5955 Tyro ne Road , Suite 3 Reno , Nevada 89502Voice (775) 856-2001 Fax (775) 856-4111
May 16, 2006
Funding Reserve Analysisfor
Lakeside Plaza HOA 2006
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
2/37
Lakeside Plaza HOA 2006 Fundin g Study
Table of Con tents
Pages Sub ject
1 Repor t Cover Sheet
2 Tab le o f Con ten ts
3 to 9 Reserve Study Summary
10 to 14 Reserve It em Summary
15 to 23 Reserve It em L is t ing
24 to 27 Presen t Cos t Report
28 Cash Flow
29 Dues Summary
30 to 37 Expense Repo rt
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
3/37
5955 Tyro ne Road , Suite 3 Reno , Nevada 89502Voice (775) 856-2001 Fax (775) 856-4111
May 16, 2006
Mr. Kevin BergEugene Burger Management Corp.294 E. Moana Lane
Reno, Nevada 89502
Subject: Lakeside Plaza HOA 2006
Mr. Berg,
Resource 1 BC, LLC. is pleased to present to Mr. Kevin Berg the requested Reserve Funding study. We believe that
you will find the attached study to be thorough and complete. After you have had an opportunity to review the report
you may have questions. Please do not hesitate to write of call - we would be pleased to answer any questions you
may have.
Project Description
Lakeside Plaza is located off of Lakeside Drive in Reno Nevada. Project has 2 main buildings that are 3 stories high
with built up roofs. The parking lots have asphalt with concrete curbs with metal carports. The common area
improvements have a small amount of landscaping, sidewalks, a small club house and a swimming pool.
The redwood decking and concrete patios are the responsibility of each owner.
Roof repairs and replacement will have to be completed in the near future.
The boilers have reached there economic life and will have to be replaced in the near future. The stucco siding hasdeveloped cracks and has to be repairs or cause structural damage to the buildings.
The units are assessed by square footage. There are 191 units in this project.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
4/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
The association did not raise reserve fees from the last reserve study done 5
years ago. This has caused a shortfall of about $400,000 in the reserve account.
The reserve fees to the budget will have to be increased to the projected amountby NRS statue. A special assessment of up to $1,000.00 will reduce the annual
amount of contributions..
Taxed as an IRS exempt association (IRS Tax Rules Attached)
Reserve Study Assumptions
Cost estimates and financial information are accurate and current. No unforeseen circumstances will cause
a significant reduction of reserves. Sufficient comprehensive property insurance exists to protect from
insurable risks. The association plans to continue to maintain the existing common areas and amenities.
Reserve payments occur at the end of every calendar month. Expenses occur at the end of the expenseyear.
Impact of Component Life
The projected life expectancy of the major components and the reserve funding needs of the association are closely
tied. Performing the appropriate routine maintenance for each major component generally increases the component
useful life, effectively moving the component expense into the future which reduces the reserve funding payments of
the association. Failure to perform such maintenance can shorten the remaining useful life of the major components,
bringing the replacement expense closer to the present which increases the reserve funding payments of theassociation.
Initial Reserves
The association did not raise reserve fees from the last reserve study done 5 years ago. This has caused a shortfall of
about $400,000 in the reserve account. The reserve fees to the budget will have to be increased to the projected
amount by NRS statue. A special assessment of up to $1,000.00 will reduce the annual amount of contributions..
Reserve Funding Goal
The reserve fund goal is a minimum account balance consistent with the cash demands of maintenance and
replacement of reserve items. (Baseline Funding)
S d M h d
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
5/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
association. (b) The budget to maintain the reserve required by paragraph (b) of subsection 2 of NRS 116.3115.
The budget must include, without limitation: (1) The current estimated replacement cost, estimated remaining
life and estimated useful life of each major component of the common elements; (2) As of the end of the fiscalyear for which the budget is prepared, the current estimate of the amount of cash reserves that are necessary, and the
current amount of accumulated cash reserves that are set aside, to repair, replace or restore the major components of
the common elements; (3) A statement as to whether the executive board has determined or anticipates that
the levy of one or more special assessments will be required to repair, replace or restore any major component of the
common elements or to provide adequate reserves for that purpose; and (4) A general statement describing the
procedures used for the estimation and accumulation of cash reserves pursuant to subparagraph (2), including, without
limitation, the qualifications of the person responsible for the preparation of the study of the reserves required by NRS
116.31152. 2. In lieu of distributing copies of the budgets of the association required by subsection 1, the executive
board may distribute to each unit's owner a summary of those budgets, accompanied by a written notice that: (a)
The budgets are available for review at the business office of the association or some other suitable location within the
county where the common-interest community is situated or, if it is situated in more than one county, within one of
those counties; and (b) Copies of the budgets will be provided upon request. (Added to NRS by 1999, 2993; A
2003, 2241) NRS 116.31152 Study of reserves; duties of executive board regarding study; qualifications of person
who conducts study; contents of study; submission of study to Commission; regulations regarding study; use of money
credited against residential construction tax for upkeep of park facilities and related improvements identified in study.
1. The executive board of an association shall: (a) Cause to be conducted, at least once every 5 years, a study of
the reserves required to repair, replace and restore the major components of the common elements; (b) Review theresults of that study at least annually to determine if those reserves are sufficient; and (c) Make any adjustments it
deems necessary to maintain the required reserves. 2. The study of the reserves required by subsection 1 must be
conducted by a person who is qualified by training and experience to conduct such a study, including, without
limitation, a member of the executive board, a unit's owner or a community manager who is so qualified. The study of
the reserves must include, without limitation: (a) A summary of an inspection of the major components of the
common elements that the association is obligated to repair, replace or restore; (b) An identification of the major
components of the common elements that the association is obligated to repair, replace or restore which have a
remaining useful life of less than 30 years; (c) An estimate of the remaining useful life of each major component
identified pursuant to paragraph (b); (d) An estimate of the cost of repair, replacement or restoration of each major
component identified pursuant to paragraph (b) during and at the end of its useful life; and (e) An estimate of the
total annual assessment that may be required to cover the cost of repairing, replacement or restoration of the major
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
6/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
include: (a) A copy of the component inventory from the previous reserve study if such copy was provided by the
executive board to the person conducting the reserve study; (b) A 30-year schedule which shows: (1) The
projected increase in assessments that will be required in any given year to provide an adequately funded reserve; and(2) The projected inflation and estimated interest income from the reserve fund; (c) The names and credentials of
any consultants and other persons with expertise used to assist in the preparation of the reserve study; (d) Any
written reports prepared by consultants and other persons with expertise; (e) If there are any conflicting
recommendations of the consultants or other persons with expertise while preparing the reserve study, a written
explanation as to which recommendations are selected and the reasons for their selection; (f) The disclosures set
forth in NAC 116.430; and (g) A statement, prominently displayed, which reads substantially as follows: The
projected life expectancy of the major components and the funding needs of the reserves of the association are based
upon the association performing appropriate routine and preventative maintenance for each major component. Failure
to perform such maintenance can negatively impact the remaining useful life of the major components and dramatically
increase the funding needs of the reserves of the association. 2. As used in this section, adequately funded
reserve means the funds sufficient to maintain the common elements: (a) At the level described in the governing
documents and in a reserve study; and (b) Without using the funds from the operating budget or without special
assessments, except for occurrences that are a result of unforeseen catastrophic events. (Added to NAC by
Commn for Common-Interest Communities by R129-04, eff. 4-14-2005)
Summary of Findings
Summary of Findings. Resource 1 BC, LLC. has estimated future projected expenses for Lakeside Plaza HOA 2006based upon preservation of existing improvements.
The attached funding study is limited in scope to those expense items listed in the attached "Lakeside Plaza HOA 2006
Reserve Study Expense Items". Expense items which have an expected life of more than 30 Years are not included in
this reserve study unless payment for these long lived items occurs within the 30 Years of the reserve study envelope.
Of primary concern is the preservation of a positive funding balance with funds sufficient to meet projected expenses
throughout the study life. Based upon the attached funding study, it is our professional opinion that member monthly
fees as shown in the attached "Lakeside Plaza HOA 2006 Dues Summary" will realize this goal. Some reserve items
in the "Revenue Summary Table" may not contain payments. In this analysis the initial reserves were used to make
annual payments for expense items in their order of occurrence until the initial reserve was consumed. As a result
reserve items without payments may be expected, particularly in the first few years of the funding study. Reserve
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
7/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
A summary of our recommended Capital Reserve payments for the next five years is shown below.
Proposed Payment Schedule
Calendar
Year
MemberMonthly
Reserve
Payment
Monthly
Reserve
Payment
Annual
Reserve
Payment
2006 $14,815.99 $14,815.99 $88,895.97
2007 $14,815.99 $14,815.99 $177,791.94
2008 $14,815.99 $14,815.99 $177,791.94
2009 $13,800.72 $13,800.72 $165,608.64
2010 $13,800.72 $13,800.72 $165,608.64
2011 $9,582.94 $9,582.94 $114,995.24
Percent Funded
Many reserve studies use the concept of "Percent Funded" to measure the reserve account balance against a
theoretically perfect value. Percent Funded is often used as a measure of the "Financial Health" of an association.
The assumption is, the higher the percentage, the greater the "Financial Health". The question of substance is simply:
"How much is enough?"To answer the question, some understanding of Percent Funded is required. Percent Funded is the ratio of current
cash reserves divided by the Fully Funded value at any instant in time. Fully Funded is defined as the Future Value,
multiplied by the number of years used, divided by the expected life for the sum of all reserve items. In essence, Fully
Funded is simply the total of the average net present value of the association improvements. Percent Funded is then,
the current reserve balance divided by the Fully Funded value multiplied by 100 (to give a percentage). The concept is
useful when the reserve study is comprehensive, but misleading when the reserve study is superficial or constrained.
As a result, we recommend that the statement "Percent Funded" be used with caution.
Conflict of Interest
As the preparer of this reserve study, Resource 1 BC, LLC. certifies that we do not have any vested interests, financial
interests or other interests that would cause a conflict of interest in the preparation of this reserve study The Reserve
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
8/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
Resource 1 BC, LLC. would like to thank Mr. Kevin Berg for the opportunity to be of service in the preparation of the
attached Funding Study. Again, please feel free to write or call at our letterhead address if you have any questions.
Prepared by:
_____________________________________________Kenneth R. Rowan
Certified Master Inspector # IOS.0000008-M State of NevadaCAI RS 0064
Enclosures:
Interal Revenue Service Tax Rules
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
9/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Summary - Continued
IRS Tax Rules
Unlike most things with the IRS, association tax rates are really not very complicated.
Tax rates on the first $50,000 in association taxable income can be either 15% or 30%. To qualify for the lower taxrate, the association must file with the IRS as a non exempt membership association.When an association pays taxes as a non exempt membership association, the tax rate for the first $50,000 of taxableincome is 15%. The tax rate increases to 30% for taxable income beyond the first $50,000. Non exempt membershiporganizations are treated the same as a time-share associations . Taxes are filed with form 1120.When an association pays taxes under form 1120H, the tax rate for all taxable income is 30% and the IRS considers it ahomeowners association. Taxes are filed with form 1120.H
Tax Rate ComparisonTaxable Income Form 1120 Form 1120HFirst $50,000 $7,500 $15,000Remaining $30,000 $9,000 $9,000Income Tax $16,500 $24,000
Associations benefit from filing Form 1120 rather than Form 1120H because the tax rate for form 1120 is 15% for thefirst $50,000 of taxable income compared to a flat rate of 30% for Form 1120H. Associations may elect on an annual
basis to file either Form 1120H or Form 1120. However, filing Form 1120 puts associations at risk if they do notcomply with all IRS procedures.In summary, there are two ways to report financial activities to the IRS:a. Form 1120H
Form 1120H is the tax form specifically made for homeowner associations and is likened to the 1040EZ for its relativesimplicity. The tax rate for 1120H filers is 30%.b. Form 1120
Form 1120 is an option for all incorporated HOA's (and all HOA's should be incorporated.). While it is more complex,it carries a tax rate of 15%. Since healthy reserve funds can often rise to hundreds of thousands and even millions ofdollars, it is usually prudent to use the Form 1120 and cut the tax rate in half. Check with a knowledgeable CPA.It is important to note that small associations with reserve balances of less than $50,000 can benefit greatly by changing
tax forms. This will result in lower dues to the membership.Check with your CPA for compliance of IRS rules and regulations.For more information click on the US Treasury link: http://www.irs.ustreas.gov/formspubs/index.html
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
10/37
Lakeside Plaza HOA 2006 Reserve Study Expense Item Summary
Reserve ItemsCurrent Cost
When New
Expected
Life When
New
Estimated
Remaining
Life
First
Replacement
Cost
Raw
Annual
Payment
Repeating
Item?
Common AreaPCC Walks $2,000 1 Year 1 Year $2,076 $1,355 Yes
Site lighting $3,000 20 Years 18 Years $4,762 $193 Yes
East Parking
Paving 1 inch AC
Overlay$23,125 25 Years 11 Years $30,819 $2,247 Yes
Slurry Seal $5,920 5 Years 1 Year $6,146 $4,011 Yes
Carports Metal $12,750 25 Years 15 Years $18,777 $953 Yes
Front Boiler Building
Roof Tile $1,617 40 Years 18 Years $2,567 $104 Yes
Stucco $500 10 Years 0 Years $506 $506 Yes
Fence Wood $625 20 Years 3 Years $682 $185 Yes
Paint Fence $90.00 5 Years 3 Years $98 $26.65 Yes
Electric Panel $1,500 40 Years 18 Years $2,381 $96.43 Yes
Lattice with Arbor $1,500 30 Years 8 Years $1,855 $192 Yes
Boiler Room Equipment $85,000 25 Years 2 Years $90,476 $34,895 Yes
Front Building
Roof Tile $11,480 40 Years 8 Years $14,195 $1,468 Yes
(1) Roof Built Up New $50,400 20 Years 19 Years $82,022 $3,100 No
(2) Roof Built Up Old $201,600 20 Years 3 Years $220,015 $59,697 Yes
Stucco Repairs $15,000 30 Years 0 Years $15,188 $15,188 Yes
Fence Wood $32,500 20 Years 5 Years $37,285 $6,244 Yes
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
11/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued
Reserve Items
Current Cost
When New
Expected
Life WhenNew
Estimated
RemainingLife
First
ReplacementCost
Raw
AnnualPayment
Repeating
Item?
Paint Interior $5,472 8 Years 8 Years $6,766 $700 Yes
Ventilation $4,000 30 Years 8 Years $4,946 $512 Yes
Carpet AQ $5,550 12 Years 0 Years $5,620 $5,620 Yes
North West Parking
Paving 1 inch AC
Overlay $52,375 25 Years 11 Years $69,800 $5,090 Yes
Slurry Seal $13,408 5 Years 1 Year $13,920 $9,084 Yes
Fencing Chain Link 6 ft $900 40 Years 13 Years $1,261 $75.87 Yes
Carports Metal $82,500 25 Years 25 Years $155,966 $4,080 Yes
Rear Boiler Building
Roof Tile $1,617 40 Years 13 Years $2,265 $136 Yes
Stucco $500 10 Years 0 Years $506 $506 Yes
Lattice with Arbor $1,500 30 Years 8 Years $1,855 $192 Yes
Fence Wood $625 20 Years 8 Years $773 $79.93 Yes
Paint Fence $90.00 5 Years 0 Years $91 $91.13 Yes
Boiler Room Equipment $85,000 25 Years 3 Years $92,764 $25,170 Yes
Electric Panel $1,500 40 Years 18 Years $2,381 $96.43 Yes
Rear Building
Roof Tile $11,480 40 Years 5 Years $13,170 $2,205 Yes
(3) Roof Built Up New $46,200 20 Years 20 Years $77,088 $2,726 No
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
12/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued
Reserve Items
Current Cost
When New
Expected
Life WhenNew
Estimated
RemainingLife
First
ReplacementCost
Raw
AnnualPayment
Repeating
Item?
Carpet AQ $3,900 12 Years 0 Years $3,949 $3,949 Yes
Rear Building 3rd Floor
Lighting common $500 20 Years 18 Years $794 $32.14 Yes
Paint Interior $4,260 8 Years 8 Years $5,267 $545 Yes
Ventilation $4,000 30 Years 5 Years $4,589 $768 Yes
Carpet AQ $3,900 12 Years 0 Years $3,949 $3,949 Yes
Rear Parking
Paving 1 inch AC
Overlay$5,750 25 Years 11 Years $7,663 $559 Yes
Slurry Seal $1,472 5 Years 1 Year $1,528 $997 Yes
Fencing Chain Link 6 ft $900 40 Years 13 Years $1,261 $75.87 Yes
Carports Metal $76,500 25 Years 25 Years $144,623 $3,783 Yes
Recreation Center
Roof Tile $3,500 30 Years 8 Years $4,328 $448 Yes
Stucco Repairs $500 30 Years 28 Years $1,019 $22.66 Yes
HVAC $2,500 25 Years 20 Years $4,171 $148 Yes
Paving PCC sidewalks $500 30 Years 8 Years $618 $63.95 Yes
Pool Deck PCCConcrete
$11,000 15 Years 5 Years $12,620 $2,113 Yes
Pool Equipment $5,000 10 Years 3 Years $5,457 $1,481 Yes
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
13/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Study Expense Item Summary - Continued
Initial Reserve: $201,005
Reserve Item Comments
(1) 20% of this building has been completed.
(2) 80% of the built up roof will have to completed in the next 3 years. There is a total of 36,000 sf of roof.
(3) 30% of the Roof is new.
(4) 70% of the roof will have to replaced in the next 3 years . There is a total of 22,000 sg of roofing.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
14/37
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
15/37
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
Life
When
New
Estimated
Remaining
Life
Calendar
Year
Estimated
Future Cost
Raw
Annual
Payment
Common Area
[FR] PCC Walks $2,000 ea 1 $2,000 1 Year 1 Year
2007 $2,076 $1,355.05
2008 $2,129 $2,099.74
2009 $2,183 $2,152.84
PCC Walks $2,000 ea 1 $2,000 1 Year 1 Year
2010 $2,238 $2,207.28
2011 $2,294 $2,263.10
2012 $2,352 $2,320.33
2013 $2,412 $2,379.00
2014 $2,473 $2,439.17
2015 $2,536 $2,500.85
2016 $2,600 $2,564.09
2017 $2,665 $2,628.93
2018 $2,733 $2,695.41
2019 $2,802 $2,763.58
2020 $2,873 $2,833.46
2021 $2,945 $2,905.12
2022 $3,020 $2,978.58
2023 $3,096 $3,053.91
2024 $3,175 $3,131.14
2025 $3,255 $3,210.32
2026 $3,337 $3,291.50
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
16/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
LifeWhen
New
Estimated
Remaining
Life
CalendarYear
EstimatedFuture Cost
Raw
Annual
Payment
[FR] Slurry Seal $0.32 / ft 18500 ft $5,920 5 Years 1 Year 2007 $6,146 $4,010.94
Slurry Seal $0.32 / ft 18500 ft $5,920 5 Years 5 Year
2012 $6,963 $1,292.58
2017 $7,890 $1,464.49
2022 $8,939 $1,659.27
2027 $10,128 $1,879.95
2032 $11,475 $2,129.99
2037 $13,001 $2,413.28
Carports Metal $750 ea 17 $12,750 25 Years15 Years 2021 $18,777 $953.00
25 Years 2046 $35,057 $943.22
Front Boiler Building
Roof Tile $3.50 / ft 462 ft $1,617 40 Years18 Years 2024 $2,567 $103.95
40 Years 2064 $6,970 $90.31
[FR] Stucco $500 / ft 1 ft $500 10 Years 0 Years 2006 $506 $254.73
Stucco $500 / ft 1 ft $500 10 Years 10 Years
2016 $650 $55.81
2026 $834 $71.64
2036 $1,071 $91.97
[FR] FenceWood
$25.00 / lf 25 lf $625 20 Years 3 Years 2009 $682 $185.07
F W d $25 00 / lf 25 lf $625 20 Y 20 Y2029 $1,124 $41.08
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
17/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
LifeWhen
New
Estimated
Remaining
Life
CalendarYear
EstimatedFuture Cost
Raw
Annual
Payment
Boiler Room $85,000 ea 1 $85,000 25 Years 25 Years 2058 $315,382 $8,485.48
Front Building
Roof Tile $3.50 / ft 3280 ft $11,480 40 Years8 Years 2014 $14,195 $1,468.18
40 Years 2054 $38,546 $499.48Roof Built Up
New$7.00 / ft 7200 ft $50,400 20 Years 19 Years 2025 $82,022 $3,100.30
Roof Built Up
Old$7.00 / ft 28800 ft $201,600 20 Years
3 Years 2009 $220,015 $59,697.35
20 Years2029 $362,554 $13,251.98
2049 $597,440 $21,837.46
[FR] Stucco
Repairs
$15,000 ea 1 $15,000 30 Years 0 Years 2006 $15,188 $7,641.86
Stucco Repairs $15,000 ea 1 $15,000 30 Years 30 Years 2036 $32,129 $661.61
Fence Wood $25.00 / lf 1300 lf $32,500 20 Years
5 Years 2011 $37,285 $6,243.68
20 Years2031 $61,441 $2,245.77
2051 $101,246 $3,700.73
Wrought Iron $25.00 / lf 720 lf $18,000 40 Years10 Years 2016 $23,397 $1,898.47
40 Years 2056 $63,533 $823.27
Gutters $5.00 / lf 780 lf $3,900 30 Years8 Years 2014 $4,822 $498.77
30 Years 2044 $10,201 $210.06
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
18/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
LifeWhen
New
Estimated
Remaining
Life
CalendarYear
EstimatedFuture Cost
Raw
Annual
Payment
Front Building 2nd Floor
Acoustic Ceiling $1.00 / ft 3700 ft $3,700 20 Years
8 Years 2014 $4,575 $473.19
20 Years2034 $7,539 $275.56
2054 $12,423 $454.09
Lighting
common$50.00 ea 10 $500 20 Years
8 Years 2014 $618 $63.95
20 Years2034 $1,019 $37.24
2054 $1,679 $61.36
Paint Interior $0.60 / ft 9120 ft $5,472 8 Years 8 Years
2014 $6,766 $699.82
2022 $8,262 $915.10
2030 $10,090 $1,117.47
2038 $12,321 $1,364.60
[FR] Carpet AQ $1.50 / ft 3700 ft $5,550 12 Years 0 Years 2006 $5,620 $2,827.49
Carpet AQ $1.50 / ft 3700 ft $5,550 12 Years 12 Years
2018 $7,583 $525.80
2030 $10,233 $709.53
2042 $13,809 $957.47
Front Building 3rd Floor
Lighting
common$50.00 ea 10 $500 20 Years
13 Years 2019 $700 $42.15
20 Years 2039 $1,154 $42.19
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
19/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
LifeWhen
New
Estimated
Remaining
Life
CalendarYear
EstimatedFuture Cost
Raw
Annual
Payment
Slurry Seal $0.32 / ft 41900 ft $13,408 5 Years 5 Year
2022 $20,245 $3,758.02
2027 $22,938 $4,257.84
2032 $25,989 $4,824.14
2037 $29,445 $5,465.75
Fencing ChainLink 6 ft
$30.00 / lf 30 lf $900 40 Years 13 Years 2019 $1,261 $75.87
40 Years 2059 $3,424 $44.37
Carports Metal $750 ea 110 $82,500 25 Years 25 Years2031 $155,966 $4,079.51
2056 $291,193 $7,834.64
Rear Boiler Building
Roof Tile $3.50 / ft 462 ft $1,617 40 Years
13 Years 2019 $2,265 $136.32
40 Years 2059 $6,151 $79.71
[FR] Stucco $500 ea 1 $500 10 Years 0 Years 2006 $506 $254.73
Stucco $500 ea 1 $500 10 Years 10 Years
2016 $650 $55.81
2026 $834 $71.64
2036 $1,071 $91.97
Lattice with
Arbor
$1,500 ea 1 $1,500 30 Years8 Years 2014 $1,855 $191.84
30 Years 2044 $3,923 $80.79
Fence Wood $25 00 / lf 25 lf $625 20 Years
8 Years 2014 $773 $79.93
2034 $1 273 $46 55
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
20/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
Cost
When New
Expected
LifeWhen
New
Estimated
Remaining
Life
CalendarYear
EstimatedFuture Cost
Raw
Annual
Payment
Rear Building
Roof Tile $3.50 / ft 3280 ft $11,480 40 Years5 Years 2011 $13,170 $2,205.46
40 Years 2051 $35,763 $463.43
Roof Built Up
New $7.00 ea 6600 $46,200 20 Years 20 Years 2026 $77,088 $2,726.40
Roof Built Up
Old$7.00 / ft 15400 ft $107,800 20 Years
3 Years 2009 $117,647 $31,921.50
20 Years2029 $193,866 $7,086.13
2049 $319,465 $11,676.98
[FR] Stucco
Repairs$10,000 / ft 1 ft $10,000 10 Years 0 Years 2006 $10,126 $5,094.57
Stucco Repairs $10,000 / ft 1 ft $10,000 10 Years 10 Years2016 $12,998 $1,116.192026 $16,686 $1,432.85
2036 $21,419 $1,839.34
Gutters $5.00 / lf 780 lf $3,900 30 Years8 Years 2014 $4,822 $498.77
30 Years 2044 $10,201 $210.06
Fence Wood $25.00 / lf 700 lf $17,500 20 Years
3 Years 2009 $19,099 $5,182.06
20 Years
2029 $31,472 $1,150.35
2049 $51,861 $1,895.61
Wrought Iron $20 00 / lf 1120 lf $22 400 40 Years13 Years 2019 $31,381 $1,888.37
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
21/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Reserve Study Expense Item Listing - Continued
Reserve Items Unit Cost No Units
Current
CostWhen New
Expected
LifeWhen
New
Estimated
RemainingLife
CalendarYear
EstimatedFuture Cost
Raw
AnnualPayment
Floor Tile
Ceramic$8.00 / ft 1020 ft $8,160 30 Years
20 Years 2026 $13,616 $481.55
30 Years 2056 $28,802 $593.10
Rear Building 2nd Floor
Acoustic Ceiling $1.00 / ft 2600 ft $2,600 20 Years
8 Years 2014 $3,215 $332.52
20 Years2034 $5,298 $193.64
2054 $8,730 $319.09
Lighting
common$50.00 ea 10 $500 20 Years
13 Years 2019 $700 $42.15
20 Years 2039 $1,154 $42.19
Paint Interior $0.60 / ft 7100 ft $4,260 8 Years 8 Years
2014 $5,267 $544.81
2022 $6,432 $712.41
2030 $7,855 $869.96
2038 $9,592 $1,062.36
[FR] Carpet AQ $1.50 / ft 2600 ft $3,900 12 Years 0 Years 2006 $3,949 $1,986.88
Carpet AQ $1.50 / ft 2600 ft $3,900 12 Years 12 Years
2018 $5,329 $369.48
2030 $7,191 $498.59
2042 $9,704 $672.81
Rear Building 3rd Floor
Lighting$50 00 ea 10 $500 20 Years
18 Years 2024 $794 $32.14
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
22/37
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
23/37
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
24/37
Present Costs
Category Item Name No Units Unit Cost Present CostNet Present
Value
Depreciated
Value
Common AreaPCC Walks 1 $2,000.00 ea $2,000.00 $2,000.00 $0.00
Site lighting 1 $3,000.00 ea $3,000.00 $2,700.00 $300.00
Common Area Sub Total = $5,000.00 $4,700.00 $300.00
East Parking
Paving 1 inch AC
Overlay18500 ft $1.25 / ft $23,125.00 $10,175.00 $12,950.00
Slurry Seal 18500 ft $0.32 / ft $5,920.00 $1,184.00 $4,736.00
Carports Metal 17 $750.00 ea $12,750.00 $7,650.00 $5,100.00
East Parking Sub Total = $41,795.00 $19,009.00 $22,786.00
Front Boiler Building
Roof Tile 462 ft $3.50 / ft $1,617.00 $727.65 $889.35
Stucco 1 ft $500.00 / ft $500.00 $0.00 $500.00
Fence Wood 25 lf $25.00 / lf $625.00 $93.75 $531.25Paint Fence 150 $0.60 ea $90.00 $54.00 $36.00
Electric Panel 1 $1,500.00 ea $1,500.00 $675.00 $825.00
Lattice with Arbor 1 $1,500.00 ea $1,500.00 $400.00 $1,100.00
Boiler Room
Equipment1 $85,000.00 ea $85,000.00 $6,800.00 $78,200.00
Front Boiler Building Sub Total = $90,832.00 $8,750.40 $82,081.60
Roof Tile 3280 ft $3.50 / ft $11,480.00 $2,296.00 $9,184.00
$ $ $ $
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
25/37
Prepared by Resource 1 BC, LLC.
Present Costs - Continued
Category Item Name No Units Unit Cost Present CostNet Present
Value
Depreciated
Value
Front Building 2ndFloor
Paint Interior 9120 ft $0.60 / ft $5,472.00 $5,472.00 $0.00
Carpet AQ 3700 ft $1.50 / ft $5,550.00 $0.00 $5,550.00
Front Building 2nd Floor Sub Total = $15,222.00 $7,152.00 $8,070.00
Front Building 3rd
Floor
Lighting common 10 $50.00 ea $500.00 $325.00 $175.00
Paint Interior 9120 ft $0.60 / ft $5,472.00 $5,472.00 $0.00
Ventilation 4 $1,000.00 ea $4,000.00 $1,066.67 $2,933.33
Carpet AQ 3700 ft $1.50 / ft $5,550.00 $0.00 $5,550.00
Front Building 3rd Floor Sub Total = $15,522.00 $6,863.67 $8,658.33
North West Parking
Paving 1 inch AC
Overlay41900 ft $1.25 / ft $52,375.00 $23,045.00 $29,330.00
Slurry Seal 41900 ft $0.32 / ft $13,408.00 $2,681.60 $10,726.40
Fencing Chain Link6 ft
30 lf $30.00 / lf $900.00 $292.50 $607.50
Carports Metal 110 $750.00 ea $82,500.00 $82,500.00 $0.00
North West Parking Sub Total = $149,183.00 $108,519.10 $40,663.90
Rear Boiler Building
Roof Tile 462 ft $3.50 / ft $1,617.00 $525.53 $1,091.47
Stucco 1 $500.00 ea $500.00 $0.00 $500.00
Lattice with Arbor 1 $1,500.00 ea $1,500.00 $400.00 $1,100.00
Fence Wood 25 lf $25.00 / lf $625.00 $250.00 $375.00
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
26/37
Prepared by Resource 1 BC, LLC.
Present Costs - Continued
Category Item Name No Units Unit Cost Present CostNet Present
Value
Depreciated
Value
Rear Building 1stFloor
Elevator Equipment 1 $25,000.00 ea $25,000.00 $12,500.00 $12,500.00
Intercom System 1 $2,500.00 ea $2,500.00 $1,000.00 $1,500.00
Carpet AQ 2600 ft $1.50 / ft $3,900.00 $3,900.00 $0.00
Floor Tile Ceramic 1020 ft $8.00 / ft $8,160.00 $5,440.00 $2,720.00
Rear Building 1st Floor Sub Total = $43,820.00 $27,100.00 $16,720.00
Rear Building 2nd
Floor
Acoustic Ceiling 2600 ft $1.00 / ft $2,600.00 $1,040.00 $1,560.00
Lighting common 10 $50.00 ea $500.00 $325.00 $175.00
Paint Interior 7100 ft $0.60 / ft $4,260.00 $4,260.00 $0.00
Carpet AQ 2600 ft $1.50 / ft $3,900.00 $0.00 $3,900.00
Rear Building 2nd Floor Sub Total = $11,260.00 $5,625.00 $5,635.00
Rear Building 3rd
Floor
Lighting common 10 $50.00 ea $500.00 $450.00 $50.00
Paint Interior 7100 ft $0.60 / ft $4,260.00 $4,260.00 $0.00
Ventilation 4 $1,000.00 ea $4,000.00 $666.67 $3,333.33
Carpet AQ 2600 ft $1.50 / ft $3,900.00 $0.00 $3,900.00
Rear Building 3rd Floor Sub Total = $12,660.00 $5,376.67 $7,283.33
Rear Parking
Paving 1 inch AC
Overlay4600 ft $1.25 / ft $5,750.00 $2,530.00 $3,220.00
Slurry Seal 4600 ft $0.32 / ft $1,472.00 $294.40 $1,177.60
Fencing Chain Link30 lf $30 00 / lf $900 00 $292 50 $607 50
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
27/37
Prepared by Resource 1 BC, LLC.
Present Costs - Continued
Category Item Name No Units Unit Cost Present CostNet Present
Value
Depreciated
Value
Recreation Center Hot Water Boiler 1 $25,000.00 ea $25,000.00 $4,000.00 $21,000.00
Recreation Center Sub Total = $65,890.00 $19,608.67 $46,281.33
South Parking
Paving 1 inch AC
Overlay4600 ft $1.25 / ft $5,750.00 $5,290.00 $460.00
Slurry Seal 4600 ft $0.32 / ft $1,472.00 $883.20 $588.80
PCC Curbs 300 ft $5.50 / ft $1,650.00 $440.00 $1,210.00
Fencing Chain Link
6 ft30 lf $30.00 / lf $900.00 $405.00 $495.00
Carports Metal 52 $750.00 ea $39,000.00 $23,400.00 $15,600.00
South Parking Sub Total = $48,772.00 $30,418.20 $18,353.80
Total of All Costs Above = $1,351,342.00 $560,343.14 $790,998.86
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
28/37
Lakeside Plaza HOA 2006 Funding Study Cash Flow Analysis
Calendar
Year
Annual
Payment
Annual
Interest
Total
Salvage
Annual
Expenses
Annual
Income Tax
Net Reserve
Funds% Funded
2006 $88,896 $3,591 $45,555 $1,077 $246,860 26.0 %2007 $177,792 $9,974 $23,670 $2,992 $407,963 41.3 %
2008 $177,792 $14,874 $92,605 $4,462 $503,562 48.0 %
2009 $165,609 $17,613 $468,980 $5,284 $212,519 20.3 %
2010 $165,609 $8,760 $30,211 $2,628 $354,049 52.1 %
2011 $114,995 $12,363 $70,062 $3,709 $407,636 54.0 %
2012 $114,995 $13,993 $26,818 $4,198 $505,608 63.8 %
2013 $111,980 $16,931 $2,412 $5,079 $627,028 71.7 %2014 $111,980 $20,624 $93,495 $6,187 $659,950 67.3 %
2015 $110,246 $21,602 $3,486 $6,480 $781,830 78.2 %
2016 $110,246 $25,309 $40,411 $7,593 $869,381 78.5 %
2017 $108,808 $27,952 $138,667 $8,386 $859,088 72.7 %
2018 $108,808 $27,639 $40,445 $8,292 $946,798 81.6 %
2019 $107,890 $30,294 $137,319 $9,088 $938,574 75.7 %
2020 $107,890 $30,044 $2,873 $9,013 $1,064,622 86.7 %
2021 $106,670 $33,860 $138,198 $10,158 $1,056,796 78.3 %
2022 $106,670 $33,622 $78,511 $10,087 $1,108,490 82.6 %
2023 $108,418 $35,219 $3,096 $10,566 $1,238,465 88.8 %
2024 $108,418 $39,172 $98,536 $11,752 $1,275,767 83.7 %
2025 $106,793 $40,284 $86,497 $12,085 $1,324,262 84.8 %
2026 $106,793 $41,759 $139,242 $12,528 $1,321,044 82.1 %
2027 $104,312 $41,627 $39,005 $12,488 $1,415,490 88.5 %
2028 $104,312 $44,500 $3,508 $13,350 $1,547,443 91.4 %
2029 $112 129 $48 622 $630 292 $14 586 $1 063 314 58 4 %
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
29/37
Lakeside Plaza HOA 2006 Reserve Payment Summary
Projected Payments by Month and by Calendar Year
Calendar
Year
Member
Monthly
Operations
Payment
Member
Monthly
Reserve
Payment
Member Total
Monthly
Payment
Member Total
Annual
Payment
Monthly
Reserve
Payment
Annual
Reserve
Payment
2006 NA $14,815.99 NA NA $14,816 $88,896
2007 NA $14,815.99 NA NA $14,816 $177,792
2008 NA $14,815.99 NA NA $14,816 $177,792
2009 NA $13,800.72 NA NA $13,801 $165,609
2010 NA $13,800.72 NA NA $13,801 $165,609
2011 NA $9,582.94 NA NA $9,583 $114,995
2012 NA $9,582.94 NA NA $9,583 $114,995
2013 NA $9,331.63 NA NA $9,332 $111,980
2014 NA $9,331.63 NA NA $9,332 $111,980
2015 NA $9,187.16 NA NA $9,187 $110,246
2016 NA $9,187.16 NA NA $9,187 $110,246
2017 NA $9,067.32 NA NA $9,067 $108,8082018 NA $9,067.32 NA NA $9,067 $108,808
2019 NA $8,990.84 NA NA $8,991 $107,890
2020 NA $8,990.84 NA NA $8,991 $107,890
2021 NA $8,889.15 NA NA $8,889 $106,670
2022 NA $8,889.15 NA NA $8,889 $106,670
2023 NA $9,034.80 NA NA $9,035 $108,418
2024 NA $9,034.80 NA NA $9,035 $108,418
2025 NA $8,899.42 NA NA $8,899 $106,793
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
30/37
Lakeside Plaza HOA 2006 Funding Stud y - Expenses b y Item and by Calendar Year
Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Reserve Category : Comm on Area
PCC Walks $2,076 $2,129 $2,183 $2,238 $2,294 $2,352 $2,412 $2,473 $2,536 $2,600 $2,665 $2,733 $2,802 $2,873 $2,945
Site lighting
Category Subtotal : $2,076 $2,129 $2,183 $2,238 $2,294 $2,352 $2,412 $2,473 $2,536 $2,600 $2,665 $2,733 $2,802 $2,873 $2,945
Reserve Category : East Parking
Paving 1 inch AC Overlay $30,819
Slurry Seal $6,146 $6,963 $7,890
Carports Metal $18,777
Category Subtotal : $6,146 $6,963 $38,709 $18,777
Reserve Category : Front Boiler Building
Roof Tile
Stucco $506 $650
Fence Wood $682
Paint Fence $98 $111 $126
Electric Panel
Lattice with Arbor $1,855
Boiler Room Equipment $90,476
Category Subtotal : $506 $90,476 $780 $1,966 $650 $126
Reserve Category : Front Building
Roof Tile $14,195
Roof Built Up New
Roof Built Up Old $220,015
Stucco Repairs $15,188
Fence Wood $37,285
Wrought Iron $23,397
Gutters $4,822
Electric Panel $75,651
Category Subtotal : $15,188 $220,015 $37,285 $19,017 $23,397 $75,651
Reserve Category : Front Building 1st Floor
Elevator Equipment $22,090
Carpet AQ $6,559
Intercom System
Paint Interior $6,766
Page 30 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC LLC
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
31/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Category Subtotal : $6,766 $6,559 $22,090
Reserve Category : Front Building 2nd Floor
Acoustic Ceiling $4,575
Lighting common $618
Paint Interior $6,766
Carpet AQ $5,620 $7,583
Category Subtotal : $5,620 $11,959 $7,583
Reserve Category : Front Building 3rd Floor
Lighting common $700
Paint Interior $6,766
Ventilation $4,946
Carpet AQ $5,620 $7,583
Category Subtotal : $5,620 $11,712 $7,583 $700
Reserve Category : North West Parking
Paving 1 inch AC Overlay $69,800
Slurry Seal $13,920 $15,771 $17,869
Fencing Chain Link 6 ft $1,261
Carports Metal
Category Subtotal : $13,920 $15,771 $87,669 $1,261
Reserve Category : Rear Boiler Building
Roof Tile $2,265
Stucco $506 $650
Lattice with Arbor $1,855
Fence Wood $773
Paint Fence $91 $103 $117 $133
Boiler Room Equipment $92,764
Electric Panel
Category Subtotal : $597 $92,764 $103 $2,628 $767 $2,265 $133
Reserve Category : Rear Building
Roof Tile $13,170
Roof Built Up New
Page 31 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC LLC
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
32/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Roof Built Up Old $117,647
Stucco Repairs $10,126 $12,998
Gutters $4,822
Fence Wood $19,099
Wrought Iron $31,381
Electric Panel
Category Subtotal : $10,126 $136,746 $13,170 $4,822 $12,998 $31,381
Reserve Category : Rear Building 1st Floor
Paint Interior $5,267
Elevator Equipment $36,817
Intercom System $3,091
Carpet AQ $5,329
Floor Tile Ceramic
Category Subtotal : $8,358 $5,329 $36,817
Reserve Category : Rear Building 2nd Floor
Acoustic Ceiling $3,215
Lighting common $700
Paint Interior $5,267
Carpet AQ $3,949 $5,329
Category Subtotal : $3,949 $8,482 $5,329 $700
Reserve Category : Rear Building 3rd Floor
Lighting common
Paint Interior $5,267
Ventilation $4,589
Carpet AQ $3,949 $5,329
Category Subtotal : $3,949 $4,589 $5,267 $5,329
Reserve Category : Rear Parking
Paving 1 inch AC Overlay $7,663
Slurry Seal $1,528 $1,731 $1,962
Fencing Chain Link 6 ft $1,261
Carports Metal
Category Subtotal : $1,528 $1,731 $9,625 $1,261
Page 32 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC, LLC.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
33/37
Prepared by Resource 1 BC, LLC.
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Reserve Category : Recreat ion Center
Roof Tile $4,328
Stucco Repairs
HVAC
Paving PCC sidewalks $618
Pool Deck PCC Concrete $12,620
Pool Equipment $5,457 $7,005
Pool Filter $951
Pool Resurface $9,429 $12,104
Wrought Iron
Bathroom Fixtures $1,236
Electric Panel
Hot Water Boiler $27,974
Category Subtotal : $14,886 $27,974 $12,620 $6,182 $951 $19,109
Reserve Category : South Parking
Paving 1 inch AC Overlay
Slurry Seal $1,606 $1,820 $2,062
PCC Curbs $2,040
Fencing Chain Link 6 ft
Carports Metal $57,435
Category Subtotal : $1,606 $3,860 $2,062 $57,435
Expense Totals : $45,555 $23,670 $92,605 $468,980 $30,211 $70,062 $26,818 $2,412 $93,495 $3,486 $40,411 $138,667 $40,445 $137,319 $2,873 $138,198
Page 33 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC, LLC.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
34/37
p y ,
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Reserve Category : Comm on Area
PCC Walks $3,020 $3,096 $3,175 $3,255 $3,337 $3,422 $3,508 $3,597 $3,688 $3,781 $3,877 $3,975 $4,075 $4,178 $4,284
Site lighting $4,762
Category Subtotal : $3,020 $3,096 $7,937 $3,255 $3,337 $3,422 $3,508 $3,597 $3,688 $3,781 $3,877 $3,975 $4,075 $4,178 $4,284
Reserve Category : East Parking
Paving 1 inch AC Overlay
Slurry Seal $8,939 $10,128 $11,475
Carports Metal
Category Subtotal : $8,939 $10,128 $11,475
Reserve Category : Front Boiler Building
Roof Tile $2,567
Stucco $834 $1,071
Fence Wood $1,124
Paint Fence $143 $162 $183
Electric Panel $2,381
Lattice with Arbor
Boiler Room Equipment $168,922
Category Subtotal : $5,091 $834 $1,286 $168,922 $183 $1,071
Reserve Category : Front Building
Roof Tile
Roof Built Up New $82,022
Roof Built Up Old $362,554
Stucco Repairs $32,129
Fence Wood $61,441
Wrought Iron
Gutters
Electric Panel
Category Subtotal : $82,022 $362,554 $61,441 $32,129
Reserve Category : Front Building 1st Floor
Elevator Equipment
Carpet AQ $8,851
Intercom System $4,171
Page 34 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC, LLC.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
35/37
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Paint Interior $8,262 $10,090
Category Subtotal : $8,262 $4,171 $18,941
Reserve Category : Front Building 2nd Floor
Acoustic Ceiling $7,539
Lighting common $1,019
Paint Interior $8,262 $10,090
Carpet AQ $10,233
Category Subtotal : $8,262 $20,323 $8,558
Reserve Category : Front Building 3rd Floor
Lighting common
Paint Interior $8,262 $10,090
Ventilation
Carpet AQ $10,233
Category Subtotal : $8,262 $20,323
Reserve Category : North West Parking
Paving 1 inch AC Overlay
Slurry Seal $20,245 $22,938 $25,989
Fencing Chain Link 6 ft
Carports Metal $155,966
Category Subtotal : $20,245 $22,938 $155,966 $25,989
Reserve Category : Rear Boiler Building
Roof Tile
Stucco $834 $1,071
Lattice with Arbor
Fence Wood $1,273
Paint Fence $150 $170 $193
Boiler Room Equipment $173,194
Electric Panel $2,381
Category Subtotal : $2,381 $984 $170 $174,467 $1,264
Reserve Category : Rear Building
Roof Tile
Page 35 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC, LLC.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
36/37
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Roof Built Up New $77,088
Roof Built Up Old $193,866
Stucco Repairs $16,686 $21,419
Gutters
Fence Wood $31,472
Wrought Iron
Electric Panel $66,666
Category Subtotal : $66,666 $93,774 $225,338 $21,419
Reserve Category : Rear Building 1st Floor
Paint Interior $6,432 $7,855
Elevator Equipment
Intercom System $5,094
Carpet AQ $7,191
Floor Tile Ceramic $13,616
Category Subtotal : $6,432 $13,616 $15,046 $5,094
Reserve Category : Rear Building 2nd Floor
Acoustic Ceiling $5,298
Lighting common
Paint Interior $6,432 $7,855
Carpet AQ $7,191
Category Subtotal : $6,432 $15,046 $5,298
Reserve Category : Rear Building 3rd Floor
Lighting common $794
Paint Interior $6,432 $7,855
Ventilation
Carpet AQ $7,191
Category Subtotal : $6,432 $794 $15,046
Reserve Category : Rear Parking
Paving 1 inch AC Overlay
Slurry Seal $2,223 $2,518 $2,853
Fencing Chain Link 6 ft
Carports Metal $144,623
Page 36 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com
Prepared by Resource 1 BC, LLC.
7/27/2019 FBI ALERT: Reserve Study - No "Embezzlement Assessment" Required of Lakeside Plaza Condominium Association
37/37
Lakeside Plaza HOA 2006 Funding Stud y Expenses by Calendar Year - Continued
Item Descr ipt ion 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
Category Subtotal : $2,223 $2,518 $144,623 $2,853
Reserve Category : Recreat ion Center
Roof Tile
Stucco Repairs $1,019
HVAC $4,171
Paving PCC sidewalks
Pool Deck PCC Concrete $18,354
Pool Equipment $8,992
Pool Filter $1,221 $1,567
Pool Resurface $15,538
Wrought Iron $9,524
Bathroom Fixtures
Electric Panel $2,381
Hot Water Boiler $52,227
Category Subtotal : $11,905 $1,221 $22,525 $24,530 $1,019 $53,794
Reserve Category : South Parking
Paving 1 inch AC Overlay $10,341
Slurry Seal $2,336 $2,647 $2,999
PCC Curbs
Fencing Chain Link 6 ft $1,429
Carports Metal
Category Subtotal : $3,765 $12,988 $2,999
Expense To tals : $78,511 $3,096 $98,536 $86,497 $139,242 $39,005 $3,508 $630,292 $108,412 $365,980 $44,193 $172,896 $201,693 $57,972 $60,167
Page 37 of 37 PagesTuesday, May 16, 2006
AFI Pro V3.5221
Copyright IME 2001-2005
www.afiprofessional.com