  • Proposed Two-Storey Residential Building with Roofdeck

    I. Concreting Works II. Rebar Works

    PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL

    LAFARGE REPUBLIC PORTLAND PLUS 40KG 203.00 /bag 10 mmWASHED SAND 600.00 /m 12 mm

    CRUSHED GRAVEL 1" 850.00 /m 16 mm

    Concreting of Column Footing #16 G.I. WIRE

    Total Volume of Column Footing (m) 5.4 REINFORCEMENT BARS FOR COLUMN FOOTING (F1)

    DIMENSIO

    NS

    WIDTH 1.5Total Length for of RSB for Column Footing (m)

    LENGTH 1.5

    HEIGHT/THICKNESS 0.2

    DIMENSIO

    NS

    NUMBER OF CF 12

    CEMENT

    48.6TOTAL COST

    12825.54MATERIAL COST LABOR COST

    9865.8 2959.74 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR

    105.6SAND

    2.7 m of Washed SandTOTAL COST MATERIAL COST

    2106 LABOR COSTMATERIAL COST LABOR COST COST

    1620 486 390 /m #16 G.I. WIRENUMBER OF INTERSECTIONS

    GRAVEL NUMBER OF FOOTING

    5.4 m of Crushed Gravel 1"TOTAL COST LENGTH OF TIE WIRE

    5967 302.4MATERIAL COST LABOR COST

    4590 1377 1105 /m MATERIAL COSTLABOR COST

    Concreting of Column TOTAL COST

    Total Volume of Column (m) 11.56

    REINFORCEMENT BARS FOR COLUMN FOOTING (F2)

    DIMENSIO

    NS

    WIDTH 0.25

    LENGTH 0.4Total Length for of RSB for Column Footing (m)

    CONCRETE M

    IXTURE CLASS A

    40 kg./bag Portland Cement

    CONCRETE M

    IXTURE CLASS A

  • DIMENSIO

    NS HEIGHT/THICKNESS 6.8Total Length for of RSB for Column Footing (m)

    NUMBER OF COLUMN 17

    DIMENSIO

    NS

    CEMENT

    104.04TOTAL COST

    27456.156MATERIAL COST LABOR COST

    21120.12 6336.036 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR

    SAND9.9

    5.78 m of Washed SandTOTAL COST

    4508.4 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST

    3468 1040.4 390 /mCOST

    #16 G.I. WIRE

    GRAVEL NUMBER OF INTERSECTIONS

    11.56 m of Crushed Gravel 1"TOTAL COST NUMBER OF FOOTING

    12773.8 LENGTH OF TIE WIREMATERIAL COST LABOR COST

    24.3

    9826 2947.8 1105 /mMATERIAL COST

    Concreting of Wall Footing LABOR COST

    Total Volume of Wall Footing (m) 4.4925TOTAL COST

    DIMENSIO

    NS

    WIDTH 0.5REINFORCEMENT BARS FOR COLUMN (C1)

    THICKNESS 0.15

    LENGTH OF WF1 59.9Total Length for of RSB for Column (m)

    CEMENT

    40.4325TOTAL COST DIM

    ENSIONS

    10670.13675MATERIAL COST LABOR COST

    8207.7975 2462.33925 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR

    SAND 119.68

    2.24625 m of Washed SandTOTAL COST

    1752.075 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST

    1347.75 404.325 390 /mCOST

    #16 G.I. WIRE

    CONCRETE M

    IXTURE CLASS A

    40 kg./bag Portland Cement

    CONCRETE M

    IXTURE CLASS A

    40 kg./bag Portland Cement

  • GRAVEL NUMBER OF LATERAL TIES

    4.4925 m of Crushed Gravel 1"TOTAL COST NUMBER OF RSB

    4964.2125 NUMBER OF COLUMNMATERIAL COST LABOR COST LENGTH OF TIE WIRE

    3818.625 1145.5875 1105 /m 1180.8

    Concreting of Beam MATERIAL COST

    Total Volume of Beam (m) 16.9425LABOR COST

    TOTAL COST

    DIMENSIO

    NS

    WIDTH 0.5 THICKNESS 0.15

    REINFORCEMENT BARS FOR COLUMN (C2)LENGTH OF BEAMS 225.9

    LENGTH OF FTB-1 34.95Total Length for of RSB for Column (m)

    LENGTH OF RCB-1 190.95

    CEMENT

    DIMENSIO

    NS

    152.4825TOTAL COST

    40240.13175MATERIAL COST LABOR COST

    30953.9475 9286.18425 80480.2635 /m16 mm x 6m REINFORCEMENT STEEL BAR

    9.97SAND

    8.47125 m of Washed SandTOTAL COST MATERIAL COST

    6607.575 LABOR COSTMATERIAL COST LABOR COST COST

    5082.75 1524.825 13215.15 /mLENGTH OF COLUMN LATERAL TIES (m)

    GRAVEL PERIMETER OF COLUMN

    16.9425 m of Crushed Gravel 1"TOTAL COST NUMBER OF COLUMN

    18721.4625 NUMBER OF LATERAL TIESMATERIAL COST LABOR COST NUMBER

    14401.125 4320.3375 37442.925 /m SPACINGREMAINING LENGTH

    Concreting of Slab (GF) SPACING

    Total Volume of Slab (m) 14.344510 mm x 6m REINFORCEMENT STEEL BAR

    166.12DIMENSIO

    NS

    THICKNESS 0.15

    TOTAL AREA 95.63MATERIAL COST

    LABOR COST

    CONCRETE M

    IXTURE CLASS A

    40 kg./bag Portland Cement

    CONCRETE M

    IXTURE CLASS A

  • CEMENT COST

    86.067TOTAL COST #16 G.I. WIRE

    22713.0813NUMBER OF LATERAL TIES

    MATERIAL COST LABOR COST NUMBER OF RSB

    17471.601 5241.4803 1583.4 /m NUMBER OF COLUMNLENGTH OF TIE WIRE

    SAND98.4

    7.17225 m of Washed SandTOTAL COST

    5594.355MATERIAL COST

    MATERIAL COST LABOR COST LABOR COST

    4303.35 1291.005 390 /mTOTAL COST

    GRAVEL

    REINFORCEMENT BARS FOR WALL FOOTING14.3445 m of Crushed Gravel 1"

    TOTAL COST

    15850.6725 Total Length of RSB for Wall Footing (m)MATERIAL COST LABOR COST

    12192.825 3657.8475 1105 /m

    DIMENSIO

    NS

    Concreting of Slab (2F and RD)

    Total Volume of Slab (m) 35.23545

    DIMENSIO

    NS

    THICKNESS 0.15

    TOTAL AREA 234.90312 mm x 6m REINFORCEMENT STEEL BAR

    32.95CEMENT

    317.11905TOTAL COST MATERIAL COST

    83687.717295 LABOR COSTMATERIAL COST LABOR COST COST

    64375.16715 19312.550145 2375.1 /m10 mm x 6m REINFORCEMENT STEEL BAR

    18.49SAND

    17.617725 m of Washed SandTOTAL COST MATERIAL COST

    13741.8255 LABOR COSTMATERIAL COST LABOR COST COST

    10570.635 3171.1905 390 /m#16 G.I. WIRE

    NUMBER OF HOOP BARS

    GRAVEL NUMBER OF RSB

    35.23545 m of Crushed Gravel 1"TOTAL COST LENGTH OF TIE WIRE

    40 kg./bag Portland Cement

    CONCRETE

    MIXTURE CLASS A

    40 kg./bag Portland Cement

  • 35.23545 m of Crushed Gravel 1"

    38935.17225 180.6MATERIAL COST LABOR COST

    29950.1325 8985.03975 1105 /mMATERIAL COST

    LABOR COST

    Concreting of Stairs TOTAL COST

    Total Volume of Column (m) 0.9

    REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)

    DIMENSIO

    NS

    WIDTH 1.5

    LENGTH 0.2 Total Length of RSB for FTB-1

    HEIGHT/THICKNESS 0.2 DIMENSIO

    NS

    NUMBER OF STEPS 15

    CEMENT

    8.1TOTAL COST

    2137.5912 mm x 6m REINFORCEMENT STEEL BAR

    MATERIAL COST LABOR COST41.94

    1644.3 493.29 2375.1 /mMATERIAL COST

    SAND LABOR COST

    0.45 m of Washed SandTOTAL COST COST

    351 Total Length of Stirrups for FTB-1MATERIAL COST LABOR COST

    270 81 390 /m PERIMETER OF FTB-110 mm x 6m REINFORCEMENT STEEL BAR

    GRAVEL61.16

    0.9 m of Crushed Gravel 1"TOTAL COST

    994.5 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST

    765 229.5 1105 /mCOST

    #16 G.I. WIRE

    NUMBER OF STIRRUPSNUMBER OF RSB

    LENGTH OF TIE WIRE

    550.4625

    MATERIAL COST

    LABOR COST

    TOTAL COST

    REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

    CONCRETE M

    IXTURE CLASS A

    40 kg./bag Portland Cement

  • REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

    Total Length of RSB for RCB-1

    DIMENSIO

    NS

    16 mm x 6m REINFORCEMENT STEEL BAR

    305.52

    MATERIAL COST

    LABOR COSTCOST

    Total Length of Stirrups for RCB-1

    PERIMETER OF RCB-110 mm x 6m REINFORCEMENT STEEL BAR

    334.16

    MATERIAL COST

    LABOR COSTCOST

    #16 G.I. WIRENUMBER OF STIRRUPS

    NUMBER OF RSB

    LENGTH OF TIE WIRE

    4009.95

    MATERIAL COST

    LABOR COST

    TOTAL COST

    REINFORCEMENT FOR GROUND FLOOR SLAB

    Total Length of RSB for GF Slab

    A

    B

    LENGTH OF RSBALONG A

    ALONG B

  • 12 mm x 6m REINFORCEMENT STEEL BAR

    257.91

    MATERIAL COST

    LABOR COSTCOST

    #16 G.I. WIRENUMBER OR INTERSECTIONS

    LENGTH OF TIE WIRE

    1310.4

    MATERIAL COST

    LABOR COST

    TOTAL COST

    REINFORCEMENT FOR 2F AND RD SLAB

    NUMBER OF STEEL BARS

    AREA12 mm x 6m REINFORCEMENT STEEL BAR

    144.74

    MATERIAL COST

    LABOR COSTCOST

    NUMBER OF STEEL BARS

    AREA10 mm x 6m REINFORCEMENT STEEL BAR

    144.74

    MATERIAL COST

    LABOR COSTCOST

    #16 G.I. WIRENUMBER OR INTERSECTIONS

    LENGTH OF TIE WIRE

    Total Length of 12mm RSB

    Total Length of 10mm RSB

  • 80.886

    MATERIAL COST

    LABOR COST

    TOTAL COST

  • II. Rebar Works III. Masonry Works

    PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL

    10 mm 125.00 /pc CONCRETE HOLLOW BLOCK 5" THK12 mm 192.00 /pc CONCRETE HOLLOW BLOCK 4" THK16 mm 315.00 /pc LAFARGE REPUBLIC PORTLAND PLUS 40KG

    #16 G.I. WIRE 180.00 /kg WASHED SAND

    REINFORCEMENT BARS FOR COLUMN FOOTING (F1)CRUSHED GRAVEL 1"

    CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)Total Length for of RSB for Column Footing (m) 633.6

    LENGTH 3.3 NUMBER OF RSBGROUND FLOOR

    ALONG (B) 1.5 9 SECOND FLOOR

    ALONG (L) 1.5 7CONCRETE HOLLOW BLOCK 5" THK

    NUMBER OF FOOTING (F1) 12CEMENT MORTAR (CLASS C)

    16 mm x 6m REINFORCEMENT STEEL BAR CEMENT

    105.6 pcsTOTAL COST SAND

    43243.2 PLASTERING @ 12mm THK (CLASS B)MATERIAL COST 33264 AREA OF WALLS (TWO SIDES)

    LABOR COST 9979.2 CEMENTCOST 19219.2 /m SAND

    #16 G.I. WIRE TOTAL COSTNUMBER OF INTERSECTIONS 63 MATERIAL COST

    NUMBER OF FOOTING 16 CHB 5" THK

    LENGTH OF TIE WIRE 0.3 m CEMENT

    302.4 meters 5.71 kg.SAND

    CHB 5" THKMATERIAL COST 1027.0188679245 CEMENT

    LABOR COST 308.1056603774 SAND

    TOTAL COST 1335.1245283019CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)

    593.3886792453

    REINFORCEMENT BARS FOR COLUMN FOOTING (F2)

    Total Length for of RSB for Column Footing (m) 59.4GROUND FLOOR

    REINFORCEM

    ENT BARS

    16 mm x 6m

    REINFORCEM

    ENT STEEL BAR

    Total Area of Exterior Walls (m)

    /m

    Total Area of Interior Walls (m)

    16 mm x 6m

    REINFORCEM

    ENT STEEL BAR

  • Total Length for of RSB for Column Footing (m)Total Length for of RSB for Column Footing (m) 59.4SECOND FLOOR

    LENGTH 3.3 NUMBER OF RSB CONCRETE HOLLOW BLOCK 4" THK

    ALONG (B) 1.5 9 CEMENT MORTAR (CLASS C)ALONG (L) 1.5 9 CEMENT

    NUMBER OF FOOTING (F1) 1SAND

    PLASTERING @ 8mm THK (CLASS B)16 mm x 6m REINFORCEMENT STEEL BAR AREA OF WALLS (TWO SIDES)

    9.9 pcsTOTAL COST CEMENT

    4054.05 SANDMATERIAL COST 3118.5 TOTAL COST

    LABOR COST 935.55 MATERIAL COSTCOST 68.25 /m CHB 5" THK

    #16 G.I. WIRE CEMENTNUMBER OF INTERSECTIONS 81 SAND

    NUMBER OF FOOTING 1 CHB 5" THK

    LENGTH OF TIE WIRE 0.3 m CEMENT

    24.3 meters 0.46 kg.SAND

    Total Length of RSB for Vertical BarsMATERIAL COST 82.5283018868

    LABOR COST 24.758490566 TOTAL WIDTH OF WALLS

    TOTAL COST 107.2867924528 SPACING47.6830188679 LENGTH

    REINFORCEMENT BARS FOR COLUMN (C1)12 mm x 6m REINFORCEMENT STEEL BAR

    67.5229166667

    Total Length for of RSB for Column (m) 718.08MATERIAL COST

    LENGTH OF COLUMN6.8

    12964.4COST

    NUMBER OF RSB/COLUMN 6Total Length of RSB for Horizontal Bars

    NUMBER OF COLUMN 1616 mm x 6m REINFORCEMENT STEEL BAR HEIGHT OF WALL

    119.68 pcs TOTAL COST WIDTH 49008.96 10 mm x 6m REINFORCEMENT STEEL BAR

    MATERIAL COST 37699.28.98

    LABOR COST 11309.76COST 68.25 /m MATERIAL COST

    #16 G.I. WIRE LABOR COST

    16 mm x 6m

    REINFORCEM

    ENT STEEL BAR

    /m

    16 mm

    x 6m

    REINFO

    RCEMENT STEEL

    BAR

  • NUMBER OF LATERAL TIES 41 COST

    NUMBER OF RSB 6

    NUMBER OF COLUMN 16

    LENGTH OF TIE WIRE 0.3 /m

    1180.8 meters 22.28 kg.

    MATERIAL COST 4010.2641509434

    LABOR COST 1203.079245283TOTAL COST 5213.3433962264

    766.6681465039 /m

    REINFORCEMENT BARS FOR COLUMN (C2)

    Total Length for of RSB for Column (m) 59.84

    LENGTH OF COLUMN 6.8

    NUMBER OF RSB/COLUMN 8

    NUMBER OF COLUMN 1

    16 mm x 6m REINFORCEMENT STEEL BAR

    9.97 pcsTOTAL COST

    4084.08MATERIAL COST 3141.6

    LABOR COST 942.48COST 68.25 /m

    LENGTH OF COLUMN LATERAL TIES (m)996.71

    PERIMETER OF COLUMN 1.3 m

    NUMBER OF COLUMN 17

    NUMBER OF LATERAL TIES 40.5

    NUMBER 11TOTAL NUMBER OF LATERAL TIES

    SPACING 0.1

    REMAINING LENGTH 5.741

    SPACING 0.210 mm x 6m REINFORCEMENT STEEL BAR

    166.12 pcsTOTAL COST

    26994.2291666667MATERIAL COST 20764.7916666667

    LABOR COST 6229.4375

    16 mm

    x 6m

    REINFO

    RCEMENT STEEL

    BAR

  • COST 27.0833333333 /m#16 G.I. WIRE

    NUMBER OF LATERAL TIES 41

    NUMBER OF RSB 8

    NUMBER OF COLUMN 1

    LENGTH OF TIE WIRE 0.3 /m

    98.4 meters 1.86 kg.

    MATERIAL COST 334.1886792453LABOR COST 100.2566037736TOTAL COST 434.4452830189

    63.8890122087 /m

    REINFORCEMENT BARS FOR WALL FOOTING

    Total Length of RSB for Wall Footing (m) 197.67

    NUMBER OF RSB 3

    LENGTH OF WALL FOOTING 59.9

    Total Length of Hoop Bars (m) 110.92

    SPACING OF HOOP BARS 0.3

    WIDTH OF HOOP BARS 0.512 mm x 6m REINFORCEMENT STEEL BAR

    32.95 pcsTOTAL COST

    8223.072MATERIAL COST 6325.44

    LABOR COST 1897.632COST 41.6 /m

    10 mm x 6m REINFORCEMENT STEEL BAR

    18.49 pcsTOTAL COST

    3003.9930555556MATERIAL COST 2310.7638888889

    LABOR COST 693.2291666667COST 27.0833333333 /m

    #16 G.I. WIRE

    NUMBER OF HOOP BARS 200.67

    NUMBER OF RSB 3

    LENGTH OF TIE WIRE 0.3 m

    12 mm

    and 10 mm

    REINFORCEM

    ENT STEEL BARS

  • 180.6 meters 3.41 kg.

    MATERIAL COST 613.358490566LABOR COST 184.0075471698

    TOTAL COST 797.3660377358

    13.3116199956 /m

    REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)

    Total Length of RSB for FTB-1 251.64 m

    NUMBER OF RSB 6TOP BARS 3

    BOTTOM BARS 3

    TOTAL LENGTH OF FTB-1 34.95 m

    12 mm x 6m REINFORCEMENT STEEL BAR

    41.94 pcsTOTAL COST

    10468.224MATERIAL COST 8052.48

    LABOR COST 2415.744COST 41.6 /m

    Total Length of Stirrups for FTB-1 366.975

    PERIMETER OF FTB-1 1.2 m

    10 mm x 6m REINFORCEMENT STEEL BAR

    61.16 pcsTOTAL COST

    9938.90625MATERIAL COST 7645.3125

    LABOR COST 2293.59375COST 284.375 /m

    #16 G.I. WIRE

    NUMBER OF STIRRUPS 305.8125NUMBER OF RSB 6

    LENGTH OF TIE WIRE 0.3

    550.4625 meters 10.39 kg.

    MATERIAL COST 1869.4952830189LABOR COST 560.8485849057TOTAL COST 2430.3438679245

    810.1146226415 /m

    REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

  • REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)

    Total Length of RSB for RCB-1 1833.12 m

    WEB BARS 2TOP BARS 3

    BOTTOM BARS 3

    TOTAL LENGTH OF RCB-1 190.95 m

    16 mm x 6m REINFORCEMENT STEEL BAR

    305.52 pcsTOTAL COST

    125110.44MATERIAL COST 96238.8

    LABOR COST 28871.64COST 68.25 /m

    Total Length of Stirrups for RCB-1 2005.0

    PERIMETER OF RCB-1 1.2 m

    10 mm x 6m REINFORCEMENT STEEL BAR

    334.16 pcsTOTAL COST

    54301.40625MATERIAL COST 41770.3125

    LABOR COST 12531.09375COST 284.375 /m

    #16 G.I. WIRENUMBER OF STIRRUPS 1670.8125

    NUMBER OF RSB 8

    LENGTH OF TIE WIRE 0.3

    4009.95 meters 75.66 kg.

    MATERIAL COST 13618.6981132075LABOR COST 4085.6094339623TOTAL COST 17704.3075471698

    92.7169811321 /m

    REINFORCEMENT FOR GROUND FLOOR SLAB

    Total Length of RSB for GF Slab 1547.46

    7.05 m SPACING ALONG A 48

    13.5 m 0.15 m ALONG B 91

    LENGTH OF RSB 1289.55 m

    ALONG A 648 m

    ALONG B 641.55 m

  • 12 mm x 6m REINFORCEMENT STEEL BAR

    257.91 pcsTOTAL COST

    64374.336MATERIAL COST 49518.72

    LABOR COST 14855.616COST 14.7377142857 /m

    #16 G.I. WIRENUMBER OR INTERSECTIONS 4368

    LENGTH OF TIE WIRE 0.3 m

    1310.4 meters 24.72 kg.

    MATERIAL COST 4450.4150943396LABOR COST 1335.1245283019TOTAL COST 5785.5396226415

    1.3245283019 /m

    REINFORCEMENT FOR 2F AND RD SLAB

    868.45

    NUMBER OF STEEL BARS 3.221 m

    AREA 269.6212 mm x 6m REINFORCEMENT STEEL BAR

    144.74 pcsTOTAL COST

    36127.354432MATERIAL COST 27790.27264

    LABOR COST 8337.081792COST 133.9936 /m

    868.45

    NUMBER OF STEEL BARS 3.221 m

    AREA 269.6210 mm x 6m REINFORCEMENT STEEL BAR

    144.74 pcsTOTAL COST

    23520.4130416667MATERIAL COST 18092.6254166667

    LABOR COST 5427.787625COST 87.2354166667 /m

    #16 G.I. WIRENUMBER OR INTERSECTIONS 269.62

    LENGTH OF TIE WIRE 0.3 m

    Total Length of 12mm RSB

    m

    Total Length of 10mm RSB

    m

  • 80.886 meters 1.53 kg.

    MATERIAL COST 274.7071698113LABOR COST 82.4121509434TOTAL COST 357.1193207547

    1.3245283019 /m

  • III. Masonry Works III. Formworks

    PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL

    CONCRETE HOLLOW BLOCK 5" THK 9.00 /pc Form Lumber 2" x 3" x 12' Coco LumberCONCRETE HOLLOW BLOCK 4" THK 8.00 /pc Form Lumber 2" x 2" x 12' Coco LumberLAFARGE REPUBLIC PORTLAND PLUS 40KG 203.00 /bag 1/2"x4'x8' Ordinary Plywood

    WASHED SAND

    600.00 /m FORMS FOR COLUMN

    CRUSHED GRAVEL 1" 850.00 /m SIDES OF THE COLUMN

    CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR) SHORTER SIDELONGER SIDE

    167.929LATERAL PERIMETER OF THE COLUMN

    GROUND FLOOR 85.3155 COLUMN HEIGHT

    SECOND FLOOR 82.6135 NUMBER OF COLUMNS

    CONCRETE HOLLOW BLOCK 5" THK 2099.1125 pcs.TOTAL AREA

    1/2"x4'x8' Ordinary PlywoodCEMENT MORTAR (CLASS C)

    CEMENT 1601.62 bag TOTAL COSTSAND 177.17 MATERIAL COST

    PLASTERING @ 12mm THK (CLASS B) LABOR COSTAREA OF WALLS (TWO SIDES) 335.86 m 42.651

    CEMENT 48.36 bag WOOD FRAME OF COLUMNSSAND 4.03 m

    Form Lumber 2" x 2" x 12' Coco LumberTOTAL COST 601323.43MATERIAL COST LABOR COST TOTAL COST

    18892.0125 5667.60375 MATERIAL COST 334947.2370685 100484.17112055 LABOR COST 108717.23 32615.17038 29.000

    CHB 5" THK 146.25 /m SCAFFOLDING FOR COLUMNSCEMENT 2592.94945 /m

    HORIZONTAL BRACESSAND 841.62 /m

    CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)VERTICAL BRACES

    DIAGONAL BRACES

    150.005

    Form Lumber 2" x 2" x 12' Coco LumberGROUND FLOOR 65.2

    Total Area of Exterior Walls (m)

    m

    Total Area of Interior Walls (m)

  • SECOND FLOOR 84.805 TOTAL COST

    CONCRETE HOLLOW BLOCK 4" THK 1875.0625 pcs.MATERIAL COST

    LABOR COST

    CEMENT MORTAR (CLASS C) 1675.960CEMENT 1430.67 bag

    Form Lumber 2" x 3" x 12' Coco LumberSAND 158.26PLASTERING @ 8mm THK (CLASS B) TOTAL COST

    AREA OF WALLS (TWO SIDES) 300.01 m MATERIAL COST

    CEMENT 28.80 bag LABOR COST

    SAND 2.40 m 66.733TOTAL COST 529966.92 FORMS FOR BEAM

    MATERIAL COST LABOR COST PERIMETER OF TWO SIDES FORM

    15000.5 4500.15 TWO SIDE FORMS 296273.1504425 88881.94513275 BOTTOM FORM 96393.21 28917.9639 LENGTH OF BEAM

    CHB 5" THK 130 /m TOTAL AREACEMENT 2567.61505 /m 1/2"x4'x8' Ordinary Plywood

    SAND 835.38 /m

    Total Length of RSB for Vertical Bars 405.1375 mTOTAL COST

    MATERIAL COST

    TOTAL WIDTH OF WALLS 107.77 m LABOR COST

    SPACING 0.8 m 42.651LENGTH 3.00 m WOOD FRAME OF COLUMNS

    12 mm x 6m REINFORCEMENT STEEL BARForm Lumber 2" x 3" x 12' Coco Lumber

    67.5229166667 pcs.TOTAL COST

    16853.72 TOTAL COSTMATERIAL COST LABOR COST MATERIAL COST

    12964.4 3889.32 LABOR COST 156.3860072376 /m 55.126

    Total Length of RSB for Horizontal Bars 53.885 mSCAFFOLDING FOR COLUMNS

    HORIZONTAL BRACESHEIGHT OF WALL 3

    WIDTH 107.77VERTICAL BRACES

    10 mm x 6m REINFORCEMENT STEEL BAR

    Form Lumber 2" x 2" x 12' Coco Lumber8.98 pcs

    TOTAL COST 1459.3854166667 TOTAL COST

    MATERIAL COST 1122.6041666667 MATERIAL COSTLABOR COST 336.78125 LABOR COST

    m

  • 27.0833333333 /m 47.165

    Form Lumber 2" x 3" x 12' Coco LumberTOTAL COST

    MATERIAL COST

    LABOR COST

    90.316

  • PRICE LISTMATERIAL PRICE

    Form Lumber 2" x 3" x 12' Coco Lumber 132.00 /pcForm Lumber 2" x 2" x 12' Coco Lumber 88.00 /pc

    1/2"x4'x8' Ordinary Plywood 320.00 /pc

    FORMS FOR COLUMN

    SIDES OF THE COLUMN 0.65 m

    SHORTER SIDE 0.25 m

    LONGER SIDE 0.4 m

    LATERAL PERIMETER OF THE COLUMN1.5 m

    COLUMN HEIGHT 6.8m

    NUMBER OF COLUMNS 17

    TOTAL AREA 173.4 m

    1/2"x4'x8' Ordinary Plywood 17.7780511811 pcs

    TOTAL COST 7395.67MATERIAL COST 5688.98

    LABOR COST 1706.6942.651 /m

    WOOD FRAME OF COLUMNS

    Form Lumber 2" x 2" x 12' Coco Lumber43.956

    pcs

    TOTAL COST 5028.59MATERIAL COST 3868.15

    LABOR COST 1160.4429.000 /m

    SCAFFOLDING FOR COLUMNS

    HORIZONTAL BRACES 2427.6

    bd. Ft.

    VERTICAL BRACES 809.2

    bd. Ft.

    DIAGONAL BRACES 1352.52

    bd. Ft.

    Form Lumber 2" x 2" x 12' Coco Lumber2540.310

    bd. Ft.

  • TOTAL COST 290611.46MATERIAL COST 223547.28

    LABOR COST 67064.181675.960 /m

    Form Lumber 2" x 3" x 12' Coco Lumber67.433

    bd. Ft.

    TOTAL COST 11571.56MATERIAL COST 8901.20

    LABOR COST 2670.3666.733 /m

    FORMS FOR BEAM

    PERIMETER OF TWO SIDES FORM 0.95 m

    TWO SIDE FORMS 0.25 m

    BOTTOM FORM 0.35 m

    LENGTH OF BEAM 225.9 m

    TOTAL AREA 214.605 m

    1/2"x4'x8' Ordinary Plywood 22.003 pcs

    TOTAL COST 9153.10MATERIAL COST 7040.85

    LABOR COST

    2112.25

    42.651 /m

    WOOD FRAME OF COLUMNS

    Form Lumber 2" x 3" x 12' Coco Lumber68.942

    bd. Ft.

    TOTAL COST 11830.38MATERIAL COST 9100.29

    LABOR COST 2730.0955.126 /m

    SCAFFOLDING FOR COLUMNS

    HORIZONTAL BRACES 88.4775

    bd. Ft.

    VERTICAL BRACES 112.95

    bd. Ft.

    Form Lumber 2" x 2" x 12' Coco Lumber88.478

    pcs

    TOTAL COST 10121.83MATERIAL COST 7786.02

    LABOR COST 2335.81

  • 47.165 /m

    Form Lumber 2" x 3" x 12' Coco Lumber112.950

    bd. Ft.

    TOTAL COST 19382.22MATERIAL COST 14909.40

    LABOR COST 4472.82

    90.316 /m

  • TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK

    BILL OF MATERIALSI.D. NO DESCRIPTION UNIT

    GENERAL REQUIREMENTSMobilization/Temporary Structures, Utilities

    lotand Services/Demobilization/Permits

    Sub-total1.00 Earthworks1.01 Clearing and Grubbing sq.m1.02 Structural Excavation cu.m1.03 Backfilling and Compaction cu.m1.04 Gravel Bedding G-1 cu.m1.05 Select Fill cu.m1.06 Soil Poisoning sq.m

    Sub-Total

    2.00 Concreting WorksColumn Footing

    2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m

    Wall Footing2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m

    Column 2.01 Portland Cement bag2.02 Crushed Gravel 3/4"" cu.m2.03 Washed Sand cu.m

    Beams2.01 Portland Cement bag2.02 Crushed Gravel 3/4"" cu.m2.03 Washed Sand cu.m

    Slab on Grade2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m

    Stairs

  • 2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m

    Sub-total

    3.00 Rebar WorksFootings

    Column Footings3.01 16 mm pc3.02 #16 G.I. Wire kg

    Wall Footings3.01 12 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg

    Column 3.01 16 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg

    Roof beams & Tie beams3.01 16 mm pc3.02 12 mm pc3.03 10 mm pc3.04 #16 G.I. Wire kg

    Slabs3.01 12 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg

    Sub-total4.00 Forms and Scaffoldings

    Column form4.01 Good lumber ( 2" x 2" x 12') pc4.02 Plywood Ordinary, 1/4" x 4" x 8' pc4.03 CWN, Assorted kg

    Column & Roof beam Scaffolding4.01 Vertical Support ( 2" x 3" x 12' Good lumber) pc

    Horizontal Support (2" x 2" x 12' Good lumber) pcDiagonal braces (2" x 2" x 12' Good lumber) pc

    4.02 CWN, Assorted kgBeam form

    4.01 Good lumber ( 2" x 2" x 12') pc4.02 Plywood Ordinary, 1/4" x 4" x 8' pc

  • 4.03 CWN, Assorted kgSub-total

    5.00 Masonry WorksMasonry wall

    5.01 CHB 5" THK pcs.5.02 CHB 4" THK pcs.5.03 Portland Cement bag5.04 Washed Sand cu.m5.05 12mm x 6m RSB pc5.06 #61 G.I. Tie wire kg

    Plastering5.01 Portland Cement bag5.02 Washed Sand cu.m

    Sub-total6.00 Doors And Windows

    6.01 set

    6.02 set

    6.03 set

    6.04 set

    6.05 set

    6.07 set

    6.08 set

    6.09 set

    6.1 set

    6.12 set

    6.13 set

    Sub-total7.00 Electrical Works

    Roughing-ins

    7.01 Electrical Conduit uPVC, 15mm pc

    D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb

    D-2, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb

    D-3, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb

    W-1, 12mm thk. bronze glass on powder coatedaluminum frame

    W-2, 6mm thk. bronze glass on powdercoated aluminum frame

    W-3, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-4, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-5, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-6, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-7, 12mm thk. bronze glass on powder coatedaluminum frame

    W-8, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

  • 7.02 RSC 60mm pc

    7.03

    Entrance Cap 60mm dia.

    pc

    7.04

    Junction Box , 4" x 4" G.I

    pc

    7.05

    Utility Box, 2" x 4" x G.I

    pc

    7.06

    Grounding Rod, 2.4m x 16mm dia.

    pcWires and Fixtures

    7.01

    3.5 mm2 THW wire , Stranded

    box

    7.02

    Duplex C.O. with Plate

    pc

    7.03

    3 Way Switch With Plate

    pc

    7.04

    40 watts Flourescent Lamp

    pc

    7.05

    Single Switch with Plate

    pc

    7.06

    2-Gang Switch with Plate

    pc

    7.07 Incandescent Bulb 50W set

    7.08 Panel Box, Flush Type, 4 Branches set7.09 Circuit Breaker, 20A 2P set7.10 Main Circuit Breaker, 175A 2P set7.11 Electrical Tape pc

    Sub-total8.00 Plumbing Works8.01 Water Closet 1.6gpf with Accessories set8.02 Kitchen Sink set8.03 Faucet , Hose Bibb , Brass 3/4" pc8.04 G.I Coupling, 3/4" pc8.05 G.I Tee, 3/4" pc8.06 G.I. Pipe 3/4" Sch.40 pc8.07 G.I. Elbow 90 x 3/4" pc8.08 Gate Valve , 3/4"dia. pc8.09 Check Valve , 3/4"dia. pc8.10 S.S. Floor Drain 4' x 4" pc

    Sub-total

  • 9.00 Sanitary works9.01 uPVC Sanitary Pipe 4" x 10' pc9.02 uPVC Wye 4" x 4" pc

    9.03 uPVC Wye 4" x 2" pc

    9.04 uPVC Sanitary Pipe 2" pc9.05 uPVC P-TRAP 2" pc9.06 uPVC P-TRAP 4" pc9.07 uPVC Elbow 45 x 4 " pc9.08 uPVC Cleanout 4" diameter pc9.09 PVC Cement can

    Sub-total10.00 Painting Works

    Concrete surfaces sq.m10.01 Neutralizer qrt10.02 Latex, Flat gal

    10.03 Latex, Semi Gloss gal

    10.04 Acri Color qrtSub-total

    11.00 TileWorksWall

    11.01 Unglazed Wall Tiles 20cm x 30cm T&B pc11.02 Unglazed Wall Tiles 20cm x 20cm KITCHEN pc11.03 Tile Trim 6mm. pc11.04 Lining 2" X 20cm (T&B and KITCHEN) pc11.05 Tile Adhesive 25kg/bag bag11.06 Tile Grout 5 kg/bag bag

    Flooring sq.m

    11.01Glazed Floor Tiles 20cmx 20cm

    pc(INTERIOR )

    11.02 Tile Adhesive 25kg/bag bag

    11.03 Tile Grout 5 kg/bag bagSub-total

    TOTAL BUILDING COST (LABOR AND MATERIAL)

    PRICE FOR BIDDING

    LABOR AND MATERIALS

  • TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK

    BILL OF MATERIALSQTY UNIT COST TOTAL COST

    MATERIAL LABOR MATERIAL LABOR

    1.00 30,000.00 9,000.00 30,000.00 9,000.00

    140.00 0.00 50.00 0.00 7,000.0075.80 0.00 250.00 0.00 18,950.0050.00 150.00 50.00 7,500.00 2,500.005.00 850.00 255.00 4,250.00 1,275.00

    13.00 150.00 45.00 1,950.00 585.00140.00 50.00 15.00 7,000.00 2,100.00

    48.60 203.00 66.00 9,865.80 3,207.605.40 850.00 255.00 4,590.00 1,377.002.70 600.00 180.00 1,620.00 486.00

    40 203.00 66.00 8,120.00 2,640.002.25 850.00 255.00 1,912.50 573.754.5 600.00 180.00 2,700.00 810.00

    105.00 203.00 66.00 21,315.00 6,930.0011.56 850.00 255.00 9,826.00 2,947.805.78 600.00 180.00 3,468.00 1,040.40

    153.00 203.00 66.00 31,059.00 10,098.0016.94 850.00 255.00 14,399.00 4,319.708.47 600.00 180.00 5,082.00 1,524.60

    417.00 203.00 66.00 84,651.00 27,522.0050.85 850.00 255.00 43,225.90 12,967.7725.40 600.00 180.00 15,240.60 4,572.18

  • 8.00 203.00 66.00 1,624.00 528.000.90 850.00 255.00 765.00 229.500.45 600.00 180.00 270.00 81.00

    164.00 315.00 10.00 51,660.00 1,640.004.28 180.00 10.00 770.40 42.80

    33.00 192.00 10.00 6,336.00 330.0018.50 125.00 10.00 2,312.50 185.003.41 180.00 10.00 613.80 34.10

    130.00 315.00 10.50 40,950.00 1,365.00167.00 125.00 10.00 20,875.00 1,670.0024.14 180.00 10.00 4,345.20 241.40

    306.00 315.00 10.50 96,390.00 3,213.0041.94 192.00 10.00 8,052.48 419.40

    395.00 125.00 10.00 49,375.00 3,950.0086 180.00 10.00 15,480.00 860.00

    403.00 192.00 10.00 77,376.00 4,030.00144.74 125.00 10.00 18,092.50 1,447.4026.25 180.00 10.00 4,725.00 262.50

    44.00 88.00 26.40 3,872.00 1,161.6018.00 320.00 96.00 5,760.00 1,728.0030.00 80.00 24.00 2,400.00 720.00

    180.38 132.00 39.60 23,810.16 7,143.05209.67 88.00 26.40 18,450.96 5,535.29112.71 88.00 26.40 9,918.48 2,975.5435.00 80.00 24.00 2,800.00 840.00

    69.00 88.00 26.40 6,072.00 1,821.6022.00 320.00 96.00 7,040.00 2,112.00

  • 30.00 80.00 24.00 2,400.00 720.00

    2,100.00 9.00 2.55 18,900.00 5,355.001,875.00 8.00 2.55 15,000.00 4,781.253,032.00 203.00 57.00 615,496.00 172,824.00

    275.43 600.00 168.00 165,258.00 46,272.2476.50 192.00 9.60 14,688.00 734.4020.00 180.00 19.50 3,600.00 390.00

    77.16 203.00 54.00 15,663.48 4,166.6456.32 600.00 168.00 33,792.00 9,461.76

    1 10,800.00 3,240.00 10,800.00 3,240.00

    5 4,500.00 1,350.00 22,500.00 6,750.00

    3 2,495.00 748.50 7,485.00 2,245.50

    1 8,700.00 2,610.00 8,700.00 2,610.00

    9 7,500.00 2,250.00 67,500.00 20,250.00

    6 7,000.00 2,100.00 42,000.00 12,600.00

    7 5,625.00 1,687.50 39,375.00 11,812.50

    2 5,500.00 1,650.00 11,000.00 3,300.00

    5 4,200.00 1,260.00 21,000.00 6,300.00

    1 3,145.00 943.50 3,145.00 943.50

    1 3,000.00 900.00 3,000.00 900.00

    50.00 58.00 14.50 2,900.00 725.00

  • 11.00 1,000.00 250.00 11,000.00 2,750.00

    11.00 80.00 20.00 880.00 220.00

    34.00 20.00 5.00 680.00 170.00

    12.00 20.00 5.00 240.00 60.00

    14.00 200.00 50.00 2,800.00 700.00

    12.00 3,750.00 937.50 45,000.00 11,250.00

    14.00 108.00 27.00 1,512.00 378.00

    4.00 250.00 62.50 1,000.00 250.00

    10.00 150.00 37.50 1,500.00 375.00

    10.00 68.00 17.00 680.00 170.00

    13.00 108.00 27.00 1,404.00 351.00

    14.00 40.00 10.00 560.00 140.00

    3.00 320.00 80.00 960.00 240.004.00 350.00 87.50 1,400.00 350.001.00 3,000.00 750.00 3,000.00 750.00

    35.00 25.00 6.25 875.00 218.75

    4.00 4,500.00 1,125.00 18,000.00 4,500.002.00 600.00 150.00 1,200.00 300.007.00 250.00 62.50 1,750.00 437.50

    11.00 17.00 4.25 187.00 46.7511.00 17.00 4.25 187.00 46.7513.00 370.00 92.50 4,810.00 1,202.508.00 17.00 4.25 136.00 34.005.00 360.00 90.00 1,800.00 450.00

    12.00 300.00 75.00 3,600.00 900.004.00 200.00 50.00 800.00 200.00

  • 11.00 525.00 131.25 5,775.00 1,443.7511.00 160.00 40.00 1,760.00 440.00

    14.00 97.00 24.25 1,358.00 339.50

    14.00 205.00 51.25 2,870.00 717.5011.00 50.00 12.50 550.00 137.5017.00 110.00 27.50 1,870.00 467.508.00 97.00 24.25 776.00 194.005.00 110.00 27.50 550.00 137.506.00 120.00 30.00 720.00 180.00

    646.528.62 130.00 32.50 1,120.60 280.15

    21.55 450.00 112.50 9,697.50 2,424.38

    22.00 440.00 110.00 9,680.00 2,420.00

    4.20 123.00 30.75 516.60 129.15

    168.00 40.00 10.00 6,720.00 1,680.0045.00 32.00 8.00 1,440.00 360.0021.00 50.00 12.50 1,050.00 262.5054.00 25.00 6.25 1,350.00 337.508.00 270.00 67.50 2,160.00 540.008.00 165.00 41.25 1,320.00 330.00

    431.39

    15,530.00 13.00 3.25 201,890.00 50,472.50

    134.00 270.00 67.50 36,180.00 9,045.00

    134.00 185.00 46.25 24,790.00 6,197.50

    TOTAL BUILDING COST (LABOR AND MATERIAL) 2,993,117.44

    PRICE FOR BIDDING

    LABOR AND MATERIALS 31506.50

  • TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK

    BILL OF MATERIALS DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY) GRAND TOTAL I.D. NO

    39,000.00

    39,000.001.00

    7,000.00 1.0118,950.00 1.0210,000.00 1.035,525.00 1.042,535.00 1.059,100.00 1.0653,110.00

    2.00

    13,073.40 2.015,967.00 2.022,106.00 2.03

    10,760.00 2.012,486.25 2.023,510.00 2.03

    28,245.00 2.0112,773.80 2.024,508.40 2.03

    41,157.00 2.0118,718.70 2.026,606.60 2.03

    112,173.00 2.0156,193.67 2.0219,812.78 2.03

  • 2,152.00 2.01994.50 2.02351.00 2.03

    303,686.45

    3.00

    53,300.00 3.01813.20 3.02

    6,666.00 3.012,497.50 3.02647.90

    3.0142,315.00 3.0222,545.00 3.034,586.60

    99,603.00 3.018,471.88 3.0253,325.00 3.0316,340.00

    3.0181,406.00 3.0219,539.90 3.034,987.50

    417,044.483.013.02

    5,033.60 3.037,488.003,120.00 3.01

    3.0230,953.21 3.0323,986.2512,894.023,640.00 3.01

    3.027,893.609,152.00 3.01

  • 3,120.00 3.02107,280.68 3.03

    4.0024,255.0019,781.25 4.01788,320.00 4.02211,530.24 4.0315,422.403,990.00 4.01

    19,830.1243,253.76 4.02

    1,236,783.454.01

    14,040.00 4.02

    29,250.00 4.03

    9,730.50

    11,310.00 5.00

    87,750.00

    54,600.00 5.01

    51,187.50 5.02

    14,300.00 5.03

    27,300.00 5.04

    4,088.50 5.05

    3,900.00 5.06

    307,456.505.015.02

    3,625.00

  • 13,750.00 6.00

    1,100.00 6.01

    850.00 6.02

    300.00 6.03

    3,500.00 6.04

    6.05

    56,250.00 6.07

    1,890.00 6.08

    1,250.00 6.09

    1,875.00 6.1

    850.00 6.12

    1,755.00 6.13

    700.001,200.00 7.001,750.003,750.00 7.011,093.75 7.0295,488.75 7.03

    7.0422,500.00 7.051,500.00 7.062,187.50233.75 7.01233.75 7.02

    6,012.50 7.03170.00 7.04

    2,250.00 7.054,500.00 7.061,000.00 7.0740,587.50 7.08

  • 7.097,218.75 7.102,200.00 7.111,697.503,587.50 8.00687.50 8.01

    2,337.50 8.02970.00 8.03687.50 8.04900.00 8.05

    20,286.25 8.068.078.08

    1,400.75 8.0912,121.88 8.1012,100.00

    645.75 9.0026,268.38 9.01

    9.029.03

    8,400.00 9.041,800.00 9.051,312.50 9.061,687.50 9.072,700.00 9.081,650.00 9.09

    252,362.5010.00

    45,225.00 10.0130,987.50 10.02346,125.00 10.03

    2,993,117.44 10.04

    PRICE FOR BIDDING11.00

    /m11.01

    11.02

    11.0311.0411.05

  • 11.06

    11.01

    11.0211.03

  • TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK

    DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY)

    DESCRIPTION COST

    MATERIALS AND LABORGENERAL REQUIREMENTSMobilization/Temporary Structures, Utilities

    Php 278.57 and Services/Demobilization/Permits

    Earthworks Php 379.36 Clearing and Grubbing Php 50.00 Structural Excavation Php 135.36 Backfilling and Compaction Php 71.43 Gravel Bedding G-1 Php 39.46 Select Fill Php 18.11 Soil Poisoning Php 65.00

    Concreting Works Php 63,257.24 Concreting of Column Footing (F1) Php 3,916.00 Portland Cement Php 2,421.00 Crushed Gravel 1" Php 1,105.00 Washed Sand Php 390.00 Concreting of Wall Footing (WF1) Php 3,103.01 Portland Cement Php 1,992.59 Crushed Gravel 1" Php 460.42 Washed Sand Php 650.00 Column (C1 & C2) Php 8,430.96 Portland Cement Php 5,230.56 Crushed Gravel 3/4"" Php 2,365.52 Washed Sand Php 834.89 Beams (FTB-1, RCB-1 & RFB-1) Php 12,311.54 Portland Cement Php 7,621.67 Crushed Gravel 3/4"" Php 3,466.43 Washed Sand Php 1,223.44 Slab on Grade (S-1) Php 34,848.05 Portland Cement Php 20,772.78 Crushed Gravel 1" Php 10,406.24 Washed Sand Php 3,669.03 Stairs Php 647.69

  • Portland Cement Php 398.52 Crushed Gravel 1" Php 184.17 Washed Sand Php 65.00

    Rebar Works Php 8,162.37 Reinforcing Steel Bars in Footings Php 3,582.52 Column Footing (C1F1) Php 1,651.05 16 mm Php 1,601.60 #16 G.I. Wire Php 49.45 Column Footing (C2F1) Php 1,849.48 16 mm Php 1,801.80 #16 G.I. Wire Php 47.68 Wall Footings Php 81.99 12 mm Php 41.60 10 mm Php 27.08 #16 G.I. Wire Php 13.31 Reinforcing Steel Bars in Column Php 1,629.87 Column (C1F1) Php 731.87 16 mm Php 450.45 10 mm Php 233.51 #16 G.I. Wire Php 47.91 Column (C2F1) Php 898.00 16 mm Php 600.60 10 mm Php 233.51 #16 G.I. Wire Php 63.89 Reinforcing Steel Bars in Roof Beams Php 1,686.46 FTB-1 Php 653.88 12 mm Php 300.00 10 mm Php 284.35 #16 G.I. Wire Php 69.53 RCB-1 and RFB-2 Php 1,032.58 16 mm Php 655.20 10 mm Php 284.38 #16 G.I. Wire Php 93.00 Reinforcing Steel Bars in Slabs Php 1,263.52 Ground Floor Slab Php 738.52 12 mm Php 677.62 #16 G.I. Wire Php 60.90 S-1 Php 525.00 12 mm Php 275.13

  • 10 mm Php 174.87 #16 G.I. Wire Php 75.00

    Installation of Forms and Scaffoldings Php 15,776.57 Column form Php 2,300.24 Good lumber ( 2" x 2" x 12') Php 740.24 Plywood Ordinary, 1/4" x 4" x 8' Php 1,101.18 CWN, Assorted Php 458.82 Column & Roof beam Scaffolding Php 10,510.81 Vertical Support ( 2" x 3" x 12' Good lumber) Php 4,551.94 Horizontal Support (2" x 2" x 12' Good lumber) Php 3,527.39 Diagonal braces (2" x 2" x 12' Good lumber) Php 1,896.18 CWN, Assorted Php 535.29 Beam form Php 2,965.53 Good lumber ( 2" x 2" x 12') Php 1,160.82

    Plywood Ordinary, 1/4" x 4" x 8' Php 1,345.88

    CWN, Assorted Php 458.82

    Masonry Works Php 3,690.59

    Masonry wall Php 3,491.59

    CHB 5" THK Php 144.38

    CHB 4" THK Php 131.88

    Portland Cement Php 2,486.81

    Washed Sand Php 667.29

    12mm x 6m RSB Php 48.65

    #61 G.I. Tie wire Php 12.59

    Plastering Php 199.00 Portland Cement Php 62.56 Washed Sand Php 136.45

  • Installation of Doors And Windows Php 3,236.38

    D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb Php 147.79

    Php 307.89

    Php 102.43

    Php 119.05

    Php 923.68

    Php 574.74

    Php 538.82

    Php 150.53

    Php 287.37

    Php 43.04

    Php 41.05

    Electrical Works Php 1,005.14 Installation of Roughing-ins Php 243.42 Electrical Conduit uPVC, 15mm Php 38.16 RSC 60mm Php 144.74 Entrance Cap 60mm dia. Php 11.58 Junction Box , 4" x 4" G.I Php 8.95 Utility Box, 2" x 4" x G.I Php 3.16 Grounding Rod, 2.4m x 16mm dia. Php 36.84 Wires and Fixtures Php 761.72 3.5 mm2 THW wire , Stranded Php 592.11 Duplex C.O. with Plate Php 19.89 3 Way Switch With Plate Php 13.16 40 watts Flourescent Lamp Php 19.74 Single Switch with Plate Php 8.95 2-Gang Switch with Plate Php 18.47 Incandescent Bulb 50W Php 7.37 Panel Box, Flush Type, 4 Branches Php 12.63

    D-2, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb

    D-3, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb

    W-1, 12mm thk. bronze glass on powder coatedaluminum frame

    W-2, 6mm thk. bronze glass on powdercoated aluminum frame

    W-3, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-4, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-5, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-6, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

    W-7, 12mm thk. bronze glass on powder coatedaluminum frame

    W-8, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.

  • Circuit Breaker, 20A 2P Php 18.42 Main Circuit Breaker, 175A 2P Php 39.47 Electrical Tape Php 11.51

    Plumbing Works Php 427.24 Water Closet 1.6gpf with Accessories Php 236.84 Kitchen Sink Php 15.79 Faucet , Hose Bibb , Brass 3/4" Php 23.03 G.I Coupling, 3/4" Php 2.46 G.I Tee, 3/4" Php 2.46 G.I. Pipe 3/4" Sch.40 Php 63.29 G.I. Elbow 90 x 3/4" Php 1.79 Gate Valve , 3/4"dia. Php 23.68 Check Valve , 3/4"dia. Php 47.37 S.S. Floor Drain 4' x 4" Php 10.53

    Sanitary works Php 213.54 uPVC Sanitary Pipe 4" x 10' Php 75.99 uPVC Wye 4" x 4" Php 23.16 uPVC Wye 4" x 2" Php 17.87 uPVC Sanitary Pipe 2" Php 37.76 uPVC P-TRAP 2" Php 7.24 uPVC P-TRAP 4" Php 24.61 uPVC Elbow 45 x 4 " Php 10.21 uPVC Cleanout 4" diameter Php 7.24 PVC Cement Php 9.47

    Painting Works Php 87.56

    Concrete surfacesNeutralizer Php 4.67 Latex, Flat Php 40.41 Latex, Semi Gloss Php 40.33 Acri Color Php 2.15

    TileWorks Php 3,643.42 Wall Php 184.74 Unglazed Wall Tiles 20cm x 30cm T&B Php 88.42 Unglazed Wall Tiles 20cm x 20cm KITCHEN Php 18.95 Tile Trim 6mm. Php 13.82 Lining 2" X 20cm (T&B and KITCHEN) Php 17.76 Tile Adhesive 25kg/bag Php 28.42

  • Tile Grout 5 kg/bag Php 17.37 Flooring Php 3,458.68 Glazed Floor Tiles 20cmx 20cm

    Php 2,656.45 (INTERIOR )Tile Adhesive 25kg/bag Php 476.05 Tile Grout 5 kg/bag Php 326.18

  • TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK

    DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY)

    COST

    MATERIALS AND LABOR LABOR

    Php 278.57 Php 64.29

    Php 379.36 per m Php 231.50 per m Php 50.00 per m Php 50.00 per m Php 135.36 per m Php 135.36 per m Php 71.43 per m Php 17.86 per m Php 39.46 per m Php 9.11 per m Php 18.11 per m Php 4.18 per m Php 65.00 per m Php 15.00 per m

    Php 63,257.24 Php 15,393.39 Php 3,916.00 Php 1,174.00 Php 2,421.00 Php 594.00 Php 1,105.00 Php 255.00 Php 390.00 Php 90.00 Php 3,103.01 Php 745.14 Php 1,992.59 Php 488.89 Php 460.42 Php 106.25 Php 650.00 Php 150.00 Php 8,430.96 Php 2,021.89 Php 5,230.56 Php 1,283.33 Php 2,365.52 Php 545.89 Php 834.89 Php 192.67 Php 12,311.54 Php 2,952.28 Php 7,621.67 Php 1,870.00 Php 3,466.43 Php 799.94 Php 1,223.44 Php 282.33 Php 34,848.05 Php 8,344.81 Php 20,772.78 Php 5,096.67 Php 10,406.24 Php 2,401.44 Php 3,669.03 Php 846.70 Php 647.69 Php 155.28

    per m per m

    per m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per m

  • Php 398.52 Php 97.78 Php 184.17 Php 42.50 Php 65.00 Php 15.00

    Php 8,162.37 per m Php 2,448.71 per m Php 3,582.52 per m Php 1,074.76 per m Php 1,651.05 per m Php 495.32 per m Php 1,601.60 per m Php 480.48 per m Php 49.45 per m Php 14.84 per m Php 1,849.48 per m Php 554.84 per m Php 1,801.80 per m Php 540.54 per m Php 47.68 per m Php 14.30 per m Php 81.99 per m Php 24.60 per m Php 41.60 per m Php 12.48 per m Php 27.08 per m Php 8.12 per m Php 13.31 per m Php 3.99 per m Php 1,629.87 per m Php 488.96 per m Php 731.87 per m Php 219.56 per m Php 450.45 per m Php 135.14 per m Php 233.51 per m Php 70.05 per m Php 47.91 per m Php 14.37 per m Php 898.00 per m Php 269.40 per m Php 600.60 per m Php 180.18 per m Php 233.51 per m Php 70.05 per m Php 63.89 per m Php 19.17 per m Php 1,686.46 per m Php 505.94 per m Php 653.88 per m Php 196.16 per m Php 300.00 per m Php 90.00 per m Php 284.35 per m Php 85.31 per m Php 69.53 per m Php 20.86 per m Php 1,032.58 per m Php 309.77 per m Php 655.20 per m Php 196.56 per m Php 284.38 per m Php 85.31 per m Php 93.00 per m Php 27.90 per m Php 1,263.52 per m Php 379.06 per m Php 738.52 per m Php 221.56 per m Php 677.62 per m Php 203.29 per m Php 60.90 per m Php 18.27 per m Php 525.00 per m Php 157.50 per m Php 275.13 per m Php 82.54 per m

    per m per mper m per mper m per m

  • Php 174.87 per m Php 52.46 per m Php 75.00 per m Php 22.50 per m

    Php 15,776.57 per m Php 4,732.97 per m Php 2,300.24 per m Php 690.07 per m Php 740.24 per m Php 222.07 per m Php 1,101.18 per m Php 330.35 per m Php 458.82 per m Php 137.65 per m Php 10,510.81 per m Php 3,153.24 per m Php 4,551.94 per m Php 1,365.58 per m Php 3,527.39 per m Php 1,058.22 per m Php 1,896.18 per m Php 568.85 per m Php 535.29 per m Php 160.59 per m Php 2,965.53 per m Php 889.66 per m Php 1,160.82 per m Php 348.25 per m

    Php 1,345.88 per m Php 403.76 per m

    Php 458.82 per m Php 137.65 per m

    Php 3,690.59 per m Php 1,107.18 per m

    Php 3,491.59 per m Php 1,047.48 per m

    Php 144.38 per m Php 43.31 per m

    Php 131.88 per m Php 39.56 per m

    Php 2,486.81 per m Php 746.04 per m

    Php 667.29 per m Php 200.19 per m

    Php 48.65 per m Php 14.60 per m

    Php 12.59 per m Php 3.78 per m

    Php 199.00 per m Php 59.70 per m Php 62.56 per m Php 18.77 per m Php 136.45 per m Php 40.93 per m

  • Php 3,236.38 per m Php 970.92 per m

    Php 147.79 per m Php 44.34 per m

    Php 307.89 per m Php 92.37 per m

    Php 102.43 per m Php 30.73 per m

    Php 119.05 per m Php 35.72 per m

    Php 923.68 per m Php 277.11 per m

    Php 574.74 per m Php 172.42 per m

    Php 538.82 per m Php 161.64 per m

    Php 150.53 per m Php 45.16 per m

    Php 287.37 per m Php 86.21 per m

    Php 43.04 per m Php 12.91 per m

    Php 41.05 per m Php 12.32 per m

    Php 1,005.14 per m Php 301.54 per m Php 243.42 per m Php 73.03 per m Php 38.16 per m Php 11.45 per m Php 144.74 per m Php 43.42 per m Php 11.58 per m Php 3.47 per m Php 8.95 per m Php 2.68 per m Php 3.16 per m Php 0.95 per m Php 36.84 per m Php 11.05 per m Php 761.72 per m Php 228.52 per m Php 592.11 per m Php 177.63 per m Php 19.89 per m Php 5.97 per m Php 13.16 per m Php 3.95 per m Php 19.74 per m Php 5.92 per m Php 8.95 per m Php 2.68 per m Php 18.47 per m Php 5.54 per m Php 7.37 per m Php 2.21 per m Php 12.63 per m Php 3.79 per m

  • Php 18.42 per m Php 5.53 per m Php 39.47 per m Php 11.84 per m Php 11.51 per m Php 3.45 per m

    Php 427.24 per m Php 128.17 per m Php 236.84 per m Php 71.05 per m Php 15.79 per m Php 4.74 per m Php 23.03 per m Php 6.91 per m Php 2.46 per m Php 0.74 per m Php 2.46 per m Php 0.74 per m Php 63.29 per m Php 18.99 per m Php 1.79 per m Php 0.54 per m Php 23.68 per m Php 7.11 per m Php 47.37 per m Php 14.21 per m Php 10.53 per m Php 3.16 per m

    Php 213.54 per m Php 64.06 per m Php 75.99 per m Php 22.80 per m Php 23.16 per m Php 6.95 per m Php 17.87 per m Php 5.36 per m Php 37.76 per m Php 11.33 per m Php 7.24 per m Php 2.17 per m Php 24.61 per m Php 7.38 per m Php 10.21 per m Php 3.06 per m Php 7.24 per m Php 2.17 per m Php 9.47 per m Php 2.84 per m

    Php 87.56 per m Php 26.27 per m

    Php 4.67 per m Php 1.40 per m Php 40.41 per m Php 12.12 per m Php 40.33 per m Php 12.10 per m Php 2.15 per m Php 0.65 per m

    Php 3,643.42 per m Php 1,093.03 per m Php 184.74 per m Php 55.42 per m Php 88.42 per m Php 26.53 per m Php 18.95 per m Php 5.68 per m Php 13.82 per m Php 4.14 per m Php 17.76 per m Php 5.33 per m Php 28.42 per m Php 8.53 per m

  • Php 17.37 per m Php 5.21 per m Php 3,458.68 per m Php 1,037.61 per m

    Php 2,656.45 per m Php 796.93 per m

    Php 476.05 per m Php 142.82 per m Php 326.18 per m Php 97.86 per m

    FACTORBOM & DET