No. KGS 2003 - 033

Factory Registration Manual

for Foreign Manufacturers of Gas Product

April, 2013

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

1

Korea Gas Safety Corporation

Contents

Section Page

1 General ............................................................................................................................ 2

1.1 Enactment Background of the Registration System ............................................................................. 2 1.2 Related Law of the Registration System & Objects of Factory Registration ......................................... 2 1.3 Definitions .............................................................................................................................................. 4

2 Procedure and Detail for Factory Registration ............................................................ 9

2.1 Factory Registration Process Flow Chart ............................................................................................. 9 2.2 Detail for Each Process ....................................................................................................................... 14

3 Pre-Audit Preparations & Responsibility ................................................................... 16

3.1 Pre-Audit Preparation .......................................................................................................................... 16 3.2 Responsibility ...................................................................................................................................... 17

Appendix

Appendix 1 Classification for Manufacture Registration of Cylinders, etc. .................................. 20

Appendix 2 Required Document. ................................................................................................. 21

Appendix 3 Basic Fee. ................................................................................................................. 24

Appendix 4 Guide for Subcontract Registration . ........................................................................ 25

Form

Form-1 Application Form for Technical Review (Cylinders, etc.). ......................................... 26

Form-2 Application Form for Technical Review (Gas Appliances). ....................................... 27

Form-3 Application Form for Factory Audit (Cylinders, etc.). ................................................ 28

Form-4 Application Form for Factory Audit (Gas Appliances) ............................................... 29

Form-5 Application Form for Factory Registration (Cylinders, etc.). ..................................... 30

Form-6 Application Form for Factory Registration or Alteration (Gas Appliances). ............... 31

Form-7 Declaration for Alteration (Gas Appliances). ............................................................. 32

Form-8 Application Form for Manufacture Alteration Registration (Cylinders, etc.). ............. 33

Form-9 Certificate of Manufacture Registration (Cylinders, etc.) .......................................... 34

Form-10 Certificate of Manufacture Registration (Gas Appliances) ........................................ 35

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

2

Korea Gas Safety Corporation

1. General

1.1 Enactment Background of the Registration System

Factory registration system means that foreign manufacturers who are willing to export their gas-related products specified by High-Pressure Gas Safety Control Act and Safety Control and Business of Liquefied Petroleum Gas Act to the Republic of Korea (hereinafter referred to as "Korea") shall be registered in Ministry of Trade Industry and Energy prior to manufacturing and exporting the products to Korea.

The registration system was established to allow only the verified manufacturers with their quality assurance capability through the factory audit to export their gas products to Korea with a view to preventing gas accidents to be caused by gas products manufactured not conforming to Korean standards or imported (or distributed) from unapproved manufacturers with unverified manufacturing and inspecting capability, and maintaining the uniform quality of gas products to be distributed in the Korean market.

1.2 Related Laws of the Registration System & Objects of Factory Registration

1.2.1 High-Pressure Gas Cylinders, etc. in accordance with High-Pressure Gas Safety Control Act

1.2.1.1 Related Laws of the Registration System

Law: Article 5-2 of the High-Pressure Gas Safety Control Act Enforcement decree: Article 5-2 of the Enforcement Decree of the High-Pressure

Gas Safety Act Enforcement Rule: Article 4 ~ Article 9-2 of the Enforcement Rule of the High-

Pressure Gas Safety Act Attached tables of enforcement Rule: The attached Table 10 ~ Table 12 of the

Enforcement Rule of High-Pressure Gas Safety Act Code: KGS Code

1.2.1.2 Objects of Factory Registration

Manufacture of cylinder for filling high-pressure gases(excluding those of which the internal volume is less than 3 dl)

Manufacture of accessories (valve and safety valve) of high-pressure gas cylinder Manufacture of high-pressure gas tank, tank fixed to vehicles and pressure vessel Manufacture of compressor, condenser, evaporator and pressure vessel consisting

of specified equipment for refrigeration (excluding unit refrigerator) Manufacture of emergency cut-off device Manufacture of safety valve

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

3

Korea Gas Safety Corporation

Manufacture of valve for toxic gas pipe * See Appendix A for further detail

1.2.1.3 Objects Exempted from Registration

Cylinders, etc. imported for test, research and development, Cylinders, etc. imported to be used at foreign agencies and already inspected by

foreign institutes, Cylinders, etc. attached to imported industrial equipment and facilities, Cylinders, etc. imported by manufacturers or importers as samples, Cylinders, etc. imported for importation of high-pressure gases and to be sent back

after using up the gases, the cylinders shall be inspected by foreign institute authorized from the Ministry of Trade Industry and Energy according to the attached Tables 10, 10-2 and 12 of the inspection standard in the Enforcement Rule of the High-Pressure Gas Safety Control Act.

Cylinders, etc. for special high-pressure gases, the type of cylinder is not manufactured in Korea.

Aerosol Cylinders, Cylinders, etc. imported to be exported, and, Other foreign Cylinders, etc. of which manufacture registration is acknowledged to

be difficult and notified by the Minister of Knowledge Economy.

1.2.2 Gas Appliances in accordance with Safety Control and Business of Liquefied Petroleum Gas Act

1.2.2.1 Related Laws of the Registration System

Law: Article 6-2 of the Safety Control and Business of Liquefied Petroleum Gas Act Enforcement decree: Article 3-2 of the Enforcement Decree of the Safety Control

and Business of Liquefied Petroleum Gas Act Enforcement Rule: Article 4, 6, 8~10, 13 and 14 of the Enforcement Rule of the

Safety Control and Business of Liquefied Petroleum Gas Act Attached tables of enforcement Rule: The attached Table 4 and 7 of the

Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act

Code: KGS Code

1.2.2.2 Objects of Factory Registration

Pressure Regulators Automatic Shut-off Device for Gas Leakage Hoses for Gases Valves for Pipes Gas Cocks Joints for Pipes

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

4

Korea Gas Safety Corporation

Quick Coupling Units Filters for Governor Stations Multifunctional Gas Meters Loading Arms Safety Couplings Governors for Underground Use Fuel Cells Forced Mixed Type Gas Burners Gas Burning Appliances

(See Appendix A for further detail)

1.2.2.3 Objects Exempted from Registration

Gas appliances imported for test, research and development, Gas appliances imported to be used at foreign agencies and already inspected by

foreign institutes, Gas appliances attached to imported industrial equipment and facilities, Gas appliances imported to be exported, In according with Common Criteria Recognition Arrangement, gas appliances

already inspected by foreign institutes which the Minister of Knowledge Economy acknowledge

Gas appliances imported by manufacturers or importers as samples Other foreign Gas appliances of which the Minister of Knowledge Economy

acknowledges the difficulty for manufacture and notify that.

1.3 Definitions

1.3.1 Definitions for the Audit

1.3.1.1 Manufacturer Any person who intends to manufacture cylinders, etc. or gas appliances.

1.3.1.2 Factory Registration The Ministry of Trade Industry and Energy (hereinafter referred to as "MOTIE") sees if the result for the technical and on-site audit conducted by the Korea Gas Safety Corporation (hereinafter referred to as "KGS”) is suitable against the registration criteria, and then issues the registration certificate.

1.3.1.3 Alteration Registration In case of some change (3.2.3.1 or 3.2.3.2) in contents registered at initial audit, the MOTIE accept the alteration registration applications and issues the registration certificate.

1.3.1.4 Technical Review The technical review means the document review (by KGS) of the general present

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

5

Korea Gas Safety Corporation

status, standards for manufacturing and testing technologies, quality control by processes, manufacturing and testing facilities of the manufacturer, and its subcontractors' quality control.

1.3.1.5 Factory Audit

Factory audit is the procedure for conducting field inspection of matters related to technical review and quality control regulation, and consists of checks on manufacturing and testing facilities, quality control by processes, subcontractors' quality control and quality control regulations.

1.3.1.6 Initial Audit The audit for the manufacturer applies for registration at the MOTIE initially consists of technical review (documental review) and on-site audit.

1.3.1.7 Alteration Audit The audit for some change (3.2.3.1①~④ or 3.2.3.2①~③) according to 1.3.1.3 con

sists of alteration technical review and on-site audit.

1.3.1.8 Renewal Audit The audit for the manufacturer applies for extension of registration within the expiration date. Renewal audit consists of on-site audit only.

1.3.1.9 Re-Audit The audit for non-conformity of the manufacturer got the result 'rejected'. Re-audit consists of technical review and on-site audit, depending on type of non-conformity.

1.3.2 Definitions for the Cylinders, etc.

1.3.2.1 High-Pressure Gases High-pressure gases means compressed gases of which the gauge pressure is more than 1 MPa at an ambient temperature, or liquefied gases of which gauge pressure is more than 0.2 MPa.

1.3.2.2 Cylinders, etc. Cylinders, etc. means cylinders, refrigerators, or specified equipment.

1.3.2.3 Cylinders and Cylinder Accessories Cylinders mean the cylinders to be filled with high-pressure gases and are movable, and "Cylinder accessories" mean the valves etc. (including safety valves) that are attached to the cylinders but are separable.

1.3.2.4 Specified Equipment Specified equipment means such equipment as storage tanks, tanks fixed to vehicles, pressure vessels, safety valves, emergency cut-off devices, valves for toxic gaspipe, etc. that are used for manufacturing high-pressure gases

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

6

Korea Gas Safety Corporation

1.3.2.5 Storage Tanks Storage tanks means the tanks fixed and installed aboveground or underground to be filled with and store high-pressure gases.

1.3.2.6 Tanks Fixed to Vehicles

Tanks fixed to vehicles means the tanks installed on vehicles in order to transport high-pressure gases.

1.3.2.7 Pressure Vessels Pressure vessels means the vessels of which the pressure at 35℃ or design pres

sure is more than 0.2 MPa in case of liquid gases, or more than 1 MPa in case of compressed gases, and of which the value obtained by multiplying the design pressure (MPa) by the internal volume (m3) exceeds 0.004.

1.3.2.8 Welded Cylinders Welded cylinders means the cylinders manufactured by joining a separately- formed shells and heads by welding.

1.3.2.9 Seamless Cylinders Seamless cylinders means the cylinders manufactured by forming the shell and end plates in a monolithic construction without any seam.

1.3.2.10 Composite Cylinders Cylinder that is made up of being circumferentially reinforced by winding liner with fiber pre-impregnated into resin or by being impregnated with fiber on resin without liner

1.3.2.11 Joined or Soldered Cylinders Joined or soldered cylinders are disposable cylinders of which the internal volume is less than 1 liter, and of which the shell and end plates are separately formed and joined together by seam welding or soldering.

1.3.2.12 Specified Equipment for Refrigeration Specified equipment for refrigeration means compressors, condensers, evaporators and pressure vessels of which the refrigeration capacity per day is more than 3 tons.

1.3.2.13 Emergency Cut-Off Devices Emergency cut-off devices means the devices which promptly block the high pressure gas equipment at the time of abnormal conditions.

1.3.2.14 Safety Valves Safety valves means the spring-type safety valves installed inside of the pressure vessels and release the internal pressure by opening the valve when the internal pressure exceeds the set value.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

7

Korea Gas Safety Corporation

1.3.2.15 Valves for Toxic Gas Pipes Valves for toxic gas pipes means the valves installed inside of the pipes run with toxic gases.

1.3.2.16 Toxic Gases "Toxic Gas" under High-Pressure Safety Control ACT means that if there is more than a fixed amount in the air, gas has a toxic effect harmful to the human body and whose permitted concentration is 5,000/1 million or less.

Types of Toxic Gas specified in 『High-Pressure Safety Management ACT』

are as follows;

acrylonitrile, acryl aldehyde, sulfurous acid gas, ammonia, carbon monoxide, carbon disulfide, fluorine, chlorine, bromide methane, chloride methane, chloroprene, oxide ethylene, hydrogen cyanide, hydrogen sulfide, mono methylamine, di-methylamine, tri-methylamine, benzene, phosgene, hydrogen iodide, bromide hydrogen, chloride hydrogen, fluoride hydrogen, mustard gas, algin, monosilane, disilane, diborane, selenium hydrogen, phosphine, monogermane

1.3.3 Definitions for the Gas Appliances

1.3.3.1 Gas Appliances Gas appliances means devices for fuel gas (where refer to followings, from article 1.3.3.2 to 1.3.3.14)

1.3.3.2 Pressure Regulators mean the device used for allowing high-pressure fluid supply lines or tanks to be reduced to safe and/or usable pressures for various applications

1.3.3.3 Automatic Shut-off Device for Gas Leakage A device used for detecting leakage of gas and shut-off valve automatically, which consist of detector, controller and shutoff unit

1.3.3.4 Filters for Governor Stations A device used for eliminating impurities from gas flow in pipes

1.3.3.5 Governors for Underground Use A unit that is used underground and equipped with separate functional devices such as pressure regulator, filter, valve, safety device and other accessary

1.3.3.6 Hoses A flexible tube which is made with metallic or non-metallic material

1.3.3.7 Valves for Pipes A glove type or ball type valve that controls or open and close the flow of a fluid

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

8

Korea Gas Safety Corporation

on pipes

1.3.3.8 Gas Corks A device used for open and close of a fluid flow by turning around cap 90 degrees. A fuse type cock, a box cock and a nozzle type cock for a cast burner are limited for this manual.

1.3.3.9 Joints (or Fittings) A rolled and welded pipe with the purpose of connecting two pipes

1.3.3.10 Forced Mixed Type Gas Burners A gas burner blowing air with a fan for combustion

1.3.3.11 Gas Burning Appliances Appliance that is designed for use in gas burning process, where gas capacity is not more than 232.6kW(200,000 Kcal/h)

1.3.3.12 Multifunctional Gas Safety Meters A gas meters that is equipped with safety devices like shut-off device for overflow or gas leakage.

1.3.3.13 Loading Arms for Gases A device that permits the transfer of liquid or liquefied gas from one tank to another through an articulated pipe system consisting of rigid piping and swivel joints to obtain flexibility

1.3.3.14 Gas Fuel Cells A device that converts the chemical energy from electric active substance (so-called fuel) into electricity through a chemical reaction and continuous elimination of dead product continuously

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

9

Korea Gas Safety Corporation

2. Procedure and Detail for Factory Registration

2.1 Factory Registration Process Flow Chart

2.1.1 Initial Audit (1.3.1.1)

<Object Company of Registration> <Facility in Charge>

Preparation Prior Consultation KGS

Apply for Technical Review (2.1.1.1, the attached Table 2-1, 3, Form 1 or 2)

Technical Review Technical Review (2.1.1.2) KGS

Issue Technical Review Report (2.1.1.2)

Apply for Factory Audit (2.2.2.1, the attached Table 3, Form 3 or 4)

Factory Audit Factory Audit (2.2.2.2, 3.1) KGS

Issue Factory Audit Report (2.2.2.2)

Apply for Factory Registration (2.2.3.1, the attached Table 2-3, 3, Form 5 or 6)

Factory Registration Registration Review (2.2.3.2) MOTIE

Issue Certificate (2.2.3.2, Form 9 or 10)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

10

Korea Gas Safety Corporation

2.1.2 Alternation Audit (1.3.1.2)

<Object Company of Registration> <Facility in Charge>

Some Change Some Change

Apply for Technical Review (2.2.1.1, the attached Table 2-1, 3, Form 1 or 2)

Technical Review Alternation Technical Review (2.2.1.2) KGS

Issue Technical Review Report (2.1.1.2)

Apply for Factory Audit (2.2.2.1, the attached Table 3, Form 3 or 4)

Factory Audit Factory Audit (2.2.2.2, 3.1) KGS

Issue Factory Audit Report (2.2.2.2)

Apply for Factory Registration (2.2.3.1, the attached Table 2-3, 3, Form 5 or 6)

Factory Registration Alteration Registration Review (2.2.3.2) MOTIE

Issue Alteration Certificate (2.2.3.2, Form 9 or 10)

In case of some change in according with 3.2.3.1 ⑤ or ⑥ / 3.2.3.2 ④ or ⑤, the technical review and the factory audit can be dispensed with.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

11

Korea Gas Safety Corporation

2.1.3 Renewal Audit (1.3.1.3)

<Object Company of Registration> <Facility in Charge>

Expiration Maintaining the Registration Status

Preparation Expression of Intention for Renewal Audit

& Prior Consultation KGS

Apply for Factory Audit (2.2.2.1, the attached Table 3, Form 3 or 4)

Factory Audit Factory Audit (2.2.2.2, 3.1) KGS

Issue Factory Audit Report (2.2.2.2)

Apply for Factory Registration (2.2.3.1, the attached Table 2-3, 3, Form 5 or 6)

Factory Registration Registration Review (2.2.3.2) MOTIE

Issue Certificate (2.2.3.2, Form 9 or 10)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

12

Korea Gas Safety Corporation

2.1.4 Technical Review for Re-Audit (1.3.1.4)

<Object Company of Registration> <Facility in Charge>

Apply for Factory Audit (2.2.2.1, the attached Table 3, Form 3 or 4)

Factory Audit Factory Audit (2.2.2.2, 3.1) KGS

Issue Factory Audit Report (2.2.2.2) Minor Non-Conformity

After Eliminating Non-Conformity,

Submit the Result of Corrective Action and related Records

Technical Review Technical Review (2.2.2.2) KGS

Issue Factory Audit Report (2.2.2.2)

Apply for Factory Registration (2.2.3.1, the attached Table 2-3, 3, Form 5 or 6)

Factory Registration Registration Review (2.2.3.2) MOTIE

Issue Certificate (2.2.3.2, Form 9 or 10)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

13

Korea Gas Safety Corporation

2.1.5 Factory Audit for Re-Audit (1.3.1.4)

<Object Company of Registration> <Facility in Charge>

Apply for Factory Audit (2.2.2.1, the attached Table 3, Form 3 or 4)

Factory Audit Factory Audit (2.2.2.2, 3.1) KGS

Issue Factory Audit Report (2.2.2.2) Major Non-Conformity

After Eliminating Non-Conformity,

Submit the Result of Corrective Action and related Records

Factory Re-Audit Factory Re-Audit (2.2.2.2) KGS

Issue Factory Audit Report (2.2.2.2)

Apply for Factory Registration (2.2.3.1, the attached Table 2-3, 3, Form 5 or 6)

Factory Registration Registration Review (2.2.3.2) MOTIE

Issue Certificate (2.2.3.2, Form 9 or 10)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

14

Korea Gas Safety Corporation

2.2 Details for Each Process

2.2.1 Technical Review

2.2.1.1 Application for Technical Review Applicant for the registration should fill out the Form-1 (Application From for Technical Review for Cylinders, etc.) or Form-2 (Application Form for Technical Review for Gas Appliances), prepare the required documents prescribed in the Appendix B, and submit those documents to KGS en bloc

All documents related to factory registration such as applications for technical review and factory audit shall be prepared in Korean in principle. In case it is not possible to submit the Korean version, the English version may be submitted.

The company name, address and name of representative should be filled out in the Applicant field.

2.2.1.2 Processing the Results Technical review is to be conducted within seven days after its document submission. In case there is any item to be supplemented or incomplete, supplementary documents shall be submitted for that part and that period is not included in the seven days.

The results of technical review are judged to be acceptable, unacceptable, or required to be supplemented.

Acceptable: In case the submitted documents conform to the registration standard, the case is judged to be acceptable.

Supplement required: In case the submitted documents fall short of the registration standard or are inappropriate, an immediate notice requiring supplement is issued and the supplementary documents shall be submitted additionally for the defective parts.

Unacceptable (rejected): In case supplementation is not made even after two notifications for supplementation, the application is to be declared unacceptable and all the application documents are to be returned to the applicant but the cost of technical review is not to be returned.

In case there is any change in the registered items of any object companies and the registration shall be modified, the change shall be subject to modification technical review and the review method shall be the same as that of initial technical review.

2.2.2 Factory Audit

2.2.2.1 Application for Factory Audit After consultation with the factory audit team for the desired audit date, applicants

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

15

Korea Gas Safety Corporation

for the registrations should fill out the Form-3 (Application Form for Factory Audit for Cylinders, etc.) or Form-4 (Application Form for Factory Audit for Gas Appliances) and submit the form to KGS with full payment for the factory audit.

The types and standards of products to be registered with the MOTIE after technical review and the desired audit date consulted with KGS shall be listed.

2.2.2.2 Filed for the Factory Audit & Processing the Results In principle, the audit days shall be 4days (or 3days) for initial audit, 3days for renewal audit and 2days for re-audit, but the audit days may be adjusted to reflect the types and standards of products

The item for 4 days for initial audit: Cylinders, Storage Tanks, Tanks Fixed to Vehicles, Pressure Vessels, Specified Equipment for Refrigeration

The audit team consists of 3 auditors (2 auditors for re-audit) in principle, but the number of auditors may be adjusted to reflect the types and standards of products

The factory audit consists of 3 fields (stages) as below.

Field(Stage) Description

Manufacturing codes and standards

Audit for the implementation of technical requirements specified in manufacturing standards and Korean law, where the technical requirements include manufacture (design, forming, etc.) and inspection.

Manufacturing and testing equipment

Audit for manufacturing and test facilities specified in the manufacturing standards and Korean law. the each facility shall maintain the performance and accuracy appropriate for manufacture and inspection of the products

Quality management

systems

Audit to comply with the quality control by process which can guarantee stable quality of the products and the quality management system throughout the factory.

The processing for the factory audit should be completed within 30 days from desired audit day, and the results of the factory audit are judged as accept, minor or major

<Minor Non-conformities> When one non-conformity to either KGS regulations or manufacturing specification is found.

When the found non-conformity factor is deemed not to affect the production quality.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

16

Korea Gas Safety Corporation

<Major Non-conformities> When the relevant KGS regulations or manufacturing specifications are not met.

When any major fault is found.

When multiple minor faults, which are deemed to affect the production quality, are found.

<Corrective Action>

The corrective action to eliminate non-conformities should be confirmed by the document review for minor or on-site re-audit for major

In case of the corrective action completed over 1 year from the notification date for no-conformities, the audit shall be same as the renewal audit.

If the corrective action for minor nonconformities is completed over 3 months from the notification date for non-conformities, the on-site re-audit shall be added.

2.2.3 Factory Registration

2.2.3.1 Application for Factory Registration After receiving a notice of acceptance for technical review and factory audit, applicants for the registrations should fill out the Form-5 (Application Form for Factory Registration for Cylinders, etc.) or Form-6 (Application Form for Factory Registration or Alteration for Gas Appliances), prepare the required documents prescribed in the Appendix B, and submit those documents to MOTIE.

Contact details

Address: 47, Gwanmoonro, Gwacheon-si, Gyeonggi-do, 427-700, Republic of KOREA. Post: Ministry of Trade Industry and Energy, Energy Safety Team. Tel : +82-2-2110-4904 / Fax : +82-2-503-9632

In case an agency or branch in Korea substitute for the applicant, the attorney shall be attached. (There is no special form for the attorney)

2.2.3.2 Processing the Results For factory registration, conformity to the registration standard and items required for quality assurance shall be checked on the basis of the results of technical review and subsequent factory inspection.

Factory registration is to be processed and the certificate of manufacture registration such as Form 9 or 10 issued within 5 days after the receipt of the application.

3. Pre-Audit Preparations & Responsibility

3.1 Pre-Audit Preparation

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

17

Korea Gas Safety Corporation

Interpreter(s), local transportation, and audit data translated into Korean shall be prepared by the applicant.

Documents related to facilities

Design documents, drawings, catalogs, handling manuals, etc. of manufacturing facilities

Specification, calibration certificates, handling manuals, etc. of test and inspection facilities

In the case of subcontractors' processes, documents related to subcontractors' process facilities

Documents related to quality control

Related documents such as ISO/QC manuals and procedures or quality

3.2 Responsibility

3.2.1 Maintaining the Registration

The manufacturer (Certificate Holder) shall comply with registration standards specified in the certificate, relevant Korean laws and regulations in the term of validity (3 years).

The manufacturer shall apply for the renewal factory audit in the term of validity which is 3 years before about 6 months before the validity date of certificate.

In case of expiration of the validity term without a prior application for renewal audit, your registration will be canceled. The initial audit which includes the technical review and on-site audit shall be conducted for the re-registration.

In case the result of renewal audit of which application is received before expiry is decided after a prior expiration date, the new term of validity for renewal factory audits shall be assessed as followings.

Case 1 – the result of the audit is conformity (pass) The new term of validity shall be extended for the next three years from the expiration date on the prior registration certification.

Case 2 – the result of the audit is non-conformity (fail) In case of passing re-audit by eliminating non-conformity, the new term of validity shall begin from acceptance date of the re-audit but expire in 3 years from the expiration date on the prior registration certification.

This means that the product manufactured between the expiration date on the prior registration certification and the acceptance date for the re-audit cannot be exported to Korea

3.2.2 Deregistration

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

18

Korea Gas Safety Corporation

In case that one of following is found, the registration shall be canceled. Once the registration is canceled, the manufacturer shall return the registration certificate to MOTIE.

3.2.2.1 Cylinders etc.

Where a registration has been obtained by false of other unjust means Where he/she fails to meet the criteria for registration Where he/she violates regulation for marking Where he/she manufactures cylinders, etc. or fails to report importation Where he/she violates any reclamation order (recall, exchange, refund and publicly

announcement of such fact)

3.2.2.2 Gas Appliances.

Where a registration has been obtained by false of other unjust means Where he/she fails to meet the criteria for registration Where he/she sell or use gas appliances without inspections Where he/she violates any reclamation order (recall, exchange, refund and publicly

announcement of such fact) - Where he/she violates regulation for marking

3.2.3 Alteration Registration If there is some change of your company information registered to MOTIE, it would be the object of an alteration audit; the manufacturer shall inform KGS immediately and undergo the alteration audit. After the alteration audit, the manufacturer s

hall apply the alteration registration to MOTIE (But in case of 3.2.3.1⑤, ⑥ or 3.2.

3.1 ④, ⑤, the manufacturer can apply the alteration registration to MOTIE without

the alteration audit by KGS)

3.2.3.1 Cylinders etc.

① Change in the location of business place (specified in the certificate) ② Change in the type of registration item ③ Change in manufacturing process of the registration item ④ Change in the manufacturing standard & code

⑤ Change in the name of company ⑥ Change in the name of representative

3.2.3.2 Gas Appliances.

① Change in the location of business place (specified in the certificate) ② Change in the type of registration item

③ Change in the manufacturing standard & code ④ Change in the name of company

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

19

Korea Gas Safety Corporation

⑤ Change in the name of representative

3.2.4 Marking on Gas Products The manufacturers who export gas products to Korea shall place a mark on them as determined by Korean laws

3.2.5 Disclosure Order When it deems necessary for safety control of the gas products distributed in Korea, they may be collected and inspected. Where inspection results reveal any serious defect in a gas product, the manufacturer shall recall, exchange, refund it and publicly announce such fact.

3.2.6 Discontinue Business In case of discontinuing the business registered to MOTIE, the manufacturer shall inform MOTIE

3.2.7 Follow-Up Audit In any of the following cases, special follow-up audit (additional audit) shall be conducted:

The results of the sampling inspection in accordance with the laws and Regulations do not conform to the relevant standards.

Its poor quality has become a social issue. The president of KGS recognizes the necessity of the follow-up audit. The MOTIE requests the follow-up audit.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

20

Korea Gas Safety Corporation

[Appendix 1] Classification for Manufacture Registration of Cylinders, etc.

Registration Classification

Cylinders, etc. Gas Appliances

Burning Appliances

Safety Appliances

1

Seamless steel cylinders

Spinning type Ranges Pressure Regulators for LP

Gas

2 Billet type Ovens

Pressure Regulators for Urban Gas

(including Regulators for Governor Stations)

3 Deep drawing type Grills Automatic Shut-Off Device

for Gas Leakage

4 Seamless aluminum

alloy Cylinders

Spinning type Oven Ranges Filters for Governor Stations

5 Billet type Rice Cookers High-pressure Hoses

6 Deep drawing type Water Heaters Low-pressure Hoses

7 Welded Cylinders

with internal volume under 500ℓ

Boilers Valves for Pipes

8 with internal volume over 500ℓ

Heaters Polyethylene Valves for

Gases

9 Cryogenic gas

cylinders

with internal volume under 500ℓ

Cooling and Heating Appliances

Gas Corks

10 with internal volume over 500ℓ

Portable Butane Stoves

Electric Insulation Joints

11 Cylinders with internal volume under 500ℓ for LNG vehicles

Cast Iron Gas Burners

Electrofused Polyethylene Fittings

12 Welded cylinders Commercial Gas

Burning AppliancesTransition Fittings

13 Composite material

cylinders

Steel liner Other Gas Burning

Appliances Quick Coupling Units for

Gases

14 Aluminum alloy liner Gas Fuel Cells Safety Couplings

15 Non-metal liner Clothes Gas Dryers Multifunctional Gas Meters

16 Cylinders prohibited from refilling for high-pressure gases

Butane Gas Burning Appliances

Loading Arms

17 Cylinder accessories for high-pressure gases Charcoal Stove

Starters Others

18 Storage tanks for high-pressure gases Forced Mixing Type

Gas Burners

19 Tanks fixed to vehicles(tank lorry) for high-pressure gases

Others

20 Pressure vessels, Specified equipment for refrigeration (Except Compressors)

21 Specified equipment for refrigeration (Compressors)

22 Emergency cut-off devices for high-pressure gases

23 Safety valves for high-pressure gases

24 Valves for toxic gas pipes

25 Other cylinders etc.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

21

Korea Gas Safety Corporation

[Appendix 2] Required Document

1. Technical Review (1.3.1.5)

1.1 General

1.1.1 Company profile: Name of company and representative, factory address, products etc.

1.1.2 Qualification: Certificates for Manufacturing Codes (Standards) and Quality (where applicable)

1.1.3 Manufacturing items and process drawings for application: The classification, manufacturing codes (standards), and process drawing which will be registered (see Appendix 1)

1.1.4 Sub-Contractor: If the forming, mechanical test, heat treatment and NDT are conducted by sub-contractor, fill out the following table

Process of Sub-contractor

Company name CEO name AddressDistance from Your

Company (Km) note

Forming shell, head

Mechanical Test

tensile, bending

Heat treatment furnace,

local

NDT RT,MT,UT

In case the sub-contractor already has a certificate for the factory audit, the certificate can be substituted for required documents for sub-contractor.

1.2 Manufacturing Facilities & Inspection Equipment list

For manufacturing and inspecting products which will be registered, facilities and equipment shall be submitted as bellows;

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

22

Korea Gas Safety Corporation

<Example for manufacturing facilities list>

NO Facility classification Facility name Capacity Quantity note

1 Forming facility ex) Press

2 Welding facility SMAW/SAW etc.

3 Cleaning facility Picking

4 Heat treatment facility Furnace

5 Pretreatment and corrosion-resistant

coating equipment Shot blast room

6 Other facilities necessary for manufacture TURNING ROLLER

ETC

<Example for Inspecting equipment list>

NO Equipment classification Equipment name Capacity Quantity note

1 Standard pressure gauge ex) Dead weight

2 Standard thermometer Digital thermometer

3 Hydrostatic test equipment pump

4 Dimension Measuring equipment micro meter

Thickness gauge

5 Mechanic test equipment Impact TEST BEND TEST

6 Metallurgical Microscope MACRO TEST

7 Insulation Test Facility VACUUM PUMP

8 Other equipment necessary for

manufacture

The facility and equipment refer to only registering products.

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

23

Korea Gas Safety Corporation

1.3 Quality Control Procedure

The manual or procedure including belows (where applicable)

Essential Contents

1) Authority and Responsibility 2) Organization 3) Drawings Design Calculations and Specification Control 4) Material Control 5) Purchases Control(including control of subcontractors) 6) Examination and Inspection Program 7) Non-conformity Correction Reports Control 8) Welding 9) NDT 10) Heat Treatment(exemption cause shall be noticed) 11) Hydrostatic Test 12) Calibration Control of Measuring and inspection devices 13) Name Plates and Marking (High-Pressure Gas Safety Control Act) 14) Documents and Record control

1.4. Drawings and Strength Calculation

2. Factory Audit (1.3.1.6)

In case that the technical review for the initial or alteration audit has been conducted, there are no (additional) required documents.

3. Factory Registration

3.1 Initial and Alteration Audit

Application form with a revenue stamp Company profile (it can be a brochure) Technical review result by KGS Factory audit result by KGS

3.2 Renewal Audit

- Application form with a revenue stamp - Company profile (it can be a brochure) - Factory audit result by KGS - Original Certificate issued by MOTIE (before 2012 April, MKE)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

24

Korea Gas Safety Corporation

[Appendix 3] Basic Fee

Classification Basic fee (won)

Initial Audit

(1.3.1.1)

Cylinders Storage Tanks

Tanks fixed to vehicle Pressure Vessels

Specified equipment for refrigeration

12,600,000

Cylinder accessories Emergency cut-off devices

Safety valves Valves for toxic gas pipes

Gas appliances

10,800,000

Renewal Audit

Cylinders Storage Tanks

Tanks fixed to vehicle Pressure Vessels

Specified equipment for refrigeration

10,800,000

Cylinder accessories Emergency cut-off devices

Safety valve Valves for toxic gas pipes

Gas appliances

9,000,000

Alteration Audit

No classification (Excluding change in location of factory) 3,150,000

Re-audit On-site audit 6,100,000

Documental audit 1,800,000

Additional fee for adding classification (Appendix 1) or standards 1,290,000

Technical Review

When the type of gas product to be registered is 4 or over 4,410,000

When the type of gas product to be registered is 3 or under 3,150,000

Official Airfare, accommodations and other expenditure are calculated based on KGS's criteria

Registration to MOTIE

Initial or Renewal Audit Cylinders, etc. 25,000

Gas Appliances 30,000

Alteration 15,000

note1) In case of simultaneous audit for the different type of gas products, higher fee applies to the basic fee. note2) Additional audit period by adding standards, registration items, and subcontractors shall not exceed

the basic audit period. note3) Additional fee for adding the audit period is calculated at a additional increase rate of basic fee. note4) Additional fee for adding classification or standards is calculated at the product of classification and

standard note5) Change in business place applies to initial audit although it is an alteration audit. note6) If refund of audit fee is requested in written form prior to the date of appointing the person in charge ,

the fee will be refunded as below - 7 days advance request : 100% - 3 days advance request : 60% - 1 days advance request : 20%

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

25

Korea Gas Safety Corporation

[Appendix 4] Guide for Subcontract Registration

Guide for Subcontract Registration

Overseas Supplier Registration System (OSRS) of KGS is a voluntary application and registration system to ensure the quality of products as well as to resolve the inconveniences of frequent visiting of suppliers.

Objects of audit are limited to four types of process (i.e., NDE, Forming /Bending, Heat Treatment and Mechanical Testing) necessary for manufacturing cylinders and pressure vessels. Moreover, the application and registration are possible only when the manufacturer and its suppliers agree and the suppliers must supply products to be exported to the Republic of Korea.

Methods of audit application are determined by voluntary agreement and decisions between subcontractors and manufacturer who want to register or were registered to Korean government to export their products.

The applicant can choose to undergo the audit for suppliers simultaneously at the time of its factory audit.

The applicant can choose to undergo an audit separately with its factory audit. In this case, there will be no affections between each audit results.

Benefits expected by OSRS of KGS In case of registered suppliers, no site visiting is necessary within valid period of

registration. The NCRs of suppliers do not affect the results of the manufacturer. The manufacturer can reduce the auditing time for outside process. The manufacturer can choose OSRS assured by KGS.

Audit type consists of document review and on-site audit.

In the document review, the manuals (procedures) will be checked to assure the quality of products in accordance with the manufacture codes (standards) and requirements.

In the on-site audit, the activities and records will be checked to assure quality of products in accordance with manuals (procedures).

In addition, the kind of audits are as follows; the initial audit, renewal audit, additional audit (needs to audit for additional site of the company) and re-audit (for the rejected audit).

Lists of suppliers

Company Type Address Need to register?

NDT □ Yes □ No

Heat treatment □ Yes □ No

Mechanical Test □ Yes □ No

Head Forming □ Yes □ No

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

26

Korea Gas Safety Corporation

Form-1 Application Form for Technical Review (Cylinders, etc.): 1.3.1.5

Application Form for Technical Review

※ Check "√" in applicable bracket

Receipt No. Receipt Date Issue Date Process Term 7 Days

Applicant

Company Name:

Name of Representative: Date of Birth:

Office Address: Phone No.:

Information

for

registration

Business

Address

Business Type [ ]Manufacture [ ]Storage [ ]Sales [ ]Importer [ ]Trans poser

Type of

Cylinders,

Refrigeration,

Specified

Equipment, etc

Manufacturing Standards and Classification:

I hereby apply to undergo the technical review in accordance with the Article 3-6 of the Enforcement Decree of the High

Pressure Gas Safety Control Act and the Article 5-2-3 and Article 7-1 of the Enforcement Rule of the same Act.

/ / (Year/Month/Date)

Applicant(Signature)

to: Korea Gas Safety Corporation

Required

Documents

1. 1 copy of facility installation plan (only the changed plan of the

corresponding section in case of alteration)

2. 1 drawing and 1 manual on facility standards and technical standards (only

the changed document of the corresponding section in case of alteration)

Handling Fee:

According to the Article 22 of

the Enforcement Decree of the

High Pressure Gas Safety

Control Act

210mm×297mm[일반용지 60g/㎡(재활용품)]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

27

Korea Gas Safety Corporation

Form-2 Application Form for Technical Review (Gas Appliances): 1.3.1.5

Application Form for Technical Review

※ The dark colored field is not applicable for an applicant

Receipt No. Receipt Date Process Term 15 Days

※ Your E-mail is used for issuing E-Tax Bill

Applicant

Company Name:

Name of Representative: Date of Birth:

Office Address: Phone No.:

E-mail:

Business Address:

Business

Type and

Scope

I hereby apply to undergo the technical review in accordance with the Article 4-1-4 of the Safety Control and Business of

Liquefied Petroleum Gas Act and the Article3-2-4and Article 3-2-2-2 of the Enforcement Decree of the same Act and the

Article 13-1, Article 28-3 and Article 48-2 of the Enforcement Rule of the same Act.

/ / (Year/Month/Date)

Applicant (Signature)

to: Korea Gas Safety Corporation

Required

Documents

1. The technical review in accordance with the Article 13 of the Enforcement Rule of the Safety Control and

Business of Liquefied Petroleum Gas Act.

copy of facility installation plan (only the changed plan of the corresponding section in case of alteration)

1 drawing and 1 manual on facility standards and technical standards (only the changed document of the

corresponding section in case of alteration)

Process drawing, for manufacturer (including foreigner)of gas appliances.(only the changed document of the

corresponding section in case of alteration) 2. The technical review in accordance with the Article 28-3 and Article 48-2 of the Enforcement Rule of the

Safety Control and Business of Liquefied Petroleum Gas Act.

copy of facility installation plan (only the changed plan of the corresponding section in case of alteration)

1 drawing and 1 manual on facility standards and technical standards (only the changed document of the

corresponding section in case of alteration)

Handling Fee:

According to the

Article 22 of the

Enforcement

Decree of the

High Pressure

Gas Safety

Control Act

210mm×297mm[일반용지 60g/㎡(재활용품)]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

28

Korea Gas Safety Corporation

Form-3 Application Form for Factory Audit (Cylinders, etc.): 1.3.1.6

Application Form for Factory Audit

Receipt No. Receipt Date Process Term 30 Days

Applicant

Company Name: Name of Representative:

Office Address:

(Phone No.: )

Information

for

registration

Business Type:

Business Address:

Desired Audit Date :

Manufacturing Standards and Classification:

I hereby apply to undergo the factory audit in accordance with the Article 7-2 of the Enforcement Rule of the High Pressure

Gas Safety Control Act

/ / (Year/Month/Date)

Applicant (Signature)

to: Korea Gas Safety Corporation

Required

Documents

1 copy of facility installation plan (only the changed plan of the

corresponding section in case of alteration)

1 drawing and 1 manual on facility standards and technical standards

(only the changed document of the corresponding section in case of

alteration)

Handling Fee:

According to the Article 22 of the

Enforcement Decree of the High

Pressure Gas Safety Control Act

Process Flow Chart

Apply ⇒ Receipt ⇒Factory Audit

(On-Site) ⇒Acceptance

Decision ⇒ Issue Audit Report

Applicant KGS KGS KGS

210mm×297mm[일반용지 60g/㎡(재활용품)]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

29

Korea Gas Safety Corporation

Form-4 Application Form for Factory Audit (Gas Appliances): 1.3.1.6

Application Form for Factory Audit

※ The dark colored field is not applicable for an applicant

Receipt No. Receipt Date Process Term 30 Days

※ Your E-mail is used for issuing E-Tax Bill

Applicant

Company Name:

Name of Representative: Date of Birth:

Office Address: Phone No.:

E-mail:

Business Address:

Information

for

registration

Desired Audit Date :

Type of Gas Appliances :

Manufacturing Standards and Classification:

I hereby apply to undergo the factory audit in accordance with the Article 3-2-2-2 of the Enforcement Decree of the Safety Control and Business of Liquefied Petroleum Gas Act

/ / (Year/Month/Date)

Applicant(Signature)

to: Korea Gas Safety Corporation

Required

Documents

copy of facility installation plan (only the changed plan of the corresponding section in

case of alteration)

1 drawing and 1 manual on facility standards and technical standards (only the changed

document of the corresponding section in case of alteration)

3Process drawing, for manufacturer (including foreigner)of gas appliances.(only the

changed document of the corresponding section in case of alteration)

Handling Fee:

According to the Article

22 of the Enforcement

Decree of the High

Pressure Gas Safety

Control Act

Process Flow Chart

Apply ⇒ Receipt ⇒Factory Audit

(On-Site) ⇒Acceptance

Decision ⇒ Issue Audit Report

Applicant KGS

210mm×297mm[일반용지 60g/㎡(재활용품)]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

30

Korea Gas Safety Corporation

Form-5 Application Form for Factory Registration (Cylinders, etc.): 1.3.1.7

□ Cylinders □ Freezer □ Specified Equipment

Application Form for Manufacture Registration

Process Term

5 Days

A p p l I c a n t

Name of business

Name of Representative

Resident number

Office address (Tel : )

Business Type

Type of Cylinders

I hereby apply to register the manufacture of cylinder (refrigerator, specified equipment) in accordance with the Article 5-1(Article 5-2-1) of the High Pressure Gas Safety Control Act.

/ / (Year/Month/Date)

Applicant (Signature)

To : Minister of Knowledge Economy

※ Required Documents

Handling Fee:

25,000 Won

1. 1 copy of a business project plan

2. 1 copy of the articles of association and 1 copy of register (these will only come under corporations; exemption in the case where each of the copies are already sent to the governor, mayor, or the district chairman and can be verified, or in the case of registering under the regulations of the Article 5-2-1 of the High-Pressure Gas Safety Control Act)

3. 1 copy of technical review (this concerns only the paper issued by the Korea Gas Safety Corporation and cases where technical review is being taken under the regulations Article 3, Item 6 of the High-Pressure Gas Safety Control Act or where manufacture registration of overseas vessels, freezers, or specified equipments is being conducted under the Article 5-2-1 of the High-Pressure Gas Safety Control Act.)

4. 1 copy of factory audit results (this concern cases where manufacture registrations of overseas vessels, freezers, or specified equipments are being conducted under the Article 5-2-1 of the High-Pressure Gas Safety Control Act.)

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

31

Korea Gas Safety Corporation

Form-6 Application Form for Factory Registration or Alteration (Gas Appliances): 1.3.1.7

Application Form for

[ ] Manufacture

Registration [ ] Alteration

[ ] Re-

※ The dark colored field is not applicable for an applicant. ※ Check "√" in applicable bracket

Receipt No. Receipt Date Process Term 5 Days

Applicant

Company Name:

Name of Representative: Date of Birth:

Office Address: Phone No.:

Business Address:

※ Altered Contents for only alteration registration

Altered Contents

Section Before Change After Change

Business Location

Type of Gas Appliances

Manufacturing Standards

Reason

I hereby apply to undergo the manufacture [alteration, re-] registration in accordance with the Article 6-2-1, Article 6-2-2 and Article 6-2-3 of the Safety Control and Business of Liquefied Petroleum Gas Act and the Article 4-2 and Article 8-2 of the Enforcement Rule of the same Act.

/ / (Year/Month/Date)

Applicant (Signature)

To: Minister of Trade Industry and Energy

Required Document

Initial Registration 1. 1 copy of a business project plan 2. 1 copy of technical review 3. 1 copy of factory audit results

Handling Fee

Initial and Re-Registration : 30,000 won Alteration : 15,000 won

Alteration Registration 1. 1 copy of a business project plan 2. 1 copy of technical review 3. 1 copy of factory audit results ※ The copy of business project plan can be omitted if there is no modification compared to the initial registration

Re-Registration 1. 1 copy of a business project plan 2. 1 copy of technical review 3. 1 copy of factory audit results ※ The copy of business project plan and technical review can be omitted if there is no modification compared to the initial registration

210mm×297mm[일반용지 60g/㎡(재활용품)]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

32

Korea Gas Safety Corporation

Form-7 Declaration for Alteration (Gas Appliances): 1.3.1.9

Declaration Form for Alteration Registration

※ The dark colored field is not applicable for an applicant.

Receipt No. Receipt Date Process Term 3 Days

Applicant

Company Name:

Name of Representative: Date of Birth:

Office Address: Phone No.:

Business Address:

Altered Contents

Section Before Change After Change

Company Name

Name of Representative

Reason

I hereby apply to undergo the alteration registration in accordance with the Article 6-2-2 of the Safety Control and Business of Liquefied Petroleum Gas Act and the Article 8-4 of the Enforcement Rule of the same Act.

/ / (Year/Month/Date)

Applicant(Signature)

To: Minister of Trade Industry and Energy

Required Document 1 copy of an evidentiary document for alterations No Handling Fee

Process Flow Chart

Apply ⇒ Receipt ⇒ Review ⇒ Draft ⇒ Fill in Change ⇒ Reissue

Certificate

Applicant MOTIE

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

33

Korea Gas Safety Corporation

Form-8 Application Form for Manufacture Alteration Registration (Cylinders, etc.): 1.3.1.8

□ Cylinders □ Refrigerator □ Specified Equipment

Application Form for Manufacture Alteration Registration

Process Term

4 Days

A p p l I c a n t

Name of Business

Name of Representative

Resident Number

Office Address

Reasons

Altered Contents

Section Before Change After Change

Business Location

Type of Cylinders

Manufacturing Process of Cylinders

Name of Business

Name of Representative

I hereby apply to alter the manufacture registration under the Article 5-1 of the High-Pressure Gas Safety Control Act.

/ / (Year/Month/Date) Applicant (Signature)

※Required Documents: 1. Document stating the changed details 2. Related document about changed contents 1) 1 copy of a business project plan 2) 1 copy of the articles of association and 1 copy of register 3) 1 copy of technical review 4) 1 copy of factory audit results (this concern cases where manufacture registrations of

overseas vessels, freezers, or specified equipments are being conducted under the Article 5-2-1 of the High-Pressure Gas Safety Control Act.)

Handling Fee

15,000 Won

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

34

Korea Gas Safety Corporation

Form-9 Certificate of Manufacture Registration (Cylinders, etc.)

제 호 (Certificate No.)

용기(냉동기 및 특정설비)제조 등록증명서

Certificate of Manufacture Registration of Cylinder(Refrigerator & Specific Equipment)

사업의 종류(Business Type)

상호(Company Name)

사업소 소재지(Office Address)

성명(대표자) (Name of Representative)

생년월일(The date of birth)

용기ㆍ냉동기ㆍ특정설비(Cylinder, Refrigerator, Specified Equipment)

종류(Type) 규격(Standard)

「고압가스 안전관리법」 제 5 조제 1 항, 제 5 조의 2 제 1 항ㆍ제 2 항 및 같은 법 시행규칙 제 6 조제 1 항제 3 호에 따라 용기(냉동기ㆍ특정설비)의 제조등록 또는 재등록을 마쳤으므로 용기(냉동기ㆍ특정설비)제조 등록증명서를 발급합니다. [This certificate is granted for completing the manufacture registration under Article 5(1), Article 5-2(1) or (2) of the High-Pressure Gas Safety Control Act and Article 6(1)3 of the Enforcement Rule there of]

년 월 일

(Year) (Month) (Date)

유효기간 : (Valid Period) :

산업통상자원부장관

시장ㆍ군수ㆍ구청장 직인

(Signature)

210 ㎜×297 ㎜[보존용지(2 종) 70g/㎡]

Korea Gas Safety

Corporation

Factory Registration ManualIssue Date April 2003

Revision Date April 2013

Document No. 2003-033

35

Korea Gas Safety Corporation

Form-10 Certificate of Manufacture Registration (Gas Appliances)

제 호 (Certificate No.)

외국가스용품 제조등록 증명서

Certificate of Manufacture Registration of Foreign Gas Appliances 1. 업 체 명:

(Company Name)

2. 사업소 소재지:

(Factory Address)

3. 대표자의 성명: 4. 생년월일:

(Name of Representative) (Date of birth)

5. 가스용품의 종류:

(Type of Gas Appliances)

6. 가스용품의 규격:

(Standard of Gas Appliances)

「액화석유가스의 안전관리 및 사업법」 제 6 조의 2 제 1 항ㆍ제 3 항 및 같은 법 시행규칙 제 9 조제 2 항제 1 호에 따라 외국가스용품의 제조등록 또는 재등록을 마쳤으므로 외국가스용품 제조등록 증명서를 발급합니다. [This certificate is granted for completing the manufacture registration under Article 6-2(1)ㆍ(3) of the LPG Safety Control & Business Act and Article 9(2)1 of the Enforcement Rule there of]

년 월 일 (Year) (Month) (Date)

유효기간:

(Valid Period)

산업통상자원부장관 직인

(Signature)