THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA 206/210 Sa -05 -001 Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category Steel Pipe Pile Year Constructed 1967 Maintenance Record unknown Facility Description Concrete filled steel pipe pile with internal diameter of 25 or 27 inches Location Photos Existing Condition Above Splash Zone: corroded Splash Zone: severely corroded Structural Condition Assessment Grade 2 The facility is in structurally bad condition. It will become the object of rehabilitation plan. - Port of Namibe -

Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA206/210

Sa -05 -001Facility ID Survey Date 2005/05/17Port Name Namibe Saco Mar Category Steel Pipe Pile

Year Constructed 1967

Maintenance Record unknown

Facility Description Concrete filled steel pipe pile with internal diameter of 25 or 27 inches

Location

Photos

Existing Condition Above Splash Zone: corrodedSplash Zone: severely corroded

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

- Port of Namibe -

Page 2: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA207/210

Sa -14 -001

Location

Photos

Existing Condition Concrete coveres are spalling and exposed reinforcing bars are severely corroded.Very dangerous condition

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description Concrete Steps with 1200mm in width

Year Constructed 1967

Facility ID Survey Date 2005/06/07Port Name Namibe Saco Mar Category Miscellaneous Accessories

- Port of Namibe -

Page 3: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA208/210

Sa -14 -002

Location

Photos

Existing Condition Teribly deteriorated

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description Steel ancillary facilities

Year Constructed 1967Port Name Namibe Saco Mar Category Miscellaneous Accessories Facility ID Survey Date 2005/06/07

- Port of Namibe -

Page 4: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA209/210

Sa -08 -001Facility ID Survey Date 2005/05/17Port Name Namibe Saco Mar Category Crane Rail

Year Constructed 1967

Maintenance Record unknown

Facility Description Located at Iron Ore Jetty used for Iron Ore Ship Loader

Location

Photos

Existing Condition The rail fixing bolts seem to be artificially removed (encircled part in the photo hereunder).The rail seems to be artificially bended (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

- Port of Namibe -

Page 5: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA210/210

Sa -09 -001

Location

Photos

Existing Condition Sound condition at the landside section.Some rails on the Iron Ore Jetty are uneven and bended (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description Railway for the materials transport

Year Constructed 1967

Facility ID Survey Date 2005/05/17Port Name Namibe Saco Mar Category Railway

- Port of Namibe -

Page 6: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

APPENDIX-3.4

Deterioration Assessment Sheets of the Port of Cabinda

Page 7: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year
Page 8: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA1/32

Ca -06 -001Facility ID Survey Date 2005/04/25, 10/24Port Name Cabinda Category Wooden Deck

Year Constructed unknown

Maintenance Record The rehabilitation work was completed in 2005.

Facility Description Approaching Jetty supported by steel pile

Existing Condition There are some gaps and bumps between wood beams.The rehabilitation works of wooden deck is in progress(04/25).

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Location

Photos

- Port of Cabinda -

Page 9: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA2/32

Ca -06 -002Facility ID Survey Date 2005/04/25, 10/24Port Name Cabinda Category Wooden Deck

Year Constructed unknown

Maintenance Record The rehabilitation work was completed in 2005.

Facility Description Passenger Jetty supported by steel piles

Location

Photos

Existing Condition There are some gaps and bumps between wood beams.General condition is good.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

- Port of Cabinda -

Page 10: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA3/32

Ca -06 -003

Location

Photos

Existing Condition There are some gaps and bumps between wood beams.The rehabilitation works of wooden deck is partially in progress (4/25).

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record The rehabilitation work was completed in 2005.

Facility Description Cargo Handling Jetty supported by steel piles

Year Constructed unknown

Facility ID Survey Date 2005/04/25, 10/24Port Name Cabinda Category Wooden Deck

- Port of Cabinda -

Page 11: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA4/32

Ca -18 -001Facility ID Survey Date 2005/04/26, 10/24Port Name Cabinda Category Steel Pile

Year Constructed unknown

Maintenance Record Repair works were conducted recently

Facility Description Approaching Jetty

Existing Condition There can be seen some rust on the surface but general condition is sound.The installation works of craft berthing and mooring equipment were in progress (10/24).

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Location

Photos

- Port of Cabinda -

Page 12: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA5/32

Ca -18 -002Facility ID Survey Date 2005/05/27Port Name Cabinda Category Steel Pile

Year Constructed unknown

Maintenance Record unknown

Facility Description Passenger Jetty

Location

Photos

Existing Condition There can be seen some rust on the surface but general condition is sound.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

- Port of Cabinda -

Page 13: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA6/32

Ca -18 -003

Location

Photos

Facility ID Survey Date 2005/04/26, 10/24Cabinda

Maintenance Record unknown

Facility Description Cargo Handling Jetty

Existing Condition There can be seen some rust on the surface but general condition is sound.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Port Name Category Steel PileYear Constructed unknown

- Port of Cabinda -

Page 14: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA7/32

Ca -10 -001

Location

Photos

Existing Condition There can be seen no damages to be pointed out.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record unknown

Facility Description Fendering System at Passenger Jetty comprised of used tyres, timber shock absorber,rubber fender and support pile

Year Purchased unknown Manufacturer

Facility ID Survey Date 2005/05/25Port Name Cabinda Category Fendering System

- Port of Cabinda -

Page 15: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA8/32

Ca -10 -002

Location

Photos

Existing ConditionSome timber shock absorbers are broken (encircled in the photo hereunder).The rehabilitation works of wooden deck is partially in progress.Large tyres were placed in front of the timber shock absorbers.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record The rehabilitation work was completed in 2005.

Facility Description Fendering System at Cargo Handring Jetty comprised of timber shock absorber, rubberfender and support pile

Year Purchased unknown ManufacturerPort Name Cabinda Category Fendering SystemFacility ID Survey Date 2005/04/25, 10/24

- Port of Cabinda -

Page 16: Facility ID Survey Date Sa -05 -001 2005/05/17 Namibe Saco Mar … · 2006-12-20 · Facility ID Survey DateCa -06 -002 2005/04/25, 10/24 Port Name Cabinda Category Wooden Deck Year

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA9/32

Ca -10 -003

Location

Photos

Existing Condition

Steel fendering piles seem to be out of commision (encircled and indicated by arrows in the photohereunder).Severely corroded (4/26).Some rehabilitation work was done (10/24).

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record The rehabilitation work was completed in 2005.

Facility Description Fendering System at land side of Cargo Handling Jetty comprised of steel fendering pile

Year Purchased unknown Manufacturer

Facility ID Survey Date 2005/04/26, 10/24Port Name Cabinda Category Fendering System

- Port of Cabinda -