Page 1: Factory Building Symposium on Lean Production

Factory Building Symposium on Lean

Production

January 29, 2007Austin, Texas

Page 2: Factory Building Symposium on Lean Production

Four Seasons Housing, Inc.Middlebury, IN

Austin Baidas, CEO and President

Level the Load

Page 3: Factory Building Symposium on Lean Production

Four Seasons Housing Started: 1994 Location: Middlebury, IN Home type(s): Primarily HUD

Code Price point: Moderate Design: Limited

customization Production: 10 floors/day Market area: Northern US

Page 4: Factory Building Symposium on Lean Production

Objective: Balance the Line Eliminate non-value

added (NVA) activity Reduce cycle time

variability› Station to station› Floor to floor

Page 5: Factory Building Symposium on Lean Production

Strategy1. Map product flow2. Analyze data to

identify causes of cycle time variability

3. Implement solutions that reduce NVA and control cycle time variability

Page 6: Factory Building Symposium on Lean Production

Sources of Variation Double vs. single floor

stations Variation in

complexity from A to B half

Tactic: Convert single Tactic: Convert single floor stations to double floor stations to double

floor stationsfloor stations

Page 7: Factory Building Symposium on Lean Production

Then

Raw Material

Raw Material

Raw Material

Roof Ass’y

Raw Material

Mud Pit

Raw Material

Side Wall Jig

Side Wall Jig

End Wall

Plumb & Tile

Mud Pit

Raw Material

5 Interior Walls

1A Frame

1B Post-Frame

2B Pre-Floor

2A HVAC, H2O, DWV

2C Decking 3 Plumb, Util., Floor 4 Cabinet Set

6 End, Side, Drywall & Electrical

7 Side, Drywall, Elec.

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

10 Rough Roof,

Exterior & Interior

11 Shingle, Siding

& Interior

12 Sofit & Fascia

13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Heater

Cabinet Shop

Interior Walls

Cab

inet

Top

s Upper Cabinet

Cabinet Shop

Plu

mb

& T

ile

HVAC Mezzanine

Page 8: Factory Building Symposium on Lean Production

NowInterior Walls

Cab

inet

Top

s Upper Cabinet

Raw Material

Raw Material

Roof Ass’y

Raw Material

Mud Pit

Side Wall Jig

Side Wall Jig

End Wall

Mud Pit

HVAC Mezzanine

Cabinet Shop

Plu

mb

& T

ile

HVAC Mezzanine

2B Decking

3 Plumb, Util., Tile 5 Interior Walls

6 End, Side, Drywall & Electrical

7 Side, Drywall, Elec.

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

10 Rough Roof,

Exterior & Interior

11 Shingle, Siding

& Interior

12 Sofit & Fascia

Paint, Dry, Finish

13 Mud, Dry, Prep

Paint, Dry, Finish

Paint, Dry, Finish

13 Mud, Dry, Prep Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

2A Floor Box

Heater

Raw Material

4 Cab. & Utility Set

Buffer

2A Electrical

13 Mud, Dry, Prep

13 Mud, Dry, Prep

Page 9: Factory Building Symposium on Lean Production

Future

Raw Material

HVAC MezzanineRaw Material

Roof Ass’y

Mud Pit

Raw Material

Side Wall Jig

Side Wall Jig

End Wall

3 DeckingHeater

8 Marriage, Drywall & Electrical

9 Roof Set, Drywall

& Electrical

11 Shingle, Siding

& Interior

12 Sofit & Fascia

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

13 Mud, Dry, Prep Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish

Paint, Dry, Finish13 Mud, Dry, Prep

13 Mud, Dry, Prep

13 Mud, Dry, Prep

2 Floor Box

4 Plumb

Interior Walls

Cab

inet

Top

s

Upper Cabinet

Lower Cabinet Util

ity

Pre

p.

Plu

mb

6 Interior Wall Set 7 End, Side & Mate Wall

5 Cabinet Set, Tile

& Utility Set

10 Rough Roof,

Exterior & Interior

Page 10: Factory Building Symposium on Lean Production

Results

Reduced through-put time 27% All production within facility Eliminated NVA protection for outside floors Eliminated NVA moves Identified real-time data collection

requirements Started a kaizen project list

Page 11: Factory Building Symposium on Lean Production

Highlights Lean initiative driven by business objective Established lean process Identified root cause Listened to the data Workers contributed mightily

Page 12: Factory Building Symposium on Lean Production

Lessons Lean cannot be forced by one person Involve employees Allow team to own the decisions Lean is a process

Page 13: Factory Building Symposium on Lean Production

Going Forward Refine our lean

process Conduct kaizen

events to improve efficiency in departments

Revise plant layout to convert to double floor stations

Page 14: Factory Building Symposium on Lean Production

Lean Symposium

Page 15: Factory Building Symposium on Lean Production

Manufactured Housing Research AllianceJordan Dentz

(212) 496-0900 [email protected]

www.mhrahome.org