126
Washington Laboratories (301) 417-0220 web: www.wll.com 7560 Lindbergh Dr. Gaithersburg, MD 20879 FCC Requiremen ts for Unlicensed Devices Washington Laboratories, Ltd. Laboratory Workshop Gaithersburg, MD

FCC Part 15 Regulations

Embed Size (px)

DESCRIPTION

Tets and measurement aspects of using Part 15

Citation preview

Page 1: FCC Part 15 Regulations

Washington Laboratories (301) 417-0220 web: www.wll.com 7560 Lindbergh Dr. Gaithersburg, MD 20879

FCC Requirements

for Unlicensed

Devices

Washington Laboratories, Ltd.Laboratory Workshop

Gaithersburg, MD

Page 2: FCC Part 15 Regulations

Regulatory Requirements for Wireless Systems

• Greg Snyder• Chief EMC Engineer

Page 3: FCC Part 15 Regulations

Routes to Compliance

• US: Federal Communications Commission• Title 47 CFR• Telecommunications Certification Bodies

• FCC Identifier & Certification

• EU: R&TTE (+EMC+Safety)• Self-Declaration

• CE Marking

• Notified Body/Conformity Assessment Body (CAB)• Technical Construction File

• CE Marking

Page 4: FCC Part 15 Regulations

FCC CFR Title 47 Regulations• Part 2 General Requirements• Part 5 Experimental Radio Service• Part 15 Subpart C, D, and E Unlicensed Low

Power Transmitters• Part 20 Common Carrier• Part 21 Domestic Public Service• Part 22 Public Mobile Service• Part 24 Licensed PCS

http://www.gpoaccess.gov/ecfr/

Page 5: FCC Part 15 Regulations

FCC CFR 47 Regulations

• Part 25 Satellite Communication Services• Part 26 General Wireless services• Part 27 Miscellaneous Wireless Services• Part 68 Telecom Services• Part 73 Education Services• Part 74 Television Broadcast• Part 80 Maritime Service

Page 6: FCC Part 15 Regulations

FCC CFR 47 Regulations

• Part 87 Aviation• Part 90 Private Land Mobile• Part 95 Personal Radio Service• Part 97 Amateur Radio• Part 100 Digital Satellite Broadcast

(Eliminated and now requirements are in Part 25)

• Part 101 Fixed Microwave

Page 7: FCC Part 15 Regulations

FCC Part 15.1: Scope

• This part sets out the regulations under which an intentional, unintentional, or incidental radiator may be operated without an individual license. It also contains the technical specifications, administrative requirements and other conditions relating to the marketing of part 15 devices.

Page 8: FCC Part 15 Regulations

FCC Part 15.15: General Technical Requirements• Good Design. Emanations < Limits• No adjustments by user• Operators of Part 15 devices must

cease operation if interference is caused to authorized users

Page 9: FCC Part 15 Regulations

Measurement Standards

• ANSI C63.4–2003: “Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz”

• MP-2: Noise Figures of UHF TV Receivers• ANSI C63.17–1998: “Methods of

Measurement of the Electromagnetic and Operational Compatibility of Unlicensed Personal Communications Services (UPCS) Devices”

Page 10: FCC Part 15 Regulations

Certification

• “Equipment Authorizations”• Requires a detailed list of “Exhibits”

• See 2.1033 for complete details

• Essentially, two classes• Licensed (e.g. Part 90, VHF/UHF Radios)• Unlicensed: (e.g. Part 15, Much of the wireless

development is unlicensed (802.11, WLAN, UWB, Low Power Devices)

Page 11: FCC Part 15 Regulations

Certification Application Items• Cover Letters:

• Request for Confidentiality (if desired)• Modifications 

• Test Report from Lab• User’s Manual• Schematics • Block Diagram • Test Setup Photographs from Lab • Internal/External Photographs by Lab • FCC ID Label Artwork: • FCC Label Position on Device  • Operational Description:  • Attestation Statements (for Transmitters)

Page 12: FCC Part 15 Regulations

FCC ID

• FCC ID: AAAnnnnnnnnnnnnnn

• AAA: is Grantee Code from FCC. Need to get the Grantee Code from FCC:

• nnnnnnnnnnnnnn: is from Manufacturer

• Get grantee code from web site• “https://gullfoss.fcc.gov/prod/oet/index.html”• Cost: $50 (one time only)

• The FCC ID number must be on all Certified Devices

Page 13: FCC Part 15 Regulations

Obtaining an FCC Grantee Code• Procedures regarding online grantee code assignments and payment information:1. Go to: https://gullfoss2.fcc.gov/prod/oet/cf/eas/index.cfm2. For first-time filers, go to Miscellaneous on the left side of the page.3. Click on GET FRN. Follow Directions. WRITE DOWN FRN!4. Go back to: https://gullfoss2.fcc.gov/prod/oet/cf/eas/index.cfm5. Go to Filing Options > Grantee Registration. Follow Directions. WRITE DOWN

GRANTEE CODE6. The client should retain the grantee code assignment page. This page provides

the date that the grantee code was assigned.7. Payment (one-time $50.00 fee) via online credit card is recommended as the

quickest payment procedure. The payer should retain a copy of the acknowlegment of the payment. If for some reason the online payment fails, the payment (via check; money order; wire transfer; or credit card) and Form 159 should be submitted to Mellon Bank AS SOON AS POSSIBLE - within a day or two of the date the code was assigned, and certainly NO LONGER THAN 15 days after the code assignment. It is important to allow enough time for the payment to clear through Mellon Bank before the 30-day time limit.

Page 14: FCC Part 15 Regulations

FCC Part 2 Requirements

Page 15: FCC Part 15 Regulations

Test Report Requirements

• Designed to show transmitter is “well-behaved”

• 2.1046 – Output Power• 2.1047 – Modulation Requirements• 2.1049 – Occupied Bandwidth• 2.1051 – Antenna Conducted Spurs• 2.1053 – Transmitter Radiated Spurs• 2.1055 – Frequency Stability

Page 16: FCC Part 15 Regulations

FCC Part 15CLow Power Transmitters“Unlicensed Operation”

Page 17: FCC Part 15 Regulations

15 C Intentional Radiators

• General Requirements:• FCC 15.207• FCC 15.209

• Class B Limits Only

Page 18: FCC Part 15 Regulations

15.33 Frequency range of radiated measurements• Intentional Emitters:

• f < 10 GHz: to the tenth harmonic of the highest fundamental frequency or to 40 GHz, whichever is lower.

• 10 GHz < f < 30 GHz: fifth harmonic of the highest fundamental frequency or to 100 GHz, whichever is lower.

• f >: fifth harmonic of the highest fundamental frequency or to 200 GHz, whichever is lower, unless specified otherwise elsewhere in the rules.

Page 19: FCC Part 15 Regulations

15.33 Frequency range of radiated measurements• Unintentional Emitters

• Highest frequency generated or used in the device or on which the device operates or Upper frequency of tunes (MHz) measurement range (MHz)

• Below 1.705.............................30• 1.705-108.................................1000• 108-500................................... 2000• 500-1000..................................5000• Above 1000..............................5th harmonic or 40 GHz, whichever is lower

• 15.33(b)(2) See exceptions for CB radios

Page 20: FCC Part 15 Regulations

15.203 Antenna Requirements

• 15.203 Antenna requirement. - An intentional radiator shall be designed to ensure that no antenna other than that furnished by the responsible party shall be used with the device. • Unique connector• Permanently affixed• Professional Installation

Page 21: FCC Part 15 Regulations

15.205 Restricted Bands

• Bands are generally US Government, military bands, Biomedical Telemetry

• The field strength of emissions appearing within these frequency bands shall not exceed the limits shown in §15.209.

• Basis for all radiated “band edge” requirements (i.e. 2483.5MHz).

• Caution: Restricted Bands change over time

Page 22: FCC Part 15 Regulations

AC Conducted Limits 15.207• Unless specified elsewhere, all Intentional

Radiators must meet 15.207 limits anywhere outside of their allotted frequency band• CISPR 22 Limits (150 kHz – 30MHz, peak

and average) (July 10, 2004)• Limit = 250uV 450kHz to 30 MHz (peak only)

• Required if it connects directly or indirectly to AC mains

• Conducted emissions not required for battery powered devices

Page 23: FCC Part 15 Regulations

Radiated Emission Limits 15.209General Emissions Limits• Unless specified elsewhere, all Intentional

Radiators must meet 15.209 limits anywhere outside of their allotted frequency band

• Test set-up per ANSI C63.4-2001 • Limits identical to FCC Class B. Tighter limits

apply at all band edges• Specific rules may apply for the device. • Intentional radiators must generally be

measured to the 10th Harmonic

Page 24: FCC Part 15 Regulations

Measurement Standards

• ANSI C63.4-2001- per Part 15.31 (a) (3)

• CISPR 22 (Must use ANSI setup)

• FCC Part 15

• Other Resources:• Public Notices, FCC Dockets, Interpretations

www.fcc.gov

Page 25: FCC Part 15 Regulations

15.225: 13.110 – 14.010MHz

• RFID devices (new rules in 2003)• Allow the tag to be certified with the

interrogator device • Increased frequency range• Limits increased

Page 26: FCC Part 15 Regulations

15.231 Periodic Operation

• 40.66MHz – 40.70MHz• Above 70MHz• Now allows data transmission to be sent with

control signal (Late 2003)• Limited to 5 second Tx duration• Periodic transmissions not allowed

• Polling/supervision transmissions allowed for security and safety applications (e.g. alarm system)

• Limited in duration (2 sec./hour)

Page 27: FCC Part 15 Regulations

15.231 Periodic Operation

• Field strength limits:• QP below 1GHz• Average above 1GHz

• Duty cycle correction for pulsed operations

• Peak limit above 1GHz also applies

• 20dB Bandwidth limited to 0.25% of operating frequency

Page 28: FCC Part 15 Regulations

15.231 Periodic Operation

• Common devices:• Garage door remotes• Car entry systems/keyfobs• Alarm systems

• Voice, video and radio controlled toys only permitted under 15.231(e)• Tighter limits• Limited transmission duration

Page 29: FCC Part 15 Regulations

Duty Cycle Correction

• Used with pulsed operation to obtain average value of emission

• Based on pulse train or worst case 100ms.

• 20dB Max duty cycle correction allowed

Page 30: FCC Part 15 Regulations

Duty Cycle Correction• Example: Worst case 100ms

Page 31: FCC Part 15 Regulations

Duty Cycle Correction• Pulse Width:

Page 32: FCC Part 15 Regulations

Duty Cycle Correction

• Calculation:• On Time Per 100ms (worst case):

• 8.5 x 4.2ms = 35.7ms

• Duty cycle calculation:• 35.7ms/100ms = 35.77% on time

• 20 * LOG(0.3577) = -8.9dB duty cycle correction.

Page 33: FCC Part 15 Regulations

15.247 Spread Spectrum

• ISM Band• 902 – 928 MHz• 2400 – 2483.5MHz• 5725 – 5850MHz

• Direct Sequence and Digital Transmission Systems

• Frequency Hopping Systems• 802.11 a/b/g systems

Page 34: FCC Part 15 Regulations

Spread Spectrum Definitions

• BER = Bit Error Rate• dBc = decibels below carrier• dBd = decibels above dipole• dBi= decibels above an Isotropic• dBm = decibels above 1 millwatt• EIRP = Effective Isotropic Radiated Power• ERP = Effective Radiated Power

Page 35: FCC Part 15 Regulations

• Direct Sequence Systems (DSSS)• Frequency Hopping Systems (FHSS)

• Hybrid Systems - Combination of DSS and DTS

• Digital Transmission Systems (DTS)

Spread Spectrum Requirements

Page 36: FCC Part 15 Regulations

Spread Spectrum

• Direct Sequence and DTS use a sequential modulation to spread a narrow signal over a relative broad band.

• Frequency hopping - uses an encoded narrow band signal that shifts in a pseudo-randomly-generated frequency shifts.

Page 37: FCC Part 15 Regulations

Spread Spectrum

• Hybrid: Combination of both Frequency Hopping and Direct Sequence systems• Bluetooth, e.g.

Page 38: FCC Part 15 Regulations

Spread Spectrum

• Operate in the Industrial, Scientific, and Medical bands on a secondary basis.

• ISM are global and not restricted by ITU regions

Page 39: FCC Part 15 Regulations

Spread Spectrum

• 902 - 928 MHz

• 2400 - 2483.5 MHz

• 5725 - 5850 MHz

Page 40: FCC Part 15 Regulations

IEEE 802.11b Specifications

• Use Direct Sequence Radio rules• U.S.Frequency of Operation 2412 – 2462 MHz• ETSI Frequency of Operation 2412 - 2472 MHz• Channel Spacing Every 5 MHz• 802.11 Protocol Header Transmitted on Start of

Every Initial Transmission

Page 41: FCC Part 15 Regulations

IEEE 802.11

• Frequency Hoppers• U.S. Frequency of Operation 2402 -

2480• ETSI Frequency of Operation 2402-

2480• 802.11 Hop Patterns• 802.11 Header

Page 42: FCC Part 15 Regulations

Canadian Standards

• RSP-100• RSS-139-1• RSS-210• RSS-102

Page 43: FCC Part 15 Regulations

US Standards

• CFR 47 FCC Part 15 Subpart B Unintentional Radiators

• CFR 47 FCC Part 15 Subpart C Intentional Radiators

• CFR 47 FCC Part 15.247 Spread Spectrum

Page 44: FCC Part 15 Regulations

FCC Requirements for Spread Spectrum Devices• Four types of transmitter modulation

allowed• Frequency Hopper• Direct Sequence• Digital Transmission Systems• Hybrid

Page 45: FCC Part 15 Regulations

FCC Requirements for Spread Spectrum transmitters• Transmitter Power Output 1 Watt Max• Effective Isotropic Radiated Power 4

Watts Max• Antenna Gain - limited to +6dBi without

power reduction from transmitter of 1dB Power for Every 1dB Antenna Exceeds 6dBi

• Unique Antenna Jack Required

Page 46: FCC Part 15 Regulations

Additional FCC Requirements

• For systems Operating Strictly as a Point to Point system, the Power Reduction Requirement is 1dB for every 3dB the antenna exceeds 6dBi

• Device Must Meet OET-65 RF Safety Requirements (1mW/cm2 for 2.4 GHz Devices)

Page 47: FCC Part 15 Regulations

Additional FCC Requirements

• Operate on Non-Interference Basis• Out of Band Requirements including

being 20dB down in any 100kHz Outside the Band of Operation and meet general emissions limits (15.209) in the Restricted Bands.

Page 48: FCC Part 15 Regulations

Modification Filings

• Class II Changes

• Addition of second antenna

• Addition of second power level

• Limited test suites can be used

Page 49: FCC Part 15 Regulations

Spurious Emission Requirements• Conducted Emissions Limits

• 450 kHz to 30 MHz 48dBuV

• Radiated Emissions Limits (@3m)• 30 to 88 MHz 40 dBuV/m• 88 to 216 MHz 43.5 dBuV/m• 216 to 960 MHz 46 dBuV/m• 960 MHz+ 54 dBuV/m

Page 50: FCC Part 15 Regulations

Frequency Hopping Requirements• If maximum 20dB Bandwidth is 1 MHz (500kHz

for 900 MHz)• Minimum of 75 Hopping Frequencies for 2.4 GHz• 50 hopping Frequencies for 900 MHz• Average Occupancy less then 0.4 seconds in a 30

second period• If maximum 20dB Bandwidth is > 1MHz

• Minimum of 13 channels over 75 MHz• Average Occupancy less then 0.4 seconds in time to

hop all channels• Random Non-Sequential Hop Pattern

Page 51: FCC Part 15 Regulations

Direct Sequence / DTS Requirements• Transmitter Power Density Averaged

Over 1 Second Shall Not Exceed 8dBm In Any 3kHz Bandwidth

• Minimum Bandwidth is 500 kHz• Processing gain no longer required

Page 52: FCC Part 15 Regulations

Hybrid Requirements

• Hop Time 0.4 Seconds in 30 Seconds• Transmitter Power Density Averaged

Over 1 Second Shall Not Exceed 8dBm In Any 3kHz Bandwidth

Page 53: FCC Part 15 Regulations

Conducted Power• Diode detector substitution method• The output from the transmitter connected to a diode detector

and oscilloscope• The peak deflection measured on the oscilloscope and recorded• A signal generator was then substituted in place of EUT and set

to the same frequency as the transmitter• The CW output of the signal generator increased until the same

deflection was noted on the oscilloscope• A power meter connected to the output of the signal generator

to determine the output power of the signal generator • This level is then recorded as the output power of the EUT at

the specified frequency• The EUT carrier was modulated during this test.

Page 54: FCC Part 15 Regulations

Testing• Radio testing done in several parts

• Lab bench testing for all conducted tests

• Open field test site or Anechoic Chamber for all radiated tests.

Page 55: FCC Part 15 Regulations

Family Antenna Approvals

• Allows the use similar antennas without re testing or filing a Class II Change.

• Example 12 dBi Omni approved for use. You can substitute a 10dBi Omni different manufacturer without re-testing as long as conducted TX Output Power Remains the Same

Page 56: FCC Part 15 Regulations

15.203

• The use of a permanently attached antenna or of an antenna that uses a unique coupling to the intentional radiator shall be considered sufficient to comply with the provisions of this section. The manufacturer may design the unit so that a broken antenna can be replaced by the user, but the use of a standard antenna jack or electrical connector is prohibited..

Page 57: FCC Part 15 Regulations

15.203

• Standard Connectors now include: • Reverse SMA, TNC, BNC acceptable until

action on pending petition for reconsideration

• MMCX, MCX are possible candidates

Page 58: FCC Part 15 Regulations

15.204 Power Amp Restrictions• Amplifiers designed for use with Spread

Spectrum Systems must be approved as part of the system and marketed as part of a complete package.

Page 59: FCC Part 15 Regulations

Spread Spectrum Requirements • Modular Approval – This is being treated on a

case-by-case basis by FCC.

• TCB has some limitations on approving modular cards depending on RF Exposure requirements.

• Antenna Family Approvals accepted

Page 60: FCC Part 15 Regulations

Spread Spectrum RF Exposure

Requirements • Fixed or mast mounted equipment

(usually outdoor)• Mobile equipment – usage greater than

20cm• Portable equipment – usage less than

20cm.

Page 61: FCC Part 15 Regulations

Test Equipment• Spectrum Analyzer to 10X Transmit Frequency (max 40

GHz @ 5.8 GHz)• Power meter with peak head adapter• Extremely low loss cables• Pre-amp• High Pass & Notch Filters• Horn antenna• Signal Generator• Oscilloscope• Diode Detector• Attenuators• Adapters, miscellaneous

Page 62: FCC Part 15 Regulations

Test Data Required

• All spurious emission data above 1 GHz taken with average detector, but peak must be provided to show compliance with 15.35(b)

• Data and plots (peak & average) for band edge emissions

• Harmonics (peak & average) to 10th harmonic• TX power (radiated & conducted)

Page 63: FCC Part 15 Regulations

Receiver Measurements

• Receiver and Spurious Emissions must meet the requirements of 15.209 emission levels

Page 64: FCC Part 15 Regulations

Spurious Emissions

• In-Band Measurements• Out-of-Band Measurements

• Spurious Emissions• Conducted emissions at antenna terminals

or• Radiated emissions (if no antenna terminal)

Page 65: FCC Part 15 Regulations

Test Setup

• General Setup

RadioBP/HPFilter

Page 66: FCC Part 15 Regulations

In-Band Conducted Measurements

• Transmit Power• Occupied Bandwidth• Power Spectral Density

Page 67: FCC Part 15 Regulations

In-Band Conducted Emissions

• Peak Transmit Power• RBW>=6 dB BW

• Use power meter with peak head detector

or• Diode detector/signal generator substitution

method with an oscilloscope.

Page 68: FCC Part 15 Regulations

In-Band Conducted Emissions• Power Spectral Density

• RBW=3kHz; VBW>=RBW• Sweep = Span/3kHz• Typical, Span = 300 kHz, Sweep = 100s• Limit = +8dBm

Page 69: FCC Part 15 Regulations

In-Band Conducted Emissions• Power Spectral Density

Page 70: FCC Part 15 Regulations

Measurement Settings

• Occupied Bandwidth• RBW = 100 kHz; VBW => RBW• Span >> RBW

Page 71: FCC Part 15 Regulations

In-Band Measurements• 6 dB OBW > 500 kHz

Page 72: FCC Part 15 Regulations

In-Band Radiated Measurements• If no antenna connector:• Radiated Transmit Power Peak Measurement

(substitution method)• EUT at Max Power• With highest gain of each• Spectrum Analyzer settings (Peak Readings)

• RBW > 6dB BW of emission• VBW => RBW

• Spectrum Analyzer settings (Average Readings)• RBW > 6dB BW of emission• VBW => RBW

Page 73: FCC Part 15 Regulations

Spurious Emissions

• Harmonics (Radiated)• Frequencies : Low, Middle, Highest• Spectrum Analyzer settings

• Peak Measurements:• RBW=1 MHz VBW= or >RBW

• Average Measurements:• RBW=1 MHz, VBW = 10 Hz

Page 74: FCC Part 15 Regulations

Out-of-band Emissions• Band Edge • Low and Highest Frequency of

operation• Peak Readings

RBW = 100 kHz; VBW = or > RBW

Limit = 20dBc in any 100 kHz BW outside of allocated frequency band

Page 75: FCC Part 15 Regulations

Out-of-Band Conducted Emissions

• Band Edge

Page 76: FCC Part 15 Regulations

Band Edge Testing Low End

• For Frequencies between 2390 - 2400 signals must be -20dBc down from fundamental

• For 2390 MHz to 2300 - signals must comply with 15.209 levels (Restricted Bands)

Page 77: FCC Part 15 Regulations

Band Edge Testing High End

• Restricted band starts at band edge - all signals must be compliant to 15.209.

Page 78: FCC Part 15 Regulations

Out of Band Emission Requirements• In any 100 kHz bandwidth outside the

frequency band in which the spread spectrum intentional radiator is operating, the radio frequency power that is produced by the intentional radiator shall be at least 20 dB below that in the 100 kHz bandwidth within the band that contains the highest level of the desired power, based on either an RF conducted or radiated measurement.

Page 79: FCC Part 15 Regulations

Spurious Emission Plots (30MHz-10X Fo)

Page 80: FCC Part 15 Regulations

Harmonics \ Restricted Bands Testing• Required for Each transmitter and

Antenna Combination.• Low, Mid , and High Frequency checked• Up to 10th Harmonic of Fundamental• Requires Pre Amp and High Pass Filter• Test Distance 3 meters

Page 81: FCC Part 15 Regulations

Receiver Local Oscillator

• Requires receiver to be tuned to low, mid, and high channels

• Each antenna and TX combination required to be checked

• Checked up to 10th harmonic

Page 82: FCC Part 15 Regulations

Bandwidth Measurements

• Conducted Test

• Requires Use of Spectrum Analyzer

Page 83: FCC Part 15 Regulations

FCC Submittal Information

• Test Data • Quasi Peak below 1GHz• Both average and Peak above• Plots of Band Edge Measurements

Page 84: FCC Part 15 Regulations

FHSS FCC Requirements

• Max Power Out• Max EIRP• Bandwidth Data.

Page 85: FCC Part 15 Regulations

Required Test Software

• Must be able to turn off transmitter and go to receive only mode

• Must be able to select low , mid, and high channels

• Must be able to run in continuous transmit mode

• Modulation must be turned on• For FH Radios - Must be able to hop on all

useable channels

Page 86: FCC Part 15 Regulations

15.247 Spread SpectrumFCC Requirements• Tx Output Power 1 Watt• Effective Isotropic Radiated Power 4 Watts (36dBm)• Antenna Gain: Limited to 6dBi (Output power must be

reduced 1dB for every dB gain over 6dBi)• Fixed Pt. to Pt. Systems in 2.4GHz band: Reduce power

1dB for every 3dB exceeding 6dBi.• Fixed Pt. to Pt. Systems in 5.8GHz band: No reduction in

output power required.• Antenna requirements

Page 87: FCC Part 15 Regulations

15.247 Spread SpectrumFCC Requirements DSSS• Out of band emissions: 20dBc in any 100kHz

band• Band edge requirements• Bandwidth: DSSS (6dB minimum 500kHz)• Spectral Power Density averaged over 1

second not to exceed +8dBm in any 3kHz bandwidth

• Processing Gain: No longer a requirement

Page 88: FCC Part 15 Regulations

15.247 Spread SpectrumFCC Requirements FHSS• Minimum number of hopping frequencies

• 50 hopping frequencies for 902-928 MHz• 15 hopping frequencies for 2400-2483.5 MHz• 75 hopping frequencies for 5725-5850 MHz

• Average occupancy less then 0.4 seconds in a 30 second period. [ 0.4 seconds in 0.4 second period x number of channels 2.4GHz band ]

• 20dB bandwidth: 1 MHz 5.8 GHz/ 500kHz 902-928 MHz. Not specified at 2.4GHz

• Random non-sequential hop pattern

Page 89: FCC Part 15 Regulations

15.249General Unlicensed/ISM Band• 902-928 MHz• 2400-2483.5 MHz• 5725-5875 MHz• 24.0-24.25 GHz• Any type of data• Continuous transmission• E-Field emission limits

Page 90: FCC Part 15 Regulations

Unlicensed Transmitters Millimeter Wave Devices• FCC Part 15.253

• Frequencies of operation • 46.7-46.9 GHz, 76-77 GHz

• Limited to vehicle mounted field-disturbance systems

Page 91: FCC Part 15 Regulations

Unlicensed Transmitters Millimeter Wave Devices• FCC Part 15.255

• Frequencies of operation • 57 - 64 GHz• Can not be used on aircraft or satellites

Page 92: FCC Part 15 Regulations

Part 15 Subpart D - Unlicensed PCS Bands• 1910 -1930 MHz

• 2390-2400 MHz

• Unique Antenna Connector Required

• 3dBi Max (1 to 1 Power Reductions vs. antenna gain)

Page 93: FCC Part 15 Regulations

Unlicensed National Information InfrastructureUNII - Part 15.401• 5.15 -5.25 GHz• 5.25 -5.35 GHz• 5.725 -5.825 GHzSpecific power and usage limitations for each

band• Indoor use only with integral antennas in the

5.25-5.35 GHz band. • Unique antenna connectors DO NOT

qualify

Page 94: FCC Part 15 Regulations

UNII Devices Continued

• New Rules: Docket No. 03-122, Feb. 19, 2004

• New 255 MHz of spectrum• 5.47 – 5.725GHz• Dynamic Frequency Range Selection (DFS) for

devices in the 5.25 – 5.35GHz and 5.47 – 5.725GHz bands

• DFS Interim Test Procedures in rules.• Transmit Power Control (TPC) 5.47 – 5.725GHz

band. No testing, statement will suffice. • Requires submission of application to FCC

Page 95: FCC Part 15 Regulations

Part 15 Subpart F: UWB• Technology referred to as Ultra-Wide Band.• This is a new rule part adopted in April of 2002• Does not yet qualify for TCB Approval• No standardized test procedures yet adopted• Devices range from see-through-wall devices,

ground radar for construction and safety, to low power communication.

• Coordination with NTIA is required.• Operates over wide area of band (1 to 6 GHz wide

signals)

Page 96: FCC Part 15 Regulations

Comparison of Spectrum

30 kHzAnalog Cellular Voice Channel

6 MHzTV Channel

28 - 100 MHzUnlicensed Spread Spectrum Devices

1000 - 3000 MHz Ultra-Wideband Devices

Page 97: FCC Part 15 Regulations

RF Exposure

B

-30

N

F+30

0

+20 0

-60

RE (ERP)

10 mm square

.

wb/2wb/2

vertical center line

horizontal line

bottom of handset

acoustic output

wt/2wt/2

A

B

Page 98: FCC Part 15 Regulations

RF Safety Issues OET 65 (FCC)• MPE: Maximum Permissible Exposure

(calculation to determine separation distances)

• SAR: Specific Absorption Rate (test for body-worn devices)

• MPE or SAR Test Required?• This can be determined by referencing

OET Bulletin 65 Supplement C.

Page 99: FCC Part 15 Regulations

RF Safety Issues Human ExposureRules and Regulations

• ANSI C95.1• OET 65• OET 65-C • FCC Part 1.1037• FCC Part 2.1091 Mobile Devices• FCC Part 2.1093 Portable Devices• FCC Part 15.247 (b) (4)

Page 100: FCC Part 15 Regulations

Part 15 and RF Exposure

• Though categorically excluded from Routine Examination under the FCC Rules, the FCC frequently requires a SAR test or SAR modeling done for portable devices if the power exceeds 100mW EIRP

Page 101: FCC Part 15 Regulations

Part 15 and RF Exposure

• The FCC will require a MPE study for both Mobile and Fixed devices that use high gain antennas.

• For evaluation purposes for SAR and MPE, the default limits are for Uncontrolled Environments which use the tighter limits.

Page 102: FCC Part 15 Regulations

Controlled Environment

• People are aware of potential hazards (posted warnings/training)• Radio Facilities• Test Environments• Manufacturing Environments

• Limits: • 5mW/cm2 over a 5 minute period

Page 103: FCC Part 15 Regulations

Uncontrolled Environment

• People are unaware of potential hazards• General Public

• Limits• 1mW/cm2 over a 30 minute period

Page 104: FCC Part 15 Regulations

Categories of Devices

• Fixed

• Mobile

• Portable

Page 105: FCC Part 15 Regulations

Fixed Device

• Permanent mounted device

• Antenna 2 meters away from all users and bystanders

• Antenna usually roof mounted or pole mounted

Page 106: FCC Part 15 Regulations

Mobile devices

• Designed to operate at 20cm or more from any bystander

• Subject to MPE study• MPE Example Calculation:

• Desktop devices

Page 107: FCC Part 15 Regulations

Portable devices

• Operate less then 20cm from any user or bystander

• Usually involves body worn devices

• SAR Testing may be required

Page 108: FCC Part 15 Regulations

European Requirements Overview

Page 109: FCC Part 15 Regulations

European R&TTE Market

• Before R&TTE Directive: highly fragmented• > 1000 national regulations, around 30 harmonised

EU regulations• fragmentation of spectrum

• After R&TTE Directive: less fragmented

Page 110: FCC Part 15 Regulations

R&TTE

• Covers the following aspects:• Efficient use of spectrum (Article 3.2)• EMC (Article 3.1b)• Safety (Article 3.1a)

Page 111: FCC Part 15 Regulations

R&TTE Approval Process

• CE Marking by manufacturer• Self-Declaration for many products• Reduced approval procedures and

processes• Harmonized standards developed

(Official Journal)

Page 112: FCC Part 15 Regulations

Annexes• Annex I: Things NOT covered

• Cables, Receive-only broadcast, Kits, Aviation and Air Traffic, marine

• Annex II: Internal Production Control• Basis for all Annexes (good documentation!)

• Annex III: Annex II + Testing• Type testing

• Annex IV: TCF• Notified Body (for new technologies)

• Annex V: Full QA• Accredited Quality Assurance System

Page 113: FCC Part 15 Regulations

R&TTE Testing

• No longer requires involvement of accredited test house

• Test to harmonized standards• DoC• CE Marking• Ship

• Non-harmonized frequencies:• Notification to Spectrum Authority• Alert Signal (Equipment Class Identifier)• Restricted Geographical Area

Page 114: FCC Part 15 Regulations

Harmonized Frequencies(Short Range Devices)• Document CEPT 70-03

• Lists frequencies and usage in different European countries

• Latest: Feb 2004• Published by: European Conference of

Postal and Telecommunications Administrators

• Available at http://www.ero.dk/

Page 115: FCC Part 15 Regulations

Examples from CEPT 70-03

Page 116: FCC Part 15 Regulations

Example from CEPT 70-03

Page 117: FCC Part 15 Regulations

Notification

• Applies to radio equipment using a non-harmonized frequency

• If non-harmonized frequency band, the manufacturer must determine if the frequency is available for use in a particular member state

• Notify each member state where the equipment is to be sold

Page 118: FCC Part 15 Regulations

Notification

• Notify the Spectrum Authorities in each member state• Available on-line

• Must be made 4 weeks prior to the equipment being offered for sale.

Page 119: FCC Part 15 Regulations

ETSI/EN Standards• Available from www.etsi.org (free!)

EMC & Radio Matters

• ETS 300 328: • Radio Equipment and Systems (RES); Wideband

transmission systems; Technical characteristics and test conditions for data transmission equipment operating in the 2,4 GHz ISM band and using spread spectrum modulation techniques

• EN 301 428:• Satellite Earth Stations and Systems (SES);

Harmonized EN for Very Small Aperture Terminal (VSAT); Transmit-only, transmit/receive or receive-only satellite earth stations operating in the 11/12/14 GHz frequency bands covering essential requirements under article 3.2 of the R&TTE directive

Page 120: FCC Part 15 Regulations

Example: Short Range Device

• Equipment Parameters:• 433.92MHz• Low power <2.5mW• Modulation: FSK• Duty Cycle: <1%• Integral Antenna• Battery Powered

Page 121: FCC Part 15 Regulations

Example: Short Range Device

• Markets of interest:• UK• France• Italy

• Refer to CEPT 70-03 for restrictions

Page 122: FCC Part 15 Regulations

Example:Short Range Device at 433MHzCEPT 70-03 Restrictions

Page 123: FCC Part 15 Regulations

Example: Short Range Device

• Compliance test requirements• LVD: EN 60065• EMC EN 301 489-3 (SRD)

• Emissions• Immunity

• Radio: EN 300 220-1• Spurious emissions• Power (ERP)• Bandwidth• Frequency Stability

Page 124: FCC Part 15 Regulations

Example: Short Range Device• Documentation

• Equipment complies: Test report/TCF• Generates and signs DOC• Labels equipment• Notifies countries before marketing (Only of

frequencies are not harmonized)

Page 125: FCC Part 15 Regulations

R&TTE Labeling Example

NAME OF A COMPANY

MODEL NUMBER

SERIAL NUMBER

FREQUENCY BAND

nnnn

The Notified Body Number: used when either annex III, IV or V have been used

Page 126: FCC Part 15 Regulations

WLL Contact Informationwww.wll.com; [email protected]: 800-839-1649; Fax: 301-417-90697560 Lindbergh Dr., Gaithersburg, MD 20879 Greg Snyder: [email protected]

Chief EMC Engineer

Steve Koster: [email protected] Operations Manager

Berri Remenick: [email protected], Product Safety, Frederick LabPhone: 301-473-1255; Fax: 301-473-1257