FAIRwayDanube Commission Meeting in Budapest 29.09.2015Károly GOMBÁS (Andreas Bäck)
Harmonized realization of theFairway Rehabilitation and Maintenance Master Plan
Global ProjectIWW of theRhine-Danube Corridor
Proposed ActionFAIRway waterways
Page 3Page 3
Fairway Maintanance Master Planfor the Danube and its navigable tributaries
Conclusions byDanube Ministers
Guidelines+ CEF
Key facts
Page 5
ScheduleStart: 07/2015Closure: 06/2020[Duration of 5 years]
BudgetTotal: 23,4 Mn EURCEF: 19,7 Mn EUR
SettingMulti-applicant CEF study including pilot operations: seven interlinked actions
• Elaborate coordinated national action plans and define pilots
• Procure equipment for hydrological services
• Execute and evaluate pilots
• Harmonized basic data on critical locations
• Coherent monitoring of navigational status
• Harmonized water level prognosis
• Potential of fairway relocation and floating ship data
• Develop innovative approaches (aerial monitoring, AtoNs …)
• Prepare documentation for future implementation steps
• Manage project and disseminate results
Page 6
Overview on FAIRway activities
Ministerial Conclusions (Dec 2014) ask for national roadmaps based on the Fairway Rehabilitation and Maintenance Master Plan until June 2015.
Further development within FAIRway:
• Develop 1st version further
• Update national action plans yearly
• Elaborate pilot implementation concept and evaluation
framework
Page 7
Activity 2 National action plans and definition of pilots
Joint market survey, aligned technical specifications, preparation of procurement documents with support of international expertsJoint tenders envisaged for transnational waterway asset management system.
Page 8
Activity 3 Procurement of hydrological service pilots
Data gathering
Data processing and analysis
Waterway asset management
system
Water level prognosis
Surveying vessels and
gauging stations, floating ship data
Respond to data
Multifunctional marking
equipment
Joint market survey, aligned technical specifications, preparation of procurement documents by national experts.Joint tenders envisaged for transantional waterway asset management system.
Page 9
Activity 3 Pilot operation over 3 years…
Systematic decision support through
improved data
analysis. Matchable water level prognosis
displayed in a
harmonized way.
Optimized surveys with
denser intervals at
critical locations.
Strategically placed water level gauges deliver basic
data.
Exploit full potential of navigation conditions through dynamic marking
… to gain experience for the full deployment of the FRMMP
Add new perspectives to the waterway administration.
• Aerial photo monitoring concepts
• Optimum speed at navigable canals
• Recalculation of Low Navigable Water Level at the Lower Danube
• Agree on AIS AtoN application standard
Page 10
Activity 5 Innovative approaches
Prepare for the full implementation of the Fairway Rehabilitation and Maintenance Master Plan based on the national roadmaps and pilot results.
• Feasibility studies in Slovakia (Lower Váh and
Gabcikovo)
• Prepare implementation of additional measures
Page 11
Activity 6 Documentation for full deployment
Thank you for your attention!