7
FACILITIES DESIGN & CONSTRUCTION SEALED BID NO.: 4794A/A4L-382/966031 DATE: 8/13/14 PROJECT: RECLAIMED WATER PIPELINE EXPANSION TIME: 2:00 P.M. PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $2,500,000 LUMP SUM ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE YES NO BASE BID #1 #2 #3 #4 #5 #6 #7 #8 #9 TOTAL ARB, INC. #3 LAKE FOREST - 1:33 P.M. NEWEST CONSTRUCTION #1 SAN DIEGO -1:34 P.M. REYES CONSTRUCTION #2 POMONA - 1:53 P.M. $51,000 $63,000 $73,000 $33,000 $28,000 $36,000 $134,000 $104,000 $46,000 $154,000 $62,000 $4,298,000 X X $78,000 $76,000 $13,500 $20,000 $88,000 $114,000 $158,000 $185,000 $75,000 10 $60,000 $5,138,800 $2,499,000 $1 X 10 $10 $3,169,510 $132,000 $36,200 $83,200 $185,100 $202,000 $68,100 $211,200 X $3,533,000 $6,000 X $3,975,000 $3,000 X 10 $30,000 CONTRACTOR'S NAME CITY - TIME REC'D BID PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER

FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

FACILITIES DESIGN & CONSTRUCTION

SEALED BID NO.: 4794A/A4L-382/966031 DATE: 8/13/14

PROJECT: RECLAIMED WATER PIPELINE EXPANSION TIME: 2:00 P.M.

PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $2,500,000

LUMP SUM ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATE ALTERNATEYES NO BASE BID #1 #2 #3 #4 #5 #6 #7 #8 #9 TOTAL

ARB, INC. #3

LAKE FOREST - 1:33 P.M.

NEWEST CONSTRUCTION #1

SAN DIEGO -1:34 P.M.

REYES CONSTRUCTION #2

POMONA - 1:53 P.M.

$51,000

$63,000

$73,000

$33,000$28,000

$36,000

$134,000

$104,000 $46,000

$154,000 $62,000

$4,298,000

X

X

$78,000

$76,000

$13,500

$20,000

$88,000

$114,000

$158,000

$185,000

$75,000

10 $60,000

$5,138,800

$2,499,000 $1 X 10 $10 $3,169,510

$132,000 $36,200 $83,200 $185,100 $202,000 $68,100 $211,200X

$3,533,000 $6,000 X

$3,975,000 $3,000 X 10 $30,000

CONTRACTOR'S NAMECITY - TIME REC'D BID

PREQUALIFIED DAILY RATE OF COMPENSATIONX 10 MULTIPLIER

Page 2: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: N£~~~1' Cl)IIJ7T(lOCTJ&l}

Bidder will use Subcontractors for the Work:

Yes ~ No

4794A/A4L-382/966031

If "yes", provide in the spaces below (a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of 1/2 of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is qefined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

HDD

L/fll} 15(f1-f1E_

March 3, 2014 LF/BF/MP-BF

Subcontractor Name of Business Location of Business License No.

(City)

Rl t/flhiJ£ f};t_&.r/Oill/-l.. 1(' vw 111£:.. 93Sb7/ Vl-/llWY,

mlf-rurJA- tf~Jif.HEim~ c J4- '-1? ?.8C., z

.. (Note: Add add1t1onal pages 1f requ1red.)

Bid Form 9

Page 3: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

\

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME: {\)£vJf.:f(cetJ{T/Lik:T}6A.J

4 794A/ A4L -382/966031

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of 1/2 of 1% of Bidder's Total Bid.

Alternate No.

March 3, 2014 LF/BF/MP-BF

Subcontractor Portion of the Work Name Location License No.

Activity (City) (e.g. electrical,

mechanical, concrete)

-

(Note: Add additional pages if required.)

Bid Form 10

Page 4: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: R£1£~ CONS1f2.UGllON, INC .

Bidder will use Subcontractors for the Work:

Yes x:- No

4 794A/A4L-382/966031

If "yes", provide in the spaces below (a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of 1/2 of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

f.P-1 <. l" 'f' e. "F\4 ~ ... 1:, ~ ~\.to.i't'\...'l.~fZ...

~1l-'Z<M.f%.. t:>\tt. • "l) 1l-\ '-l. :\"' "' \,......W9~'~~ ~ ~~~,6~0\...\

March 3, 2014 LF/BF/MP-BF

Subcontractor Name of Business Location of Business License No.

(City)

1A..W t7E:'i'-Gt~ a.\.WO ?owtr'( , ~ ~ t:\ ~" ~ s" ~ o ~ '"'-cw.c;

""" E:.~~\~ 1-t>\tt..E:.c.t'\o..:l~ "~Wo.l~ \<\'I£~S\'9E \ c..A ~A q ~-&'o, 1 TE~~ 8tu"-A

~k\.\ 1:> \~ u LA~".::> 'SLic-C:>E £...b cA .J1. '1'1'5 ~~ b

. . (Note: Add additional pages 1f requ1red.)

Bid Form 9

Page 5: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

\

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME: fZfiES (.of'{S1f<.\ll.1\0N 1 INC

4794A/A4L-382/966031

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of 1/2 of 1% of Bidder's Total Bid.

Alternate No.

March 3, 2014 LF/BF/MP-BF

Subcontractor Portion of the Work Name Location License No.

Activity (City) (e.g. electrical,

mechanical, concrete)

(Note: Add additional pages if required .)

Bid Form 10

Page 6: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME:....:A...:;R~B'l-:l:..:..:n..:::.c·=-------

Bidder will use Subcontractors for the Work:

YeslL_ No

4794NA4L-382/966031

If "yes", provide in the spaces below (a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of 1/2 of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

{e.g. electrical, mechanical, concrete)

L a-na 5c..u. o ·,&,. ""l v

-Cof\c.t~~- -

. H~~

1> 0.. \) .' ftc-\

"' f~\JC.. • ~\'?e! f"-~D"

March 3, 2014 LF/BF/MP-BF

Subcontractor Name of Business Location of Business License No.

(City)

t-4-!A.r-\11\CA. L-.~ .J c., _ _ ,.., f..f\a..~~:-M '1~7..~6~

t..r-::.~ r ,.\e. C.h-.'4\o " ; \l.s b\\'\'1,.'\.

~OWl\.,_.*'. '\)·,>Jt!.C'&~-("~,1 K"- \c.fll\o... (\~(,'-il.'\

~\\ io.~e<'~""-VI A~P~c.l+" C.o'fot~-.. 2.b7073

U11rll'l"o,.Co.-~".-.\ SDI.c..~ D..,.._ '"? OWCA \1 q~7.l5'1 '-' I

. . (Note: Add additional pages 1f reqUired.)

Bid Form 9

Page 7: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4794A A4L-382 Bid Results.pdfcity - time rec'd bid. prequalified daily rate of compensation x 10 multiplier. reclaimed

RECLAIMED WATER PIPELINE EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO

\

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME:_,_A..!.!R..:.:B=.'-!I.:..:.nc=·-----

4794NA4L-382/966031

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of 1/2 of 1% of Bidder's Total Bid.

Subcontractor Alternate Portion of the Work Name Location

No. Activity (e.g. electrical,

mechanical, concrete)

l,'l,'i,s, c., L o.Nl ~ vtA.I' e, 7 Sl

I, t. ,'~}i, S, (, 7.~ G\ c.. e>nc.c- e.-\' e 1,1.,>,'1,~ .

ra.-.l'-t\" "· 7 'i. ct

March 3, 2014 LF/BF/MP-BF

'-J

(City)

""'"~·"'"" k~ ..~ .. . IJC:. ~nc..hl!:.m

L~"- C..onGt"""'t" c.h~M '-' '·lis

I 1\\\ f...fti~~CAn A~ .. l.. .l-\- Co ton"\

(Note: Add additional pages if required.)

10

License No.

Lf'\'2.$lb2..

b\\'\'1'\

2."-7o73,

Bid Form