Fabio De Felice; Armando Carlomusto; Antonella Fabio De Felice; Armando Carlomusto; Antonella Petrillo Department of Mechanism, Structures and Environment, University of C i i G Di Bi i 43 03043 C i It l Cassino, via G. Di Biasio 43, 03043, Cassino - Italy [email protected] , [email protected] , [email protected] September 14-16, 2011, ABANO TERME, Padova, ITALY

Fabio De Felice; ArmandoFabio De Felice; Armando ... · Fabio De Felice; ArmandoFabio De Felice; Armando Carlomusto; Antonella; Antonella Petrillo Department of Mechanism, Structures

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • Fabio De Felice; Armando Carlomusto; AntonellaFabio De Felice; Armando Carlomusto; Antonella Petrillo

    Department of Mechanism, Structures and Environment, University of C i i G Di Bi i 43 03043 C i It lCassino, via G. Di Biasio 43, 03043, Cassino - Italy

    [email protected], [email protected], [email protected]

    September 14-16, 2011, ABANO TERME, Padova, ITALY

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    1 Problem Introduction;1. Problem Introduction;

    2 Description of study;2. Description of study;

    3 Methodological Approach;3. Methodological Approach;

    4 Conclusions4. Conclusions.

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Advanced Technology

    System R li bilit

    Safety of

    Technology Reliability

    workers

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Man

    MachineEnvironment

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    The scope of HRA is to…

    IDENTIFY REPRESENT ANALYSE

    ALL HUMAN ERRORS

    BEFORE, DURING and AFTER ACCIDENTS

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    HRA METHODSHRA METHODS

    2nd Generation1st Generation

    -THERP- ASEP

    HEP

    - CREAM

    - HEP- ecc.

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    CognitiveReliabilityyErrorAnalysis

    Methodology

    Method

    1. Identify tasks that require cognitive processes by operators;y q g p y p ;

    2. Determine conditions under which cognitive reliability can degrade to become risk;

    3. Provide an impact estimate of human action on safety.

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 1.1: Definition of cognitive model

    Sequential cognitive model

    Cyclical cognitive model

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 1.1: Definition of cognitive model

    ContextualControlModel

    CoCoM

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 1.2: Definition of target and reference scenario

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 2.1: Global analysis of “system” and evaluation for human reliability study

    QUALITATIVE LEVELQUALITATIVE LEVEL

    CPCs M(man)T

    (technology)O

    (organization)

    Quality and fitness for EfficientCPCy

    tasks Efficient

    Microclimatic conditions of the Compatible Compatible Compatible Common

    workplace

    Man-machine interaction and Unfit Fit Tolerable

    PerformanceConditions

    computer and mechanical support

    Unfit Fit Tolerable

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 2.2: Tasks analysis or HTA analysis

    CPCCPCsCommon Performance Conditions

    Qualitative Level Expected Effect

    Very Efficient ImprovedEfficient Not significant

    Quality and fitness for tasksEfficient Not significantInefficient ReducedUnfit/Insufficient Reduced

    Microclimatic conditions of theAdvantageous Improved

    Microclimatic conditions of the workplace Compatible Not significant

    Incompatible Reduced

    Man-machine interaction and Support ImprovedFit Not significant

    computer and mechanical supportg

    Tolerable Not significantUnappropriate Reduced

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 2.3: Description of context of identified activities

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 3.1: Input data analysis

    765

    Σ Improved 432100

    0 1 2 3 4 5 6 7 8 9

    Σ Reduced

    Reliability Intervalstrategictacticalopportunisticscrambled

    IF PCM strategic OK

    1,0 E-2 < p < 0,5 E-01,0 E-1 < p < 1,0 E-0

    0,5 E-5 < p < 1,0 E-21,0 E-3 < p < 1,0 E-1

    IF PCM strategic OKIF PCM tactical OKIF PCM opportunistic NOIF PCM scrambled NO vai a extended method

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    Activity 3.2: Translation of model in simulation software

    Screenshot fof

    SIMULATIONSOFTWARE

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo

  • XVI Summer School“Francesco Turco”

    Industrial Mechanical Plants - SSD ING-Plants SSD ING

    IND/17

    In summary this model provides to….

    1. Define production cycle organization;

    2. Formulate Common Performance Conditions;

    3. Determine reliability range of MTO and identification of control modes (strategic, tactical, opportunistic, scrambled);

    4. Identify actions to be implemented to improve reliability, with numerical evaluation in terms of error probability.

    Fabio De Felice, Armando Carlomusto, Antonella Petrillo