Design Testing
Overview
User and system designer work as partners to develop
not only an efficient application system, but also one
that is acceptable to the user.
Objective
Test process recommends scoring the design success
factor, conducting a design review; and inspecting
design deliverables
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
3/13
Concerns
Produces more effective testing.
Test process to be more productive
Create a more professional image
Develop more meaningful findings and
recommendations
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
4/13
WORKBENCH
DO CHECK
REWORK
Task 1
Task 2
Task 3
Score Success
Factors
Analysis Design
Factors
Conduct Design
Review
Design accurate
&
complete
Design process
Design phase
Deliverables
Test Report
Task 4Inspect Design
Deliverables
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
5/13
Input
The sooner the project team become aware of
potential defects, the cheaper it is to correct
those defects
When defects are found, the corrective process
can be so time-consuming and painful that it
may appear cheaper to live with the defects
than to correct them
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
6/13
Design Phase Deliverables
Input specification
Processing specification
File specification
Output specification
Control specification
System flowcharts
Hardware and software requirements
Manual operating procedure specifications
Data retention policies
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
7/13
Task 1: Score Success Factors
Scoring is a predictive tool that utilizes previous systemsexperience.
Existing systems are analyzed to determine the attributes
of those systems and their correlation to the success orfailure of that particular application.
When attributes that correlate to success or failure canbe identified, they can be used to predict the behavior ofsystems under development.
The more heavily the user is involved, the higher theprobability that system will be successful
Election
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
8/13
Scoring Process
Scoring Criteria (Attributes)
Sampling
High positive correlation
Ease of use Develop risk score
Scoring test tool
Project leader assessment
Test team assessment
Conclusion
Estimate extent of testing
Identify area of test
Identify composition of test team
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
9/13
Task 2: Analyze test factors
Data integrity controls designed
Authorization rules designed
File integrity controls designed
Audit trail designed
Contingency plan designed Method to achieve service level designed
Access procedures defined
Design complies with methodology
Design conforms with requirements
Design facilitates use Design is maintainable
Design is portable
Interface design is complete
Design achieves criteria
Needs communicated to operations
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
10/13
Task 3: Conduct Design Review
Conducted by team of individual
knowledgeable in the design process
Follow predetermined review process Project personnel
Independent review team
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
11/13
Guidelines
Select the review team
Train the review team member
Notify the project team
Allot adequate time
Document the review facts
Review the facts with the project team
Develop review recommendations
Review recommendation with project team
Prepare formal report
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
12/13
Task 4: Inspect Design Deliverables
Inspection is a process by which completed butuntested design products are evaluated as towhether the specified changes were installed
correctly 3 types of defects
Errors, the change has not been made correctly
Missing, something that should have been changed ,but
was not changed
Extra, something not intended was changed or added
7/27/2019 FALLSEM2013 14 CP0600 06 Sep 2013 RM01 2 Design Phase Testing
13/13
Output
Deficiencies uncovered in the design review
Defects and assessment produced by theinspection process
Results from deliverables inspection
No defects found
Minor work required
Major rework required
Training & product quality - enhance benefits of formalinspection