31
T. 1-905-370-0410 l 1-905-370-0500 www.lprglobal.com l www.uskoreahotlink.com Email: [email protected] Factory Automation Assembly Lines Measurement Equipment 344 Bloor St. W., Suite 607 Toronto, ON M5S 3A7 Canada

Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: [email protected] Factory Automation Assembly Lines Measurement Equipment

Embed Size (px)

Citation preview

Page 1: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

T. 1-905-370-0410 l 1-905-370-0500

www.lprglobal.com l www.uskoreahotlink.com

Email: [email protected]

Factory Automation Assembly Lines

Measurement Equipment

344 Bloor St. W., Suite 607Toronto, ON M5S 3A7

Canada

Page 2: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

Coampany OverviewCore Technology

Automotive and Industrial FA Equipment

Assembly Machines for Electronic and Electric Parts

Other FA Lines and Machine Tools

Contents

Page 3: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

Location

Automotive Assembly Line

Annual Production CapacityItems

Oderer’s Spec.Production Model

6~12 LINEQuantity

USD 18 millionAmount

Electric & Electronic Parts Assembly Line Customer’s Spec. 4~6 LINE USD 80 million

Robot Automation and Test M/C Order Production -

CAPA Total USD 300 Million

USD 40 million

FY 2016: Factory Scale of Land 2,300 square meter will be Constructe to add Capacity

03

Overview

Page 4: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

04

Patent Application

Patent Registration

Name: 3D Vision Inspection System NO. 10-2015-0047272

Name: Label Separating M/C. Good NO. 10-0733769

Name: Box Loader Device Good NO. 10-0822784

Name: Sorting Device For Defective Processed Good NO. 10-0932194

Name: Ball Arrangement Supply Apparatus Good NO. 10-009751154

Patent

Page 5: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

Name: Label Separating M/C. Good NO. 10-0733769

Name: Box Loader Device Good NO. 10-0822784

Name: Sorting Device For Defective Processed Good NO. 10-0932194

Name: Ball Arrangement Supply Apparatus Good NO. 10-009751154

Full automation system design, Development 1

2

3

4

·Process automation; NC Press, 3D Inspection, Performance Evaluation Autoloader Module withhold·Automated in assembly and inspection; high reliability high productivity,Safety, Quick Delivery

Laser Welding Automation

·Soldering, Carbon steel, Special steel, SUS steel·Full data monitoring & recording·Jig & Fixture, Welding Inspection Equipment

User Interface

·Meets customer requirements (PC, PLC)·Customer System (SPC, MES, QMS) and Interface

SMART Manufacturing

·Full data Monitoring & recording process·DMS(Data Management System)

Certifications

GDI Pump Ass’y Assembly Line

- Venture Business- ISO 9001- Exportpromising firm

- MAIN-BIZ- INNO-BIZ- R&D Center

05

Page 6: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

GDI Pump Ass’y Assembly Line

* Process

06

1.Part indentation and currying 2.Laser welding and vision measure 3.Part indentation and caulking4.Performance test and airtight inspection5.Various data storage systems

Assembly and test line of GDI Pump

Page 7: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

07

EV Relay Laser and Plasma Process System

Electric car parts production line. An automation manufacturing system featuring laser welding and plasma assembly with test operation.

Page 8: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

*Process

3.Mount Ecu Ass’y 4.Leak Test 5.Performance of inspection

Actuator

ECU

Sensor

08

Sensor Ass’y Assembly and Test LineAn assembly and inspection line of Sensor Ass’y mounted on the front end to the bumper

1.Insert Sensor 2.After coating, drying bonding and molding

Page 9: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

FRT & REAR MODULE

Knuckle & Carrier Disc & Hub Drum & Disc Caliper cylinder Fly wheel

09

Knuckle, Disk and Other PartsAn assembly inspection line of Power Trunk Ass'y

Page 10: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

10

Knuckle Assembly Line

Page 11: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

An assembly inspection line of Power Trunk Ass’y

*Process

1.Part Riveting and Crimping 2.Assembly components and Soldering3.Laser welding and airtight inspection 4.Inspection and data storage

11

Spindle Ass’y Assembly Line

Page 12: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

-Nut attach Inspection & Primary Coating Inspection

-Dried dual lock automatic Attach & Inspection

12

Panorama Sunroof Guide Rail Assembly and Inspection Line

Door Hinge Assembly Line Door Latch Assembly Line

Page 13: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

13

Clutch Assembly Line

Page 14: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

14

Brake System Assembly Line

Page 15: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

15

Crank Case Ass’y Assembly Line

Page 16: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

Power Steering Assembly Line

16

Page 17: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

17

Case Auto Welding MachineAn automated system to test CB parts with assay mechanism through various test for electric part production companies.

Driving system: WORK transfer(SERVO), WORK welding (AIR CYL’)

W/D TRANS: AC 150KVA (B/K), DC 250KVA (S/T)

USE: Auto supply with Case of rotary compressor pressure vessel, Bracket and Section parts and next Auto Resistance welding.

Page 18: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

18

Auto Pier’g & Burr’g Machine

USE : Drilling 3 holes at side of Case Pipe and burring

Driving system : Hydraulic Cylinder

Main Power : Hydraulic Drive Motor (15 hp, 5 hp)

An automated system to test CB parts with assay mechanism through various test for electric part production companies.

Page 19: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

19

Valve Body Assembly Line

Page 20: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

20

P/Valve Torsion Bar Cutting Line

Page 21: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

21

An automated system to manufacture electrical parts with ass’y mechanism trough various test for electric part production companies.

ABH- 250c Total Main Automated Assembly line

Page 22: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

22

MCB Auto Test Line System

An automated system to test CB parts with assay mechanism through various test for electric part production companies.

Page 23: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

23

Inverter Semi Auto System LineA semi automated production system to manufacture inverter with various test and packing systems or electric part productioncompanies.

Page 24: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

24

LCD Extension Panel Ass’y Line

Assembly line for production of extension panels of LCD liquid crystal

Page 25: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

25

Roll Transferring SystemFMS equipment for automated transfer of the rolls used for Mills to Roll Shop, unattended delivery of rolls for maintenance to and their retrieval from the grinder, automated and operational.

Page 26: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

26

Roll Transferring SystemTransfer System for maintenance of rolls used for mills used for an increase of productivity and operational efficiency. Maximized by automation of manual work.

Page 27: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

27

Auto Loader SystemRaw materials supplied into system to be auto loaded for multiple processes, such as CNC, milling, rolling. Automatic progressing system with inspection stages.

Page 28: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

28

Automation Equipment

Automated equipment for assembly of automobiles and electronic products, and various types of conveyors and units for multiple processes.

Page 29: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

29

Gantry Loader SystemAutomated system to deliver unmachined parts from the feeding mechanism and retrieve machined parts from CNC machine tools.

Page 30: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

30

Gantry Loader System

NC Lathe, External Diameter & Groove width gauge

Page 31: Factory Automation Assembly Lines Measurement · PDF fileT. 1-905-370-0410 l 1-905-370-0500 l Email: info@lprglobal.com Factory Automation Assembly Lines Measurement Equipment

T. 1-905-370-0410 l 1-905-370-0500 [email protected]

www.lprglobal.com l www.uskoreahotlink.comwww.lprglobal.com l www.uskoreahotlink.com

344 Bloor St. W., Suite 607, Toronto, ON M5S 3A7 Canada