13
FACILITIES MASTER PLAN FMP Review October 2015

FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

Embed Size (px)

Citation preview

Page 1: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

F A C I L I T I E S M A S T E R P L A N

FMP ReviewO c t o b e r 2 0 1 5

Page 2: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

T I M E L I N E

2014 November

2015February

March

April

May

October /

November

December

Education / Facility Master Plan kick-off

Review existing buildings with Maintenance & Operations StaffSurvey Students, Faculty, Staff

Review SWOT findings & solicit input

Updated District BoardCAC & President’s Cabinet – First Draft of Facilities Master Plan

Facilities & Safety Committee SWOT Review & First Draft of Facilities Master Plan

Review of Facilities Master PlanOpen Forum

Recommendation to Board

D R A F T10.19.2015

Page 3: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

O B J E C T I V E S

Supporting student access to learning

Balancing & supporting socialization & formal learning.

Maintaining student safety

Fostering environmental responsibility

Highest & Best Use of Existing Facilities

Building Upon your current planning documents

Creating unique “places”

D R A F T10.19.2015

Page 4: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

c a m p u s e d g e / a c c e s s

ONE WAY Vehicular Access

TWO WAY Vehicular Access

Campus Entry

Interior Vehicular Circulation

Restricted Interior Vehicular

Circulation

Drop Off

Plaza

Signalized Intersection

Moorpark Ave

Parkmoor AveS

Bascom

Ave

Leig

h A

ve

Change Access on Moorpark Ave

• Allow 3-WAY traffic @ Leland Ave Traffic Light

• Allow Vehicle to exit campus directly onto Leland (North Bound)

• Improve Main Drop-Off (@ Leleand Ave)

• Provide drop-off @ Science Building

• Provide drop-off @ Wellness Center

Lela

nd

Ave

Today

FMP

D R A F T10.19.2015

Page 5: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

c a m p u s e d g e / a c c e s s

ONE WAY Vehicular Access

TWO WAY Vehicular Access

Campus Entry

Interior Vehicular Circulation

Restricted Interior Vehicular

Circulation

Drop Off

Plaza

Signalized Intersection

Kingman Ave

S B

ascom

Ave

Leig

h A

ve

Change Access on Kingman Ave

• Allow 4-WAY traffic @ Kingman Ave Traffic Light

• On-Campus Road• 2-way traffic (1 lane each)

• Multiple Access points for Parking Structure

• Allow loop connection East of Football fieldToday

FMP

Kingman Ave

S B

ascom

Ave

Leig

h A

ve

D R A F T10.19.2015

Page 6: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

p a r k i n g c o u n t

Kingman Ave

Leig

h A

ve

Parking Counts:

Today: 1,775 Stalls

2014 Enroll. : 8,953 = 5 students / stall

2030 Enroll. : 13,699 = 7.7 students / stall

FMP: 2,281 Stalls

2014 Enroll. : 8,953 = 3.4 students / stall

2030 Enroll. : 13,699 = 6 students / stall

Increase = 506 Parking stalls = +28%

Square Footage

Today = 612,771 GSF

FMP POW = 691,805 GSF = +13%

FMP ALL = 808,805 GSF = +32%

S B

ascom

Ave

Leig

h A

ve

Moorpark Ave

Parkmoor Ave

620

900180/plate @ 5 plates

40145

76

4439

8726

20

91

1631614

D R A F T10.19.2015

Page 7: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City CollegeMoorpark Ave

S B

ascom

Ave

Leig

h A

ve

SWOT

• Limited drop-off

• Restricted pedestrian circulation

• Limited purposeful outdoor student spaces

• Pedestrian Safety

p e d e s t r i a n a c c e s s a n d o p e n s p a c e

T Public Transit

Drop Off

Plaza

Activity Node

Improved Pedestrian Circulation

Campus Open Space

Food Service (Existing and

Potential)

D R A F T10.19.2015

Page 8: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

Moorpark Ave

S B

ascom

Ave

Leig

h A

ve

Remove GE Buildings

• Allow for drop-off and vista into campus

• Ease E/W pedestrian circulation

Create Campus Quad

• Repurpose Jaguar Gym into Student Activities

Improve North / South pedestrian circulation

• Provide connection from parking to campus core

p e d e s t r i a n a c c e s s a n d o p e n s p a c e

Drop Off

Plaza

Activity Node

Improved Pedestrian Circulation

Campus Open Space

Food Service (Existing and

Potential)

D R A F T10.19.2015

Page 9: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

Moorpark Ave

S B

ascom

Ave

Leig

h A

ve

Service

• Perimeter Road

• M&O relocated to south of Kingman

• Maintain perimeter access to service buildings

s e r v i c eD R A F T10.19.2015

Page 10: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

San Jose City College

Moorpark Ave

S B

ascom

Ave

Leig

h A

ve

N

f a c i l i t i e s m a s t e r p l a n

Lela

nd

Ave

Parkmoor Ave

S

T

M

A

TH6

X

5

C

CT

L

SC7

AWAW

AAW CCTMLRSTTHSC

Fine Arts Center Athletics / Wellness (Under Construction)Cosmetology / EstheticianCareer TechnologyMulti-Disciplinary BuildingLibrary / Learning Resource CenterReprographics Science ComplexTechnology CenterTheaterStudent Center

1 23

45678910X

Relocate Softball FieldCTE BuildingMaintenance & Operations / ReprographicsGE / Business / AdministrationCosmetology Expansion / Adaptive PEDrama / Theater LobbyStudent Activities (Repurp. Jaguar Gym)Parking StructureChild Development CenterTechnology Center – Expansion of Current Future Building Pad

2

9

4

X

8

Kingman Ave

3

6

Program of Work

1

D R A F T10.19.2015

10

Page 11: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

SJCC M&O / Grounds / Reprographics Softball Field Relocation Student Activities Drama Building /

Theater Renovation

Adaptive PE / Esthetician Expansion

CTE Building w/ Food Service

GE / Business / Administration

South Parking Structure /

On-Campus Road: Kingman

New Campus Drop Off (Moorpark)

p r o g r a m o f w o r k : fl o w c h a r tD R A F T10.19.2015

Page 12: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

1. Adopt a Facilities Master Plan

2. Link Current Planning

3. Work with City / Community

4. Larger/ Multi-Story Buildings

5. Structured Parking

D R A F T10.19.2015r e c o m m e n d a t i o n s

Page 13: FACILITIES MASTER PLAN FMP Review October 2015. TIME LINE 2014November 2015 February March April May October / November December Education / Facility

D I S C U S S I O N :

Q U E S T I O N S & A N S W E R S

D R A F T10.19.2015