M, S

CHED

ULED

MAI

NTEN

ANCE)

Ins

pect

fil

ters

and

cle

an a

s ne

cess

ary

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

TRAN

SFER

OPS

Ref

. Tr

ansf

er L

ist

& MS

G 090

~

PLT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 01:38-02:17

Ref. MSG 097

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

C&W PANEL COVER DEPLOY F

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK

(ASSY OPS, ACT&C/O)

Steps 1-6.9

VAJ/ISA to remain mated to NOD2 Deck MPEV.

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

~

Notes

3-86

ZAMK

AVI

RTS

HIRE

08

CREW WAKE AT 07/12:00

REPLANNED

F C&W COVER PANEL DEPLOY

Install the C&W Panel Emergency

Button Cover (Part #528-21469-1)

on the Node 3 C&W panel and the

COL Starboard C&W Panel. Replace

the current Lab C&W panel shield

with this new part also. The old

Lab cover should be placed in a

ziplock bag and the front of the

bag labeled "P/N:UHW-CW,Part Name

INC1C&W PANEL" for return.

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/15

(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

7W

EZ

T D R SD / N

O R B 1 1 1 1 1 2 1 1 3 1 1 4

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

TV (

ILLU

MINA

TOR

OPS) (

PHOTO/TV, CC)

ILL

UMIN

ATOR

S ON

- A

& D

PRIV

ATE

MEDI

CAL

CONF

ERENCE

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

Per

form

via

A/G

2

FILT

ER C

LEAN

ING

(IF

M, S

CHED

ULED

MAI

NTEN

ANCE)

Ins

pect

fil

ters

and

cle

an a

s ne

cess

ary

FLIG

HT D

IREC

TOR

CONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~TR

ANSF

ER O

PS R

ef.

Tran

sfer

Lis

t &

MSG 090

PLT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 01:38-02:17

Ref. MSG 097

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

C&W PANEL COVER DEPLOY F

~1.156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

1.188 CUPOLA FINE LEAK CHECK ON NODE3 DECK

(ASSY OPS, ACT&C/O)

Steps 1-6.9

VAJ/ISA to remain mated to NOD2 Deck MPEV.

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~1.

156 VESTIBULE OUTFITTING N3-CUPOLA

(ASSY OPS, ACT&C/O) Steps 1-5

Ref. MSG 093

Notes

14

Page 16: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

08

CREW WAKE AT 07/12:00

REPLANNED

3-87

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/15

(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

7W

EZ

T D R S

~~

~

D / N

O R B 1 1 1 1 1 2 1 1 3 1 1 4

~ ~B I A S - X L V - Z V VS T S A T T

MS2

DAIL

Y PL

ANNI

NG C

ONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

1.12

2 NO

DE 3

PPR

V RE

MOVA

L & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Stbd

Hatch

~

TRAN

SFER

TAG

UP C

oord

inat

e wi

th t

rans

fer counterpart

TRAN

SFER

BRI

EF C

all

down

sta

tus

to M

CC

MS3

ROBO: 1.510 SSRMS CUPOLA RELEASE AND

PMA3 RELOCATE

Steps 1-5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

GLACIER STATUS CHECK (ASSY OPS,CC)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ROBO: 1.510 SSRMS CUPOLA RELEASE AND

PMA3 RELOCATE

Steps 1-5

EXERCISE

~

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 01:38-02:17

Ref. MSG 097

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

3-87

ROBI

NSON

PATR

ICK

BEHN

KEN

08

CREW WAKE AT 07/12:00

REPLANNED

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/15

(046)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

7W

EZ

T D R SD / N

O R B 1 1 1 1 1 2 1 1 3 1 1 4

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

DAIL

Y PL

ANNI

NG C

ONFERENCE

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~1.

122

NODE

3 P

PRV

REMO

VAL & MPEV INSTL

(AS

SY O

PS,

ACT&

C/O)

Per

form

for

Nod

e 3

Stbd

Hatch

TRAN

SFER

TAG

UP C

oord

inat

e wi

th t

rans

fer counterpart

TRAN

SFER

BRI

EF C

all

down

sta

tus

to M

CC

MS3

ROBO: 1.510 SSRMS CUPOLA RELEASE AND

PMA3 RELOCATE

Steps 1-5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

GLACIER STATUS CHECK (ASSY OPS,CC)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ROBO: 1.510 SSRMS CUPOLA RELEASE AND

PMA3 RELOCATE

Steps 1-5

~

EXERCISE

PUBLIC AFFAIRS EVENT

ISS KU AVAIL: 01:38-02:17

Ref. MSG 097

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

15

Page 17: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 089A - FD08 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15

Good Morning Endeavour!!!! Your EVA yesterday was awesome!!!! Congratulations on getting the lights turned on in Node 3! Node 3 is now open for business!!!! Because of your excellent work in checking interferences, we are now comfortable with proceeding with cupola depress and relocate today!!! Thanks so much!!! (If you wish, you can see the technical details for this decision in the Daily Summary MSG 094) Have a great cupola relocate day!!!! YOUR CURRENT ORBIT IS: 188 X 181 NM NOTAMS: NO CHANGE 16

17 18 19 20 21 22 23 24 25 26 27 28

EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS USABLE. DRYING OUT. WAL- CLOSED. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. ESN - RWY 03R/21L CLOSED. 03L/21R USABLE. GUA - RWY 06L/24R RWY END LIGHTS OUT OF SERVICE. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 29

30 31 32 33 34

EDT04L ORB 110 – 6/22:15 FEW180 7 020/3P4 EDT22R ORB 126 – 7/22:38 SKC 7 200/3P4 OMS TANK FAIL CAPABILITY: 35

36 37 38 39

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 40

41 42 43 44

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 45

46 47 48 49 50 51

L OMS OX = 30.2 R OMS OX = 31.4 FU = 29.9 FU = 31.2 Subtract interconnect counter for current OMS quantities.

END OF PAGE 1 OF 2, MSG 089A 16

Page 18: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 089A - FD08 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 089A

1 DELTA V AVAILABLE: 2

3 4

OMS 321 FPS ARCS (TOTAL ABOVE QTY1) 44 FPS 5

6 7 8 9

10 11 12 13 14 15

TOTAL IN THE AFT 365 FPS ARCS (TOTAL ABOVE QTY2) 77 FPS FRCS (ABOVE QTY 1) 32 FPS AFT QTY 1 82 % AFT QTY 2 44 % SYSTEM FAILURE IMPACT WORK AROUND

EVA  During EVA2 PREP, Behnken reported no EMU CWS Audio Tones with his backup comm cap.  

Behnken backup EVA comm cap was not used for EVA2. 

Bob is using Patrick backup comm cap. Both of Williams’ comm caps will be available for backup on EVA3.

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

17

Page 19: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 090A (22-0711A) - FD08 TRANSFER MESSAGE Page 1 of 6

Good morning Kay, Terry, & Steve, 1 2 3 4 5 6 7 8 9

10 11 12 13 14

You are still ahead of schedule on transfer overall, and now 56 percent complete! Today you have many hours of XFER OPS in store, so you can work on any unconstrained return items. If it makes it easier for you, we have outlined the open items that we think you can work on, and these are listed in your choreography below. The Transfer List Excel file, FD08_Transfer_List_STS130.xls, is located on the KFX machine in C:\OCA-up\transfer (and available via the PGSC homepage). For ISS, the Transfer List Excel file, FD08_Transfer_List_STS130.xls, is located in K:\OCA-up\transfer. Change Pages 15

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Please incorporate changes as follows: In the Transfer List RESUPPLY tab

Pen and Ink the following page: Resupply – 6 For item 25: in the notes field, change “FD11” to “FD12”

Replace the following page: Resupply – 8

Pen and Ink the following page: Resupply – 14 For item 804: in the notes field, change “FD11” to “FD12”

In the Transfer List RETURN tab

Pen and Ink the following page: Return – 3 For item 702 & 704: in the notes field, change “FD11” to “FD12”

Replace the following page: Return – 5, 6, and 9

Questions for Kay 36

37 38 39 40 41 42 43 44 45 46

1. From our discussion in last night’s Transfer Brief, you were going to check on whether item 608 can be marked complete (this item is on Return page 2).

2. We understand Jeff did not create a CTB for his GSC sample collected on FD06. Please get an empty 1.0 CTB from NOD1D2 and record the CTB s/n (we will get this info from you at the Transfer Brief tonight). Place the CTB in MF57O. If the GSC is already in the locker, please wrap it in a towel or bubble wrap and stow it in the CTB. If it is not in the locker, we recommend you tag up with Jeff on its location. You can also complete item 718 by placing it into the same CTB.

FD08 Choreography 47

48

49 50

51

• TJ: Transfer Node 3 ITCS sample per N3-LTL-ITCS-SAMPLE activity (Item 740) • Bob & Jeff: Transfer cold samples from ISS MELFI to shuttle Glacier per MLF GLCR

20A SMP XFR activity (Item 721) • Nick: Transfer CGBAs per CGBA UNIT SWAP activity (Items 29 and 706)

Page 1 of 6, MSG 090A (22-0711A) 18

Page 20: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 090A (22-0711A) - FD08 TRANSFER MESSAGE Page 2 of 6

Page 2 of 6, MSG 090A (22-0711A)

2 3 4 5 6 7 8

• XFER OPS: 1 o Return pages 1, 2, and 9 (all items on these pages) o Return page 6 (Items 723 and 725) o Return page 8 (Item 738)

Have a great day! - The 20A Transfer Team 9

10 11 12 13

20A Transfer Choreography

FD09 (no xfer brief) 14

15 16

• Terry: Return old C&W panel per C&W PANEL COVER DEPLOY activity (Item 705) FD10 17

18 19 20 21

• XFER OPS: o Transfer returning RFTA after Soichi’s WRS-RFTA-R&R activity (Item 732) o After EVA3 A/L egress, transfer CSA-O2s (Items 707 and 708)

FD11 22

23 24 25

• XFER OPS: o Continue return transfers

FD12 26

27

28

29

30

31

32 33

34

35

36 37 38 39 40 41

• Jeff: Transfer returning blood sample per BLD STW activity (Item 704) • TJ: Transfer returning saliva sample per SLV STW activity (Item 728) • Steve: Transfer AFD PCS per AFT PCS XFER activity (Item 39) • Steve: Transfer SSC back to ISS during SSC RETURN activity (Item 804) • Bob: Transfer SAFER to shuttle per SAFER XFER activity (Item 714) • Nick & Bob: Transfer EVA items to shuttle per EVA RECONFIG & XFER activity

(Items 702, 712, 713, and 715) • Soichi: Transfer returning RAMs to shuttle per RAM INSTALL activity (Item 726) • Soichi: Transfer DCBs to shuttle per DCB-TRANSFER activity (Item 709 and 710) • XFER OPS:

o Complete water hardware transfers (Items 24, 25, 801, 729, and 735) o Transfer Return to Houston Imagery ziplock (Item 727) o Transfer remaining 5 MLE bags (Items 408 and 701)

5 MLE Bag Plan (9 total) 42

43

44

45

46

47 48 49

• Bags B & H: to Columbus for temp stow (as needed) • Bag F: to Columbus permanently (return prepacked 5 MLE in its place) • Bags C, D & E: remain on shuttle for unpacking/repacking • Bag A: contains UPA DA, temp stow in JEM for FD04 • Bags G & I: handled via EVA procedures (G will be temp stowed in Node 1)

19

Page 21: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MS

G 0

90A

(22-

0711

A) --

FD

08 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

esup

ply

Tran

sfer

Lis

t

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p S

tow

age

Sto

wag

e at

U

ndoc

kW

t (lb

s)A

CTI

VIT

Y /

Con

stra

ints

/ *

*Com

men

ts

336

EC

OK

[Be]

1S

huttl

e A

/L

Floo

r Bag

(in B

ag I)

ISS

A/L

8.20

Tran

sfer

on

FD03

per

PO

ST D

OC

K E

VA

XFER

act

ivity

.

337

EC

OK

[Pk]

1S

huttl

e A

/L

Floo

r Bag

(in B

ag I)

ISS

A/L

7.20

Tran

sfer

on

FD03

per

PO

ST D

OC

K E

VA

XFER

act

ivity

.

38E

ntry

Gar

men

ts +

Spa

re A

CE

S g

love

s (2

pr)

1 m

esh

bag

Shu

ttle

A/L

Fl

oor B

ag(in

Bag

I)

Mid

deck

Cre

w

Pre

fere

nce

12.8

0R

emov

e fr

om B

ag I

and

stow

on

the

mid

deck

for u

se o

n en

try

day.

Do

not

tran

sfer

to IS

S.

X

39A

FD P

CS

[s/n

103

2]1

Shu

ttle

Flig

ht

Dec

k de

ploy

ed

NO

D1S

4_A

16.

50Tr

ansf

er o

n FD

12 F

D11

per

AFT

PC

S XF

ER a

ctiv

ity.

Tran

sfer

lapt

op o

nly.

X

40S

huttl

e M

PC

[s/n

100

8]Ite

m D

elet

ed

1S

huttl

e Fl

ight

D

eck

depl

oyed

LAB

1OS

4 in

stal

led

9.50

Tran

sfer

on

FD09

.

Swap

with

retu

rn it

em #

720.

2/14

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Res

uppl

y - 8

20

Page 22: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MS

G 0

90A

(22-

0711

A) --

FD

08 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

571

6Fo

am la

bele

d "P

FE"

1C

OL1

D2

(in B

ag F

)M

D F

LOO

R

STB

D 1

(in

Bag

C)

1.00

**R

efer

ence

resu

pply

item

#6.

3.

571

7Fo

am la

bele

d "N

OD

E 3

QD

M"

1C

OL1

D2

(in B

ag F

)M

D F

LOO

R

STB

D 1

(in

Bag

C)

1.00

**R

efer

ence

resu

pply

item

#6.

2.

718

Food

War

mer

[s/n

100

7]1

MD

DK

(in B

ag D

)M

F57O

(in C

TB)

13.0

0Tr

ansf

er a

fter F

D06

.

Swap

s w

ith re

supp

ly it

em 2

0.1.

719

GS

C [s

/n 1

082]

[in C

TB]

1.0

CTB

in u

seM

F57O

5.10

Tran

sfer

afte

r EH

S-G

SC-O

PS a

ctiv

ity

on F

D06

.

X

720

Lab

MP

C[s

/n 1

004]

Item

Del

eted

1LA

B1O

S4

inst

alle

dS

huttl

e Fl

ight

D

eck

depl

oyed

9.50

Tran

sfer

on

FD09

.

Swap

with

resu

pply

item

#40

.

721

ME

LFI S

ampl

es-

ME

LFI

MF2

8E/G

(in G

laci

er)

11.9

0Tr

ansf

er o

n FD

08 p

er M

LF G

LCR

20A

SM

P XF

R a

ctiv

ity.

472

2M

ultim

eter

[DO

PE

Y]1

NO

D2

depl

oyed

(inM

ultim

eter

MA

16D

(in M

ultim

eter

Ki

t)

1.40

Swap

with

resu

pply

item

#1.

Tf

ltit

ll

kit

(in M

ultim

eter

Ki

t)Ki

t)Tr

ansf

er m

ultim

eter

onl

y, le

ave

kit

and

lead

s.

2/14

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 5

21

Page 23: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MS

G 0

90A

(22-

0711

A) --

FD

08 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

723

Pre

-Tre

at T

ank

(E-K

)[s

/n 8

0202

5]1.

0 C

TBA

/L F

loor

(stra

pped

to

Bag

I)

MD

CEI

L S

TBD

1(in

Bag

I)

5.84

Don

PPE

- To

x 2

fluid

. Ve

rify

PY-4

, PY

-5 c

onne

ctor

s cl

osed

(pos

ition

“3

”).

Verif

y PY

-4 c

appe

d. W

rap

Pret

reat

Tan

k an

d ho

se in

bub

ble

wra

p to

pre

vent

dam

age

to H

efty

B

ag d

urin

g re

turn

. B

ag P

retr

eat

Tank

and

atta

ched

hos

e in

Hef

ty

Bag

. Se

cure

, tie

ope

n en

d of

bag

an

d gr

ey ta

pe.

Plac

e as

sem

bly

into

a

1.0

CTB

(use

em

pty

CTB

from

N

OD

1D2)

.

725

PW

R1.

0 C

TBM

F14K

MD

FLO

OR

S

TBD

1

(in B

ag C

)

5.50

**O

nly

CTB

and

foam

retu

rn in

shu

ttle;

th

e P

WR

that

laun

ched

insi

de

trans

ferr

ed to

ISS

. R

efer

ence

resu

pply

ite

m #

17.

X72

6R

adia

tion

Are

a M

onito

rs1

zipl

ock

ISS

inst

alle

dM

F57O

(in C

TB)

0.55

Tran

sfer

on

FD12

FD

11 a

fter R

AM

IN

STA

LL a

ctiv

ity.

X

727

Ret

urn

to H

oust

on Im

ager

y1

zipl

ock

NO

D2P

4 (in

0.5

CTB

s/n

13

60)

MF1

4K

(in it

em 4

03)

1.61

Tran

sfer

on

FD12

FD

11.

**Ta

pes

will

cont

inue

to b

e ad

ded

until

ft

EV

A3

afte

r EV

A3.

X72

8S

aliv

a S

ampl

e R

etur

n P

ouch

1in

use

MF5

7O(in

CTB

)0.

26Tr

ansf

er o

n FD

12 F

D11

per

SA

LIVA

ST

OW

act

ivity

.

X

729

Silv

er B

ioci

de S

yrin

ge K

it[s

/n 1

001]

1N

OD

2O2

(in M

-02

Bag

s/

n 10

26)

MF5

7K1.

34Tr

ansf

er o

n FD

12 F

D11

afte

r fin

al

CW

C fi

ll.

Swap

s w

ith re

turn

item

25.

**U

se p

er w

ater

ops

cue

car

d, th

en

trans

fer t

o sh

uttle

.

2/14

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 6

22

Page 24: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MS

G 0

90A

(22-

0711

A) --

FD

08 T

rans

fer M

essa

geST

S-13

0 / 2

0A R

etur

n Tr

ansf

er L

ist

CH

NG

FDIn

itial

sIte

m #Ite

m N

ame

Qty

Initi

al S

tow

age

Tem

p St

owag

eSt

owag

e at

U

ndoc

kW

t (lb

s)AC

TIVI

TY /

Con

stra

ints

/ **

Com

men

ts

Ret

urn

Rea

ltim

e A

dditi

ons

X

901

EM

U P

ower

Har

ness

Ass

y.[s

/n 1

042]

1IS

S A

/L(in

EV

A T

ask

Xfer

Bag

)

MD

FLO

OR

S

TBD

2(in

Bag

G)

0.50

Rem

ove

from

mes

h ba

g an

d w

rap

with

tow

els,

foam

or b

ubbl

e w

rap.

B

end

radi

us s

houl

d no

t be

smal

ler

than

6 in

ches

.

2/14

/201

0[ ]

- no

tes

incl

uded

by

trans

fer t

eam

, - n

ot o

n ac

tual

labe

l

Ret

urn

Pag

e - 9

23

Page 25: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 091 - FD08 CREW CHOICE DOWNLINK

1

2 FD 8 Crew Choice Times TDRS AOS LOS Delta (min) Notes W-171 7/01:48 7/02:20 32 E-275 7/03:15 7/03:25 10 Gimbal flip at 7/03:23; Analog only

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.

END OF PAGE 1 OF 1, MSG 091

24

Page 26: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

of 2

4

Pag

e 1

of 2

4, 2

2-07

12 (M

SG

092

)

Con

tent

s:

1

Tim

elin

e Pr

oced

ures

: 2

**C

UP

OLA

DE

PR

ESS

PA

RT1

 3

**C

UP

OLA

DE

PR

ESS

PA

RT2

 4

**C

UP

OLA

DE

PR

ESS

PA

RT3

 5

**C

BCS

MO

VE N

3N N

3P 

6

**C

BCS

SE

TUP 

7

SO

DI-D

SC

-H/W

SE

TUP 

8

CU

POLA

-PR

ESS

-CK 

9

CU

POLA

-PR

ESS

-S/U

 10

CU

POLA

-PR

ESS 

11

**C

UP

OLA

FN

LK

CK

INIT 

12

WH

C H

AR

DW

ARE

RE

TRIE

VE 

13

N3-

LAU

NC

H B

OLT

-RM

14

**N

3 U

RIN

/PO

T B

US

VEN

T 15

**N

3 P

OT

BU

S VE

NT/

FILL

 16

N3-

LTL-

SMP

L TO

OL

INS 

17

N3-

LTL

ITC

S-C

LOS

EO

UT 

18

WR

S-U

PA-

FILL

 19

N3-

LTL

ITC

S-SA

MPL

20

**N

3 U

RIN

E B

US

FIL

L 21

**N

OD

3 EL

PS E

NA

BLE

 22

SPI

NA

L-H

/W-S

ETU

P 23

SPI

NA

L-ST

ND

-HT-

S/U 

24

SPI

NA

L-D

ATA

-CLC

T-O

PR 

25

SPI

NA

L-D

ATA

-CO

LLE

CT 

26

SPI

NA

L-ST

ND

-HT-

CLC

T 27

SPI

NA

L-H

/W-S

TOW 

28

**N

3 N

AD M

PEV

INST

L 29

** N

3 S

TBD

MP

EV

INS

TL 

30

P/T

V-E

VA

CA

MR

-CO

NFG

 31

MLF

-GLC

R-2

0A-S

MP

XFR

 32

WR

S-C

WC

I-FIL

L-PT

1 33

WR

S-C

WC

I-FIL

L-PT

2 34

** N

OD

3O4

RA

CK

OU

TFIT 

35

WH

C-U

R/IF

-CH

GO

UT 

36

25

Page 27: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

of 2

4

Pag

e 2

of 2

4, 2

2-07

12 (M

SG

092

)

ESA

Tim

elin

e Pr

oced

ures

: 1

FSL-

HA

ND

LE-R

PA

2

FSL-

VM

U H

W-U

PDAT

E S

1 3

JAXA

Tim

elin

e Pr

oced

ures

: 4

CB

EF-

FAN

REP

AIR

-1G 

5

Task

list P

roce

dure

s: 

6

BC

AT3

-CR

YST

AL-

CH

EC

7

WH

C-K

TO-R

EPLA

CE 

8

WH

C-ЕДВ-У-

R&

9

PW

D-B

EV

AD

PTR

-R&R

 10

JAXA

Tas

klis

t Pro

cedu

res: 

11

Non

e 12

ESA

Tas

klis

t Pro

cedu

res: 

13

Non

e 14

15

16

17

18

19

20

Tim

elin

e Pr

oced

ures

: 21

22

**C

UPO

LA D

EPR

ESS

PAR

T1

**C

UPO

LA D

EPR

ESS

PAR

T2

**C

UPO

LA D

EPR

ESS

PAR

T3

1.17

2 C

upol

a D

epre

ssur

izat

ion

(Nod

e 3

Port

) Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 Te

mp

stow

ed

NO

D3

from

N

OD

1/N

OD

3 ve

stib

ule

leak

ch

eck

MP

EV

Inte

rnal

Sam

plin

g A

dapt

er (I

SA

) 97

M55

830-

1 2

0000

02M

2 S

cope

met

er P

ress

ure

Pro

be

SE

G39

1302

44-3

02

- 00

4461

J In

stal

led

on IS

A

3 V

AJ-

78-1

5ft

683-

1711

1-1

- 00

0026

77J

4

Mul

timet

er K

it 10

118-

1001

8-04

10

17

-

5 M

ultim

eter

87

10

10

0008

8636

J H

appy

26

Page 28: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 3

of 2

4

Pag

e 3

of 2

4, 2

2-07

12 (M

SG

092

)

Type

: Res

tow

6 Le

ave

conn

ecte

d to

N

OD

3 Po

rt

Hat

ch M

PEV

for F

D8

CU

P pr

essu

re

chec

k

MP

EV

Inte

rnal

Sam

plin

g A

dapt

er (I

SA

) 97

M55

830-

1 2

0000

02M

7 S

cope

met

er P

ress

ure

Pro

be

SE

G39

1302

44-3

02

- 00

4461

J In

stal

led

on IS

A

8 V

AJ-

78-1

5ft

683-

1711

1-1

- 00

0026

77J

9

Mul

timet

er K

it 10

118-

1001

8-04

10

17

-

10

Mul

timet

er

87

1010

00

0886

36J

Hap

py

1

2

**C

BC

S M

OVE

N3N

N3P

**

CB

CS

SETU

P 1.

403

CB

CS

INST

ALL

ATI

ON

/REM

OVA

L - G

ENER

IC

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Tem

p st

owed

at

N1

Port

Hat

ch

from

FD

5

CB

CS

Cam

era

Ass

embl

y S

EG

3311

2576

-301

-

-

3

SOD

I-DSC

-H/W

SET

UP

2.00

6 D

SC E

XPER

IMEN

T SE

TUP

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Tool

Set

“Jef

f” o

r “TV

” R

atch

et, 1

/4" D

rive

T936

-

-

2 D

river

Han

dle,

1/4

" Driv

e TM

4B

- -

3 St

atic

Wris

t Tet

her

WS

-AM

6-4M

M

- -

4 N

OD

1D4

5 m

m H

ex H

ead,

1/4

" Driv

e S

KG

3311

7562

-615

-

- 5

ТГК4

04Гр

О_2

_2

Car

go B

ay Z

one

2 P

lain

2

DS

C C

ell A

rray

Sto

wag

e B

ag 1

S

OD

I-01-

1515

-100

0-00

0-V

E

- 00

SO

D10

0M

(Blu

e C

onta

iner

line

d w

ith fo

am la

bele

d "K

EE

P W

ITH

H

AR

DW

ARE.

")

27

Page 29: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 4

of 2

4

Pag

e 4

of 2

4, 2

2-07

12 (M

SG

092

)

6 C

OL1

_STB

D_

Endc

one

3.0

CTB

, S/N

10

68,

B/C

004

253J

DS

C F

lash

Dis

k S

tow

age

Bag

S

OD

I-01-

1524

-100

0-00

0-V

E

- 01

SO

D10

0M

1

2

CU

POLA

-PR

ESS-

CK

C

UPO

LA-P

RES

S-S/

U

CU

POLA

-PR

ESS

**C

UPO

LA F

N L

K C

K IN

IT

1.17

2 C

UPO

LA D

EPR

ESSU

RIZ

ATI

ON

(NO

DE

3 PO

RT)

1.

174

CU

POLA

PR

ESSU

RIZ

ATI

ON

AN

D L

EAK

CH

ECK

1.

188

CU

POLA

FIN

E LE

AK

CH

ECK

ON

NO

DE

3 D

ECK

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 Te

mp

Stow

N

OD

3

MP

EV

Inte

rnal

Sam

plin

g A

dapt

er

97M

5583

0-1

2 00

0002

M

2

Sco

pem

eter

Pre

ssur

e

P

robe

S

EG

3913

0244

-302

-

0044

61J

3 V

AJ-

83-1

35f

t 68

3-17

111-

2 -

0000

2676

J

4 V

AJ-

78-1

5ft

683-

1711

1-1

- 00

0026

77J

5

Mul

timet

er K

it 10

118-

1001

8-04

10

17

-

6

Mul

timet

er

87

1010

00

0886

36J

“Hap

py”

7 Pr

egat

here

d To

olse

t “J

eff”

or “

TV”

Rat

chet

, 1/4

" Driv

e -

- -

8

5/32

" Hex

Hea

d, 1

/4" D

rive

- -

-

3

4

5

6

7

8

9

28

Page 30: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 5

of 2

4

Pag

e 5

of 2

4, 2

2-07

12 (M

SG

092

)

WH

C H

AR

DW

AR

E R

ETR

IEVE

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1P

2 U

rine

Filte

r Hos

e 10

523.

6728

.00.

020

7040

03

0010

0237

J B

ehin

d pa

nel W

HC

-03

tape

d to

Wrin

g C

olle

ctor

(CO

T).

Tran

sfer

to N

OD

3F4

2 LA

B1S

1 ЕД

В Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

910

0009

8602

R

Tran

sfer

to N

OD

3F4

3 ЕДВ

Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

474

0005

0804

R

Type

: Res

tow

4 N

OD

3F4

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

910

0009

8602

R

Tem

p st

ow E

DV

and

ho

se fo

r N3

Urin

e B

us

Fill

task

. 5

ЕДВ

Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

474

0005

0804

R

6 U

rine

Filte

r Hos

e 10

523.

6728

.00.

020

7040

03

0010

0237

J

1

2

3

4

5

6

7

8

N3-

LAU

NC

H B

OLT

-RM

V 1.

138

NO

DE

3 LA

UN

CH

RES

TRA

INT

BO

LTS

REM

OVA

L Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 N

OD

1D4_

B2

0.5

CTB

, S/N

11

75, B

/C

0066

24J

Driv

er D

rill K

it S

JG33

1098

29-3

01

- 00

3422

J

2 N

OD

1D4

Hex

Sha

nk, 1

/4" D

rive

SK

G33

1175

62-0

08

- -

3

Preg

athe

red

Tool

set

“Jef

f” o

r “TV

5/32

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

42

- -

4

3/16

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

43

- -

5

Driv

er H

andl

e, 1

/4" D

rive

SK

G33

1175

62-9

41

- -

29

Page 31: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 6

of 2

4

Pag

e 6

of 2

4, 2

2-07

12 (M

SG

092

)

Type

: Res

tow

6 N

OD

1P2

3.0

CTB

: Nod

e 3

Ves

tibul

e O

utfit

ting

kit

(VO

K),

S/N

104

8,

B/C

004

233J

0.5

CTB

: NO

D3

Uni

nsta

lled

Har

dwar

e S

EG

3311

1836

-303

10

65

0039

47J

7

Zip

lock

Bag

-

- -

8

Lau

nch

Res

train

t Bol

ts

- -

-

1

2

3

4

5

6

**N

3 U

RIN

/PO

T B

US

VEN

T **

N3

POT

BU

S VE

NT/

FILL

1.

109

NO

DE

1 A

ND

NO

DE

3 PO

TAB

LE W

ATE

R A

ND

UR

INE

BU

S PU

RG

E W

ITH

VA

CU

UM

BA

CK

FILL

OF

POTA

BLE

WA

TER

BU

S Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 N

OD

3F1

2.0

CTB

: IN

STA

LLAT

ION

H

W 2

, S/N

10

45, B

/C

0041

79J

Pot

able

Wat

er P

urge

/Fill

Ada

pter

68

3-64

435-

1 00

0001

00

0601

28H

2 LA

B1P

4 Zi

ploc

k -

- -

3

Z

iplo

ck: “

Yel

low

/Yel

low

Hos

e -

QD

Rem

oved

on

GM

T X

XX

” -

- -

4

R/Y

QD

Ada

pter

10

108-

2017

5-01

50

08

- Y

ou c

an g

et th

is

adap

ter f

rom

TJ,

who

w

ill b

e us

ing

it fo

r his

C

WC

-I fil

l act

ivity

in

the

Lab.

5

JLP1

F1

CW

C-Io

dine

S

EG

3312

0607

-303

20

09

0010

7911

J U

se C

WC

-I P

WR

with

R

-Y a

dapt

er in

pla

ce

of a

PW

R.

30

Page 32: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 7

of 2

4

Pag

e 7

of 2

4, 2

2-07

12 (M

SG

092

)

6 Te

mp

Stow

N

OD

3 M

PE

V In

tern

al S

ampl

ing

Ada

pter

97

M55

830-

1 2

0000

02M

7

Sco

pem

eter

Pre

ssur

e P

robe

S

EG

3913

0244

-302

-

0044

61J

8

VA

J-78

-1 5

ft 68

3-17

111-

1 -

0000

2677

J

9

VA

J-83

-1 3

5 ft

683-

1711

1-2

- 00

0026

76J

10

M

ultim

eter

Kit

1011

8-10

018-

04

1017

-

11

Mul

timet

er

87

1010

00

0886

36J

“Hap

py”

12

NO

D1D

4 (1

0-50

in-lb

s) T

rq W

renc

h 1/

4"

Driv

e -

- -

13

Flex

Han

dle

Rat

chet

, 3/8

" Driv

e -

- -

14

1

5/8"

Cro

wfo

ot, 3

/8" D

rive

- -

-

15

1 1/

4" C

row

foot

, 3/8

" Driv

e -

- -

16

Pr

egat

here

d To

olse

t “J

eff”

or “

TV”

1/4"

to 3

/8" A

dapt

er

- -

-

17

Rat

chet

, 3/8

" Driv

e -

- -

Type

: Res

tow

18

LAB

1D5

0.5

CTB

: WR

S

Cap

s&P

lugs

P

otab

le W

ater

R

efill

Pur

ge

Ada

per,

S/N

13

79, B

/C

CTB

0028

4J

Pot

able

Wat

er P

urge

/Fill

Ada

pter

68

3-64

435-

1 00

0001

00

0601

28H

1

2

3

4

5

6 7

31

Page 33: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 8

of 2

4

Pag

e 8

of 2

4, 2

2-07

12 (M

SG

092

)

1

N3-

LTL-

SMPL

TO

OL

INS

N3-

LTL

ITC

S-C

LOSE

OU

T 1.

130

NO

DE

3 IT

CS

SAM

PLIN

G A

DA

PTER

INST

ALL

ATI

ON

- LT

L (N

OD

3D6)

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 N

OD

3F1

2.0

CTB

: IN

STA

LLAT

ION

H

W 2

, S/N

104

5,

B/C

004

179J

ITC

S C

oola

nt S

ampl

ing

Adap

ter

683-

5614

7-14

A

ny

Any

R

epor

t S/N

and

B/C

to

MC

C-H

2

ITC

S C

oola

nt S

ampl

ing

Adap

ter

Mitt

en

5561

ND

001-

415

- -

3 IT

CS

Coo

lant

Sam

plin

g Ad

apte

r M

itten

55

61N

D00

1-41

3 -

-

4 N

OD

1D4

(10-

50 in

-lbs)

Trq

Wre

nch,

1/4

" D

rive

SE

G33

1123

95-3

01

M20

6422

-

5 Pr

egat

here

d To

olse

t “J

eff”

or “

TV”

5/32

" Hex

Hea

d, 1

/4" D

rive

TMA

5E

- -

6

Rat

chet

, 1/4

" Driv

e S

KG

3311

7562

-939

-

-

Type

: Res

tow

7 Te

mp

Stow

N

ear I

TCS

QD

M

ount

ing

Bra

cket

.

“Zip

lock

”: N

OD

3D6

Insu

latio

n an

d IT

CS

Coo

lant

Sam

plin

g A

dapt

er C

ap, P

lug,

& S

pace

r.”

- -

-

8 TC

S L

TL S

PLY

TO

HX

In

sula

tion

- -

-

9 TC

S C

oola

nt S

ampl

ing

Ada

pter

Cap

-

- -

10

TCS

Coo

lant

Sam

plin

g A

dapt

er P

lug

- -

-

11

TCS

Coo

lant

Sam

plin

g A

dapt

er A

dapt

er

- -

-

2

3

4

5

32

Page 34: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 9

of 2

4

Pag

e 9

of 2

4, 2

2-07

12 (M

SG

092

)

WR

S-U

PA-F

ILL

21-0

223

1.90

4 U

PA A

CTI

VATI

ON

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1P

2 0.

5 C

TB, S

/N

1221

, B/C

01

0402

J

Reg

en E

CLS

S T

ox-2

PP

E K

it S

EG

4210

3702

-302

10

02

CH

CC

PK

02J

2

Saf

ety

Gog

gles

50

3R

- -

3

Mes

s-U

p M

itts

RM

UM

-12

- -

4

Silv

er S

hiel

d G

love

s S

S10

4M

- -

5

Sur

gica

l Mas

ks

8210

-

-

1

N3-

LTL

ITC

S-SA

MPL

E 1.

1.60

1 IT

CS

FLU

ID S

AM

PLIN

G -

GEN

ERIC

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1S

5_D

1 1.

0 C

TB: I

TCS

Sa

mpl

ing

Har

dwar

e, S

/N

1376

, B/C

C

TB00

042J

ITC

S C

oola

nt Q

ualit

y M

onito

ring

Kit

SE

G46

1182

74-3

05

1004

00

0960

80J

This

CQ

MK

is la

bele

d “U

LF2”

2

P

ort F

lush

Bag

S

EG

4611

8252

-302

-

Any

R

epor

t B/C

to M

CC

-H

3

F

luid

Sam

ple

Bag

S

EG

4611

8249

-302

-

Any

R

epor

t B/C

to M

CC

-H

4

ITC

S S

ampl

e R

etur

n Zi

ploc

k Ba

g As

sy

SE

G46

1182

78-7

01

Any

A

ny

Rep

ort S

/N to

MC

C-H

Type

: Res

tow

5 Tr

ansf

er L

ist

Ret

urn

Item

#7

40

ITC

S S

ampl

e R

etur

n Zi

ploc

k B

ag

Ass

y S

EG

4611

8278

-701

A

ny

-

6

Flu

id S

ampl

e B

ag

SE

G46

1182

49-3

02

- -

2

3

4

5 6

33

Page 35: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

0 of

24

Pag

e 10

of 2

4, 2

2-07

12 (M

SG

092

)

1

**N

3 U

RIN

E B

US

FILL

1.

113

N3

UR

INE

JUM

PER

FIL

L Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1P

2 0.

5 C

TB, S

/N

1221

, B/C

01

0402

J

Reg

en E

CLS

S T

ox-2

PP

E K

it S

EG

4210

3702

-302

10

02

CH

CC

PK

02J

2

Saf

ety

Gog

gles

50

3R

- -

3

Mes

s-U

p M

itts

RM

UM

-12

- -

4

Silv

er S

hiel

d G

love

s S

S10

4M

- -

5

Sur

gica

l Mas

ks

8210

-

-

6 Te

mp

Stow

ed

at N

OD

3F4

Zipl

ock

- -

- M

oved

to N

OD

3 du

ring

WH

C

HA

RD

WA

RE

R

ETR

IEVE

Tas

k

7

Zip

lock

-

- -

8

Urin

e Fi

lter H

ose

1052

3.67

28.0

0.02

0 70

4003

00

1002

37J

9 N

OD

3F4

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180

A15

-1

910

0009

8602

R

10

Е

ДВ

Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А

15-

1 47

4 00

0508

04R

Type

: Res

tow

11

LAB

1S1

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А

15-

1 91

0 00

0986

02R

12

ЕДВ

Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А

15-

1 47

4 00

0508

04R

13

NO

D1S

1 Je

ttiso

n S

tow

age

Bag

: “W

HC

Tra

sh

Item

s”

Urin

e Fi

lter H

ose

1052

3.67

28.0

0.02

0 70

4003

00

1002

37J

2

3

4

5 6

34

Page 36: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

1 of

24

Pag

e 11

of 2

4, 2

2-07

12 (M

SG

092

)

1

**N

OD

3 EL

PS E

NA

BLE

1.

126

NO

DE

3 EL

PS E

NA

BLE

PO

WER

SEN

SIN

G

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Preg

athe

red

Tool

set

“Jef

f” o

r “TV

5/32

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

42

- -

2

Driv

er H

andl

e, 1

/4" D

rive

SK

G33

1175

62-9

41

- -

2

SPIN

AL-

H/W

-SET

UP

SPIN

AL-

STN

D-H

T-S/

U

SPIN

AL-

DA

TA-C

LCT-

OPR

SP

INA

L-D

ATA

-CO

LLEC

T SP

INA

L-ST

ND

-HT-

CLC

T SP

INA

L-H

/W-S

TOW

Sp

inal

Elo

ngat

ion

Ope

rato

r Pro

cedu

re

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

JPM

1F6_

B1

Spi

nal E

long

atio

n K

it S

JG46

1217

76-3

01

1004

H

RF0

9342

J K

it is

to b

e re

stow

ed in

or

igin

al IS

S lo

catio

n.

3

4

5

**N

3 N

AD

MPE

V IN

STL

** N

3 ST

BD

MPE

V IN

STL

1.

122

NO

DE

3 PP

RV

REM

OVA

L A

ND

MPE

V IN

STA

LLA

TIO

N

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

LAB

1D5

1.0

CTB

: 20A

P

rega

ther

#1,

S

/N 1

263,

B/C

01

0599

J

Bra

ycot

e 60

1 -

-

2 N

OD

1D4

(40-

200

in-lb

) Trq

Wre

nch,

1/4

" D

rive

SE

G33

1123

94-3

01

M20

6421

-

35

Page 37: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

2 of

24

Pag

e 12

of 2

4, 2

2-07

12 (M

SG

092

)

3 Pr

egat

here

d To

olse

t “J

eff”

or “

TV”

5/32

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

42

- -

4

Rat

chet

, 1/4

" Driv

e S

KG

3311

7562

-939

-

-

5 4"

Ext

, 1/4

" Driv

e S

KG

3311

7562

-764

-

-

Type

: Res

tow

6 N

OD

1P2

3.0

CTB

: Nod

e 3

Ves

tibul

e O

utfit

ting

kit

(VO

K),

S/N

104

8,

B/C

004

233J

0.5

CTB

: NO

D3

Uni

nsta

lled

Har

dwar

e S

EG

3311

1836

-303

10

65

0039

47J

7

PP

RV

[QTY

: 2]

683-

1632

1-11

A

ny

Any

R

epor

t S/N

and

B/C

to

MC

C-H

1

P/TV

-EVA

CA

MR

-CO

NFG

3.

701

D2X

s EV

A C

AM

ERA

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 N

OD

1P4_

A1

1.0

CTB

: EV

A C

AM

ERA

AC

CE

SSO

RIE

S,

S/N

122

1, B

/C

0067

17J

Cam

era

Mtg

Ass

y Th

erm

al

Bla

nket

S

ED

3311

7417

-301

A

ny

- R

epor

t S/N

to M

CC

-H

Labe

led

as "T

herm

al

Bla

nket

, Cam

era

Mtg

As

sy"

2 C

amer

a M

ount

ing

Ass

y S

ED

3311

3695

-302

-

- In

stal

led

on T

herm

al

Bla

nket

. 3

EV

A C

amer

a B

lank

et

SE

Z331

2054

3-30

1 A

ny

- R

epor

t S/N

to M

CC

-H

4

28m

m, 3

5mm

, 50m

m, L

ens

Cap

S

EZ3

3113

449-

303

- -

5 E

VA

Cam

era

Eye

piec

e

SE

Z331

2054

6-30

1 A

ny

- R

epor

t S/N

to M

CC

-H

6 28

mm

EV

A L

ens

S

ED

3310

5019

-301

A

ny

- R

epor

t S/N

to M

CC

-H

2

3

4

5 6

36

Page 38: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

3 of

24

Pag

e 13

of 2

4, 2

2-07

12 (M

SG

092

)

1

MLF

-GLC

R-2

0A-S

MP

XFR

D

ESC

ENT

SAM

PLE

TRA

NSF

ER F

RO

M M

ELFI

TO

GLA

CIE

R

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

IFM

Too

ls

MA

16D

4"

Ext

, 1/4

" Driv

e -

- -

2

1/4"

TO

3/8

" AD

AP

TER

(1/4

” D

rive)

-

- -

3 R

atch

et, 1

/4" D

rive

- -

-

4 3/

16" H

ex H

ead,

3/8

" Driv

e S

KG

3311

7562

-746

-

-

5 (4

0-20

0 in

-lbs)

Trq

Wre

nch,

1/4

" D

rive

SE

G33

1123

94-3

01

M20

6421

-

6 JP

M1F

7 (d

ryin

g lo

catio

n)

Dou

ble

Col

dbag

S

EG

3913

6374

-301

10

06

0005

0400

J

7 Ic

epac

Bel

t -21

°C [Q

TY:2

] S

EG

3311

8113

-307

- - 00

0504

41J

0005

0443

J

8 9 LA

B1S

2_R

ack

Fron

t (M

ELFI

-2)

LtW

t Cry

o G

love

s, (a

.k.a

. M

echa

nix

Wea

r)

SEG

3210

9404

-30X

-

-

10

JPM

1D4

(MEL

FI-1

) D

ewar

3, T

ray

D,

Sect

ion

3

Icep

ac B

elt -

21°C

S

EG

3311

8113

-307

- -

REP

OR

T B

/C#

of o

f Ic

epac

retri

eved

from

th

is lo

catio

n to

PO

IC

11

JPM

1D4

(MEL

FI-1

) D

ewar

2, T

ray

B,

Sect

ion

4

Via

l Bag

s [Q

TY:2

] (H

RP

Blo

od)

0321

8 -

-

12

JPM

1D4

(MEL

FI-1

) D

ewar

2, T

ray

D,

Sect

ion

2

Via

l Bag

s [Q

TY:4

] (H

RP

Blo

od)

0321

8 -

-

13

3X5

Mes

h B

ag (H

RP

Urin

e)

SE

G33

1210

12-3

01

- -

14

JPM

1D4

(MEL

FI-1

) D

ewar

2, T

ray

A,

Sect

ion

1

Via

l Bag

s [Q

TY:4

] (H

RP

Blo

od)

0321

8 -

-

15

JPM

1D4

(MEL

FI-1

) V

ial B

ag

(HR

P B

lood

) 03

218

- -

37

Page 39: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

4 of

24

Pag

e 14

of 2

4, 2

2-07

12 (M

SG

092

)

Dew

ar 2

, Tra

y A

, Se

ctio

n 2/

3 16

JP

M1D

4 (M

ELFI

-1)

Dew

ar 3

, Tra

y D

, Se

ctio

n 4

Icep

ac B

elt -

21°C

S

EG

3311

8113

-307

- 00

0504

47J

17

LAB

1S2

(MEL

FI-2

) D

ewar

2, T

ray

A,

Sect

ion

3/4

APE

X-C

ambi

um K

FT

[Qty

:5]

- -

-

18

LAB

1S2

(MEL

FI-2

) D

ewar

2, T

ray

C,

Sect

ion

3/4

CE

RIS

E La

rge

Bag

[QTY

:2]

(JAX

A C

ERIS

E)

LSE

-ZIP

006V

-CE

R

001

002

CB

ES

0561

N

CB

ES

0562

N

19

Cle

ar P

late

M

CM

FM37

115

001

002

CBE

S51

N

CBE

S52

N

Sto

wed

in L

arge

Bag

on

e ea

ch

20

Mea

s E

xp C

ultu

re B

ag H

olde

r M

CM

FM37

100

012

010

CB

ES

0503

N

CB

ES

0501

N

Sto

wed

in L

arge

Bag

on

e ea

ch

21

LAB

1S2

(MEL

FI-2

) D

ewar

2, T

ray

D,

Sect

ion

3/4

CE

RIS

E La

rge

Bag

[QTY

:2]

(JAX

A C

ERIS

E)

LSE

-ZIP

006V

-CE

R

003

004

CB

ES

0563

N

CB

ES

0564

N

22

Cle

ar P

late

M

CM

FM37

115

003

004

CBE

S53

N

CBE

S54

N

Sto

wed

in L

arge

Bag

on

e ea

ch

23

Mea

s E

xp C

ultu

re B

ag H

olde

r M

CM

FM37

100

013

011

CB

ES

0504

N

CB

ES

0502

N

Sto

wed

in L

arge

Bag

on

e ea

ch

Type

: Res

tow

24

MF2

8E/G

G

laci

er

Tray

A

CE

RIS

E La

rge

Bag

[QTY

:2]

(JAX

A C

ERIS

E)

LSE

-ZIP

006V

-CE

R

001

002

CB

ES

0561

N

CB

ES

0562

N

Con

tain

s a

Cle

ar P

late

an

d a

Mea

s E

xp

Cul

ture

Bag

Hol

der

each

Tr

ansf

er L

ist R

etur

n Ite

m #

721

25

MF2

8E/G

G

laci

er

Tray

B

CE

RIS

E La

rge

Bag

[QTY

:2]

(JAX

A C

ERIS

E)

LSE

-ZIP

006V

-CE

R

003

004

CB

ES

0563

N

CB

ES

0564

N

Con

tain

s a

Cle

ar P

late

an

d a

Mea

s E

xp

Cul

ture

Bag

Hol

der

each

Tr

ansf

er L

ist R

etur

n Ite

m #

721

38

Page 40: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

5 of

24

Pag

e 15

of 2

4, 2

2-07

12 (M

SG

092

)

26

MF2

8E/G

G

laci

er

Tray

C

APE

X-C

ambi

um K

FT

[Qty

:5]

- -

- Tr

ansf

er L

ist R

etur

n Ite

m #

721

27

MF2

8E/G

G

laci

er

Tray

D

Via

l Bag

s [Q

ty:1

1]

(con

tain

ing

HR

P b

lood

sam

ples

) 03

218

- -

Tran

sfer

Lis

t Ret

urn

Item

#72

1 28

3X

5 M

esh

Bag

(HR

P U

rine)

S

EG

3312

1012

-301

-

- 29

D

ryin

g Lo

catio

n

Dou

ble

Col

dbag

S

EG

3913

6374

-301

10

06

0005

0400

J R

EPO

RT

dryi

ng

loca

tion

to P

OIC

30

Ic

epac

Bel

t -21

°C

SE

G33

1181

13-3

07

- -

REP

OR

T B

/C#

of

this

iceb

elt,

Item

#10

31

Icep

ac B

elt -

21°C

S

EG

3311

8113

-307

-

0005

0447

J

32

JPM

1F5_

L1

Icep

ac B

elt -

21°C

S

EG

3311

8113

-307

-

0005

0441

J

33

Icep

ac B

elt -

21°C

S

EG

3311

8113

-307

-

0005

0443

J

1

2

WR

S-C

WC

I-FIL

L-PT

1 W

RS-

CW

CI-F

ILL-

PT2

20-0

021

2.91

3 C

WC

- Io

dine

Fill

from

WPA

with

WPA

H2O

Tra

nsfe

r Com

mon

Hos

e Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 N

OD

2O2

Mes

h B

ag

CW

C-Io

dine

S

EG

3312

0607

-301

20

18

0010

7930

J

2 C

WC

-Iodi

ne

SE

G33

1206

07-3

01

2019

00

1079

31J

3

LAB

1O3

WP

A H

2O T

rans

fer C

omm

on

Hos

e S

EG

3311

9491

-302

10

04

0007

3323

J

4 LA

B1P

4 Zi

ploc

k -

- -

5

Z

iplo

ck: “

Yel

low

/Yel

low

Hos

e -

QD

Rem

oved

on

GM

T X

XX

” -

- -

6

R/Y

QD

Ada

pter

10

108-

2017

5-01

50

08

-

Tpe:

Res

tow

7 JL

P1F1

C

WC

-Iodi

ne

SE

G33

1206

07-3

01

2018

00

1079

30J

8

CW

C-Io

dine

S

EG

3312

0607

-301

20

19

0010

7931

J

3 4

39

Page 41: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

6 of

24

Pag

e 16

of 2

4, 2

2-07

12 (M

SG

092

)

1

** N

OD

3O4

RA

CK

OU

TFIT

1.

144

Nod

e 3

Avi

onic

s R

acks

Out

fittin

g Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1D

5 1.

0 C

TB: 2

0A

Pre

gath

er #

1,

S/N

126

3,

B/C

010

599J

AR

IS -

Piv

ot F

ittin

g B

otto

m L

eft

683-

6171

1-31

10

30

-

2 A

RIS

- P

ivot

Fitt

ing

Bot

tom

R

ight

68

3-61

711-

32

2025

-

3 K

-BA

R A

ssy,

Lef

t 68

3-62

201-

33

0020

11

BO

E00

096J

4 K

-BA

R A

ssy,

Rig

ht

683-

6220

1-34

00

2010

B

OE

0010

1J

5

Preg

athe

red

Tool

set L

abel

ed

“Jef

f” o

r “TV

Rat

chet

, 3/8

" Driv

e -

- -

6

5/32

" Hex

Hea

d, 1

/4" D

rive

- -

-

7 St

atic

Wris

t Tet

her

- -

-

8 N

OD

1D4

(40-

200

in-lb

s) T

rq W

renc

h, 3

/8”

Driv

e -

- -

9 5/

32" H

ex H

ead,

3/8

" Driv

e -

- -

10

6"

Lon

g, 3

/8" H

ex H

ead,

3/8

" D

rive

- -

-

11

5" L

ong,

3/8

" Bal

l Tip

Hex

Hea

d,

3/8"

Driv

e -

- -

12

Spe

ed H

andl

e A

ssy

- -

-

Type

: Res

tow

13

NO

D1P

2 3.

0 C

TB: N

ode

3 V

estib

ule

Out

fittin

g ki

t (V

OK

), S

/N 1

048,

B

/C 0

0423

3J

0.5

CTB

: NO

D3

Uni

nsta

lled

Har

dwar

e S

EG

3311

1836

-303

10

65

0039

47J

14

K

nee

Bra

ce

683-

5024

9-3

Any

A

ny

REP

OR

T S

/Ns

to

MC

C-H

2

3

4

5

6

40

Page 42: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

7 of

24

Pag

e 17

of 2

4, 2

2-07

12 (M

SG

092

)

WH

C-U

R/IF

-CH

GO

UT

2.30

6 W

HC

UR

INE

HO

SE R

&R

Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 JL

P1P2

_B2

U

rine

Rec

epta

cle

(Urin

e H

ose)

A

8-90

60-8

00-0

4 A

ny

Any

R

EPO

RT

S/N

s an

d B

/Cs

to M

CC

-H

2

Inse

rt Fi

lter (Ф

-В)

1018

2.55

14.0

00

Any

A

ny

3 LA

B1P

2 R

egen

EC

LSS

To

x-2

PP

E K

it

Silv

er S

hiel

d G

love

s -

- -

4

Surg

ical

Mas

k -

- -

5

Safe

ty G

oggl

es

- -

-

6 LA

B1D

5 1.

0 C

TB: 2

0A

Pre

gath

er #

1,

S/N

126

3,

B/C

010

599J

Bray

cote

-

- -

7 Pr

egat

here

d To

olse

t Lab

eled

“J

eff”

or “

TV”

Wire

Cut

ters

-

- -

Type

: Res

tow

8 N

OD

1S1

JSB

: WH

C T

rash

Ite

ms

24”x

24”

Zip

lock

Bag

for d

ispo

sal

- -

-

9

Urin

e R

ecep

tacl

e (U

rine

Hos

e)

A8-

9060

-800

-04

Any

A

ny

REP

OR

T S/

Ns

and

B/C

s to

MC

C-H

10

Ins

ert F

ilter

(Ф-В

) 10

182.

5514

.000

A

ny

Any

10

Urin

e R

ecep

tacl

e (U

rine

Hos

e)

A8-

9060

-800

-04

Any

A

ny

REP

OR

T S/

Ns

and

B/C

s to

MC

C-H

11

Ins

ert F

ilter

(Ф-В

) 10

182.

5514

.000

A

ny

Any

1

2

3

4

5

6

7

8

9

10

11

41

Page 43: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

8 of

24

Pag

e 18

of 2

4, 2

2-07

12 (M

SG

092

)

ESA

Tim

elin

e Pr

oced

ures

: 1

2

FSL-

HA

ND

LE-R

PAR

4.

345

FSL

CEM

-LO

WER

LEF

T D

RA

WER

HA

ND

LE T

RO

UB

LESH

OO

TIN

G

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Ret

rieve

from

O

leg

0.5

CTB

: ES

A-7-

0.5

CTB

FCE

Dra

wer

Han

dle

FSL-

1-10

0-10

10-0

00-

VE

-

FSL0

0071

E

Ref

. 36P

Unp

ack

item

#7

6.3

2 C

OL1

F3

Col

umbu

s To

ol

Kit #

1

Torq

ue W

renc

h 4-

20 N

m

730/

2-50

1800

02

- 00

0007

54E

3 C

OL1

F3

Col

umbu

s To

ol

Kit #

2

Flex

Han

dle

Rat

chet

, 1/4

" Driv

e TM

831

- 00

0007

60E

4 R

atch

et W

renc

h 3/

8”

435-

1211

0010

-

0000

0912

E

5

2” E

xten

sion

1/4

" Driv

e 40

5/2-

1101

0001

-

-

6 C

OL1

F3

Col

umbu

s To

ol

Kit #

3

M4

(3 m

m) H

ex H

ead

Driv

er 1

/4"

Driv

e 44

-010

5000

3 -

- U

se 1

/8” H

ex H

ead,

1/4

" D

rive

if 3

mm

not

av

aila

ble.

7

Rat

chet

Too

l 3/8

” Driv

e 73

5/5-

5825

0005

-

0000

0888

E

8

NO

D1D

4 1/

8” H

ex H

ead,

1/4

" Driv

e S

KG

3311

7562

-740

-

-

9 8

mm

Hex

Hea

d, 3

/8” D

rive

SK

G33

1175

62-6

12

- -

10

5-

35 in

-lbs

Trq

Driv

er, 1

/4" D

rive

SE

G33

1172

89-3

01

M20

6418

-

11

10

mm

Com

bina

tion

Wre

nch

SK

G33

1175

62-3

01

- -

12

V

ise

Grip

s S

KG

3311

7562

-947

-

-

Type

: Res

tow

13

CO

L1D

4_A

1 Zi

ploc

k B

ag

- -

-

14

LHA

ND

LE-B

OLT

FS

L107

4B

- -

15

Te

mp

Stow

C

OL

0.5

CTB

: ES

A-7

-0.5

CTB

S

EG

3311

1836

-303

14

15

CTB

0009

9E

REP

OR

T lo

catio

n to

M

CC

-H

3 4

42

Page 44: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 1

9 of

24

Pag

e 19

of 2

4, 2

2-07

12 (M

SG

092

)

1

FSL-

VMU

HW

-UPD

ATE

S1

4.26

6 FS

L VM

U H

AR

DW

AR

E U

PDA

TE

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

CO

L1F3

C

olum

bus

Tool

Ki

t #2

Flex

Han

dle

Rat

chet

, 1/4

" Driv

e TM

831

- 00

0007

60E

2 2”

Ext

ensi

on 1

/4" D

rive

405/

2-11

0100

01

- -

3 C

OL1

F3

Col

umbu

s To

ol

Kit #

3

M4

(3 m

m) H

ex H

ead

Driv

er 1

/4"

Driv

e 44

-010

5000

3 -

- U

se 1

/8” H

ex H

ead,

1/4

" D

rive

if 3

mm

not

av

aila

ble.

4

NO

D1D

4 5-

35 in

-lbs

Trq

Driv

er, 1

/4" D

rive

SE

G33

1172

89-3

01

M20

6418

-

5

1/8”

Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

40

- -

6

Ret

rieve

from

O

leg

0.5

CTB

: ES

A-5-

0.5

CTB

FSL

VM

U H

DD

1

FSL

14.F

M.4

50

FM00

1 FS

L002

63E

R

ef. 3

6P U

npac

k ite

m

74.2

7

FSL

VM

U H

DD

2

FSL

14.F

M.4

50

FM00

2 FS

L002

62E

8 C

OL1

O1_

J1

VM

U S

DLT

II C

artri

dge

FSL

14.F

M.5

50

QH

0711

AM

C00

194

FSL0

0107

E

Type

: Res

tow

9 C

OL1

D4_

C1

0.5

CTB

: FS

L-6,

S/N

135

6,

B/C

C

TB00

315E

FSL

VM

U H

DD

1

FSL

14.F

M.4

20

FM00

1 FS

L000

19E

10

FSL

VM

U H

DD

2

FSL

14.F

M.4

20

FM00

2 FS

L000

20E

11

FSL

VM

U D

LT

FSL

14.F

M.5

20

FM00

1 FS

L000

17E

12

Tem

p St

ow

CO

L 0.

5 C

TB: E

SA

-6-0

.5 C

TB

SE

G33

1118

36-3

03

1412

C

TB00

103E

R

EPO

RT

loca

tion

to

MC

C-H

13

0.

5 C

TB: E

SA

-5-0

.5 C

TB

SE

G33

1118

36-3

03

1414

C

TB00

104E

2

3

4

5

6

7

8

9

43

Page 45: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

0 of

24

Pag

e 20

of 2

4, 2

2-07

12 (M

SG

092

)

1

JAXA

Tim

elin

e Pr

oced

ures

: 2

3

CB

EF-F

AN

REP

AIR

-1G

F0

3459

6 4.

017

CB

EF 1

G T

EMP

CO

NTR

OL

FAN

ATT

AC

HM

ENT

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Preg

athe

red

Tool

set

“Jef

f” o

r “TV

Rat

chet

, 1/4

" Driv

e -

- -

2

5/32

" Hex

Hea

d, 1

/4" D

rive

- -

-

3 S

tatic

Wris

t Tet

her

- -

-

4 N

OD

1O4_

B1

0.5

CTB

, FC

E SP

AR

ES

, S/N

12

20, B

/C 0

1040

1J

LED

Hea

dlam

p S

EZ3

3103

989-

301

AN

Y -

5 N

OD

1D4

Und

er ta

ble

2.0

CTB

, S/N

110

9,

B/C

010

697J

Bub

ble

Wra

p B

ag “C

BE

F Fa

n Lo

ckin

g B

olt”

- -

- Tr

ansf

er L

ist R

esup

ply

Item

# 3

2 O

ne o

f tw

o bo

lts w

ill b

e us

ed. A

noth

er is

spa

re.

6 C

BE

F Fa

n Lo

ckin

g B

olt

T6-2

4497

-101

00

1 00

2 00

1116

18N

00

1116

19N

7 JP

M1O

3_C

2 1.

0 C

TB, J

AX

A #

4,

S/N

104

8, B

/C

0029

33J

Kap

ton

Tape

1"

LSE

-KA

P00

1 00

2 JL

S00

412N

8 La

rge

Glo

ve [Q

TY: 1

pai

r] LS

E-G

V00

2 00

2 JL

S00

312N

9 JP

M1O

2_C

1 1.

0 C

TB,

ME

ASU

RE

ME

NT

EXP

/DO

SIS

, S/N

13

29, B

/C 0

1066

5J

1G T

emp

Con

trol F

an

T6-2

4492

-111

00

1 C

BEFR

002N

10

JPM

1O3_

C2

JEM

Bag

6, S

/N

001,

B/C

JB

AG

0006

N

Zipl

ock

Bag

” C

BE

F IU

H

umid

ifier

” -

- -

11

CB

EF

IU H

umid

ifier

T6

-242

80

002

CB

EIH

UM

2N

12

JPM

1O3_

B2

1.0

CTB

, CTB

-U-

S2, S

/N 1

002,

B/C

1C

TB00

02N

BZK

Wip

e B

CC

K003

00

2 JL

S00

432N

44

Page 46: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

1 of

24

Pag

e 21

of 2

4, 2

2-07

12 (M

SG

092

)

Type

: Res

tow

13JP

M1O

2_C

1 1.

0 C

TB,

MEA

SU

RE

ME

NT

EXP

/DO

SIS

, S/N

13

29, B

/C 0

1066

5J

Bub

ble

Wra

p B

ag “C

BE

F Fa

n Lo

ckin

g B

olt”

- -

-

14C

BE

F Fa

n Lo

ckin

g B

olt

T6-2

4497

-101

00

2 00

1116

19N

1

Task

list P

roce

dure

s:

2

3

BC

AT3

-CR

YSTA

L-C

HEC

K

2.03

4 B

CA

T-4

CR

YSTA

L C

HEC

K F

OR

SA

MPL

ES 8

,9, a

nd 1

0 Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1O

7 R

ack

Fron

t BC

AT-3

Slo

w G

row

th S

ampl

e M

odul

e 67

041F

SM

2200

-

0003

0426

L

2 LA

B1O

4_J1

0.

5 C

TB B

CAT

S/N

12

40, B

/C 0

1042

1J

LED

Min

i Mag

light

60

107M

FA20

17

- 00

1052

56L

3

1.5V

Bat

tery

Siz

e A

A

528-

4135

0-3

- -

(if re

quire

d)

4

WH

C-K

TO-R

EPLA

CE

2.30

5 W

HC

[KTO

] R&

R

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

FGB

Pan

el 2

20 o

r FG

B F

loor

or

N

OD

1O2

Sol

id W

aste

Con

tain

er –

Bod

y (a

ka K

TO B

ody)

11Ф

615.

8720А

55-2

0 25

7 26

3 26

4 26

5 27

2 27

5 27

8 28

2 30

4 30

7 30

8 30

9

- 00

1127

22J

0011

2724

J 00

1127

35J

0011

6316

J 00

1163

13J

0011

6302

J 00

1163

11J

0011

2744

J 00

1127

38J

- 00

1127

46J

This

is th

e lis

t of a

vaila

ble

KTO

Bod

ies.

R

EPO

RT

S/N

and

B/C

45

Page 47: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

2 of

24

Pag

e 22

of 2

4, 2

2-07

12 (M

SG

092

)

310

325

0011

2748

J 00

1127

36J

2 S

olid

Was

te C

onta

iner

– L

id

(aka

KTO

Bot

tom

) 11Ф

615.

8720А

55-1

0 25

7 25

8 26

3 26

5 27

2 27

4 27

5 27

8 28

2 30

7 30

8 30

9 31

0 32

5

0009

8427

R

0009

8428

R

0011

2721

J 00

1127

33J

0009

8472

R

0009

8474

R

0009

8475

R

0009

8438

R

0009

8442

R

0011

2737

J -

0011

2745

J 00

1127

47J

-

This

is th

e lis

t of a

vaila

ble

KTO

Lid

s.

REP

OR

T S/

N a

nd B

/C

3 LA

B1D

1 S

olid

Was

te C

onta

iner

– B

ody

(aka

KTO

Bod

y)

11Ф

615.

8720А

55-2

0 30

5 00

1127

30J

Pre

posi

tione

d fo

r Ins

tall

4 S

olid

Was

te C

onta

iner

Lid

(aka

KTO

Bot

tom

)11Ф

615.

8720А

55-1

0 27

6 00

0984

36R

5 N

OD

1D4

Rat

chet

, 1/4

" Driv

e S

KG

3311

7562

-939

-

-

6 10

mm

6 P

t Soc

ket,

1/4"

Driv

e S

KG

3311

7562

-657

-

-

7 (1

0-50

in-lb

s) T

rq W

renc

h, 1

/4"

Driv

e S

EG

3311

2395

-301

M

2064

22

-

Type

: Res

tow

8 LA

B1S

1 Te

SS

S

olid

Was

te C

onta

iner

Body

(a

ka K

TO B

ody)

11Ф

615.

8720А

55-2

0 -

- R

EPO

RT

S/N

and

B/C

9 S

olid

Was

te C

onta

iner

– L

id

(aka

KTO

Bot

tom

) 11Ф

615.

8720А

55-1

0 -

-

1 2

46

Page 48: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

3 of

24

Pag

e 23

of 2

4, 2

2-07

12 (M

SG

092

)

1

WH

C-ЕДВ

-У-R

&R

2.

302

WH

C ЕДВ

R&

R

Type

: Sta

ndar

d

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

LAB

1P2

0.5

CTB

S

/N 1

221,

B

/C 0

1040

2J

Reg

en E

CLS

S T

ox-2

PPE

KIT

SE

G42

1037

02-3

02

1002

C

HC

CP

K02

J

2

S

afet

y G

oggl

es

1664

4-00

000

- -

3

Silv

er S

hiel

d G

love

s S

SG

/10

- -

4

Dus

t Mas

k 92

11

- -

5

LAB

1D1

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

93

5 00

1255

49J

Pre

posi

tione

d

6 ЕДВ

Корпус

(ED

V B

ucke

t)11Ф

615.

8711

-120А1

5-1

459

0012

5565

J 7

NO

D1O

2 ЕД

В Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

90

2 00

0985

92R

8 ЕД

В Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

90

4 00

0985

94R

9

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

92

2 00

0478

31R

10

FG

B

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

-

- R

EPO

RT

S/N

and

B/C

11

ЕД

В Корпус

(ED

V B

ucke

t) 11Ф

615.

8711

-120А1

5-1

- -

Type

: Res

tow

12

LAB

1S1

ЕДВ

Кры

шка

(ED

V L

id)

11Ф

615.

8711

-180А1

5-1

93

1 00

1163

26J

13

ЕДВ

Корпус

(ED

V

Buc

ket)

11Ф

615.

8711

-120А1

5-1

455

0011

6319

J

2

PWD

-BEV

AD

PTR

-R&

R

22-0

309

PWD

Bev

erag

e A

dapt

er M

odifi

catio

n an

d In

stal

l Ty

pe: S

tand

ard

#

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 LA

B1O

4_D

1 P

WD

Bev

erag

e A

dapt

er

SE

G33

1203

33-3

02

1002

-

2

NO

D1D

4 R

atch

et, 1

/4” D

rive

SKG

3311

7562

-939

-

-

3 5/

32” H

ex H

ead,

1/4

” Driv

e S

KG

3311

7562

-742

-

-

Type

: Res

tow

4 LA

B1O

4_D

1 PW

D B

ever

age

Adap

ter

SEG

3312

0333

-301

-

-

3 4

47

Page 49: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

712

(MSG

092

) – S

tow

age

Loca

tions

for F

D 0

8 (G

MT

046)

Pa

ge 2

4 of

24

Pag

e 24

of 2

4, 2

2-07

12 (M

SG

092

)

JAXA

Tas

klis

t Pro

cedu

res:

1

Non

e 2

3

ESA

Tas

klis

t Pro

cedu

res:

4

Non

e 5

48

Page 50: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

713

(MSG

093

) - C

upol

a Ve

stib

ule

Out

fittin

g St

owag

e M

atrix

Pa

ge 1

of 3

Pag

e 1

of 3

, 22-

0713

(MS

G 0

93)

1

2

OVE

RVI

EW: T

his

mes

sage

pro

vide

s st

owag

e in

form

atio

n fo

r the

Cup

ola

Ves

tibul

e O

utfit

ting

activ

ities

on

FD08

and

FD

09.

3

4

Tabl

e A

: Har

dwar

e an

d To

ols

5

ITEM

#

√LO

CA

TIO

N

ITEM

P/

N

S/N

B

/C

NO

TES

1

JP

M1F

2 2.

0 C

TB, S

/N

1033

, B/C

00

4167

J

2.0

CTB

S

EG

3311

1839

-303

A

ny

Any

Em

pty

REP

OR

T S/

N to

M

CC

-H

LAB

EL

“Cup

ola

CB

M

CP

As”

2

LAB

1D5

1.0

CTB

: 20A

P

rega

ther

#1,

S

/N 1

263,

B/C

01

0599

J

Ele

men

t Gro

und

Stra

p A

ssy

[QTY

: 2]

683-

1347

7-7

1028

10

29

- -

3

C

TB H

alf D

ivid

er [Q

TY: 2

] S

EG

3311

1841

-317

-

- Fo

r CP

A

stow

age

4

FF

TD a

nd G

amah

Sea

l Mai

nten

ance

K

it S

JG33

1142

23-3

01

1001

-

5

Fl

uid

Fitti

ng T

orqu

e D

evic

e

9902

04-1

01

- -

6

Driv

e G

ear,

1.37

5"

2690

0-20

066-

301

- -

7

Rea

ctio

n G

ear,

1.0"

99

0204

-032

-

-

8

G

amah

Fitt

ing

Mai

nten

ance

Kit

683-

6040

8-3

- -

9

Gam

ah S

eal R

emov

al T

ool,

3/4"

G

amah

Fitt

ing

683-

6046

7-3

- -

10

G

amah

Fitt

ing

Mai

nten

ance

Kit

683-

6040

8-4

- -

11

Ret

aini

ng R

ing

Inst

alla

tion/

Rem

oval

Too

l, .7

50"

683-

6047

4-3

- -

12

G

amah

Sea

l Mai

nten

ance

Kit

52

8-50

000-

4 -

-

13

M

etal

Sea

ls [Q

TY: 2

] S

1470

7C

- -

14

Ret

aini

ng R

ing

[QTY

: 2]

R14

107C

-

-

15

LA

B1O

5 C

SA-O

2 [Q

TY: 2

] S

ED

4611

5801

-305

10

46

1063

00

0543

24J

0005

4341

J

49

Page 51: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

713

(MSG

093

) - C

upol

a Ve

stib

ule

Out

fittin

g St

owag

e M

atrix

Pa

ge 2

of 3

Pag

e 2

of 3

, 22-

0713

(MS

G 0

93)

ITEM

#

√LO

CA

TIO

N

ITEM

P/

N

S/N

B

/C

NO

TES

16

N

OD

1D4_

G2

ISS

IVA

Too

lbox

D

raw

er 2

7/16

" Dee

p S

ocke

t, 3/

8" D

rive

SK

G33

1175

62-7

09

- -

17

7/16

" Soc

ket,

1/4"

Driv

e S

KG

3311

7562

-701

-

-

18

1/

4" H

ex H

ead,

1/4

" Driv

e S

KG

3311

7562

-745

-

-

19

6"

Ext

, 3/8

" Driv

e S

KG

3311

7562

-774

-

-

20

(4

0-20

0 in

-lbs)

Trq

Wre

nch,

3/8

" Driv

e S

EG

3311

7289

-302

M

2135

69

-

21

(1

0-50

in-lb

s) T

rq W

renc

h, 1

/4" D

rive

SE

G33

1123

95-3

01

M20

6422

-

22

Preg

athe

red

Tool

Set

“Jef

f”, “

TV”,

or

Shut

tle

Rat

chet

, 1/4

" Driv

e S

KG

3311

7562

-939

-

-

23

R

atch

et, 3

/8" D

rive

SK

G33

1175

62-9

38

- -

24

Driv

er H

andl

e, 1

/4" D

rive

SK

G33

1175

62-9

41

- -

25

5/32

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

42

- -

26

3/16

" Hex

Hea

d, 1

/4" D

rive

SK

G33

1175

62-7

43

- -

27

3/8"

Soc

ket,

1/4"

Driv

e S

KG

3311

7562

-699

-

-

28

4"

Ext

, 1/4

" Driv

e S

KG

3311

7562

-764

-

-

29

W

ire C

utte

rs

SK

G33

1175

62-9

26

- -

30

Sta

tic W

rist T

ethe

r S

KG

3311

7562

-335

-

-

31

N

OD

1P1

1.0

CTB

, S/N

10

15, B

/C

0023

10J

CTB

Hal

f Div

ider

S

EG

3311

1841

-317

-

- Fo

r CP

A

stow

age

32

N

OD

3F1

2.0

CTB

: In

stal

latio

n H

W

#1, S

/N 1

092,

B

/C 0

1068

0J

Zipl

ock”

NO

DE

3 N

adir

CB

M C

PA

R

emov

al H

ardw

are”

52

8-50

000-

5 -

- C

onta

ins

CP

A

Pro

tect

ive

Cap

s an

d 24

” x 2

4”

Zipl

ocks

33

NO

D1P

2 3.

0 C

TB: N

ode

3 V

estib

ule

Out

fittin

g ki

t (V

OK

), S

/N 1

048,

B

/C 0

0423

3J

Zipl

ock

Bag

labe

led

“NO

D1-

NO

D3

IMV

H/W

” -

- -

From

N3

Ves

tibul

e O

utfit

ting

Pro

cedu

re

34

IM

V F

lang

e S

aver

68

3-15

016-

2 -

- R

EPO

RT

S/N

to

MC

C-H

1

50

Page 52: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0

713

(MSG

093

) - C

upol

a Ve

stib

ule

Out

fittin

g St

owag

e M

atrix

Pa

ge 3

of 3

Pag

e 3

of 3

, 22-

0713

(MS

G 0

93)

Tabl

e B

: Res

tow

1

ITEM

#√

LOC

ATI

ON

IT

EM

P/N

S/

N

B/C

N

otes

35

NO

D3O

1 3.

0 C

TB: N

ode

3 V

estib

ule

Out

fittin

g ki

t (V

OK

), S

/N

1048

, B/C

00

4233

J

0.5

CTB

: NO

D3

Uni

nsta

lled

Har

dwar

e S

EG

3311

1836

-303

10

65

0039

47J

36

Zi

ploc

k B

ag

- -

-

37

W

ire T

ies

- -

-

38

La

unch

Bol

ts

- -

-

39

Zi

ploc

k B

ag la

bele

d “N

OD

1-N

OD

3 IM

V H

/W”

- -

-

40

Zi

ploc

k B

ag “N

3 N

adir

IMV

S

uppl

y C

ap”

- -

-

41

Zi

ploc

k B

ag “N

ode

3 N

adir

Ves

tibul

e P

rote

ctiv

e C

aps”

-

- -

42

P

rote

ctiv

e C

aps

[QTY

: 8]

- -

-

43

15

53 B

us T

erm

inat

ors

[QTY

: 2]

-

- -

44

Zi

ploc

k B

ag “N

OD

3-C

upol

a H

TL

Gam

ah C

aps”

-

- -

45

Gam

ah C

aps

[QTY

: 2]

- -

-

46

C

BM

Cen

ter D

isk

Cov

er

683-

1457

5 -

-

47

C

OL1

D2

5 M

LE

Bag

F

Cup

ola

Inte

rnal

MLI

-

- -

4 P

iece

s 48

Lefto

ver H

TL In

sula

tion

- -

-

49

N

OD

3D1

2.0

CTB

S

EG

3311

1839

-303

A

ny

Any

50

C

BM C

ontro

ller P

anel

Ass

embl

y [Q

TY:4

] 23

5526

0-1-

1 A

ny

Any

2

51

Page 53: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 1 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

OBJECTIVE:This procedure will be used to transfer frozen science samples from both ISS MELFIs to ShuttleGlacier. One Double Coldbag will be used to transfer samples from both MELFIs to Glacier.This activity is performed by ISS and shuttle crewmembers.

PARTS:Double Coldbag S/N 1006LtWt Cryo Gloves (a.k.a Mechanix Wear)TOOLS:3/16" Hex Head, 3/8" Drive4" Ext, 1/4" Drive1/4" to 3/8" Adapter (1/4" Drive)Ratchet, 1/4" Drive(40-200 in-lbs) Trq Wrench, 1/4" DriveColdplate/Wireway CoverITEMS TO UNSTOW WITHIN PROCEDURE:Icepac Belt -21° C (two) (unstow step 2)Vial Bags (eleven) (unstow step 2)3x5 Mesh Bag (unstow step 2)APEX-Cambium KFT (five) (unstow step 2)JAXA CERISE CBH (four) (unstow step 2)

MF28E/G(Glacier)

1. Unlock Glacier Door Captive Locks (two) using 3/16" Hex Head, 3/8" Drive;4" Ext, 1/4" Drive; 1/4" to 3/8" Adapter (1/4" Drive); Ratchet, 1/4" Drive.

Refer to Figure 1.

52

Page 54: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 2 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

Figure 1. Glacier Door Captive Locks.

MELFI 2. PACKING MELFI SAMPLES INTO DOUBLE COLDBAG

WARNING

Protective Gloves must be worn when manipulating MELFI trays orsamples to prevent injury to exposed skin.

CAUTION

1. Minimize exposure of MELFI trays, frozen Icepacs, and samples toambient air to prevent increased sample temperatures.

2. Double Coldbag lid should remain closed when the internal volume is notbeing accessed.

NOTEThe 60 seconds and 45 minutes MELFI Dewar opening rules do not applyduring packing of the Coldbag.

2.1 Don Gloves.

2.2 Pack Double Coldbag per Figure 2.

53

Page 55: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 3 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

****************************************************************************** If Tray is stuck and cannot be removed from Dewar

Insert Coldplate/Wireway Cover completely between Trayand Dewar wall

Firmly holding both Coldplate/Wireway Cover and TrayHandle, remove Tray from Dewar.

Reference: 4.010 MELFI REMOVAL OF A STUCK TRAY,steps 5 to 13 (US PODF: MELFI) if needed.

**************

******************************************************************************

54

Page 56: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 4 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

Figure 2. Double Coldbag Packing Configuration.

3. Transfer Double Coldbag to shuttle middeck.

4. UNPACKING DOUBLE COLDBAG AND INSERTING SAMPLES INTOGLACIER

WARNING

Protective gloves must be worn when handling frozen samples ormanipulating inner doors, cold trays or samples in Glacier to prevent injuryto exposed skin.

CAUTION

1. Minimize exposure of Glacier trays and samples to ambient air to preventincreased sample temperatures.

2. Glacier inner doors should remain closed when the internal volume is notbeing accessed. Glacier doors should not be open for longer than 2minutes.

55

Page 57: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 5 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

NOTE1. First priority is to perform packing as quickly as possible.2. Packing foam secured to bottom of each tray can be left in place.3. Loose cushion foam may be left in tray if there is room, or it can be

trashed.

MF28E/G(Glacier)

4.1 Don Gloves

4.2 Insert JAXA CERISE CBH (two) into Tray A.

4.3 Insert JAXA CERISECBH (two) in to Tray B.

4.4 Insert APEX-Cambium KFT (five) in Tray C

4.5 Insert Vial Bags (eleven) and 3x5 Mesh Bag (one) in Tray D

5. ✓Glacier Door is closed.

************************************************************************************** If Outer Door does not close

Press on top left corner and bottom left corner of door to assist withclosure.

********

**************************************************************************************

6. ✓Door Latch – Locked (Finger latches fully spread apart and locking flappositioned between finger latches.)

WARNING

Glacier Door Captive Locks (two) must be torqued to 75 in-lbs to preventdoor from opening during launch and return.

7. Fasten Glacier Door Captive Locks (two), torque to 75 in-lbs using 3/16" HexHead, 3/8" Drive; 4" Ext, 1/4" Drive; 1/4" to 3/8" Adapter (1/4" Drive); (40-200in-lbs) Trq Wrench, 1/4" Drive. Refer to Figure 1.

8. TEMPORARY STOW DOUBLE COLDBAG AND ICEPACS ON ISS

8.1 Temporary stow Double Coldbag on ISS in location that protects fromkick loads.

8.2 Remove Icepac Belt -21° C (two) from Double Coldbag and place intemporary stowage location to air dry.

8.3 Notify MCC-H that transfer activities completed and locations forDouble Coldbag and Icepacs.

9. GROUND UPDATES FOR IMS Ground updates IMS for the following parts:

56

Page 58: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0715 (MSG 095) DESCENT SAMPLE TRANSFER FROM MELFI TO GLACIER(ASSY OPS/20A/FIN 1) Page 6 of 6 pages

14 FEB 1022-0715_M_21566_22_0715.xml

Double Cold Bag S/N 1006 TO: per crew call down (step 8.3) Icepac Belt -21° C (two) TO: per crew call down (step 8.3) Vial Bag (eleven) TO: Middeck Glacier Mesh Bag TO: Middeck Glacier APEX-Cambium KFT (five) TO: Middeck Glacier JAXA CERISE CBH (four) TO: Middeck Glacier

57

Page 59: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 096 - CGBA SWAP OVERVIEW

Nick, 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22

Today you will transfer CGBA-6 to ISS and return CGBA-4 to the middeck. The transfer scenario has changed since your pre-flight training. Please use the updated procedure uplinked and printed today. Below is an overview of the activity for your review: Three CGBA units are onboard:

CGBA-6 located in the middeck containing NLP-Cells-3 Stowage bag CGBA-4 located in US Lab, EXPRESS Rack 1 (LAB1O2) CGBA-5 located in US Lab, EXPRESS Rack 2 (LAB1O1)

Overview of the CGBA and NLP transfer choreography:

• Transfer CGBA-6 from the middeck to the US Lab. • Remove NLP-Cells-3 Stowage bag from CGBA-6. • Remove CGBA-5 from ISS locker and insert NLP-Cells-3 Stowage bag into CGBA-5. • Insert CGBA-5 back into the ISS locker, cable and apply power. • Complete the CGBA-6 swap with CGBA-4:

– Remove CGBA-4 from EXPRESS Rack 1 – A Restraint System is stowed inside the left side of the Nomex cover of CGBA-4.

Remove this restraint system and place with CGBA-6. – Insert CGBA-6 into EXPRESS Rack 1 – Transfer CGBA-4 to middeck and install.

END OF PAGE 1 OF 1, MSG 096 58

Page 60: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Page 1 of 9

STS-130 Image Acquisition Plan For Post-Flight Quantitative Analysis of

Ammonia Jumper Connections on US Lab and Node 3

Objective: Acquire imagery to support post-flight photogrammetric analysis of the distance the MLI covered ammonia jumper connections rise above the surface of the US Lab and Node 3. The regions for quantitative analysis are restricted to the localized areas around which the ammonia jumpers connect to the Lab and where the ammonia jumpers connect to Node 3. Photography Resources Required: Imagery will be acquired using an EVA certified D2Xs camera equipped with a 28 mm fixed focal length lens (a zoom lens is not permitted).

Node 3

Node 1

US Lab

22-0720 (MSG 100) - NH3 Jumper MLI Closeout Photo Details Page 1 of 9

Page 1 of 9, 22-0720 (MSG 100) 59

Page 61: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Page 2 of 9

Requested Image Acquisition Priority 1 MLI covered ammonia jumper cables where they connect to the US Lab from

Node 1 Handrails 0132 and 0133 (on Nadir Forward side of Node 1 End Cone) As time Allows MLI covered ammonia jumper cables where they connect to Node-3 from

Node 1 Handrails 0109 and 0110 (on Nadir Port Side of Node 1 near CBM). At each location from which photos are designated to be taken, the crew member is requested to acquire at least four or more photos of each target using the “stereo photography” technique. Stereo Photography Technique

“Stereo Photography” consists of acquiring at least two photos of the same static object from a slightly different exposure location. Using images from different exposure locations allows the creation of a stereo image in which the relative depth of objects in the image can be visually discerned. Using the mathematics of photogrammetry, 3-D measurements of objects in the common field of view of the images can be made. The technique for acquiring photos which can be used to form a stereo image consists of laterally shifting the camera between adjacent exposures.

TECHNIQUE 1. Distance to subject: 3 - 7 feet.

2. With the camera as far left as possible take the first photo of the object. 3. Offset the camera exposure station laterally to the right 2” per foot of range to the

object (so that the next photo overlaps the previous photo by 60% to 80% of the field of view).

You must physically change the camera exposure location between

photos, DO NOT just pan or turn the camera.

4. Repeat as needed to cover the area of interest.

22-0720 (MSG 100) - NH3 Jumper MLI Closeout Photo Details Page 2 of 9

Page 2 of 9, 22-0720 (MSG 100) 60

Page 62: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Page 3 of 9

How to take Photos with Stereo Photographic Technique

Side View

60% to 80% Overlap

Between Photos in the Same Row

Face On View

Item of Interest

Item of Interest

Offset Camera Between Exposures

DO NOT Just Turn the Camera

22-0720 (MSG 100) - NH3 Jumper MLI Closeout Photo Details Page 3 of 9

Page 3 of 9, 22-0720 (MSG 100) 61

Page 63: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Page 4 of 9

Requested Image Acquisition A. On Nadir Forward side of Node 1 End Cone (Priority 1) Acquire photos, using a “stereo photography technique” of the MLI covered ammonia jumper cables where they connect to the US Lab.

1) With BRT attached to handrail 0132 acquire stereo photos of area shown

2) With BRT attached to handrail 0133 acquire stereo photos of area shown

22-0720 (MSG 100) - NH3 Jumper MLI Closeout Photo Details Page 4 of 9

Page 4 of 9, 22-0720 (MSG 100) 62

Page 64: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Pag

e 5

of 9

Han

drai

l 013

2

Acqu

ire

ph

oto

s o

f M

LI co

ve

red a

mm

on

ia ju

mpe

r ca

ble

s w

he

re th

ey c

on

ne

ct to

the

US

La

b f

rom

hand

rail

01

32

usin

g a

“ste

reo

pho

togr

aphy

te

chn

iqu

e”.

A

min

imu

m o

f 4 p

hoto

s s

ho

uld

be

ta

ke

n, bu

t th

e t

rue

num

ber i

s de

pend

ent u

pon

the

num

ber r

equi

red

to c

over

the

area

of i

nter

est.

Exam

ple

of P

hoto

s Ta

ken

usin

g a

Ster

eo P

hoto

grap

hic

Tech

niqu

e

22-0

720

(MSG

100

) - N

H3

Jum

per M

LI C

lose

out P

hoto

Det

ails

Pa

ge 5

of 9

Page

5 o

f 9, 2

2-07

20 (M

SG 1

00)

63

Page 65: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Pag

e 6

of 9

Han

drai

l 013

3

Acqu

ire

ph

oto

s o

f M

LI co

ve

red a

mm

on

ia ju

mpe

r ca

ble

s w

he

re th

ey c

on

ne

ct to

the

US

La

b f

rom

hand

rail

01

33

usin

g a

“ste

reo

pho

togr

aphy

te

chn

iqu

e”.

A

min

imu

m o

f 4 p

hoto

s s

ho

uld

be

ta

ke

n, bu

t th

e t

rue

nu

mbe

r is

dep

en

de

nt up

on

th

e n

um

be

r re

qu

ired

to

co

ve

r th

e a

rea

of in

tere

st.

22-0

720

(MSG

100

) - N

H3

Jum

per M

LI C

lose

out P

hoto

Det

ails

Pa

ge 6

of 9

Page

6 o

f 9, 2

2-07

20 (M

SG 1

00)

64

Page 66: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Page 7 of 9

B. On Nadir Port Side of Node 1 near CBM (as time allows) Acquire photos, using a “stereo photography technique” of the MLI covered ammonia jumper cables where they connect to Node 3.

1) With BRT attached to handrail 0109 acquire stereo photos of area shown

2) With BRT attached to handrail 0110 acquire stereo photos of area shown

22-0720 (MSG 100) - NH3 Jumper MLI Closeout Photo Details Page 7 of 9

Page 7 of 9, 22-0720 (MSG 100) 65

Page 67: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Pag

e 8

of 9

Han

drai

l 010

9 A

cqui

re p

hoto

s of

MLI

cov

ered

am

mon

ia ju

mpe

r cab

les

whe

re th

ey c

onne

ct to

Nod

e-3

from

han

drai

l 010

9 u

sin

g a

“ste

reo p

hoto

gra

ph

y

techn

iqu

e”.

A

min

imu

m o

f 4 p

hoto

s s

ho

uld

be

ta

ke

n, bu

t th

e t

rue

nu

mbe

r is

dep

en

de

nt up

on

th

e n

um

be

r re

qu

ired

to

co

ve

r th

e a

rea

of in

tere

st.

22-0

720

(MSG

100

) - N

H3

Jum

per M

LI C

lose

out P

hoto

Det

ails

Pa

ge 8

of 9

Page

8 o

f 9, 2

2-07

20 (M

SG 1

00)

66

Page 68: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

Pag

e 9

of 9

Han

drai

l 011

0

Acq

uire

pho

tos

of M

LI c

over

ed a

mm

onia

jum

per c

able

s w

here

they

con

nect

to N

ode-

3 fro

m h

andr

ail 0

110

usin

g a

“ste

reo p

hoto

gra

ph

y

techn

iqu

e”.

A

min

imu

m o

f 4 p

hoto

s s

ho

uld

be

ta

ke

n, bu

t th

e t

rue

nu

mbe

r is

dep

en

de

nt up

on

th

e n

um

be

r re

qu

ired

to

co

ve

r th

e a

rea

of in

tere

st.

22-0

720

(MSG

100

) - N

H3

Jum

per M

LI C

lose

out P

hoto

Det

ails

Pa

ge 9

of 9

Page

9 o

f 9, 2

2-07

20 (M

SG 1

00)

67

Page 69: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

MSG 102 (22-0721) - FD08 EVA DELTAS Page 1 of 1

1 2 3 4 5 6 7 8 9

10 11 12 13

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Bob & Nick, Fantastic work on EVA 2! It is great to see Node 3 coming online. We have a question from EVA 2 and a few updates to EVA 3 for you. EVA 2 We need confirmation on the torque and turn count for OIH 600 install. We were in a 5 min LOS at the time. EVA 3 1) In Mesh Bag #3 for EVA 3, you will find 3 caps. For the PMA 3 cable, you will need two caps: the -25 for P608 and the -15 for P603. The other cap (size 17) can be stowed in the done bag.

2) Pen and Ink for NOD3 NH3 Jumper/MLI Closeout on FS 7-102 WAS: Step 18. Take pictures of NH3 Jumper/MLI configuration IS: Step 18. Take pictures of NH3 Jumper/MLI configuration, reference JEDI MSG 100 - NH3 Jumper MLI Closeout Photo Details. 3) Pen and Ink for EVA QD OPS Cue Card on FS CC 7-79, Block C Add: 2a. Mitigate sideloads when opening valve Bob's Comm Cap We are trying our best to keep the lines of communication open with Bob. Bob is currently using Nick's backup comm cap, with no shuttle backups remaining. We have identified Jeff Williams' comm cap as a suitable backup for both Bob and Nick. During E-Lk Prep, retrieve both Comm Cap Wl1 (s/n 1199) and Comm Cap Wl2 (s/n 1205), and stow them in the E-Lk. Those comm caps are currently stowed in Williams' ECOK in NOD1D2.

Page 1 of 1, MSG 102 (22-0721) 68

Page 70: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0694 (MSG 103) 20A CGBA SWAP - UNPOWERED(ASSY OPS/20A/FIN/REAL-TIME) Page 1 of 4 pages

13 FEB 1022-0694_M_22093_22_0694.xml

OBJECTIVE: To swap Commercial Generic Bioprocessing Apparatus (CGBA-6), MF71E, with returningCGBA-4 in EXPRESS-1 Rack. Transfer NLP Cells from inside CGBA-6 to CGBA-5 inEXPRESS-2 Rack and then power up CGBA-5. Transfer CGBA Restraint System from CGBA-4 to CGBA-6. Install CGBA-6, connect cables and put cb/sw in the On position. TransferCGBA-4 to middeck and insert into locker.

PARTS:CGBA (two) - reference Transfer List

Figure 1. Transfer Overview

1. CGBA-6 REMOVAL FROM MIDDECK

MF71E 1.1 Unlatch, open locker door.

1.2 Grasp CGBA-6, pull unit out of locker using side handles.

If needed, pull Velcro tabs to deploy CGBA recessed handles (pushrecessed handles back into place when done).

1.3 Close locker door

LAB1O2 1.4 Transfer CGBA-6 to vicinity of EXPRESS-1 Rack

2. TRANSFER NLP-CELLS-3 STOW BAG

2.1 Open CGBA-6 lid, remove NLP-Cells-3 Stow Bag. Close CGBA-6 lid.

Temporary stow CGBA-6 on EXPRESS -1 Rack

69

Page 71: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0694 (MSG 103) 20A CGBA SWAP - UNPOWERED(ASSY OPS/20A/FIN/REAL-TIME) Page 2 of 4 pages

13 FEB 1022-0694_M_22093_22_0694.xml

2.2 Transfer NLP-Cells-3 Stow Bag to CGBA-5.

LAB1O1_B2 (CGBA-5)

2.3 Remove CGBA-5 mufflers by pulling forward (attached by Velcro)

Temporarily stow

Figure 2. CGBA Muffler

2.4 Unlatch, open CGBA-5 locker door.

2.5 Grasp CGBA-5, pull unit out, open lid.

2.6 Insert NLP-Cells-3 Stow Bag inside, close lid.

2.7 Slide CGBA-5 into locker, close locker door, latch

3. CONNECT CGBA-5 CABLES

LAB1O1_A1

3.1 ✓sw LOCKER-5 POWER-J1 – OFF (Lt off)

CGBA-5 3.2 ✓cb MAIN POWER – Open

3.3 EXPRESS Rack Power Cable →|← POWER-IN 28 VDC J1

3.4 EXPRESS Rack Data Cable→|← EXPRESS DATA J4

3.5 Attach CGBA-5 mufflers

4. APPLY POWER TO CGBA-5

LAB1O1_A1

4.1 sw LOCKER-5 POWER-J1 → ON (Lt on)

CGBA-5 4.2 cb MAIN POWER → Close

Verify LED-MAIN POWER – On

70

Page 72: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0694 (MSG 103) 20A CGBA SWAP - UNPOWERED(ASSY OPS/20A/FIN/REAL-TIME) Page 3 of 4 pages

13 FEB 1022-0694_M_22093_22_0694.xml

5. CGBA-5 CHECK OUT

5.1 Verify CGBA-5 fan running (check airflow at EXHAUST)

5.2 Verify CGBA-5 display indicates as follows (any values acceptable):

Figure 3. CGBA Time and Temp

6. DISCONNECT CGBA-4 CABLES

LAB1O2_A1

6.1 sw LOCKER-1 POWER-J1 → OFF (lt off)

CGBA-4 6.2 cb MAIN POWER → Open

6.3 Remove CGBA mufflers and temporarily stow

6.4 EXPRESS Rack Power Cable ←|→POWER-IN 28 VDC J1

6.5 EXPRESS Rack Data Cable ←|→EXPRESS DATA J4

6.6 Tether Cables out of the way as needed

7. CGBA-4 REMOVAL FROM EXPRESS LOCKER

7.1 Unlatch, open locker door.

7.2 Grasp CGBA-4, pull unit out of locker using side handles.

7.3 Remove CGBA-4 Restraint System from left side, inside Nomexcover.

Temporarily stow CGBA-4.

Reference Figure 4.

Figure 4. CGBA Restraint System Stowed

71

Page 73: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0694 (MSG 103) 20A CGBA SWAP - UNPOWERED(ASSY OPS/20A/FIN/REAL-TIME) Page 4 of 4 pages

13 FEB 1022-0694_M_22093_22_0694.xml

7.4 Stow CGBA-4 Restraint System inside CGBA-6 Nomex cover, leftside.

7.5 Slide CGBA-6 into locker, close locker door, and latch.

8. CONNECT CGBA-6 CABLES

LAB1O2_A1

8.1 ✓sw LOCKER-1 POWER-J1 – OFF (lt off)

CGBA-6 8.2 ✓cb MAIN POWER – Open

8.3 EXPRESS Rack Power Cable →|←POWER-IN 28 VDC J1

8.4 EXPRESS Rack Data Cable →|←EXPRESS DATA J4

8.5 Attach CGBA mufflers

9. PLACE CB/SW IN ON POSITION

NOTECGBA-6 will not power on. The ground will power on CGBA-6 at a later time.

LAB1O2_A1

9.1 sw LOCKER-1 POWER-J1 → ON (lt off)

CGBA-6 9.2 cb MAIN POWER → Close

10. CGBA-4 TRANSFER AND INSTALL IN MIDDECK

10.1 Transfer CGBA-4 to middeck

WARNING

CGBA must be inserted with both latches closed for safe entry.

MF71E 10.2 Slide CGBA-4 into locker, close locker door, and close both latches.

10.3 Notify MCC-H CGBA Swap complete.

72

Page 74: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 1 of 13 pages

14 FEB 10

1. SETUP Configure Cameras and overlays as required.

Monitor 1 Monitor 2 Monitor 3 SSC 1 (MON 1) SSC 2 (DTV) 09: P1 Lower

Outboard (+80, +15)

71: Camera B (-15, +50)

24: Tip Elbow (+10, +10)

72 (DNLK): SRMS Elbow

(+90, +55) HFOV = 20

Camera C (-30, +45)

OBSS ITVC (+95, -90)

Figure 1.- Cupola Installed Figure 2.- Cupola Installed (09: P1 Lower Outboard: +80, +15). (72: SRMS Elbow: +90, +55)

HFOV = 20 deg.

PCS MSS: SSRMS: Thrusters: Thruster Controls for MSS Ops Verify ‘Desat Request:’ – Inh * ****************************************************************************** If using shuttle attitude control, verify DAP: FREE * *****************************************************************************

DCP BRAKES SSRMS → ON (Verify ON)

Notify CBM operator: “SSRMS brakes on. GO for demate.”

PCS MSS: SSRMS: SSRMS

Verify Loaded Parameters – √ Verify ‘Loaded Parameters’ (two) − Cupola Install CBCS, SY Held Verify Display – Node3>Cupola Install CBCS Verify Command – SSRMS>Internal

73

Page 75: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 2 of 13 pages

14 FEB 10

Expected Cupola Install position:

SR SY SP EP WP WY WR +40.8 +170.0 +184.0 +112.4 -128.3 -169.2 +108.7

X Y Z Pitch Yaw Roll 0 0 0 0.0 0.0 0.0

FOR Loaded – Cupola Install CBCS, SY Held Disp Node3>Cupola Install CBCS

2. MANEUVERING TO DEMATE POSITION

On CBM operator: “Latches deployed. GO for Cupola Deberth.”

DCP BRAKES SSRMS → OFF (Verify OFF)

PCS MSS: SSRMS: SSRMS √Vernier

Enter Mode – Manual (Verify blue)

MSS: SSRMS: SSRMS Manual: Joint Lock: Joint Lock cmd Shoulder Yaw (Verify SY – Locked)

THC/ RHC

Maneuver Cupola to Demate position (within 5 cm/1 deg). (+X, THC push)

Locked SR SY SP EP WP WY WR

+31.7 +170.0 +174.6 +108.1 -117.8 -171.3 +99.9 X Y Z Pitch Yaw Roll

+200 0 0 0.0 0.0 0.0 FOR Loaded – Cupola Install CBCS, SY Held Disp Node3>Cupola Install CBCS

PCS MSS: SSRMS: SSRMS

Enter Mode – Standby (Verify blue)

74

Page 76: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 3 of 13 pages

14 FEB 10

* **************************************************************************************

If using shuttle attitude control and attitude maintenance required DAP: LVLH

When rates damped

DAP: FREE > 2 seconds DAP: AUTO

When in attitude and rates damped

DAP: FREE * *****************************************************************************

Figure 3.- Demate Figure 4.- Demate (09: P1 Lower Outboard: +80, +15). (24: Tip Elbow: +10, +10).

3. FOR OCAS SETUP

MSS: SSRMS: SSRMS

Change Loaded Parameters Cupola Cupola Demate SYH Verify ‘Loaded Parameters’ (two) − Cupola Demate, SY Held

Change Display Node3 Cupola Demate (Verify Node3>Cupola

Demate)

Verify SSRMS at Demate position (within 5 cm/1 deg). SR SY SP EP WP WY WR

+31.7 +170.0 +174.6 +108.1 -117.8 -171.3 +99.9 X Y Z Pitch Yaw Roll 0 +211 +400 0.0 0.0 -90.0

FOR Loaded – Cupola Demate, SY Held Disp Node3>Cupola Demate

75

Page 77: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 4 of 13 pages

14 FEB 10

4. FOR OCAS MANEUVER TO INTERMEDIATE POSITION RHC RATE → COARSE (Verify Coarse on PCS) PCS MSS: SSRMS: SSRMS

Enter Mode – FOR OCAS (Verify blue)

MSS: SSRMS: SSRMS FOR OCAS: Joint Lock: Joint Lock cmd Shoulder Yaw (Verify SY – Locked)

SSRMS FOR OCAS

pick File Cupola Intermediate

Verify ‘FOR’ ‘Destination’ for Intermediate position. X Y Z Pitch Yaw Roll 0 -250 +450 0.0 0.0 -45.0

cmd Load (Verify Sequence Status – Confirm or Cancel)

MON Verify FOR and errors are correct on FOR Position overlay. X Y Z Pitch Yaw Roll

FOR 0 +211 +400 0.0 0.0 -90.0 TGT 0 -250 +450 0.0 0.0 -45.0 ERR 0 +461 -50 0 0 -45.0

************************************************************************** PCS MON

* If FOR or errors are incorrect * cmd Cancel (Verify Sequence Status – Waiting Destination) * * Input correct Dest FOR per table above. * * cmd Load (Verify Sequence Status – Confirm or Cancel) * * Verify FOR and errors are correct on FOR Position overlay.

************************************************************************** PCS cmd Confirm (Verify Sequence Status – Auto Seq sw - Hot)

DCP AUTO SEQ → PROC PCS MSS: SSRMS: SSRMS Verify Posn Hold – orange

76

Page 78: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 5 of 13 pages

14 FEB 10

Verify SSRMS at Intermediate position (within 5 cm/1 deg).

Locked SR SY SP EP WP WY WR

+52.0 +170.0 +200.4 +58.3 -51.4 -139.4 +118.4 X Y Z Pitch Yaw Roll 0 -250 +450 0.0 0.0 -45.0

FOR Loaded – Cupola Demate, SY Held Disp Node3>Cupola Demate

DCP BRAKES SSRMS → ON (Verify ON)

Figure 5.- Intermediate Figure 6.- Intermediate (09: P1 Lower Outboard: +80, +15). (24: Tip Elbow: +10, +25).

5. CUPOLA PASSIVE CBM SURVEY

NOTE 1. A.6 PASSIVE CBM INSPECTION REFERENCE (SODF: S&M:

REFERENCE: CBM) provides detailed inspection and acceptance criteria as well as data on historically accepted debris or damage.

2. MCC-H will coordinate to record the CBM survey on-board if Ku LOS.

DCP/ Configure Cameras as required. MON

Monitor 3 07: P1 Lower

Inboard (-35, +40)

77

Page 79: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 6 of 13 pages

14 FEB 10

Figure 7.- CBM Survey (07: P1 Lower Inboard: -35, +40).

Inspect the CBM ring using the P1 Lower Inboard Camera to verify ring and seal are clear of FOD by performing A.6 PASSIVE CBM INSPECTION REFERENCE, all (SODF: S&M: REFERENCE: CBM), then:

If any verifications in A.6 procedure are not met, √MCC-H. Notify MCC-H when survey is completed. 6. FOR OCAS MANEUVER TO N3P PRE-INSTALL

Configure Cameras and overlays as required. Monitor 1 Monitor 2 Monitor 3 SSC 1 (MON 1) SSC 2 (DTV)

09: P1 Lower Outboard (+80, +15)

24: Tip Elbow (+10, +25)

07: P1 Lower Inboard

(-35, +40)

SRMS Elbow (+85, +40)

OBSS ITVC (+70, -95)

DCP BRAKES SSRMS → OFF (Verify OFF)

PCS MSS: SSRMS: SSRMS

Enter Mode – FOR OCAS (Verify blue)

MSS: SSRMS: SSRMS FOR OCAS: Joint Lock: Joint Lock cmd Shoulder Yaw (Verify SY – Locked)

SSRMS FOR OCAS

Input ‘FOR’ ‘Destination’ for N3P Pre-Install position. X Y Z Pitch Yaw Roll 0 -200 0 0.0 0.0 0.0

cmd Load (Verify Sequence Status – Confirm or Cancel)

78

Page 80: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 7 of 13 pages

14 FEB 10

MON Verify FOR and errors are correct on FOR Position overlay. X Y Z Pitch Yaw Roll

FOR 0 -250 +450 0.0 0.0 -45.0 TGT 0 -200 0 0.0 0.0 0.0 ERR 0 -50 +450 0.0 0.0 -45.0

*********************************************************************************** PCS MON

* If FOR or errors are incorrect * cmd Cancel (Verify Sequence Status – Waiting Destination) * * Input correct Dest FOR per table above. * * cmd Load (Verify Sequence Status – Confirm or Cancel) * * Verify FOR and errors are correct on FOR Position overlay.

*********************************************************************************** PCS cmd Confirm (Verify Sequence Status – Auto Seq Sw-Hot)

DCP AUTO SEQ → PROC PCS MSS: SSRMS: SSRMS Verify Posn Hold – orange

Verify SSRMS at N3P Pre-Install position (within 5 cm/1 deg). SR SY SP EP WP WY WR

+63.6 +170.0 +228.4 +59.1 -17.3 -130.4 +150.0 X Y Z Pitch Yaw Roll 0 -200 0 0.0 0.0 0.0

FOR Loaded – Cupola Demate, SY Held Disp Node3>Cupola Demate

MSS: SSRMS: SSRMS

Enter Mode – Standby (Verify blue)

79

Page 81: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 8 of 13 pages

14 FEB 10

Figure 8.- N3P Pre-Install Figure 9.- N3P Pre-Install (09: P1 Lower Outboard: +80, +5). (07: P1 Lower Inboard: -30, 0).

7. SETUP FOR MANEUVER TO RTL POSITION

* **************************************************************************************

If using shuttle attitude control and attitude maintenance required DAP: LVLH

When rates damped

DAP: FREE > 2 seconds DAP: AUTO

When in attitude and rates damped

DAP: FREE * ***************************************************************************** On CBM operator, “GO for maneuver to Ready-to-Latch position.”

NOTE

The current video software load does not recognize the Node 3 video components. Coordinate with MCC-H for routing of the Node 3 CBCS Camera.

Configure Cameras and overlays as required.

Monitor 1 Monitor 2 Monitor 3 SSC 1 (MON 1) SSC 2 (DTV) 09: P1 Lower

Outboard (+80, +5)

XX: CBCS 24: Tip Elbow (+15, +35)

07: P1 Lower Inboard (-30, 0)

SRMS Elbow (+85, +40)

Camera B (-15, +45)

Verify CBCS setup is complete. (CBCS Camera Tail pointing Station Forward)

Node 3: S&M: Port CBM: RTL Details

80

Page 82: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 9 of 13 pages

14 FEB 10

Monitor CBM RTLs using PCS. RHC RATE → VERNIER (Verify Vernier on PCS) PCS MSS: SSRMS: Rate: SSRMS Rate

Set ‘Scale’ ‘Vernier’ Rate Scale: as desired √MCC-H for availability of SSRMS Snapshot Display Frame

If SSRMS Snapshot Display Frame is available | Go to Step 8

If SSRMS Snapshot Display Frame is not available | Go to Step 9 8. MANEUVERING TO RTLS USING SNAPSHOT DISPLAY FRAME

PCS MSS: SSRMS: SSRMS Change Loaded Parameters Cupola Cupola Install CBCS SYH Verify ‘Loaded Parameters’ (two) − Cupola Install CBCS, SY Held Change Display SSRMS Snapshot (Verify SSRMS>Snapshot) Verify Command – SSRMS>Internal

Verify SSRMS at N3P Pre-Install position (within 5 cm/1 deg).

SR SY SP EP WP WY WR +63.6 +170.0 +228.4 +59.1 -17.3 -130.4 +150.0

X Y Z Pitch Yaw Roll +200 0 0 0.0 0.0 0.0 FOR Loaded – Cupola Install CBCS, SY Held Disp SSRMS>Snapshot

Enter Mode – Manual (Verify blue)

MSS: SSRMS: SSRMS Manual: Joint Lock: Joint Lock cmd Shoulder Yaw (Verify SY – Locked)

81

Page 83: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 10 of 13 pages

14 FEB 10

THC/ RHC

Maneuver Cupola until RTL (four) – green (-X, THC pull) Expected Cupola RTL position:

Locked SR SY SP EP WP WY WR

+61.3 +170.0 +222.7 +79.7 -32.6 -128.2 +150.0 X Y Z Pitch Yaw Roll

+12 0 0 0.0 0.0 0.0 FOR Loaded – Cupola Install CBCS, SY Held Disp SSRMS>Snapshot

Figure 10.- Cupola Install CBCS RTL Diagram.

Table 1. Cupola Install CBCS Missing RTL Configuration (Refer to Figure 10).

Missing RTLs RHC Input* 1 -Pitch, +Yaw 2 +Pitch, +Yaw 3 +Pitch, -Yaw 4 -Pitch, -Yaw

1,2 +Yaw 3,4 -Yaw 1,4 -Pitch 2,3 +Pitch

* All inputs with respect to Cupola Demate FOR.

PCS MSS: SSRMS: SSRMS

Verify Posn Hold – orange

Verify RTL (four) – green

Enter Mode – Standby (Verify blue)

Notify CBM operator: “Maneuver to RTL complete.”

Go To step 10

4 1

23

+ZISSACS

+XISSACS

Cupola Install CBCS

+Y

+Z

82

Page 84: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 11 of 13 pages

14 FEB 10

9. MANEUVER TO RTLS USING CUPOLA DEMATE DISPLAY FRAME

PCS MSS: SSRMS: SSRMS

Verify ‘Loaded Parameters’ (two) − Cupola Demate, SY Held Verify Display – Node3>Cupola Demate Change Command Node3 Cupola Demate (Verify Node3>Cupola Demate)

Enter Mode – Manual (Verify blue)

MSS: SSRMS: SSRMS Manual: Joint Lock: Joint Lock cmd Shoulder Yaw (Verify SY – Locked) THC/ RHC

Maneuver Cupola until RTL (four) – green (+Y, THC right) Expected Cupola RTL position:

Locked SR SY SP EP WP WY WR

+61.3 +170.0 +222.7 +79.7 -32.6 -128.2 +150.0 X Y Z Pitch Yaw Roll 0 -12 0 0.0 0.0 0.0

FOR Loaded – Cupola Demate, SY Held Disp Node3>Cupola Demate

Figure 11.- Cupola Demate RTL Diagram.

3 2

14

Cupola Demate

-Z

+X

-ZISSACS

+XISSACS

83

Page 85: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 12 of 13 pages

14 FEB 10

Table 2. Cupola Demate Missing RTL Configuration (Refer to Figure 11).

Missing RTLs RHC Input* 1 +Roll, +Yaw 2 +Roll, -Yaw 3 -Roll, -Yaw 4 -Roll, +Yaw

1,2 +Roll 3,4 -Roll 1,4 + Yaw 2,3 - Yaw

* All inputs with respect to Cupola Demate FOR.

PCS MSS: SSRMS: SSRMS Verify Posn Hold – orange

Verify RTL (four) – green

Enter Mode – Standby (Verify blue)

Notify CBM operator: “Maneuver to RTL complete.”

10. POST FIRST STAGE CAPTURE On CBM operator, “GO for SSRMS mode to Limp.”

NOTE Following SSRMS mode to Limp, closed RTLs may open due to RTL spring forces. RTL closed indication is not required prior to execution of second stage capture (for latches used during first stage capture).

MSS: SSRMS: Limp: SSRMS Limp

cmd All Limp (Verify Limp – blue)

MSS: SSRMS: SSRMS Verify all joints – Limped

WARNING If SSRMS fails to brakes-on from limp mode, continuation of Second Stage Capture may cause structural failure of SSRMS or primary structure. If CBM stops unexpectedly (and Cmd Code changes to ‘Stop’) or SSRMS safes during Second Stage Capture, √MCC-H before proceeding.

84

Page 86: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0722 (MSG 104) SSRMS CUPOLA RETURN TO N3 PORT Page 13 of 13 pages

14 FEB 10

Notify CBM operator: “SSRMS Mode to Limp complete. GO for Second Stage Capture.”

11. POST SECOND STAGE CAPTURE

On CBM operator, “GO for SSRMS Brakes ON.” DCP BRAKES SSRMS → ON (Verify ON)

Expected Cupola Install position (For either FOR/Display Frame Config) SR SY SP EP WP WY WR

+61.1 +170.0 +222.5 +80.8 -33.5 -128.0 +150.0 X Y Z Pitch Yaw Roll 0 0 0 0.0 0.0 0.0

MSS: SSRMS: Rate: SSRMS Rate

Set ‘Scale’ ‘Vernier’ Rate Scale: 1.0 (Verify 1.0)

Figure 12.- Cupola Install Figure 13.- Cupola Install (09: P1 Lower Outboard: +80, +5). (24: Tip Elbow: +15, +35).

************************************************************************************

If using shuttle attitude control and attitude maintenance required DAP: LVLH

When rates damped

DAP: FREE > 2 seconds DAP: AUTO

******************************************************************************

85

Page 87: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0723 (MSG 105) – Reference Data for Contingency Cupola Return (HIP POCKET) Page 1 of 3

Page 1 of 3, 22-0723 (MSG 105)

Data to be used with Step 8 of SSRMS Cupola Return to N3 Port. 1

2

Figure 1.- Cupola, Node 3 Port, Snapshot Display Frame Location: Cupola CBM interface origin (geometric center) when Cupola is fully mated to the Node 3 Port CBM.

3

Table 1. Cupola motion when: 4

FOR: Cupola Install CBCS, SY Held and DYF: Snapshot 5

HC Input Cupola Motion Digitals

ISSACS CBCS Visual Snapshot THC In Port Away From Camera +X

THC Out Starboard Towards Camera -X THC Right Zenith Right in Camera +Y THC Left Nadir Left in Camera -Y

THC Down Forward Down in Camera +Z THC Up Aft Up in Camera -Z Pitch Up -Yaw Top Towards Camera +Pitch

Pitch Down +Yaw Bottom Towards Camera -Pitch Yaw Right +Roll Right Towards Camera +Yaw Yaw Left -Roll Left Towards Camera -Yaw Roll Right -Pitch Roll to Right (RTL 3

towards Right) +Roll

Roll Left +Pitch Roll to Left (RTL 2 towards Left)

-Roll

6

86

Page 88: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0723 (MSG 105) – Reference Data for Contingency Cupola Return (HIP POCKET) Page 2 of 3

Page 2 of 3, 22-0723 (MSG 105)

Data to be used with Step 9 of SSRMS Cupola Return to N3 Port. 1

2

Figure 2.- Cupola, Node 3 Port, Cupola Demate Display Frame 3

Location: Cupola CBM interface origin (geometric center) when cupola is fully mated 4

to the Node 3 Port CBM. 5

Orientation: Aligned with ISSACS when Cupola is fully mated to Node 3 Port CBM. 6

7

Table 2. Cupola motion when: 8

FOR: Cupola Demate, SY Held and DYF: Cupola Demate 9

HC Input Cupola Motion Digitals

ISSACS CBCS Visual Cupola Demate

THC In Forward Down in Camera +X THC Out Aft Up in Camera -X

THC Right Starboard Towards Camera +Y THC Left Port Away From Camera -Y

THC Down Nadir Left in Camera +Z THC Up Zenith Right in Camera -Z Pitch Up +Pitch Roll to Left (RTL 2 towards

Left) +Pitch

Pitch Down -Pitch Roll to Right (RTL 3 towards Right)

-Pitch

Yaw Right +Yaw Bottom Towards Camera +Yaw Yaw Left -Yaw Top Towards Camera -Yaw Roll Right +Roll Right Towards Camera +Roll Roll Left -Roll Left Towards Camera -Roll

87

Page 89: FD08 FLIGHT PLAN REVISION - NASA · PDF fileFD08 Flight Plan Revision 089A ; 15 - 16 FD08 Mission Summary; ... EXPLORER SCHOOLS EDUCATION EVENT ... MSG-100 NH3 Jumper MLI Closeout

22-0723 (MSG 105) – Reference Data for Contingency Cupola Return (HIP POCKET) Page 3 of 3

Page 3 of 3, 22-0723 (MSG 105)

1

Figure 3.- Cupola CBCS Target Orientation, Installed on Node 3 Port

Figure 4.- Cupola CBCS Target Orientation, Installed on Node 3 Port

2

NOTE • The FRGFs are located ISS Zenith and AFT with the grappled FRGF being ISS

Zenith. • ISS FWD should match CBCS +Z Input, ISS Zenith CBCS +Y (CBCS Tail

FWD) 3

88