    NORMConstruction and Development Corporation

    June 10, 2015

    Mr. Jerin RajChief Manager, Projects

    KEC International, Ltd.

    Subject : FABRICATION OF TOWER PARTS, STUB ANGLE, CABLE TRAYS and CABLE TRENCH COVER,

    REIMBURSEMENT OF EXPANSION BOLTS, PAYMENT FOR TRUCK RENTAL AND UTILIZATION

    OF MANPOWER OUTSIDE SCOPE OF WORK

    KEC Matanao - Gensan Transmission Line Project

    KEC Matanao and Kidapawan Substation Project

    KEC Lumban EHV Substation Project

    Dear Sir:

    We are formally submitting herewith the additional works that has been done for KEC Matanao-Gensan TL Project, Matanao

    & Kidapawan Substation Project and Lumban Substation Project amounting to Three Hundred FourteenThousand Eight

    Hundred Thirty Four and 68/100 (Php ).

    Attached are the following to support our claim:

    1) Fabrication of Tower Parts (MGSTLP)

    a) SA Tower Type : kgs x /kg =

    b) SB Tower Type : kgs x /kg =

    c) SC Tower Type : kgs x /kg =d) SDst Tower Type : kgs x /kg =

    e) SDde Tower Type : kgs x /kg =

    2) Fabrication of Stub Angle (MGSTLP)

    a) SA Tower Type 9 pcs @ kg /pc : kgs x /kg =

    b) SB Tower Type 6 pcs @ kg /pc : kgs x /kg =

    c) SC Tower Type 3 pcs @ kg /pc : kgs x /kg =

    d) SDst Tower Type 1 pc @ kg /pc : kgs x /kg =

    3) Truck Rental (MGSTLP)

    a) Rental of Boomtruck : days x /day =

    4) Purchased Expansion Bolts for Cable Trays (Kidapawan Substation)

    a) Expansion Shield, Log Screw & Washer : lot x /lot =

    5) Fabrication of Cable Trench Cover (Matanao & Kidapawan SS)

    a) RSC1 (from 1.20 x 0.60 to 1.20 x 0.50) : pcs x /pc =

    b) RSC2 modified angular stiffener : pcs x /pc =

    314,834.68

    11215-A J. M. Loyola St., Mabuhay, Carmona, Cavite

    2,284.80

    1,240.79

    21.00

    77.46

    459.99

    377.64

    210.62

    78.2752.75

    49.34

    8,279.82

    18.00

    18.00

    18.00 18.00

    18.00

    18.00

    41,126.40

    22,334.22

    1,408.86 949.50

    888.12

    Subtotal: 28,743.00

    23.00

    Subtotal: 60,000.00

    Subtotal: 7,639.60

    66,707.10Subtotal:

    6,797.52

    3,791.07

    1,394.28

    18.00

    18.00

    18.00

    417.00

    5,000.00 60,000.00

    51.11

    62.94

    70.21

    77.46

    1

    Subtotal: 20,262.69

    7,639.60 7,639.60

    12

    19,152.00

    9,591.00

    912.00

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    2/62

    NORMConstruction and Development Corporation

    11215-A J. M. Loyola St., Mabuhay, Carmona, Cavite

    6) Utilization of Manpower Outside Scope of Works as of May 19, 2015 (Lumban Substation)

    a) Supervisor : days x /day =

    b) Technician/Electrician : days x /day =

    c) Skilled : days x /day =d) Laborer : days x /day =

    7) Utilization of NORM Service Vehicle (Lumban Substation)

    a) Service Vehicle : days x /day =

    :

    :

    :

    We hope that you will find this in order and requesting for your early payment.

    Thank you very much.

    Very truly yours,

    Ricardo S. David, Jr.

    VP for Operations

    146 350.00

    33,732.29

    51,100.00

    8 1,500.00 12,000.00

    Subtotal: 6,250.00

    2.5 2,500.00 6,250.00

    36 650.00

    314,834.68

    281,102.39

    Subtotal: 91,500.00

    Total Amount VAT Inclusive

    Total

    12% VAT

    23,400.00

    10 500.00 5,000.00

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    3/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    4/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    5/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    6/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    7/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    8/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    9/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    10/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    11/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    12/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    13/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    14/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    15/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    16/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    17/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    18/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    19/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    20/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    21/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    22/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    23/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    24/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    25/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    26/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    27/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    28/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    29/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    30/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    31/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    32/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    33/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    34/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    35/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    36/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    37/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    38/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    39/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    40/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    41/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    42/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    43/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    44/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    45/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    46/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    47/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    48/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    49/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    50/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    51/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    52/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    53/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    54/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    55/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    56/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    57/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    58/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    59/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    60/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    61/62

  • 7/21/2019 Fabricatiossssssssn of Tower Parts

    62/62

    Lumban EHV Substation Project

    KECInternational Ltd

    UTILIZATION OF SERVICE

    VEHICLE

    NORMConstruction and Development Corporation