International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Status FAIR / legal frameworkJ. Eschke, FAIR Joint Core Team, GSI Darmstadt, Germany
- Brief overview on FAIR facility and research programme - Status FAIR project - Status governance structure and organisation - Legal framework chosen / status legal documents - Remarks on proposed Community legal framework for ERI
Facility for Antiproton and Ion Research (FAIR)
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Primary Beams
• 1012/s; 1.5-2 GeV/u; 238U28+
• Factor 100-1000 over present intensity• 2(4)x1013/s 30 GeV protons• 1010/s 238U92+ up to 35 GeV/u • up to 90 GeV protons
Secondary Beams
•Broad range of radioactive beams up to 1.5 - 2 GeV/u; up to factor 10 000 in intensity over present •Antiprotons 0 - 15 GeV
•Cooled beams•Rapidly cycling superconducting magnets
Key Technical Features
Storage and Cooler Rings•Radioactive beams•e- – A (or Antiproton-A) collider•1011 stored and cooled 0.8 - 14.5 GeV antiprotons•Polarized antiprotons
Facility for Antiproton and Ion Research FAIR Project:International Accelerator Facility 'next' to GSI Intensity Frontiers
SIS
FRS
ESR
SIS 100/300
HESRSuperFRS
NESR
CR
RESR
CBMHADES
FLAIR
FAIR
GSI today
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Research Areas:
• Nuclear structure and nuclear astro- physics with beams of short-lived nuclei
• Hadron physics and QCD with cooled antiproton beams
• Physics of high-density nuclear matter and the quark-gluon phase transition
• Physics of dense plasmas
• Atomic physics, fundamental symmetries and material science
(and polarisation)
(antimatter)
Five Scientific Pillars
Scientific users: more than 2500 scientists from 44 countries
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
FAIR - Facility for Antiproton and Ion Research
100 m
UNILAC SIS 18
SIS 100/300
HESR
SuperFRS
NESR
CRRESR
GSI today
ESR
• Beam intensities by factors of 100 - 10000• Beam energies by a factor 20• Production of antimatter beams• Factor 10000 in beam brilliance via cooling• Efficient parallel operation of programs
Gain Factors
• Construction from 2008 until 2016• Total construction cost: 1187 M€ (investment 1 B€) • Scientific users: > 2500 from 44 countries (FAIR Baseline Technical Report 2006)
Construction Period, Cost, Users
• up to 75 % Federal Government of Germany and State of Hessen• at least 25 % Partner Countries FAIR GmbH with international shareholders
Financing, Organisation
FAIR
Austria China Finland Germany Hessen India
Poland Romania Russia Spain Sweden UKSlovenia
Facility for Antiproton and Ion Research FAIR = International Accelerator Facility 'next' to GSI
contribution not
yet defined
France
ItalyGreece Slovakia, Georgia are Observers and interested to join
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
PAC QCD E. Chiavassa
PAC NUSTAR R. Casten
PAC APPA D. Schwalm
TAC Y. Cho
Observers:
FAIR ProjectJoint Core Team
CORECost Review Groups
D. Plane, W. Bartel
FCIFull Cost Issues
B. Brandt
AFI Working GroupAdministrative + Funding Issues
Ö. Skeppstedt
LFILegal Framework Issues
U.B. Jahn
STI Working GroupScientific + Technical Issues
H. Wenninger
ISCInternational Steering Committee
J.T. Gierlinski
MiniTACs• Cryogenics• Warm and Cold magnets• Power Supplies• Beam Instrumentation• p-Linac
Hungary, Slovakia, Georgia
Governance structure of FAIR
Legal documents:ConventionFinal ActArticles of AssociationFAIR GmbH......
since 2004
FAIR Start Event: November 7,
2007 A splendid perspective and eminent challenge !
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Status / Roadmap – FAIR
November 2007: FAIR Start Event – Signing of Communique of official launch of FAIR
May 2008: Completion of the founding documents (the Convention with its five Annexes and the Final Act) ready for signature
Declared contributions (in-kind and in cash) amount to 1040 M€
Summer 2008: Confirmation of contributions of countries to the construction costs and designation of Shareholders of FAIR GmbH (Company with Limited Liability Company under German Law)
November 2008: Signing Conference of the Delegates of the Governments of the participating Countries
Before end 2008: Incorporation of the FAIR GmbH
Appointments of FAIR managerial positions
2009 to 2015: Construction of FAIR facility (civil construction, accelerators and experiments)
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Legal Framework for FAIR
Discussion on legal Framework for FAIR since 2004:
One company or two company model:GSI GmbH is transformed into company with international shareholdersorGSI GmbH (Federal Government plus State of Hessen are Shareholders)plus FAIR GmbH (with international shareholders)
Different legal frameworks considered:•International Organisation (like CERN)•EEIG (European Economic Interest Grouping)•GmbH (Company with Limited Liability under German Law)
Discussion on legal Framework for FAIR since 2004:
One company or two company model:GSI GmbH is transformed into company with international shareholdersorGSI GmbH (Federal Government plus State of Hessen are Shareholders)plus FAIR GmbH (with international shareholders)
Different legal frameworks considered:•International Organisation (like CERN)
•EEIG (European Economic Interest Grouping)
•GmbH (Company with Limited Liability under German Law)
not appreciated
problems: liability not limited / not open to 3rd countries
Draft organisational plan of the FAIR GmbH
External Committees:
Scientific Advisory CommitteesAccelerator Advisory Committee
Resource Review BoardsTechnical Board
CouncilShareholders' assembly
Management(2 managing directors)FAIR Scientific Director
Director for Administration safety
Research
finance and budget
accounting &bookkeeping
legal matters & contracts
general administration
mechanical & electr.
interfacing
documentation & quality
management
project coordination
NUSTARresource coordinator technical coordinator
CBMresource coordinator
technical coordinator
HESR
experimentintegration
Finance Committee Scientific Council
visitors science prog.
acceleratorinterfacing
PANDAresource coordinatortechnical coordinator
APPA
Civil Construction
planning
Regulatory aspect & Permits
NESR
p-Bar TARGET
RESR/CR
Super-FRS
p-LINAC
SIS100
SIS300
HEBT
Accelerator Administra-tion
Integration
Injector Upgrade
FAIR project management Team
(Director's Office)
audit & controlling
public relations
Total personnel after start-up phase ~ 70 FTE
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
• Convention (intergovernmental agreement)Annex 1: Description of FAIR (incl. Start Version)
Annex 2: Articles of Association of FAIR GmbH ("rules" how this company is governed)Annex 3: Cost and Spending Profile (also for Start Version)
Annex 4: MapAnnex 5: Procedures for Contributions in-kind
• Final Act
By Laws (prepared together with AFI-XFEL):• Financial RulesFinancial Rules• Procurement RulesProcurement Rules• Guidelines for In-Kind ContributionsGuidelines for In-Kind Contributions• Rules of Procedure for Council Rules of Procedure for Council • Rules of Procedure for Management BoardRules of Procedure for Management Board• Staff RulesStaff Rules
FAIR legal documents
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
Disadvantages of GmbH as legal framework for FAIR
Tax status: Exemption from value-added tax (VAT) was difficult to achieve
Staff Rules:Depend on rules of German Treasury for public funded institutions (TVöD).International Allowance and more adequate salaries in senior-scientist pay groupwere difficult to achieve.
Financial Rules:Significant Loans (e.g. from EIB) not permitted (only if shareholder does not pay in time hiscontribution (up to 10 % of the annual budget of the operation period) may be taken as a loan for 6 months).
FAIR GmbH has to perform annual financial statement on profit and lossand cameralistic accountancy (income and expenditures) two annual balance sheets
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, Germany
EU-FP6-FAIR-CNI:⇒ FAIR injector SIS18 intensity upgrade, HADES upgrade + R3BmagnetEU-Support: 10,4 M€
EU-FP6-FAIR-Design Study:⇒ Secondary Beams (RIB and Antiprotons)EU-Support: 9 M€
EU-FP6-I3s:⇒ HadronPhysicsFAIR related EU-Support: 10,8 M€⇒ EURONS:FAIR related EU-Support: 2 M€
Total EU support for FAIR related activities in FP6: 32 M€
plus 4,9 M€ in FP7 FAIR preparatory phase
International Accelerator Facility forBeams of Ions and Antiprotons at Darmstadt
Status FAIR Seminar on Legal Framework for ERI, Brussels, 24.7.2008 J. Eschke, FAIR Joint Core Team, GSI, Darmstadt, GermanyAustria China Finland France Germany Greece India Italy Poland Spain Sweden Romania Russia UK
Thank you for you attention!
in 2016