C-2120.3 SPECIFICATIONS FOR FARMER SCHOOL OF BUSINESS Southeast Breezeway Roof Replacement PREPARED FOR: MIAMI UNIVERSITY OXFORD, OHIO PREPARED BY: ARCHITECTURE ENGINEERING INTERIOR DESIGN PLANNING 300 WEST FOURTH STREET CINCINNATI, OHIO 45202PHONE: (513) 721-0600 FAX: (513) 721-0611 E-MAIL: [email protected] February - 2017

FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

C-2120.3

SPECIFICATIONS

FOR

FARMER SCHOOL OF BUSINESS Southeast Breezeway Roof Replacement

PREPARED FOR:

MIAMI UNIVERSITY OXFORD, OHIO

PREPARED BY:

ARCHITECTURE ENGINEERING INTERIOR DESIGN PLANNING 300 WEST FOURTH STREET ● CINCINNATI, OHIO 45202PHONE: (513) 721-0600 ● FAX: (513) 721-0611

E-MAIL: [email protected]

February - 2017

Page 2: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TOC C-2120.3 – Miami University – Farmer School of Business 000003 - 1 Southeast Breezeway Roof Replacement

SECTION 000003 - TABLE OF CONTENTS

FARMER SCHOOL OF BUSINESS

SOUTHEAST BREEZEWAY ROOF REPLACEMENT

AT

MIAMI UNIVERSITY

Prepared by: SFA Architects, Inc.

300 West Fourth Street Cincinnati, Ohio 45202

____________________________________________________________________________ Section 000003 Table of Contents Section 000004 List of Drawings SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS Section 011000 Summary Section 012200 Unit Prices Section 013200 Construction Progress Documentation Section 013233 Photographic Documentation Section 013300 Submittal Procedures Section 014000 Quality Requirements Section 014200 References Section 015000 Temporary Facilities and Controls Section 017300 Execution Section 017700 Closeout Procedures Section 017839 Project Record Documents DIVISION 6 - WOOD, PLASTICS AND COMPOSITES Section 061000 Rough Carpentry Section 061600 Sheathing DIVISION 7 - THERMAL/MOISTURE PROTECTION Section 070150.19 Preparation for Re-roofing Section 074113.16 Standing-Seam Metal Roof Panels Section 076200 Sheet Metal Flashing and Trim Section 079200 Joint Sealants DIVISION 9 – FINISHES Section 092216 Non-Structural Metal Framing Section 092900 Gypsum Board Section 099113 Exterior Painting DIVISION 32 - EXTERIOR IMPROVEMENTS Section 329113 Planting Soils Section 329200

Turf and Grasses

Appendix A: Miami University Closeout Forms END OF SECTION 000003

Page 3: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

LIST OF DRAWINGS C-2120.3 – Miami University – Farmer School of Business 000004-1 Southeast Breezeway Roof Replacement

SECTION 000004 – LIST OF DRAWINGS NUMBER DESCRIPTION GENERAL G000 Cover Sheet, Index, Maps G001 Aerial Photos & Utility Site Plan ARCHITECTURAL A001 Photos and Photographic Key Plan A100 Roof Plan A160 Details A161 Details END OF SECTION 000004

Page 4: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information. 2. Work covered by Contract Documents. 3. Access to site. 4. Coordination with occupants. 5. Work restrictions. 6. Specification and drawing conventions.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: Farmer School of Business Southeast Breezeway Roof Replacement

1. Project Location: Farmer School of Business Miami University Oxford, Ohio 45056

B. Owner: Miami University

Owner's Representative: Glen Moss Planning & Construction Miami University Cole Services Building, 127 Oxford, Ohio 45056 [email protected] (513) 529-7013

Page 5: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-2

C. Architect: Dan Montgomery SFA Architects, Inc. 300 West Fourth Street Cincinnati, Ohio 45202 [email protected] (513) 721-0600

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

Remove existing masonry parapet walls to existing roof line and reinstall existing stone coping.

B. Work to include, but will not be limited to the following:

1. Demolition: The roofing contractor is to remove the existing copper roof and flashings down to the substrate. The existing copper roof is to be removed down to the underlayment. All loose underlayment is to be removed. New self-adhering ice and water shield is to be installed in a shingle fashion with all down water laps.

The existing railing and posts are to be removed, protected, and saved for reinstallation. All broken and damaged components of the railing system are to be replaced. The fiberglass square railing posts are covering steel frame that is fastened to the metal stud framing of the soffit metal framing. The metal framing for the square posts shall be removed by unfastening the framing. The existing fiberglass cover on the gutter edge on which the square posts are located is to be removed and turned over to the University. The posts metal stud framing is wrapped with plywood and exterior gypsum board. All exterior gypsum board is to be removed. Gypsum board is also located on the gutter edge. The step flashing at both the east and west sides of the roof is to be removed and replaced with new 16 oz. copper step flashing.

The existing exterior ceilings, trim, etc. are to be removed in order to gain access to the existing gutter and downspouts. The existing downspout piping is to be removed. The existing downspout piping located in the columns is to be abandoned in place. Removal of the ceilings will need to be performed carefully.

2. Replacement: The existing plywood and gypsum board along the north edge of the north gutter and the existing plywood along the south edge of the south gutter is to be replaced with all exterior fire rated plywood.

New ice and water shield is to be applied over the entire roof and extend into the built-in gutter and over the gutter edge and over the edge of the fiberglass cornice. Red rosin paper slip sheets are to be placed under all copper work over the new ice and water shield. Contractor to provide 3 to 4 lbs. per 100 s.f. of red rosin paper. The contractor is to provide a new standing seam double-lock copper roof. Spacing of the standing seam panels is to match existing standing seam copper roof on the West breezeway.

Page 6: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-3

Provide a minimum of three cleats evenly spaced per rib. Contractor to use all copper nails. Cap nails are NOT to be used to hold down the red rosin paper. The roofing contractor is to provide a standing seam expansion joint that will bisect the roof at right angles to the roof’s long axis and is continuous from the north side of the roof to the south side extending through both gutters.

The framing for the railing square posts is to be removed and saved for reinstallation. Covering for the framing is both exterior gypsum board and plywood, both are to be removed. The roof contractor is to provide new plywood around each square post, gutter and gutter edge. The plywood shall be FRT fire retardant treated plywood.

The new cover gutter liner is to extend over the gutter edge and up the roof slope approximately 12”. The new copper roof is to be cleated to the gutter liner. After the new plywood is installed, the ice and water shield is to be applied. The new copper gutter will be fully cleated to allow movement.

The ceiling is to be removed and reinstalled at both the east and west ends of the roof in order to gain access to the existing roof drain and piping. The roofing contractor is to add four new copper scupper boxes and downspouts. Piping from the roof drains is to be concealed above the ceiling of the breezeway. Piping above the breezeway is to be Schedule 40 copper with all necessary copper fittings and hangers for a complete installation. All pipe connections are to be fully brazed. Extend copper pipes through the existing cornice and into the new copper scupper boxes. All holes are to be cut with hole saws. The leader boxes are to connect to corrugated downspouts secured by rack and key attachment systems.

The roof contractor is to reinstall all railings, etc. Only copper or bronze rails are to be used for fastening copper. Stainless steel rails are to be used everywhere else.

The University replaced the existing West breezeway. The contractor shall use the West breezeway roof, built-in gutter, downspouts, etc. as a guide. The new East breezeway is to match the materials and configuration of the West breezeway.

C. Type of Contract:

1. Project will be constructed under a single prime contract.

1.5 WORK BY OWNER

A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

Page 7: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-4

1.6 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited by Owner's right to perform work or to retain other contractors on portions of Project.

B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

C. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to Contract limits. 2. Driveways, Walkways and Entrances: Keep driveways, parking garage, loading

areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair all damage caused by construction operations.

1.7 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or

Page 8: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-5

used facilities without written permission from Owner and authorities having jurisdiction.

2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.

C. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.

1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work.

2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Owner occupancy.

3. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work.

4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work.

1.8 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: See Supplemental Conditions.

1. Weekend Hours: See Supplemental Conditions.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Owner not less than two days in advance of proposed utility interruptions. 2. Obtain Owner's written permission before proceeding with utility interruptions.

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than two days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

E. Nonsmoking Building and Campus: Smoking is not permitted within the building or on the campus of Miami University.

Page 9: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUMMARY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

011000-6

F. Controlled Substances: Use of tobacco products and other controlled substances within the existing building is not permitted.

1.9 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

3. Provide means to supply and install.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

Page 10: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

UNIT PRICES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

012200-1

SECTION 012200 -

PART 1 - GENERAL

UNIT PRICES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 012600 "Contract Modification Procedures" for procedures for submitting and handling Change Orders.

2. Section 014000 "Quality Requirements" for general testing and inspecting requirements.

1.3 DEFINITIONS

A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

Page 11: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

UNIT PRICES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

012200-1

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Unit Price No. 1 - Replacement of existing deteriorated roofing wood nailers.

Price per linear foot to remove the existing wood roof nailers and all associated fasteners and to install new roof wood nailers with pressure treated 2" x 6" wood nailers.

ADDITION: $__________________________ Per Linear Foot

B. Unit Price No. 2 - Replacement of existing deteriorated ¾ “ plywood roof deck consisting of ¾” exterior plywood..

Price per square foot to remove existing deteriorated wood roof decking and reinstall new wood roof decking.

ADDITION: $__________________________ Per Square Foot

END OF SECTION 012200

Page 12: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 1

SECTION 013200 -

PART 1 - GENERAL

CONSTRUCTION PROGRESS DOCUMENTATION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Startup construction schedule. 2. Contractor's construction schedule. 3. Construction schedule updating reports.

B. Related Requirements:

1. Section 013300 "Submittal Procedures" for submitting schedules and reports. 2. Section 014000 "Quality Requirements" for submitting a schedule of tests and

inspections.

1.3 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network. 3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the schedule of values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum unless otherwise approved by Architect.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

Page 13: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 2

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Event: The starting or ending point of an activity.

F. Float: The measure of leeway in starting and completing an activity.

1. Float time belongs to Owner. 2. Free float is the amount of time an activity can be delayed without adversely

affecting the early start of the successor activity. 3. Total float is the measure of leeway in starting or completing an activity without

adversely affecting the planned Project completion date.

G. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.

1.4 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals in the following format:

1. Working electronic copy of schedule file, where indicated. 2. PDF electronic file.

B. Startup construction schedule.

1. Approval of cost-loaded, startup construction schedule will not constitute approval of schedule of values for cost-loaded activities.

C. Startup Network Diagram: Of size required to display entire network for entire construction period. Show logic ties for activities.

D. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

E. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

Page 14: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 3

F. Construction Schedule Updating Reports: Submit with Applications for Payment.

1.5 QUALITY ASSURANCE

A. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting, with capability of producing CPM reports and diagrams within 24 hours of Architect's request.

1.6 COORDINATION

A. Coordinate Contractor's construction schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of final completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each story or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Architect.

2. Submittal Review Time: Include review and resubmittal times indicated in Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule with submittal schedule.

3. Startup and Testing Time: Include no fewer than 10 days for startup and testing. 4. Substantial Completion: Indicate completion in advance of date established for

Substantial Completion, and allow time for Architect's administrative procedures necessary for certification of Substantial Completion.

5. Punch List and Final Completion: Include not more than 10 days for completion of punch list items and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

Page 15: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 4

1. Phasing: Arrange list of activities on schedule by phase. 2. Work under More Than One Contract: Include a separate activity for each

contract. 3. Work by Owner: Include a separate activity for each portion of the Work

performed by Owner. 4. Products Ordered in Advance: Include a separate activity for each product.

Include delivery date indicated in Section 011000 "Summary." Delivery dates indicated stipulate the earliest possible delivery date.

5. Owner-Furnished Products: Include a separate activity for each product. Include delivery date indicated in Section 011000 "Summary." Delivery dates indicated stipulate the earliest possible delivery date.

6. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction. b. Limitations of continued occupancies. c. Uninterruptible services. d. Partial occupancy before Substantial Completion. e. Use of premises restrictions. f. Provisions for future construction. g. Seasonal variations. h. Environmental control.

7. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:

a. Subcontract awards. b. Submittals. c. Purchases. d. Mockups. e. Fabrication. f. Sample testing. g. Deliveries. h. Installation. i. Tests and inspections. j. Adjusting. k. Curing. l. Building flush-out. m. Startup and placement into final use and operation.

8. Construction Areas: Identify each major area of construction for each major portion of the Work. Indicate where each construction activity within a major area must be sequenced or integrated with other construction activities to provide for the following:

a. Structural completion. b. Temporary enclosure and space conditioning. c. Permanent space enclosure. d. Completion of mechanical installation. e. Completion of electrical installation. f. Substantial Completion.

Page 16: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 5

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion, and the following interim milestones:

1. Submission of Submittal Schedule with Lead times. 2. Ready to Punchlist. 3. Turn-over to Owner.

E. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues. 2. Unanswered Requests for Information. 3. Rejected or unreturned submittals. 4. Notations on returned submittals. 5. Pending modifications affecting the Work and Contract Time.

F. Recovery Schedule: When periodic update indicates the Work is 5 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, and equipment required to achieve compliance, and date by which recovery will be accomplished.

G. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules.

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE)

A. General: Prepare network diagrams using AON (activity-on-node) format.

B. Startup Network Diagram: Submit diagram within 14 days of date established for the Notice to Proceed. Outline significant construction activities for the first 90 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.

C. CPM Schedule: Prepare Contractor's construction schedule using a cost- and resource-loaded, time-scaled CPM network analysis diagram for the Work.

1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use no later than 15 days after date established for the Notice to Proceed.

a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Architect's approval of the schedule.

2. Conduct educational workshops to train and inform key Project personnel, including subcontractors' personnel, in proper methods of providing data and using CPM schedule information.

Page 17: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 6

3. Establish procedures for monitoring and updating CPM schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

4. Use "one workday" as the unit of time for individual activities. Indicate nonworking days and holidays incorporated into the schedule in order to coordinate with the Contract Time.

D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the startup network diagram, prepare a skeleton network to identify probable critical paths.

1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in relation to other activities. Include estimated time frames for the following activities:

a. Preparation and processing of submittals. b. Mobilization and demobilization. c. Purchase of materials. d. Delivery. e. Fabrication. f. Utility interruptions. g. Installation. h. Work by Owner that may affect or be affected by Contractor's activities. i. Testing. j. Punch list and final completion. k. Activities occurring following final completion.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float near the edges.

a. Subnetworks on separate sheets are permissible for activities clearly off the critical path.

5. Cost- and Resource-Loading of CPM Schedule: Assign cost to construction activities on the CPM schedule. Do not assign costs to submittal activities. Obtain Architect's approval prior to assigning costs to fabrication and delivery activities. Assign costs under main subcontracts for testing and commissioning activities, operation and maintenance manuals, punch list activities, Project record documents,and demonstration and training (if applicable), in the amount of 5 percent of the Contract Sum.

a. Each activity cost shall reflect an appropriate value subject to approval by Architect.

b. Total cost assigned to activities shall equal the total Contract Sum.

Page 18: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 7

E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using a network fragment to demonstrate the effect of the proposed change on the overall project schedule.

F. Initial Issue of Schedule: Prepare initial network diagram from a sorted activity list indicating straight "early start-total float." Identify critical activities. Prepare tabulated reports showing the following:

1. Contractor or subcontractor and the Work or activity. 2. Description of activity. 3. Main events of activity. 4. Immediate preceding and succeeding activities. 5. Early and late start dates. 6. Early and late finish dates. 7. Activity duration in workdays. 8. Total float or slack time. 9. Average size of workforce. 10. Dollar value of activity (coordinated with the schedule of values).

G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following:

1. Identification of activities that have changed. 2. Changes in early and late start dates. 3. Changes in early and late finish dates. 4. Changes in activity durations in workdays. 5. Changes in the critical path. 6. Changes in total float or slack time. 7. Changes in the Contract Time.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Scheduling Consultant: Engage a consultant to provide planning, evaluation, and reporting using CPM scheduling.

1. In-House Option: Owner may waive the requirement to retain a consultant if Contractor employs skilled personnel with experience in CPM scheduling and reporting techniques. Submit qualifications.

2. Meetings: Scheduling consultant shall attend all meetings related to Project progress, alleged delays, and time impact.

B. Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule 3 days before each regularly scheduled progress meeting.

Page 19: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CONSTRUCTION PROGRESS C-2120.3 – Miami University – Farmer School of Business DOCUMENTATION Southeast Breezeway Roof Replacement

013200 - 8

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

C. Distribution: Distribute copies of approved schedule to Architect Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and

post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 013200

Page 20: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PHOTOGRAPHIC C-2120.3 – Miami University – Farmer School of Business 013233-1 DOCUMENTATION Southeast Breezeway Roof Replacement

SECTION 013233 -

PART 1 - GENERAL

PHOTOGRAPHIC DOCUMENTATION

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs. This submittal must be made prior to the start of any work.

B. Related Requirements:

1. Section 013300 "Submittal Procedures" for submitting photographic documentation.

2. Section 017700 "Closeout Procedures" for submitting photographic documentation as project record documents at Project closeout.

1.3 INFORMATIONAL SUBMITTALS

A. Digital Photographs: Submit image files within three days of taking photographs and before starting work.

1. Digital Camera: Minimum sensor resolution of 8 megapixels. 2. Format: Minimum 3200 by 2400 pixels, in unaltered original files, with same

aspect ratio as the sensor, uncropped, date and time stamped, in folder named by date of photograph, accompanied by key plan file.

3. Identification: Provide the following information with each image description in file metadata tag:

a. Name of Project. b. Name and contact information for photographer. c. Name of Architect. d. Name of Contractor. e. Date photograph was taken. f. Description of vantage point, indicating location, direction (by compass

point), and elevation or story of construction. g. Unique sequential identifier keyed to accompanying key plan.

Page 21: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PHOTOGRAPHIC C-2120.3 – Miami University – Farmer School of Business 013233-2 DOCUMENTATION Southeast Breezeway Roof Replacement

B. Construction Photographs: Submit six prints of each photographic view within seven days of taking photographs.

1. Format: E-mail digital images to Owner and Architect. 2. Identification: On each print, provide the following information:

a. Name of Project. b. Name and contact information for photographer. c. Name of Architect. d. Name of Contractor. e. Date photograph was taken if not date stamped by camera. f. Description of vantage point, indicating location, direction (by compass

point), and elevation or story of construction. g. Unique sequential identifier keyed to accompanying key plan.

1.4 QUALITY ASSURANCE

A. Photographer Qualifications: An individual who has been regularly engaged as a photographer of construction projects for not less than three years.

1.5 USAGE RIGHTS

A. Obtain and transfer copyright usage rights from photographer to Owner for unlimited reproduction of photographic documentation.

PART 2 - PRODUCTS

2.1 PHOTOGRAPHIC MEDIA

A. Digital Images: Provide images in JPG format, produced by a digital camera with minimum sensor size of 8 megapixels, and at an image resolution of not less than 3200 by 2400 pixels.

PART 3 - EXECUTION

3.1 CONSTRUCTION PHOTOGRAPHS

A. Photographer: Engage a qualified photographer to take construction photographs.

B. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

Page 22: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PHOTOGRAPHIC C-2120.3 – Miami University – Farmer School of Business 013233-3 DOCUMENTATION Southeast Breezeway Roof Replacement

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

C. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

1. Date and Time: Include date and time in file name for each image. 2. Field Office Images: Maintain one set of images accessible in the field office at

Project site, available at all times for reference. Identify images in the same manner as those submitted to Architect.

D. Preconstruction Photographs: Before commencement of demolition, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Architect.

E. Periodic Construction Photographs: Take 20 photographs weekly, with timing each month adjusted to coincide with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.

F. Architect-Directed Construction Photographs: From time to time, Architect will instruct photographer about number and frequency of photographs and general directions on vantage points. Select actual vantage points and take photographs to show the status of construction and progress since last photographs were taken.

END OF SECTION 013233

Page 23: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 1 PROCEDURES Southeast Breezeway Roof Replacement

SECTION 013300 -

PART 1 - GENERAL

SUBMITTAL PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Sections:

1. Section 017839 "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

2. Section 061000 “Rough Carpentry”. 3. Section 061600 “Sheathing”. 4. Section 075323 “EPDM Roofing”. 5. Section 076200 “Sheet Metal Flashing and Trim”. 6. Section 077100 “Roof Specialties”. 7. Section 077200 “Roof Accessories”. 8. Section 079200 “Joint Sealants”.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action. Action submittals are those submittals indicated in individual Specification Sections as action submittals.

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as informational submittals.

C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access files.

D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.

Page 24: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 2 PROCEDURES Southeast Breezeway Roof Replacement

1.4 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Architect and additional time for handling and reviewing submittals required by those corrections.

1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.

2. Initial Submittal: Submit concurrently with start-up construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule.

a. Submit revised submittal schedule to reflect changes in current status and timing for submittals.

4. Format: Arrange the following information in a tabular format:

a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal category: Action, informational. d. Name of subcontractor. e. Description of the Work covered. f. Scheduled date for Architect's final release or approval. g. Scheduled dates for purchasing. h. Scheduled dates for installation. i. Activity or event number.

1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Architect's Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will be provided by Architect for Contractor's use in preparing submittals.

1. Architect will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings and Project record drawings.

a. Architect makes no representations as to the accuracy or completeness of digital data drawing files as they relate to the Contract Drawings.

b. Digital Drawing Software Program: The Contract Drawings are available in Autocad 2007.

c. Contractor shall execute a data licensing agreement in the form of an Agreement form acceptable to the Owner and Architect.

Page 25: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 3 PROCEDURES Southeast Breezeway Roof Replacement

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal. 4. Sequential Review: Where sequential review of submittals by Architect's

consultants, Owner, or other parties is indicated, allow 21 days for initial review of each submittal.

5. Concurrent Consultant Review: Where the Contract Documents indicate that submittals may be transmitted simultaneously to Architect and to Architect's consultants, allow 15 days for review of each submittal. Submittal will be returned to Architect before being returned to Contractor.

D. Identification and Information: Place a permanent label or title block on each paper copy submittal item for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 6 by 8 inches

3. The Contractor shall stamp the submittal approved and have it signed by the person that reviewed the submission. Submission not stamped with a stamp identifying the Contractor’s company and clearly marked approved will be returned to the Contractor without being reviewed.

on label or beside title block to record Contractor's review and approval markings and action taken by Architect.

4. Include the following information for processing and recording action taken:

a. Project name. b. Date. c. Name of Architect.

Page 26: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 4 PROCEDURES Southeast Breezeway Roof Replacement

d. Name of Construction Manager. e. Name of Contractor. f. Name of subcontractor. g. Name of supplier. h. Name of manufacturer. i. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 061000.01.A).

j. Number and title of appropriate Specification Section. k. Drawing number and detail references, as appropriate. l. Location(s) where product is to be installed, as appropriate. m. Other necessary identification.

E. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-061000.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Architect.

4. Include the following information on an inserted cover sheet:

a. Project name. b. Date. c. Name and address of Architect. d. Name of Contractor. e. Name of firm or entity that prepared submittal. f. Name of subcontractor. g. Name of supplier. h. Name of manufacturer. i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Location(s) where product is to be installed, as appropriate. l. Related physical samples submitted directly. m. Other necessary identification.

5. Include the following information as keywords in the electronic file metadata:

a. Project name.

Page 27: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 5 PROCEDURES Southeast Breezeway Roof Replacement

b. Number and title of appropriate Specification Section. c. Manufacturer name. d. Product name.

F. Options: Identify options requiring selection by the Architect.

G. Deviations: Identify deviations from the Contract Documents on submittals.

H. Additional Paper Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect.

I. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will return submittals, without review, received from sources other than Contractor.

1. Transmittal Form: Use AIA Document G810. 2. Transmittal Form: Provide locations on form for the following information:

a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Specification Section number and title. i. Indication of full or partial submittal. j. Drawing number and detail references, as appropriate. k. Transmittal number. l. Submittal and transmittal distribution record. m. Remarks. n. Signature of transmitter.

3. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

J. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent

of revision. 3. Resubmit submittals until they are marked with approval notation from Architect's

action stamp.

Page 28: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 6 PROCEDURES Southeast Breezeway Roof Replacement

K. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

L. Use for Construction: Use only final submittals that are marked with approval notation from Architect's action stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Send electronic submittals as PDF electronic files directly to the Architect and copy Project Manager with Miami University.

a. Architect will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

2. Submit electronic submittals via email as PDF electronic files.

a. Architect will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

3. Action Submittals: Submit three paper copies of each submittal, unless otherwise indicated. Architect will return two copies.

4. Informational Submittals: Submit two paper copies of each submittal, unless otherwise indicated. Architect will not return copies.

5. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 01 Section "Closeout Procedures."

6. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

a. Provide a digital signature with digital certificate on electronically-submitted certificates and certifications where indicated.

b. Provide a notarized statement on original paper copy certificates and certifications where indicated.

7. Test and Inspection Reports Submittals: Comply with requirements specified in Division 01 Section "Quality Requirements."

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

Page 29: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 7 PROCEDURES Southeast Breezeway Roof Replacement

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts. b. Manufacturer's product specifications. c. Standard color charts. d. Statement of compliance with specified referenced standards. e. Testing by recognized testing agency. f. Application of testing agency labels and seals. g. Notation of coordination requirements. h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams showing factory-installed wiring. b. Printed performance curves. c. Operational range diagrams. d. Clearances required to other construction, if not indicated on

accompanying Shop Drawings.

5. Submit Product Data before or concurrent with Samples. 6. Submit Product Data in the following format:

a. PDF electronic file. b. Three paper copies of Product Data, unless otherwise indicated. Architect

will return two copies.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products. b. Schedules. c. Compliance with specified standards. d. Notation of coordination requirements. e. Notation of dimensions established by field measurement. f. Relationship and attachment to adjoining construction clearly indicated. g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches

3. Submit Shop Drawings in the following format:

Retain subparagraph below unless default submittal format specified elsewhere in this article applies.

Page 30: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 8 PROCEDURES Southeast Breezeway Roof Replacement

a. PDF electronic file. b. Two opaque (bond) copies of each submittal. Architect will return one

copy. c. Three opaque copies of each submittal. Architect will retain two copies;

remainder will be returned.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample. b. Product name and name of manufacturer. c. Sample source. d. Number and title of applicable Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit one full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three sets of Samples. Architect will retain two Sample sets; remainder will be returned.

Page 31: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 9 PROCEDURES Southeast Breezeway Roof Replacement

1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.

E. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form:

1. Type of product. Include unique identifier for each product. 2. Manufacturer and product name, and model number if applicable. 3. Number and name of room or space. 4. Location within room or space. 5. Submit product schedule in the following format:

a. PDF electronic file. b. Three paper copies of product schedule or list, unless otherwise indicated.

Architect will return two copies.

F. Contractor's Construction Schedule: Comply with requirements specified in Division 01 Section "Construction Progress Documentation."

G. Application for Payment: Follow University’s procedures.

H. Schedule of Values: Follow University’s procedures.

I. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, and telephone number of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract. 4. Submit subcontract list in the following format:

a. PDF electronic file. b. Number of Copies: Three paper copies of subcontractor list, unless

otherwise indicated. Architect will return two copies.

J. Coordination Drawings: Comply with requirements specified in Division 01 Section "Project Management and Coordination."

K. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

Page 32: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 10 PROCEDURES Southeast Breezeway Roof Replacement

L. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on American Welding Society (AWS) forms. Include names of firms and personnel certified.

M. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

N. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

O. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

P. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

Q. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

R. Product Test Reports: Submit written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

S. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information:

1. Name of evaluation organization. 2. Date of evaluation. 3. Time period when report is in effect. 4. Product and manufacturers' names. 5. Description of product. 6. Test procedures and results. 7. Limitations of use.

T. Schedule of Tests and Inspections: Comply with requirements specified in Division 01 Section "Quality Requirements."

U. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

V. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests

Page 33: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 11 PROCEDURES Southeast Breezeway Roof Replacement

performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

W. Field Test Reports: Submit reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

X. Maintenance Data: Comply with requirements specified in Division 01 Section "Operation and Maintenance Data."

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Project Closeout and Maintenance/Material Submittals: Refer to requirements in Division 01 Section "Closeout Procedures."

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Company name, project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. Submissions/submittals must be marked approved by the Contractor or the submittals will be returned without being reviewed.

3.2 ARCHITECT'S ACTION

A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action.

C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

D. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Architect.

E. Incomplete submittals are not acceptable, will be considered nonresponsive, and will be returned without review.

Page 34: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SUBMITTAL C-2120.3 – Miami University – Farmer School of Business 013300 - 12 PROCEDURES Southeast Breezeway Roof Replacement

F. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

END OF SECTION 013300

Page 35: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 1

SECTION 014000 -

PART 1 - GENERAL

QUALITY REQUIREMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-assurance and -control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect.

C. Mockups: Provide in place mortar and brick samples, roof edge metal samples (10’-0” length) prior to fabrication for Owner’s approval.

Page 36: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 2

D. Preconstruction Testing: Tests and inspections performed specifically for the Project before products and materials are incorporated into the Work to verify performance or compliance with specified criteria.

E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.

G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade or trades.

J. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Architect for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.

Page 37: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 3

1.5 ACTION SUBMITTALS

A. Shop Drawings: For mockups, provide plans, sections, and elevations, indicating materials and size of mockup construction.

1. Indicate manufacturer and model number of individual components.

1.6 INFORMATIONAL SUBMITTALS

A. Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities.

B. Contractor's Quality-Control Manager Qualifications: For supervisory personnel.

C. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, submit copy of written statement of responsibility sent to authorities having jurisdiction before starting work on the following systems.

D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority. Testing agency will only be engaged if the Architect or Owner wants a portion of the installed work tested for compliance to the Contract Documents.

1.7 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue. 2. Project title and number. 3. Name, address, and telephone number of testing agency. 4. Dates and locations of samples and tests or inspections. 5. Names of individuals making tests and inspections. 6. Description of the Work and test and inspection method. 7. Identification of product and Specification Section. 8. Complete test or inspection data. 9. Test and inspection results and an interpretation of test results. 10. Record of temperature and weather conditions at time of sample taking and

testing and inspecting. 11. Comments or professional opinion on whether tested or inspected Work complies

with the Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting and reinspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:

Page 38: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 4

1. Name, address, and telephone number of technical representative making report. 2. Statement on condition of substrates and their acceptability for installation of

product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with

requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed

performance complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections.

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, and telephone number of factory-authorized service representative making report.

2. Statement that equipment complies with requirements. 3. Results of operational and other tests and a statement of whether observed

performance complies with requirements. 4. Statement whether conditions, products, and installation will affect warranty. 5. Other required items indicated in individual Specification Sections.

D. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.8 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance. The Roofing Company is to have been in business for at least five years and have been certified with the roof manufacturer for a minimum of five years.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing

Page 39: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 5

engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this Project in material, design, and extent.

F. Specialists: Certain Specification Sections require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.

1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.

G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 329; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. 2. NVLAP: A testing agency accredited according to NIST's National Voluntary

Laboratory Accreditation Program.

H. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by Architect.

2. Notify Architect seven days in advance of dates and times when mockups will be constructed.

3. Employ supervisory personnel who will oversee mockup construction. Employ workers that will be employed during the construction at the Project.

4. Demonstrate the proposed range of aesthetic effects and workmanship. 5. Obtain Architect's approval of mockups before starting work, fabrication, or

construction.

a. Allow three days for initial review and each re-review of each mockup.

6. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

7. Demolish and remove mockups when directed, unless otherwise indicated.

Page 40: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 6

1.9 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order.

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.

1. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

2. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

3. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

4. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

5. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

6. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. The qualified person shall be a registered roof observer with RCI. Report results in writing as specified in Division 01 Section "Submittal Procedures."

D. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.

E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

Page 41: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 7

F. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform any duties of Contractor.

G. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing

and inspecting. Assist agency in obtaining samples. 4. Facilities for storage and field curing of test samples. 5. Delivery of samples to testing agencies. 6. Preliminary design mix proposed for use for material mixes that require control by

testing agency. 7. Security and protection for samples and for testing and inspecting equipment at

Project site.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

I. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-control services required by the Contract Documents as a component of the Contractor's quality-control plan. Coordinate and submit concurrently with Contractor's construction schedule. Update as the Work progresses. .

1. Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.

Page 42: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

QUALITY REQUIREMENTS

C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014000 - 8

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted. 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Architect. 4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to test and inspection log for Architect's reference during normal working hours.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Division 01 Section "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 014000

Page 43: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

REFERENCES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014200 - 1

SECTION 014200 -

PART 1 - GENERAL

REFERENCES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. General: Basic Contract definitions are included in the Conditions of the Contract.

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract.

C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed."

D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

H. "Provide": Furnish and install, complete and ready for the intended use.

I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and

Page 44: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

REFERENCES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014200 - 2

effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.4 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale's "Encyclopedia of Associations: National Organizations of the U.S." or in Columbia Books' "National Trade & Professional Associations of the United States."

B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

AAMA American Architectural Manufacturers Association (847) 303-5664 www.aamanet.org ACI American Concrete Institute (248) 848-3700 (Formerly: ACI International) www.concrete.org AIA American Institute of Architects (The) (800) 242-3837 www.aia.org (202) 626-7300 ANSI American National Standards Institute (202) 293-8020 www.ansi.org ARMA Asphalt Roofing Manufacturers Association (202) 207-0917 www.asphaltroofing.org www.asse-plumbing.org ASTM ASTM International (610) 832-9500

Page 45: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

REFERENCES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014200 - 3

(American Society for Testing and Materials International)

www.astm.org EJMA Expansion Joint Manufacturers Association, Inc. (914) 332-0040 www.ejma.org FM Approvals FM Approvals LLC (781) 762-4300 www.fmglobal.com FM Global FM Global (401) 275-3000 (Formerly: FMG - FM Global) www.fmglobal.com ICC International Code Council (888) 422-7233 www.iccsafe.org (202) 370-1800 NAAMM National Association of Architectural Metal

Manufacturers (630) 942-6591

www.naamm.org NeLMA Northeastern Lumber Manufacturers Association (207) 829-6901 www.nelma.org NFPA NFPA (800) 344-3555 (National Fire Protection Association) (617) 770-3000 www.nfpa.org NFPA NFPA International (See NFPA) NFRC National Fenestration Rating Council (301) 589-1776 www.nfrc.org NHLA National Hardwood Lumber Association (800) 933-0318 www.nhla.com (901) 377-1818 NLGA National Lumber Grades Authority (604) 524-2393 www.nlga.org NRCA National Roofing Contractors Association (800) 323-9545 www.nrca.net (847) 299-9070 SMACNA Sheet Metal & Air Condition Contractors

National Association www.smacna.org

(703) 803-2980

TMS The Masonry Society (303) 939-9700 www.masonrysociety.org

Page 46: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

REFERENCES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

014200 - 4

TPI Truss Plate Institute (703) 683-1010 www.tpinst.org UBC Uniform Building Code (See ICC)

C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

ICC-ES ICC Evaluation Service, LLC (800) 423-6587 www.icc-es.org (562) 699-0543

D. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web sites are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

DOE Department of Energy (202) 586-9220 www.energy.gov EPA Environmental Protection Agency (202) 272-0167 www.epa.gov OSHA Occupational Safety & Health Administration (800) 321-6742 www.osha.gov www.ojp.usdoj.gov

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 014200

Page 47: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TEMPORARY FACILITIES C-2120.3 – Miami University – Farmer School of Business AND CONTROLS Southeast Breezeway Roof Replacement

015000 - 1

SECTION 015000 -

PART 1 - GENERAL

TEMPORARY FACILITIES AND CONTROLS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Requirements:

1. Section 011000 "Summary" for work restrictions and limitations on utility interruptions.

1.3 USE CHARGES

A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Architect, testing agencies, and authorities having jurisdiction.

B. Water Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

1.4 INFORMATIONAL SUBMITTALS

A. Moisture-Protection Plan: Describe procedures and controls for protecting materials and construction from water absorption and damage.

1. Describe delivery, handling, and storage provisions for materials subject to water absorption or water damage.

Page 48: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TEMPORARY FACILITIES C-2120.3 – Miami University – Farmer School of Business AND CONTROLS Southeast Breezeway Roof Replacement

015000 - 2

2. Indicate procedures for discarding water-damaged materials, protocols for mitigating water intrusion into completed Work, and replacing water-damaged Work.

3. Indicate sequencing of work that requires water, such as sprayed fire-resistive materials, plastering, and terrazzo grinding, and describe plans for dealing with water from these operations. Show procedures for verifying that wet construction has dried sufficiently to permit installation of finish materials.

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.

PART 2 - PRODUCTS

2.1 TEMPORARY FACILITIES

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

2.2 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures. Contractor must have working and fully charged fire extinguishers on site at all times.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance as specified in Section 011000 "Summary."

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

Page 49: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TEMPORARY FACILITIES C-2120.3 – Miami University – Farmer School of Business AND CONTROLS Southeast Breezeway Roof Replacement

015000 - 3

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.

D. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas. Coordinate the shutdown of air intakes with the Owner.

E. Electric Power Service: Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner.

3.3 SUPPORT FACILITIES INSTALLATION

A. Parking: Use designated areas of Owner's existing parking areas for construction personnel.

B. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.

B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

1. Comply with work restrictions specified in Section 011000 "Summary."

C. Barricades and Warning Signs: Comply with requirements of authorities/Owner having jurisdiction for erecting structurally adequate barricades, including warning signs.

Page 50: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TEMPORARY FACILITIES C-2120.3 – Miami University – Farmer School of Business AND CONTROLS Southeast Breezeway Roof Replacement

015000 - 4

3.5 MOISTURE AND MOLD CONTROL

A. Contractor's Moisture-Protection Plan: Avoid trapping water in finished work. Document visible signs of mold that may appear during construction.

3.6 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

END OF SECTION 015000

Page 51: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 1 Southeast Breezeway Roof Replacement

SECTION 017300 -

PART 1 - GENERAL

EXECUTION

1.1 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout. 2. Installation of the Work. 3. Cutting and patching. 4. Progress cleaning. 5. Starting and adjusting. 6. Protection of installed construction.

B. Related Requirements:

1. Section 011000 "Summary" for limits on use of Project site.

1.2 INFORMATIONAL SUBMITTALS

A. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements.

B. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

1.3 QUALITY ASSURANCE

A. Manufacturer’s Representative Qualifications: A person certified with the Roof Consulting Institute and holds a Registered Roof Observer Certification.

B. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from Architect before proceeding. Shore, brace, and support structural element during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that

Page 52: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 2 Southeast Breezeway Roof Replacement

results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to Architect for the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, and other construction affecting the Work.

B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

Page 53: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 3 Southeast Breezeway Roof Replacement

3.2 PREPARATION

A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. The Contractor must perform field measurements prior to the submission of shop drawings, etc. The Contractor must perform the field measurements and submit a letter stating that they have field verified all dimensions and conditions prior to commencement of the work and that any changes in the work due to unconfirmed conditions or dimensions will be will be made at the expense of the Contractor. The Owner will not assume any additional cost.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Architect according to requirements in Section 013100 "Project Management and Coordination."

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.

3.4 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for

maintenance and ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

Page 54: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 4 Southeast Breezeway Roof Replacement

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations.

F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels, spark or flames within the building.

G. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.

2. Allow for building movement, including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings, templates, and

directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

J. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

3.5 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Temporary Support: Provide temporary support of work to be cut.

Page 55: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 5 Southeast Breezeway Roof Replacement

C. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

D. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.

4. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

5. Proceed with patching after construction operations requiring cutting are complete.

E. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable.

F. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.6 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly.

Page 56: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXECUTION C-2120.3 – Miami University – Farmer School of Business 017300 - 6 Southeast Breezeway Roof Replacement

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.7 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Comply with manufacturer's written instructions for temperature and relative humidity.

END OF SECTION 017300

Page 57: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 1

SECTION 017700 -

PART 1 - GENERAL

CLOSEOUT PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Substantial Completion procedures. 2. Final completion procedures. 3. Warranties. 4. Final cleaning. 5. Repair of the Work.

B. Related Requirements:

1. Section 013233 "Photographic Documentation" for submitting final completion construction photographic documentation.

2. Section 013300 “Submittals”. 3. Section 017300 "Execution" for progress cleaning of Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For cleaning agents.

B. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.

C. Certified List of Incomplete Items: Final submittal at Final Completion.

1.4 CLOSEOUT SUBMITTALS

A. Certificates of Release: From authorities having jurisdiction.

B. Certificate of Insurance: For continuing coverage.

C. Field Report: For pest control inspection.

Page 58: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 2

1.5 MAINTENANCE MATERIAL SUBMITTALS

A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in other Sections.

1.6 SUBSTANTIAL COMPLETION PROCEDURES

A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's punch list), indicating the value of each item on the list and reasons why the Work is incomplete.

B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.

1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

2. Submit closeout submittals specified in other Division 01 Sections, including project record documents, operation and maintenance manuals, final completion construction photographic documentation, damage or settlement surveys, property surveys, and similar final record information.

3. Submit closeout submittals specified in individual Sections, including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Submit maintenance material submittals specified in individual Sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Architect. Label with manufacturer's name and model number where applicable.

5. Submit test/adjust/balance records. 6. Submit changeover information related to Owner's occupancy, use, operation,

and maintenance.

C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.

1. Complete final cleaning requirements, including touchup painting and ceiling tile replacement in areas where water damage has occurred during the course of the Project.

2. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

D. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the

Page 59: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 3

Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for final completion.

1.7 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting final inspection for determining final completion, complete the following:

1. Submit a final Application for Payment according to the University’s guidelines and requirements.

2. Certified List of Incomplete Items: Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by the Architect. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.8 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each roof and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order. 2. Include the following information at the top of each page:

a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Page number.

3. Submit list of incomplete items in the following format:

Page 60: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 4

a. MS Excel electronic file. Architect will return annotated file.

1.9 SUBMITTAL OF PROJECT WARRANTIES

A. Time of Submittal: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated, or when delay in submittal of warranties might limit Owner's rights under warranty.

B. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual.

1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

paper.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

4. Warranty Electronic File: Scan warranties and bonds and assemble complete warranty and bond submittal package into a single indexed electronic PDF file with links enabling navigation to each item. Provide bookmarked table of contents at beginning of document.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

Page 61: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 5

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Remove tools, construction equipment, machinery, and surplus material from Project site.

d. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

e. Clean all gutters and make sure downspouts are clear.

3.2 REPAIR OF THE WORK

A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion.

B. Repair or remove and replace defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired. Restore damaged construction and permanent facilities used during construction to specified condition.

1. Touch up and otherwise repair and restore marred or exposed finishes and surfaces. Replace finishes and surfaces that that already show evidence of repair or restoration.

a. Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates. Remove paint applied to required labels and identification.

Page 62: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

CLOSEOUT C-2120.3 – Miami University – Farmer School of Business PROCEDURES Southeast Breezeway Roof Replacement

017700 - 6

END OF SECTION 017700

Page 63: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PROJECT RECORD C-2120.3 – Miami University – Farmer School of Business DOCUMENTS Southeast Breezeway Roof Replacement

017839 - 1

SECTION 017839 -

PART 1 - GENERAL

PROJECT RECORD DOCUMENTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for project record documents, including the following:

1. Record Drawings. 2. Record Specifications. 3. Record Product Data. 4. Miscellaneous record submittals. 5. Close out forms as required by the University.

B. Related Sections:

1. Division 01 Section "Closeout Procedures" for general closeout procedures. 2. Divisions 04 and 07 Section for specific requirements for project record

documents of the Work in those Sections.

1.3 CLOSEOUT SUBMITTALS

A. Record Drawings: Comply with the following:

1. Number of Copies: Submit one set of marked-up record prints.

B. Record Specifications: Submit one paper copy of Project's Specifications, including addenda and contract modifications.

C. Record Product Data: Submit one paper copy of each submittal.

1. Where record Product Data are required as part of operation and maintenance manuals, submit duplicate marked-up Product Data as a component of manual.

D. Miscellaneous Record Submittals: Refer to other Specification Sections for miscellaneous record-keeping requirements and submittals in connection with various construction activities. Submit one paper copy of each submittal.

Page 64: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PROJECT RECORD C-2120.3 – Miami University – Farmer School of Business DOCUMENTS Southeast Breezeway Roof Replacement

017839 - 2

E. Reports: Submit written report weekly indicating items incorporated in Project record documents concurrent with progress of the Work, including modifications, concealed conditions, field changes, product selections, and other notations incorporated.

PART 2 - PRODUCTS

2.1 RECORD DRAWINGS

A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings.

1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints.

a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.

b. Accurately record information in an acceptable drawing technique. c. Record data as soon as possible after obtaining it. d. Record and check the markup before enclosing concealed installations. e. Cross-reference record prints to corresponding archive photographic

documentation.

2. Content: Types of items requiring marking include, but are not limited to, the following:

a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Locations and depths of underground utilities. d. Revisions to routing of piping and conduits. e. Revisions to electrical circuitry. f. Actual equipment locations. g. Duct size and routing. h. Locations of concealed internal utilities. i. Changes made by Change Order or Construction Change Directive. j. Changes made following Architect's written orders. k. Details not on the original Contract Drawings. l. Field records for variable and concealed conditions. m. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings and Shop Drawings completely and accurately. Utilize personnel proficient at recording graphic information in production of marked-up record prints.

4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

Page 65: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PROJECT RECORD C-2120.3 – Miami University – Farmer School of Business DOCUMENTS Southeast Breezeway Roof Replacement

017839 - 3

5. Mark important additional information that was either shown schematically or

omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order

numbers, and similar identification, where applicable.

B. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.

1. Record Prints: Organize record prints and newly prepared record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.

2. Identification: As follows:

a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect. e. Name of Contractor.

2.2 RECORD SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.

3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.

4. For each principal product, indicate whether record Product Data has been submitted in operation and maintenance manuals instead of submitted as record Product Data.

5. Note related Change Orders, record Product Data, and record Drawings where applicable.

B. Format: Submit record Specifications as paper copy.

2.3 RECORD PRODUCT DATA

A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

Page 66: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PROJECT RECORD C-2120.3 – Miami University – Farmer School of Business DOCUMENTS Southeast Breezeway Roof Replacement

017839 - 4

2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.

3. Note related Change Orders, record Specifications, and record Drawings where applicable.

B. Format: Submit record Product Data as paper copy.

1. Include record Product Data directory organized by specification section number and title, electronically linked to each item of record Product Data.

2.4 MISCELLANEOUS RECORD SUBMITTALS

A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

B. Format: Submit miscellaneous record submittals as paper copy.

1. Include miscellaneous record submittals directory organized by specification section number and title, electronically linked to each item of miscellaneous record submittals.

PART 3 - EXECUTION

3.1 RECORDING AND MAINTENANCE

A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and modifications to project record documents as they occur; do not wait until the end of Project.

B. Maintenance of Record Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's reference during normal working hours.

END OF SECTION 017839

Page 67: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 1

SECTION 061000 -

PART 1 - GENERAL

ROUGH CARPENTRY

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Wood roof nailers. 2. Miscellaneous wood blocking. 3. Roof deck repair and replacement.

B. Related Sections include the following:

1. Division 07 Section “Preparation for Re-Roofing”. 2. Division 07 Section “Sheet Metal, Flashing and Trim”.

1.3 DEFINITIONS

A. Exposed Framing: Framing not concealed by other construction.

B. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal

C. Timber: Lumber of

in least dimension.

5 inches nominal

D. Lumber grading agencies, and the abbreviations used to reference them, include the following:

or greater in least dimension.

1. NeLMA: Northeastern Lumber Manufacturers' Association. 2. NLGA: National Lumber Grades Authority. 3. RIS: Redwood Inspection Service. 4. SPIB: The Southern Pine Inspection Bureau. 5. WCLIB: West Coast Lumber Inspection Bureau. 6. WWPA: Western Wood Products Association.

Page 68: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 2

1.4 SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.

1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.

2. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials based on testing by a qualified independent testing agency.

3. For fire-retardant treatments specified to be High-Temperature (HT) type, include physical properties of treated lumber both before and after exposure to elevated temperatures, based on testing by a qualified independent testing agency according to ASTM D 5664.

4. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.

5. Include copies of warranties from chemical treatment manufacturers for each type of treatment.

B. Fastener Patterns: Full-size templates for fasteners in exposed framing.

C. Material Certificates: For dimension lumber specified to comply with minimum allowable unit stresses. Indicate species and grade selected for each use and design values approved by the ALSC Board of Review.

D. Research/Evaluation Reports: For the following, showing compliance with building code in effect for Project:

1. Wood-preservative-treated wood. 2. Fire-retardant-treated wood. 3. Engineered wood products. 4. Power-driven fasteners. 5. Power-actuated fasteners. 6. Expansion anchors. 7. Metal framing anchors.

1.5 QUALITY ASSURANCE

A. Source Limitations for Engineered Wood Products: Obtain each type of engineered wood product through one source from a single manufacturer.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Stack lumber flat with spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings.

Page 69: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 3

PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL

A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.

1. Factory mark each piece of lumber with grade stamp of grading agency. 2. For exposed lumber indicated to receive a stained or natural finish, mark grade

stamp on end or back of each piece. 3. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20

for moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry lumber.

4. Provide dressed lumber, S4S, unless otherwise indicated. 5. All plywood to be APA exterior rated plywood.

2.2 WOOD-PRESERVATIVE-TREATED LUMBER

A. Preservative Treatment by Pressure Process: AWPA C2, except that lumber that is not in contact with the ground and is continuously protected from liquid water may be treated according to AWPA C31 with inorganic boron (SBX).

1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.

2. For exposed items indicated to receive a stained or natural finish, use chemical formulations that do not require incising, contain colorants, bleed through, or otherwise adversely affect finishes.

B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or does not comply with requirements for untreated material.

C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

1. For exposed lumber indicated to receive a stained or natural finish, mark end or back of each piece.

D. Application: Treat all rough carpentry, unless otherwise indicated, items indicated on Drawings, and the following:

1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.

2. Wood sills, sleepers, blocking, furring and similar concealed members in contact with masonry or concrete.

Page 70: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 4

2.3 DIMENSION LUMBER FRAMING

A. Maximum Moisture Content: 19 percent for 2-inch nominal thickness or less, 19 percent for more than 2-inch nominal

2.4 MISCELLANEOUS LUMBER

thickness.

A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:

1. Rooftop equipment bases and support curbs.

B. For items of dimension lumber size, provide Construction or No. 2 grade lumber with 19 percent maximum moisture content of any species.

2.5 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture.

1. Provide fasteners of Type 316 stainless steel for all applications, unless roof manufacturer requires other fasteners.

B. Wood Screws: ASME B18.6.1.

C. Lag Bolts: ASME B18.2.1

D. Bolts: Steel bolts complying with

.

ASTM A 307, Grade A; with ASTM A 563

2.6 MISCELLANEOUS MATERIALS

hex nuts and, where indicated, flat washers and locking washers.

A. Flexible Flashing: As supplied by roofing manufacturer.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit. Locate furring and similar supports to comply with requirements for attaching other construction.

B. Framing Standard: Comply with AF&PA's "Details for Conventional Wood Frame Construction," unless otherwise indicated.

Page 71: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 5

C. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions.

D. Metal Framing Anchors: Install metal framing to comply with manufacturer's written instructions.

E. Do not splice structural members between supports, unless otherwise indicated.

F. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

1. Provide metal clips for fastening gypsum board or lath at corners and intersections where framing or blocking does not provide a surface for fastening edges of panels. Space clips not more than 16 inches

G. Install wood nailers per I-49. All fasteners to be stainless steel.

o.c.

H. Sort and select lumber so that natural characteristics will not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

I. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.

1. Use inorganic boron for items that are continuously protected from liquid water. 2. Use copper naphthenate for items not continuously protected from liquid water.

J. Securely attach rough carpentry work to substrate by anchoring and fastening as per I-49.

K. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; do not countersink nail heads, unless otherwise indicated.

3.2 WOOD SLEEPER, BLOCKING AND NAILER INSTALLATION

A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.

B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated.

C. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.

D. Provide permanent grounds of dressed, pressure-preservative-treated, key-beveled lumber not less than 1-1/2 inches wide and of thickness required to bring face of

Page 72: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

ROUGH CARPENTRY C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061000 - 6

ground to exact thickness of finish material. Remove temporary grounds when no longer required.

3.3 PROTECTION

A. Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.

B. Protect rough carpentry from weather. If, despite protection, rough carpentry becomes wet, apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.

END OF SECTION 061000

Page 73: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEATHING C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061600 - 1

SECTION 061600 -

PART 1 - GENERAL

SHEATHING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Roof sheathing.

B. Related Requirements:

1. Division 06 Section "Rough Carpentry" for plywood backing panels. 2. Division 07 Section “Sheet Metal Flashing and Trim”. 3. Division 07 Section “Joint Sealants”.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.

1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated plywood complies with requirements. Indicate type of preservative used and net amount of preservative retained.

2. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated plywood complies with requirements. Include physical properties of treated materials.

3. For fire-retardant treatments, include physical properties of treated plywood both before and after exposure to elevated temperatures, based on testing by a qualified independent testing agency according to ASTM D 5516.

4. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.

5. Include copies of warranties from chemical treatment manufacturers for each type of treatment.

1.4 INFORMATIONAL SUBMITTALS

A. Evaluation Reports: For following products, from ICC-ES:

Page 74: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEATHING C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061600 - 2

1. Preservative-treated plywood. 2. Fire-retardant-treated plywood.

1.5 QUALITY ASSURANCE

A. Testing Agency Qualifications: For testing agency providing classification marking for fire-retardant-treated material, an inspection agency acceptable to authorities having jurisdiction that periodically performs inspections to verify that the material bearing the classification marking is representative of the material tested.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Stack panels flat with spacers beneath and between each bundle to provide air circulation. Protect sheathing from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Test-Response Characteristics: For assemblies with fire-resistance ratings, provide materials and construction identical to those of assemblies tested for fire resistance per ASTM E 119 by a testing and inspecting agency acceptable to authorities having jurisdiction.

1. Fire-Resistance Ratings: Indicated by design designations from UL's "Fire Resistance Directory.".

2.2 WOOD PANEL PRODUCTS

A. Plywood: DOC PS 1.

B. Thickness: As needed to comply with requirements specified, but not less than thickness indicated. For roof deck replacement.

C. Factory mark panels to indicate compliance with applicable standard.

D. APA factory mark panels required.

2.3 PRESERVATIVE-TREATED PLYWOOD

A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with the ground.

1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.

Page 75: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEATHING C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061600 - 3

B. Mark plywood with appropriate classification marking of an inspection agency acceptable to authorities having jurisdiction.

C. Application: Treat items indicated on Drawings and plywood in contact with masonry or concrete or used with roofing, flooring, flashing, vapor barriers, and waterproofing.

2.4 FIRE-RETARDANT-TREATED PLYWOOD

A. General: Where fire-retardant-treated materials are indicated, use materials complying with requirements in this article that are acceptable to authorities having jurisdiction and with fire-test-response characteristics specified as determined by testing identical products per test method indicated by a qualified testing agency.

B. Fire-Retardant-Treated Plywood by Pressure Process: Products with a flame-spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet

1. Use treatment that does not promote corrosion of metal fasteners.

beyond the centerline of the burners at any time during the test.

2. Exterior Type: Treated materials shall comply with requirements specified above for fire-retardant-treated plywood by pressure process after being subjected to accelerated weathering according to ASTM D 2898. Use for exterior locations and where indicated.

3. Design Value Adjustment Factors: Treated lumber plywood shall be tested according ASTM D 5516 and design value adjustment factors shall be calculated according to ASTM D 6305. Span ratings after treatment shall be not less than span ratings specified. For roof sheathing and where high-temperature fire-retardant treatment is indicated, span ratings for temperatures up to 170 deg F

C. Kiln-dry material after treatment to a maximum moisture content of 15 percent. Do not use material that is warped or does not comply with requirements for untreated material.

shall be not less than span ratings specified.

D. Identify fire-retardant-treated plywood with ‘UL’ classification marking of qualified testing agency.

E. Application: Treat plywood indicated on Drawings, and the following:

1. Roof sheathing.

2.5 ROOF SHEATHING

A. Plywood Roof Sheathing: Exposure 1 sheathing.

1. Span Rating: Not less than 20/0. 2. Nominal Thickness: Not less than 3/4 inch, minimum.

Page 76: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEATHING C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061600 - 4

2.6 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.

1. For roof and wall sheathing, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M or of Type 316 stainless steel.

2. Fasteners to be compatible with the treatment chemicals. Provide a letter of recommendations by chemical manufacturer.

B. Nails, Brads, and Staples: ASTM F 1667.

C. Power-Driven Fasteners: NES NER-272.

D. Wood Screws: ASME B18.6.1.

E. Screws for Fastening Wood Structural Panels to Cold-Formed Metal Framing: ASTM C 954, except with wafer heads and reamer wings, length as recommended by screw manufacturer for material being fastened.

1. For wall, floor and roof sheathing panels, provide screws with organic-polymer or other corrosion-protective coating having a salt-spray resistance of more than 800 hours according to ASTM B 117.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joints or optimum joint arrangement. Arrange joints so that pieces do not span between fewer than three support members.

B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction unless otherwise indicated.

C. Securely attach to substrate by fastening as indicated, complying with the following:

1. NES NER-272 for power-driven fasteners. 2. Table 2304.9.1, "Fastening Schedule," in ICC's "International Building Code." 3. APA requirements.

D. Use common wire nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections. Install fasteners without splitting wood.

E. Coordinate wall and roof sheathing installation with flashing and joint-sealant installation so these materials are installed in sequence and manner that prevent exterior moisture from passing through completed assembly.

Page 77: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEATHING C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

061600 - 5

F. Do not bridge building expansion joints; cut and space edges of panels to match spacing of structural support elements.

G. Coordinate sheathing installation with installation of materials installed over sheathing so sheathing is not exposed to precipitation or left exposed at end of the workday when rain is forecast.

3.2 PLYWOOD UNDERLAYMENT INSTALLATION

A. Installation to follow APA standards, with 1/8" joints spacing, offset all joints a min. of 4", sanded face up, use non-corrosive 3d x 1-1/4" screw shank nails or not less than subfloor thickness plus underlayment with a min. shank diameter of 12-1/2 ga.

B. Fastening pattern to be 3"o.c. at edges and 6" o.c. in the field, in both ways. No glue. Nails to be 3/8" from the edges of the plywood. Drive in screws just flush with the plywood.

C. Install face grain of plywood perpendicular to existing wood flooring direction..Install "loose laid" perimeter attached floor system.

D. Fill all plywood seams, screws and open joints with a non-shrinking quick setting filler,1/2 hour to be full cured, and sand before installing the flooring.

E. Use premium quality floor adhesives with high solids and reduced water content, as recommended by flooring manufacturer.

END OF SECTION 061600

Page 78: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 1

SECTION 070150.19 -

PART 1 - GENERAL

PREPARATION FOR RE-ROOFING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Roof tear-off. 2. Partial roof tear-off. 3. Temporary roofing membrane. 4. Roof re-cover preparation. 5. Removal of base flashings. 6. Removal of railings, down spouts, etc. Save and protect for reinstallation.

B. Related Sections:

1. Division 01 Section "Summary" for use of the premises and phasing requirements.

2. Division 01 Section "Temporary Facilities and Controls" for temporary construction and environmental-protection measures for reroofing preparation.

3. Division 06 Section 061000 “Rough Carpentry”. 4. Division 07 Section 076200 “Sheet Metal Flashing and Trim.”

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section.

B. Existing Membrane Roofing System: Roofing membrane, roof insulation, surfacing, and components and accessories between deck and roofing membrane.

Page 79: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 2

C. Roof Tear-Off: Removal of existing membrane roofing system to deck. Removal to include the complete roof system.

D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.

E. Existing to Remain: Existing items of construction that are not indicated to be removed.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Temporary Roofing: Include Product Data and description of temporary roofing system. If temporary roof will remain in place, submit surface preparation requirements needed to receive permanent roof, and submit a letter from roofing membrane manufacturer stating acceptance of the temporary membrane and that its inclusion will not adversely affect the roofing system's resistance to fire and wind or its FM Global rating.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer including certificate that Installer is licensed to perform asbestos abatement.

B. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, that might be misconstrued as having been damaged by reroofing operations. Submit before Work begins.

C. Landfill Records: Indicate receipt and acceptance of hazardous wastes, such as asbestos-containing material, by a landfill facility licensed to accept hazardous wastes.

1.7 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning membrane roofing removal. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Installer Qualifications: Installer of new membrane roofing system, licensed to perform asbestos abatement in the State or jurisdiction where Project is located and approved by warrantor of existing roofing system to work on existing roofing.

C. Reroofing Conference: Conduct conference at Project site.

1. Meet with Owner; Architect; Owner's insurer if applicable; testing and inspecting agency representative; roofing system manufacturer's representative; deck Installer; roofing Installer including project manager, superintendent, and

Page 80: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 3

foreman; and installers whose work interfaces with or affects reroofing including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing system tear-off and replacement including, but not limited to, the following:

a. Reroofing preparation, including membrane roofing system manufacturer's written instructions.

b. Temporary protection requirements for existing roofing system that is to remain during and after installation.

c. Existing roof drains and roof drainage during each stage of reroofing, and roof drain plugging and plug removal requirements.

d. Construction schedule and availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

e. Existing deck removal procedures and Owner notifications. f. Condition and acceptance of existing roof deck and base flashing substrate

for reuse. g. Structural loading limitations of deck during reroofing. h. Base flashings, special roofing details, drainage, penetrations, equipment

curbs, and condition of other construction that will affect reroofing. i. HVAC shutdown and sealing of air intakes. j. Shutdown of fire-suppression, -protection, and -alarm and -detection

systems. k. Asbestos removal and discovery of asbestos-containing materials. l. Governing regulations and requirements for insurance and certificates if

applicable. m. Existing conditions that may require notification of Architect before

proceeding.

1.8 PROJECT CONDITIONS

A. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

1. Coordinate work activities daily with Owner so Owner can place protective dust or water leakage covers over sensitive equipment or furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below the work area.

2. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below the affected area. Verify that occupants below the work area have been evacuated before proceeding with work over the impaired deck area.

B. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

Page 81: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 4

D. Conditions existing at time of inspection for bidding will be maintained by Owner as far as practical.

1. Construction Drawings and Project Manual for existing roofing system are provided for Contractor's reference. Contractor is responsible for conclusions derived from existing documents.

E. Limit construction loads on the roof to 45 sf rooftop equipment wheel loads and 10 lbs/sf for uniformly distributed loads.

F. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building.

G. Hazardous Materials: See accompanying asbestos report.

1. Hazardous material will be removed by the roofing contractor as part of this work.

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during reroofing, by methods and with materials so as not to void existing roofing system warranty. Notify warrantor before proceeding.

1. Notify warrantor of existing roofing system on completion of reroofing, and obtain documentation verifying that existing roofing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 INFILL MATERIALS

A. Use infill materials matching existing membrane roofing system materials unless otherwise indicated.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect existing and new membrane roofing system.

1. Limit traffic and material storage to areas of existing roofing membrane that have been protected.

2. Maintain temporary protection and leave in place until replacement roofing has been completed. Remove temporary protection on completion of reroofing.

Page 82: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 5

B. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.

C. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.

D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday. Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

1. If roof drains are temporarily blocked or unserviceable due to roofing system removal or partial installation of new membrane roofing system, provide alternative drainage method to remove water and eliminate ponding. Do not permit water to enter into or under existing membrane roofing system components that are to remain.

E. Verify that rooftop utilities and service piping have been shut off before beginning the Work.

3.2 ROOF TEAR-OFF

A. General: Notify Owner and Architect each day of extent of roof tear-off proposed for that day.

B. Remove aggregate ballast and insulation from roofing membrane.

C. Remove loose aggregate from aggregate-surfaced built-up bituminous roofing using a power broom.

D. Remove pavers and accessories from roofing membrane.

E. Remove protection mat and extruded-polystyrene insulation from protected roofing membrane.

F. Roof Tear-Off: Remove existing roofing system and other membrane roofing system components down to the deck.

1. Remove roof insulation. 2. Remove all bitumen and felts to the concrete/wood roof decks.

G. Partial Roof Tear-Off: Where indicated, remove existing roofing system and other membrane roofing system components as required to complete the work. Save and store all ceramic roof tile for reinstallation. Turn all copper over to the Owner. In areas where ceramic roof tiles are located, remove tiles down to underlayment.

H. Roof Deck Replacement (where required): Remove roof deck down to supporting joist. Repair joist as required. Provide temporary shoring as required.

Page 83: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 6

I. Remove existing roof felts. Remove existing wood deck. Provide temporary roofing as required.

3.3 DECK PREPARATION

A. Inspect deck after partial tear-off of membrane roofing system.

B. If broken or loose fasteners that secure deck panels to one another or to structure are observed or if deck appears or feels inadequately attached, immediately notify Architect. Do not proceed with installation until directed by Architect.

C. If deck surface is not suitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Architect. Do not proceed with installation until directed by Architect.

D. Provide additional deck securement as required.

E. Replace deck as indicated on Drawings.

3.4 INFILL AND REPLACEMENT MATERIALS

A. Immediately after removal of selected portions of existing membrane roofing syste, and inspection and repair, if needed, of deck, fill in the tear-off areas to match existing membrane roofing system construction.

1. Installation of infill materials is specified in Division 07. 2. Install new roofing membrane patch over roof infill area. If new roofing membrane

is installed the same day tear-off is made, roofing membrane patch is not required.

3.5 TEMPORARY ROOFING MEMBRANE

A. Install approved temporary roofing membrane over area to be reroofed, as selected by Roofing Contractor.

B. Remove temporary roofing membrane before installing new roofing membrane.

3.6 EXISTING BASE FLASHINGS

A. Remove existing base flashings around parapets, curbs, walls, and penetrations.

1. Clean substrates of contaminants such as asphalt, sheet materials, dirt, and debris.

B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings specified in Division 07 Section "Sheet Metal Flashing and Trim.”

Page 84: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PREPARATION C-2120.3 – Miami University – Farmer School of Business FOR RE-ROOFING Southeast Breezeway Roof Replacement

070150.19 - 7

C. Inspect parapet sheathing for deterioration and damage. If parapet sheathing has deteriorated, immediately notify Architect.

3.7 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

1. Storage or sale of demolished items or materials on-site is not permitted.

B. Transport and legally dispose of demolished materials off Owner's property.

3.8 CLEANING

A. Contractor to remove all debris from roof removal.

END OF SECTION 070150.19

Page 85: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 1

SECTION 074113.16 -

PART 1 - GENERAL

STANDING-SEAM METAL ROOF PANELS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes copper standing-seam metal roof panels. Panels, built-in gutter, expansion joints, downspouts, etc. shall match the Southwest breezeway renovation.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, metal panel Installer, metal panel manufacturer's representative, structural-support Installer, and installers whose work interfaces with or affects metal panels, including installers of roof accessories and roof-mounted equipment.

2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review methods and procedures related to metal panel installation, including manufacturer's written instructions.

4. Examine support conditions for compliance with requirements, including alignment between and attachment to structural members.

5. Review structural loading limitations of deck during and after roofing. 6. Review flashings, special details, drainage, penetrations, equipment curbs, and

condition of other construction that affect metal panels. 7. Review governing regulations and requirements for insurance, certificates, and

tests and inspections if applicable. 8. Review temporary protection requirements for metal panel systems during and

after installation. 9. Review procedures for repair of metal panels damaged after installation. 10. Document proceedings, including corrective measures and actions required, and

furnish copy of record to each participant.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

Page 86: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 2

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.

B. Shop Drawings:

1. Include fabrication and installation layouts of metal panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.

2. Accessories: Include details of the flashing, trim, and anchorage systems, at a scale of not less than 1-1/2 inches per 12 inches

C. Samples for Initial Selection: For each type of metal panel indicated with factory-applied color finishes.

.

1. Include similar Samples of trim and accessories involving color selection.

D. Samples for Verification: For each type of exposed finish required, prepared on Samples of size indicated below.

1. Metal Panels: 12 inches

1.5 INFORMATIONAL SUBMITTALS

long by actual panel width. Include clips, fasteners, closures, and other metal panel accessories.

A. Qualification Data: For Installer.

B. Product Test Reports: For each product, for tests performed by a qualified testing agency.

C. Field quality-control reports.

D. Sample Warranties: For special warranties.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For metal panels to include in maintenance manuals.

1.7 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

B. UL-Certified, Portable Roll-Forming Equipment: UL-certified, portable roll-forming equipment capable of producing metal panels warranted by manufacturer to be the same as factory-formed products. Maintain UL certification of portable roll-forming equipment for duration of work.

C. Mockups: Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for fabrication and installation.

Page 87: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 3

1. Build mockup of typical roof area and gutter, including fascia, and soffit as shown on Drawings; approximately 12 feet

2. Build mockups for typical roof area only, including accessories.

square by full thickness, including attachments, underlayment, and accessories.

a. Size: 12 feet long by 6 feet

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

.

4. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver components, metal panels, and other manufactured items so as not to be damaged or deformed. Package metal panels for protection during transportation and handling.

B. Unload, store, and erect metal panels in a manner to prevent bending, warping, twisting, and surface damage.

C. Stack metal panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal panels to ensure dryness, with positive slope for drainage of water. Do not store metal panels in contact with other materials that might cause staining, denting, or other surface damage.

D. Copper Panels: Wear gloves when handling to prevent fingerprints and soiling of surface.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit assembly of metal panels to be performed according to manufacturers' written instructions and warranty requirements.

1.10 COORDINATION

A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.

B. Coordinate metal panel installation with rain drainage work, flashing, trim, construction of soffits, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

Page 88: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 4

1.11 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Structural failures including rupturing, cracking, or puncturing. b. Deterioration of metals and other materials beyond normal weathering.

2. Warranty Period: Two years from date of Substantial Completion.

B. Special Weathertightness Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that fail to remain weathertight, including leaks, within specified warranty period.

1. Warranty Period: 2 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Energy Performance: Not required.

B. Structural Performance: Provide metal panel systems capable of withstanding the effects of the following loads, based on testing according to ASTM E 1592:

1. Wind Loads: 90 lbs/sf. 2. Other Design Loads: As indicated on Drawings.

C. Water Penetration under Static Pressure: No water penetration when tested according to ASTM E 1646 at the following test-pressure difference:

1. Test-Pressure Difference: 6.24 lbf/sq. ft.

D. Hydrostatic-Head Resistance: No water penetration when tested according to ASTM E 2140.

.

E. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.

1. Uplift Rating: UL 90.

F. FM Global Listing: Provide metal roof panels and component materials that comply with requirements in FM Global 4471 as part of a panel roofing system and that are listed in FM Global's "Approval Guide" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Global markings.

1. Fire/Windstorm Classification: Class 1A- 90.

Page 89: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 5

2. Hail Resistance: SH.

G. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 deg F, ambient; 180 deg F

2.2 STANDING-SEAM METAL ROOF PANELS

, material surfaces.

A. General: Provide metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with joint type indicated and mechanically attaching panels to supports using concealed clips in side laps. Include clips, cleats, pressure plates, and accessories required for weathertight installation.

1. Steel Panel Systems: Unless more stringent requirements are indicated, comply with ASTM E 1514.

2. Aluminum Panel Systems: Unless more stringent requirements are indicated, comply with ASTM E 1637.

3. Copper Sheet: ASTM B 370, cold-rolled copper sheet, H00 temper.

a. Thickness: 16, 20 and 24 oz./sq. ft.b. Exposed Finish: Mill.

.

4. Clips: One-piece fixed to accommodate thermal movement.

a. Material: 24 oz. nominal thickness, CR copper.

5. Panel Coverage: Match existing.

B. Integral-Standing-Seam Metal Roof Panels: Formed with integral ribs at panel edges and a flat pan between ribs; designed for sequential installation by mechanically attaching panels to supports using concealed clips located under one side of panels and lapping and interconnecting side edges of adjacent panels.

1. Copper Sheet: ASTM B 370, cold-rolled copper sheet, H00 temper.

a. Thickness: 16 oz./sq. ft.b. Exposed Finish: Mill.

.

2. Clips: One-piece fixed to accommodate thermal movement.

a. Material: 24 oz CR copper

3. Panel Coverage: match existing. 4. Panel Height: match existing.

Page 90: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 6

2.3 UNDERLAYMENT MATERIALS

A. Self-Adhering, High-Temperature Underlayment: Provide self-adhering, cold-applied, sheet underlayment, a minimum of 30 mils

1. Thermal Stability: Stable after testing at

thick, consisting of slip-resistant, polyethylene-film top surface laminated to a layer of butyl or SBS-modified asphalt adhesive, with release-paper backing. Provide primer when recommended by underlayment manufacturer.

240 deg F2. Low-Temperature Flexibility: Passes after testing at minus

; ASTM D 1970. 20 deg F

B. Felt Underlayment: ASTM D 4869/D 6757M, Type II (No. 30), asphalt-saturated organic felts, as indicated on the drawings.

; ASTM D 1970.

C. Slip Sheet: Red rosin paper.

2.4 MISCELLANEOUS MATERIALS

A. Miscellaneous Metal Subframing and Furring: ASTM C 645; cold-formed, metallic-coated steel sheet, ASTM A 653/A 653M, G90 coating designation or ASTM A 792/A 792M, Class AZ50

B. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal panels unless otherwise indicated.

coating designation unless otherwise indicated. Provide manufacturer's standard sections as required for support and alignment of metal panel system.

1. Closures: Provide closures at eaves and ridges, fabricated of same metal as metal panels.

2. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.

3. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch-

C. Flashing and Trim: Provide flashing and trim formed from same material as metal panels as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers. Finish flashing and trim with same finish system as adjacent metal panels.

thick, flexible closure strips; cut or premolded to match metal panel profile. Provide closure strips where indicated or necessary to ensure weathertight construction.

D. Gutters: Formed from same material as roof panels, complete with end pieces, outlet tubes, and other special pieces as required. Fabricate in minimum 96-inch-long sections, of size and metal thickness according to SMACNA's "Architectural Sheet Metal Manual." Furnish gutter supports spaced a maximum of 36 inches o.c.,

Page 91: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 7

fabricated from same metal as gutters. Provide wire ball strainers of compatible metal at outlets. Finish gutters to match metal roof panels.

E. Downspouts: Formed from same material as roof panels. Fabricate in 10-foot-

2.5 FABRICATION

long sections, complete with formed elbows and offsets, of size and metal thickness according to SMACNA's "Architectural Sheet Metal Manual." Finish downspouts to match gutters.

A. General: Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.

B. On-Site Fabrication: Subject to compliance with requirements of this Section, metal panels may be fabricated on-site using UL-certified, portable roll-forming equipment if panels are of same profile and warranted by manufacturer to be equal to factory-formed panels. Fabricate according to equipment manufacturer's written instructions and to comply with details shown.

C. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.

D. Fabricate metal panel joints with factory-installed captive gaskets or separator strips that provide a weathertight seal and prevent metal-to-metal contact, and that minimize noise from movements.

E. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations and recommendations in “Copper and Common Sense and Copper Development Association" that apply to design, dimensions, metal, and other characteristics of item indicated.

1. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.

2. Seams for Aluminum: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer. Rivet joints for additional strength.

3. Seams for Other Than Aluminum: Fabricate nonmoving seams in accessories with flat-lock seams. Tin edges to be seamed, form seams, and solder.

4. Sealed Joints: Form nonexpansion, but movable, joints in metal to accommodate sealant and to comply with SMACNA standards.

5. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces of accessories exposed to view.

6. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal recommended in writing by metal panel manufacturer.

Page 92: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 8

a. Size: As recommended by SMACNA's "Architectural Sheet Metal Manual" or metal panel manufacturer for application, but not less than thickness of metal being secured.

2.6 FINISHES

A. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in same piece are unacceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal panel supports, and other conditions affecting performance of the Work.

1. Examine primary and secondary roof framing to verify that rafters, purlins, angles, channels, and other structural panel support members and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer.

2. Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal roof panel manufacturer.

a. Verify that air- or water-resistive barriers have been installed over sheathing or backing substrate to prevent air infiltration or water penetration.

B. Examine roughing-in for components and systems penetrating metal panels to verify actual locations of penetrations relative to seam locations of metal panels before installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support members and anchorages according to ASTM C 754 and metal panel manufacturer's written recommendations.

Page 93: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 9

3.3 UNDERLAYMENT INSTALLATION

A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Apply at locations indicated below, wrinkle free, in shingle fashion to shed water, and with end laps of not less than 6 inches staggered 24 inches between courses. Overlap side edges not less than 3-1/2 inches

1. Apply over the entire roof surface.

. Extend underlayment into gutter trough. Roll laps with roller. Cover underlayment within 14 days.

B. Slip Sheet: Apply slip sheet over underlayment before installing metal roof panels.

C. Flashings: Install flashings to cover underlayment to comply with requirements specified in Section 076200 "Sheet Metal Flashing and Trim."

3.4 METAL PANEL INSTALLATION

A. General: Install metal panels according to manufacturer's written instructions in orientation, sizes, and locations indicated. Install panels perpendicular to supports unless otherwise indicated. Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.

1. Shim or otherwise plumb substrates receiving metal panels. 2. Flash and seal metal panels at perimeter of all openings. Fasten with self-tapping

screws. Do not begin installation until air- or water-resistive barriers and flashings that will be concealed by metal panels are installed.

3. Install screw fasteners in predrilled holes. 4. Locate and space fastenings in uniform vertical and horizontal alignment. 5. Install flashing and trim as metal panel work proceeds. 6. Locate panel splices over, but not attached to, structural supports. Stagger panel

splices and end laps to avoid a four-panel lap splice condition. 7. Align bottoms of metal panels and fasten with blind rivets, bolts, or self-tapping

screws. Fasten flashings and trim around openings and similar elements with self-tapping screws.

8. Provide weathertight escutcheons for pipe- and conduit-penetrating panels.

B. Fasteners:

1. Copper Panels: Use copper, stainless-steel, or hardware-bronze fasteners. 2. Fasteners shall be of copper, copper alloy, or non-magnetic, series 300 stainless

steel. 3. Nails shall be number 11, barbed copper slating nails not less than one inch (1”)

long.

C. Anchor Clips: Anchor metal roof panels and other components of the Work securely in place, using manufacturer's approved fasteners according to manufacturers' written instructions.

Page 94: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 10

D. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action as recommended in writing by metal panel manufacturer.

E. Standing-Seam Metal Roof Panel Installation: Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended in writing by manufacturer.

1. Install clips to supports with self-tapping fasteners. 2. Install pressure plates at locations indicated in manufacturer's written installation

instructions. 3. Snap Joint: Nest standing seams and fasten together by interlocking and

completely engaging factory-applied sealant. 4. Seamed Joint: Crimp standing seams with manufacturer-approved, motorized

seamer tool so clip, metal roof panel, and factory-applied sealant are completely engaged.

5. Watertight Installation:

a. Apply a continuous ribbon of sealant or tape to seal joints of metal panels, using sealant or tape as recommend in writing by manufacturer as needed to make panels watertight.

b. Provide sealant or tape between panels and protruding equipment, vents, and accessories.

c. At panel splices, nest panels with minimum 6-inch

F. Clipless Metal Panel Installation: Fasten metal panels to supports with screw fasteners at each lapped joint at location and spacing recommended by manufacturer.

end lap, sealed with sealant and fastened together by interlocking clamping plates.

G. Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete metal panel system including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items. Provide types indicated by metal roof panel manufacturers; or, if not indicated, types recommended by metal roof panel manufacturer.

H. Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

1. Install exposed flashing and trim that is without buckling and tool marks, and that is true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and achieve waterproof and weather-resistant performance.

2. Expansion Provisions: Provide for thermal expansion of exposed flashing, trim and ridge cap. Space movement joints at a maximum of 10 feet with no joints

Page 95: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 11

allowed within 24 inches

I. Built-in Gutters: Join sections with riveted and soldered or lapped and sealed joints. Attach gutters to eave with gutter hangers spaced not more than

of corner or intersection. Lapped expansion joints are not allowed.

36 inches

J. Downspouts: Schedule 40 copper pipe. Provide fasteners designed to hold downspouts securely

o.c. using manufacturer's standard fasteners. Provide end closures and seal watertight with sealant. Provide for thermal expansion.

1 inch away from walls; locate fasteners at top and bottom and at approximately 60 inches

1. Provide elbows at base of downspouts to direct water away from building.

o.c. in between.

2. Connect downspouts to underground drainage system indicated.

K. Roof Curbs: Install flashing around bases where they meet metal roof panels.

L. Pipe Flashing: Form flashing around pipe penetration and metal roof panels. Fasten and seal to metal roof panels as recommended by manufacturer.

3.5 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align metal panel units within installed tolerance of 1/4 inch in 20 feet on slope and location lines as indicated and within 1/8-inch

3.6 FIELD QUALITY CONTROL

offset of adjoining faces and of alignment of matching profiles.

A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect metal roof panel installation, including accessories. Report results in writing.

B. Remove and replace applications of metal roof panels where tests and inspections indicate that they do not comply with specified requirements.

C. Additional tests and inspections, at Contractor's expense, are performed to determine compliance of replaced or additional work with specified requirements.

D. Prepare test and inspection reports.

3.7 CLEANING AND PROTECTION

A. Remove temporary protective coverings and strippable films, if any, as metal panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal panel installation, clean finished surfaces as recommended by metal panel manufacturer. Maintain in a clean condition during construction.

Page 96: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

STANDING-SEAM C-2120.3 – Miami University – Farmer School of METAL ROOF PANELS Business Southeast Breezeway Roof Replacement

074113.16 - 12

B. Replace metal panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 074113.16

Page 97: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2120.3 – Miami University – Farmer School of Business FLASHING AND TRIM Southeast Breezeway Roof Replacement

076200 - 1

SECTION 076200 -

PART 1 - GENERAL

SHEET METAL FLASHING AND TRIM

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Formed roof-drainage sheet metal fabrications. 2. Formed wall sheet metal fabrications. 3. Formed counter flashing. 4. Built in copper gutters. 5. Leader boxes and downspouts. 6. New copper pipe downspouts.

B. Related Sections:

1. Division 06 Section “Rough Carpentry” for wood nailers, curbs, and blocking. 2. All Division 07 Sections.

1.3 PERFORMANCE REQUIREMENTS

A. General: Sheet metal flashing and trim assemblies as indicated shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

B. Fabricate and install roof edge flashing and copings capable of resisting the following forces according to recommendations in FMG Loss Prevention Data Sheet 1-49:

1. Wind Zone 2: For velocity pressures of 31 to 45 lbf/sq. ft.: 90-lbf/sq. ft. perimeter

uplift force, 120-lbf/sq. ft. corner uplift force, and 45-lbf/sq. ft.

C. Metal edge fabrications must also be certified as SPRI/ES-1 compliant.

outward force.

D. Thermal Movements: Provide sheet metal flashing and trim that allows for thermal movements from ambient and surface temperature changes.

Page 98: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2120.3 – Miami University – Farmer School of Business FLASHING AND TRIM Southeast Breezeway Roof Replacement

076200 - 2

1. Temperature Change (Range): 120 deg F, ambient; 180 deg F

1.4 SUBMITTALS

, material surfaces

A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each manufactured product and accessory

B. Shop Drawings: Show fabrication and installation layouts of sheet metal flashing and trim, including plans, elevations, expansion-joint locations, and keyed details. Distinguish between shop- and field-assembled work. Include the following:

1. Identification of material, thickness, weight, and finish for each item and location in Project.

2. Details for forming sheet metal flashing and trim, including profiles, shapes, seams, and dimensions.

3. Details for joining, supporting, and securing sheet metal flashing and trim, including layout of fasteners, cleats, clips, and other attachments. Include pattern of seams.

4. Details of termination points and assemblies, including fixed points. 5. Details of expansion joints and expansion-joint covers, including showing

direction of expansion and contraction. 6. Details of edge conditions, including eaves, ridges, valleys, rakes, crickets, and

counter flashings as applicable. 7. Details of special conditions. 8. Details of connections to adjoining work. 9. Detail formed flashing and trim at a scale of not less than 1-1/2 inches per 12

inches

C. Samples for Initial Selection: For each type of sheet metal flashing, trim, and accessory indicated with factory-applied color finishes involving color selection.

.

D. Sample for Verification: For each type of exposed finish required, prepared on Samples of size indicated below:

1. Sheet Metal Flashing: 12 inches

2. Trim, Metal Closures, Expansion Joints, Joint Intersections, and Miscellaneous Fabrications:

long by actual width of unit, including finished seam and in required profile. Include fasteners, cleats, clips, closures, and other attachments.

12 inches

3. Accessories and Miscellaneous Materials: Full-size sample.

long and in required profile. Include fasteners and other exposed accessories.

4. Anodized Aluminum Samples: Samples to show full range to be expected for each color required.

Page 99: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2120.3 – Miami University – Farmer School of Business FLASHING AND TRIM Southeast Breezeway Roof Replacement

076200 - 3

E. Qualification Data: For qualified fabricator.

F. Maintenance Data: For sheet metal flashing, trim, and accessories to include in maintenance manuals.

G. Warranty: Sample of warranty. Warranty to include labor and materials.

1.5 QUALITY ASSURANCE

A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.

B. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual" unless more stringent requirements are specified or shown on Drawings.

C. Copper Sheet Metal Standard: Comply with CDA's "Copper in Architecture Handbook." Conform to dimensions and profiles shown unless more stringent requirements are indicated.

D. Mockups: Provide samples of soldered and pop riveted seams, counter flashing, coping, roof edge metals, etc. Provide 10’-0” lengths.

E. Pre-installation Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, Installer, and installers whose work interfaces with or affects sheet metal flashing and trim including installers of roofing materials, roof accessories, and roof-mounted equipment.

2. Review methods and procedures related to sheet metal flashing and trim. 3. Examine substrate conditions for compliance with requirements, including

flatness and attachment to structural members. 4. Review special roof details, roof drainage, roof penetrations, equipment curbs,

and condition of other construction that will affect sheet metal flashing. 5. Document proceedings, including corrective measures and actions required, and

furnish copy of record to each participant.

1.6 DELIVERY, STORAGE AND HANDLING

A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage. Store sheet metal flashing and trim materials away from uncured concrete and masonry.

B. Protect strippable protective covering on sheet metal flashing and trim from exposure to sunlight and high humidity, except to the extent necessary for the period of sheet metal flashing and trim installation.

Page 100: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 4

PART 2 - PRODUCTS

2.1 SHEET METALS

A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying a strippable, temporary protective film before shipping.

B. Copper Sheet:

1. Cold rolled 16 oz, 20oz., 24 and 32 oz. Copper sheet conforming to ASTM B 370. Unless otherwise noted, temper shall be 400.

2. Surface: Smooth, flat; mill finish.

2.2 UNDERLAYMENT MATERIALS

A. High temperature ice and water shield and red rosin paper.

2.3 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, protective coatings, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and as recommended by manufacturer of primary sheet metal or manufactured item unless otherwise indicated.

B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal or manufactured item.

1. General: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.

a. Exposed Fasteners: Heads matching color of sheet metal using plastic caps or factory-applied coating.

b. Blind Fasteners: Copper pop rivets with brass mandrels or stainless-steel rivets suitable for metal being used.

2. Fasteners for Copper Sheet: Copper, hardware bronze or passivated Series 300 stainless steel.

C. Solder:

1. For Zinc-Coated (Galvanized) Steel: ASTM B 32, Grade Sn50, 50 percent tin and 50 percent lead or Grade Sn60, 60 percent tin and 40 percent lead.

2. Contractor is to pre-tin all joints before soldering.

D. Sealant Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch wide and 1/8 inch thick.

Page 101: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 5

E. Elastomeric Sealant: ASTM C 920, elastomeric polyurethane polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.

F. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant; polyisobutylene plasticized; heavy bodied for placement as indicated on the drawings.

G. Dawn dish soap.

H. Weathered membrane cleaner.

I. Red rosin paper.

2.4 FABRICATION, GENERAL

A. General: Custom fabricate sheet metal flashing and trim to comply with details shown and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required. Fabricate sheet metal flashing and trim in shop to greatest extent possible.

1. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.

2. Obtain field measurements for accurate fit before shop fabrication. 3. Form sheet metal flashing and trim to fit substrates without excessive oil canning,

buckling, and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.

4. Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.

B. Fabrication Tolerances: Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet on slope and location lines as indicated and within 1/8-inch

C. Fabrication Tolerances: Fabricate sheet metal flashing and trim that is capable of installation to tolerances specified in CDA Copper Development Association Manual and SMANCA Sheet Metal and Air Conditioning Contractor’s National Association.

offset of adjoining faces and of alignment of matching profiles.

D. Expansion Joints: Form expansion joints as indicated on Drawings.

E. Expansion Provisions: Provide expansion joints not to exceed spacing as recommended by SMACNA and the Copper Development Association.

F. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal. Cleats to be at least one gauge heavier than the covering metal.

G. Fabricate cleats and attachment devices of sizes as recommended by SMACNA's "Architectural Sheet Metal Manual” and by FMG Loss Prevention Data Sheet 1-49 for nailer securement, but not less than one gauge heavier than of metal being secured.

Page 102: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 6

H. Wash metal first with Dawn dish soap and rinse. Clean with weathered membrane cleaner.

I. Seams: Lap metal a minimum 1 1/2", pop rivet and solder all seams. Draw solder completely through the seams

J. Do not use graphite pencils to mark metal surfaces.

2.5 LOW-SLOPE ROOF SHEET METAL FABRICATIONS

A. Roof Edge Flashing: Fabricate in minimum 96-inch-long, but not exceeding 10-foot-long sections. Furnish with 6-inch-

1. Joint Style: Backup Plate 6

wide, joint cover plates.

inches2. Fabricate with dimensions required with

wide. 4-inch- wide flanges and base extending

4 inches3. Fabricate from the Following Materials:

or tapered strip into field of roof.

a. Copper: 16 oz for flashing and 24 oz for cleats.

B. Copings: Fabricate in minimum 96-inch-long, but not exceeding 10-foot-

1. Coping and Curb Cap Profile: Match existing.

long, sections. Fabricate joint plates of same thickness as copings. Furnish with continuous cleats to support edge of external leg and interior leg and drill elongated holes for fasteners on interior leg. Miter corners, pop rivet and solder or weld watertight.

2. Joint Style: Butt, with 12-inch-wide, concealed backup plate. 3. Fabricate from the Following Materials:

a. Copper: 20 oz.

C. Counterflashing: Fabricate from the following materials:

1. Copper: 16 oz./sq. ft.

2.6 MISCELLENEOUS SHEET METAL FABRICATIONS

.

A. Masonry Wall Caps:

1. Copper:

B. Through Wall Scupper Sleeves:

20 oz.

1. Copper: 20 oz

.

C. Drain Pipe:

1. Schedule 40.

Page 103: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 7

D. Scupper Box:

1. Copper: 16 oz

E. Stand-in Seam Double Lock Copper Roof:

.

1. Copper: 16 oz

F. Expansion Joint Caps:

.

1. Copper: 16 oz

G. Cleats:

.

1. One level heavier than material being cleated.

H. Built-in Gutter Liner:

1. Copper: 16 oz

PART 3 - EXECUTION

.

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of the Work.

1. Verify compliance with requirements for installation tolerances of substrates. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and

securely anchored.

B. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

D. Before proceeding with soldering of joints, the copper is to be cleaned. The Contractor shall wash the metal with Dawn dish washing liquid and completely fully clean the area metal to be soldered. The metal is to be washed and dried completely. Then the area is to be washed with weathered membrane cleaner and thoroughly dried before applying solder. Other cleaners may be used in conjunction with the steps listed above. The steps listed above for cleaning copper are the minimum steps required and must

3.2 INSTALLATION, GENERAL

be followed prior to soldering.

A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners,

Page 104: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 8

solder, protective coatings, separators, sealants, and other miscellaneous items as required to complete the sheet metal flashing and trim system.

3.3 ROOF FLASHING INSTALLATION

A. General: Install sheet metal flashing and trim to comply with performance requirements of the Copper Development Association Manual and SMACNA’s “Architectural Sheet Metal Manual.” Provide concealed fasteners where possible, and set units true to line, levels, and slopes. Install work with laps, joints, and seams that are permanently watertight and weather resistant.

B. Roof Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in SMACNA's "Architectural Sheet Metal Manual" and as indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate at staggered 3-inch centers. Roof edge metal shall must also meet ES-1 requirements and provide the required certification.

C. Roof Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in FMG Loss Prevention Data Sheet 1-49 for specified wind zone and as indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate at 16-inch

D. Copings: Anchor to resist uplift and outward forces according to recommendations in SMACNA's "Architectural Sheet Metal Manual" and as indicated.

centers. Flashing must also meet ES-1 requirements.

1. Interlock exterior bottom edge of coping with continuous cleat anchored to substrate at 16-inch

2. Anchor interior leg of coping with washers and screw fasteners through slotted holes at 16 inch on centers.

on centers. Loosely lock front edge of scupper with conductor head.

E. Copings: Anchor to resist uplift and outward forces according to recommendations in FMG Loss Prevention Data Sheet 1-49 and ES-1 for specified wind zone and as indicated.

1. Interlock exterior bottom edge of coping with continuous cleat anchored to substrate at 16-inch

2. Anchor interior leg of coping with washers and screw fasteners through slotted holes at 16 inch on centers.

on centers. Loosely lock front edge of scupper with conductor head.

F. Post Counter Flashing: Solder copper flashing 2” high with a soldring flange on the copper coping of 2”. The base flashing is to be installed around each column.

G. Counter flashing: Coordinate installation of counter flashing with installation of base flashing. Insert counter flashing in reglets or receivers and fit tightly to base flashing. Extend counter flashing 4 inches over base flashing. Lap counter flashing joints minimum of 4 inches and bed with sealant. Secure in a waterproof manner by means of anchor and washer at 36-inch centers. Saw cut new reglets in masonry and caulk. Fabricate horizontal leg of the counter flashing with a spring lok.

Page 105: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SHEET METAL C-2008.4 – Miami University – Bachelor Hall Roof Replacement FLASHING AND TRIM

076200 - 9

H. Roof-Penetration Flashing: Coordinate installation of roof-penetration flashing with installation of roofing and other items penetrating roof. Seal with elastomeric sealant and clamp flashing to pipes that penetrate roof.

3.4 WALL FLASHING INSTALLATION

A. General: Install sheet metal wall flashing to intercept and exclude penetrating moisture according to SMACNA recommendations and as indicated. Coordinate installation of wall flashing with installation of wall-opening components such as windows, doors, and louvers.

3.5 MISCELLANEOUS FLASHING INSTALLATION

A. Equipment Support Flashing: Coordinate installation of equipment support flashing with installation of roofing and equipment. Weld or seal flashing with elastomeric sealant to equipment support member.

3.6 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerance of 1/4 inch in 20 feet on slope and location lines as indicated and within 1/8-inch

B. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerances specified in MCA's "Guide Specification for Residential Metal Roofing."

offset of adjoining faces and of alignment of matching profiles.

3.7 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder.

C. Clean off excess sealants.

D. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed unless otherwise indicated in manufacturer's written installation instructions. On completion of installation, remove unused materials and clean finished surfaces. Maintain in a clean condition during construction.

E. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 076200

Page 106: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 1 Southeast Breezeway Roof Replacement

SECTION 079200 -

PART 1 - GENERAL

JOINT SEALANTS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Silicone joint sealants. 2. Urethane joint sealants (for sealing top of termination bars). Sealant shall be

covered by roof manufacturer. 3. Provide a pull test using both silicone and urethane sealants, primed and

unprimed on stone coping.

B. Related Sections: 1. Division 07 Section "Sheet Metal Flashing and Trim" for shop- and field-formed

metal flashing, roof-drainage systems, roof expansion-joint covers, and miscellaneous sheet metal trim and accessories.

2. Division 07 Section “EPDM Roofing”.

1.3 PRECONSTRUCTION TESTING

A. Preconstruction Compatibility and Adhesion Testing: Submit to joint-sealant manufacturers, for testing indicated below, samples of materials that will contact or affect joint sealants.

1. Use manufacturer's standard test method to determine whether priming and other specific joint preparation techniques are required to obtain rapid, optimum adhesion of joint sealants to joint substrates. This testing must be performed prior to the start of the Work and must include the Owner and the Owner’s representative.

2. Submit not fewer than eight pieces of each kind of material, including joint substrates, shims, joint-sealant backings, secondary seals, and miscellaneous materials.

3. Schedule sufficient time for testing and analyzing results to prevent delaying the Work.

4. For materials failing tests, obtain joint-sealant manufacturer's written instructions for corrective measures including use of specially formulated primers.

Page 107: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 2 Southeast Breezeway Roof Replacement

B. Preconstruction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates as follows:

1. Locate test joints where indicated on Project or, if not indicated, as directed by Architect.

2. Conduct field tests for each application indicated below:

a. Each kind of sealant and joint substrate indicated.

3. Notify Architect and Owner seven days in advance of dates and times when test joints will be installed and pulled.

4. Arrange for tests to take place with joint-sealant manufacturer's technical representative present.

a. Test Method: Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521.

1) For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side. Repeat procedure for opposite side.

5. Report whether sealant failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. For sealants that fail adhesively, retest until satisfactory adhesion is obtained.

6. Evaluation of Preconstruction Field-Adhesion-Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with requirements, will be considered satisfactory. Do not use sealants that fail to adhere to joint substrates during testing.

1.4 ACTION SUBMITTALS

A. Product Data: For each joint-sealant product indicated.

B. Samples for Initial Selection: Manufacturer's color charts consisting of strips of cured sealants showing the full range of colors available for each product exposed to view.

C. Samples for Verification: For each kind and color of joint sealant required, provide Samples with joint sealants in 1/2-inch- wide joints formed between two 6-inch-

D. Joint-Sealant Schedule: Include the following information:

long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.

1. Joint-sealant application, joint location, and designation. 2. Joint-sealant manufacturer and product name. 3. Joint-sealant formulation. 4. Joint-sealant color.

Page 108: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 3 Southeast Breezeway Roof Replacement

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Product Certificates: For each kind of joint sealant and accessory, from manufacturer.

C. Sealant, Waterproofing, and Restoration Institute (SWRI) Validation Certificate: For each sealant specified to be validated by SWRI's Sealant Validation Program.

D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, indicating that sealants comply with requirements.

E. Preconstruction Compatibility and Adhesion Test Reports: From sealant manufacturer, indicating the following:

1. Materials forming joint substrates and joint-sealant backings have been tested for compatibility and adhesion with joint sealants.

2. Interpretation of test results and written recommendations for primers and substrate preparation needed for adhesion.

F. Preconstruction Field-Adhesion Test Reports: Indicate which sealants and joint preparation methods resulted in optimum adhesion to joint substrates based on testing specified in "Preconstruction Testing" Article.

G. Field-Adhesion Test Reports: For each sealant application tested.

H. Warranties: Sample of special warranties.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project.

B. Source Limitations: Obtain each kind of joint sealant from single source from single manufacturer.

C. Product Testing: Test joint sealants using a qualified testing agency.

1. Testing Agency Qualifications: An independent testing agency qualified according to ASTM C 1021 to conduct the testing indicated.

2. Test according to SWRI’s Sealant Validation Program for compliance with requirements specified by reference to ASTM C 920 for adhesion and cohesion under cyclic movement, adhesion-in-peel, and indentation hardness.

D. Mockups: Provide pull tests on all substrates to be sealed. Test two sealants with primer and two without primer.

E. Preinstallation Conference: Conduct conference at Project site.

Page 109: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 4 Southeast Breezeway Roof Replacement

1.7 PROJECT CONDITIONS

A. Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F

2. When joint substrates are wet. .

3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.

4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

1.8 WARRANTY

A. Special Installer's Warranty: Manufacturer's standard form in which Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

B. Special Manufacturer's Warranty: Manufacturer's standard form in which joint-sealant manufacturer agrees to furnish joint sealants to repair or replace those that do not comply with performance and other requirements specified in this Section within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

C. Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:

1. Movement of the structure caused by structural settlement or errors attributable to design or construction resulting in stresses on the sealant exceeding sealant manufacturer's written specifications for sealant elongation and compression.

2. Disintegration of joint substrates from natural causes exceeding design specifications.

3. Mechanical damage caused by individuals, tools, or other outside agents. 4. Changes in sealant appearance caused by accumulation of dirt or other

atmospheric contaminants.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.

Page 110: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 5 Southeast Breezeway Roof Replacement

B. VOC Content of Interior Sealants: Provide sealants and sealant primers for use inside the weatherproofing system that comply with the following limits for VOC content when calculated according to 40 CFT 59, Part 59, Subpart D (EPA Method 24).

1. Architectural Sealants: 250 g/L. 2. Sealant Primers for Nonporous Substrates: 250 g/L. 3. Sealant Primers for Porous Substrates: 775 g/L.

C. Liquid-Applied Joint Sealants: Comply with ASTM C 920 and other requirements indicated for each liquid-applied joint sealant specified, including those referencing ASTM C 920 classifications for type, grade, class, and uses related to exposure and joint substrates.

1. Suitability for Immersion in Liquids: Where sealants are indicated for Use I for joints that will be continuously immersed in liquids, provide products that have undergone testing according to ASTM C 1247. Liquid used for testing sealants in deionized water, unless otherwise indicated.

D. Stain-Test-Response Characteristics: Where sealants are specified to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project.

E. Colors of Exposed Joint Sealants: As selected by Architect from manufacturer's full range of colors.

2.2 SILICONE JOINT SEALANTS (To be used at all masonry joints, step flashing, etc.)

A. Single-Component, Nonsag, Neutral-Curing Silicone Joint Sealant: ASTM C 920, Type S, Grade NS, Class 100/50, for Use NT.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Dow Corning Corporation; 790. b. GE Advanced Materials - Silicones; SilPruf LM SCS2700.

2.3 URETHANE JOINT SEALANTS (Only to be used with approval from the Architect.)

A. Single-Component, Nonsag, Urethane Joint Sealant: ASTM C 920, Type S, Grade NS, Class 100/50, for Use NT.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Sika Corporation, Construction Products Division; Sikaflex – 15LM b. Tremco Incorporated; Vulkem 92. c. Carlisle Syn Tec Inc.; Universal Single Ply Sealant, polyurethane

(termination bar) or approved equal by roof manufacturer and Architect.

Page 111: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 6 Southeast Breezeway Roof Replacement

2.4 JOINT SEALANT BACKING

A. General: Provide sealant backings of material that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.

B. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin); Type O (open-cell material) and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.

C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.

2.5 MISCELLANEOUS MATERIALS

A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.

C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant

Page 112: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 7 Southeast Breezeway Roof Replacement

manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following:

a. Concrete. b. Masonry. c. Unglazed surfaces of ceramic tile. d. Exterior insulation and finish systems.

3. Remove laitance and form-release agents from concrete. 4. Clean nonporous joint substrate surfaces with chemical cleaners or other means

that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:

a. Metal. b. Glass. c. Porcelain enamel. d. Glazed surfaces of ceramic tile.

B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.

C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.

3.3 INSTALLATION OF JOINT SEALANTS

A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.

B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Install sealant backings of kind indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of sealant backings. 2. Do not stretch, twist, puncture, or tear sealant backings. 3. Remove absorbent sealant backings that have become wet before sealant

application and replace them with dry materials.

Page 113: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 8 Southeast Breezeway Roof Replacement

D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.

E. Install sealants using proven techniques that comply with the following and at the same time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates. 2. Completely fill recesses in each joint configuration. 3. Produce uniform, cross-sectional shapes and depths relative to joint widths that

allow optimum sealant movement capability.

F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealant from surfaces adjacent to joints. 2. Use tooling agents that are approved in writing by sealant manufacturer and that

do not discolor sealants or adjacent surfaces. 3. Provide concave joint profile per Figure 8A in ASTM C 1193, unless otherwise

indicated. 4. Provide flush joint profile where indicated per Figure 8B in ASTM C 1193. 5. Provide recessed joint configuration of recess depth and at locations indicated

per Figure 8C in ASTM C 1193.

a. Use masking tape to protect surfaces adjacent to recessed tooled joints.

G. Installation of Preformed Silicone-Sealant System: Comply with the following requirements:

1. Apply masking tape to each side of joint, outside of area to be covered by sealant system.

2. Apply silicone sealant to each side of joint to produce a bead of size complying with preformed silicone-sealant system manufacturer's written instructions and covering a bonding area of not less than 3/8 inch. Hold edge of sealant bead 1/4 inch

3. Within 10 minutes of sealant application, press silicone extrusion into sealant to wet extrusion and substrate. Use a roller to apply consistent pressure and ensure uniform contact between sealant and both extrusion and substrate.

inside masking tape.

4. Complete installation of sealant system in horizontal joints before installing in vertical joints. Lap vertical joints over horizontal joints. At ends of joints, cut silicone extrusion with a razor knife.

H. Installation of Preformed Foam Sealants: Install each length of sealant immediately after removing protective wrapping. Do not pull or stretch material. Produce seal continuity at ends, turns, and intersections of joints. For applications at low ambient temperatures, apply heat to sealant in compliance with sealant manufacturer's written instructions.

Page 114: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 9 Southeast Breezeway Roof Replacement

3.4 FIELD QUALITY CONTROL

A. Field-Adhesion Testing: Field test joint-sealant adhesion to joint substrates as follows:

1. Extent of Testing: Test completed and cured sealant joints as follows:

a. Perform 10 tests for the first 1000 feet

b. Perform 1 test for each 1000 feet of joint length thereafter or 1 test per each floor per elevation.

of joint length for each kind of sealant and joint substrate.

2. Test Method: Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521.

a. For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side. Repeat procedure for opposite side.

3. Inspect tested joints and report on the following:

a. Whether sealants filled joint cavities and are free of voids. b. Whether sealant dimensions and configurations comply with specified

requirements. c. Whether sealants in joints connected to pulled-out portion failed to adhere

to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. Compare these results to determine if adhesion passes sealant manufacturer's field-adhesion hand-pull test criteria.

4. Record test results in a field-adhesion-test log. Include dates when sealants were installed, names of persons who installed sealants, test dates, test locations, whether joints were primed, adhesion results and percent elongations, sealant fill, sealant configuration, and sealant dimensions.

5. Repair sealants pulled from test area by applying new sealants following same procedures used originally to seal joints. Ensure that original sealant surfaces are clean and that new sealant contacts original sealant.

B. Evaluation of Field-Adhesion Test Results: Sealants not evidencing adhesive failure from testing or noncompliance with other indicated requirements will be considered satisfactory. Remove sealants that fail to adhere to joint substrates during testing or to comply with other requirements. Retest failed applications until test results prove sealants comply with indicated requirements.

3.5 CLEANING

A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.

Page 115: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

JOINT SEALANTS C-2120.3 – Miami University – Farmer School of Business 079200 - 10 Southeast Breezeway Roof Replacement

3.6 PROTECTION

A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.

3.7 JOINT-SEALANT SCHEDULE

A. Joint-Sealant Application: Exterior joints in vertical surfaces and horizontal nontraffic surfaces.

1. Joint Locations:

a. Copings b. Joints between metals. c. Joints between different materials. d. Sealing termination bars. e. Other joints as indicated.

END OF SECTION 079200

Page 116: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

NON-STRUCTURAL C-2120.3 – Miami University – Farmer School of Business METAL FRAMING Southeast Breezeway Roof Replacement

092216 - 1

SECTION 092216 -

PART 1 - GENERAL

NON-STRUCTURAL METAL FRAMING

1.1 SUMMARY

A. Section Includes:

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum soffits.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Test-Response Characteristics: Provide materials and construction identical to those tested according to ASTM E 119.

2.2 FRAMING SYSTEMS

A. Steel Studs and Runners: ASTM C 645.

1. Minimum Base-Metal Thickness: 0.033 inch2. Depth:

. 3-5/8 inches

B. Slip-Type Head Joints: Where indicated, provide one of the following in thickness not less than indicated for studs and in width to accommodate depth of studs:

, 5-1/2 inches.

1. Single Long-Leg Runner System: ASTM C 645 top runner with 2-inch- deep flanges, installed with studs friction fit into top runner and with continuous bridging located within 12 inches

2. Double-Runner System: ASTM C 645 top runners, inside runner with of the top of studs to provide lateral bracing.

2-inch-

3. Deflection Track: Steel sheet top runner manufactured to prevent cracking of finishes due to deflection of structure above.

deep flanges and fastened to studs, and outer runner sized to friction fit inside runner.

a. Products: Subject to compliance with requirements, provide one of the following:

1) Dietrich Metal Framing; SLP-TRK Slotted Deflection Track.

Page 117: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

NON-STRUCTURAL C-2120.3 – Miami University – Farmer School of Business METAL FRAMING Southeast Breezeway Roof Replacement

092216 - 2

2) MBA Building Supplies; FlatSteel Deflection Track. 3) Steel Network Inc. (The); VertiClip SLD Series. 4) Superior Metal Trim; Superior Flex Track System (SFT).

C. Flat Strap and Backing Plate: Steel sheet for blocking and bracing in length and width indicated.

1. Minimum Base-Metal Thickness: 0.033 inch

2.3 SUSPENSION SYSTEMS

.

A. Hanger Attachments to Concrete:

1. Anchors: Capable of sustaining a load equal to 5 times that imposed as determined by ASTM E 488.

a. Type: Post-installed, expansion anchor.

2. Powder-Actuated Fasteners: Capable of sustaining, a load equal to 10 times that imposed as determined by ASTM E 1190.

2.4 AUXILIARY MATERIALS

A. Fasteners for Metal Framing: Of type, material, size, corrosion resistance, holding power, and other properties required to fasten steel members to substrates.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Installation Standard: ASTM C 754. 1. Gypsum Board Assemblies: Also comply with requirements in ASTM C 840 that

apply to framing installation.

B. Install supplementary framing, and blocking to support fixtures, equipment services, heavy trim, furnishings, or similar construction.

C. Install bracing at terminations in assemblies.

3.2 INSTALLING FRAMED ASSEMBLIES

A. Install framing system components according to spacings indicated, but not greater than spacings required by referenced installation standards for assembly types.

B. Install studs so flanges within framing system point in same direction.

Page 118: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

NON-STRUCTURAL C-2120.3 – Miami University – Farmer School of Business METAL FRAMING Southeast Breezeway Roof Replacement

092216 - 3

C. Install tracks (runners) at floors and overhead supports. Extend framing full height to structural supports or substrates above suspended ceilings, except where partitions are indicated to terminate at suspended ceilings. Continue framing around ducts penetrating partitions above ceiling.

1. Slip-Type Head Joints: Where framing extends to overhead structural supports, install to produce joints at tops of framing systems that prevent axial loading of finished assemblies.

2. Openings: Screw vertical studs at jambs to jamb anchor clips on door frames; install runner track section (for cripple studs) at head and secure to jamb studs.

a. Install two studs at each jamb unless otherwise indicated. b. Install cripple studs at head adjacent to each jamb stud, with a minimum

1/2-inch

c. Extend jamb studs through suspended ceilings and attach to underside of overhead structure.

clearance from jamb stud to allow for installation of control joint in finished assembly.

3. Other Framed Openings: Frame openings other than door openings the same as required for door openings unless otherwise indicated. Install framing below sills of openings to match framing required above door heads.

D. Installation Tolerance: Install each framing member so fastening surfaces vary not more than 1/8 inch

3.3 INSTALLING SUSPENSION SYSTEMS

from the plane formed by faces of adjacent framing.

A. Install suspension system components according to spacings indicated, but not greater than spacings required by referenced installation standards for assembly types.

B. Isolate suspension systems from building structure where they abut or are penetrated by building structure to prevent transfer of loading imposed by structural movement.

C. Suspend hangers from building structure as follows:

1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structural or suspension system.

a. Splay hangers only where required to miss obstructions and offset resulting horizontal forces by bracing, countersplaying, or other equally effective means.

2. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with locations of hangers, install supplemental suspension members and hangers in the form of trapezes or equivalent devices.

3. Do not attach hangers to steel roof deck.

Page 119: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

NON-STRUCTURAL C-2120.3 – Miami University – Farmer School of Business METAL FRAMING Southeast Breezeway Roof Replacement

092216 - 4

D. Installation Tolerances: Install suspension systems that are level to within 1/8 inch in 12 feet

END OF SECTION 092216

measured lengthwise on each member that will receive finishes and transversely between parallel members that will receive finishes.

Page 120: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

GYPSUM BOARD C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

092900 - 1

SECTION 092900 -

PART 1 - GENERAL

GYPSUM BOARD

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Exterior gypsum board for ceilings and soffits.

B. Related Requirements:

1. Section 061600 "Sheathing" for gypsum sheathing for exterior walls. 2. Section 092116.23 "Gypsum Board Shaft Wall Assemblies" for metal shaft-wall

framing, gypsum shaft liners, and other components of shaft-wall assemblies. 3. Section 092216 "Non-Structural Metal Framing" for non-structural steel framing

and suspension systems that support gypsum board panels.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Sustainable Design Submittals: Not required.

C. Samples: For the following products:

1. Trim Accessories: Full-size Sample in 12-inch-

2. Textured Finishes: Manufacturer's standard size for each textured finish indicated and on same backing indicated for Work.

long length for each trim accessory indicated.

1.4 DELIVERY, STORAGE AND HANDLING

A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack panels flat and supported on risers on a flat platform to prevent sagging.

Page 121: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

GYPSUM BOARD C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

092900 - 2

1.5 FIELD CONDITIONS

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

B. Do not install paper-faced gypsum panels until installation areas are enclosed and conditioned.

C. Do not install panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E 119 by an independent testing agency.

2.2 GYPSUM BOARD, GENERAL

A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.

2.3 EXTERIOR GYPSUM BOARD FOR CEILINGS AND SOFFITS

A. Exterior Gypsum Soffit Board: ASTM C 1396/C 1396M, with manufacturer's standard edges.

1. Core: Match existing.

2.4 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C 475/C 475M.

B. Joint Tape:

1. Exterior Gypsum Soffit Board: Paper.

C. Joint Compound for Exterior Applications:

1. Exterior Gypsum Soffit Board: Use setting-type taping compound and setting-type, sandable topping compound.

Page 122: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

GYPSUM BOARD C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

092900 - 3

2.5 AUXILIARY MATERIALS

A. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written instructions.

B. Laminating Adhesive: Adhesive or joint compound recommended for directly adhering gypsum panels to continuous substrate.

C. Steel Drill Screws: ASTM C 1002 unless otherwise indicated.

1. Use screws complying with ASTM C 954 for fastening panels to steel members from 0.033 to 0.112 inch

2. For fastening cementitious backer units, use screws of type and size recommended by panel manufacturer.

thick.

D. Sound-Attenuation Blankets: ASTM C 665, Type I (blankets without membrane facing) produced by combining thermosetting resins with mineral fibers manufactured from glass, slag wool, or rock wool.

1. Fire-Resistance-Rated Assemblies: Comply with mineral-fiber requirements of assembly.

E. Acoustical Sealant: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying with ASTM C 834. Product effectively reduces airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and substrates including welded hollow-metal frames and support framing, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 APPLYING AND FINISHING PANELS, GENERAL

A. Comply with ASTM C 840.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

Page 123: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

GYPSUM BOARD C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

092900 - 4

C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch

D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.

of open space between panels. Do not force into place.

E. Form control and expansion joints with space between edges of adjoining gypsum panels.

F. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.

1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft.

2. Fit gypsum panels around ducts, pipes, and conduits. in area.

3. Where partitions intersect structural members projecting below underside of floor/roof slabs and decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch-

G. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments. Provide

wide joints to install sealant.

1/4- to 1/2-inch-

H. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first.

wide spaces at these locations and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.

I. Metal Framing: Install gypsum panels over existing metal framing, with floating internal corner construction.

3.3 APPLYING EXTERIOR GYPSUM PANELS FOR CEILINGS AND SOFFITS

A. Apply panels perpendicular to supports, with end joints staggered and located over supports.

1. Install with 1/4-inch

2. Fasten with corrosion-resistant screws.

open space where panels abut other construction or structural penetrations.

3.4 FINISHING GYPSUM BOARD

A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare

Page 124: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

GYPSUM BOARD C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

092900 - 5

gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.

B. Prefill open joints, rounded or beveled edges, and damaged surface areas.

C. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.

D. Gypsum Board Finish Levels: Finish panels to levels indicated below and according to ASTM C 840:

1. Level 5: Where indicated on Drawings.

a. Primer and its application to surfaces are specified in Section 099113 "Exterior Painting."

3.5 PROTECTION

A. Protect adjacent surfaces from drywall compound and promptly remove from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise damaged during drywall application.

B. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.

C. Remove and replace panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 092900

Page 125: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 1

SECTION 099113 –

PART 1 - GENERAL

EXTERIOR PAINTING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes surface preparation and field painting of exposed exterior and interior items and surfaces.

1. Surface preparation, priming, and finish coats specified in this section are in addition to shop priming and surface treatment specified in other sections.

B. Paint exposed surfaces, except where these Specifications indicate that the surface or material is not to be painted or is to remain natural. It an item or a surface is not specifically mentioned, paint the item or surface the same as similar adjacent materials or surfaces. If a color of finish is not indicated, Architect will select from standard colors and finishes available.

1. Painting includes field painting of touch up areas. 2. Shop primed items will not be considered prefinished and will be painted.

1.3 DEFINITIONS

A. General: Standard coating terms defined in ASTM D 16 apply to this Section.

1.4 SUBMITTALS

A. Product Data: For each type of paint system indicated. Include preparation requirements and application instructions. Include block filters and primers.

1. Material List: An inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer’s catalog number and general classification.

Page 126: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 2

2. Manufacturer’s Information: Manufacturer’s technical information, including label analysis and instructions for handling, storing, and applying each coating material.

B. Samples for Verification: For each color and material to be applied, with texture to simulate actual conditions.

1.5 QUALITY ASSURANCE

A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.

B. Source Limitations: Obtain primers for each coating system from the same manufacturer as the finish coats.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project Site in manufacturer’s original, unopened packages and containers bearing manufacturer’s name and label and the following information:

1. Product name or title of material. 2. Product description (generic classification or binder type). 3. Manufacturer’s tock number and date of manufacture. 4. Contents by volume, for pigment and vehicle constituents. 5. Thinning instructions. 6. Application instructions. 7. Color name and number. 8. VOC content.

B. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F

1. Maintain containers in clean condition, free of foreign materials and residue.

.

2. Protect from freezing. 3. Keep storage area neat and orderly. Remove oily rags and waste daily.

1.7 FIELD CONDITIONS

A. Apply waterborne paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 90 deg F

B. Apply solvent-thinned paints only when temperature of surfaces to be painted and ambient air temperatures are between

.

45 and 95 deg F.

Page 127: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 3

C. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F

1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods.

above the dew point; or to damp or wet surfaces.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Products: Subject to compliance with requirements, provide one of the products listed in other Part 2 articles for the paint category indicated.

B. Manufacturers: Subject to compliance with requirements, provide products by the following:

1. PPG Paints. 2. Approved equal.

2.2 PAINT, GENERAL

A. Material Compatibility: Provide block fillers, primers, and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application as demonstrated by manufacturer based on testing and field experience.

B. Material Quality: Provide manufacturer’s best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying manufacturer’s product identification will not be acceptable.

C. Colors: To be determined by Architect. Gloss is indicated in Articles 2.5.

2.3 EXTERIOR PRIMERS

A. Exterior Galvanized Metal Primer: Factory-formulated galvanized metal primer for exterior application.

1. PPG: 97946 SERIES PRIMER: All Weather DTR epoxy primer. Applied at a dry film thickness of not less than 6 mils.

Page 128: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 4

2.4 EXTERIOR FINISH COATS

A. Exterior Urethane Gloss: Factory-formulated gloss, urethane second and top coat for exterior application.

1. PPG Paints: 95850 SERIES-GLOSS-35 2ND

PART 3 - EXECUTION

AND TOP COAT: Urethane Applied at a dry film thickness of not less than 4 mils.

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work. Comply with procedures specified in PDCA P4.

1. Proceed with coating application only after unsatisfactory conditions have been corrected.

2. Start of painting will be construed as Applicator’s acceptance of surfaces and conditions within a particular area.

B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

1. Notify Architect about anticipated problems when using the materials specified over substrates primed by others.

3.2 PREPARATION

A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.

B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove oil and grease before cleaning.

1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

Page 129: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 5

C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written detailed instructions for each particular substrate condition and as specified.

1. Provide barrier coats over incompatible primers or remove and re-prime. 2. Cementitious Materials: Prepare concrete, concrete unit masonry, cement

plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

a. Use abrasive blast-cleaning methods if recommended by paint

manufacturer. b. Determine alkalinity and moisture content of surfaces by performing

appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces if moisture content exceeds that permitted in manufacturer's written instructions.

3. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been

shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with SSPC's recommendation.

a. Blast steel surfaces clean as recommended by paint system manufacturer and according to SSPC-SP 6/NACE No. 3 or SSPC-SP 10/NACE No. 2.

b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming.

c. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with same primer as the shop coat.

4. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based

solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods.

D. Material Preparation: Mix and prepare paint materials according to manufacturer's written instructions.

1. Maintain containers used in mixing and applying paint in a clean condition, free of

foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density. Stir as

required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using.

3. Use only thinners approved by paint manufacturer and only within recommended limits.

Page 130: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2120.3 - Miami University - Farmer School of Business Southeast Breezeway Roof Replacement

099113 - 6

E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat.

3.3 APPLICATION

A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied.

1. Paint colors, surface treatments, and finishes are indicated in the paint schedules.

2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

3. Provide finish coats that are compatible with primers used. 4. The term "exposed surfaces" includes areas visible when permanent or built-in

fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.

5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles.

7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces.

8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces.

9. Sand lightly between each succeeding enamel or varnish coat.

B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

1. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications.

2. Omit primer over metal surfaces that have been shop primed and touch up painted surfaces.

3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.

Page 131: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2092.1 – Miami University – Laws Hall Roof Replacement

099113 - 7

4. Allow sufficient time between successive coats to permit proper drying. Do not re-coat surfaces until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another coat of paint does not cause undercoat to lift or lose adhesion.

C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions.

1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being painted.

2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep's wool as recommended by manufacturer for material and texture required.

D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.

E. Mechanical and Electrical Work: Painting of mechanical and electrical work is limited to items exposed in equipment rooms and occupied spaces.

F. Prime Coats: Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Re-coat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn-through or other defects due to insufficient sealing.

G. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudi-ness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface im-perfections will not be acceptable.

H. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not complying with requirements.

3.4 CLEANING

A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site.

1. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces.

3.5 PROTECTION

A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect.

Page 132: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

EXTERIOR PAINTING C-2092.1 – Miami University – Laws Hall Roof Replacement

099113 - 8

B. Provide “Wet Paint” sign to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work.

1. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1.

3.6 EXTERIOR PAINT SCHEDULE

A. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated metal surfaces:

1. Gloss Urethane Finish: Two finish coats over a galvanized metal primer.

a. Primer: Exterior galvanized metal primer. b. Finish Coats: Exterior gloss urethane.

END OF SECTION 099113

Page 133: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-1 Southeast Breezeway Roof Replacement

SECTION 329113 -PLANTING SOILS PART 1 - GENERAL

1.1 GENERAL PROVISIONS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. The work of this Section consists of providing all labor, equipment, materials,

incidental work, and construction methods necessary to provide and place planting soils disturbed during construction.

1. Off site mixing, amending and manufacturing planting soils from base components.

2. Delivery of planting soil to the Project site. 4. Placing, spreading and grading of planting soil.

1.3 RELATED SECTIONS

A. The following items of related work are specified and included in other Sections of the Specifications:

1. Division 32 Section Turf and Grasses.

1.4 DEFINITIONS

A. Planting Soils: The lawn and planting soils consist of a blend of natural topsoil

without admixture of subsoil, stripped from the project site, and organic material. Do not mix subsoil with topsoil. The existing topsoil stripped from the Site requires testing after stockpiling to determine the proportion of soil amendments required to meet Specification Requirements.

1. Base Components:

a. Base topsoil is a natural growing medium, either stripped from the Site or from other off-site sources.

b. Uniform Sand is uniformly graded medium to coarse Uniform Sand. c. Organic Material is fully decomposed organic material

1.5 SUBMITTALS

A. At least 30 days prior to ordering materials, the Contractor shall submit to the

Landscape Architect representative samples, certifications, manufacturer's product data and certified test results for materials as specified below for approval. No

Page 134: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-2 Southeast Breezeway Roof Replacement

materials shall be ordered or delivered until the required submittals have been reviewed and approved by the Architect. Delivered materials shall closely match the approved samples. Approval shall not constitute final acceptance. The Architect reserves the right to reject, on or after delivery, any material that does not meet these Specifications.

B. Topsoil:

1. Existing On-Site Topsoil: Sample and test existing on-site topsoil. 2. The Contractor shall provide a one cubic foot representative sample per each

1,000 cubic yard on-site stockpile of existing topsoil for testing. All stockpile sampling shall be per ASTM D 75 and Appendixes for securing samples from stockpiles.

3. Testing will be at the Contractor's expense. Contractor shall deliver all samples to testing laboratories via overnight courier and shall have the testing report sent directly to the Architect. Perform all tests for gradation, organic content, soil chemistry and pH by the Soil and Plant Nutrient Laboratory, MSU Extension Service,

4. Testing reports shall be dated within 30 days of submission to the Landscape Architect. Testing reports beyond 30 days old will be rejected and new testing reports mandated.

Department of Crop and Soil Sciences of Michigan State University, East Lansing, MI 48824-1325; (517)355-0218.

5. Testing reports shall include the following tests and recommendations. Contractor shall deliver samples to testing laboratories and shall have the testing report sent directly to the Architect from the Soil and plant Tissue Laboratory. Testing reports shall include the following tests and recommendations.

a. Mechanical gradation (sieve analysis) shall be performed and compared to the USDA Soil Classification System. Sieve analysis shall be by combined hydrometer and wet sieving using sodium hexametaphosphate as a dispersant in compliance with ASTM D 422 after destruction of organic matter by H2O2. To facilitate review and approval of sieve analysis, provide a computer generated gradation curve from MSU Extension Service,

b. Percent of organics shall be determined by the loss on ignition of oven- Department of Crop and Soil Sciences of Michigan State University.

dried samples. Test samples minus #10 material shall be oven-dried to a constant weight at a temperature of 450 degrees Fahrenheit (752 degrees Centigrade).

c. Chemical analysis shall be undertaken for Nitrate Nitrogen, Ammonium Nitrogen, Phosphorus, Potassium, Calcium, Magnesium, extractable Aluminum, Lead, Zinc, Cadmium, Copper, Soluble Salts, and pH and buffer pH. A Conductivity Meter shall be used to measure Soluble Salts in 1:2 soil/water (v/v). Except where otherwise noted, nutrient tests shall be for available nutrients. d. Soil analysis tests shall show recommendations for soil additives to correct soils deficiencies as necessary, and for additives necessary to accomplish turf and planting work as specified.

Page 135: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-3 Southeast Breezeway Roof Replacement

C. Soil amendments:

1. Submit:

a. Acidulant: Submit supplier’s certification that the acidulant being supplied conforms to these Specifications.

b. Fertilizer: Submit product data of seeding and planting fertilizer and certificates showing composition and analysis. Submit fertilization rates for fertilizer product based upon soil testing, analysis, and recommendations

D. Sand:

1. Tests shall be by combined hydrometer and wet sieving in compliance with ASTM D422 after destruction of organic matter by ignition.

2. Test for agricultural suitability analysis including: Particle size and characteristics, pH.

1.6 EXAMINATION OF CONDITIONS

A. The Contractor shall be solely responsible for judging the full extent of work

requirements involved, including but not limited to sampling and testing of on-site stockpiles of delivered off-site loam borrow prior to final planting installation.

1.7 SITE CONDITIONS

A. Soil Moisture Content:

1. Contractor shall not move, blend or grade soil when moisture content is so great that adequate mixing is not possible, nor when it is so dry that dust will form in the air or that clods will not break readily, nor when it is frozen. Apply water, if necessary, or allow soil to dry to bring soil moisture between 60% of optimum moisture content and optimum moisture content as determined by ASTM D698 for compaction, grading and plantings.

2. Soil may not be manipulated in any way while in a wet condition, including moving of stockpiles, grading, planting or any other excavation. Contractor is responsible for removal and replacement of any and all soils that were manipulated when wet.

3. Field Soil Moisture Test:

a. Form soil in palm of hand, if soil retains shape and crumbles upon touching, the soil may be worked.

b. If the soil will not retain shape it is too dry and should not be worked. c. If the soil retains shape and will not crumble, it is too wet and should not be

worked. d. If the soil glistens or free water is observed when the sample is patted in

the palm of hand the soil is too wet and should not be worked.

Page 136: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-4 Southeast Breezeway Roof Replacement

PART 2 - PRODUCTS 2.1 TOPSOIL

A. There is insufficient space available on the project site to mix and amend topsoil with sand and compost. All work of manufacturing the various blends of planting soil for use on this project shall occur off site on property under the control of the Contractor and returned to the site fully amended and mixed to meet the requirements of this Section.

B. On-site Soils:

1. Topsoil stockpiled from on-site stripping shall be utilized for reuse. 2. Amend all topsoil on site by mixing with sand and compost to manufacture

specified soil mixes.

C. Additional topsoil:

1. In the event that there is an insufficient amount of on-site topsoil to complete the project, additional topsoil from off-site sources shall be provided for mixing with sand and compost to manufacture the specified soil mixes. Any amendments used to manufacture a soil to be imported shall meet the specifications defined in this section.

2.2 AMENDED TOPSOIL FOR GENERAL USE

A. The on-site soil or any imported topsoil shall be amended with the specified sand or compost to produce a soil meeting the following criterion, as determined by ASTM F1632 or D422:

1. Sand: (0.05 to 2.0 mm) 65 – 75% with at least 50% of the total sand falling into the medium and coarse sand fractions and no more than 25% of the total sand in the fine and very fine sand fractions.

2. Silt: (0.002 to 0.05 mm) 15 - 25% 3. Clay: (< 0.002) 5 - 15% 4. Gravel: (> 2.0 mm) < 15% 5. Maximum size shall be three eights (3/8”) inches largest diameter.

For bidding purposes, topsoil, sand and compost, each as specified in this Section, shall be combined in an approximate mix ratio of 1 part by volume of sand to one part by volume of on-site topsoil to one part by volume of compost (1S:1TS:1C). Final mix ratios to be determined by the Contractor and shall meet the requirements of this Section.

Page 137: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-5 Southeast Breezeway Roof Replacement

B. The amended soil shall have an organic matter content of 4 to 6% (by weight) as determined by ASTM F1647. For bidding purposes, the amount of compost required to increase the organic matter content to meet the specifications can range from 30 to 50% by volume, depending on the quality of the compost.

C. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing

(D30) shall be 5.5 or less. (D80/D30 <8) D. The amended soil shall have a minimum percolation rate of 0.50-inch per hour with

the soil compacted to 88% of maximum standard proctor density (ASTM D698). E. The topsoil meeting this specification shall serve as the baseline for subsequent

quality control testing. Samples shall be taken every 1000 yards prior to placement on the lawn area for conformity to the specifications. Quality control testing shall include organic matter content and particle size analysis.

F. The final soil mix shall be submitted to a nutrient testing laboratory to determine the

fertility status of the soil.

2.3 HIGH USE TURF MIX: A sandy mix for use in high traffic areas as shown on the Plans.

A. The on-site topsoil or any imported topsoil shall be amended with the specified sand and/or compost to produce a soil meeting the following criteria, as determined by ASTM F1632 or D422:

1. Sand: (0.05 to 2.0 mm) 70 – 85% with at least 50% of the total sand falling into the medium and coarse sand fractions and no more than 25% of the total sand in the fine and very fine sand fractions.

2. Silt: (0.002 to 0.05 mm) 7 - 18% 3. Clay: (< 0.002) 2 - 6% 4. Gravel: (> 2.0 mm) < 15% 5. Maximum size shall be three eights (3/8”) inches largest diameter.

For bidding purposes, topsoil, sand and compost, each as specified in this Section, shall be combined in an approximate mix ratio of 3 parts by volume of sand to one part by volume of on-site topsoil to two part by volume of compost (3S:1TS:2C). Final mix ratios to be determined by the Contractor and shall meet the requirements of this Section.

B. The amended soil shall have an organic matter content of 4 to 6% (by weight) as

determined by ASTM F1647. For bidding purposes, the amount of compost required to increase the organic matter content to meet the specifications can range from 30 to 50% by volume, depending on the quality of the compost.

C. Ratio of the particle size for 80% passing (D80) to the particle size for 30% passing

(D30) shall be 6 or less for high use turf mix (D80/D30 <6).

Page 138: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-6 Southeast Breezeway Roof Replacement

D. The amended soil shall have a minimum percolation rate of 3-inches per hour with the soil compacted to 88% of maximum standard proctor density (ASTM D698).

E. The topsoil meeting this specification shall serve as the baseline for subsequent

quality control testing. Samples shall be taken every 1000 yards prior to placement on the lawn area for conformity to the specifications. Quality control testing shall include organic matter content and particle size analysis.

F. The final soil mix shall be submitted to a nutrient testing laboratory to determine the

fertility status of the soil. 2.4 REINFORCED TURF ROOT ZONE MIX

A. Reinforced Turf Root Zone Mix (RTRZM) shall be as specified for High Use Turf Mix, Paragraph 2.3 of this Section except as follows:

1. Top 6-inches of the 12-inch profile of the RTRZM shall be High Use Turf Mix that has been thoroughly mixed with Synthetic Fibers. Percentage of Synthetic Fibers to volume of RTRZM shall be in accordance with manufacturer’s written instructions.

2. The amended soil shall have a minimum percolation rate of 8-inches per hour with the soil compacted to 88% of maximum standard proctor density (ASTM D698).

3. For bidding purposes, topsoil, sand and compost, each as specified in this Section, shall be combined in an approximate mix ratio of 3 parts by volume of sand to one part by volume of on-site topsoil to one part by volume of compost (3S:1TS:2C). Final mix ratios to be determined by the Contractor and shall meet the requirements of this Section.

4. A layer of compost ½” in depth should be spread across the top surface of the High Use Turf Mix after compaction is met and at the time of seeding.

2.5 SOIL ADDITIVES

A. General: Soil additives shall be used to counteract soil deficiencies as recommended by the soils analysis and as supplements for turf construction as specified herein.

B. Acidulant for adjustment of loam borrow pH shall be commercial grade flours of

sulfur, ferrous sulfate, or aluminum sulfate that are unadulterated. Acidulants shall be delivered in unopened containers with the name of the manufacturer, material, analysis and net weight appearing on each container.

C. Ground limestone for adjustment of loam borrow pH shall contain not less than 85

percent of total carbonates and shall be ground to such fineness that 40 percent will pass through 100 mesh sieve and 95 percent will pass through a 20 mesh sieve. Contractor shall be aware of loam borrow pH and the amount of lime needed to adjust pH to meet the requirements of the testing lab recommendations.

Page 139: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-7 Southeast Breezeway Roof Replacement

D. The compost used to amend the soil shall be well decomposed, stable, mature, aerobically composted product utilizing feedstock from yard wastes, food wastes, biosolids, or any combination of these. The compost shall meet the following criteria:

1. An organic matter content of no less than 35% as determined by ASTM D2974. 2. A moisture content of 35 – 70%, as determined by ASTM D2974. 3. A carbon/nitrogen ratio of 15:1 to 30:1. 4. Soluble salts not to exceed 2 dS/m. 5. A Solvita Index of 5 to 8. 6. 95 – 100% passing a 3/8” screen. 7. A pH of 6 to 8. 8. Non-phytotoxic. 9. All EPA and state regulations for biosolid composts.

The Contractor shall submit representative samples of organic matter amendment they intend to bring onto the site to the owners testing agent. All reports shall be sent to the Landscape Architect for approval.

F. Sand shall be blended into the topsoil in the proper amount to achieve the particle

size distribution described in these specifications. Sand for use as a soil amendment shall be a washed natural or classified sand meeting the following particle size distribution as determined by ASTM C-136 or F1632.

No. 4 4.75 mm 100% Sieve Sieve Size % Passing

No. 8 2.38 mm 90 - 100% No. 16 1.19 mm 80 - 100% No. 30 0.60 mm 25 - 60 No. 50 0.30 mm 0 - 25% No. 100 0.15 mm 0 - 5 No. 270 0.075 mm 0 - 3

In addition, the sand shall have a coefficient of uniformity (D60/D10) of less than 4.0.

I. Commercial fertilizer shall be a product complying with the State and United States

fertilizer laws. Deliver fertilizer to the site in the original unopened containers bearing the manufacturer's certificate of compliance covering analysis and which shall be furnished to the Architect. Fertilizer shall contain not less than the percentages of weight of ingredients as recommended by the soil analysis.

1. Fertilizer for planting shall be formulated for top-dressing, soil surface application to plants. Fertilizer shall be designed and certified by the manufacturer to provide controlled release of fertilizer continuously for not less than 9 months. One hundred percent of the nitrogen content shall be derived from organic materials. Nitrogen source shall be coated to ensure slow

Page 140: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-8 Southeast Breezeway Roof Replacement

release. Fertilizer percentages of weight of ingredients shall be as recommended by the soil testing and analysis specified, performed, and paid for under this Section, PLANTING SOILS.

PART 3 - INSTALLATION 3.1 EXAMINATION

A. Verification of Conditions: in the event field conditions are not as shown on

Drawings and outlined in the Specifications, notify Resident Engineer in writing.

1. Spot and Invert Elevations: verify field elevations of site improvements such as drainage and utility fixtures, pavements, existing plantings, and subsurface piping conform to drawings.

2. Rough grade: verify specified elevations and prior earthwork operations have shaped, trimmed, and finished rough grade.

3.2 PREPARATION

A. Protection:

1. Contractor shall be required to clear working areas with Ohio Utility Protection Service prior to doing excavation on site. If work is to be done around underground utilities, appropriate authority of utility must be notified of impending work. Hand excavate areas adjacent to utilities. Contractor shall be responsible for damages done by himself or his personnel to existing utilities, which shall be repaired or paid for by Contractor.

3.3 MIXING PLANTING SOIL ON SITE

A. Soil additives shall be thoroughly incorporated into planting soil by harrowing or

other methods standard to the industry. B. Correct deficiencies in soil as directed by horticultural soil test results. Thoroughly

incorporate amendments into planting mixture to ensure even distribution. 3.4 FILLING AND COMPACTION

A. Perform percolation tests on existing sub-soils or placed fill prior to placing and

spreading planting soils (this requirement is waved where there is under drain perforated piping):

1. Perform percolation testing of subsoil or placed fills to determine whether or not the subgrade will drain properly. Perform percolation tests as specified in this Section,

2. In the event that percolation testing indicates that the subsoil, placed fills or ordinary borrow has been over compacted and will not drain, the contractor shall loosen up the top 12 inches of the subgrade to be planted and seeded by

for each lift of loam borrow.

Page 141: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-9 Southeast Breezeway Roof Replacement

ripping or other mechanical means. Re-compact the borrow by driving a small, tracked bulldozer over the area at low speeds so that the tracks of the bulldozer pass over the affected area and the soil is compacted to a density that will percolate as. Under no circumstances shall wheeled vehicles be driven over subsoil, placed fills or ordinary borrow that have been shown to percolate or subsoil, placed fills or ordinary borrow that has been loosened and shown to percolate.

3. Perform sufficient percolation tests in areas of poorly draining or compacted subsoil or compacted placed fills as directed by the Landscape Architect to ensure that these underlying soils drain. Likewise, perform sufficient percolation tests after ripping and loosening to ensure that the soils are no longer too compact to drain.

B. Do not damage the work previously installed. Maintain all required angles of

repose of materials adjacent to the loam as shown on the Contract Documents. Do not over excavate compacted subgrades of adjacent pavement or structures during loaming operations.

C. Confirm that the subgrade is at the proper elevation and that no further earthwork

is required to bring the subgrade to proper elevations. Subgrade elevations shall slope parallel to the finished grade and or toward the subsurface drain lines as shown on the Contract Documents.

D. Clear the subgrade of all construction debris, trash, rubble and any foreign

material. In the event that fuels, oils, concrete washout or other material harmful to plants have been spilled into the subgrade material, excavate the soil sufficiently to remove the harmful material. Such construction debris, trash, rubble and foreign material shall be removed from the site and disposed of in a legal manner. Fill any over excavation with approved fill and compact to the required subgrade compaction levels.

E. Do not proceed with the installation of amended topsoil until all utility work in the

area has been installed. F. Protect adjacent walls, walks and utilities from damage or staining by the soils.

Use 0.5-inch plywood and or plastic sheeting as directed to cover existing concrete, metal and masonry work and other items as directed during the progress of the work. Clean up all trash and any soil or dirt spilled on any paved surface at the end of each working day.

3.5 SOIL VOLUMES

A. Plant soil volumes required for trees are as follows:

1. Large canopy trees and evergreens:

a. Single trees: 4 cubic yard per tree b. Trees in groups of two (2) or more: 3 cubic yard per tree

Page 142: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-10 Southeast Breezeway Roof Replacement

2. Flowering and ornamental trees:

a. Single trees: 2.5 cubic yard per tree b. Trees in groups of two (2) or more: 2 cubic yard per tree

3. See planting details in Contract Documents for required depth of planting soil. 4. Contractor shall provide shop drawings showing limits of planting soil beds for

review and approval by the Architect prior to tree planting. B. Planting soil depth for turf areas shall be as shown on the Drawings.

3.6 FINE GRADING

A. Immediately prior to dumping and spreading loam borrow, the subgrade shall be cleaned of all stones greater than 2 inches and all debris or rubbish. Such material shall be removed from the site, not raked to the edges and buried. Notify the Architect that the subsoil has been cleaned and request his/her attendance on site to review and approve subgrade conditions prior to spreading loam borrow.

B. Notify the Landscape Architect when the amended topsoil is scheduled for

placement and schedule his/her attendance on site to witness delivery and stockpiling. Landscape Architect will inspect the amended topsoil for conformance to the requirements of this Section.

C. Amended topsoil shall be protected from erosion at all times. Materials shall be

spread immediately upon approval soil test reports. Otherwise, materials that set on site for more than 24 hours shall be covered with tarpaulin or other soil erosion system acceptable to the Architect and surrounded by silt fence.

D. Place amended topsoil in two lifts. Place the first lift to a depth of 2 inches and

harrow or till the loam into the underlying subsoil to a depth of 2 inches, creating a blended interface of loam and subsoil approximately 4 inches deep. Spread the second lift of loam to a minimum depth of 4 inches or greater as shown on the Contract Documents.

E. No loam borrow shall be handled, planted, or seeded in any way if it is in a wet or

frozen condition. A moist loam borrow is desirable. F. Fertilizer shall be spread and thoroughly incorporated into the top layer of the

amended topsoil by harrowing or other method reviewed by the Landscape Architect. Fertilizer shall be applied at the rate recommend by the soil analysis.

G. Remove all large stiff clods, lumps, brush, roots, stumps, litter and other foreign

matter. Remove from unscreened soils all stones over 1 inch in diameter from the top 6 inches of the amended topsoil bed. Amended topsoil shall also be free of smaller stones in excessive quantities as determined by the Architect.

H. The Contractor shall install amended topsoil in successive horizontal lifts no thicker

than 3 inches in areas of Reinforced Turf Root Zone Mix, 6 inches in turf areas

Page 143: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-11 Southeast Breezeway Roof Replacement

(including areas of High Use Turf Mix and General Use Mix) and 12 inches in plant bed areas to the desired compaction as described herein. The Contractor shall install the soil at a higher level to anticipate any reduction of amended topsoil volume due to compaction, settling, erosion, decomposition, and other similar processes during the warranty period. The Landscape Architect will ensure that the full depths of amended topsoil for turf and plant beds are obtained by digging holes in the amended topsoil at the same frequency as for compaction testing.

1. Compact planting soil to the required density as specified herein. 2. Maximum dry density planting soil shall be determined in accordance with

ASTM D698. The following percentages of minimum to maximum dry densities shall be achieved for amended topsoil. In turf, plant beds and tree pits:

a. Fills within turf and planting areas in top eighteen inches of finished grade 83% 86%

Minimum Maximum

b. Reinforced Turf Root Zone Mix As achieved after two flood events per 3-inch lift.

3. The surface area of each lift hall shall be scarified by raking prior to placing the

next lift.

I. Compaction:

1. For amended topsoil for general use in turf and plant beds, and for High Use Turf Mix in turf areas, compact each lift sufficiently to reduce settling but not enough to prevent the movement of water and feeder roots through the soil. The amended topsoil in each lift should feel firm to the foot in all areas and make only slight heel prints. At completion of the loam borrow installation, the soil should offer a firm, even resistance when a soil sampling tube is inserted from lift to lift.

2. For Reinforced Turf Root Zone Mix, consolidate the root zone mix and the fiber-reinforced root zone mix by flooding each lift a minimum of two times and allowing the water to drain away before subsequent flood events or successive soil lifts.

J. Percolation test procedure:

1. Dig a hole in the installed soil that is a minimum of 4 inches in diameter. Holes in 6-inch lift in turf areas shall be 4 inches deep. Holes in 12-inch lifts in plant beds shall be 8 inches deep. Do not penetrate through the lift being tested.

2. Fill the hole with water and let it drain completely. Immediately refill the hole with water and measure the rate of fall in the water level.

3. In the event that the water drains at a rate less than one inch per hour, till the soil to a depth required to break the over compaction.

Page 144: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-12 Southeast Breezeway Roof Replacement

4 Perform a minimum of one soil percolation test per 10,000 square feet area of turf area and 2,500 square feet of tree and shrub planting area as directed by the Landscape Architect.

5. Do not spread any amended topsoil for general use, high use turf mix of reinforced turf root zone mix until placed materials have been tested for percolation rates.

K. Select equipment and otherwise phase the installation of the amended topsoil to

ensure that wheeled equipment does not travel over subsoil, placed fills or ordinary borrow or already installed soil. Movement of tracked equipment over said soils will be reviewed and considered for approval by the Landscape Architect. If it is determined by the Landscape Architect that wheeled equipment must travel over already installed soil, provide a written description of sequencing of work that ensures that compacted soil is loosened and un-compacted as the work progresses or place one-inch thick steel plate ballast (or equivalent ballast approved by the Architect) over the length and width of any travel way to cover loam borrow to protect it from compaction.

L. Disturbed areas outside the limit of turf work shall be graded smooth and spread

with a minimum of 6 inches of loam borrow to the finished grade.

3.7 PREPARATION OF TREE PITS

A. After tree planting pits have been excavated to the dimensions shown on the plans, the entire bottom area of the pit shall be scarified utilizing the bucket of a backhoe or equivalent equipment. The entire loosened area shall then be compressed firmly with the bucket of the backhoe. The central portion of the pit, beneath the rootball, shall be compressed adequately to support the rootball and prevent settlement.

3.8 CLEANING

A. Clean up debris generated under work of this section. B. Site Improvements:

1. Wash and sweep clean site improvements such as drainage and utility fixtures, pavements, existing plantings, and site furnishings.

3.9 PROTECTION

A. Protect work of this section until Final Acceptance. B Protect prepared soils from compaction by construction traffic and from

contamination by construction materials and from saturation.

Page 145: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

PLANTING SOILS C-2120.3 – Miami University – Farmer School of Business 329113-13 Southeast Breezeway Roof Replacement

3.10 ACCEPTANCE

A. Confirm that the final grade of the loam borrow is at the proper finish grade elevations. Adjust grade as required to meet the contours and spot elevations noted on the Plans. Request the presence of the Architect to inspect final grade. Do not proceed with the remaining work of this Contract until the Architect has given his/her written approval of the final grade.

END OF SECTION

Page 146: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 1

SECTION 32 92 00-

PART 1 - GENERAL

TURF AND GRASSES

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section Includes: 1. Seeding 2. Lawn Maintenance

1.03 DEFINITIONS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

B. Base Mix: Homogenously blended mix of the specified topsoil and the specified sand which is then used for mixing with the specified organic amendment to create various Planting Mixes.

C. Compost: An organic material that has been aerobically composted and stabilized from feedstocks such as a green waste (yard debris) or other suitable organic materials

D. Finish Grade: Elevation of finished surface of planting soil.

E. Manufactured Planting Soil Mix: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce a planting soil mix.

F. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

G. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses.

Page 147: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 2

H. Planting Soil Mix: Standardized topsoil; existing, native surface topsoil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

I. Sand: a naturally occurring material that has been processed to remove coarse gravel, silt and clay and sized to meet the specifications.

J. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or top surface of a fill or backfill before planting soil is placed.

K. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

L. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soil can be subsoil.

1.04 SUBMITTALS

A. Product Data: For each type of product indicated.

1. Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to this Project.

B. Certification of Grass Seed: From seed vendor for each grass-seed monostand or mixture stating the botanical and common name, percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.

1. Certification of each seed mixture. Include identification of source and name and telephone number of supplier.

C. Qualification Data: For qualified landscape Installer. Include list of similar projects completed by Installer demonstrating Installer's capabilities and experience. Include project names, addresses, and year completed, and include names and addresses of owners' contact persons.

D. Product Certificates: For fertilizers, from manufacturer.

E. Maintenance Instructions: To be submitted upon lawn work acceptance. Recommended procedures to be established by University for maintenance of lawns during a calendar year. Submit before expiration of required maintenance periods.

1.05 QUALITY ASSURANCE

A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful turf establishment.

Page 148: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 3

1. Professional Membership: Installer shall be a member in good standing of either the Ohio Nursery and Landscape Association or the American Nursery and Landscape Association.

2. Experience: Five years' experience in turf installation in addition to requirements in Division 01 Section "Quality Control."

3. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on Project site when work is in progress.

4. Personnel Certifications: Installer's field supervisor personnel assigned to the Work shall have certification in one of the following categories from the Ohio Nursery and Landscape Association:

a. Ohio Certified Nursery Technician – Master Status b. Ohio Certified Nursery Technician – Landscape Status

5. Pesticide Applicator: State licensed, commercial.

B. Soil-Testing Laboratory Qualifications: An independent laboratory or university laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed.

C. Topsoil Analysis: Topsoil analysis has already been documented and it has determined that no additional soil amendments will be required. Copies of the soil test are available upon contractors request.

D. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Coordination."

1.06 DELIVERY, STORAGE, AND HANDLING

A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable. Store in a manner to prevent wetting and deterioration.

B. Bulk Materials: 1. Do not dump or store bulk materials near structures, utilities, walkways and

pavements, or on existing turf areas or plants. 2. Provide erosion-control measures to prevent erosion or displacement of bulk

materials, discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways.

3. Accompany each delivery of bulk fertilizers, lime, and soil amendments with appropriate certificates.

C. Store materials at site in an orderly manner at location acceptable to the Associate.

Page 149: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 4

1.07 PROJECT CONDITIONS

A. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with maintenance periods to provide required maintenance from date of Substantial Completion.

B. Planting Season: Coordinate planting with specified maintenance periods to provide required maintenance from date of Substantial Completion. For seed, the early fall period is preferred.

1. Fall Planting: August 15 to October 15 (Preferred Time)

C. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions.

D. Work notification: Notify the Associate at least seven working days before installation of lawn materials.

E. Verify location and extent of underground utilities. Protect existing utilities, irrigation, paving and other facilities from damage caused by lawn work operations.

F. Perform lawn work only after planting and other work affecting ground surface has been completed.

G. Restrict traffic from lawn areas until grass is established. Erect temporary signs and barriers as required by the University.

H. Locate, protect and maintain newly installed irrigation system during lawn work operations. Repair irrigation system components, damaged during lawn work operations, at Contractor’s expense.

I. Provide necessary hose and watering equipment as required for lawn maintenance.

1.08 LAWN MAINTENANCE

A. Initial maintenance of installed and accepted lawn plantings will be performed by the Contractor.

B. Begin maintenance immediately after each area is planted and continue until acceptable turf is established but for not less than the following periods:

1. Seeded Turf: 60 days from date upon completion of seeding operations.

a. When full maintenance period has not elapsed before end of planting season, or if lawn is not fully established, continue maintenance during next planting season.

Page 150: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 5

2. Maintain lawns until completion and acceptance of the entire project.

C. Maintain and establish lawn by watering, fertilizing, weeding, mowing, trimming, replanting, and other operations. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth lawn. 1. Replant bare areas with same materials specified for lawns. 2. When seedlings have reached a height of approximately 2”, apply an additional

½ lb. Actual nitrogen in the water soluble form of ammonium nitrate per 1000 sq. ft. A fertilizer with a 2:1:2 or 3:1:2 or similar ratio will be acceptable for this application.

3. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch. Anchor as required to prevent displacement.

D. Watering: Provide and maintain temporary piping, hoses, and lawn-watering equipment to convey water from sources and to keep lawn uniformly moist to a depth of 4 inches (100 mm)

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

.

2. Water lawn at a minimum rate of 1 inch

E. Mow lawn as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 40 percent of grass height. Remove no more than 40 percent of grass-leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height:

per week.

1. Mow grass 2 to 3 inches

F. Lawn post fertilization: Apply fertilizer after initial mowing and when grass is dry.

high.

1. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft.

G. If infestation of weeds or crabgrass develops, treat infestation by hand weeding or herbicidal control. Furnish and install weed chemical control as recommended by manufacturer. Herbicidal controls, including renovation before seeding or sodding operations, shall be acceptable to the Associate.

to lawn area.

1.09 WARRANTY

A. Warranty Period: Warrant that grasses shall be in a healthy and flourishing condition of active growth at the end of the next growing season after the date of Final Completion.

B. Conditions: Established turf that is free of dead or dying patches and shows vigorous growth of foliage of normal density, size, and color.

Page 151: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 6

C. Delays: Delays in completion of planting operations which extend the planting into more than on planting season shall extend the Warranty period accordingly.

D. Coverage: 1. Seeded Turf: Warranty growth and coverage of turf to the effect that a minimum

of 98 percent of the area seeded shall be covered with specified planting at Final Acceptance with no bare spots greater than 3 square inches with such areas not comprising more than two percent of the total seeded lawn area.

2. Unacceptable areas are all areas not showing proper catch, or weed infestation at the end of the maintenance period, and shall be re-seeded or re-sodded.

PART 2 - PRODUCTS

2.01 SEED

A. Grass Seed: Trophy XRE Turf-Type Tall Fescue Blend

Fresh, clean, dry, weed-free, new-crop seed complying with AOSA's "Journal of Seed Technology; Rules for Testing Seeds" for germination tolerances.

B. Timing of the seeding is determined by the date; see 1.7 B. in this section for details. If seeding is to be split because of time of planting, multiply each of the following percentage by 2 for the proper mix at each seeding.

2.02 PLANTING SOIL MIX FOR LAWN AREAS

A. There is insufficient space available on the project site to mix and amend topsoil with

sand and compost. All work of manufacturing the various blends of planting soil for use on this project shall occur off site on property under the control of the Contractor and re-turned to the site fully amended and mixed to meet the requirements of this Section.

B. On-site Soils: 1. Topsoil stockpiled from on-site stripping shall be utilized for reuse. 2. Remove this product to an offsite area for mixing with sand and compost to manufac-

ture specified soil mixes.

C. Additional topsoil: 1. In the event that there is an insufficient amount of on-site topsoil to complete the pro-

ject, additional topsoil from off-site sources shall be provided for mixing with sand and compost to manufacture the specified soil mixes. Any amendments used to manufacture a soil to be imported shall meet the specifications defined in Section 32 91 13 Planting Soils.

Page 152: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 7

2.03 FERTILIZERS

A. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition: 1. Composition: Nitrogen, phosphorous, and potassium in amounts recommended

by manufacturer for turf growth.

B. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium in the following composition: 1. Fertilize at the time of seeding with 18-24-12 at a rate of 4 lbs of fertilizer (by

weight) per 1,000 sq. ft. or a similar analysis with one pound of phosphorus per 1,000 sq. ft. and low nitrogen. The fertilizer must be coded for slow release.

2.04 MULCHES

A. Straw Mulch: Provide air-dry, clean, free from seed bearing stalks or roots of noxious weeds, mildew free, salt hay or threshed straw of wheat, rye, oats, or barley.

2.05 PESTICIDES

A. General: Pesticide, registered and approved by EPA, acceptable to authorities having jurisdiction, and of type recommended by manufacturer for each specific problem and as required for Project conditions and application. Do not use restricted pesticides unless authorized in writing by authorities having jurisdiction.

B. Pre-Emergent Herbicide (Selective and Non-Selective): Effective for controlling the germination or growth of weeds within planted areas at the soil level directly below the mulch layer.

C. Post-Emergent Herbicide (Selective and Non-Selective): Effective for controlling weed growth that has already germinated.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Examine areas to be planted for compliance with requirements and other conditions affecting performance. 1. Verify that no foreign or deleterious material or liquid such as paint, paint

washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area.

Page 153: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 8

2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.

3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results.

4. Uniformly moisten excessively dry soil that is not workable and which is too dusty.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by Owner’s Representative and replace with new planting soil.

D. Begin lawn installation only after finished grading has been approved in writing by Owner’s Representative. Examine lawn areas to verify they are ready to receive work under this section. Start of installation constitutes acceptance of work by other trades.

3.02 PROTECTION

A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, and plantings from damage caused by planting operations.

B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

3.03 PREPARATION OF SUBGRADE

A. Refer to Section 31 20 10 Finish Grading, Article 3.3 Preparation of Subgrade.

3.04 PLACEMENT OF PLANTING SOIL MIX

A. Refer to Section 31 20 10 Finish Grading, Article 3.4 Placement of Planting Soil Mix.

3.05 APPLICATION OF FERTILIZER

A. Fertilizers and conditioners shall be applied at the following rates: 1. Amended Topsoil For General Use and High Use Turf Mix: Commercial Fertilizer

–per manufacturer’s recommendations and application rates. 2. Reinforced Turf Root Zone Mix: Slow Release Fertilizer – per manufacturer’s

recommendations and application rates.

B. Mixing with planting soil:

Page 154: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 9

1. Fertilizer and conditioners shall be spread over the entire lawn areas at the application rates indicated above.

2. Materials shall be uniformly and thoroughly mixed into the top 4” of topsoil by discing, rototilling, or other approved method.

3.06 SEED APLICATION

A. Seed shall be broadcast by means of an approved mechanical spreader, to give uniform application at the following rates: Rate – 10 lbs/1000 square foot.

3.07 HYDROSEEDING

A. Hydroseeding: Hydroseeding is not an acceptable application process for this project.

3.08 TURF MAINTENANCE

A. Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and resod to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation. 1. Fill in as necessary soil subsidence that may occur because of settling or other

processes. Replace materials and turf damaged or lost in areas of subsidence. 2. In areas where mulch has been disturbed by wind or maintenance operations,

add new mulch and anchor as required to prevent displacement. 3. Apply treatments as required to keep turf and soil free of pests and pathogens or

disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards.

B. Watering: Coordinate with University staff to set newly installed irrigation system to settings necessary for optimum growth of lawn. Continually monitor irrigation system to keep turf uniformly moist to a depth of 4 inches throughout the duration of the grow-in season1. Schedule watering to prevent wilting, puddling, erosion, and displacement of

seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

.

2. Revise rate of watering in subparagraph below to suit Project. 3. Water turf with fine spray at a minimum rate of 1 inch per week unless rainfall

precipitation is adequate.

C. Mow turf as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 1/3 of grass height. Remove no more than 1/3 of grass-leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. Schedule initial and subsequent mowings to maintain the following grass height:

Page 155: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

TURFS AND GRASSES C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

329200 - 10

D. Turf Post-fertilization: Apply fertilizer after initial mowing and when grass is dry. 1. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. ft.

3.09 SATISFACTORY TURF

to turf area.

A. Turf installations shall meet the following criteria as determined by Landscape Architect: 1. Seeded Turf: Warranty growth and coverage of turf to the effect that a minimum

of 98 percent of the area seeded shall be covered with specified planting at Final Acceptance with no bare spots greater than 3 square inches with such areas not comprising more than two percent of the total seeded lawn area.

2. Unacceptable areas are all areas not showing proper catch, or weed infestation at the end of the maintenance period, and shall be re-seeded or re-sodded

B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory.

3.10 PESTICIDE APPLICATION

A. Apply pesticides and other chemical products and biological control agents in accordance with requirements of authorities having jurisdiction and manufacturer's written recommendations. Coordinate applications with Owner's operations and others in proximity to the Work. Notify Owner before each application is performed.

B. Post-Emergent Herbicides (Selective and Non-Selective): Apply only as necessary to treat already-germinated weeds and in accordance with manufacturer's written recommendations.

3.11 CLEANUP AND PROTECTION

A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established.

C. Remove non-degradable erosion-control measures after grass establishment period.

END OF SECTION

Page 156: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

APPENDIX A C-2120.3 – Miami University – Farmer School of Business Southeast Breezeway Roof Replacement

APPENDIX A

CLOSEOUT FORMS

Page 157: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

Certification of Contract CompletionMiami University Office of Facilities Contracting 181 Cole Service Building Oxford, Ohio 45056

www.muohio.edu e: [email protected]

v:513.529.2801 / f: 513-529-6846

Project Name PO Number Project Location Contractor

Exceptions (attach additional pages if necessary) Required Completion Date

Contractor Certification Contractor certifies that all Work, except as noted above, is 100% complete, is in conformance with the Contract Documents and that all other requirements for final payment and release of retainage have been completed. Contractor agrees that it shall complete all remaining work indicated above on or before the date or dates indicated, as a contract obligation.

Name Signature Date

A/E Certification Each firm signing below certifies, based on actual observation and knowledge prior to signing, that all Work, except as noted, has been completed in substantial compliance with the contract documents.

Name Signature Date

Owner Acceptance (Miami Project Manager) Contract Acceptance (check one) Partial Final (all work finished – no exceptions noted)

Name Signature Date

7/08

Page 158: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

SAO-F320-02v0710 Page 1 of 1

Certification of Warranty Commencement Miami University Physical Facilities e: [email protected] Facilities Contracting ▪ 181 Cole Service Building ▪ Oxford, Ohio 45056 v:513.529.2801 ▪ f: 513.529.6846

Project Name MU Contract No.

Local No.

Project Location Contractor Equipment and materials included Warranty start date Warranty end date*

*Date does not supercede or take precedence over Contract requirements.

Exceptions for each equipment and material (Include terms and requirements to cure each exception listed, i.e. testing, maintenance, cleaning, etc.)

Required completion date

Contractor Certification Warranty(ies) certified to comply with the Contract Documents.

Architect/Engineer Approval Equipment / material accepted for this Contract.

Name Name

- - - - Signature Date Signature Date

Construction Manager Approval Equipment / material accepted for this Contract.

MU Project Manager Acknowledgement Owner acknowledges receipt of warranty(ies), manual(s) and all other required submittals associated with the noted equipment or material.

Name N/A Name

- - - - Signature Date Signature Date

Page 159: FARMER SCHOOL OF BUSINESS - Miami University...SUMMARY C-2120.3 –Miami University –Farmer School of Business Southeast Breezeway Roof Replacement 011000-3 Provide a minimum of

Page 1 of 1

Payment Release Affidavit Miami University Physical Facilities e: [email protected] Facilities Contracting ▪ 181 Cole Service Building ▪ Oxford, Ohio 45056 v:513.529.2801 ▪ f: 513.529.6846

Project Name Local P.O. No.

Project Location Owner Miami University Project County Butler Contractor to submit with final payment request and with request to release retainage escrow. Certification By signing this document, the Contractor certifies that it and all of its Subcontractors and Material Suppliers have fully complied with Chapter 4115 of the Ohio Revised Code (ORC), “Wages and Hours on Public Works,” for the Contract noted above, and that all Subcontractors and Material Suppliers have been paid in full for all Work performed or materials furnished for the Contract except (check all that apply): amounts that will be paid from payment(s) now due to the Contractor. amounts for liens which the Contractor previously disputed and resolved with the University by

providing a Bond pursuant to Section 1311.311 ORC and has served a Notice to Commence Suit to the lien claimant.

no exceptions. Affiant: Company Name ______________________________________________ ______________________________________________ Signature Print or Type Name ______________________________________________ Title ______________________________________________ Notary The Affiant acknowledged and signed this instrument before me, a Notary Public in and for the County of

_____________________________, State of Ohio. [Seal] Sworn and subscribed before me this _____ day of ________________, 20____. ________________________________________ Notary Public