Vent and flare stack are used dispose waste gas in safeand enviroment friendly manner. Flare stack is probablypreferred as compare to vent stack if the release fluidcontain HC from environmental point of view e.g. impactto greenhouse effect for 1 mole of C1 is about 20 times of1 mole of CO2. However, flare stack may be costly.

For a vent stack, at least 3 main criteria shall be met :

i) Toxic / flammable component well dispersed andmeeting health and safe level during Normal operation(Nor. Op.) and emergency situation (Emer. Op.). very

much subject to components / species in vent gas. Local regulations will probably indicatethe limits of various components. In additional, Material Safety Datasheet (MSDS) willprobably indicate the limits. PHAST, FRED, etc can be used for dispersion study.

ii) Radiation due to ignition of lightning (Emer. Op.). In the event, vent gas is HC andpotentially ignited by lightning, radiation study shall be conducted to ensure radiation at thereceptor (human) point is meeting criteria e.g. 6.31 kW/m2. In addition to the radiation level,the temperature of receptor (equipment) shall not damage the equipment. FLARESIM,FRED, etc can be used for radiation study.

iii) Noise level at receptor meeting noise criteria during Normal operation (Nor. Op.) andemergency situation (Emer. Op.). Noise level at receptor (human) is meeting criteria e.g. 115dBA with background noise. Keeping in mind, some plant owner may impose more stringentrequirement i.e. 90 dBA @ receptor (human). FLARESIM, FRED, etc can be used for noisestudy.

If some spill over control PCV tie to vent header and release continuously into vent stack,fluid exit temperature may be a concern in some environment sensitive area.

Ads by Google Natural Gas Flare Gas Oil and Gas Plant Design Direct Vent

Gas Turbine Efficiency www.MeeFog.com/Gas_Turbine

Improve Gas Turbine Output Download OurWhitepaper Today!

Stack Analyzers www.ThermoScientific.com/air

Comprehensive Compliance Systems ReviewProduct Overviews Online

CO2 Removal www.moleculargate.com

CO2 Removal made easy with the MolecularGate adsorption system

Gas/Oil/Water Separation www.kirkprocess.com

Separator internals and designs to maximiseperformance & capacity

Useful Documents Related t(PRV) - Part 1Pressure Relief Valve (PRV) haoverpressure protection of presequipment. Regardless of vessdesigned in accordance to anye.g. ASME, JIS, BS, GB, etc,...

http://webwormcpt.blogspot.com/2007/07/factors-and-criteria-for-vent-stack.html

1 of 3 27/04/2011 14:01

Page 2: Factors and Criteria for Vent Stack Design

Recommended Jobs

Chemical EngineerCikarang - PT Priuk Perkasa Abadi

Process Improvement SpecialistJakarta - EONCHEMICALSPUTRA, PT

Process EngineerJakarta - PT Bidar Timur

Sales Engineer for ProcessJakarta - PT. Yabestindo MitraUtama

Process Engineer (Code : PEG)South Jakarta - CITRANUSANTARA GEMILANG

www.indeed.com

API 521 has recommended Mach = 0.5 and this value is probably a good start for ventdiameter determination. Vent stack height will subject to above criteria, location of ventstack, plant layout, wind speed, wind direction, etc. Modeling vent stack with inclusion ofvent diameter and height using software as mentioned will be conducted in order to ensuremeeting all criteria as mentioned earlier.

WebWormContinue receive FREE stuff & Update.......Subscribe by Email OR RSSAny comments / advices ?..........Drop it in comment field (below) or sent a private email tome...

Labels: Environment, Flare, Stack, Vent

Process engineer jobs

PROCESS ENGINEERWESTINDO ESA PERKASA, PT - Cibinonglocated at Cibinong, Bogor is looking for : PROCESSENGINEER Requirements : S1 degree withbackground... Jobs Keywords: PROCESSENGINEER Personal Notes...JobsDB Indonesia

more jobs »

Jobs by Indeed

posted by Webworm, 4:45 AM

Post a CommentLet us know your opinion !!! You can use some HTML tags, such as <b>, <i>, <a>

http://webwormcpt.blogspot.com/2007/07/factors-and-criteria-for-vent-stack.html

2 of 3 27/04/2011 14:01

Page 3: Factors and Criteria for Vent Stack Design

© 2008-2010 Chemical & Process Technology | Design by Webworm

Subscribe to Post Comments [Atom]

Create a Link

<< Home

http://webwormcpt.blogspot.com/2007/07/factors-and-criteria-for-vent-stack.html

3 of 3 27/04/2011 14:01