Fairfield-Suisun Unified School District 2490 Hilborn Road Fairfield, California 94534 Telephone (707) 399-5145 FAX: (707) 399-5151 [email protected] Governing Board Perry W. Polk Board President David C. Isom President-Elect Judi Honeychurch Clerk Dave Gaut Kathy Marianno Pat Shamansky John Silva Superintendent Jacki Cottingim-Dias, Ph.D. DATE: April 10, 2013 TO: PROSPECTIVE BIDDERS FROM: Sharon Ketcherside, Director Purchasing and Contract Services REFERENCE: BID #041113 ADMINISTRATION BUILDLING – ARMIJO HIGH SCHOOL ADDENDUM #4 The following clarifications and changes shall apply in accordance with the attachments that were provided by Meta Architecture Design Initiative. This Addendum supersedes all previous drawings, specifications, and instructions pertaining to this project. “Our Mission is to Provide a Quality Educational System that Assures Opportunities for Every Student to Learn and Meet the Challenges of the Future”

Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Embed Size (px)

Citation preview

Page 1: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Fairfield-Suisun Unified School District

2490 Hilborn Road • Fairfield, California 94534 Telephone (707) 399-5145 FAX: (707) 399-5151 [email protected]

Governing Board

Perry W. Polk Board President

David C. Isom President-Elect

Judi Honeychurch

Clerk

Dave Gaut Kathy Marianno Pat Shamansky

John Silva

Superintendent

Jacki Cottingim-Dias, Ph.D.

DATE: April 10, 2013 TO: PROSPECTIVE BIDDERS FROM: Sharon Ketcherside, Director Purchasing and Contract Services REFERENCE: BID #041113 ADMINISTRATION BUILDLING – ARMIJO HIGH SCHOOL ADDENDUM #4 The following clarifications and changes shall apply in accordance with the attachments that were provided by Meta Architecture Design Initiative. This Addendum supersedes all previous drawings, specifications, and instructions pertaining to this project.

“Our Mission is to Provide a Quality Educational System that Assures Opportunities for Every Student to Learn and Meet the Challenges of the Future”

Page 2: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Fairfield‐Suisun Unified School District 2490 Hilborn Road, Fairfield, CA 94534 O 707.399.5000   DSA #: 02‐112509                                File #: FSAH‐02  Project: ARMIJO HIGH SCHOOL: New Administration and Counseling Buildings This Addendum forms a part of the Contract Documents and modifies and clarifies the original bidding documents as noted below.  Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form.  Failure to do so may subject the Bidder to disqualification. 

 

Addendum No. 4, dated April 10, 2013 

1. CHANGES TO THE PROJECT MANUAL: 

ITEM 1 Various revisions to project specifications, to correct typographical errors. Refer to 

specifications sections: 

SECTION 12486  WALK‐OFF MATS  

ITEM 2 Various revisions to project specifications, to supercede multiple versions distributed. Refer to specifications sections: 

SECTION 01640  OWNER FURNISHED PRODUCTS  ITEM 3 Addition of note regarding BEMS. Per mechanical engineer: “The Building Energy 

Management System (BEMS), including the controls system design, software, hardware, and programming  required to provide a fully functioning and campus wide integrated system, shall be provided by and/or based on Alerton Controls.  The Temperature Controls Contractor (TCC) shall be responsible for coordinating the controls system design between school district personnel, the engineer of record, and the Alerton Controls representative to ensure the design and specifications meet all district requirements.  The TCC shall also be responsible for the installation, commissioning, and servicing of the final controls system design.  Training of school district personnel and commissioning assistance shall be included.  Balancing of mechanical systems shall be by an independent air balance contractor as specified in the divisions 15 specifications.” 

 2. CHANGES TO THE DRAWINGS: 

 ITEM 1 Revisions to sheet A2.5: Addition of schedule columns denoting wall finish. Refer to 

sheet:  

A2.5  

3. ADDITIONAL SPECIFICATIONS: 

ITEM 1 Additions to specifications. Refer to specifications sections: 

SECTION 08580  SPECIAL FUNCTION WINDOWS 

Page 3: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

4. CLARIFICATIONS:  ITEM 1 Responses to Requests for Information. Refer to RFI Responses: 

RFI#1      SPRINKLERS/DEFERRED APPROVALS 

RFI#9      ACOUSTIC/ TACKBOARD PANELS 

RFI#10      WALL FINISH SCHEDULE 

RFI#11      INTERIOR ELEVATIONS 

RFI#12      SD5 BULKHEAD SUPPORT 

RFI#13      ACOUSTICAL CEILING TILES 

RFI#BROWARD#1    SPECIFICATIONS 

RFI#BROWARD#2    SECTION 01640 OWNER FURNISHED PRODUCTS 

RFI#BROWARD#3    FLAGPOLES 

RFI#BROWARD#4    ACOUSTICAL PANELS/ BID TIME EXTENSION 

RFI#BROWARD#5    VARIOUS CLARIFICATIONS 

RFI#BROWARD#6    VARIOUS CLARIFICATIONS 

RFI#SWANK#1 Response#1    VARIOUS CLARIFICATIONS 

RFI#SWANK#2 Response#1    VARIOUS CLARIFICATIONS  

ITEM 2 Responses to Requests for Substitutions. Refer to submittals: 

Submittal A4‐1  FLUSH BOLTS 

Submittal A4‐2  CYLINDRICAL LOCKS 

Submittal A4‐3  DOOR CLOSERS 

Submittal A4‐4  EXIT DEVICES 

Submittal A4‐5  PHENOLIC TOILET COMPARTMENTS   Number of Pages added by this Addendum, including this page is 93 Pages. 

Page 4: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Walk‐Off Mats

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 12486‐1

 

WALK‐OFF MATS  

Section 12486  PART 1 ‐ GENERAL  

  1.1   STIPULATIONS  

A.   The specification sections "General Conditions of the Design/Build Contract", "Supplemental Conditions", "Division 1 ‐ General Requirements" and Drawings form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.  

  1.2   SUMMARY  

A.   This Section includes recessed walk‐off mats.  

B.   The extent of recessed walk‐off mats are shown on Drawings.  

1.3.   REFERENCES  

A.   American Society for Testing and Materials (ASTM)  

B.   The Aluminum Association  

C.   The Carpet and Rug Institute (CRI)  

D.   The National Floor Safety Institute (NFSI)  

1.4   SUBMITTALS  

A.   Product data for each type of floor grid and frame specified, including manufacturer's specifications and installation instructions.  

B.   Shop drawings in sufficient detail showing layout of grid and frame specified including details indicating construction relative to materials, direction of traffic, spline locations, profiles, anchors and accessories.  

C.   Samples for verification purposes: Submit an assembled section of floor grid and frame members with selected tread insert showing each type of color for exposed floor grid, frame and accessories required.  

D.   Maintenance data in the form of manufacturer's printed instructions for cleaning and maintaining floor grids.  

1.5   QUALITY CONTROL  

Page 5: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Walk‐Off Mats

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 12486‐2

 

A. Flammability in accordance with ASTM E648, Class 1, Critical Radiant Flux, minimum  0.45 watts/m.   B. Slip resistance in accordance with ASTM D‐2047‐96, Coefficient of Friction, minimum  0.60 for accessible routes.   C. Standard rolling load performance is 400 lb./wheel with larger loading requirements as specified (load applied to a solid 5” x 2” wide polyurethane wheel, 1000 passes without damage).  

D. Single Source Responsibility: Obtain floor grids and frames from one source of a single manufacturer.  

E. Utilize superior structural aluminum alloys 6105‐T5 & 6016‐T6for rail components.   

1.6 DELIVERY, STORAGE AND HANDLING   A. Deliver materials to the project site ready for use and fabricated in as large sections and 

assemblies as practical, in unopened original factory packaging clearly labeled to identify manufacturer.  

 1.7 PROJECT CONDITIONS  

A. Field measurements: Check actual openings for grids by accurate field measurements before fabrication. Record actual measurements on final shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of work.  

B. Coordinate frame installation with concrete construction to ensure recess and frame anchorage are accurate and that the base is level and flat. Defer frame installation until building enclosure is complete and related interior finish work is in progress.  

PART 2 PRODUCTS  

2.1 MANUFACTURERS  

A. Drawings and specifications are based on manufacturer's literature from Construction Specialties, Inc.  

2.2 MATERIALS  

A. Aluminum ‐ ASTM B 221, alloy 6105‐T5 for rail extrusions and 6061‐T6 for key lock bars.  

B. Tread insert options ‐ refer to section 2.05.  

2.3 FLOOR GRIDS  

A. Model and Description ‐ G1 Pedigrid shall be extruded 6105‐T5 aluminum alloy tread rails joined mechanically by extruded 6106‐T6 aluminum alloy key lock bars. (welding 

Page 6: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Walk‐Off Mats

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 12486‐3

 

or bolting shall not be permitted.) Rail finish to be 1 of 7 colors in powder coat finish.  

2.4 GRID FRAMES  

A. LB ‐ Level Base Shall be 6063‐T5 aluminum alloy with 1/2"(12.7mm) exposed surface and a depth of 1‐13/16" (46.0mm). These assemblies receive 1/4"(6.4mm) thick heavy gauge support cushions 1" (25.4mm) long mounted to each continuous foot at 20" (0.51m) on center. Frame color shall be supplied in 1 of 7 colors in powder coat finish.  

2.5 TREAD INSERT  

A. HD MonoTuft HD™ Carpet shall meet the Carpet and Rug Institute’s standard for indoor air quality. Fibers shall include a minimum of 100, 12 mil monofilament fibers per square inch and colorfast, solution‐dyed nylon. Available in one of 25 standard colors as offered by manufacturer. Each carpet fiber and monofilament shall be fusion‐bonded to a rigid two‐ply backing to prevent fraying and supplied in continuous splice‐free lengths. Antistatic carpet fiber shall contain antimicrobial additive and be treated with Scotchgard® to reduce soiling. Carpet weight shall be 33‐oz./yd². Urea‐formaldehyde free.  VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart d (EPA Method 24). Submit VOC Submittal form.  

PART 3 EXECUTION  

3.1 EXAMINATION  

A. Verification of conditions: Examine areas and conditions under which work is to be performed and identify conditions detrimental to proper or timely completion.. Do not proceed until unsatisfactory conditions have been corrected.  

3.2 PREPARATION  

A. Manufacturer shall offer assistance and guidance to provide a template of irregular shaped grid assemblies to ensure a proper installation.  

3.3 INSTALLATION  

A. Install the work of this section in strict accordance with the manufacturer's recommendations.  

B. Set grid at height recommended by manufacturer for most effective cleaning action.  

C. Coordinate top of grid surfaces with bottom of doors that swing across to provide ample clearance between door and grid.  

Page 7: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Walk‐Off Mats

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 12486‐4

 

3.5 PROTECTION  A. After completing required frame installation and concrete work, provide temporary filler of plywood or 

fiberboard in recess, and cover frames with plywood protective flooring. Maintain protection until construction traffic has ended and project is near time of substantial completion.  

B. Defer installation of floor grids until time of substantial completion of project.  

END OF SECTION 12486 

Page 8: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FSUSD Armijo Admin Documents 38 Bid #041113

SECTION 01640 OWNER FURNISHED PRODUCTS

PART 1 - GENERAL 1.3 SUMMARY

A. DESCRIPTION: The Owner shall procure and provide certain products for installation as shown and specified per Contract Documents.

B. RELATED WORK SPECIFIED ELSEWHERE:

1. GENERAL: Products furnished and paid for by the Owner are described

in the following technical sections and /or in the Drawings.

2. DISTRICT SUPPLIED MATERIAL Note that this project includes the installation of owner-supplied material; the District has acquired building material through the CMAS (California Multiple Award Schedules) program.

1.2 DEFINITIONS

A. GENERAL: The following are used to identify products as noted on the Drawings.

B. OWNER FURNISHED OWNER INSTALLED (O.F.O.I.): Products or equipment

to be provided and installed by the Owner, but requiring surfacing, backing, utility connections or other preparation under this contract, for proper installation.

PART 2 - PRODUCTS 2.3 PRODUCTS

A. EQUIPMENT: OWNER FURNISHED OWNER INSTALLED (O.F.O.I.):

TABLE OF EQUIPMENT: OWNER FURNISHED OWNER INSTALLED (O.F.O.I.):

EQUIPMENT APPLIANCES CLOCKS TV MONITORS

B. WINDOW TREATMENT: OWNER FURNISHED OWNER INSTALLED

(O.F.O.I.): TABLE OF WINDOW TREATMENT: OWNER FURNISHED OWNER INSTALLED (O.F.O.I.):

Page 9: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

FSUSD Armijo Admin Documents 39 Bid #041113

EQUIPMENT HORIZONTAL BLINDS DRAPERY & TRACK

C. FURNITURE: OWNER FURNISHED OWNER INSTALLED (O.F.O.I.):

TABLE OF FURNITURE: OWNER FURNISHED OWNER INSTALLED (O.F.O.I.):

EQUIPMENT PRINCIPAL A-07 ASSISTANT PRINCIPAL A-08 SECRETARY A-06 (HI-LO) ASSISTANT PRINCIPAL D-03 ASSISTANT PRINCIPAL D-06 ADDITIONAL FURNITURE AS NECESSARY

PART 3 - EXECUTION 2.4 OWNER'S RESPONSIBILITIES

A. SUBMITTALS: Arrange for and deliver necessary shop drawings, product data and samples to Contractor.

B. DELIVERY:

1. General: Arrange and pay for product delivery to site, in accordance with

construction schedule.

2. Bill of Materials: Deliver supplier's documentation to Contractor.

3. Inspection: Inspect jointly with Contractor.

4. Claims: Submit for transportation damage and replacement of otherwise damaged, defective, or missing items.

C. GUARANTEES: Arrange for manufacturer's warranties, bonds, service,

inspections, as required.

* End Section 01640

Page 10: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

 

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Special Function Windows

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 08580‐1

 

SECTION 08580 SPECIAL FUNCTION WINDOWS 

 PART 1 ‐GENERAL   

    1.1    SUMMARY   

A.    DESCRIPTION: Provide Special Function Windows, as shown and specified per Contract Documents.   

   1.2    SUBMITTALS   

A.    GENERAL: Refer to Section 01330 ‐SUBMITTALS.   

B.    SHOP DRAWINGS: Submit manufacturer's standard colors for finish specified.   

C.    SAMPLES: Submit full range of colors available.   

D.    PRODUCT DATA: None required for specified products; required for alternate products.   

E.    CLOSEOUT:   

1 General: Refer to Section 01770 ‐CLOSEOUT PROCEDURES.   

2 Maintenance Data: Manufacturer's instructions.   

3 Guarantee: Provide in required form for a period of two (2) years from date of final acceptance by Owner.   

    1.3    QUALITY REQUIREMENTS   

A.    GENERAL: Refer to Section 01430 ‐QUALITY ASSURANCE.   

B.    REFERENCE STANDARDS:   

1. General: Refer to Section 01420 ‐REFERENCES for reference standards, applicable codes and definitions.   

2. American Architectural Manufacturers Association (AAMA): ANSI/AAMA 101; maximum air infiltration 0.37 cfm per lineal foot of crack.    3. American Society for Testing Materials (ASTM):   

Page 11: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

 

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Special Function Windows

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 08580‐2

 

 a. ASTM E330: Structural Performance of Exterior Windows, Curtain Walls, and Doors by Uniform Static Air Pressure Difference.   

b. Requirements: Design and size units to withstand dead and live loads produced bywind pressure acting normal to plane of wall, calculated in accordance with CBC to a design pressure of 24 Ibs. per square foot.    

4. UBS Standard 7‐4.    C.    QUALIFICATIONS:  Installer specializing  in the work of this Section with minimum three 

(3) years documented experience on at least five (5) similar installations.    PART 2 ‐PRODUCTS    2.1    MATERIALS    A.    GENERAL: Refer to Section 01600 ‐PRODUCT REQUIREMENTS.   

B.    PASS WINDOWS:   

1. General: Manufactured by Nissen & Co., Inc., custom size and glass thickness as shown.   

2. Alternate Manufacturers: Comparable products manufactured by Creative Industries, Inc., or accepted equal.   

3. Vertical Sliding: "Series C", size as shown.   

4. Lock: Sliding bolt lock.    

C.    FINISH: Clear anodized.   

D.    GLASS: Size and type as shown; see Section 08810 ‐GLASS AND GLAZING.   

E.    FASTENERS: As recommended by manufacturer.   

F.    SEALANT: As specified under Section 07901 ‐JOINT SEALERS; match frame color.   

G.    PROTECTIVE COATING: Bituminous; conforming to FS TT‐C‐494.   

PART 3 ‐EXECUTION   

Page 12: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

 

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Special Function Windows

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 08580‐3

 

3.1    PERFORMANCE   

A.    GENERAL: Refer to Section 01700 ‐EXECUTION REQUIREMENTS.   

3.2    PREPARATION   

A.    ENVIRONMENTAL REQUIREMENTS: Do not  install sealants when  temperature  is below 40 degrees Farenheit. 

B.    EXAMINATION:  Examine  conditions  of  work  in  place  before  beginning  work;  report defects.   

C.    MEASUREMENTS:  Take  field measurements;  report  variance  between  plan  and  field dimensions.   

3.3    INSTALLATION   

A.    GENERAL:  Install  in  conformance  with  referenced  standards, manufacturer's  written directions, as shown, and as specified.   

B.    ATTACHMENT: Set windows  straight, plumb and  level,  free of warp or  twist;  securely anchor  in  place  as  recommended  by  manufacturer,  to  accommodate  construction tolerances and other irregularities; align with adjacent work.   

C.    THERMAL  INSULATION:  Provide  thermal  isolation  where  components  penetrate  or disrupt  building  insulation.  Pack  fibrous  insulation  in  shim  spaces  at  perimeter  of assembly to maintain continuity of thermal barrier. Coordinate attachment and seal of perimeter air and vapor barrier materials.   

D.    HARDWARE: Install per manufacturer's instructions.    

E.    GLASS:   

1. General: Install glass per Section 08810 ‐GLASS AND GLAZING.   

F.    SEALANT:  Install per Section 07901  ‐JOINT SEALERS; apply as shown, make  installation fully watertight.   

G.    DISSIMILAR MATERIALS: Separate concealed aluminum surfaces in contact with ferrous metals, concrete, masonry or plaster with bituminous coating compound.   

3.4    ADJUSTMENT   

Page 13: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

 

FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT Special Function Windows

ARMIJO HIGH SCHOOL: PROPOSED ADMINISTRATION & COUNSELING BUILDING Section 08580‐4

 

A.    GENERAL: Prior to acceptance, adjust moveable parts to assure smooth operation.   

3.5    CLEANING   

A.    GENERAL:  Keep  premises  free  from  accumulation  of  waste  and  rubbish.  At  the completion  of work  remove  surplus materials,  rubbish,  debris,  and  thoroughly  clean exposed surfaces per manufacturer's instructions.   

END SECTION 08580   

 

Page 14: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 15: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 RFI RESPONSE FORM  

 

  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#1 

Issued By  SW Allen Construction, Inc.  Date  04/01/13 

ITEMS SUBMITTED:   A. Deferred approval on fire sprinklers? Any Deferred approvals on this project?     RESPONSE: Fire sprinkler design has been approved by DSA. See sheets FP‐1 through FP‐4 and Fire Water Calculations and cutsheets. This project has no deferred approvals.    

 

Reviewed by  Lily Good  Date  04/08/13 

Page 16: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 17: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. Elevations showing acoustic panels & tack board locations. RESPONSE: DELETE Acoustic panels. This material will not be used in this project. See revised sign & 

finish plan and finish schedule on sheet A2.5 included in this addendum. 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#9 

Issued By  S W Allen Construction, Inc.  Date  04/10/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 18: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 19: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. Wall finish schedule. RESPONSE: See revised sign & finish plan and finish schedule on sheet A2.5 included in this 

addendum. 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#10 

Issued By  S W Allen Construction, Inc.  Date  04/10/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 20: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 21: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. Interior elevations. RESPONSE: No new interior elevations will be provided. See revised sign & finish plan and finish 

schedule on sheet A2.5 included in this addendum for floor and wall finishes. 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#11 

Issued By  S W Allen Construction, Inc.  Date  04/10/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 22: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 23: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. SD5 Bulkhead support. RESPONSE: Per Structural Engineer; “reference sheet S2.1 of the DSA approved structural plans.  

There is an additional Bulkhead Framing plan located in the lower right corner of the sheet showing the required framing.” 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#12 

Issued By  S W Allen Construction, Inc.  Date  04/10/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 24: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 25: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. Acoustical ceiling tiles. RESPONSE: See response to RFI#Broward#4. 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#13 

Issued By  S W Allen Construction, Inc.  Date  04/10/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 26: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 27: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 RFI RESPONSE FORM  

 

  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Broward#1 

Issued By  Chuck Klenzendorf, Broward Builders, Inc.  Date  04/05/13 

ITEMS SUBMITTED:   1. Missing spec. sections for Metal Fabrications, Structural Steel, Expansion Joints, Rough Carpentry.     RESPONSE:  

Metal Fabrications: Refer to attached DSA‐approved PC for National Carport Single Post Walkway Cover, sheets S‐1 through S‐4 and S‐9 through S‐12. 

Structural Steel: Refer to structural plans. See sheet SN1 structural steel notes Section 2 Table 1. Expansion Joints: See details 13‐16/A8.1 for manufacturer and part number. Install per 

manufacturer’s recommendation. 

Rough Carpentry: See Addendum#2‐ Section 06100 Rough Carpentry.  2. Section 01640 Owner Furnished Products page numbers.     RESPONSE: Section 01640 Owner Furnished Products comprises pages 38‐39 of the Specifications document. Any numbering discrepancy may be due to the PDF inclusion of Table of Contents sheet.  3. Typographical error in footer of Section 12486 Walk‐Off Mats.      RESPONSE: Refer to revised section included in this addendum. 

 

Reviewed by  Lily Good  Date  04/05/13 

Page 28: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 29: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 30: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 31: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   

1. Section 01640 Owner Furnished Products, varying versions. RESPONSE: Section 01640 attached in this addendum to supercede all previous versions. 

   

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Broward#2 

Issued By  Chuck Klenzendorf, Inc.  Date  04/15/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 32: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 33: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 34: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 35: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 36: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 37: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 38: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 RFI RESPONSE FORM  

 

  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Broward#3 

Issued By  Dan Delorefice, Broward Builders, Inc.  Date  04/05/13 

ITEMS SUBMITTED:   A. Flagpole quantity, specifications, included in bid?     RESPONSE: Two flagpoles are shown on plan sheets A1.2a and A1.2b. See detail 13/A1.4. Provide Bolander or equal. Flagpoles are included in base bid, and are not owner furnished.    

 

Reviewed by  Lily Good  Date  04/08/13 

Page 39: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 40: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

RFI RESPONSE FORM

MADI Project # FSAH-02 DSA # 02-112509 File # 48-H10

Project Descrip�on New Administra�on & Counseling Buildings at Armijo High

Client Fairfield Suisun Unified School District

Submi�al # RFI#Broward#4

Issued By Chuck Klenzendorf, Broward Builders, Inc. Date 04/04/13

ITEMS SUBMITTED: 1. Sec�on 09841 Acous�c Panels. Loca�ons of acous�c wall panels. RESPONSE: Delete this sec�on. This material will not be used in this project. 2. Sec�on 09510 Acous�c Ceilings. Loca�ons of various acous�c ceiling �le types. RESPONSE:

? 09510-2.1-2-C (AP2): This ceiling �le to be installed everywhere T-bar ceilings are indicated on A2.4a, and everywhere T-bar ceilings are indicated on A2.4b EXCEPT WHERE NOTED BELOW.

? 09510-2.1-2-D (AP3): This ceiling panel to be installed only in the 10’-6” AFF coffered ceiling area above rooms C-04 and C-05. Linearity of pa�ern shall run North-East to South-West.

? 09510-2.1-2-E (AP4) Delete this reference. This material is not to be used in this project. 3. Request to change bid �me from 10:00AM to 2:00PM. RESPONSE: See response in addendum

Reviewed by Lily Good Date 04/05/13

#3.

Page 41: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 42: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 43: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 RFI RESPONSE FORM  

 

  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Broward#5 

Issued By  Chuck Klenzendorf, Broward Builders, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   1. On site clayey soils as engineered fill. RESPONSE: Per Geotechnical Engineer, in reference to page 21 of Geotechnical report; “On‐site clayey soils, if properly moisture conditioned, may be used as engineered fill. The on‐site clayey soils may not be used in the 2‐foot thick layer of non‐expansive fill at the top of the building pad. They may be used in non‐structural areas, not requiring non‐expansive fill, or areas of asphalt pavement.”  2. Existing asphalt grindings as sub grade fill at concrete pedestrian paved areas. RESPONSE: Per Geotechnical Engineer; “Asphalt grindings, if sufficiently processed, i.e to a gradation similar to AB, may be used as subgrade fill at concrete pedestrian paved areas.” To reiterate, this material may be used at concrete flatwork ONLY.  3. Specifications section 12497 Drapery and Track. RESPONSE: This section will be owner‐supplied, owner‐installed, per section 01640 Owner Furnished Products.  4. Specifications section 12491 Horizontal Blinds. RESPONSE: This section will be owner‐supplied, owner‐installed, per section 01640 Owner Furnished Products.  5. Specifications section 09841 Acoustical Panels. RESPONSE: Delete this section. This material will not be used on this project.  6. Specifications section 09721 Dry Erase Wall Coverings. RESPONSE: See revised sign & finish plan and finish schedule on Sheet A2.5 included in this addendum. 

 

Reviewed by  Lily Good  Date  04/09/13 

Page 44: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 45: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 46: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 47: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 48: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 49: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 50: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 51: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 RFI RESPONSE FORM  

 

  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Broward#6     

Issued By  Chuck Klenzendorf, Broward Builders, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   1. Clarify Extent of mechanical service access guardrail at low roof. RESPONSE: See response to Item 11 in RFI#Swank#1.  2. Plaque inclusion/location. RESPONSE: One bronze dedication plaque shall be provided according to Section 10420‐Plaques and location in lobby shall be coordinated with district and architect.  3. Prequalification List Missing. 

RESPONSE: Per owner; “Updated pre‐qualification list is provided on the district's web page under "facilities". This will be updated throughout the bid process.”  4. Electrical subconsultant prequalification time. RESPONSE: See addendum 3 revised Bid Time.  

 

Reviewed by  Lily Good  Date  04/09/13 

Page 52: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 53: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 54: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 55: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 56: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 57: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:   RESPONSE:  

*NOTE: All items not responded to in this Addendum will be addressed in a future Addendum.  

1. Extension of bid date. RESPONSE:  See response in addendum#3.  

2. Are plans DSA approved? RESPONSE:   The bid set that has been issued is DSA approved.  

3. Reference to equipment anchorage notes RESPONSE:  Equipment anchorage notes relate to contractor’s installation requirements. Does not relieve contractor from installing products per requirements of the contract or per manufacturer’s requirements, whichever is more stringent.  

4. Questions referring to single post covered walkway RESPONSE:  Refer to manufacturer drawings issued with bid set  

5. Questions referring to civil scope: RESPONSE: Per Civil Engineer;  a. No parking lot lighting removal is noted on this plan. b. Yes the saw cut line are correct. 

 6. Questions referring to civil scope 

RESPONSE: Per Civil Engineer; a. Phase I and 2 have the same finish floor elevation.  See slab design by others for the 

total thickness of slab and rock section. 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Swank#1    Response#1 

Issued By  Swank Construction inc.  Date  04/05/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 58: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

b. Provide AC paving as noted on the Architectural plans.  Pavement section to be per Type 7. 

 7. Reference to partial utility plan 

RESPONSE: Per Civil Engineer; C3.1 is the only Civil utility plan.  

8. ‐  

9. Reference to flagpole manufacturer RESPONSE:  All flagpole manufacturers as specified must meet the requirements in specifications and drawings. Manufacturer can be as recommended or an approved equal.  

10. Reference to walk off mats and kitchen appliances RESPONSE:  a.  See Section 12486‐Walk Off Mats in this addendum, and response to 

substitution request in Addendum #2 for walk off mats.     b.  Kitchen appliances are owner provided and owner installed.  

11. Reference to guard rail RESPONSE:   Provide guard rail as shown in drawings if Administration Building (Phase 1) and Counseling Building (Phase 2) are not constructed concurrently. Extent of guardrail for base bid shall continue from edge of wall corner near Gridlines D and Pb (near door R0.1/A), along parapet to a point where mechanical service access path is 10’‐0” away from parapet edge.  This is the only location of guardrail shown on plans A2.2a and A2.2b. If Phases are constructed concurrently, guard rail may be deleted.  

12. Downspouts location/ material. RESPONSE: There are downspouts serving all roof drains on the flat roof; refer to A2.2b. There are downspouts serving all gutters (at both ends) at sloped roof areas; refer to A2.3b. Gutters run full height and are connected to storm drain lines, refer to C3.1. Per Section 07601: 2.13 G: 

5.   Gutters (GTR):  a.   General: 24 gage as shown with galvanized Schedule 40 steel pipe, with 

closed ends; 16 gage prefinished straps at 30" OC.  b.   Color: As selected by Architect from manufacturer's standard range.  

6.   Downspouts (OS): Schedule 40, with turnouts; weld and grind seams smooth. Miter offset spout ends that terminate over splash pans or splash blocks. Provide 1/8 inch thick x 1 1/2 inch wide galvanized metal straps. Color per exterior elevations (Custom color to match adjacent wall).  

  13. Reference to reflected ceiling plans 

RESPONSE:  No access panel locations are specified. Note 4 on A2.4a and A2.4b states that "WHERE CEILING IS GYP. BOARD, CAVITY ABOVE SHALL BE ACCESSED THROUGH 

Page 59: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

UNSHEATHED STUD WALL OVER ADJACENT T‐BAR CEILING CAVITY, TYP." Cavity above T‐bar ceiling shall be accessed by lifting any acoustic tile panel. 

 14. Reference to photovoltaic system 

RESPONSE:  Per Addendum #2, photovoltaic system is part of base bid.  

15. Reference to top of exterior wall finish RESPONSE:  In base bid, top of exterior wall adjoining Counseling building is to be finished similar to detail 11/A8.1  

16. Daktronics sign coordination. RESPONSE: Per Electrical Engineer; “Please refer to the Symbol Legend on Sheet TC0.1 for model/part number (see below) and Sheet TC2.1, which indicates a CAT6 data drop.” 

  

Page 60: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

17. Wood doors in aluminum frames. RESPONSE: For all wood doors (WD) listed on schedule A10.1a and A10.1b provide painted hollow metal frames (HM) in lieu of Aluminum (ALUM). 

 18. J‐mold. 

RESPONSE: Fry Reglet“’J’” molding shall be extruded alloy 6063 T5. For 7/8” Plaster use JPM‐100, refer to ‘J’ molding sizes by Fry Reglet to confirm molding widths.   

19. Sheet metal window pan. RESPONSE: Window pan minimum requirements to be ASTM E2112‐07. See diagram below: 

  

20. Reference to engineered wood products RESPONSE:   "Engineered Wood Products" or "Structural Composite Lumber" specifications are shown in the framing notes on each main framing plan. Redbuilt products are not specified or required. Redbuilt may be used as an approved equal if DSA approves the current ICC Report. 

 21. Reference to temporary erection of columns 

RESPONSE:  DSA specifically omitted erection pads because of the cold joint at cantilevered column.  HSS columns must be supported with temporary framing and the footing will be mono‐poured around base.  

22. ‐ 

Page 61: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

  23. Reference to electrical notes 

RESPONSE:  No, it is not the intent to have the electrician install conduit for low‐voltage wiring by mechanical, however division of work is up to the Contractor.  

24. Reference to electrical bid alternates RESPONSE:  DELETE Line Item for Bid Alternate E2 for light fixture alternates.  

25. Reference to electrical bid alternates RESPONSE:  DELETE bid alternate E1 shown in electrical drawings. Photovoltaic system is part of base bid.  

26. Reference to electrical bid alternates RESPONSE:  Base bid is Phase 1.  

27. Reference to photovoltaic systems RESPONSE:  a.  A complete photo‐voltaic system is one that meets the design intent as 

shown. Reference to Sheet E2.4A should say "... as depicted on Sheet E2.4 and E3.0." b.   The entire PV system, including the work shown on Sheet E3.0, Keynote 18 is part of base bid.  c.   All roof penetrations will need to avoid solar laminate locations.  

28. Mechanical duct attachment/ finish. RESPONSE:  

a. With a 22 gauge galvanized sheet metal strap fastened to structure or blocking through the underside of the sheet rock with a 2" 10 gauge zinc plated wood screw. 

b. The sheet rock shall be cut to fit the duct snuggly and the penetration shall be sealed with paintable silicone based caulk at non rated assembly penetrations and UL listed fire caulk at rated assembly penetrations. 

 29. Plumbing pipe attachment/ penetrations. 

RESPONSE:   a) For bidding purposes assume that this condition does not exist.  The winning 

plumbing contractor shall submit a formal RFI during the construction phase should this condition occur. 

b) For bidding purposes assume that penetrations through beams are not larger than permitted by structural requirements. 

 30. Reference to keynotes in landscape drawings 

RESPONSE:  DELETE reference to keynotes 6 and 7 shown on plan  

Page 62: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

31. Reference to Addendum #1 RESPONSE:  The FP sheets in Addendum#1 are 24x36 and should be plotted full scale. Yes, the fire sprinkler design is the same as issued in the original bid set, but those issued for Addendum#1 have superfluous gridlines turned off for visual clarity. 

 32. ‐ 

 33. Reference to structural steel and engineered products. 

RESPONSE:  Specifications for all Steel, Lumber, & Engineered Lumber is provided in the Structural Plans sheets SN1 & SN2 or all main framing plans  

34. Reference to partial utility plans. RESPONSE:  See response to Item 7.  

35. Reference to phase 1 bid RESPONSE:  Yes. The contractor is responsible for providing an operational fire protection in any scenario; whether only one or both phases of the building are accepted.  

36. ‐   

37. Reference to typo in general conditions RESPONSE:  DELETE reference to Live Oak School District and SUBSTITUTE with Fairfield Suisun Unified School District.  

38. Reference to conflict between concrete specification and drawings RESPONSE:  Concrete specifications on sheet SN2 of the DSA approved structural plans should govern.  

39. Pass‐thru sill specifications. RESPONSE: See attached Section 08580 Special Function Windows.  

40. Corrugated Metal ceiling spec‐ what is meant by 1.02 3 &4 optional? RESPONSE: DELETE optional reference from Section 09547‐Corrugated metal Ceiling System section 1.02.3 and 1.02.4. Corrugated metal ceiling shall be provided with both perforations and sound absorbing materials.  

41. Paint schedules missing. RESPONSE: Paint schedule to be provided during submittals phase. Paint colors shall be custom and selected by architect.  

42. Plaque location. RESPONSE: See response to RFI#Broward#6 item 2. 

Page 63: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/09/13 

 43. Plumbing fixture schedule. 

RESPONSE: Per Plumbing Engineer; ”We have not been able to find significant differences in the fixture specifications between the fixture schedule on sheet P0 and specification 15440 except that specification 15440 requires battery sensor operated flush valves.  The battery sensor operated flush valves required by specification 15440 shall be used as a basis for contractor bids.  Where other conflicts exist the contractor shall base their bid on the costlier fixture, taking into account all additional costs involved in providing a fully functional plumbing system.  The winning contractor shall submit a formal RFI during the construction phase and be prepared to credit the Fairfield Unified School District (FUSD) any cost savings realized from providing and installing the plumbing fixtures preferred by the FUSD.”  

 

Page 64: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 65: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 66: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 67: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 RFI RESPONSE FORM  

 

  ITEMS SUBMITTED:  

*NOTE: All items not responded to in this Addendum will be addressed in a future Addendum.  1.  Payroll data still electronic? RESPONSE: YES, per page 4 of the Instructions to Bidders.  

2. ‐  3. Supplemental GC “plywood fencing/ sound absorbing fencing” and Fire Lane fencing.     RESPONSE: Delete reference in section 27: “Work During School Year”, to the requirement for plywood fencing for sound apsorption. The requirement for visual screening shall remain. Second part of question unclear. Fire lane runs adjacent to fenced construction/staging area as shown in Addendum#1 1/A1.7 SK1. Only one fence required between fire lane and base bid construction area.  4. ‐  5. Different Section 01640 Owner Furnished Products supplied by McGraw Hill.     RESPONSE:  See response to RFI#Broward#2.   6. Window treatments.     RESPONSE: Delete specifications sections 12491 and 12497 for window treatment. Per section 01640, window treatments shall be owner‐provided, owner‐installed.  7 and 8. Locations of finish materials.     RESPONSE: Refer to revisions to sheet A2.5, included in this addendum. No new elevations will be provided. See revised sign & finish plan and notes, and revised finish schedule for locations of wall and floor finishes. See reflected ceiling plans A2.4a and A2.4b for ceiling finishes.  9. Division 1 Specifications Page 51 Plywood Web Joist.     RESPONSE: Per structural engineer, “The TJI 110, 210, 230, & 360 shown in the DSA approved structural plans are not considered commercial grade I‐joists and therefore still fall under the TJI(Weyerhauser) ICC ESR‐1153.  Redbuilt commercial product is not required.” 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  RFI#Swank#2    Response#1 

Issued By  Alan Cooper, Swank Construction, Inc.  Date  04/05/13 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

Page 68: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

Reviewed By  Lily Good  Date  04/10/13 

 

10. Scheduling/ Procedural clarifications.      RESPONSE: A substitution request is not the same as a submittal. Provide all submittals and substitution requests no later than June 10, 2013. 

Page 69: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 70: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 71: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 72: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 73: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 74: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 75: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 76: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 77: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:
Page 78: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 SUBMITTAL/SHOP DRAWING REVIEW FORM 

 Checking is for the general conformance with design concept of the project and general compliance with the information given and the contract documents.  Actions shown are subject to the requirements of the contract documents.  Contractor is responsible for: dimensions, which shall be confirmed and verified at the job site; fabrication process and techniques of construction; coordination of work with that of all other trades; and the satisfactory performance of the work. 

 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  A4‐1 

Issued By  DLR Sales, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   SUBSTITUTION REQUEST FORM :     Section 87100  PROPOSED SUBSTITUTION:      Don‐Jo Flush bolts, etc. MANUFACTURER NAME:      Don‐Jo 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

No Exception Taken    Make Corrections Noted    Rejected  X 

Submit Specified Item    Revise and Resubmit    Not reviewed         

NOTES:  NOT ACCEPTED. Substitution submittal is incomplete and there is not enough information to determine whether the product is comparable to the one specified in the bid package. 

Reviewed by  Lily Good  Date  04/10/13 

Page 79: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Project:

Details:

Details:

Details:

Details:

Website:

Phone:

Fax: Name: Notes:

Email: Title:

Firm:

Date:

If you would like to schedule a meeting for further discussion or product review please advise in "Notes". Please send response to DLR Sales, Inc.

San Francisco, CA 94120

PO Box 7775 #24397

Mailing Address:

Substitution Request Form:

Submission Date: 4/8/2013

408-988-1294

Mark Boyda

www.dlrsales.com

408-988-2307

DLR Sales, Inc.

D. Does the manufacturer of the proposed product offer a comparable product guarantee?

Don-Jo Manufacturing - Flush Bolts, Dust Proof Strikes, Automatic Flush Bolts, Door Stops, Protection Plates

The manufacturer of the proposed product offers a comparable product guarantee.

The undersigned states the the function, appearance, and quality of the proposed product is equivalent and/or superior to the specified product.

SUBMITTED BY: FOR USE BY ARCHITECT/ENGINEER:

Armijo High School Administration Building

We hereby submit for your review the following substitution for the following specified material for the above project:

Specified Material:

Ives - Flush Bolts, Auto Flush Bolts, DPS, Stops, Protection Plates

Fairfield, CA 94533

4/11/2013

Project Location:

87100

Paragraph:

Don-Jo Manufcaturing offers a full line of comparable products and this will allow for more competitive bidding, reducing costs.

Signature:

2-2.02-E, F, G

Projected Bid Date:

Section:

E. Additional Comments: Please consider Don-Jo as an approved equal for Ives hardware specified in sections E, F, G

In an effort to be more environmentally friendly this submittal is being made electronically with one copy mailed to the Contractor and to the

Designer. Additional copies may be requested from DLR Sales, Inc.

B. Does the substitution affect other trades?

C. What are the differences between the proposed substitution and specified product?

Attach all technical data, including laboratory tests, if applicable, in duplicate to allow the Architect/Engineer to review this request. Include

complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Proposed Substitution:

A. Does the substitution affect dimensions shown on the Construction Documents?

Proposed product is equivalent and/or superior to the specified product.

YES NO

YES NO

YES NO

Approved, Except As Noted: Not Accepted

Received Too LateApproved

Page 80: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 SUBMITTAL/SHOP DRAWING REVIEW FORM 

 Checking is for the general conformance with design concept of the project and general compliance with the information given and the contract documents.  Actions shown are subject to the requirements of the contract documents.  Contractor is responsible for: dimensions, which shall be confirmed and verified at the job site; fabrication process and techniques of construction; coordination of work with that of all other trades; and the satisfactory performance of the work. 

 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  A4‐2 

Issued By  DLR Sales, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   SUBSTITUTION REQUEST FORM :     Section 87100  PROPOSED SUBSTITUTION:      Best Access cylindrical Locks MANUFACTURER NAME:      Best Access Systems 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

No Exception Taken    Make Corrections Noted    Rejected  X 

Submit Specified Item    Revise and Resubmit    Not reviewed         

NOTES:  NOT ACCEPTED. Substitution submittal is incomplete and there is not enough information to determine whether the product is comparable to the one specified in the bid package. 

Reviewed by  Lily Good  Date  04/10/13 

Page 81: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Project:

Details:

Details:

Details:

Details:

Website:

Phone:

Fax: Name: Notes:

Email: Title:

Firm:

Date:

If you would like to schedule a meeting for further discussion or product review please advise in "Notes". Please send response to DLR Sales, Inc.

San Francisco, CA 94120

PO Box 7775 #24397

Mailing Address:

Substitution Request Form:

Submission Date: 4/8/2013

408-988-1294

Mark Boyda

www.dlrsales.com

408-988-2307

DLR Sales, Inc.

D. Does the manufacturer of the proposed product offer a comparable product guarantee?

Best Access Systems 9K Series Cylindrical Locksets

The manufacturer of the proposed product offers a comparable product guarantee. Please see attached.

The undersigned states the the function, appearance, and quality of the proposed product is equivalent and/or superior to the specified product.

SUBMITTED BY: FOR USE BY ARCHITECT/ENGINEER:

Armijo High School Administration Building

We hereby submit for your review the following substitution for the following specified material for the above project:

Specified Material:

Schlage ND Series Cylindrical Locksets

Fairfield, CA 94533

4/11/2013

Project Location:

87100

Paragraph:

Signature:

2-2.02-C

Projected Bid Date:

Section:

E. Additional Comments:

In an effort to be more environmentally friendly this submittal is being made electronically with one copy mailed to the Contractor and to the

Designer. Additional copies may be requested from DLR Sales, Inc.

B. Does the substitution affect other trades?

C. What are the differences between the proposed substitution and specified product?

Attach all technical data, including laboratory tests, if applicable, in duplicate to allow the Architect/Engineer to review this request. Include

complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Proposed Substitution:

A. Does the substitution affect dimensions shown on the Construction Documents?

Proposed product is equivalent and/or superior to the specified product. Please see attached.

YES NO

YES NO

YES NO

Approved, Except As Noted: Not Accepted

Received Too LateApproved

Page 82: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

VS

Certification & Warranty ND Series (Specified) 9K Series (Proposed)

ANSI A156.2, Series 4000, Grade 1 Yes Yes

UL Rating 3 hour A label doors 3 hour A label doors

Warranty 7 Years 7 Years

Meets A117.1 Accessibility Code Yes Yes

Title 19 Compliance Yes Yes

Construction ND Series (Specified) 9K Series (Proposed)

Lock ChassisZinc Plated for corrosion

resistance

Critical latch and chassis

components are brass or

corrison-treated steel.

Latch 1/2" Steel 9/16" Solid Brass

Strike ANSI Curved Lip Strike StandardSTK Curved Lip Strike -

Standard

Key Pinning 6 Pin Standard 7 Pin Standard

Levers Yes Yes

Roses Yes Yes

Rose Locking Pin N/A Yes

No Exposed Keeper Hole On Exterior Trim Yes Yes

Antimicrobial Finish Option Yes Yes

RQE Feature Option Yes Yes

Non IC Lever Option Standard Yes

Lost Motion Trim Option Yes Yes

Installation ND Series (Specified) 9K Series (Proposed)

Door Thickness1-5/8" - 2-1/8", 1-3/8" (with

Spacer rings available)

1-3/4" - 2-1/4", 1-3/8" (with

Spacer rings available)

Installation Thru Bolt Mounting Thru Bolt Mounting

Backset2-3/4" Standard, 2-3/8", 3-3/4"

and 5" Available

2-3/4" Standard, 3-3/4", and 5"

Available

N/A means either Not Available or Information has not been located

This is a general comparison of a like product.

Consult Manufacturer Catalog for Detail and Accuracy

Product ComparisonGRADE 1 - Cylindrical Locksets

Schlage - ND Series

BEST Access Systems - 9K Series

Page 83: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Warranty

Stanley Security Solutions, Inc www.stanleysecuritysolutions.com Price List 60 Phone: (800) 711-6814 Fax: (877) 835-1030 Page 5

LIMITED WARRANTY

Except as otherwise provided below, STANLEY warrants that all Products manufactured by STANLEY and sold under its trade names “BEST” and "STANLEY” are free of defects in materials, workmanship and operation, normal wear and tear excepted, for a period of three (3) years from the date of sale to the original purchaser. The liability of STANLEY under this warranty is limited to the repair or replacement of any Product covered by the warranty. Written notice of a claim under this warranty should be mailed to STANLEY SECURITY SOLUTIONS, P.O. Box 50444, Indianapolis, IN 46250. The notice should include information as to the identity of the Product and its defect along with a customer contact name, company name, address, and phone number. STANLEY will then provide shipping directions, with all shipping charges prepaid by you. STANLEY will then cause the Product to be examined and, if found defective and covered under this warranty, will repair or replace said Product at the sole discretion of STANLEY. Warranty service shall only be provided in the United States.

9K Mechanical Cylindrical Lock warranty term shall be seven (7) years from the date of sale to the original purchaser.

45H/47H Mechanical Mortise Lock Warranty term shall be limited lifetime. 48H/49H Mortise Deadlock and all 45HW and 47HW Electromechanical Mortise Lock warranty term shall be five (5) years from the date of sale to the original purchaser.

BEST 93KQ, 45HQ and EXQ locks using the Stanley Wi-Q™ Wireless Technology shall be three (3) years from the date of sale to the original purchaser. Stanley Portal Gateways, Wireless Access Controllers, Antennas and other products using Stanley Wi-Q™ Wireless Technology not specifically mentioned shall be one (1) year from the date of sale to the original purchaser.

Software

NT500, Stanley Wi-Q™ Technology, and B.A.S.I.S. Software Warranty - STANLEY warrants that all CD ROM and hardware keys shall be free from defects in material and workmanship and will function in substantial accordance to the specifications for a period of one (1) year from the date of installation.

Specific Limitations:

The warranty for all NT500, Stanley Wi-Q™ Technology, and B.A.S.I.S. Software Products does not cover, free-of-charge, any post-sales technical support during the warranty under the following circumstances:

Calls from sub-contractors not authorized by STANLEY

Problems caused by misuse of software or hardware.

Failure to provide a network connection or site phone line for a modem connection, if deemed necessary by STANLEY.

Technical support for third party software or hardware products.

Technical support for network software products.

Support for the items above during normal technical support hours will be provided at an hourly rate of $150, billable in one (1) hour increments. For pre-arranged, after-hours support, please call for quote.

GENERAL LIMITATIONS OF WARRANTY

This warranty specifically excludes, and STANLEY shall not be held responsible for, damage caused by Product malfunction or failure attributable to acts of God, improper use or installation, poor or no maintenance, work performed by other than an Authorized STANLEY technician; failure to follow STANLEY’s operating instructions or environmental specifications, modification, vandalism, shipping and/or handling, improper storage, accident, abuse or any other cause not within the control of STANLEY other than ordinary wear and tear.

STANLEY provides no warranty or guarantee that its cores and/or cylinders will function properly or be mechanically compatible with products not manufactured by STANLEY.

Third Party Warranty

Except as otherwise provided above, STANLEY makes no warranty, express or implied, with regard to third party hardware or software and expressly disclaims the implied warranties or conditions of merchantability or , merchantable quality, fitness for a particular purpose, title, infringement and those arising by statute or otherwise in law. Customer’s sole recourse for warranty claims is with the manufacturer of the Product. However, STANLEY agrees to pass through any third party warranty that STANLEY receives from the manufacturer of the Products to buyer. The extent of any third party warranty details, terms and conditions, remedies and procedures may be expressly stated on, or packaged with, or otherwise accompanying the Products.

Page 84: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Warranty

Stanley Security Solutions, Inc www.stanleysecuritysolutions.com Price List 60 Phone: (800) 711-6814 Fax: (877) 835-1030 Page 6

EXCEPT AS SET FORTH HEREIN, STANLEY MAKES NO WARRANTIES, EXPRESSED OR IMPLIED, AND BUYER ACKNOWLEDGES THAT NO REPRESENTATIONS, WARRANTIES, PROMISES OR STATEMENTS HAVE BEEN MADE BY STANLEY, WITH RESPECT TO THIS PRODUCT, OR ANY PART OR PORTION THEREOF. IN ADDITION, STANLEY MAKES NO WARRANTY OF MERCHANTABILITY OF THIS PRODUCT OR ANY PART OR PORTION THEREOF, FOR ANY PURPOSE, NOR ANY WARRANTY WHICH EXTENDS BEYOND THE DESCRIPTION ON THE FACE HEREOF. STANLEY SHALL NOT, IN ANY EVENT, BE LIABLE FOR ANY CONSEQUENTIAL OR INCIDENTAL

DAMAGES SUFFERED BY BUYER OR ANYONE CLAIMING BY, THROUGH OR UNDER BUYER, AS A RESULT OF THE CONDITION OF THIS PRODUCT, OR ANY PART OR PORTION THEREOF, AND THERE ARE NO ORAL OR WRITTEN UNDERTAKINGS OR AGREEMENTS OF ANY TYPE PROVIDED BY STANLEY EXCEPT AS EXPRESSLY SET FORTH HEREIN. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS OR PROHIBIT THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THE ABOVE LIMITATION AND EXCLUSIONS MAY NOT APPLY IN YOUR STATE

Architectural Finishes

BHMA No.

U.S. No. Description

605 3 Bright brass, clear coated

606 4 Satin brass, clear coated

611 9 Bright bronze, clear coated

612 10 Satin bronze, clear coated

613 10B Oxidized satin bronze, oil rubbed

618 14 Bright nickel plated, clear coated

619 15 Satin Nickel Plated, Clear Coated

622 19 Flat Black, Coated

625 26 Bright Chromium Plated

626 26D Satin Chromium Plated

627 27 Satin Aluminum, Clear Coated

628 28 Satin Aluminum, Clear Anodized

629 32 Bright Stainless Steel

630 32D Satin Stainless Steel

690 20 Dark Bronze Coated

Page 85: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 SUBMITTAL/SHOP DRAWING REVIEW FORM 

 Checking is for the general conformance with design concept of the project and general compliance with the information given and the contract documents.  Actions shown are subject to the requirements of the contract documents.  Contractor is responsible for: dimensions, which shall be confirmed and verified at the job site; fabrication process and techniques of construction; coordination of work with that of all other trades; and the satisfactory performance of the work. 

 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  A4‐3 

Issued By  DLR Sales, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   SUBSTITUTION REQUEST FORM :     Section 87100  PROPOSED SUBSTITUTION:      D4550 Series Door Closers MANUFACTURER NAME:      Stanley Security Solutions 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

No Exception Taken    Make Corrections Noted    Rejected  X 

Submit Specified Item    Revise and Resubmit    Not reviewed         

NOTES:  NOT ACCEPTED. Substitution submittal is incomplete and there is not enough information to determine whether the product is comparable to the one specified in the bid package. 

Reviewed by  Lily Good  Date  04/10/13 

Page 86: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Project:

Details:

Details:

Details:

Details:

Website:

Phone:

Fax: Name: Notes:

Email: Title:

Firm:

Date:

If you would like to schedule a meeting for further discussion or product review please advise in "Notes". Please send response to DLR Sales, Inc.

San Francisco, CA 94120

PO Box 7775 #24397

Mailing Address:

Substitution Request Form:

Submission Date: 4/8/2013

408-988-1294

Mark Boyda

www.dlrsales.com

408-988-2307

DLR Sales, Inc.

D. Does the manufacturer of the proposed product offer a comparable product guarantee?

Stanley Security Solutions D4550 Series Door Closers

The manufacturer of the proposed product offers a comparable product guarantee. Please see attached.

The undersigned states the the function, appearance, and quality of the proposed product is equivalent and/or superior to the specified product.

SUBMITTED BY: FOR USE BY ARCHITECT/ENGINEER:

Armijo High School Administration Building

We hereby submit for your review the following substitution for the following specified material for the above project:

Specified Material:

LCN 4040 Series Door Closers

Fairfield, CA 94533

4/11/2013

Project Location:

87100

Paragraph:

Signature:

2-2.02-E

Projected Bid Date:

Section:

E. Additional Comments:

In an effort to be more environmentally friendly this submittal is being made electronically with one copy mailed to the Contractor and to the

Designer. Additional copies may be requested from DLR Sales, Inc.

B. Does the substitution affect other trades?

C. What are the differences between the proposed substitution and specified product?

Attach all technical data, including laboratory tests, if applicable, in duplicate to allow the Architect/Engineer to review this request. Include

complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Proposed Substitution:

A. Does the substitution affect dimensions shown on the Construction Documents?

Proposed product is equivalent and/or superior to the specified product. Please see attached.

YES NO

YES NO

YES NO

Approved, Except As Noted: Not Accepted

Received Too LateApproved

Page 87: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

VS

Certification & Warranty 4040 Series (Specified) D4550 Series (Proposed)

BHMA 156.4 Grade 1 Certification Yes Yes

UL Listed & UL Listed Yes Yes

Warranty 10 Year 10 Year

Extended Cycle Test Yes Yes

Size & Construction 4040 Series (Specified) D4550 Series (Proposed)

Strength or Size Adjustable 1 to 6 Adjustable 1 to 6

Case Material FC20 Gray Iron R14 High Silicon Aluminum Alloy

Case Construction 2 Piece Single Piece

Piston/Plunger 1-1/2" Diameter 1-1/2" Diameter

Pinion Shaft & Tooth Diameter 5/8” Broached Small Teeth 5/8” Cold Forged Large Teeth

Handed Closer Body Non Handed Non Handed

Main Arm Material Forged Steel Forged Steel

Pressure Relief Valves None None

Back Check Standard Standard

Valve Material N/A Brass

Valve Type Multiple Regulating/V-Slotted Multiple Regulating/V-Slotted

Valves Staked N/A Yes

Valve Adjustment Hex Key Hex Key

PRV Valve None None

Cold Weather Fluid Standard Standard

Green Manufacturing Process No Yes

Installation & Finishes 4040 Series (Specified) D4550 Series (Proposed)

Regular Arm Application Yes Yes

Top Jamb Application Yes Yes

Parallel Arm Application Yes Yes

Track Application Yes Yes

Fasteners/Screws Wood Screws & Machine Screws Self Tapping Screws

Cover High Impact Plastic Standard Standard

Metal Cover Optional Optional

Rust Inhibitor Optional Optional

BHMA Standard Finishes Available Yes Yes

Options 4040 Series (Specified) D4550 Series (Proposed)

Heavy Duty Arms Yes Yes

Delayed Action Yes Yes

Thru Bolts Yes Yes

Security Screws Yes Yes

N/A means either Not Available or Information has not been located

This is a general comparison of like products.

Consult Manufacturer Catalog for Detail and Accuracy

Product ComparisonGRADE 1 - Full Feature Door Closers

LCN - 4040 Series

Stanley Door Closers - D4550 Series

Page 88: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Stanley Security Solutions, Inc • www.stanleysecuritysolutions.comPhone: (800) 711-6814 • Fax: (877) 835-1030

Price List 60DC 5

Warranty

1. STANLEY SECURITY SOLUTIONS, INC. mechanical products are warranted against defects in material and workmanship for a period of TEN (10) YEARS from the date of invoice. The D-4550EH, and D-4990 product is warranted against defects in material and workmanship for a period of TWO (2) YEARS from the date of invoice.

2. STANLEY SECURITY SOLUTIONS, INC. electrical products are warranted against defects in material and workmanship for a period of ONE (1) YEAR from the date of invoice.

3. This warranty does not cover defects or damage arising from failure to perform normal maintenance, faulty installation, ordinary wear and tear, misuse, abuse, freight damage, application for which the product was not designed, or incorrect or improper wiring of electrical products.

4. Claims under this warranty must be made in writing to STANLEY. At its option, STANLEY will repair the defect, replace the product, or issue credit at the net value originally invoiced. STANLEY liability shall in no event exceed the net cost of the product.

REPAIR, REPLACEMENT OR CREDIT AS PROVIDED UNDER THIS WARRANTY IS THE EXCLUSIVE REMEDY OF THE CONSUMER. STANLEY SECURITY SOLUTIONS, INC. SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES FOR BREACH OF ANY EXPRESS OR IMPLIED WARRANTY ON THIS PRODUCT. EXCEPT TO THE EXTENT PROHIBITED BY APPLICABLE LAW, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ON THIS PRODUCT IS LIMITED IN DURATION TO THE DURATION OF THIS WARRANTY. WE ARE NOT RESPONSIBLE FOR ANY CHARGES FOR LABOR OR MATERIALS INCURRED BY OTHERS WITHOUT OUR PRIOR WRITTEN CONSENT.

Some states do not allow the exclusion or limitation of incidental or consequential damages, or allow limitations on how long an implied warranty lasts, so the above limitations or exclusion may not apply to you. This warranty gives you specific legal rights, and you may also have other rights which vary from state to state.

Page 89: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 SUBMITTAL/SHOP DRAWING REVIEW FORM 

 Checking is for the general conformance with design concept of the project and general compliance with the information given and the contract documents.  Actions shown are subject to the requirements of the contract documents.  Contractor is responsible for: dimensions, which shall be confirmed and verified at the job site; fabrication process and techniques of construction; coordination of work with that of all other trades; and the satisfactory performance of the work. 

 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  A4‐4 

Issued By  DLR Sales, Inc.  Date  04/08/13 

ITEMS SUBMITTED:   SUBSTITUTION REQUEST FORM :     Section 87100  PROPOSED SUBSTITUTION:      Apex 2000 Series Exit Devices MANUFACTURER NAME:      Precision Hardware 

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

No Exception Taken    Make Corrections Noted    Rejected  X 

Submit Specified Item    Revise and Resubmit    Not reviewed         

NOTES:  NOT ACCEPTED. Substitution submittal is incomplete and there is not enough information to determine whether the product is comparable to the one specified in the bid package. 

Reviewed by  Lily Good  Date  04/10/13 

Page 90: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Project:

Details:

Details:

Details:

Details:

Website:

Phone:

Fax: Name: Notes:

Email: Title:

Firm:

Date:

If you would like to schedule a meeting for further discussion or product review please advise in "Notes". Please send response to DLR Sales, Inc.

San Francisco, CA 94120

PO Box 7775 #24397

Mailing Address:

Substitution Request Form:

Submission Date: 4/8/2013

408-988-1294

Mark Boyda

www.dlrsales.com

408-988-2307

DLR Sales, Inc.

D. Does the manufacturer of the proposed product offer a comparable product guarantee?

Precision Hardware Apex 2000 Series Exit Devices

The manufacturer of the proposed product offers a comparable product guarantee. Please see attached.

The undersigned states the the function, appearance, and quality of the proposed product is equivalent and/or superior to the specified product.

SUBMITTED BY: FOR USE BY ARCHITECT/ENGINEER:

Armijo High School Administration Building

We hereby submit for your review the following substitution for the following specified material for the above project:

Specified Material:

Von Duprin 99 Series Exit Devices

Fairfield, CA 94533

4/11/2013

Project Location:

87100

Paragraph:

Signature:

2-2.02-D

Projected Bid Date:

Section:

E. Additional Comments:

In an effort to be more environmentally friendly this submittal is being made electronically with one copy mailed to the Contractor and to the

Designer. Additional copies may be requested from DLR Sales, Inc.

B. Does the substitution affect other trades?

C. What are the differences between the proposed substitution and specified product?

Attach all technical data, including laboratory tests, if applicable, in duplicate to allow the Architect/Engineer to review this request. Include

complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Proposed Substitution:

A. Does the substitution affect dimensions shown on the Construction Documents?

Proposed product is equivalent and/or superior to the specified product. Please see attached.

YES NO

YES NO

YES NO

Approved, Except As Noted: Not Accepted

Received Too LateApproved

Page 91: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

VS

Certification & Warranty 98-99 Series (Specified) Apex 2000 Series (Proposed)

ANSI A156.3-2001 Grade 1 Yes Yes

Panic Listed Yes Yes

UL10C / UBC 7-2 Yes Yes

Hurricane Rated Consult Manufacturer Yes

Warranty 3 Year 5 Year

Extended Cycle Test Yes Yes (10 Million+)

Construction 98-99 Series (Specified) Apex 2000 Series (Proposed)

Base Metals on Finished Parts Aluminum (99) Stainless Steel (98) Stainless Steel, Brass & Bronze

Antimicrobial Protection Available Yes Yes

AntiVandal Trim Yes Yes

Deadlocking Latchbolt Standard Standard

Latchbolt Projection 3/4" 3/4"

Active Case Assembly Stamped Investment Cast Steel

Sound Dampening Plastic Hydraulic Fluid Dampener Rubber Sound Dampeners

Beveled Touchpad End Caps No Yes

Projection (Neutral) 3 - 13/16" 3 - 1/4"

Projection (Depressed) 3 - 1/16" 2 - 3/8"

Dogging Feature Hex Dogging Standard Hex Dogging Standard

Installation 98-99 Series (Specified) Apex 2000 Series (Proposed)

Mullion Stabilizers Available Standard

Field Reversible Yes Yes

Retrofits to Other Devices No Yes

Standard Strike Roller Type Investment Cast Stainless Steel

Device Functions Field Selectable Field Selectable

Shim Kit Required for 1/4" Frame Yes No

Fasteners Wood and Metal Screws Std. Wood and Metal Screws Std.

Notes

N/A means either Not Available or Information has not been located

This is a general comparison of like products.

Consult Manufacturer Catalog for Detail and Accuracy

Product ComparisonGRADE 1 - Exit Devices

Von Duprin - 98-99 Series

Precision Hardware - Apex 2000 Series

Page 92: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

Stanley Security Solutions, Inc • www.stanleysecuritysolutions.comPhone: (800) 711-6814 • Fax: (877) 835-1030

5Price List 60ED

Exit Device Warranty

1. STANLEY SECURITY SOLUTIONS, INC. mechanical products are warranted against defects in material and workmanship for a period of FIVE (5) YEARS for Apex 2000 series THREE (3) YEARS for Reliant 5000 and Olympian series from the date of invoice.

2. STANLEY SECURITY SOLUTIONS, INC. electrical products are warranted against defects in material and workmanship for a period of ONE (1) YEAR from the date of invoice.

3. This warranty does not cover defects or damage arising from failure to perform normal maintenance, faulty installation, ordinary wear and tear, misuse, abuse, freight damage, applica-tion for which the product was not designed, or incorrect or improper wiring of electrical products.

4. Claims under this warranty must be made in writing to STANLEY.At its option, STANLEY will repair the defect, replace the prod-uct, or issue credit at the net value originally invoiced. STANLEY liability shall in no event exceed the net cost of the product.

REPAIR, REPLACEMENT OR CREDIT AS PROVIDED UNDERTHIS WARRANTY IS THE EXCLUSIVE REMEDY OF THE CON-SUMER. STANLEY SECURITY SOLUTIONS, INC. SHALL NOT BELIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGESFOR BREACH OF ANY EXPRESS OR IMPLIED WARRANTY ONTHIS PRODUCT. EXCEPT TO THE EXTENT PROHIBITED BY AP-PLICABLE LAW, ANY IMPLIED WARRANTY OF MER-CHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ONTHIS PRODUCT IS LIMITED IN DURATION TO THE DURATIONOF THIS WARRANTY. WE ARE NOT RESPONSIBLE FOR ANYCHARGES FOR LABOR OR MATERIALS INCURRED BY OTHERSWITHOUT OUR PRIOR WRITTEN CONSENT.

Some states do not allow the exclusion or limitation of incidentalor consequential damages, or allow limitations on how long animplied warranty lasts, so the above limitations or exclusion maynot apply to you. This warranty gives you specific legal rights,and you may also have other rights which vary from state tostate.

Warranty

Page 93: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

MADI tm META ARCHITECTURE I DESIGN INITIATIVE

777 N 1st Street, Suite 615 | San Jose, CA 95112 | T: 408.294.6234 | F: 408.521.0500 www.madi-arch.com

 SUBMITTAL/SHOP DRAWING REVIEW FORM 

 Checking is for the general conformance with design concept of the project and general compliance with the information given and the contract documents.  Actions shown are subject to the requirements of the contract documents.  Contractor is responsible for: dimensions, which shall be confirmed and verified at the job site; fabrication process and techniques of construction; coordination of work with that of all other trades; and the satisfactory performance of the work. 

 

Project Description  New Administration & Counseling Buildings at Armijo High  

Client   Fairfield Suisun Unified School District 

Submittal #  A4‐5 

Issued By  R E Edwards & Assoc.  Date  04/08/13 

ITEMS SUBMITTED:   SUBSTITUTION REQUEST FORM :     10170‐ Solid Plastic Toilet Compartments  PROPOSED SUBSTITUTION:      Phenolic  or Sierra Series partitions  

MADI Project #  FSAH‐02  DSA #  02‐112509  File #  48‐H10 

No Exception Taken    Make Corrections Noted    Rejected  X 

Submit Specified Item    Revise and Resubmit    Not reviewed         

NOTES:  

NOT ACCEPTED. Toilet partitions shall comply with testing standards prescribed by CBC 2010.  

Reviewed by  Lily Good  Date  04/10/13 

Page 94: Fairfield-Suisun Unified School District a-07 assistant principal a-08 secretary a-06 (hi-lo) ... fairfield-suisun unified school district special function windows armijo high school:

1

Lillian Good

From: Mike Edwards [[email protected]]Sent: Monday, April 08, 2013 10:11 AMTo: [email protected]: New Armijo HS Admin, Counseling BuildingAttachments: SKMBT_42313040514340.pdf; CBC 2010 HDPE Partitions NFPA 286.pdf

Hello, For your Fairfield-Suisun USD, you have specified HDPE Solid Plastic Toilet Partitions to comply with ASTM-84 fire testing requirements. Per CBC 2010 (second attachment), solid plastic toilet partitions are now required to meet NFPA 286 fire testing requirements. (Page 3 of 4) All potential bidding sub-contractors will be providing you with a price for old testing standards, and therefore your client will not be receiving compliant material. The NFPA material is much more expensive, and most manufacturers of HDPE have not passed this test. Suggest switching toilet partition material to Phenolic or Sierra Series which still only has to comply with ASTM-84. Call or email me with any questions. Mike 925-366-1966 Mike Edwards R.E. Edwards & Assoc 925-829-2942 925-829-2002 [email protected]