5
UP LADDER LADDER LADDER 111D 112C 112B 113C 113A 113 113E 113B 113D 112A 112 114A 116D 116 116A 116B 116C 116E 118A 114 111 111C 111B 111A 110 109D 109 109A 109B 109C 117 118 108 107 106 105 104 119 120 121A 121 122 103T 103A 103 102 101B 100 101A FUME HOOD HOOD FUME 119B 119A AQUARIUM AQUARIUM AQUARIUM AQUARIUM AQUARIUM AQUARIUM AQUARIUM WORKSHOP MECHANICAL MEN TELECOM MEN JANITOR WOMEN H-1 EXT ALARM PULL STA EXT EXT EXT EXT EXT EXT EXT EXT A ALARM PULL STA EXT EXT EXT EXT EXT EXT WALK-IN FRIDGE WALK-IN FREEZER MECHANICAL ROOM WET LAB A 01 A0.1 PROJECT DATA & DEMO PLAN PLANNING, DESIGN + CONSTRUCTION A0.1 MICHAEL FISHER (707) 826-4444 [email protected] PROJECT CONTACTS DRAWING INDEX A2.1 SCOPE OF WORK, PROJECT DATA, EGRESS PLAN (this sheet) DEMOLITION PLAN, FLOOR PLAN THE SCOPE OF WORK FOR THIS FACILITIES MAINTENANCE PROJECT INCLUDES IMPROVEMENTS TO THE FAILING CONCRETE FLOOR IN ROOM. WORK ALSO INCLUDES THE MODIFICATION OF THE EXISTING STUDENT WORK STATIONS BY ADDING CASTERS TO THE CABINETRY AND REPLACING THE WORK SURFACES WITH NEW PHENOLIC RESIN TOPS, REPLACEMENT OF THE DARKENING PANEL AT (3) WINDOW MULLIONS, PROVIDING OVERHEAD POWER DROPS, & REPLACEMENT OF RUSTED ELECTRICAL COVERS ON THE FACE OF THE SEA WATER TABLES. THE WORK WILL BE COMPLETED UNDER THE 2020/2021 ANNUAL BUILDING PERMIT. ALL SINKS, UTILITIES, CLASSROOM TECHNOLOGY, INSTRUCTOR STATION, LIGHTING & CONTROLS, AND STORAGE ARE EXCLUDED IN THE SCOPE OF WORK. 1 SCOPE OF WORK IN-HOUSE CONSTRUCTION KASSIDY BANDUCCI (707) 826-5707 [email protected] ARCHITECT of RECORD KAY BRADFORD (707) 826-5907 [email protected] NOT FOR CONSTRUCTION FACILITIES MANAGEMENT 1 HARPST STREET ARCATA, CA 95521 707 826-3646 STATUS PRELIMINARY DESIGN TELONICHER MARINE LAB 121 CLASSROOM FLOOR REPAIR & FURNITURE MODIFICATIONS TELONICHER MARINE LAB (BLDG 027) This project has demonstrated conformance with applicable codes and standards established by statute and University policy. Based on this determination these documents are 'APPROVED FOR CONSTRUCTION' ___________________________________ MICHAEL FISHER Campus Deputy Building Official Humboldt State University The California State University Date:_____________________________ Permit #:__________________________ Other approvals, as applicable: SFM Approval:_____________________ DSA Access Approval:_______________ Seismic Peer Review:________________ Other:____________________________ BUILDING PERMIT APPROVAL: CALIFORNIA STATE FIRE MARSHAL APPROVED Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans shall be available on the project site at all times. _________________________________ Reviewed by:______________________ _ of 5 sheets SHEET ISSUE DATE: AUG. 10, 2020 REV: W.O. #: SHEET TITLE XPLXXX PROJECT #: ####_###### NOT FOR CONSTRUCTION DRAWN BY: CKB, KDB Sheet: 1 File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf Missing or invalid reference 2020/21-002 (ANNUAL PERMIT) A9.1 DETAILS, SCHEDULES TML - VICINITY MAP - TRINIDAD, CA NORTH GATE SHED SHED SHED SHED GATE E D W A R D S S T R E E T E W I N G S T R E E T LIGHTHOUSE ROAD GALINDO STREET SITE ACCESS ROAD MARINE LAB ACCESS ROAD TELONICHER MARINE LAB SCALE: 1/16" = 1' - 0" 1 TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS 2019 CALIFORNIA ADMINISTRATIVE CODE Title 24, Pt 1 2019 CALIFORNIA BUILDING CODE (CBC) Title 24, Pt 2 2019 CALIFORNIA ELECTRICAL CODE (CEC) Title 24, Pt 3 2019 CALIFORNIA MECHANICAL CODE (CMC) Title 24, Pt 4 2019 CALIFORNIA PLUMBING CODE (CPC) Title 24, Pt 5 2019 CALIFORNIA ENERGY CODE CCR Title 24, Pt 6 2019 CALIFORNIA FIRE CODE (CFC) CCR Title 24, Pt 9 2019 CALIFORNIA GREEN BUILDING STANDARDS Title 24, Pt 11 2019 CALIFORNIA REFERENCED STANDARDS Title 24, Pt 12 2019 NFPA 13, SPRINKLER SYSTEMS (CA amended) 2016 NFPA 14, STANDPIPE & HOSE (CA amended) 2019 NFPA 20, PUMPS FOR FIRE PROTECTION (CA amended) 2019 NFPA 24, FIRE SERVICE MAINS (CA amended) 2019 NFPA 72, FIRE ALARM CODE (CA amended) APPLICABLE CODES & STANDARDS FOR PROJECT: STANDARDS CODES FIRST FLOOR MEANS OF EGRESS & FIRE EXTINGUISHER DISTANCE DISTANCE TO FIRE EXTINGUISHER IN ROOM 121 = 44'-7" TO PUBLIC WAY 1. VERIFY ALL DIMENSIONS IN FIELD. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY UPON DISCOVERY OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS. 2. COMPLY WITH ALL REGULATIONS FOR CAL-OSHA SAFETY REGULATIONS. MEANS AND METHODS OF CONSTRUCTION INCLUDING SHORING, SCAFFOLDING, PERSONAL PROTECTIVE EQUIPMENT, ARE THE RESPONSIBILITY SOLELY OF THE CONTRACTOR. 3. SUBMIT REQUEST FOR INFORMATION (RFI) TO ARCHITECT FOR ANY QUESTIONS OR PROPOSED CHANGES TO THE WORK. SUBMIT PRODUCT DATA SHEETS FOR ALL PRODUCTS AND SYSTEM COMPONENTS. SUBMIT SHOP DRAWINGS FOR MOUNTING DEVICE AS NOTED ON PLAN. 4. WORK ONLY FROM APPROVED PERMITTED DRAWINGS AND APPROVED SUBMITTALS. 5. SUBMIT RECORD AS-BUILT DRAWINGS UPON SUBSTANTIAL COMPLETION. HAZARDOUS MATERIALS TESTING - DEFERRED SUBMITTAL. HAZARDOUS MATERIALS & ABATEMENT PROCEDURES: 1. HAZARDOUS MATERIALS: CONTRACTOR SHALL REMOVE AND/OR MITIGATE IN ACCORDANCE WITH THE SPECIFICATIONS BY OTHERS. THE ARCHITECT HAS NOT CONDUCTED SAMPLING AND IS NOT RESPONSIBLE FOR IDENTIFYING POTENTIALLY HAZARDOUS MATERIALS WHICH MAY BE ENCOUNTERED, NOR THE MEANS & METHODS OF CONSTRUCTION FOR CONTAINMENT, REMOVAL, OR OTHER MITIGATION MEASURES. COMPLY WITH ALL APPLICABLE STATE AND FEDERAL LAWS, REGULATIONS, AND STANDARDS. EWING STREET PROJECT LOCATION CLOSE OUT NOTES 1. SUBMIT RECORD AS-BUILT DRAWINGS UPON SUBSTANTIAL COMPLETION. 2. NEW ROOM NUMBERS REQUIRE COORDINATION WITH TNS FOR JACK LABELS AND ALSO FACILITIES LINK UPDATE. 1. RELOCATE EXISTING CASEWORK/CABINETS AND FURNISHINGS AS INDICATED ON PLANS. 2. PROVIDE DUST CONTROL MEASURES TO PROTECT OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES. 3. PATCH, REPAIR AND PAINT WALL SURFACES WHERE REQUIRED BY NEW WORK TO MATCH COLOR SCHEME. 4. COORDINATE w/ OFFICE OF SUSTAINABILITY FOR RECYCLING OF ALL MATERIALS. GENERAL NOTES ABATEMENT DEMOLITION NOTES TRAVIS FLEMING (707) 826-5069 [email protected] RAY ROBINSON (707) 826-5895 [email protected] DISTANCE TO FIRE EXTINGUISHER IN ROOM 121 = 49'-1" A2.2 POWER / DATA PLAN, RCP w/ ELECTRICAL, MECHANICAL & PLUMBING A2.3 PLUMBING IN SLAB PLAN THE PROVISIONS OF THE ANNUAL PERMIT IS DESIGNED TO COVER SCOPES OF WORK THAT WOULD OTHERWISE REQUIRE A PERMIT AS DESCRIBED IN FACILITIES MANAGEMENT DEPARTMENT REGULATION “PERMITTING REQUIREMENTS FOR WORK PERFORMED ON HSU PROPERTIES” AND IN ACCORDANCE WITH THE FOLLOWING CALIFORNIA BUILDING CODE SECTION 105.1.: “IN LIEU OF AN INDIVIDUAL PERMIT FOR EACH ALTERATION OR REPAIR TO AN EXISTING ELECTRICAL, GAS, MECHANICAL, OR PLUMBING INSTALLATION, THE CAMPUS DEPUTY BUILDING OFFICIAL (CDBO) IS AUTHORIZED TO ISSUE AN ANNUAL PERMIT UPON APPLICATION THEREFOR TO ANY PERSON, FIRM, DEPARTMENT, DIVISION, OR COMPANY REGULARLY EMPLOYING ONE OR MORE QUALIFIED TRADESPERSONS IN THE BUILDING, STRUCTURE OR ON THE PREMISES OPERATED BY THE APPLICANT FOR PERMIT.” THE INTENT OF THE ANNUAL PERMIT IS TO COVER SCOPES OF WORK THAT WOULD BE WITHIN THE PURVIEW OF CALIFORNIA BUILDING CODE SECTION 105.1 AND THE FACILITIES MANAGEMENT DEPARTMENT REGULATION “PERMITTING REQUIREMENTS FOR WORK PERFORMED ON HSU PROPERTIES” . THIS WORK WOULD BE ABOVE AND BEYOND THAT WHICH IS SPECIFICALLY IDENTIFIED UNDER CALIFORNIA BUILDING CODE SECTION 105.2 “WORK EXEMPT FROM PERMIT” AND WORK THAT WOULD NOT QUALIFY AS WORK IDENTIFIED AS A “PROJECT” AS PUBLISHED IN FACILITIES MANAGEMENT DEPARTMENT REGULATION “FACILITY PROJECT DEFINITIONS, CATEGORIES, AND TYPES”. WORK BEING EXECUTED WITHIN A COMMON AREA OR IN RELATION TO ONE ANOTHER FOR A COMMON PURPOSE SHALL BE CONSIDERED TOGETHER WHEN EVALUATING IF THE PROJECT DEFINITION APPLIES. WORK TO BE INCLUDED WITH THIS ANNUAL PERMIT IS SPECIFICALLY IDENTIFIED BELOW. ANY QUESTION OR ALTERNATE INTERPRETATION OF PROVISIONS HEREIN SHALL BE SUBMITTED IN WRITING THE CDBO FOR REVIEW. GENERALLY, THE FOLLOWING SCOPE OF WORK WOULD BE LIMITED TO REPLACEMENT IN KIND WITH MINOR MODIFICATION OF IDENTIFIED BUILDING CONSTRUCTION AS FOLLOWS AND THE IMPACTED SURROUNDING AREA OF REPLACEMENT OR REPAIR SUCH AS PATCHING, PAINTING, AND FINISH CARPENTRY. SHOULD THERE BE ANY CHANGES IN BUILDING ELEMENTS THAT MAY AFFECT ACCESSIBILITY AND/OR AS REGULATED BY CBC CHAPTER 11A/B, THE CDBO AND THE HSU CASP MUST BE CONSULTED PRIOR TO COMMENCEMENT OF WORK. I. GENERAL REPAIR AND MAINTENANCE: WITHIN A BUILDING; REPLACEMENT, REMOVAL, REPAIR AND MINOR MODIFICATION TO ROOM FINISHES INCLUDING DRY WALL REPAIR, PAINT, FLOORING, AND CEILING ELEMENTS; REPLACEMENT AND REPAIR OF DOORS, WINDOWS, BUILT-IN CASEWORK; ALL FINISH SELECTION WITH REGARD TO PRODUCT AND COLOR WILL REQUIRE REVIEW AND APPROVAL BY FACILITIES MANAGEMENT PLANNING, DESIGN & CONSTRUCTION. LIMITED TO BUILDING EXTERIORS; REPLACEMENT, REPAIR AND MINOR MODIFICATIONS OF THE BUILDINGS EXISTING EXTERIOR SHELL INCLUDING SIDING, WATERPROOFING, DRAINAGE, ROOFING. II. ELECTRICAL: WITHIN A BUILDING; REPLACEMENT, REMOVAL, AND MINOR MODIFICATION OF ELECTRICAL SERVICE POINTS INCLUDING LIGHT SWITCHES, FIXTURES, AND CONTROLS; POWER RECEPTACLES, SWITCHING AND SERVICE VOLTAGE OR AMPERAGE MODIFICATIONS. ALSO RESTORATION OR MODIFICATION OF POWER SUPPLY TO EXISTING GROUP I AND GROUP II EQUIPMENT. ANY SCOPE OF WORK THAT RELOCATES OR ADJUSTS HEIGHT OF OPERABLE PARTS WILL BE SUBJECT TO REVIEW BY THE UNIVERSITY CASP (OR INSPECTOR). ALL WORK CONDUCTED OUTSIDE OF A BUILDING WITH REGARDS TO INFRASTRUCTURE WILL REQUIRE CONSULTATION WITH UNIVERSITY BUILDING OFFICIAL. III.TELECOMMUNICATIONS: WITHIN A BUILDING; REPLACEMENT REMOVAL AND MINOR MODIFICATION OF TELECOMMUNICATION PATHWAYS, RECEPTACLES, JACK BOXES, AND BDF/MDF PATHWAY AND EQUIPMENT CONFIGURATION. ALL WORK CONDUCTED OUTSIDE OF A BUILDING WITH REGARDS TO INFRASTRUCTURE WILL REQUIRE CONSULTATION WITH UNIVERSITY BUILDING OFFICIAL. IV. PLUMBING: WITHIN A BUILDING; REPLACEMENT, REMOVAL, AND MINOR MODIFICATION OF EXISTING PLUMBING FIXTURES INCLUDING WATER CLOSETS, URINALS, LAVATORIES, DRINKING FOUNTAINS, FAUCETS, HOSE BIBS, QUICK COUPLERS, ANGLE STOPS. PLUMBING SYSTEMS INCLUDING PIPING, FITTINGS, AND VALVES. PLUMBING EQUIPMENT INCLUDING PUMPS, TANKS, BOILER PARTS, GAUGES, AND CONTROLS. ALL WORK CONDUCTED OUTSIDE OF A BUILDING WITH REGARDS TO INFRASTRUCTURE WILL REQUIRE CONSULTATION WITH UNIVERSITY BUILDING OFFICIAL. V.MECHANICAL: WITHIN A BUILDING, REPLACEMENT, REMOVAL, REPAIR, AND MINOR MODIFICATION TO BUILDING AIR HANDLERS, LOUVERS, PUMPS, VARIABLE FREQUENCY DRIVES (VFD'S), HEAT PUMPS, AIR CONDITIONER PACKAGED UNITS, ASSOCIATED PIPING, AND CONTROLS. VI. BUILDING FURNITURE: WITHIN A BUILDING, REPLACEMENT, REMOVAL, REPAIR AND MINOR MODIFICATION TO ROOM OR AREA FURNISHINGS. ALL FINISH SECTION WITH REGARD TO PRODUCT AND COLOR WILL REQUIRE REVIEW AND APPROVAL BY FACILITIES MANAGEMENT PLANNING, DESIGN & CONSTRUCTION. VII. BUILDING EQUIPMENT: WORK RELATED TO THE MODIFICATION OF BUILDING SYSTEMS TO SUPPORT GROUP I AND GROUP II EQUIPMENT SHALL BE INCLUDED IN THE ANNUAL PERMIT TO THE EXTENT IDENTIFIED IN OTHER BUILDING SYSTEM SECTIONS OF THIS REGULATION. VIII.EXTERIOR WORK: WORK PERFORMED OUTSIDE OF THE BUILDING FOOTPRINT, OR WITHIN COURTYARDS SHALL INCLUDE THE FOLLOWING: MINOR PATCHING AND REPAIR OF EXTERIOR CONCRETE, PAVING, HARDSCAPE, AND SITE FURNITURE. REPLACEMENT, REPAIR OR REMOVAL OF SITE ELEMENTS INCLUDING FIXED FURNITURE, STREET LIGHTS, POLES, BOLLARDS, STREET SIGNS, BUILDING SIGNAGE, AND LANDSCAPE BARRIERS. ALL SIGNAGE WILL REQUIRE CONSULTATION WITH PLANNING, DESIGN AND CONSTRUCTION. REFERENCES: CALIFORNIA BUILDING CODE, SECTION 105 EXECUTIVE ORDER NO 672 HUMBOLDT STATE UNIVERSITY, CAPITAL MANAGEMENT PLAN, MOST RECENT EDITION ANNUAL BUILDING PERMIT NOTES NORTH TELONICHER MARINE LAB HSU BLDG #027, CSFM #: 18-12-11-0001-00051 OCCUPANCY CLASSIFICATION & USE: B UNIVERSITY LABS, CLASSROOMS, & OFFICES ADDITIONAL USES: H-1 HAZARDOUS (ASSUMED) CONSTRUCTION TYPE: TYPE VB YEAR CONSTRUCTED: 1965, ADDITION 1977 NUMBER OF STORIES: 1 BUILDING HEIGHT: ± 12'-6" 1st FLOOR AREA: 15,979 SF BUILDING AREA (TOTAL): 15,979 SF, GROSS AREA PER METABIM NON-SEPARATED USE: NON-SEPARATED ALLOWABLE AREA PER (CBC): N/A (NO CHANGE) AREA INCREASE: N/A (NO CHANGE) HEIGHT INCREASE: N/A (NO CHANGE) FIRE SPRINKLERS: NO (NO CHANGE) FIRE ALARM: YES, MANUAL ONLY, SIMPLEX/HYBRID (NO CHANGE) OTHER FIRE PROTECTION SYSTEMS: PORTABLE FIRE EXTINGUISHERS 1st FLOOR OCCUPANT LOAD: 164 OCCUPANTS BUILDING OCCUPANT LOAD (TOTAL): 164 OCCUPANTS (OCCUPANT LOADS CALCS PER 2019 CBC T1004.1.2) HIGH FIRE HAZARD SEVERITY ZONE: NO SEISMIC JOINTS: NO EMERGENCY RESPONDER RADIO: NO SHAWN AVILA (707) 826-5908 [email protected] RFQ #PW20-3, Exhibit G, Page 1 of 5

FACILITIES MANAGEMENT DEPARTMENT REGULATION …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FACILITIES MANAGEMENT DEPARTMENT REGULATION …

UP

LADDER

LA

DD

ER

LA

DD

ER

11

1D

11

2C

11

2B

11

3C

11

3A

11

3

11

3E

11

3B

11

3D

11

2A

11

2

11

4A

11

6D

11

6

11

6A

11

6B

11

6C

11

6E

11

8A

11

4

11

1

11

1C

11

1B

11

1A

11

0

10

9D

10

9

10

9A

10

9B

10

9C

11

7

11

8

10

8

10

71

06

10

5

10

4

11

9

12

0

12

1A

121

12

2

10

3T

10

3A

103

102

10

1B

10

0

10

1A

FU

ME

HO

OD

HO

OD

FU

ME

11

9B

11

9A

AQ

UA

RIU

M

AQ

UA

RIU

M

AQ

UA

RIU

M

AQ

UA

RIU

M

AQ

UA

RIU

M

AQ

UA

RIU

M

AQ

UA

RIU

M

WO

RK

SH

OP

ME

CH

AN

IC

AL

ME

N

TE

LE

CO

M

ME

N

JA

NIT

OR

WO

ME

N

[B

G]1

00

[C

G]1

0

[C

G]1

1

[C

G]1

2

[C

G]1

4

H-1

EX

T

ALA

RM

PU

LL S

TA

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

EX

TE

XT

A

ALA

RM

PU

LL S

TA

EX

T

EX

T

EX

T

EX

T

EX

T

EX

T

WA

LK

-IN

FR

ID

GE

WA

LK

-IN

F

RE

EZ

ER

ME

CH

AN

IC

AL

RO

OM

WE

T LA

B

A

01

A0.1

PROJECT

DATA &

DEMO PLAN

PLANNING, DESIGN + CONSTRUCTION

A0.1

MICHAEL FISHER

(707) 826-4444

[email protected]

PROJECT CONTACTS

DRAWING INDEX

A2.1

SCOPE OF WORK, PROJECT DATA, EGRESS PLAN (this sheet)

DEMOLITION PLAN, FLOOR PLAN

THE SCOPE OF WORK FOR THIS FACILITIES MAINTENANCE PROJECT INCLUDES

IMPROVEMENTS TO THE FAILING CONCRETE FLOOR IN ROOM. WORK ALSO

INCLUDES THE MODIFICATION OF THE EXISTING STUDENT WORK STATIONS BY

ADDING CASTERS TO THE CABINETRY AND REPLACING THE WORK SURFACES WITH

NEW PHENOLIC RESIN TOPS, REPLACEMENT OF THE DARKENING PANEL AT (3)

WINDOW MULLIONS, PROVIDING OVERHEAD POWER DROPS, & REPLACEMENT OF

RUSTED ELECTRICAL COVERS ON THE FACE OF THE SEA WATER TABLES. THE

WORK WILL BE COMPLETED UNDER THE 2020/2021 ANNUAL BUILDING PERMIT.

ALL SINKS, UTILITIES, CLASSROOM TECHNOLOGY, INSTRUCTOR STATION, LIGHTING

& CONTROLS, AND STORAGE ARE EXCLUDED IN THE SCOPE OF WORK.

1

SCOPE OF WORK

IN-HOUSE CONSTRUCTION

KASSIDY BANDUCCI

(707) 826-5707

[email protected]

ARCHITECT of RECORD

KAY BRADFORD

(707) 826-5907

[email protected]

NO

T F

OR

CO

NS

TR

UC

TIO

N

FACILITIES

MANAGEMENT

1 HARPST STREET

ARCATA, CA 95521

707 826-3646

STATUS

PRELIMINARY

DESIGN

TE

LO

NIC

HE

R M

AR

IN

E L

AB

121

CLA

SS

RO

OM

F

LO

OR

R

EP

AIR

&

FU

RN

IT

UR

E M

OD

IF

IC

AT

IO

NS

TE

LO

NIC

HE

R M

AR

IN

E LA

B (B

LD

G 027)

This project has demonstrated

conformance with applicable codes and

standards established by statute and

University policy. Based on this

determination these documents are

'APPROVED FOR CONSTRUCTION'

___________________________________

MICHAEL FISHER

Campus Deputy Building Official

Humboldt State University

The California State University

Date:_____________________________

Permit #:__________________________

Other approvals, as applicable:

SFM Approval:_____________________

DSA Access Approval:_______________

Seismic Peer Review:________________

Other:____________________________

BUILDING PERMIT APPROVAL:

CALIFORNIA STATE FIRE

MARSHAL APPROVED

Approval of this plan does not authorize

or approve any omission or deviation from

applicable regulations. Final approval is

subject to field inspection. One set of

approved plans shall be available on the

project site at all times.

_________________________________

Reviewed by:______________________

_ of 5 sheets

SHEET

ISSUE DATE: AUG. 10, 2020

REV:

W.O. #:

SHEET TITLE

XPLXXXPROJECT #:

####_######

NOT FORCONSTRUCTION

DRAWN BY: CKB, KDB

Sheet: 1

File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf

Missing or invalid reference

2020/21-002

(ANNUAL PERMIT)

A9.1DETAILS, SCHEDULES

TML - VICINITY MAP - TRINIDAD, CA

NORTH

GATE

SHED

SHED

SHED

SHED

GATE

E D

W

A R D

S S T R E E T

E

W

I

N

G

S

T

R

E

E

T

L

I

G

H

T

H

O

U

S

E

R

O

A

D

GALIN

DO

STREET

S

IT

E

A

C

C

E

S

S

R

O

A

D

MARINE LAB ACCESS ROAD

TELONICHER

MARINE

LAB

SCALE: 1/16" = 1' - 0"

1

TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS

2019 CALIFORNIA ADMINISTRATIVE CODE Title 24, Pt 1

2019 CALIFORNIA BUILDING CODE (CBC) Title 24, Pt 2

2019 CALIFORNIA ELECTRICAL CODE (CEC) Title 24, Pt 3

2019 CALIFORNIA MECHANICAL CODE (CMC) Title 24, Pt 4

2019 CALIFORNIA PLUMBING CODE (CPC) Title 24, Pt 5

2019 CALIFORNIA ENERGY CODE CCR Title 24, Pt 6

2019 CALIFORNIA FIRE CODE (CFC) CCR Title 24, Pt 9

2019 CALIFORNIA GREEN BUILDING STANDARDS Title 24, Pt 11

2019 CALIFORNIA REFERENCED STANDARDS Title 24, Pt 12

2019 NFPA 13, SPRINKLER SYSTEMS (CA amended)

2016 NFPA 14, STANDPIPE & HOSE (CA amended)

2019 NFPA 20, PUMPS FOR FIRE PROTECTION (CA amended)

2019 NFPA 24, FIRE SERVICE MAINS (CA amended)

2019 NFPA 72, FIRE ALARM CODE (CA amended)

APPLICABLE CODES & STANDARDS FOR PROJECT:

ST

AN

DA

RD

SC

OD

ES

FIRST FLOOR MEANS OF EGRESS & FIRE EXTINGUISHER DISTANCE

DISTANCE TO FIRE EXTINGUISHER

IN ROOM 121 = 44'-7"

TO

PUBLIC

WAY

1. VERIFY ALL DIMENSIONS IN FIELD. DO NOT SCALE DRAWINGS. NOTIFY

ARCHITECT IMMEDIATELY UPON DISCOVERY OF ANY DISCREPANCIES OR

POTENTIAL CONFLICTS.

2. COMPLY WITH ALL REGULATIONS FOR CAL-OSHA SAFETY REGULATIONS.

MEANS AND METHODS OF CONSTRUCTION INCLUDING SHORING,

SCAFFOLDING, PERSONAL PROTECTIVE EQUIPMENT, ARE THE

RESPONSIBILITY SOLELY OF THE CONTRACTOR.

3. SUBMIT REQUEST FOR INFORMATION (RFI) TO ARCHITECT FOR ANY

QUESTIONS OR PROPOSED CHANGES TO THE WORK. SUBMIT PRODUCT

DATA SHEETS FOR ALL PRODUCTS AND SYSTEM COMPONENTS. SUBMIT

SHOP DRAWINGS FOR MOUNTING DEVICE AS NOTED ON PLAN.

4. WORK ONLY FROM APPROVED PERMITTED DRAWINGS AND APPROVED

SUBMITTALS.

5. SUBMIT RECORD AS-BUILT DRAWINGS UPON SUBSTANTIAL COMPLETION.

HAZARDOUS MATERIALS TESTING - DEFERRED SUBMITTAL.

HAZARDOUS MATERIALS & ABATEMENT PROCEDURES:

1. HAZARDOUS MATERIALS: CONTRACTOR SHALL REMOVE AND/OR MITIGATE IN

ACCORDANCE WITH THE SPECIFICATIONS BY OTHERS. THE ARCHITECT HAS

NOT CONDUCTED SAMPLING AND IS NOT RESPONSIBLE FOR IDENTIFYING

POTENTIALLY HAZARDOUS MATERIALS WHICH MAY BE ENCOUNTERED, NOR

THE MEANS & METHODS OF CONSTRUCTION FOR CONTAINMENT, REMOVAL, OR

OTHER MITIGATION MEASURES. COMPLY WITH ALL APPLICABLE STATE AND

FEDERAL LAWS, REGULATIONS, AND STANDARDS.

EW

IN

G S

TR

EE

T

PROJECT LOCATION

CLOSE OUT NOTES

1. SUBMIT RECORD AS-BUILT DRAWINGS UPON SUBSTANTIAL COMPLETION.

2. NEW ROOM NUMBERS REQUIRE COORDINATION WITH TNS FOR JACK LABELS AND

ALSO FACILITIES LINK UPDATE.

1. RELOCATE EXISTING CASEWORK/CABINETS AND FURNISHINGS AS INDICATED ON

PLANS.

2. PROVIDE DUST CONTROL MEASURES TO PROTECT OCCUPIED SPACES DURING

CONSTRUCTION ACTIVITIES.

3. PATCH, REPAIR AND PAINT WALL SURFACES WHERE REQUIRED BY NEW WORK

TO MATCH COLOR SCHEME.

4. COORDINATE w/ OFFICE OF SUSTAINABILITY FOR RECYCLING OF ALL MATERIALS.

GENERAL NOTES

ABATEMENT

DEMOLITION NOTES

TRAVIS FLEMING

(707) 826-5069

[email protected]

RAY ROBINSON

(707) 826-5895

[email protected]

DISTANCE TO FIRE EXTINGUISHER

IN ROOM 121 = 49'-1"

A2.2POWER / DATA PLAN, RCP w/ ELECTRICAL, MECHANICAL & PLUMBING

A2.3 PLUMBING IN SLAB PLAN

THE PROVISIONS OF THE ANNUAL PERMIT IS DESIGNED TO COVER SCOPES OF

WORK THAT WOULD OTHERWISE REQUIRE A PERMIT AS DESCRIBED IN

FACILITIES MANAGEMENT DEPARTMENT REGULATION “PERMITTING

REQUIREMENTS FOR WORK PERFORMED ON HSU PROPERTIES” AND IN

ACCORDANCE WITH THE FOLLOWING CALIFORNIA BUILDING CODE

SECTION 105.1.: “IN LIEU OF AN INDIVIDUAL PERMIT FOR EACH ALTERATION OR

REPAIR TO AN EXISTING ELECTRICAL, GAS, MECHANICAL, OR PLUMBING

INSTALLATION, THE CAMPUS DEPUTY BUILDING OFFICIAL (CDBO) IS

AUTHORIZED TO ISSUE AN ANNUAL PERMIT UPON APPLICATION THEREFOR TO

ANY PERSON, FIRM, DEPARTMENT, DIVISION, OR COMPANY REGULARLY

EMPLOYING ONE OR MORE QUALIFIED TRADESPERSONS IN THE

BUILDING, STRUCTURE OR ON THE PREMISES OPERATED BY THE APPLICANT

FOR PERMIT.”

THE INTENT OF THE ANNUAL PERMIT IS TO COVER SCOPES OF WORK THAT

WOULD BE WITHIN THE PURVIEW OF CALIFORNIA BUILDING CODE

SECTION 105.1 AND THE FACILITIES MANAGEMENT DEPARTMENT

REGULATION “PERMITTING REQUIREMENTS FOR WORK PERFORMED ON HSU

PROPERTIES” . THIS WORK WOULD BE ABOVE AND BEYOND THAT WHICH IS

SPECIFICALLY IDENTIFIED UNDER CALIFORNIA BUILDING CODE

SECTION 105.2 “WORK EXEMPT FROM PERMIT” AND WORK THAT WOULD NOT

QUALIFY AS WORK IDENTIFIED AS A “PROJECT” AS PUBLISHED IN FACILITIES

MANAGEMENT DEPARTMENT REGULATION “FACILITY PROJECT

DEFINITIONS, CATEGORIES, AND TYPES”. WORK BEING EXECUTED WITHIN A

COMMON AREA OR IN RELATION TO ONE ANOTHER FOR A COMMON PURPOSE

SHALL BE CONSIDERED TOGETHER WHEN EVALUATING IF THE PROJECT

DEFINITION APPLIES.

WORK TO BE INCLUDED WITH THIS ANNUAL PERMIT IS SPECIFICALLY

IDENTIFIED BELOW. ANY QUESTION OR ALTERNATE INTERPRETATION OF

PROVISIONS HEREIN SHALL BE SUBMITTED IN WRITING THE CDBO FOR REVIEW.

GENERALLY, THE FOLLOWING SCOPE OF WORK WOULD BE LIMITED TO

REPLACEMENT IN KIND WITH MINOR MODIFICATION OF IDENTIFIED BUILDING

CONSTRUCTION AS FOLLOWS AND THE IMPACTED SURROUNDING AREA OF

REPLACEMENT OR REPAIR SUCH AS PATCHING, PAINTING, AND FINISH

CARPENTRY. SHOULD THERE BE ANY CHANGES IN BUILDING ELEMENTS THAT

MAY AFFECT ACCESSIBILITY AND/OR AS REGULATED BY CBC CHAPTER 11A/B,

THE CDBO AND THE HSU CASP MUST BE CONSULTED PRIOR TO

COMMENCEMENT OF WORK.

I. GENERAL REPAIR AND MAINTENANCE: WITHIN A BUILDING; REPLACEMENT,

REMOVAL, REPAIR AND MINOR MODIFICATION TO ROOM FINISHES

INCLUDING DRY WALL REPAIR, PAINT, FLOORING, AND CEILING ELEMENTS;

REPLACEMENT AND REPAIR OF DOORS, WINDOWS, BUILT-IN CASEWORK;

ALL FINISH SELECTION WITH REGARD TO PRODUCT AND COLOR WILL

REQUIRE REVIEW AND APPROVAL BY FACILITIES MANAGEMENT PLANNING,

DESIGN & CONSTRUCTION. LIMITED TO BUILDING EXTERIORS;

REPLACEMENT, REPAIR AND MINOR MODIFICATIONS OF THE BUILDINGS

EXISTING EXTERIOR SHELL INCLUDING SIDING, WATERPROOFING,

DRAINAGE, ROOFING.

II. ELECTRICAL: WITHIN A BUILDING; REPLACEMENT, REMOVAL, AND MINOR

MODIFICATION OF ELECTRICAL SERVICE POINTS INCLUDING LIGHT

SWITCHES, FIXTURES, AND CONTROLS; POWER RECEPTACLES, SWITCHING

AND SERVICE VOLTAGE OR AMPERAGE MODIFICATIONS. ALSO

RESTORATION OR MODIFICATION OF POWER SUPPLY TO EXISTING GROUP I

AND GROUP II EQUIPMENT. ANY SCOPE OF WORK THAT RELOCATES OR

ADJUSTS HEIGHT OF OPERABLE PARTS WILL BE SUBJECT TO REVIEW BY

THE UNIVERSITY CASP (OR INSPECTOR). ALL WORK CONDUCTED OUTSIDE

OF A BUILDING WITH REGARDS TO INFRASTRUCTURE WILL REQUIRE

CONSULTATION WITH UNIVERSITY BUILDING OFFICIAL.

III.TELECOMMUNICATIONS: WITHIN A BUILDING; REPLACEMENT REMOVAL

AND MINOR MODIFICATION OF TELECOMMUNICATION PATHWAYS,

RECEPTACLES, JACK BOXES, AND BDF/MDF PATHWAY AND EQUIPMENT

CONFIGURATION. ALL WORK CONDUCTED OUTSIDE OF A BUILDING WITH

REGARDS TO INFRASTRUCTURE WILL REQUIRE CONSULTATION WITH

UNIVERSITY BUILDING OFFICIAL.

IV. PLUMBING: WITHIN A BUILDING; REPLACEMENT, REMOVAL, AND MINOR

MODIFICATION OF EXISTING PLUMBING FIXTURES INCLUDING WATER

CLOSETS, URINALS, LAVATORIES, DRINKING FOUNTAINS, FAUCETS, HOSE

BIBS, QUICK COUPLERS, ANGLE STOPS. PLUMBING SYSTEMS INCLUDING

PIPING, FITTINGS, AND VALVES. PLUMBING EQUIPMENT INCLUDING PUMPS,

TANKS, BOILER PARTS, GAUGES, AND CONTROLS. ALL WORK CONDUCTED

OUTSIDE OF A BUILDING WITH REGARDS TO INFRASTRUCTURE WILL

REQUIRE CONSULTATION WITH UNIVERSITY BUILDING OFFICIAL.

V.MECHANICAL: WITHIN A BUILDING, REPLACEMENT, REMOVAL, REPAIR, AND

MINOR MODIFICATION TO BUILDING AIR HANDLERS, LOUVERS, PUMPS,

VARIABLE FREQUENCY DRIVES (VFD'S), HEAT PUMPS, AIR CONDITIONER

PACKAGED UNITS, ASSOCIATED PIPING, AND CONTROLS.

VI. BUILDING FURNITURE: WITHIN A BUILDING, REPLACEMENT, REMOVAL,

REPAIR AND MINOR MODIFICATION TO ROOM OR AREA FURNISHINGS. ALL

FINISH SECTION WITH REGARD TO PRODUCT AND COLOR WILL REQUIRE

REVIEW AND APPROVAL BY FACILITIES MANAGEMENT PLANNING, DESIGN &

CONSTRUCTION.

VII. BUILDING EQUIPMENT: WORK RELATED TO THE MODIFICATION OF

BUILDING SYSTEMS TO SUPPORT GROUP I AND GROUP II EQUIPMENT

SHALL BE INCLUDED IN THE ANNUAL PERMIT TO THE EXTENT IDENTIFIED IN

OTHER BUILDING SYSTEM SECTIONS OF THIS REGULATION.

VIII.EXTERIOR WORK: WORK PERFORMED OUTSIDE OF THE BUILDING

FOOTPRINT, OR WITHIN COURTYARDS SHALL INCLUDE THE FOLLOWING:

MINOR PATCHING AND REPAIR OF EXTERIOR CONCRETE, PAVING,

HARDSCAPE, AND SITE FURNITURE. REPLACEMENT, REPAIR OR REMOVAL

OF SITE ELEMENTS INCLUDING FIXED FURNITURE, STREET LIGHTS, POLES,

BOLLARDS, STREET SIGNS, BUILDING SIGNAGE, AND LANDSCAPE

BARRIERS. ALL SIGNAGE WILL REQUIRE CONSULTATION WITH PLANNING,

DESIGN AND CONSTRUCTION.

REFERENCES:

CALIFORNIA BUILDING CODE, SECTION 105

EXECUTIVE ORDER NO 672

HUMBOLDT STATE UNIVERSITY, CAPITAL MANAGEMENT PLAN, MOST RECENT

EDITION

ANNUAL BUILDING PERMIT NOTES

NORTH

TELONICHER MARINE LAB

HSU BLDG #027, CSFM #: 18-12-11-0001-00051

OCCUPANCY CLASSIFICATION & USE: B UNIVERSITY LABS, CLASSROOMS, & OFFICES

ADDITIONAL USES: H-1 HAZARDOUS (ASSUMED)

CONSTRUCTION TYPE: TYPE VB

YEAR CONSTRUCTED: 1965, ADDITION 1977

NUMBER OF STORIES: 1

BUILDING HEIGHT: ± 12'-6"

1st FLOOR AREA: 15,979 SF

BUILDING AREA (TOTAL): 15,979 SF, GROSS AREA PER METABIM

NON-SEPARATED USE: NON-SEPARATED

ALLOWABLE AREA PER (CBC): N/A (NO CHANGE)

AREA INCREASE: N/A (NO CHANGE)

HEIGHT INCREASE: N/A (NO CHANGE)

FIRE SPRINKLERS: NO (NO CHANGE)

FIRE ALARM: YES, MANUAL ONLY, SIMPLEX/HYBRID (NO CHANGE)

OTHER FIRE PROTECTION SYSTEMS: PORTABLE FIRE EXTINGUISHERS

1st FLOOR OCCUPANT LOAD: 164 OCCUPANTS

BUILDING OCCUPANT LOAD (TOTAL): 164 OCCUPANTS

(OCCUPANT LOADS CALCS PER 2019 CBC T1004.1.2)

HIGH FIRE HAZARD SEVERITY ZONE: NO

SEISMIC JOINTS: NO

EMERGENCY RESPONDER RADIO: NO

SHAWN AVILA

(707) 826-5908

[email protected]

RFQ #PW20-3, Exhibit G, Page 1 of 5

Page 2: FACILITIES MANAGEMENT DEPARTMENT REGULATION …

EXT

EXT

EXT

T

01

120

121A

121

122

119B

119A

[CG]14

EXT

EXT

EXT

JJ

J J

JJ

JJ

JJ

JJ

A2.1

DEMOLITION

&

PROPOSED

FLOOR PLAN

PROPOSED FLOOR PLAN

2

2

NO

T F

OR

CO

NS

TR

UC

TIO

N

FACILITIES

MANAGEMENT

1 HARPST STREET

ARCATA, CA 95521

707 826-3646

STATUS

PRELIMINARY

DESIGN

TE

LO

NIC

HE

R M

AR

IN

E L

AB

121

CLA

SS

RO

OM

F

LO

OR

R

EP

AIR

&

FU

RN

IT

UR

E M

OD

IF

IC

AT

IO

NS

TE

LO

NIC

HE

R M

AR

IN

E LA

B (B

LD

G 027)

This project has demonstrated

conformance with applicable codes and

standards established by statute and

University policy. Based on this

determination these documents are

'APPROVED FOR CONSTRUCTION'

___________________________________

MICHAEL FISHER

Campus Deputy Building Official

Humboldt State University

The California State University

Date:_____________________________

Permit #:__________________________

Other approvals, as applicable:

SFM Approval:_____________________

DSA Access Approval:_______________

Seismic Peer Review:________________

Other:____________________________

BUILDING PERMIT APPROVAL:

CALIFORNIA STATE FIRE

MARSHAL APPROVED

Approval of this plan does not authorize

or approve any omission or deviation from

applicable regulations. Final approval is

subject to field inspection. One set of

approved plans shall be available on the

project site at all times.

_________________________________

Reviewed by:______________________

_ of 5 sheets

SHEET

ISSUE DATE: AUG. 10, 2020

REV:

W.O. #:

SHEET TITLE

XPLXXXPROJECT #:

####_######

NOT FORCONSTRUCTION

DRAWN BY: CKB, KDB

Sheet: 1

File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf

Missing or invalid reference

2020/21-002

(ANNUAL PERMIT)

NORTH

SCALE: 1/4" = 1' - 0"

PREPARE EXISTING

CONCRETE FLOOR PER

DETAIL 1/A9.1

1

DEMOLITION PLAN

SCALE: 1/4" = 1' - 0"

NEW EPOXY FLOOR, SEE DETAIL

1/A9.1 FOR MORE INFORMATION

FURNITURE SHOWN IN GRAY TO BE

MODIFIED FROM ITS ORIGINAL

VERSION, SEE DETAILS SHEET A9.1

EXISTING FURNITURE TO BE

MODIFIED; SEE PROPOSED

PLAN & DETAILS

TEMPORARILY REMOVE

OR PROTECT IN PLACE

ALL FURNITURE DURING

CONSTRUCTION, TYP.

REMOVE & REPLACE (3) ROOM

DARKENING PANELS; VERIFY

SIZE IN FIELD AND REPLACE

NEW SOLID WOOD ROOM

DARKENING PANELS, PAINTED,

TYP. OF (3) CONTRACTOR TO

MATCH DIMENSIONS OF ORIGINAL

PROTECT IN PLACE EXISTING

FLOOR DRAINS, TYP. OF (2).

CONTRACTOR TO EVALUATE

CONDITION IN FIELD &

COORDINATE FIELD

INVESTIGATION w/ ARCHITECT

121

CLASSROOM

1446 S.F.

GROUP B OCCUPANCY

PER CBC 303.1.2

29 OCCUPANTS

CBC TABLE 1004.1.2:

EDUCATIONAL, LAB

AREA: 50 NET / OCCUPANT

CLASSROOM SPACE

29 STATIONS

INCLUDES ACCESSIBLE

STATION(S) @ FRONT ROW

1 INSTRUCTION STATION

FACILITIES MANAGEMENT TO

DETERMINE IF INSTRUCTOR

STATION SHALL RECEIVE NEW

COUNTERTOP VIA FIELD

INVESTIGATION

REMOVE (E) ROOM NUMBER

SIGN ABOVE DOOR

INSTALL NEW SIGNAGE PER CAMPUS

STANDARDS; SEE SCHEDULE, A9.1

NORTH

NEW FLOOR SURFACING TO

SLOPE TO (E) FLOOR DRAINS,

TYP. OF (2)

INDICATES AREA OF PLUMBING

TRENCH. SEE PLUMBING PLAN, A2.3

(E) PLUMBING IN SLAB; FOR

MORE INFORMATION, SEE

PLUMBING PLAN, A2.3

(E) PLUMBING IN SLAB PER ORIGINAL

CONSTRUCTION DOCUMENTS; FOR MORE

INFORMATION, SEE PLUMBING PLAN, A2.3

RFQ #PW20-3, Exhibit G, Page 2 of 5

Page 3: FACILITIES MANAGEMENT DEPARTMENT REGULATION …

EXT

EXT

EXT

T

SS

SS

SS

SS

SS

S

SINK

1/2" H.W., 1/2" C.W., 1/2" GAS,

1/2" C.A., 3/4" S.W. PIPING

A

G

A

G

A

G

1/2" H.W., 1/2" C.W., 1/2" GAS,

1/2" C.A., 3/4" S.W. PIPING TO

INSTRUCTOR STATION

A

G

3/4" H.W., 3/4" C.W., 3/4" GAS,

1" C.A., 1 1/4" S.W. PIPING

SUSPENDED BELOW CEILING

A

G

G

A

G

A

F

C.O.

G G

A

F

F

A

G

A

F

A

F

3/4" GAS, 2" S.W., 1" C.A., & 2" F.W.

DROPS ALONG WALL TO TROUGH

PIPING DROPS ALONG

WALL TO TRENCH

1/2" H.W., 1/2" C.W.,

1/2" GAS,1/2" C.A.,

3/4" S.W. DROPS IN WALL

120

121A

121

122

119B

119A

[CG]14

EXT

EXT

EXT

WALK-IN FREEZER

JJ

J J

JJ

JJ

JJ

JJ

J

J

M

AV

TV

C

PA

NE

L "B

"

A2.2

POWER

PLAN &

REFLECTED

CEILING PLAN

REFLECTED CEILING PLAN w/ ELECTRICAL, MECHANICAL & PLUMBING

2

3

NO

T F

OR

CO

NS

TR

UC

TIO

N

FACILITIES

MANAGEMENT

1 HARPST STREET

ARCATA, CA 95521

707 826-3646

STATUS

PRELIMINARY

DESIGN

TE

LO

NIC

HE

R M

AR

IN

E L

AB

121

CLA

SS

RO

OM

F

LO

OR

R

EP

AIR

&

FU

RN

IT

UR

E M

OD

IF

IC

AT

IO

NS

TE

LO

NIC

HE

R M

AR

IN

E LA

B (B

LD

G 027)

This project has demonstrated

conformance with applicable codes and

standards established by statute and

University policy. Based on this

determination these documents are

'APPROVED FOR CONSTRUCTION'

___________________________________

MICHAEL FISHER

Campus Deputy Building Official

Humboldt State University

The California State University

Date:_____________________________

Permit #:__________________________

Other approvals, as applicable:

SFM Approval:_____________________

DSA Access Approval:_______________

Seismic Peer Review:________________

Other:____________________________

BUILDING PERMIT APPROVAL:

CALIFORNIA STATE FIRE

MARSHAL APPROVED

Approval of this plan does not authorize

or approve any omission or deviation from

applicable regulations. Final approval is

subject to field inspection. One set of

approved plans shall be available on the

project site at all times.

_________________________________

Reviewed by:______________________

_ of 5 sheets

SHEET

ISSUE DATE: AUG. 10, 2020

REV:

W.O. #:

SHEET TITLE

XPLXXXPROJECT #:

####_######

NOT FORCONSTRUCTION

DRAWN BY: CKB, KDB

Sheet: 1

File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf

Missing or invalid reference

2020/21-002

(ANNUAL PERMIT)

NORTH

SCALE: 1/4" = 1' - 0"

1

POWER PLAN - EXISTING CONDITIONS + DEMOLITION

SCALE: 1/4" = 1' - 0"

(E) 20 A, 208v, 3ɸ OUTLET

(E) EXPOSED BEAM,

GLU-LAM = 5 1/4 x 16,

TYP. OF (4)

(E

) W

ALL E

XH

AU

ST

F

AN

TR-28x8

16x12 16x7 EXPOSED DUCT

TR-28x8

16x12 16x7

16x12 16x7

TR-28x8

(E) 20 A, 208v, 3ɸ OUTLET

(E) TV JACK;

PER ORIG CONST DOCS

(E) AUDIO-VISUAL JACK;

PER ORIG CONST DOCS

SUPPLY

500 cfm

12x12

TYP. OF (6)

(E) SUSPENDED LIGHT

FIXTURES, ± 1x4,

5 ROWS OF 5 FIXTURES

SET @ 8'-6" A.F.F.

(E) EXPOSED SUPPLY DUCT NEAR

CEILING w/ DROP DOWN TO SUPPLY

REGISTERS (2 EA), TYP. OF (3)

NORTH

(E) SUSPENDED PROJECTOR

(E) PLUMBING IN SLAB; FOR

MORE INFORMATION, SEE

PLUMBING PLAN, A2.3

REPLACE RUSTED

ELECTRICAL COVERS ON

THE FACE OF THE SEA

WATER TABLES w/ NEW

EXISTING ELECTRICAL @ ALL

TABLES TO BE REMOVED.

PREP & PATCH TABLES

WHERE REMOVAL OCCURS.

REFER TO 2/A2.2 FOR NEW

OVERHEAD POWER

CONTRACTOR TO INSTALL NEW

CEILING MOUNTED OUTLETS,

CENTERED BETWEEN TABLE

LOCATIONS FOR NEW EXTENSION

CORD REEL DROPS MOUNTED

ABOVE TABLES. BASIS OF DESIGN:

GOODYEAR EXTENSION CORD REEL

HEAVY DUTY, 40FT. 12AWG/3C

SJTOW, TRIPLE TAP w/ LED LIGHTED

CONNECTOR OR APPROVED EQUAL.

CONTRACTOR TO DETERMINE

CIRCUITING IN FIELD & PROVIDE

AS-BUILT CONDITIONS UPON

COMPLETION OF WORK

OVERHEAD PIPING MAINS SUSPENDED @ 10'-0" A.F.F., U.O.N.

RFQ #PW20-3, Exhibit G, Page 3 of 5

Page 4: FACILITIES MANAGEMENT DEPARTMENT REGULATION …

120

121A

121

122

119B

119A

[CG]14

EXT

EXT

EXT

WALK-IN FREEZER

COTG

PIPE TRENCH TO

INSTRUCTOR SINK

V.T.R.

COTF

2" V.T.R.

3" DOWNSPOUT FROM R.D. (ROOF DRAIN) ABOVE

2" V.T.R.

COTG

3"

COTG

COTF3"

SINK

2"

3"

3" F.D.

SINK

2"

C.O.

3"

3"

3"

F.D.

F.D.

SINK

3" OVERFLOW

ALONG WALL

ABOVE FLOOR

6"

A2.3

PLUMBING

PLAN

4

NO

T F

OR

CO

NS

TR

UC

TIO

N

FACILITIES

MANAGEMENT

1 HARPST STREET

ARCATA, CA 95521

707 826-3646

STATUS

PRELIMINARY

DESIGN

TE

LO

NIC

HE

R M

AR

IN

E L

AB

121

CLA

SS

RO

OM

F

LO

OR

R

EP

AIR

&

FU

RN

IT

UR

E M

OD

IF

IC

AT

IO

NS

TE

LO

NIC

HE

R M

AR

IN

E LA

B (B

LD

G 027)

This project has demonstrated

conformance with applicable codes and

standards established by statute and

University policy. Based on this

determination these documents are

'APPROVED FOR CONSTRUCTION'

___________________________________

MICHAEL FISHER

Campus Deputy Building Official

Humboldt State University

The California State University

Date:_____________________________

Permit #:__________________________

Other approvals, as applicable:

SFM Approval:_____________________

DSA Access Approval:_______________

Seismic Peer Review:________________

Other:____________________________

BUILDING PERMIT APPROVAL:

CALIFORNIA STATE FIRE

MARSHAL APPROVED

Approval of this plan does not authorize

or approve any omission or deviation from

applicable regulations. Final approval is

subject to field inspection. One set of

approved plans shall be available on the

project site at all times.

_________________________________

Reviewed by:______________________

_ of 5 sheets

SHEET

ISSUE DATE: AUG. 10, 2020

REV:

W.O. #:

SHEET TITLE

XPLXXXPROJECT #:

####_######

NOT FORCONSTRUCTION

DRAWN BY: CKB, KDB

Sheet: 1

File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf

Missing or invalid reference

2020/21-002

(ANNUAL PERMIT)

1

PLUMBING PLAN IN SLAB - FOR REFERENCE

SCALE: 1/4" = 1' - 0"

PLUMING LAYOUT FOR REFERENCE.

CONTRACTOR TO PROTECT PLUMBING

IN PLACE DURING CONSTRUCTION

NORTH

RFQ #PW20-3, Exhibit G, Page 4 of 5

Page 5: FACILITIES MANAGEMENT DEPARTMENT REGULATION …

9" MIN.

CL

"RAISED

CHARACTERS"

::..::..::..

60" M

AX

. A

.F

.F

. - B

AS

ELIN

E O

F

HIG

HE

ST

R

AIS

ED

C

HA

RA

CT

ER

S

48" M

IN

. A

.F

.F

. B

AS

ELIN

E O

F

LO

WE

ST

B

RA

ILLE

TACTILE

SIGN

59" A

.F

.F

.

T

O C

EN

TE

R O

F S

IG

N

DOOR SIGN

: .. ::

Text

SIGN TYPE 2B: ROOM ID

SEE CAMPUS STANDARD

SIGN TYPE DOCUMENT,

FOR MORE DETAIL

175B

SIGNAGE SHOWN FOR REFERENCE ONLY - NOT TO SCALE.

SEE SCHEDULE FOR SIGN TEXT & NOTES.

NEW EPOXY FINISH FLOOR.

CONTRACTOR TO INSTALL KOSTER MPE

OR APPROVED EQUAL OVER MOISTURE

MITIGATION SYSTEM. THE MPE SHALL

BE SQUEEGEE APPLIED w/ A QUARTZ

OR SAND SINGLE BROADCAST SYSTEM

FOR THE BODY COAT; SEAL TOP COAT.

TOP COAT OF MPE SHALL BE APPLIED

OVER THE BODY COAT

NEW MOISTURE MITIGATION SYSTEM

APPLIED OVER PREPARED CONCRETE

SURFACE. CONTRACTOR TO FURNISH &

INSTALL KOSTER VAP 1 2000 OR

APPROVED EQUAL

EXISTING CONCRETE SLAB TO BE

PREPARED BY GRINDING w/ PLANETARY

GRINDER & SHOT BLASTED TO REMOVE

SCALED CONC. CONTRACTOR TO

CREATE PROPER SURFACE PROFILE

FOR NEW EPOXY SYSTEM

NOTES:

1. INSTALL NEW EPOXY FLOORING PER

MANUFACTURERS RECOMMENDATIONS.

2. NEW INTEGRAL EPOXY COVE TO BE

INSTALLED ON NORTH AND EAST WALLS,

HEIGHT TO BE DETERMINED IN FIELD IN

CONSULTATION w/ ARCHITECT.

3. NEW 4" RUBBER BASE ON SOUTH AND

WEST WALLS.

REMOVE (E) DUPLEX

OUTLET, TYP. EACH

END - INSTALL NEW

BLANK PLATE

2'-9

" A

.F

.F

.

(M

AX

. 3

4")

INSTALL NEW CASTERS. REWORK BASE OF STORAGE

UNIT AS REQUIRED FOR INSTALLATION OF (4) NEW

CASTERS; MAINTAIN 27" CLEAR KNEE SPACE PER CBC

11B-306.3. MAX 34" A.F.F. TOP OF COUNTER HEIGHT;

COORDINATE w/ NEW LAB COUNTER TOP THICKNESS

8'-0"

(E) LAB TABLE TOP = 1.25"

THICK; REPLACE w/ NEW IN

KIND; SEE SCHEDULE

2'-3

"

DISCONNECT POWER: REMOVE

JUNCTION BOX IN BASE CABINET

& CONDUIT @ TABLE; REMOVE

WIRING BACK TO SOURCE & CAP

ELECTRICAL IN SLAB

INSTALL NEW CASTER @ EACH LEG &

EACH CORNER OF BASE CABINET

FOR (8) TOTAL PER TABLE

2'-6"

2 3

/4

"

REMOVE (E) BASE TRIM @ EACH LEG &

BASE CABINET. RECONDITION / REFINISH

LEG WHERE REMOVAL OCCURS

A9.1

DETAILS

&

SCHEDULES

FLOOR DETAIL

1

5

NO

T F

OR

CO

NS

TR

UC

TIO

N

FACILITIES

MANAGEMENT

1 HARPST STREET

ARCATA, CA 95521

707 826-3646

STATUS

PRELIMINARY

DESIGN

TE

LO

NIC

HE

R M

AR

IN

E L

AB

121

CLA

SS

RO

OM

F

LO

OR

R

EP

AIR

&

FU

RN

IT

UR

E M

OD

IF

IC

AT

IO

NS

TE

LO

NIC

HE

R M

AR

IN

E LA

B (B

LD

G 027)

This project has demonstrated

conformance with applicable codes and

standards established by statute and

University policy. Based on this

determination these documents are

'APPROVED FOR CONSTRUCTION'

___________________________________

MICHAEL FISHER

Campus Deputy Building Official

Humboldt State University

The California State University

Date:_____________________________

Permit #:__________________________

Other approvals, as applicable:

SFM Approval:_____________________

DSA Access Approval:_______________

Seismic Peer Review:________________

Other:____________________________

BUILDING PERMIT APPROVAL:

CALIFORNIA STATE FIRE

MARSHAL APPROVED

Approval of this plan does not authorize

or approve any omission or deviation from

applicable regulations. Final approval is

subject to field inspection. One set of

approved plans shall be available on the

project site at all times.

_________________________________

Reviewed by:______________________

_ of 5 sheets

SHEET

ISSUE DATE: AUG. 10, 2020

REV:

W.O. #:

SHEET TITLE

XPLXXXPROJECT #:

####_######

NOT FORCONSTRUCTION

DRAWN BY: CKB, KDB

Sheet: 1

File: T:\PO\Dept\Planning, Design & Construction Unit\2-Resources\Design Resources\Arch License\Banducci\Banducci_CaliforniaLicense_2021RENyear.pdf

Missing or invalid reference

2020/21-002

(ANNUAL PERMIT)

SCALE: 1 1/2" = 1' - 0"

FURNITURE MODIFICATION DETAIL

2

SCALE: 1/2" = 1' - 0"

FINISH & ACCESSORIES SCHEDULE

CATEGORY MATERIAL DESCRIPTION MANUFACTURER / SUPPLIER FINISH/COLOR REMARKS

FLOORING

NEW EPOXY COATING OVER EXISTING

CONCRETE

KOSTER MPE OVER MOISTURE

MITIGATION SYSTEM

KOSTER MPE OR APPROVED

EQUAL

-

THE MPE SHALL BE SQUEEGEE APPLIED

w/ A QUARTZ OR SAND SINGLE

BROADCAST SYSTEM FOR THE BODY

COAT; SEAL TOP COAT. TOP COAT OF

MPE SHALL BE APPLIED OVER THE

BODY COAT

FLOORING MOISTURE MITIGATION SYSTEM

NEW MOISTURE MITIGATION

SYSTEM APPLIED OVER

PREPARED CONCRETE

SURFACE

KOSTER VAP 1 2000 OR

APPROVED EQUAL

BASE NEW ROLLED RUBBER & EXPOXY

SEE DETAIL FOR MORE

INFORMATION & LOCATIONS

- -

WALLS EXISTING - PAINTED CONCRETE

MATCH EXISTING IF TOUCH-UP

REQUIRED

- - NO PAINTING IN SCOPE OF WORK

CEILING

(E) SUSPENDED ACOUSTICAL TILE

12x12 PANELS TO REMAIN N/A EXISTING

NO NEW WORK AT EXISTING CEILING,

U.O.N.

ROOM DARKENING

PANELS

WOOD

PAINTED, SOLID WOOD, SIZE TO

MATCH EXISTING

-

MATCH ADJACENT

WALLS

DOCUMENT EXISTING ROOM

DARKENING PANELS PRIOR TO

REMOVAL - SIZE / ATTACHMENT &

REPLACE w/ NEW FABRICATED TO

MATCH EXISTING; PROVIDE NEW

ATTACHMENT AS REQ'D

WORK SURFACES NEW PHENOLIC LAB TABLE TOPS ------ ----- LAB MATTE BLACK -

CASTERS STEEL HOUSING - COMPOSITE WHEEL

2" SWIVEL PLATE CASTER w/

BRAKE

AVANTCO 19354155 GALVANIZED / WHITE

RAISES HEIGHT OF UNIT BY 2 3/4";

VERIFY SIZE OF SCREW ATTACHMENT

@ BASE - (4) SLOTS

INTERIOR MATERIALS NOTES:

1. DESIGNER / ARCHITECT TO APPROVE ALL FINISH SAMPLES PRIOR TO INSTALLATION.

2. SHOP DRAWINGS OR MANUFACTURER LITERATURE TO BE APPROVED BY ARCHITECT FOR ALL CABINETRY.

3. ALL PAINTS AND COATINGS MUST COMPLY WITH CA GREEN BUILDING CODE FOR VOC LIMITS PER CALGREEN TABLE 4.504.3.

SIGN SCHEDULE

SIGN No. HSU SIGN TYPE ROOM NO. TEXT LOCATION NOTES

01 2B 121 TBD ADJACENT TO DOOR

SIGNS TO BE PROCURED BY UNIVERSITY & FURNISHED TO

CONTRACTOR FOR INSTALLATION; SEE 2 / -

-

PROJECTING SIGN - "FIRE EXTINGUISHER", 3-WAY, "V" SHAPE, PROJECTS 45°

FROM WALL, PVC PLASTIC w/ PRE-DRILLED MOUNTING HOLES

ABOVE FIRE

EXTINGUISHER

18" H x 8" W x 3" D, ULINE MODEL NO. S-19260 OR APPROVED EQUAL

SIGNAGE NOTES:

1. ALL SIGNS ARE NEW, UNLESS OTHERWISE NOTED.

2. ALL NEW SIGNS SHALL COMPLY WITH 2019 CA BUILDING CODE - SECTION 11B-703 SIGNS.

3. REFER TO MOST CURRENT HSU CAMPUS SIGN STANDARDS FOR SIGN TYPES & SPECIFICATIONS, UNLESS OTHERWISE NOTED.

4. SUBMIT PROOFS TO ARCHITECT FOR APPROVAL PRIOR TO FABRICATION.

5. VERIFY MOUNTING LOCATION & INSTALL SIGNS PER DETAIL THIS SHEET UNLESS NOTED OTHERWISE PER PLAN.

SIGNAGE LOCATION DETAIL

3

SCALE: 1/2" = 1' - 0"

RFQ #PW20-3, Exhibit G, Page 5 of 5