    5955 Tyro ne Road , Suite 3 Reno , Nevada 89502Voice (775) 856-2001 Fax (775) 856-4111

    May 16, 2006

    Funding Reserve Analysisfor

    Lakeside Plaza HOA 2006

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    2/37

    Lakeside Plaza HOA 2006 Fundin g Study

    Table of Con tents

    Pages Sub ject

    1 Repor t Cover Sheet

    2 Tab le o f Con ten ts

    3 to 9 Reserve Study Summary

    10 to 14 Reserve It em Summary

    15 to 23 Reserve It em L is t ing

    24 to 27 Presen t Cos t Report

    28 Cash Flow

    29 Dues Summary

    30 to 37 Expense Repo rt

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    3/37

    5955 Tyro ne Road , Suite 3 Reno , Nevada 89502Voice (775) 856-2001 Fax (775) 856-4111

    May 16, 2006

    Mr. Kevin BergEugene Burger Management Corp.294 E. Moana Lane

    Reno, Nevada 89502

    Subject: Lakeside Plaza HOA 2006

    Mr. Berg,

    Resource 1 BC, LLC. is pleased to present to Mr. Kevin Berg the requested Reserve Funding study. We believe that

    you will find the attached study to be thorough and complete. After you have had an opportunity to review the report

    you may have questions. Please do not hesitate to write of call - we would be pleased to answer any questions you

    may have.

    Project Description

    Lakeside Plaza is located off of Lakeside Drive in Reno Nevada. Project has 2 main buildings that are 3 stories high

    with built up roofs. The parking lots have asphalt with concrete curbs with metal carports. The common area

    improvements have a small amount of landscaping, sidewalks, a small club house and a swimming pool.

    The redwood decking and concrete patios are the responsibility of each owner.

    Roof repairs and replacement will have to be completed in the near future.

    The boilers have reached there economic life and will have to be replaced in the near future. The stucco siding hasdeveloped cracks and has to be repairs or cause structural damage to the buildings.

    The units are assessed by square footage. There are 191 units in this project.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    4/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    The association did not raise reserve fees from the last reserve study done 5

    years ago. This has caused a shortfall of about $400,000 in the reserve account.

    The reserve fees to the budget will have to be increased to the projected amountby NRS statue. A special assessment of up to $1,000.00 will reduce the annual

    amount of contributions..

    Taxed as an IRS exempt association (IRS Tax Rules Attached)

    Reserve Study Assumptions

    Cost estimates and financial information are accurate and current. No unforeseen circumstances will cause

    a significant reduction of reserves. Sufficient comprehensive property insurance exists to protect from

    insurable risks. The association plans to continue to maintain the existing common areas and amenities.

    Reserve payments occur at the end of every calendar month. Expenses occur at the end of the expenseyear.

    Impact of Component Life

    The projected life expectancy of the major components and the reserve funding needs of the association are closely

    tied. Performing the appropriate routine maintenance for each major component generally increases the component

    useful life, effectively moving the component expense into the future which reduces the reserve funding payments of

    the association. Failure to perform such maintenance can shorten the remaining useful life of the major components,

    bringing the replacement expense closer to the present which increases the reserve funding payments of theassociation.

    Initial Reserves

    The association did not raise reserve fees from the last reserve study done 5 years ago. This has caused a shortfall of

    about $400,000 in the reserve account. The reserve fees to the budget will have to be increased to the projected

    amount by NRS statue. A special assessment of up to $1,000.00 will reduce the annual amount of contributions..

    Reserve Funding Goal

    The reserve fund goal is a minimum account balance consistent with the cash demands of maintenance and

    replacement of reserve items. (Baseline Funding)

    S d M h d

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    5/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    association. (b) The budget to maintain the reserve required by paragraph (b) of subsection 2 of NRS 116.3115.

    The budget must include, without limitation: (1) The current estimated replacement cost, estimated remaining

    life and estimated useful life of each major component of the common elements; (2) As of the end of the fiscalyear for which the budget is prepared, the current estimate of the amount of cash reserves that are necessary, and the

    current amount of accumulated cash reserves that are set aside, to repair, replace or restore the major components of

    the common elements; (3) A statement as to whether the executive board has determined or anticipates that

    the levy of one or more special assessments will be required to repair, replace or restore any major component of the

    common elements or to provide adequate reserves for that purpose; and (4) A general statement describing the

    procedures used for the estimation and accumulation of cash reserves pursuant to subparagraph (2), including, without

    limitation, the qualifications of the person responsible for the preparation of the study of the reserves required by NRS

    116.31152. 2. In lieu of distributing copies of the budgets of the association required by subsection 1, the executive

    board may distribute to each unit's owner a summary of those budgets, accompanied by a written notice that: (a)

    The budgets are available for review at the business office of the association or some other suitable location within the

    county where the common-interest community is situated or, if it is situated in more than one county, within one of

    those counties; and (b) Copies of the budgets will be provided upon request. (Added to NRS by 1999, 2993; A

    2003, 2241) NRS 116.31152 Study of reserves; duties of executive board regarding study; qualifications of person

    who conducts study; contents of study; submission of study to Commission; regulations regarding study; use of money

    credited against residential construction tax for upkeep of park facilities and related improvements identified in study.

    1. The executive board of an association shall: (a) Cause to be conducted, at least once every 5 years, a study of

    the reserves required to repair, replace and restore the major components of the common elements; (b) Review theresults of that study at least annually to determine if those reserves are sufficient; and (c) Make any adjustments it

    deems necessary to maintain the required reserves. 2. The study of the reserves required by subsection 1 must be

    conducted by a person who is qualified by training and experience to conduct such a study, including, without

    limitation, a member of the executive board, a unit's owner or a community manager who is so qualified. The study of

    the reserves must include, without limitation: (a) A summary of an inspection of the major components of the

    common elements that the association is obligated to repair, replace or restore; (b) An identification of the major

    components of the common elements that the association is obligated to repair, replace or restore which have a

    remaining useful life of less than 30 years; (c) An estimate of the remaining useful life of each major component

    identified pursuant to paragraph (b); (d) An estimate of the cost of repair, replacement or restoration of each major

    component identified pursuant to paragraph (b) during and at the end of its useful life; and (e) An estimate of the

    total annual assessment that may be required to cover the cost of repairing, replacement or restoration of the major

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    6/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    include: (a) A copy of the component inventory from the previous reserve study if such copy was provided by the

    executive board to the person conducting the reserve study; (b) A 30-year schedule which shows: (1) The

    projected increase in assessments that will be required in any given year to provide an adequately funded reserve; and(2) The projected inflation and estimated interest income from the reserve fund; (c) The names and credentials of

    any consultants and other persons with expertise used to assist in the preparation of the reserve study; (d) Any

    written reports prepared by consultants and other persons with expertise; (e) If there are any conflicting

    recommendations of the consultants or other persons with expertise while preparing the reserve study, a written

    explanation as to which recommendations are selected and the reasons for their selection; (f) The disclosures set

    forth in NAC 116.430; and (g) A statement, prominently displayed, which reads substantially as follows: The

    projected life expectancy of the major components and the funding needs of the reserves of the association are based

    upon the association performing appropriate routine and preventative maintenance for each major component. Failure

    to perform such maintenance can negatively impact the remaining useful life of the major components and dramatically

    increase the funding needs of the reserves of the association. 2. As used in this section, adequately funded

    reserve means the funds sufficient to maintain the common elements: (a) At the level described in the governing

    documents and in a reserve study; and (b) Without using the funds from the operating budget or without special

    assessments, except for occurrences that are a result of unforeseen catastrophic events. (Added to NAC by

    Commn for Common-Interest Communities by R129-04, eff. 4-14-2005)

    Summary of Findings

    Summary of Findings. Resource 1 BC, LLC. has estimated future projected expenses for Lakeside Plaza HOA 2006based upon preservation of existing improvements.

    The attached funding study is limited in scope to those expense items listed in the attached "Lakeside Plaza HOA 2006

    Reserve Study Expense Items". Expense items which have an expected life of more than 30 Years are not included in

    this reserve study unless payment for these long lived items occurs within the 30 Years of the reserve study envelope.

    Of primary concern is the preservation of a positive funding balance with funds sufficient to meet projected expenses

    throughout the study life. Based upon the attached funding study, it is our professional opinion that member monthly

    fees as shown in the attached "Lakeside Plaza HOA 2006 Dues Summary" will realize this goal. Some reserve items

    in the "Revenue Summary Table" may not contain payments. In this analysis the initial reserves were used to make

    annual payments for expense items in their order of occurrence until the initial reserve was consumed. As a result

    reserve items without payments may be expected, particularly in the first few years of the funding study. Reserve

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    7/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    A summary of our recommended Capital Reserve payments for the next five years is shown below.

    Proposed Payment Schedule

    Calendar

    Year

    MemberMonthly

    Reserve

    Payment

    Monthly

    Reserve

    Payment

    Annual

    Reserve

    Payment

    2006 $14,815.99 $14,815.99 $88,895.97

    2007 $14,815.99 $14,815.99 $177,791.94

    2008 $14,815.99 $14,815.99 $177,791.94

    2009 $13,800.72 $13,800.72 $165,608.64

    2010 $13,800.72 $13,800.72 $165,608.64

    2011 $9,582.94 $9,582.94 $114,995.24

    Percent Funded

    Many reserve studies use the concept of "Percent Funded" to measure the reserve account balance against a

    theoretically perfect value. Percent Funded is often used as a measure of the "Financial Health" of an association.

    The assumption is, the higher the percentage, the greater the "Financial Health". The question of substance is simply:

    "How much is enough?"To answer the question, some understanding of Percent Funded is required. Percent Funded is the ratio of current

    cash reserves divided by the Fully Funded value at any instant in time. Fully Funded is defined as the Future Value,

    multiplied by the number of years used, divided by the expected life for the sum of all reserve items. In essence, Fully

    Funded is simply the total of the average net present value of the association improvements. Percent Funded is then,

    the current reserve balance divided by the Fully Funded value multiplied by 100 (to give a percentage). The concept is

    useful when the reserve study is comprehensive, but misleading when the reserve study is superficial or constrained.

    As a result, we recommend that the statement "Percent Funded" be used with caution.

    Conflict of Interest

    As the preparer of this reserve study, Resource 1 BC, LLC. certifies that we do not have any vested interests, financial

    interests or other interests that would cause a conflict of interest in the preparation of this reserve study The Reserve

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    8/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    Resource 1 BC, LLC. would like to thank Mr. Kevin Berg for the opportunity to be of service in the preparation of the

    attached Funding Study. Again, please feel free to write or call at our letterhead address if you have any questions.

    Prepared by:

    _____________________________________________Kenneth R. Rowan

    Certified Master Inspector # IOS.0000008-M State of NevadaCAI RS 0064

    Enclosures:

    Interal Revenue Service Tax Rules

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    9/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Summary - Continued

    IRS Tax Rules

    Unlike most things with the IRS, association tax rates are really not very complicated.

    Tax rates on the first $50,000 in association taxable income can be either 15% or 30%. To qualify for the lower taxrate, the association must file with the IRS as a non exempt membership association.When an association pays taxes as a non exempt membership association, the tax rate for the first $50,000 of taxableincome is 15%. The tax rate increases to 30% for taxable income beyond the first $50,000. Non exempt membershiporganizations are treated the same as a time-share associations . Taxes are filed with form 1120.When an association pays taxes under form 1120H, the tax rate for all taxable income is 30% and the IRS considers it ahomeowners association. Taxes are filed with form 1120.H

    Tax Rate ComparisonTaxable Income Form 1120 Form 1120HFirst $50,000 $7,500 $15,000Remaining $30,000 $9,000 $9,000Income Tax $16,500 $24,000

    Associations benefit from filing Form 1120 rather than Form 1120H because the tax rate for form 1120 is 15% for thefirst $50,000 of taxable income compared to a flat rate of 30% for Form 1120H. Associations may elect on an annual

    basis to file either Form 1120H or Form 1120. However, filing Form 1120 puts associations at risk if they do notcomply with all IRS procedures.In summary, there are two ways to report financial activities to the IRS:a. Form 1120H

    Form 1120H is the tax form specifically made for homeowner associations and is likened to the 1040EZ for its relativesimplicity. The tax rate for 1120H filers is 30%.b. Form 1120

    Form 1120 is an option for all incorporated HOA's (and all HOA's should be incorporated.). While it is more complex,it carries a tax rate of 15%. Since healthy reserve funds can often rise to hundreds of thousands and even millions ofdollars, it is usually prudent to use the Form 1120 and cut the tax rate in half. Check with a knowledgeable CPA.It is important to note that small associations with reserve balances of less than $50,000 can benefit greatly by changing

    tax forms. This will result in lower dues to the membership.Check with your CPA for compliance of IRS rules and regulations.For more information click on the US Treasury link: http://www.irs.ustreas.gov/formspubs/index.html

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    10/37

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Summary

    Reserve ItemsCurrent Cost

    When New

    Expected

    Life When

    New

    Estimated

    Remaining

    Life

    First

    Replacement

    Cost

    Raw

    Annual

    Payment

    Repeating

    Item?

    Common AreaPCC Walks $2,000 1 Year 1 Year $2,076 $1,355 Yes

    Site lighting $3,000 20 Years 18 Years $4,762 $193 Yes

    East Parking

    Paving 1 inch AC

    Overlay$23,125 25 Years 11 Years $30,819 $2,247 Yes

    Slurry Seal $5,920 5 Years 1 Year $6,146 $4,011 Yes

    Carports Metal $12,750 25 Years 15 Years $18,777 $953 Yes

    Front Boiler Building

    Roof Tile $1,617 40 Years 18 Years $2,567 $104 Yes

    Stucco $500 10 Years 0 Years $506 $506 Yes

    Fence Wood $625 20 Years 3 Years $682 $185 Yes

    Paint Fence $90.00 5 Years 3 Years $98 $26.65 Yes

    Electric Panel $1,500 40 Years 18 Years $2,381 $96.43 Yes

    Lattice with Arbor $1,500 30 Years 8 Years $1,855 $192 Yes

    Boiler Room Equipment $85,000 25 Years 2 Years $90,476 $34,895 Yes

    Front Building

    Roof Tile $11,480 40 Years 8 Years $14,195 $1,468 Yes

    (1) Roof Built Up New $50,400 20 Years 19 Years $82,022 $3,100 No

    (2) Roof Built Up Old $201,600 20 Years 3 Years $220,015 $59,697 Yes

    Stucco Repairs $15,000 30 Years 0 Years $15,188 $15,188 Yes

    Fence Wood $32,500 20 Years 5 Years $37,285 $6,244 Yes

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    11/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued

    Reserve Items

    Current Cost

    When New

    Expected

    Life WhenNew

    Estimated

    RemainingLife

    First

    ReplacementCost

    Raw

    AnnualPayment

    Repeating

    Item?

    Paint Interior $5,472 8 Years 8 Years $6,766 $700 Yes

    Ventilation $4,000 30 Years 8 Years $4,946 $512 Yes

    Carpet AQ $5,550 12 Years 0 Years $5,620 $5,620 Yes

    North West Parking

    Paving 1 inch AC

    Overlay $52,375 25 Years 11 Years $69,800 $5,090 Yes

    Slurry Seal $13,408 5 Years 1 Year $13,920 $9,084 Yes

    Fencing Chain Link 6 ft $900 40 Years 13 Years $1,261 $75.87 Yes

    Carports Metal $82,500 25 Years 25 Years $155,966 $4,080 Yes

    Rear Boiler Building

    Roof Tile $1,617 40 Years 13 Years $2,265 $136 Yes

    Stucco $500 10 Years 0 Years $506 $506 Yes

    Lattice with Arbor $1,500 30 Years 8 Years $1,855 $192 Yes

    Fence Wood $625 20 Years 8 Years $773 $79.93 Yes

    Paint Fence $90.00 5 Years 0 Years $91 $91.13 Yes

    Boiler Room Equipment $85,000 25 Years 3 Years $92,764 $25,170 Yes

    Electric Panel $1,500 40 Years 18 Years $2,381 $96.43 Yes

    Rear Building

    Roof Tile $11,480 40 Years 5 Years $13,170 $2,205 Yes

    (3) Roof Built Up New $46,200 20 Years 20 Years $77,088 $2,726 No

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    12/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued

    Reserve Items

    Current Cost

    When New

    Expected

    Life WhenNew

    Estimated

    RemainingLife

    First

    ReplacementCost

    Raw

    AnnualPayment

    Repeating

    Item?

    Carpet AQ $3,900 12 Years 0 Years $3,949 $3,949 Yes

    Rear Building 3rd Floor

    Lighting common $500 20 Years 18 Years $794 $32.14 Yes

    Paint Interior $4,260 8 Years 8 Years $5,267 $545 Yes

    Ventilation $4,000 30 Years 5 Years $4,589 $768 Yes

    Carpet AQ $3,900 12 Years 0 Years $3,949 $3,949 Yes

    Rear Parking

    Paving 1 inch AC

    Overlay$5,750 25 Years 11 Years $7,663 $559 Yes

    Slurry Seal $1,472 5 Years 1 Year $1,528 $997 Yes

    Fencing Chain Link 6 ft $900 40 Years 13 Years $1,261 $75.87 Yes

    Carports Metal $76,500 25 Years 25 Years $144,623 $3,783 Yes

    Recreation Center

    Roof Tile $3,500 30 Years 8 Years $4,328 $448 Yes

    Stucco Repairs $500 30 Years 28 Years $1,019 $22.66 Yes

    HVAC $2,500 25 Years 20 Years $4,171 $148 Yes

    Paving PCC sidewalks $500 30 Years 8 Years $618 $63.95 Yes

    Pool Deck PCCConcrete

    $11,000 15 Years 5 Years $12,620 $2,113 Yes

    Pool Equipment $5,000 10 Years 3 Years $5,457 $1,481 Yes

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    13/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued

    Initial Reserve: $201,005

    Reserve Item Comments

    (1) 20% of this building has been completed.

    (2) 80% of the built up roof will have to completed in the next 3 years. There is a total of 36,000 sf of roof.

    (3) 30% of the Roof is new.

    (4) 70% of the roof will have to replaced in the next 3 years . There is a total of 22,000 sg of roofing.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    14/37

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    15/37

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    Life

    When

    New

    Estimated

    Remaining

    Life

    Calendar

    Year

    Estimated

    Future Cost

    Raw

    Annual

    Payment

    Common Area

    [FR] PCC Walks $2,000 ea 1 $2,000 1 Year 1 Year

    2007 $2,076 $1,355.05

    2008 $2,129 $2,099.74

    2009 $2,183 $2,152.84

    PCC Walks $2,000 ea 1 $2,000 1 Year 1 Year

    2010 $2,238 $2,207.28

    2011 $2,294 $2,263.10

    2012 $2,352 $2,320.33

    2013 $2,412 $2,379.00

    2014 $2,473 $2,439.17

    2015 $2,536 $2,500.85

    2016 $2,600 $2,564.09

    2017 $2,665 $2,628.93

    2018 $2,733 $2,695.41

    2019 $2,802 $2,763.58

    2020 $2,873 $2,833.46

    2021 $2,945 $2,905.12

    2022 $3,020 $2,978.58

    2023 $3,096 $3,053.91

    2024 $3,175 $3,131.14

    2025 $3,255 $3,210.32

    2026 $3,337 $3,291.50

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    16/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    LifeWhen

    New

    Estimated

    Remaining

    Life

    CalendarYear

    EstimatedFuture Cost

    Raw

    Annual

    Payment

    [FR] Slurry Seal $0.32 / ft 18500 ft $5,920 5 Years 1 Year 2007 $6,146 $4,010.94

    Slurry Seal $0.32 / ft 18500 ft $5,920 5 Years 5 Year

    2012 $6,963 $1,292.58

    2017 $7,890 $1,464.49

    2022 $8,939 $1,659.27

    2027 $10,128 $1,879.95

    2032 $11,475 $2,129.99

    2037 $13,001 $2,413.28

    Carports Metal $750 ea 17 $12,750 25 Years15 Years 2021 $18,777 $953.00

    25 Years 2046 $35,057 $943.22

    Front Boiler Building

    Roof Tile $3.50 / ft 462 ft $1,617 40 Years18 Years 2024 $2,567 $103.95

    40 Years 2064 $6,970 $90.31

    [FR] Stucco $500 / ft 1 ft $500 10 Years 0 Years 2006 $506 $254.73

    Stucco $500 / ft 1 ft $500 10 Years 10 Years

    2016 $650 $55.81

    2026 $834 $71.64

    2036 $1,071 $91.97

    [FR] FenceWood

    $25.00 / lf 25 lf $625 20 Years 3 Years 2009 $682 $185.07

    F W d $25 00 / lf 25 lf $625 20 Y 20 Y2029 $1,124 $41.08

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    17/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    LifeWhen

    New

    Estimated

    Remaining

    Life

    CalendarYear

    EstimatedFuture Cost

    Raw

    Annual

    Payment

    Boiler Room $85,000 ea 1 $85,000 25 Years 25 Years 2058 $315,382 $8,485.48

    Front Building

    Roof Tile $3.50 / ft 3280 ft $11,480 40 Years8 Years 2014 $14,195 $1,468.18

    40 Years 2054 $38,546 $499.48Roof Built Up

    New$7.00 / ft 7200 ft $50,400 20 Years 19 Years 2025 $82,022 $3,100.30

    Roof Built Up

    Old$7.00 / ft 28800 ft $201,600 20 Years

    3 Years 2009 $220,015 $59,697.35

    20 Years2029 $362,554 $13,251.98

    2049 $597,440 $21,837.46

    [FR] Stucco

    Repairs

    $15,000 ea 1 $15,000 30 Years 0 Years 2006 $15,188 $7,641.86

    Stucco Repairs $15,000 ea 1 $15,000 30 Years 30 Years 2036 $32,129 $661.61

    Fence Wood $25.00 / lf 1300 lf $32,500 20 Years

    5 Years 2011 $37,285 $6,243.68

    20 Years2031 $61,441 $2,245.77

    2051 $101,246 $3,700.73

    Wrought Iron $25.00 / lf 720 lf $18,000 40 Years10 Years 2016 $23,397 $1,898.47

    40 Years 2056 $63,533 $823.27

    Gutters $5.00 / lf 780 lf $3,900 30 Years8 Years 2014 $4,822 $498.77

    30 Years 2044 $10,201 $210.06

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    18/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    LifeWhen

    New

    Estimated

    Remaining

    Life

    CalendarYear

    EstimatedFuture Cost

    Raw

    Annual

    Payment

    Front Building 2nd Floor

    Acoustic Ceiling $1.00 / ft 3700 ft $3,700 20 Years

    8 Years 2014 $4,575 $473.19

    20 Years2034 $7,539 $275.56

    2054 $12,423 $454.09

    Lighting

    common$50.00 ea 10 $500 20 Years

    8 Years 2014 $618 $63.95

    20 Years2034 $1,019 $37.24

    2054 $1,679 $61.36

    Paint Interior $0.60 / ft 9120 ft $5,472 8 Years 8 Years

    2014 $6,766 $699.82

    2022 $8,262 $915.10

    2030 $10,090 $1,117.47

    2038 $12,321 $1,364.60

    [FR] Carpet AQ $1.50 / ft 3700 ft $5,550 12 Years 0 Years 2006 $5,620 $2,827.49

    Carpet AQ $1.50 / ft 3700 ft $5,550 12 Years 12 Years

    2018 $7,583 $525.80

    2030 $10,233 $709.53

    2042 $13,809 $957.47

    Front Building 3rd Floor

    Lighting

    common$50.00 ea 10 $500 20 Years

    13 Years 2019 $700 $42.15

    20 Years 2039 $1,154 $42.19

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    19/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    LifeWhen

    New

    Estimated

    Remaining

    Life

    CalendarYear

    EstimatedFuture Cost

    Raw

    Annual

    Payment

    Slurry Seal $0.32 / ft 41900 ft $13,408 5 Years 5 Year

    2022 $20,245 $3,758.02

    2027 $22,938 $4,257.84

    2032 $25,989 $4,824.14

    2037 $29,445 $5,465.75

    Fencing ChainLink 6 ft

    $30.00 / lf 30 lf $900 40 Years 13 Years 2019 $1,261 $75.87

    40 Years 2059 $3,424 $44.37

    Carports Metal $750 ea 110 $82,500 25 Years 25 Years2031 $155,966 $4,079.51

    2056 $291,193 $7,834.64

    Rear Boiler Building

    Roof Tile $3.50 / ft 462 ft $1,617 40 Years

    13 Years 2019 $2,265 $136.32

    40 Years 2059 $6,151 $79.71

    [FR] Stucco $500 ea 1 $500 10 Years 0 Years 2006 $506 $254.73

    Stucco $500 ea 1 $500 10 Years 10 Years

    2016 $650 $55.81

    2026 $834 $71.64

    2036 $1,071 $91.97

    Lattice with

    Arbor

    $1,500 ea 1 $1,500 30 Years8 Years 2014 $1,855 $191.84

    30 Years 2044 $3,923 $80.79

    Fence Wood $25 00 / lf 25 lf $625 20 Years

    8 Years 2014 $773 $79.93

    2034 $1 273 $46 55

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    20/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    Cost

    When New

    Expected

    LifeWhen

    New

    Estimated

    Remaining

    Life

    CalendarYear

    EstimatedFuture Cost

    Raw

    Annual

    Payment

    Rear Building

    Roof Tile $3.50 / ft 3280 ft $11,480 40 Years5 Years 2011 $13,170 $2,205.46

    40 Years 2051 $35,763 $463.43

    Roof Built Up

    New $7.00 ea 6600 $46,200 20 Years 20 Years 2026 $77,088 $2,726.40

    Roof Built Up

    Old$7.00 / ft 15400 ft $107,800 20 Years

    3 Years 2009 $117,647 $31,921.50

    20 Years2029 $193,866 $7,086.13

    2049 $319,465 $11,676.98

    [FR] Stucco

    Repairs$10,000 / ft 1 ft $10,000 10 Years 0 Years 2006 $10,126 $5,094.57

    Stucco Repairs $10,000 / ft 1 ft $10,000 10 Years 10 Years2016 $12,998 $1,116.192026 $16,686 $1,432.85

    2036 $21,419 $1,839.34

    Gutters $5.00 / lf 780 lf $3,900 30 Years8 Years 2014 $4,822 $498.77

    30 Years 2044 $10,201 $210.06

    Fence Wood $25.00 / lf 700 lf $17,500 20 Years

    3 Years 2009 $19,099 $5,182.06

    20 Years

    2029 $31,472 $1,150.35

    2049 $51,861 $1,895.61

    Wrought Iron $20 00 / lf 1120 lf $22 400 40 Years13 Years 2019 $31,381 $1,888.37

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    21/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued

    Reserve Items Unit Cost No Units

    Current

    CostWhen New

    Expected

    LifeWhen

    New

    Estimated

    RemainingLife

    CalendarYear

    EstimatedFuture Cost

    Raw

    AnnualPayment

    Floor Tile

    Ceramic$8.00 / ft 1020 ft $8,160 30 Years

    20 Years 2026 $13,616 $481.55

    30 Years 2056 $28,802 $593.10

    Rear Building 2nd Floor

    Acoustic Ceiling $1.00 / ft 2600 ft $2,600 20 Years

    8 Years 2014 $3,215 $332.52

    20 Years2034 $5,298 $193.64

    2054 $8,730 $319.09

    Lighting

    common$50.00 ea 10 $500 20 Years

    13 Years 2019 $700 $42.15

    20 Years 2039 $1,154 $42.19

    Paint Interior $0.60 / ft 7100 ft $4,260 8 Years 8 Years

    2014 $5,267 $544.81

    2022 $6,432 $712.41

    2030 $7,855 $869.96

    2038 $9,592 $1,062.36

    [FR] Carpet AQ $1.50 / ft 2600 ft $3,900 12 Years 0 Years 2006 $3,949 $1,986.88

    Carpet AQ $1.50 / ft 2600 ft $3,900 12 Years 12 Years

    2018 $5,329 $369.48

    2030 $7,191 $498.59

    2042 $9,704 $672.81

    Rear Building 3rd Floor

    Lighting$50 00 ea 10 $500 20 Years

    18 Years 2024 $794 $32.14

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    22/37

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    23/37

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    24/37

    Present Costs

    Category Item Name No Units Unit Cost Present CostNet Present

    Value

    Depreciated

    Value

    Common AreaPCC Walks 1 $2,000.00 ea $2,000.00 $2,000.00 $0.00

    Site lighting 1 $3,000.00 ea $3,000.00 $2,700.00 $300.00

    Common Area Sub Total = $5,000.00 $4,700.00 $300.00

    East Parking

    Paving 1 inch AC

    Overlay18500 ft $1.25 / ft $23,125.00 $10,175.00 $12,950.00

    Slurry Seal 18500 ft $0.32 / ft $5,920.00 $1,184.00 $4,736.00

    Carports Metal 17 $750.00 ea $12,750.00 $7,650.00 $5,100.00

    East Parking Sub Total = $41,795.00 $19,009.00 $22,786.00

    Front Boiler Building

    Roof Tile 462 ft $3.50 / ft $1,617.00 $727.65 $889.35

    Stucco 1 ft $500.00 / ft $500.00 $0.00 $500.00

    Fence Wood 25 lf $25.00 / lf $625.00 $93.75 $531.25Paint Fence 150 $0.60 ea $90.00 $54.00 $36.00

    Electric Panel 1 $1,500.00 ea $1,500.00 $675.00 $825.00

    Lattice with Arbor 1 $1,500.00 ea $1,500.00 $400.00 $1,100.00

    Boiler Room

    Equipment1 $85,000.00 ea $85,000.00 $6,800.00 $78,200.00

    Front Boiler Building Sub Total = $90,832.00 $8,750.40 $82,081.60

    Roof Tile 3280 ft $3.50 / ft $11,480.00 $2,296.00 $9,184.00

    $ $ $ $

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    25/37

    Prepared by Resource 1 BC, LLC.

    Present Costs - Continued

    Category Item Name No Units Unit Cost Present CostNet Present

    Value

    Depreciated

    Value

    Front Building 2ndFloor

    Paint Interior 9120 ft $0.60 / ft $5,472.00 $5,472.00 $0.00

    Carpet AQ 3700 ft $1.50 / ft $5,550.00 $0.00 $5,550.00

    Front Building 2nd Floor Sub Total = $15,222.00 $7,152.00 $8,070.00

    Front Building 3rd

    Floor

    Lighting common 10 $50.00 ea $500.00 $325.00 $175.00

    Paint Interior 9120 ft $0.60 / ft $5,472.00 $5,472.00 $0.00

    Ventilation 4 $1,000.00 ea $4,000.00 $1,066.67 $2,933.33

    Carpet AQ 3700 ft $1.50 / ft $5,550.00 $0.00 $5,550.00

    Front Building 3rd Floor Sub Total = $15,522.00 $6,863.67 $8,658.33

    North West Parking

    Paving 1 inch AC

    Overlay41900 ft $1.25 / ft $52,375.00 $23,045.00 $29,330.00

    Slurry Seal 41900 ft $0.32 / ft $13,408.00 $2,681.60 $10,726.40

    Fencing Chain Link6 ft

    30 lf $30.00 / lf $900.00 $292.50 $607.50

    Carports Metal 110 $750.00 ea $82,500.00 $82,500.00 $0.00

    North West Parking Sub Total = $149,183.00 $108,519.10 $40,663.90

    Rear Boiler Building

    Roof Tile 462 ft $3.50 / ft $1,617.00 $525.53 $1,091.47

    Stucco 1 $500.00 ea $500.00 $0.00 $500.00

    Lattice with Arbor 1 $1,500.00 ea $1,500.00 $400.00 $1,100.00

    Fence Wood 25 lf $25.00 / lf $625.00 $250.00 $375.00

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    26/37

    Prepared by Resource 1 BC, LLC.

    Present Costs - Continued

    Category Item Name No Units Unit Cost Present CostNet Present

    Value

    Depreciated

    Value

    Rear Building 1stFloor

    Elevator Equipment 1 $25,000.00 ea $25,000.00 $12,500.00 $12,500.00

    Intercom System 1 $2,500.00 ea $2,500.00 $1,000.00 $1,500.00

    Carpet AQ 2600 ft $1.50 / ft $3,900.00 $3,900.00 $0.00

    Floor Tile Ceramic 1020 ft $8.00 / ft $8,160.00 $5,440.00 $2,720.00

    Rear Building 1st Floor Sub Total = $43,820.00 $27,100.00 $16,720.00

    Rear Building 2nd

    Floor

    Acoustic Ceiling 2600 ft $1.00 / ft $2,600.00 $1,040.00 $1,560.00

    Lighting common 10 $50.00 ea $500.00 $325.00 $175.00

    Paint Interior 7100 ft $0.60 / ft $4,260.00 $4,260.00 $0.00

    Carpet AQ 2600 ft $1.50 / ft $3,900.00 $0.00 $3,900.00

    Rear Building 2nd Floor Sub Total = $11,260.00 $5,625.00 $5,635.00

    Rear Building 3rd

    Floor

    Lighting common 10 $50.00 ea $500.00 $450.00 $50.00

    Paint Interior 7100 ft $0.60 / ft $4,260.00 $4,260.00 $0.00

    Ventilation 4 $1,000.00 ea $4,000.00 $666.67 $3,333.33

    Carpet AQ 2600 ft $1.50 / ft $3,900.00 $0.00 $3,900.00

    Rear Building 3rd Floor Sub Total = $12,660.00 $5,376.67 $7,283.33

    Rear Parking

    Paving 1 inch AC

    Overlay4600 ft $1.25 / ft $5,750.00 $2,530.00 $3,220.00

    Slurry Seal 4600 ft $0.32 / ft $1,472.00 $294.40 $1,177.60

    Fencing Chain Link30 lf $30 00 / lf $900 00 $292 50 $607 50

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    27/37

    Prepared by Resource 1 BC, LLC.

    Present Costs - Continued

    Category Item Name No Units Unit Cost Present CostNet Present

    Value

    Depreciated

    Value

    Recreation Center Hot Water Boiler 1 $25,000.00 ea $25,000.00 $4,000.00 $21,000.00

    Recreation Center Sub Total = $65,890.00 $19,608.67 $46,281.33

    South Parking

    Paving 1 inch AC

    Overlay4600 ft $1.25 / ft $5,750.00 $5,290.00 $460.00

    Slurry Seal 4600 ft $0.32 / ft $1,472.00 $883.20 $588.80

    PCC Curbs 300 ft $5.50 / ft $1,650.00 $440.00 $1,210.00

    Fencing Chain Link

    6 ft30 lf $30.00 / lf $900.00 $405.00 $495.00

    Carports Metal 52 $750.00 ea $39,000.00 $23,400.00 $15,600.00

    South Parking Sub Total = $48,772.00 $30,418.20 $18,353.80

    Total of All Costs Above = $1,351,342.00 $560,343.14 $790,998.86

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    28/37

    Lakeside Plaza HOA 2006 Funding Study Cash Flow Analysis

    Calendar

    Year

    Annual

    Payment

    Annual

    Interest

    Total

    Salvage

    Annual

    Expenses

    Annual

    Income Tax

    Net Reserve

    Funds% Funded

    2006 $88,896 $3,591 $45,555 $1,077 $246,860 26.0 %2007 $177,792 $9,974 $23,670 $2,992 $407,963 41.3 %

    2008 $177,792 $14,874 $92,605 $4,462 $503,562 48.0 %

    2009 $165,609 $17,613 $468,980 $5,284 $212,519 20.3 %

    2010 $165,609 $8,760 $30,211 $2,628 $354,049 52.1 %

    2011 $114,995 $12,363 $70,062 $3,709 $407,636 54.0 %

    2012 $114,995 $13,993 $26,818 $4,198 $505,608 63.8 %

    2013 $111,980 $16,931 $2,412 $5,079 $627,028 71.7 %2014 $111,980 $20,624 $93,495 $6,187 $659,950 67.3 %

    2015 $110,246 $21,602 $3,486 $6,480 $781,830 78.2 %

    2016 $110,246 $25,309 $40,411 $7,593 $869,381 78.5 %

    2017 $108,808 $27,952 $138,667 $8,386 $859,088 72.7 %

    2018 $108,808 $27,639 $40,445 $8,292 $946,798 81.6 %

    2019 $107,890 $30,294 $137,319 $9,088 $938,574 75.7 %

    2020 $107,890 $30,044 $2,873 $9,013 $1,064,622 86.7 %

    2021 $106,670 $33,860 $138,198 $10,158 $1,056,796 78.3 %

    2022 $106,670 $33,622 $78,511 $10,087 $1,108,490 82.6 %

    2023 $108,418 $35,219 $3,096 $10,566 $1,238,465 88.8 %

    2024 $108,418 $39,172 $98,536 $11,752 $1,275,767 83.7 %

    2025 $106,793 $40,284 $86,497 $12,085 $1,324,262 84.8 %

    2026 $106,793 $41,759 $139,242 $12,528 $1,321,044 82.1 %

    2027 $104,312 $41,627 $39,005 $12,488 $1,415,490 88.5 %

    2028 $104,312 $44,500 $3,508 $13,350 $1,547,443 91.4 %

    2029 $112 129 $48 622 $630 292 $14 586 $1 063 314 58 4 %

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    29/37

    Lakeside Plaza HOA 2006 Reserve Payment Summary

    Projected Payments by Month and by Calendar Year

    Calendar

    Year

    Member

    Monthly

    Operations

    Payment

    Member

    Monthly

    Reserve

    Payment

    Member Total

    Monthly

    Payment

    Member Total

    Annual

    Payment

    Monthly

    Reserve

    Payment

    Annual

    Reserve

    Payment

    2006 NA $14,815.99 NA NA $14,816 $88,896

    2007 NA $14,815.99 NA NA $14,816 $177,792

    2008 NA $14,815.99 NA NA $14,816 $177,792

    2009 NA $13,800.72 NA NA $13,801 $165,609

    2010 NA $13,800.72 NA NA $13,801 $165,609

    2011 NA $9,582.94 NA NA $9,583 $114,995

    2012 NA $9,582.94 NA NA $9,583 $114,995

    2013 NA $9,331.63 NA NA $9,332 $111,980

    2014 NA $9,331.63 NA NA $9,332 $111,980

    2015 NA $9,187.16 NA NA $9,187 $110,246

    2016 NA $9,187.16 NA NA $9,187 $110,246

    2017 NA $9,067.32 NA NA $9,067 $108,8082018 NA $9,067.32 NA NA $9,067 $108,808

    2019 NA $8,990.84 NA NA $8,991 $107,890

    2020 NA $8,990.84 NA NA $8,991 $107,890

    2021 NA $8,889.15 NA NA $8,889 $106,670

    2022 NA $8,889.15 NA NA $8,889 $106,670

    2023 NA $9,034.80 NA NA $9,035 $108,418

    2024 NA $9,034.80 NA NA $9,035 $108,418

    2025 NA $8,899.42 NA NA $8,899 $106,793

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    30/37

    Lakeside Plaza HOA 2006 Funding Stud y - Expenses b y Item and by Calendar Year

    Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    Reserve Category : Comm on Area

    PCC Walks $2,076 $2,129 $2,183 $2,238 $2,294 $2,352 $2,412 $2,473 $2,536 $2,600 $2,665 $2,733 $2,802 $2,873 $2,945

    Site lighting

    Category Subtotal : $2,076 $2,129 $2,183 $2,238 $2,294 $2,352 $2,412 $2,473 $2,536 $2,600 $2,665 $2,733 $2,802 $2,873 $2,945

    Reserve Category : East Parking

    Paving 1 inch AC Overlay $30,819

    Slurry Seal $6,146 $6,963 $7,890

    Carports Metal $18,777

    Category Subtotal : $6,146 $6,963 $38,709 $18,777

    Reserve Category : Front Boiler Building

    Roof Tile

    Stucco $506 $650

    Fence Wood $682

    Paint Fence $98 $111 $126

    Electric Panel

    Lattice with Arbor $1,855

    Boiler Room Equipment $90,476

    Category Subtotal : $506 $90,476 $780 $1,966 $650 $126

    Reserve Category : Front Building

    Roof Tile $14,195

    Roof Built Up New

    Roof Built Up Old $220,015

    Stucco Repairs $15,188

    Fence Wood $37,285

    Wrought Iron $23,397

    Gutters $4,822

    Electric Panel $75,651

    Category Subtotal : $15,188 $220,015 $37,285 $19,017 $23,397 $75,651

    Reserve Category : Front Building 1st Floor

    Elevator Equipment $22,090

    Carpet AQ $6,559

    Intercom System

    Paint Interior $6,766

    Page 30 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC LLC

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    31/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    Category Subtotal : $6,766 $6,559 $22,090

    Reserve Category : Front Building 2nd Floor

    Acoustic Ceiling $4,575

    Lighting common $618

    Paint Interior $6,766

    Carpet AQ $5,620 $7,583

    Category Subtotal : $5,620 $11,959 $7,583

    Reserve Category : Front Building 3rd Floor

    Lighting common $700

    Paint Interior $6,766

    Ventilation $4,946

    Carpet AQ $5,620 $7,583

    Category Subtotal : $5,620 $11,712 $7,583 $700

    Reserve Category : North West Parking

    Paving 1 inch AC Overlay $69,800

    Slurry Seal $13,920 $15,771 $17,869

    Fencing Chain Link 6 ft $1,261

    Carports Metal

    Category Subtotal : $13,920 $15,771 $87,669 $1,261

    Reserve Category : Rear Boiler Building

    Roof Tile $2,265

    Stucco $506 $650

    Lattice with Arbor $1,855

    Fence Wood $773

    Paint Fence $91 $103 $117 $133

    Boiler Room Equipment $92,764

    Electric Panel

    Category Subtotal : $597 $92,764 $103 $2,628 $767 $2,265 $133

    Reserve Category : Rear Building

    Roof Tile $13,170

    Roof Built Up New

    Page 31 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC LLC

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    32/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    Roof Built Up Old $117,647

    Stucco Repairs $10,126 $12,998

    Gutters $4,822

    Fence Wood $19,099

    Wrought Iron $31,381

    Electric Panel

    Category Subtotal : $10,126 $136,746 $13,170 $4,822 $12,998 $31,381

    Reserve Category : Rear Building 1st Floor

    Paint Interior $5,267

    Elevator Equipment $36,817

    Intercom System $3,091

    Carpet AQ $5,329

    Floor Tile Ceramic

    Category Subtotal : $8,358 $5,329 $36,817

    Reserve Category : Rear Building 2nd Floor

    Acoustic Ceiling $3,215

    Lighting common $700

    Paint Interior $5,267

    Carpet AQ $3,949 $5,329

    Category Subtotal : $3,949 $8,482 $5,329 $700

    Reserve Category : Rear Building 3rd Floor

    Lighting common

    Paint Interior $5,267

    Ventilation $4,589

    Carpet AQ $3,949 $5,329

    Category Subtotal : $3,949 $4,589 $5,267 $5,329

    Reserve Category : Rear Parking

    Paving 1 inch AC Overlay $7,663

    Slurry Seal $1,528 $1,731 $1,962

    Fencing Chain Link 6 ft $1,261

    Carports Metal

    Category Subtotal : $1,528 $1,731 $9,625 $1,261

    Page 32 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC, LLC.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    33/37

    Prepared by Resource 1 BC, LLC.

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    Reserve Category : Recreat ion Center

    Roof Tile $4,328

    Stucco Repairs

    HVAC

    Paving PCC sidewalks $618

    Pool Deck PCC Concrete $12,620

    Pool Equipment $5,457 $7,005

    Pool Filter $951

    Pool Resurface $9,429 $12,104

    Wrought Iron

    Bathroom Fixtures $1,236

    Electric Panel

    Hot Water Boiler $27,974

    Category Subtotal : $14,886 $27,974 $12,620 $6,182 $951 $19,109

    Reserve Category : South Parking

    Paving 1 inch AC Overlay

    Slurry Seal $1,606 $1,820 $2,062

    PCC Curbs $2,040

    Fencing Chain Link 6 ft

    Carports Metal $57,435

    Category Subtotal : $1,606 $3,860 $2,062 $57,435

    Expense Totals : $45,555 $23,670 $92,605 $468,980 $30,211 $70,062 $26,818 $2,412 $93,495 $3,486 $40,411 $138,667 $40,445 $137,319 $2,873 $138,198

    Page 33 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC, LLC.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    34/37

    p y ,

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

    Reserve Category : Comm on Area

    PCC Walks $3,020 $3,096 $3,175 $3,255 $3,337 $3,422 $3,508 $3,597 $3,688 $3,781 $3,877 $3,975 $4,075 $4,178 $4,284

    Site lighting $4,762

    Category Subtotal : $3,020 $3,096 $7,937 $3,255 $3,337 $3,422 $3,508 $3,597 $3,688 $3,781 $3,877 $3,975 $4,075 $4,178 $4,284

    Reserve Category : East Parking

    Paving 1 inch AC Overlay

    Slurry Seal $8,939 $10,128 $11,475

    Carports Metal

    Category Subtotal : $8,939 $10,128 $11,475

    Reserve Category : Front Boiler Building

    Roof Tile $2,567

    Stucco $834 $1,071

    Fence Wood $1,124

    Paint Fence $143 $162 $183

    Electric Panel $2,381

    Lattice with Arbor

    Boiler Room Equipment $168,922

    Category Subtotal : $5,091 $834 $1,286 $168,922 $183 $1,071

    Reserve Category : Front Building

    Roof Tile

    Roof Built Up New $82,022

    Roof Built Up Old $362,554

    Stucco Repairs $32,129

    Fence Wood $61,441

    Wrought Iron

    Gutters

    Electric Panel

    Category Subtotal : $82,022 $362,554 $61,441 $32,129

    Reserve Category : Front Building 1st Floor

    Elevator Equipment

    Carpet AQ $8,851

    Intercom System $4,171

    Page 34 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC, LLC.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    35/37

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

    Paint Interior $8,262 $10,090

    Category Subtotal : $8,262 $4,171 $18,941

    Reserve Category : Front Building 2nd Floor

    Acoustic Ceiling $7,539

    Lighting common $1,019

    Paint Interior $8,262 $10,090

    Carpet AQ $10,233

    Category Subtotal : $8,262 $20,323 $8,558

    Reserve Category : Front Building 3rd Floor

    Lighting common

    Paint Interior $8,262 $10,090

    Ventilation

    Carpet AQ $10,233

    Category Subtotal : $8,262 $20,323

    Reserve Category : North West Parking

    Paving 1 inch AC Overlay

    Slurry Seal $20,245 $22,938 $25,989

    Fencing Chain Link 6 ft

    Carports Metal $155,966

    Category Subtotal : $20,245 $22,938 $155,966 $25,989

    Reserve Category : Rear Boiler Building

    Roof Tile

    Stucco $834 $1,071

    Lattice with Arbor

    Fence Wood $1,273

    Paint Fence $150 $170 $193

    Boiler Room Equipment $173,194

    Electric Panel $2,381

    Category Subtotal : $2,381 $984 $170 $174,467 $1,264

    Reserve Category : Rear Building

    Roof Tile

    Page 35 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC, LLC.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    36/37

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

    Roof Built Up New $77,088

    Roof Built Up Old $193,866

    Stucco Repairs $16,686 $21,419

    Gutters

    Fence Wood $31,472

    Wrought Iron

    Electric Panel $66,666

    Category Subtotal : $66,666 $93,774 $225,338 $21,419

    Reserve Category : Rear Building 1st Floor

    Paint Interior $6,432 $7,855

    Elevator Equipment

    Intercom System $5,094

    Carpet AQ $7,191

    Floor Tile Ceramic $13,616

    Category Subtotal : $6,432 $13,616 $15,046 $5,094

    Reserve Category : Rear Building 2nd Floor

    Acoustic Ceiling $5,298

    Lighting common

    Paint Interior $6,432 $7,855

    Carpet AQ $7,191

    Category Subtotal : $6,432 $15,046 $5,298

    Reserve Category : Rear Building 3rd Floor

    Lighting common $794

    Paint Interior $6,432 $7,855

    Ventilation

    Carpet AQ $7,191

    Category Subtotal : $6,432 $794 $15,046

    Reserve Category : Rear Parking

    Paving 1 inch AC Overlay

    Slurry Seal $2,223 $2,518 $2,853

    Fencing Chain Link 6 ft

    Carports Metal $144,623

    Page 36 of 37 PagesTuesday, May 16, 2006

    AFI Pro V3.5221

    Copyright IME 2001-2005

    www.afiprofessional.com

    Prepared by Resource 1 BC, LLC.

  • 7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association

    37/37

    Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued

    Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

    Category Subtotal : $2,223 $2,518 $144,623 $2,853

    Reserve Category : Recreat ion Center

    Roof Tile

    Stucco Repairs $1,019

    HVAC $4,171

    Paving PCC sidewalks

    Pool Deck PCC Concrete $18,354

    Pool Equipment $8,992

    Pool Filter $1,221 $1,567

    Pool Resurface $15,538

    Wrought Iron $9,524

    Bathroom Fixtures

    Electric Panel $2,381

    Hot Water Boiler $52,227

    Category Subtotal : $11,905 $1,221 $22,525 $24,530 $1,019 $53,794

    Reserve Category : South Parking

    Paving 1 inch AC Overlay $10,341

    Slurry Seal $2,336 $2,647 $2,999

    PCC Curbs

    Fencing Chain Link 6 ft $1,429

    Carports Metal

    Category Subtotal : $3,765 $12,988 $2,999

    Expense To tals : $78,511 $3,096 $98,536 $86,497 $139,242 $39,005 $3,508 $630,292 $108,412 $365,980 $44,193 $172,896 $201,693 $57,972 $60,167

    Page 37 of 37 PagesTuesday, May 16, 2006