FAA - Office of Airports Report Date: 11/30/2011 Region ADO State LOCID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary ARRA Brief Description of Work AL AAL AK 76 Akiachak (Proposed GA) 2 $ 11,780,074 $ 4,780,074 $ 7,000,000 $ - Construct New Airport [Construct Airport Ph2] AL AAL AK +01D Akutan (Proposed GA) 2 $ 20,000,000 $ 9,000,000 $ 11,000,000 $ - Construct New Airport [Phase 2 (part C)] AL AAL AK BET Bethel P 19 $ 650,000 $ 650,000 $ - $ - Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368 $ - Construct New Airport [Phase 2] AL AAL AK SCC Deadhorse P 10 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan Study [MP update] AL AAL AK DLG Dillingham P 12 $ 8,555,483 $ 8,555,483 $ - $ - Rehabilitate Apron [Rehabilitate Apron (LOC)], Rehabilitate Taxiway [Rehabilitate Taxiway (LOC)] AL AAL AK FAI Fairbanks International P 38 $ 700,000 $ - $ 700,000 $ - Collect airport data for Airports Geographic Information System AL AAL AK FAI Fairbanks International P 39 $ 950,000 $ 950,000 $ - $ - Update Airport Master Plan Study [Update MP] AL AAL AK HLA Huslia CS 6 $ 800,000 $ 800,000 $ - $ - Rehabilitate Apron AL AAL AK ENA Kenai Municipal P 45 $ 531,608 $ 531,608 $ - $ - Conduct Airport Master Plan Study [Supplemental Master Plan] AL AAL AK ENA Kenai Municipal P 44 $ 199,614 $ 199,614 $ - $ - Construct Apron [Float Plane Basin Development, Phase 1] AL AAL AK KTN Ketchikan International P 20 $ 652,126 $ 152,126 $ 500,000 $ - Improve Runway Safety Area [Aeronautical Survey and Environmental Mitigation (Part D)] - 11/29 AL AAL AK KVC King Cove GA 4 $ 1,820,936 $ 1,820,936 $ - $ - Acquire Safety Equipment and/or Fencing [Install perimeter fencing (part C)] AL AAL AK IIK Kipnuk CS 3 $ 9,186,403 $ 9,186,403 $ - $ - Construct Runway [Construct runway ph.2 (A)] - Plan-1 AL AAL AK IIK Kipnuk CS 4 $ 8,451,020 $ 523,030 $ 7,927,990 $ - Construct Runway [Construct runway ph.3 (C)] - Plan-1 AL AAL AK ADQ Kodiak P 12 $ 2,499,922 $ 2,499,922 $ - $ - Construct Sand and Chemical Storage Building [Construct Chemical Storage Building (part C)] AL AAL AK DUY Kongiganak CS 3 $ 5,685,750 $ 5,685,750 $ - $ - Extend Runway [Extend/Widen RWY & RSA Phase 3] - 18/36 AL AAL AK LHD Lake Hood P 12 $ 608,255 $ - $ 608,255 $ - Install Guidance Signs [Install signage] AL AAL AK LHD Lake Hood P 13 $ 1,355,517 $ 1,355,517 $ - $ - Acquire Land for Development [Land Acquisition Phase 1(C)] AL AAL AK LHD Lake Hood P 14 $ 1,644,483 $ 1,644,483 $ - $ - Improve Seaplane Base [Bank stabilization, Phase 1] AL AAL AK Z55 Lake Louise GA 2 $ 2,106,833 $ 2,106,833 $ - $ - Rehabilitate Access Road [Phase 2], Rehabilitate Apron [Phase 2], Rehabilitate Runway [Phase 2] - 12/30 AL AAL AK MRI Merrill Field P 50 $ 3,420,000 $ 524,346 $ 2,895,654 $ - Install Runway Vertical/Visual Guidance System [Replace Rwy 34 non-fed PLASI with non- fed PAPI] - 16/34, Rehabilitate Runway [Rehab. runway] - 16/34 AL AAL AK MRI Merrill Field P 52 $ 152,000 $ 152,000 $ - $ - Remove Obstructions [Remove structure and obstructions] AL AAL AK MRI Merrill Field P 49 $ 653,600 $ 83,896 $ 569,704 $ - Acquire Snow Removal Equipment [Acquire SRE (part C)] AL AAL AK MRI Merrill Field P 51 $ 313,500 $ 313,500 $ - $ - Acquire Land For Approaches [Acquire Land] AL AAL AK ENN Nenana Municipal GA 14 $ 1,334,702 $ 1,334,702 $ - $ - Acquire Safety Equipment and/or Fencing [Perimeter Fencing], Rehabilitate Runway [(Construction)] - 04L/22R AL AAL AK OME Nome P 20 $ 525,000 $ - $ 525,000 $ - Collect airport data for Airports Geographic Information System AL AAL AK OME Nome P 19 $ 100,000 $ 100,000 $ - $ - Update Airport Master Plan Study [Update MP-Ph2] AL AAL AK NUL Nulato CS 4 $ 8,200,000 $ 8,200,000 $ - $ - Construct Snow Removal Equipment Building, Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway [Phase 1] - 02/20 AL AAL AK OTZ Ralph Wien Memorial P 15 $ 2,470,711 $ - $ 2,470,711 $ - Acquire Safety Equipment and/or Fencing [Install VPD Gates, Phase 2] FY 2010 Grants Awarded Page 1 of 97

FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

AL AAL AK 76 Akiachak (Proposed GA) 2 $ 11,780,074 $ 4,780,074 $ 7,000,000 $ - Construct New Airport [Construct Airport Ph2]AL AAL AK +01D Akutan (Proposed GA) 2 $ 20,000,000 $ 9,000,000 $ 11,000,000 $ - Construct New Airport [Phase 2 (part C)]AL AAL AK BET Bethel P 19 $ 650,000 $ 650,000 $ - $ - Conduct Airport Master Plan Study [Airport Master Plan]AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368 $ - Construct New Airport [Phase 2]AL AAL AK SCC Deadhorse P 10 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan Study [MP update]

AL AAL AK DLG Dillingham P 12 $ 8,555,483 $ 8,555,483 $ - $ -

Rehabilitate Apron [Rehabilitate Apron (LOC)], Rehabilitate Taxiway [Rehabilitate

Taxiway (LOC)]AL AAL AK FAI Fairbanks International P 38 $ 700,000 $ - $ 700,000 $ - Collect airport data for Airports Geographic Information SystemAL AAL AK FAI Fairbanks International P 39 $ 950,000 $ 950,000 $ - $ - Update Airport Master Plan Study [Update MP]AL AAL AK HLA Huslia CS 6 $ 800,000 $ 800,000 $ - $ - Rehabilitate ApronAL AAL AK ENA Kenai Municipal P 45 $ 531,608 $ 531,608 $ - $ - Conduct Airport Master Plan Study [Supplemental Master Plan]AL AAL AK ENA Kenai Municipal P 44 $ 199,614 $ 199,614 $ - $ - Construct Apron [Float Plane Basin Development, Phase 1]

AL AAL AK KTN Ketchikan International P 20 $ 652,126 $ 152,126 $ 500,000 $ -

Improve Runway Safety Area [Aeronautical Survey and Environmental Mitigation (Part

D)] - 11/29

AL AAL AK KVC King Cove GA 4 $ 1,820,936 $ 1,820,936 $ - $ - Acquire Safety Equipment and/or Fencing [Install perimeter fencing (part C)]AL AAL AK IIK Kipnuk CS 3 $ 9,186,403 $ 9,186,403 $ - $ - Construct Runway [Construct runway ph.2 (A)] - Plan-1AL AAL AK IIK Kipnuk CS 4 $ 8,451,020 $ 523,030 $ 7,927,990 $ - Construct Runway [Construct runway ph.3 (C)] - Plan-1

AL AAL AK ADQ Kodiak P 12 $ 2,499,922 $ 2,499,922 $ - $ -

Construct Sand and Chemical Storage Building [Construct Chemical Storage Building

(part C)]AL AAL AK DUY Kongiganak CS 3 $ 5,685,750 $ 5,685,750 $ - $ - Extend Runway [Extend/Widen RWY & RSA Phase 3] - 18/36AL AAL AK LHD Lake Hood P 12 $ 608,255 $ - $ 608,255 $ - Install Guidance Signs [Install signage]AL AAL AK LHD Lake Hood P 13 $ 1,355,517 $ 1,355,517 $ - $ - Acquire Land for Development [Land Acquisition Phase 1(C)]AL AAL AK LHD Lake Hood P 14 $ 1,644,483 $ 1,644,483 $ - $ - Improve Seaplane Base [Bank stabilization, Phase 1]

AL AAL AK Z55 Lake Louise GA 2 $ 2,106,833 $ 2,106,833 $ - $ -

Rehabilitate Access Road [Phase 2], Rehabilitate Apron [Phase 2], Rehabilitate Runway

[Phase 2] - 12/30

AL AAL AK MRI Merrill Field P 50 $ 3,420,000 $ 524,346 $ 2,895,654 $ -

Install Runway Vertical/Visual Guidance System [Replace Rwy 34 non-fed PLASI with non-

fed PAPI] - 16/34, Rehabilitate Runway [Rehab. runway] - 16/34AL AAL AK MRI Merrill Field P 52 $ 152,000 $ 152,000 $ - $ - Remove Obstructions [Remove structure and obstructions]AL AAL AK MRI Merrill Field P 49 $ 653,600 $ 83,896 $ 569,704 $ - Acquire Snow Removal Equipment [Acquire SRE (part C)]AL AAL AK MRI Merrill Field P 51 $ 313,500 $ 313,500 $ - $ - Acquire Land For Approaches [Acquire Land]

AL AAL AK ENN Nenana Municipal GA 14 $ 1,334,702 $ 1,334,702 $ - $ -

Acquire Safety Equipment and/or Fencing [Perimeter Fencing], Rehabilitate Runway

[(Construction)] - 04L/22RAL AAL AK OME Nome P 20 $ 525,000 $ - $ 525,000 $ - Collect airport data for Airports Geographic Information SystemAL AAL AK OME Nome P 19 $ 100,000 $ 100,000 $ - $ - Update Airport Master Plan Study [Update MP-Ph2]

AL AAL AK NUL Nulato CS 4 $ 8,200,000 $ 8,200,000 $ - $ -

Construct Snow Removal Equipment Building, Rehabilitate Access Road, Rehabilitate

Apron, Rehabilitate Runway [Phase 1] - 02/20AL AAL AK OTZ Ralph Wien Memorial P 15 $ 2,470,711 $ - $ 2,470,711 $ - Acquire Safety Equipment and/or Fencing [Install VPD Gates, Phase 2]

FY 2010 Grants Awarded

Page 1 of 97

Page 2: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

AL AAL AK OTZ Ralph Wien Memorial P 16 $ 17,700,000 $ 791,491 $ 16,908,509 $ - Rehabilitate Runway [Phase 1] - 09/27AL AAL AK A29 Sitka GA 1 $ 300,000 $ 300,000 $ - $ - Update Miscellaneous Study [Update Site study SPB]AL AAL AK SIT Sitka Rocky Gutierrez P 27 $ 29,957,716 $ 1,000,000 $ 28,957,716 $ - Construct Runway Safety Area [Phase 1] - 11/29

AL AAL AK SIT Sitka Rocky Gutierrez P 26 $ 1,193,287 $ 1,193,287 $ - $ -

Acquire Snow Removal Equipment [Acquire SRE: Sitka (Self Propelled Blower, Truck with

Plow and Sander)]AL AAL AK SXQ Soldotna GA 10 $ 1,546,891 $ 1,546,891 $ - $ - Construct Apron [Relocate utilities and road]AL AAL AK *AKS State of Alaska 14 $ 2,500,000 $ 2,500,000 $ - $ - Update State System Plan StudyAL AAL AK *AKS State of Alaska 15 $ 600,000 $ - $ 600,000 $ - Conduct aeronautical survey for WAAS approach (Coldfoot; Kivalina)

AL AAL AK *AKS State of Alaska 13 $ 700,000 $ - $ 700,000 $ - Conduct aeronautical survey for WAAS approach (Grayling; Northway; Savoonga)AL AAL AK ANC Ted Stevens Anchorage International P 139 $ 5,444,004 $ 5,444,004 $ - $ - Widen Runway [Design Group VI Improvements, Part B] - 07R/25LAL AAL AK ANC Ted Stevens Anchorage International P 138 $ 778,580 $ 778,580 $ - $ - Modify Terminal Building [Phase 7 (FY10 Phase B)]AL AAL AK ANC Ted Stevens Anchorage International P 125 $ 1,152,268 $ - $ 1,152,268 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Truck]AL AAL AK ANC Ted Stevens Anchorage International P 136 $ 2,767,912 $ 471,583 $ 2,296,329 $ - Extend Runway [extend 7R, Phase 1] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 127 $ 1,312,500 $ - $ 1,312,500 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [RSIP (phase 9), 54 homes

(est.)]

AL AAL AK ANC Ted Stevens Anchorage International P 131 $ 2,130,626 $ - $ 2,130,626 $ - Security Enhancements [Provide and Install EOC/AOC Security Equipment (C)]AL AAL AK ANC Ted Stevens Anchorage International P 132 $ 3,221,725 $ 471,725 $ 2,750,000 $ - Acquire Snow Removal Equipment [Acquire SRE Phase 2 (part C)]AL AAL AK ANC Ted Stevens Anchorage International P 129 $ 12,528,850 $ 8,528,850 $ 4,000,000 $ - Widen Runway [Design Group VI Improvements, Part A] - 07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 137 $ 750,000 $ - $ 750,000 $ - Conduct Noise Compatibility Plan Study [Part 150 Noise Study, Phase 1(part D/E)]

AL AAL AK ANC Ted Stevens Anchorage International P 130 $ 10,027,500 $ - $ 10,027,500 $ -

Rehabilitate Runway [Rehabilitate Runway 7R/25L Embankment and Drainage System] -

07R/25L

AL AAL AK ANC Ted Stevens Anchorage International P 133 $ 1,016,551 $ 1,016,551 $ - $ - Modify Terminal Building [Emergency Operations Command Center (EOC)]AL AAL AK ANC Ted Stevens Anchorage International P 134 $ 1,795,130 $ 1,795,130 $ - $ - Modify Terminal Building [Phase 6 (FY10 Phase A)]

AL AAL AK ANC Ted Stevens Anchorage International P 128 $ 991,491 $ - $ 991,491 $ - Acquire Snow Removal Equipment [Acquire Snow Removal Equipment (SRE) Phase 1]

AL AAL AK *AKV Various Locations in Alaska 75 $ 2,574,483 $ 2,574,483 $ - $ -

Acquire Snow Removal Equipment (Bethel; Cold Bay; False Pass; Kodiak; Seward;

Tuluksak)

AL AAL AK *AKV Various Locations in Alaska 76 $ 200,000 $ 200,000 $ - $ -

Conduct aeronautical survey for WAAS approach (Atqasuk Edward Burnell Sr Memorial;

Nuiqsut; Point Lay LRRS; Wainwright)

AL AAL AK *AKV Various Locations in Alaska 74 $ 3,079,767 $ 3,079,767 $ - $ -

Acquire Snow Removal Equipment (Birch Creek; Bob Baker Memorial; Diomede; Nome;

Nulato; Ralph Wien Memorial; Stevens Village), Acquire Snow Removal Equipment (Birch

Creek; Bob Baker Memorial; Diomede; Nome; Nulato; Ralph Wien Memorial; Stevens

Village)

Page 2 of 97

Page 3: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

AL AAL AK *AKV Various Locations in Alaska 73 $ 4,734,830 $ 4,734,830 $ - $ -

Rehabilitate Runway (Akhiok - 04/22; Aleknagik /New - 15/33; Bethel - 01R/19L; Big Lake

- 07/25; Buckland - 11/29; Chenega Bay - 15/33; Chignik Lake - 08/26; Deering - 11/29;

Dillingham - 01/19; Edward G. Pitka Sr - 06/24; Gustavus - 11/29; Haines - 08/26; Homer -

03/21; Hoonah - 06/24; Hughes - 17/35; Kantishna - 10/28; Karluk - 10/28; King Salmon -

12/30; Kobuk - 09/27; Kodiak - 07/25; McGrath - 16/34; Naknek - 08/26; Noatak - 01/19;

Old Harbor - 03/21; Petersburg James A Johnson - 04/22; Port Graham - 12/30; Robert

/Bob/ Curtis Memorial - 06/24; Seldovia - 16/34; Seward - 13/31; Shishmaref - 05/23;

Sitka Rocky Gutierrez - 11/29; Skagway - 02/20; Skwentna - 09/27; St Michael - 02/20; St

Paul Island - 18/36; Talkeetna - 18/36; Ugashik - 06/24; Wales - 18/36; Wrangell - 10/28;

Yakutat - 11/29)AL AAL AK IYS Wasilla GA 16 $ 1,248,726 $ 1,248,726 $ - $ - Construct Apron [Construction, Apron D (Phase 1)]AL AAL AK BRW Wiley Post-Will Rogers Memorial P 12 $ 7,200,000 $ - $ 7,200,000 $ - Construct Runway Safety Area [RSA Phase 4 construction] - 06/24AL AAL AK YAK Yakutat P 18 $ 990,280 $ 990,280 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleCE ACE IA 4C8 Albia Municipal GA 6 $ 201,916 $ 201,916 $ - $ - Construct TaxiwayCE ACE IA AXA Algona Municipal GA 7 $ 119,700 $ 119,700 $ - $ - Install Miscellaneous NAVAIDSCE ACE IA AMW Ames Municipal GA 19 $ 1,231,560 $ 332,494 $ 899,066 $ - Rehabilitate Taxiway [Taxiway A-1, A]CE ACE IA CIN Arthur N Neu GA 10 $ 1,553,250 $ 1,553,250 $ - $ - Construct Taxiway [Rwy. 13/31 Parallel]CE ACE IA AIO Atlantic Municipal GA 9 $ 94,258 $ 94,258 $ - $ - Construct Taxiway [Design only]CE ACE IA ADU Audubon County GA 3 $ 62,861 $ 62,861 $ - $ - Construct Parking Lot [design], Rehabilitate Runway [Design] - 14/32CE ACE IA TZT Belle Plaine Municipal GA 6 $ 25,080 $ 25,080 $ - $ - Construct Snow Removal Equipment Building [Design]CE ACE IA TZT Belle Plaine Municipal GA 5 $ 117,800 $ 117,800 $ - $ - Acquire Snow Removal Equipment

CE ACE IA 4K6 Bloomfield Municipal GA 4 $ 315,350 $ 315,350 $ - $ - Improve Airport Drainage, Rehabilitate Runway [Design] - 18/36, Rehabilitate TaxiwayCE ACE IA BNW Boone Municipal GA 11 $ 500,329 $ 500,329 $ - $ - Rehabilitate Apron [PHASE 1]CE ACE IA TVK Centerville Municipal GA 5 $ 32,895 $ 32,895 $ - $ - Conduct Environmental StudyCE ACE IA CNC Chariton Municipal GA 7 $ 34,822 $ 34,822 $ - $ - Conduct Environmental StudyCE ACE IA CAV Clarion Municipal GA 8 $ 71,302 $ 71,302 $ - $ - Extend Runway [EA] - 14/32CE ACE IA CAV Clarion Municipal GA 9 $ 357,309 $ 357,309 $ - $ - Rehabilitate TaxiwayCE ACE IA CWI Clinton Municipal GA 15 $ 4,427,115 $ 1,447,454 $ 2,979,661 $ - Rehabilitate Runway - 03/21CE ACE IA CWI Clinton Municipal GA 16 $ 204,250 $ 75,000 $ 129,250 $ - Improve Runway Safety Area [land] - 03/21

CE ACE IA CWI Clinton Municipal GA 17 $ 533,690 $ - $ 533,690 $ -

Improve Runway Safety Area [Relocate Localizer - Reimbursable Agreement needed] -

03/21CE ACE IA CBF Council Bluffs Municipal GA 17 $ 1,004,565 $ 206,168 $ 798,397 $ - Install Perimeter FencingCE ACE IA CSQ Creston Municipal GA 6 $ 144,400 $ 144,400 $ - $ - Acquire Snow Removal EquipmentCE ACE IA DVN Davenport Municipal GA 15 $ 883,225 $ 403,547 $ 479,678 $ - Rehabilitate TaxiwayCE ACE IA DNS Denison Municipal GA 9 $ 134,900 $ 134,900 $ - $ - Construct Taxiway [Grade partial parallel to Rwy 12 end]

Page 3 of 97

Page 4: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE IA DSM Des Moines International P 52 $ 855,000 $ 855,000 $ - $ - Construct Runway [13R/31L Trail & Partial Frink Culvert - Design Only] - Plan-1CE ACE IA DSM Des Moines International P 54 $ 975,979 $ 975,979 $ - $ - Security Enhancements

CE ACE IA DBQ Dubuque Regional P 51 $ 1,944,471 $ 1,005,572 $ 938,899 $ -

Construct Terminal Building [Design - Site work & grading, entrance road, terminal

apron, terminal building, landside circ loop/parking, water/wastewater,

parallel/connecting twy, service road]CE ACE IA DBQ Dubuque Regional P 52 $ 456,000 $ - $ 456,000 $ - Collect airport data for Airports Geographic Information SystemCE ACE IA DBQ Dubuque Regional P 53 $ 208,930 $ - $ 208,930 $ - Safety Management System (SMS) ProgramCE ACE IA DBQ Dubuque Regional P 54 $ 29,070 $ 29,070 $ - $ - Conduct Miscellaneous Study [PCI Study]CE ACE IA DBQ Dubuque Regional P 48 $ 743,772 $ 743,772 $ - $ - Improve Runway Safety Area [Construction] - 13/31CE ACE IA EGQ Emmetsburg Municipal GA 4 $ 309,726 $ 309,726 $ - $ - Rehabilitate TaxiwayCE ACE IA EGQ Emmetsburg Municipal GA 5 $ 127,373 $ 127,373 $ - $ - Update Airport Master Plan StudyCE ACE IA EST Estherville Municipal GA 8 $ 122,284 $ 122,284 $ - $ - Rehabilitate Access RoadCE ACE IA FFL Fairfield Municipal GA 12 $ 234,365 $ 234,365 $ - $ - Update Airport Master Plan StudyCE ACE IA FXY Forest City Municipal GA 10 $ 72,200 $ 72,200 $ - $ - Remove Obstructions [Design]CE ACE IA FXY Forest City Municipal GA 9 $ 115,330 $ 115,330 $ - $ - Acquire Snow Removal EquipmentCE ACE IA FOD Fort Dodge Regional CS 25 $ 312,564 $ 312,564 $ - $ - Rehabilitate Runway [Design] - 12/30CE ACE IA GFZ Greenfield Municipal GA 3 $ 157,700 $ 157,700 $ - $ - Rehabilitate Runway - 07/25CE ACE IA GGI Grinnell Regional GA 9 $ 93,670 $ 93,670 $ - $ - Update Airport Master Plan StudyCE ACE IA HPT Hampton Municipal GA 6 $ 68,685 $ 68,685 $ - $ - Construct Building [Design]CE ACE IA 0K7 Humboldt Municipal GA 5 $ 62,890 $ 62,890 $ - $ - Construct Building [Design]CE ACE IA IIB Independence Municipal GA 9 $ 130,150 $ 130,150 $ - $ - Acquire Snow Removal EquipmentCE ACE IA IFA Iowa Falls Municipal GA 5 $ 127,081 $ 127,081 $ - $ - Extend Runway [Design] - 13/31CE ACE IA EOK Keokuk Municipal GA 17 $ 450,723 $ 346,815 $ 103,908 $ - Rehabilitate Runway - 14/32CE ACE IA OXV Knoxville Municipal GA 11 $ 280,932 $ 280,932 $ - $ - Construct Building [Construction]CE ACE IA LWD Lamoni Municipal GA 6 $ 62,883 $ 62,883 $ - $ - Conduct Environmental StudyCE ACE IA LRJ Le Mars Municipal GA 7 $ 112,376 $ 112,376 $ - $ - Acquire Snow Removal EquipmentCE ACE IA LRJ Le Mars Municipal GA 9 $ 9,172 $ 9,172 $ - $ - Acquire Easement For ApproachesCE ACE IA OQW Maquoketa Municipal GA 5 $ 89,585 $ 89,585 $ - $ - Rehabilitate Access Road, Rehabilitate Parking LotCE ACE IA MIW Marshalltown Municipal GA 11 $ 449,113 $ 449,113 $ - $ - Rehabilitate Taxiway

CE ACE IA MCW Mason City Municipal P 35 $ 1,741,921 $ 1,741,921 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Construct site work]CE ACE IA MCW Mason City Municipal P 34 $ 11,533 $ 11,533 $ - $ - Runway Incursion MarkingsCE ACE IA 8C4 Mathews Memorial GA 1 $ 80,622 $ - $ 80,622 $ - Conduct Environmental StudyCE ACE IA MPZ Mount Pleasant Municipal GA 10 $ 415,974 $ 230,999 $ 184,975 $ - Rehabilitate ApronCE ACE IA MUT Muscatine Municipal GA 16 $ 127,278 $ 127,278 $ - $ - Acquire Snow Removal Equipment

CE ACE IA TNU Newton Municipal GA 11 $ 2,660,000 $ 1,560,195 $ 1,099,805 $ -

Rehabilitate Runway - 14/32, Rehabilitate Taxiway [T-Hangar Taxilane], Rehabilitate

Taxiway [Taxiway A]CE ACE IA CCY Northeast Iowa Regional GA 9 $ 63,650 $ 63,650 $ - $ - Install Runway Vertical/Visual Guidance System - 12/30

Page 4 of 97

Page 5: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE IA OLZ Oelwein Municipal GA 4 $ 91,200 $ 91,200 $ - $ - Construct Snow Removal Equipment Building [design]CE ACE IA I75 Osceola Municipal GA 11 $ 152,510 $ 152,510 $ - $ - Construct Building [taxilanes]CE ACE IA OOA Oskaloosa Municipal GA 6 $ 141,408 $ 141,408 $ - $ - Update Airport Master Plan StudyCE ACE IA OTM Ottumwa Regional GA 16 $ 52,506 $ 52,506 $ - $ - Improve Runway Safety Area [Design] - 13/31CE ACE IA PEA Pella Municipal GA 9 $ 179,757 $ 179,757 $ - $ - Rehabilitate Runway - 16/34CE ACE IA PRO Perry Municipal GA 7 $ 61,750 $ 61,750 $ - $ - Update Airport Master Plan StudyCE ACE IA PRO Perry Municipal GA 6 $ 663,309 $ 663,309 $ - $ - Construct BuildingCE ACE IA POH Pocahontas Municipal GA 6 $ 220,287 $ 220,287 $ - $ - Acquire Snow Removal EquipmentCE ACE IA RDK Red Oak Municipal GA 11 $ 50,000 $ 50,000 $ - $ - Rehabilitate Runway [Design] - 17/35CE ACE IA 2Y4 Rockwell City Municipal GA 3 $ 264,947 $ 264,947 $ - $ - Rehabilitate Runway - 12/30CE ACE IA SKI Sac City Municipal GA 8 $ 95,750 $ 95,750 $ - $ - Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 18/36CE ACE IA ICL Schenck Field GA 10 $ 571,646 $ 571,646 $ - $ - Construct Building [design]CE ACE IA SHL Sheldon Municipal GA 10 $ 80,750 $ 80,750 $ - $ - Update Airport Master Plan StudyCE ACE IA SDA Shenandoah Municipal GA 9 $ 350,182 $ 350,182 $ - $ - Construct Taxiway [Phase 1 - Partial to Rwy 22 end]CE ACE IA SUX Sioux Gateway/Col. Bud Day Field P 41 $ 383,760 $ 383,760 $ - $ - Install Guidance Signs [Phase 2 Construction]CE ACE IA BRL Southeast Iowa Regional CS 29 $ 123,477 $ 123,477 $ - $ - Rehabilitate Taxiway [Design]CE ACE IA BRL Southeast Iowa Regional CS 28 $ 187,505 $ 187,505 $ - $ - Rehabilitate Taxiway [Pavement Markings]CE ACE IA *IAS State of Iowa 18 $ 68,866 $ - $ 68,866 $ - Conduct Miscellaneous StudyCE ACE IA CID The Eastern Iowa P 40 $ 586,445 $ - $ 586,445 $ - Collect airport data for Airports Geographic Information SystemCE ACE IA CID The Eastern Iowa P 41 $ 1,773,849 $ 1,773,849 $ - $ - Rehabilitate Runway [LOI - Reimbursement, Part D Entitlement] - 09/27CE ACE IA CID The Eastern Iowa P 39 $ 5,302,311 $ 1,802,311 $ 3,500,000 $ - Rehabilitate Runway [LOI - Reimbursement] - 09/27

CE ACE IA ALO Waterloo Regional P 37 $ 746,700 $ 746,700 $ - $ -

Acquire Aircraft Deicing Equipment, Acquire Snow Removal Equipment [SRE - Snow

Sweeper]CE ACE IA C25 Waverly Municipal GA 3 $ 266,568 $ 266,568 $ - $ - Rehabilitate Apron [Reconstruct Apron], Rehabilitate Runway - 11/29

CE ACE IA EBS Webster City Municipal GA 10 $ 76,825 $ 76,825 $ - $ - Extend Runway [Relocate threshold 14 end - Design with obstruction survey] - 14/32CE ACE KS K78 Abilene Municipal GA 7 $ 850,250 $ 698,300 $ 151,950 $ - Construct Taxiway [Construction (grading&paving) - Phase 2]CE ACE KS K88 Allen County GA 11 $ 462,844 $ 462,844 $ - $ - Rehabilitate Apron [Rehab northeast portion of apron]CE ACE KS K59 Amelia Earhart GA 6 $ 95,418 $ 95,418 $ - $ - Rehabilitate Taxiway [Design]CE ACE KS ANY Anthony Municipal GA 7 $ 91,675 $ 91,675 $ - $ - Rehabilitate Runway [Design] - 17/35CE ACE KS ADT Atwood-Rawlins County City-County GA 8 $ 52,250 $ 52,250 $ - $ - Rehabilitate Runway Lighting [Design] - 16/34CE ACE KS CNK Blosser Municipal GA 7 $ 526,638 $ 526,638 $ - $ - Rehabilitate Taxiway [Construction]CE ACE KS EQA Captain Jack Thomas/El Dorado GA 8 $ 1,090,264 $ 1,090,264 $ - $ - Rehabilitate Apron [Rehabilitate Aprons - Construct]CE ACE KS CNU Chanute Martin Johnson GA 7 $ 160,848 $ 160,848 $ - $ - Rehabilitate Runway [Slurry seal] - 18/36CE ACE KS SYF Cheyenne County Municipal GA 10 $ 271,700 $ 150,000 $ 121,700 $ - Extend Runway [Aeronautical Survey and Extension Design] - 13R/31L

CE ACE KS 8K8 Cimarron Municipal GA 4 $ 63,650 $ 63,650 $ - $ -

Rehabilitate Runway [Regrade, Reseed, and install new reflectors and threshold

markers] - 11/29

CE ACE KS CYW Clay Center Municipal GA 9 $ 306,897 $ 306,897 $ - $ -

Install Miscellaneous NAVAIDS [Replace rotating beacon], Rehabilitate Runway Lighting -

17/35

Page 5 of 97

Page 6: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE KS CYW Clay Center Municipal GA 7 $ 56,525 $ 56,525 $ - $ - Conduct Environmental Study [EA for property acquisition (protective zones)]CE ACE KS UKL Coffey County GA 6 $ 953,530 $ 150,000 $ 803,530 $ - Construct Taxiway [Construction - Phase 3 - Remaining portion]CE ACE KS CFV Coffeyville Municipal GA 16 $ 582,095 $ 8,181 $ 573,914 $ - Rehabilitate Taxiway [Design & Construct Rehabilitation of Tawiway]

CE ACE KS CFV Coffeyville Municipal GA 15 $ 142,200 $ 142,200 $ - $ -

Update Airport Master Plan Study [Update Airport Layout Plan. Includes Narrative

Report]

CE ACE KS AAO Colonel James Jabara R 19 $ 63,420 $ 63,420 $ - $ -

Rehabilitate Apron [Design], Rehabilitate Runway [Design] - 18/36, Rehabilitate Taxiway

[Design]CE ACE KS DDC Dodge City Regional CS 26 $ 96,102 $ 27,101 $ 69,001 $ - Construct Apron [Design]CE ACE KS DDC Dodge City Regional CS 25 $ 122,899 $ 122,899 $ - $ - Install Airport Beacons [Install Airport Beacons]CE ACE KS EHA Elkhart-Morton County GA 6 $ 1,865,155 $ 1,865,155 $ - $ - Rehabilitate Runway [Construction - Phase 2] - 17/35CE ACE KS 9K7 Ellsworth Municipal GA 7 $ 124,755 $ 124,755 $ - $ - Construct Runway [Land] - Plan-1CE ACE KS FOE Forbes Field GA 27 $ 1,435,564 $ 1,435,564 $ - $ - Rehabilitate Runway Lighting [Design] - 13/31CE ACE KS FSK Fort Scott Municipal GA 13 $ 492,045 $ 492,045 $ - $ - Rehabilitate Taxiway [Mill/overlay parallel taxiway and connectors]

CE ACE KS GCK Garden City Regional P 30 $ 1,568,604 $ 1,000,000 $ 568,604 $ -

Rehabilitate Taxiway [Remainder of Taxiway A - Really, truly Last Phase of Taxiway A

project]CE ACE KS K34 Gardner Municipal GA 5 $ 96,900 $ 96,900 $ - $ - Improve Airport Drainage [Design]CE ACE KS K34 Gardner Municipal GA 6 $ 49,400 $ 49,400 $ - $ - Conduct Environmental StudyCE ACE KS K68 Garnett Municipal GA 6 $ 80,616 $ 80,616 $ - $ - Rehabilitate Runway

CE ACE KS GBD Great Bend Municipal GA 18 $ 277,705 $ 277,705 $ - $ - Rehabilitate Runway [Crack seal, joint replacement, slurry seal, restripe] - 17/35CE ACE KS HYS Hays Regional CS 25 $ 374,721 $ 160,251 $ 214,470 $ - Install Taxiway Lighting [Taxiway M MITL and Airport Signage]CE ACE KS HLC Hill City Municipal GA 11 $ 150,000 $ 150,000 $ - $ - Construct Fuel Farm [Jet A fuel system]CE ACE KS HQG Hugoton Municipal GA 8 $ 1,076,756 $ 150,000 $ 926,756 $ - Construct Taxiway [Construct remainder]CE ACE KS HUT Hutchinson Municipal GA 25 $ 130,863 $ 130,863 $ - $ - Improve Runway Safety Area [Design] - 13/31CE ACE KS HUT Hutchinson Municipal GA 24 $ 197,708 $ 197,708 $ - $ - Improve Runway Safety Area [Reimbursable Agreement] - 13/31

CE ACE KS IDP Independence Municipal GA 18 $ 64,101 $ 64,101 $ - $ - Construct Taxiway [Runway/taxiway connector design], Extend Runway [Design] - 04/22

CE ACE KS OJC Johnson County Executive R 24 $ 871,329 $ 166,140 $ 705,189 $ - Acquire Land For Approaches [Reimbursement for inverse condemnation]CE ACE KS LQR Larned-Pawnee County GA 12 $ 196,400 $ 196,400 $ - $ - Acquire Snow Removal Equipment [Vehicle with 10' blade/moldboard]CE ACE KS LWC Lawrence Municipal GA 16 $ 60,079 $ 60,079 $ - $ - Acquire Land For Approaches [BRL]CE ACE KS LWC Lawrence Municipal GA 15 $ 249,100 $ 249,100 $ - $ - Update Airport Master Plan Study [Master Plan Update]CE ACE KS @01S Leavenworth County 1 $ 149,320 $ - $ 149,320 $ - Conduct Miscellaneous Study [Site selection study]CE ACE KS LBL Liberal Mid-America Regional CS 18 $ 381,466 $ 381,466 $ - $ - Acquire Snow Removal Equipment

CE ACE KS LYO Lyons-Rice County Municipal GA 14 $ 125,976 $ 125,976 $ - $ -

Extend Runway [Runway Extension - Preliminary design and Aeronautical Survey] -

17R/35L

CE ACE KS MHK Manhattan Regional P 40 $ 135,009 $ 135,009 $ - $ -

Install Perimeter Fencing [Construct Wildlife Fence identified in WHMP and

recommended by Cert Inspectors]

Page 6 of 97

Page 7: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE KS 3K7 Mark Hoard Memorial GA 1 $ 174,800 $ 174,800 $ - $ - Update Airport Master Plan StudyCE ACE KS MYZ Marysville Municipal GA 7 $ 1,512,020 $ 1,097,633 $ 414,387 $ - Construct Taxiway [Construct - paving]

CE ACE KS MPR McPherson GA 12 $ 395,424 $ 395,424 $ - $ -

Improve Airport Drainage [Replace t-hangar taxilane drainage lines - Construct],

Rehabilitate Runway [Crack repair/seal] - 18/36, Rehabilitate Taxiway [Crack repair/seal]CE ACE KS MEJ Meade Municipal GA 9 $ 10,427 $ 10,427 $ - $ - Rehabilitate Runway Lighting [Regulator replacement]CE ACE KS K51 Medicine Lodge GA 3 $ 83,885 $ 83,885 $ - $ - Update Airport Master Plan Study [Update planning study]CE ACE KS K81 Miami County GA 13 $ 185,057 $ 185,057 $ - $ - Extend Taxiway [Design & Construct]CE ACE KS K61 Moritz Memorial GA 7 $ 181,546 $ 181,546 $ - $ - Extend Runway [Acquire land] - 17/35CE ACE KS 48K Ness City Municipal GA 3 $ 26,571 $ 26,571 $ - $ - Construct Runway [Land acquisition] - Plan-1

CE ACE KS +02H New 5 $ 4,290,308 $ - $ 4,290,308 $ -

Construct New Airport [Apron], Construct New Airport [Runway - grading, paving, and

lighting]

CE ACE KS EWK Newton-City-County R 27 $ 443,280 $ 268,280 $ 175,000 $ - Identify the airport's environmental footprint [Develop Sustainable Airport Master Plan]CE ACE KS OEL Oakley Municipal GA 8 $ 20,871 $ 20,871 $ - $ - Acquire Land For Approaches [Land for RWY 16-34 RPZ & BRL]

CE ACE KS OIN Oberlin Municipal GA 8 $ 143,150 $ 143,150 $ - $ - Rehabilitate Runway [Final Design] - 17/35, Rehabilitate Taxiway [Design]CE ACE KS K67 Oswego Municipal GA 7 $ 274,631 $ 274,631 $ - $ - Construct Access Road [Construct]

CE ACE KS OWI Ottawa Municipal GA 9 $ 142,497 $ 142,497 $ - $ -

Install Miscellaneous NAVAIDS [Procure equipment], Rehabilitate Runway [Design] -

17/35, Rehabilitate Runway LightingCE ACE KS TOP Philip Billard Municipal GA 15 $ 149,214 $ 149,214 $ - $ - Rehabilitate Apron [Stone Hangar - Construct]CE ACE KS PTT Pratt Industrial GA 15 $ 196,375 $ 196,375 $ - $ - Install Taxiway Lighting [Install MITL/signage]CE ACE KS GLD Renner Field /Goodland Municipal/ GA 18 $ 28,500 $ 28,500 $ - $ - Rehabilitate Taxiway [Design - Runway 5-23 to threshold]CE ACE KS RSL Russell Municipal GA 9 $ 181,289 $ 181,289 $ - $ - Construct Snow Removal Equipment BuildingCE ACE KS SLN Salina Municipal CS 33 $ 216,733 $ 216,733 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Design]CE ACE KS TQK Scott City Municipal GA 12 $ 448,839 $ 307,519 $ 141,320 $ - Rehabilitate Apron [Construct]CE ACE KS K82 Smith Center Municipal GA 9 $ 248,478 $ 96,325 $ 152,153 $ - Construct Runway [Construction - Lighting system and beacon] - 14/32CE ACE KS K82 Smith Center Municipal GA 10 $ 53,675 $ 53,675 $ - $ - Rehabilitate Apron [Design]CE ACE KS 2K3 Stanton County Municipal GA 8 $ 76,760 $ 76,760 $ - $ - Construct Taxiway [Design]CE ACE KS *KSS State of Kansas 12 $ 265,550 $ - $ 265,550 $ - Conduct State System Plan StudyCE ACE KS *KSS State of Kansas 11 $ 139,156 $ 29,156 $ 110,000 $ - Conduct aeronautical survey for WAAS approachCE ACE KS WLD Strother Field GA 17 $ 121,576 $ 121,576 $ - $ - Install Runway Vertical/Visual Guidance System [PAPis] - 17/35

CE ACE KS 3K3 Syracuse-Hamilton County Municipal GA 8 $ 56,335 $ 56,335 $ - $ - Conduct Environmental Study [EA]CE ACE KS EGT Wellington Municipal GA 11 $ 64,278 $ 64,278 $ - $ - Acquire Snow Removal Equipment [SRE with min 10' blade]CE ACE MO MKC Charles B. Wheeler Downtown R 21 $ 8,246,000 $ 150,000 $ 8,096,000 $ - Improve Runway Safety Area - 01/19CE ACE MO COU Columbia Regional P 33 $ 344,945 $ 344,945 $ - $ - Conduct Environmental StudyCE ACE MO COU Columbia Regional P 31 $ 56,695 $ 56,695 $ - $ - Wildlife Hazard AssessmentsCE ACE MO COU Columbia Regional P 32 $ 534,000 $ 534,000 $ - $ - Acquire Snow Removal Equipment

Page 7 of 97

Page 8: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE MO COU Columbia Regional P 27 $ 111,411 $ 111,411 $ - $ - Acquire Land for DevelopmentCE ACE MO MCI Kansas City International P 64 $ 224,516 $ 224,516 $ - $ - Update Airport Master Plan Study [CFR Part 150 Reimbursement]CE ACE MO STL Lambert-St Louis International P 125 $ 817,122 $ - $ 817,122 $ - Rehabilitate Runway [Phase 1 Design] - 12R/30L

CE ACE MO STL Lambert-St Louis International P 127 $ 632,086 $ - $ 632,086 $ - Rehabilitate Taxiway [Taxiway E from Taxiway L to Taxiway J Phase 1 Design]CE ACE MO STL Lambert-St Louis International P 124 $ 9,923,823 $ 1,423,823 $ 8,500,000 $ - Construct Runway - Plan-1CE ACE MO STL Lambert-St Louis International P 129 $ 1,372,974 $ 1,372,974 $ - $ - Construct Runway [Parts B & C] - Plan-1CE ACE MO STL Lambert-St Louis International P 126 $ 277,330 $ - $ 277,330 $ - Rehabilitate Taxiway [Phase 1 Design]CE ACE MO *MOB Missouri State Block Grant Program 45 $ 2,174,285 $ 2,174,285 $ - $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 34 $ 2,943,384 $ - $ 2,943,384 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 46 $ 380,000 $ - $ 380,000 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 47 $ 48,643 $ - $ 48,643 $ - Non primary development projects in state block grant programCE ACE MO *MOB Missouri State Block Grant Program 44 $ 12,994,824 $ 12,994,824 $ - $ - Non primary development projects in state block grant programCE ACE MO SGF Springfield-Branson National P 40 $ 1,534,377 $ 1,534,377 $ - $ - Construct Terminal BuildingCE ACE MO SGF Springfield-Branson National P 43 $ 1,495,386 $ 1,495,386 $ - $ - Construct Terminal Building [Parts B & C]CE ACE MO SGF Springfield-Branson National P 44 $ 5,474,454 $ - $ 5,474,454 $ - Rehabilitate Runway [Reconstruct] - 14/32CE ACE MO SGF Springfield-Branson National P 42 $ 859,856 $ - $ 859,856 $ - Rehabilitate Runway [Design] - 14/32CE ACE MO SGF Springfield-Branson National P 41 $ 672,428 $ - $ 672,428 $ - Conduct Airport Master Plan StudyCE ACE MO *MOS State of Missouri 7 $ 380,000 $ - $ 380,000 $ - Conduct State System Plan Study

CE ACE NE AUH Aurora Municipal - Al Potter Field GA 8 $ 421,339 $ 421,339 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate TaxiwayCE ACE NE BIE Beatrice Municipal GA 14 $ 474,879 $ 428,624 $ 46,255 $ - Rehabilitate Runway - 17/35CE ACE NE BTA Blair Municipal GA 10 $ 256,500 $ 256,500 $ - $ - Acquire Miscellaneous LandCE ACE NE FNB Brenner Field GA 7 $ 38,950 $ 38,950 $ - $ - Acquire Miscellaneous Land [Tract 22 Whitten]CE ACE NE HDE Brewster Field GA 8 $ 584,342 $ 584,342 $ - $ - Construct Building [Phase 1]

CE ACE NE 07K

Central City Municipal - Larry Reineke

Field GA 3 $ 91,200 $ 91,200 $ - $ - Construct Taxiway [Phase 1 Design]CE ACE NE GRI Central Nebraska Regional CS 33 $ 23,750 $ 23,750 $ - $ - Wildlife Hazard Assessments [Wildlife Hazard Assessment Study]CE ACE NE GRI Central Nebraska Regional CS 32 $ 379,385 $ 379,385 $ - $ - Rehabilitate Taxiway [PH 2 Part B Construction]CE ACE NE CDR Chadron Municipal GA 11 $ 28,500 $ 28,500 $ - $ - Wildlife Hazard AssessmentsCE ACE NE OLU Columbus Municipal GA 7 $ 242,250 $ 242,250 $ - $ - Update Airport Master Plan Study

CE ACE NE BUB Cram Field GA 4 $ 84,170 $ 84,170 $ - $ - Acquire Land for Development [Tract 7a, 7b, 8a, 8b (Mattley) Tract 9a, 9b (Larsen)]

CE ACE NE 93Y David City Municipal GA 7 $ 175,000 $ 175,000 $ - $ - Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 14/32CE ACE NE OMA Eppley Airfield P 56 $ 8,190,000 $ - $ 8,190,000 $ - Rehabilitate Taxiway [Taxiway S-South, E]CE ACE NE OMA Eppley Airfield P 55 $ 6,307,500 $ - $ 6,307,500 $ - Rehabilitate Taxiway [Taxiway S-North (phase 2), L-North]CE ACE NE OMA Eppley Airfield P 54 $ 6,225,000 $ 4,917,504 $ 1,307,496 $ - Rehabilitate Taxiway [Taxiway S-North, Taxiway L-South]CE ACE NE FBY Fairbury Municipal GA 9 $ 184,300 $ 184,300 $ - $ - Update Airport Master Plan Study

Page 8 of 97

Page 9: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE NE FET Fremont Municipal GA 10 $ 3,654,240 $ 2,827,811 $ 826,429 $ - Rehabilitate Runway - 14/32CE ACE NE HSI Hastings Municipal GA 12 $ 434,000 $ 434,000 $ - $ - Construct Fuel Farm

CE ACE NE HJH Hebron Municipal GA 6 $ 92,150 $ 92,150 $ - $ -

Acquire Miscellaneous Land [Tract 7b (Country Club) Tract 7c, 7d (Kniep) Tract 8

(Bohling)]CE ACE NE IML Imperial Municipal GA 9 $ 276,000 $ 276,000 $ - $ - Construct Fuel FarmCE ACE NE OFK Karl Stefan Memorial GA 17 $ 1,500,000 $ 1,500,000 $ - $ - Rehabilitate Runway - 01/19CE ACE NE EAR Kearney Regional P 24 $ 44,852 $ 44,852 $ - $ - Acquire Easement For Approaches

CE ACE NE IBM Kimball Municipal/Robert E Arraj Field GA 6 $ 1,666,758 $ 916,197 $ 750,561 $ - Construct TaxiwayCE ACE NE LNK Lincoln P 42 $ 1,334,351 $ 1,334,351 $ - $ - Construct Taxiway, Rehabilitate TaxiwayCE ACE NE LNK Lincoln P 43 $ 217,400 $ 217,400 $ - $ - Acquire Emergency GeneratorCE ACE NE 0F4 Loup City Municipal GA 4 $ 1,473,557 $ 593,915 $ 879,642 $ - Rehabilitate Runway [PH- II Construction] - 16/34CE ACE NE MLE Millard R 7 $ 408,500 $ 408,500 $ - $ - Rehabilitate Runway - 12/30CE ACE NE VTN Miller Field GA 7 $ 200,450 $ 200,450 $ - $ - Update Airport Master Plan StudyCE ACE NE 9V5 Modisett GA 4 $ 223,000 $ 223,000 $ - $ - Install Runway Vertical/Visual Guidance System - 14/32CE ACE NE AFK Nebraska City Municipal GA 12 $ 38,950 $ 38,950 $ - $ - Construct Taxiway [PH 1 Design]

CE ACE NE LBF

North Platte Regional Airport Lee Bird

Field P 26 $ 3,242,859 $ 1,000,000 $ 2,242,859 $ - Rehabilitate Runway - 17/35CE ACE NE 0C4 Pender Municipal GA 7 $ 456,000 $ 456,000 $ - $ - Rehabilitate TaxiwayCE ACE NE RBE Rock County GA 9 $ 608,845 $ 608,845 $ - $ - Construct Building, Remove ObstructionsCE ACE NE OGA Searle Field GA 7 $ 110,468 $ 110,468 $ - $ - Construct Building [lookback]

CE ACE NE SNY Sidney Municipal/Lloyd W. Carr Field GA 4 $ 4,139,900 $ 450,000 $ 3,689,900 $ - Rehabilitate Runway [Phase II Construction] - 13/31CE ACE NE *NES State of Nebraska 17 $ 40,604 $ - $ 40,604 $ - Update State System Plan StudyCE ACE NE *NES State of Nebraska 16 $ 109,250 $ - $ 109,250 $ - Update State System Plan StudyCE ACE NE *NES State of Nebraska 18 $ 133,000 $ - $ 133,000 $ - Conduct aeronautical survey for WAAS approach

CE ACE NE 8V2 Stuart-Atkinson Municipal GA 5 $ 1,877,000 $ 436,840 $ 1,440,160 $ - Rehabilitate Runway [Phase II Construction Reconstruct (shift Runway)] - 11/29CE ACE NE 12K Superior Municipal GA 4 $ 1,941,000 $ 499,680 $ 1,441,320 $ - Install Taxiway Lighting, Rehabilitate Runway [Construct] - 14/32

CE ACE NE ONL The O'Neill Municipal-John L Baker Field GA 8 $ 2,286,568 $ 150,000 $ 2,136,568 $ - Construct Runway [Pave runway 4-22] - 04/22, Rehabilitate Apron, Rehabilitate TaxiwayCE ACE NE AHQ Wahoo Municipal GA 8 $ 41,202 $ 41,202 $ - $ - Acquire Snow Removal EquipmentCE ACE NE AHQ Wahoo Municipal GA 9 $ 135,606 $ 135,606 $ - $ - Install Weather Reporting Equipment

CE ACE NE LCG Wayne Municipal GA 12 $ 4,090,000 $ 1,120,821 $ 2,969,179 $ -

Rehabilitate Apron [Ph 2 - Construct], Rehabilitate Runway [Construction] - 04/22,

Rehabilitate Runway [Consturction] - 17/35, Rehabilitate Taxiway [consturction]

CE ACE NE BFF

Western Nebraska Regional/William B.

Heilig Field P 32 $ 1,009,497 $ 1,009,497 $ - $ - Acquire Snow Removal Equipment

Page 9 of 97

Page 10: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

CE ACE NE BFF

Western Nebraska Regional/William B.

Heilig Field P 31 $ 715,000 $ 715,000 $ - $ - Construct Snow Removal Equipment Building

CE ACE NE JYR York Municipal GA 11 $ 268,000 $ 268,000 $ - $ - Install Runway Lighting - 17/35, Install Runway Vertical/Visual Guidance System - 17/35EA BEC WV 48I Braxton County GA 15 $ 590,498 $ 590,498 $ - $ - Construct Access RoadEA BEC WV MRB Eastern WV Regional/Shepherd Field R 28 $ 150,000 $ 150,000 $ - $ - Acquire Miscellaneous LandEA BEC WV MRB Eastern WV Regional/Shepherd Field R 27 $ 184,230 $ - $ 184,230 $ - Conduct Noise Compatibility Plan Study

EA BEC WV EKN

Elkins-Randolph County-Jennings

Randolph Field GA 18 $ 246,298 $ 246,298 $ - $ - Acquire Land For Approaches, Install Perimeter Fencing

EA BEC WV EKN

Elkins-Randolph County-Jennings

Randolph Field GA 19 $ 485,126 $ 485,126 $ - $ - Improve Airport Drainage, Remove ObstructionsEA BEC WV 4G7 Fairmont Municipal-Frankman Field GA 11 $ 94,380 $ 94,380 $ - $ - Construct Taxiway [Design]EA BEC WV 4G7 Fairmont Municipal-Frankman Field GA 10 $ 94,380 $ 94,380 $ - $ - Construct Apron [EA]EA BEC WV LWB Greenbrier Valley CS 29 $ 4,750,000 $ 150,000 $ 4,600,000 $ - Rehabilitate Runway - 04/22EA BEC WV LWB Greenbrier Valley CS 28 $ 100,000 $ - $ 100,000 $ - Wildlife Hazard AssessmentsEA BEC WV I16 Kee Field GA 14 $ 42,365 $ 42,365 $ - $ - Remove Obstructions [Study]

EA BEC WV 6L4 Logan County GA 10 $ 615,882 $ 340,882 $ 275,000 $ -

Install Airport Beacons, Rehabilitate Runway Lighting [Construct] - 06/24, Rehabilitate

Taxiway Lighting [Construct]EA BEC WV 3I2 Mason County GA 17 $ 183,120 $ 183,120 $ - $ - Install Runway Vertical/Visual Guidance System - 07/25EA BEC WV BLF Mercer County GA 23 $ 53,192 $ 53,192 $ - $ - Rehabilitate Apron [Design]EA BEC WV PKB Mid-Ohio Valley Regional CS 38 $ 68,400 $ 68,400 $ - $ - Install Perimeter Fencing [Design]EA BEC WV PKB Mid-Ohio Valley Regional CS 36 $ 370,787 $ 370,787 $ - $ - Rehabilitate Runway Lighting - 03/21EA BEC WV PKB Mid-Ohio Valley Regional CS 37 $ 73,215 $ - $ 73,215 $ - Wildlife Hazard Assessments

EA BEC WV MGW

Morgantown Municipal-Walter L. Bill

Hart Field P 32 $ 610,254 $ 610,254 $ - $ - Rehabilitate Terminal Building

EA BEC WV MGW

Morgantown Municipal-Walter L. Bill

Hart Field P 31 $ 389,746 $ 389,746 $ - $ - Update Airport Master Plan StudyEA BEC WV +08V New (Replacement) 4 $ 507,357 $ 357,974 $ 149,383 $ - Construct New Airport [Perimeter Fencing]

EA BEC WV 79D Philippi/Barbour County Regional GA 11 $ 91,490 $ 91,490 $ - $ - Acquire Easement For Approaches, Remove Obstructions [Runway 8-26 TSS]EA BEC WV BKW Raleigh County Memorial CS 26 $ 66,456 $ 66,456 $ - $ - Expand Apron [EA]EA BEC WV BKW Raleigh County Memorial CS 27 $ 145,287 $ 145,287 $ - $ - Acquire Snow Removal EquipmentEA BEC WV HTS Tri-State/Milton J. Ferguson Field P 43 $ 1,626,904 $ 415,848 $ 1,211,056 $ - Rehabilitate Apron, Rehabilitate Runway [Design] - 12/30EA BEC WV HTS Tri-State/Milton J. Ferguson Field P 42 $ 906,838 $ 906,838 $ - $ - Construct Taxiway [Construct]EA BEC WV HTS Tri-State/Milton J. Ferguson Field P 45 $ 563,933 $ 563,933 $ - $ - Update Airport Master Plan StudyEA BEC WV HTS Tri-State/Milton J. Ferguson Field P 44 $ 92,140 $ - $ 92,140 $ - Wildlife Hazard AssessmentsEA BEC WV W22 Upshur County Regional GA 23 $ 109,474 $ 109,474 $ - $ - Rehabilitate Apron [Design & Construct], Rehabilitate Runway - 11/29EA BEC WV W22 Upshur County Regional GA 24 $ 234,426 $ 234,426 $ - $ - Update Airport Master Plan StudyEA BEC WV HLG Wheeling Ohio County GA 27 $ 3,043,800 $ 150,000 $ 2,893,800 $ - Improve Runway Safety Area [Construct] - 03/21

Page 10 of 97

Page 11: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA BEC WV CRW Yeager P 48 $ 2,589,000 $ - $ - $ 2,589,000 Improve Terminal Building [Phase II, Pedestrian access bridge.]EA BEC WV CRW Yeager P 46 $ 1,519,902 $ 1,519,902 $ - $ - Extend Taxiway, Remove Obstructions [Land Acquisition Services]EA BEC WV CRW Yeager P 47 $ 131,409 $ 131,409 $ - $ - Improve Airport DrainageEA HAR DE 33N Delaware Airpark GA 14 $ 1,583,555 $ 661,838 $ 921,717 $ - Construct Runway [Land Acquisition (Lots C, D & A), Phase VIII] - 09/27EA HAR DE ILG New Castle R 30 $ 45,524 $ 45,524 $ - $ - Wildlife Hazard Assessments

EA HAR DE ILG New Castle R 31 $ 3,679,042 $ 291,476 $ 3,387,566 $ -

Extend Taxiway [Taxiway H (to include reconstruct) - design/construct], Remove

Obstructions [Off Airport - easements/appraisals]EA HAR DE *DES State of Delaware 8 $ 153,900 $ - $ 153,900 $ - Conduct State System Plan StudyEA HAR DE GED Sussex County GA 25 $ 227,712 $ 227,712 $ - $ - Extend Runway [Environmental] - 04/22

EA HAR DE GED Sussex County GA 24 $ 50,804 $ 50,804 $ - $ - Conduct Miscellaneous Study [Feasibility Study to Extend Runway 4/22]EA HAR NJ ACY Atlantic City International P 80 $ 153,837 $ 153,837 $ - $ - Environmental Mitigation [Phase VII (4th year monitoring)]EA HAR NJ ACY Atlantic City International P 79 $ 324,097 $ 324,097 $ - $ - Update Airport Master Plan Study [Phase II]EA HAR NJ WWD Cape May County GA 29 $ 357,675 $ 198,000 $ 159,675 $ - Update Airport Master Plan Study [ALP Update]EA HAR NJ WWD Cape May County GA 30 $ 904,949 $ 566,668 $ 338,281 $ - Rehabilitate Taxiway [Taxiway A]EA HAR NJ CDW Essex County R 32 $ 551,000 $ 551,000 $ - $ - Remove Obstructions [On & Off Airport (construction), Phase V]

EA HAR NJ 4N1 Greenwood Lake GA 7 $ 272,175 $ 272,175 $ - $ -

Rehabilitate Runway [Crack Repair] - 06/24, Rehabilitate Taxiway [Parallel Taxiway (crack

repair)], Rehabilitate Taxiway [Taxilanes]EA HAR NJ N81 Hammonton Municipal GA 17 $ 649,685 $ 649,685 $ - $ - Rehabilitate Runway [Construct] - 03/21

EA HAR NJ N12 Lakewood GA 12 $ 25,887 $ 25,887 $ - $ - Install Perimeter Fencing [Wetland Monitoring Runway 24 End, Phase IV]EA HAR NJ N12 Lakewood GA 11 $ 52,447 $ 52,447 $ - $ - Conduct Environmental Study [Phase III]EA HAR NJ N07 Lincoln Park R 8 $ 120,650 $ 120,650 $ - $ - Conduct Miscellaneous Study [Feasibility Study]EA HAR NJ LDJ Linden R 14 $ 190,000 $ 190,000 $ - $ - Update Airport Master Plan StudyEA HAR NJ MIV Millville Municipal GA 31 $ 310,015 $ 310,015 $ - $ - Update Airport Master Plan Study [ALP Update]

EA HAR NJ MIV Millville Municipal GA 32 $ 1,920,545 $ 750,000 $ 1,170,545 $ -

Construct Taxiway [T-hangar Taxiway (Construct)], Rehabilitate Taxiway [Construct,

Phase III]

EA HAR NJ MMU Morristown Municipal R 43 $ 3,088,266 $ 1,252,427 $ 1,835,839 $ - Install Airfield Guidance Signs, Rehabilitate Taxiway [Taxiway A - construct]EA HAR NJ 26N Ocean City Municipal GA 16 $ 66,856 $ 66,856 $ - $ - Rehabilitate Runway [Install Artificial Turf (design)] - 06/24

EA HAR NJ 26N Ocean City Municipal GA 17 $ 665,974 $ 383,731 $ 282,243 $ -

Install Airfield Guidance Signs [Construct], Install Runway Vertical/Visual Guidance

System [PAPI] - 06/24, Rehabilitate Runway Lighting [Construct] - 06/24, Rehabilitate

Taxiway Lighting [Construct]

EA HAR NJ MJX Robert J. Miller Air Park GA 21 $ 1,589,350 $ 722,269 $ 867,081 $ -

Install Airfield Guidance Signs [Construct], Rehabilitate Taxiway Lighting [Lighting &

Signage, Construct]EA HAR NJ SMQ Somerset R 10 $ 139,872 $ 139,872 $ - $ - Remove Obstructions [Construct]EA HAR NJ TTN Trenton Mercer GA 37 $ 3,092,337 $ 974,621 $ 2,117,716 $ - Rehabilitate Taxiway [Taxiways A, C & J (construct), Phase III]EA HAR PA AGC Allegheny County R 26 $ 438,002 $ - $ 438,002 $ - Collect airport data for Airports Geographic Information System

Page 11 of 97

Page 12: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA HAR PA AGC Allegheny County R 25 $ 213,061 $ 213,061 $ - $ - Remove Obstructions [Survey/Environmental]EA HAR PA AGC Allegheny County R 27 $ 2,791,237 $ 555,344 $ 2,235,893 $ - Rehabilitate Apron [Main Apron, Design & Construct]EA HAR PA AOO Altoona-Blair County P 37 $ 342,851 $ 342,851 $ - $ - Acquire Snow Removal Equipment [Carrier Vehicle & Broom Sweeper]EA HAR PA AOO Altoona-Blair County P 38 $ 68,571 $ 68,571 $ - $ - Wildlife Hazard Assessments

EA HAR PA LBE Arnold Palmer Regional P 38 $ 696,825 $ 696,825 $ - $ -

Expand Aircraft Rescue & Fire Fighting Building [Construct], Rehabilitate Access Road

[Construction]

EA HAR PA LBE Arnold Palmer Regional P 37 $ 462,175 $ 462,175 $ - $ -

Expand Aircraft Rescue & Fire Fighting Building [Design], Install Runway Vertical/Visual

Guidance System [Modify MALSR on RW 23 Approach, Phase II] - 05/23, Rehabilitate

Access Road [Including Parking Area], Rehabilitate Runway [Crack Sealing - prep work] -

05/23, Rehabilitate Taxiway [Parallel Taxiway - prep work]EA HAR PA LBE Arnold Palmer Regional P 36 $ 94,935 $ 94,935 $ - $ - Wildlife Hazard Assessments

EA HAR PA BFD Bradford Regional CS 37 $ 237,951 $ 237,951 $ - $ -

Acquire Snow Removal Equipment [Replace Plow], Rehabilitate Runway [Crack

Sealing/Marking] - 14/32, Rehabilitate Runway [Marking] - 05/23EA HAR PA CXY Capital City R 23 $ 963,209 $ 557,516 $ 405,693 $ - Rehabilitate Runway [Construct] - 08/26EA HAR PA *PAS Commonwealth of Pennsylvania 9 $ 438,598 $ - $ 438,598 $ - Conduct State System Plan StudyEA HAR PA @01N Delaware Valley Region 11 $ 150,000 $ - $ 150,000 $ - Conduct Metropolitan System Plan Study [CASP XXVIII]

EA HAR PA DUJ Dubois Regional CS 31 $ 178,900 $ 178,900 $ - $ -

Rehabilitate Apron [Terminal Apron], Rehabilitate Runway - 07/25, Rehabilitate Taxiway

[Taxiways A, B & C]

EA HAR PA ERI Erie International/Tom Ridge Field P 53 $ 5,990,221 $ 763,534 $ 5,226,687 $ -

Acquire Land For Approaches [Runway 6.24, Phase V], Extend Runway [Phase VIII] -

06/24, Improve Runway Safety Area [Phase V] - 06/24

EA HAR PA ERI Erie International/Tom Ridge Field P 51 $ 617,234 $ 617,234 $ - $ -

Acquire Land For Approaches [Runway 6/24, Phase IV], Construct Sand and Chemical

Storage BuildingEA HAR PA ERI Erie International/Tom Ridge Field P 54 $ 47,500 $ 47,500 $ - $ - Wildlife Hazard Assessments [(Plan)]EA HAR PA N68 Franklin County Regional GA 11 $ 460,350 $ 460,350 $ - $ - Rehabilitate Runway Lighting - 06/24, Rehabilitate Taxiway Lighting

EA HAR PA N68 Franklin County Regional GA 10 $ 42,512 $ 42,512 $ - $ - Install Runway Vertical/Visual Guidance System [24 End PAPI (design)] - 06/24EA HAR PA W05 Gettysburg Regional GA 7 $ 183,312 $ 183,312 $ - $ - Construct Apron [South Aircraft Parking Apron (final design)]EA HAR PA MDT Harrisburg International P 59 $ 84,489 $ 84,489 $ - $ - Environmental Mitigation [Wastewater Treatment Facility]

EA HAR PA MDT Harrisburg International P 61 $ 922,469 $ 922,469 $ - $ - Improve Airport Drainage [Flood Pumps], Rehabilitate Taxiway [Taxiway A]

EA HAR PA MDT Harrisburg International P 63 $ 2,020,195 $ 729,195 $ 1,291,000 $ -

Acquire Land for Noise Compatibility within 65 - 69 DNL [50 Persons Benefiting, Phase

III]

EA HAR PA MDT Harrisburg International P 60 $ 2,476,084 $ 2,476,084 $ - $ - Rehabilitate Access Road [Arch Calvert (design)], Rehabilitate Apron [Cargo Apron]EA HAR PA MDT Harrisburg International P 62 $ 91,717 $ 91,717 $ - $ - Wildlife Hazard AssessmentsEA HAR PA LNS Lancaster GA 33 $ 73,675 $ 73,675 $ - $ - Wildlife Hazard AssessmentsEA HAR PA LNS Lancaster GA 34 $ 577,085 $ 107,085 $ 470,000 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Foam Response Unit]

Page 12 of 97

Page 13: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA HAR PA ABE Lehigh Valley International P 85 $ 1,170,256 $ 1,170,256 $ - $ - Acquire Land for Development [WBF Inverse (legal fees)]

EA HAR PA ABE Lehigh Valley International P 86 $ 1,648,347 $ 1,648,347 $ - $ - Acquire Land for Development [WBF Inverse Condemnation-reimbursement]EA HAR PA ABE Lehigh Valley International P 87 $ 2,548,065 $ - $ 2,548,065 $ - VALE Infrastructure

EA HAR PA ABE Lehigh Valley International P 82 $ 1,047,873 $ - $ 1,047,873 $ - Noise Mitigation Measures for Public Buildings [142 Persons Benefiting]EA HAR PA PNE Northeast Philadelphia R 17 $ 1,160,264 $ 309,947 $ 850,317 $ - Rehabilitate Taxiway [Taxiways F, H, J, G]

EA HAR PA *PAB Pennsylvania State Block Grant Program 53 $ 1,065,822 $ - $ 1,065,822 $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 54 $ 3,000,000 $ 3,000,000 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 52 $ 4,974,417 $ 4,974,417 $ - $ - Non primary development projects in state block grant program

EA HAR PA *PAB Pennsylvania State Block Grant Program 51 $ 3,000,000 $ 3,000,000 $ - $ - Non primary development projects in state block grant programEA HAR PA PHL Philadelphia International P 95 $ 2,092,409 $ 2,092,409 $ - $ - Rehabilitate Runway [(design)] - 09L/27REA HAR PA PHL Philadelphia International P 96 $ 1,033,722 $ - $ 1,033,722 $ - VALE Infrastructure [GPU]

EA HAR PA PHL Philadelphia International P 94 $ 5,449,600 $ - $ 5,449,600 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [342 Persons Benefiting,

Phase VII]EA HAR PA PIT Pittsburgh International P 109 $ 4,041,200 $ 1,373,996 $ 2,667,204 $ - Rehabilitate Runway [Phase IV] - 14/32EA HAR PA PIT Pittsburgh International P 107 $ 382,901 $ 382,901 $ - $ - Update Airport Master Plan StudyEA HAR PA PIT Pittsburgh International P 108 $ 1,048,000 $ - $ 1,048,000 $ - Collect airport data for Airports Geographic Information SystemEA HAR PA PIT Pittsburgh International P 106 $ 481,500 $ 481,500 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Rescue 6]EA HAR PA PIT Pittsburgh International P 110 $ 78,578 $ - $ 78,578 $ - Safety Management System (SMS) Program

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 50 $ 689,248 $ 689,248 $ - $ - Update Airport Master Plan Study

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 48 $ 65,844 $ 65,844 $ - $ - Wildlife Hazard Assessments

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 49 $ 124,056 $ 124,056 $ - $ - Rehabilitate Taxiway [Taxiway H and E (design)]

EA HAR PA FWQ Rostraver R 16 $ 64,434 $ 64,434 $ - $ -

Rehabilitate Runway [Crack Sealing - prep work] - 08/26, Rehabilitate Taxiway [Parallel

Taxiway]EA HAR PA FWQ Rostraver R 17 $ 142,500 $ 142,500 $ - $ - Acquire Snow Removal Equipment [Plow]EA HAR PA UNV University Park P 46 $ 251,691 $ 251,691 $ - $ - Construct Building [ATCT]

EA HAR PA UNV University Park P 48 $ 864,941 $ 864,941 $ - $ -

Acquire Aircraft Deicing Equipment, Acquire Friction Measuring Equipment, Acquire

Snow Removal Equipment [Carrier Unit]EA HAR PA UNV University Park P 50 $ 81,580 $ - $ 81,580 $ - VALE Vehicle [Two Vehicles]

Page 13 of 97

Page 14: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA HAR PA UNV University Park P 49 $ 718,743 $ 718,743 $ - $ -

Acquire Equipment [Install ATCT Equipment], Rehabilitate Apron [General Aviation

Apron], Rehabilitate Runway [Crack Sealing & Marking] - 06/24, Rehabilitate Taxiway

EA HAR PA AVP Wilkes-Barre/Scranton International P 53 $ 5,546,366 $ 1,253,620 $ 4,292,746 $ - Construct Apron [South GA Apron - construct]

EA HAR PA AVP Wilkes-Barre/Scranton International P 52 $ 706,050 $ 706,050 $ - $ - Construct Apron [South GA Apron - design], Rehabilitate Apron [General Aviation Apron]EA HAR PA IPT Williamsport Regional P 38 $ 389,500 $ 389,500 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleEA HAR PA IPT Williamsport Regional P 39 $ 600,400 $ 600,400 $ - $ - Extend Taxiway [Taxiway D (construct)]EA NYC NJ EWR Newark Liberty International P 124 $ 4,219,283 $ 4,219,283 $ - $ - Rehabilitate Runway [Phase IV] - 11/29EA NYC NJ EWR Newark Liberty International P 125 $ 18,803,594 $ - $ 18,803,594 $ - Noise Mitigation Measures for Public Buildings

EA NYC NJ EWR Newark Liberty International P 126 $ 1,961,100 $ 1,961,100 $ - $ -

Rehabilitate Taxiway [Rehabilitate Taxiway A - between RA & RC and Portions of K, M, Q

& PA]EA NYC NJ EWR Newark Liberty International P 127 $ 191,157 $ - $ 191,157 $ - Identify the airport's environmental footprintEA NYC NJ EWR Newark Liberty International P 128 $ 1,646,515 $ 1,646,515 $ - $ - Widen TaxiwayEA NYC NJ TEB Teterboro R 45 $ 2,995,193 $ 75,000 $ 2,920,193 $ - Improve Runway Safety Area [Phase IV] - 01/19EA NYC NJ TEB Teterboro R 46 $ 109,711 $ 75,000 $ 34,711 $ - Identify the airport's environmental footprint

EA NYC NY SLK Adirondack Regional CS 49 $ 61,750 $ - $ 61,750 $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Management Study]EA NYC NY SLK Adirondack Regional CS 48 $ 257,372 $ 257,372 $ - $ - Acquire Snow Removal Equipment [Replace Front End Loader]

EA NYC NY SLK Adirondack Regional CS 50 $ 190,000 $ 190,000 $ - $ -

Expand Aircraft Rescue & Fire Fighting Building [ARFF/SRE Building Expansion (Design

Only) - Phase II], Improve Airport Drainage [Airport Drainage Study]

EA NYC NY 9G3 Akron R 16 $ 42,092 $ 42,092 $ - $ -

Acquire Land for Development [Land Commitment Credit-Final Design & Permits Rwy 11-

29], Construct Runway [R/W 11/29 Rehabilitation/Paving Final Design & Permits] - 11/29

EA NYC NY 9G3 Akron R 17 $ 146,154 $ 146,154 $ - $ -

Acquire Land for Development [Land Commitment Credit - Obstruction Removal

Construction], Remove Obstructions [R/W 25 Obstruction Removal Construction]

EA NYC NY ALB Albany International P 107 $ 2,141,800 $ 2,141,800 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [One ARFF Truck (3,000 Gallon Capacity)],

Acquire Snow Removal Equipment [Two High Capacity Snow Brooms and One Runway

Snow-Blower]

EA NYC NY ALB Albany International P 108 $ 2,545,232 $ 2,263,138 $ 282,094 $ -

Rehabilitate Apron [Rehabilitate Terminal Ramp], Rehabilitate Taxiway [Taxiway A, B, D,

E and F & Ramp Rehabilitation (Approx. 7,400 LF)]EA NYC NY 23N Bayport Aerodrome GA 11 $ 40,133 $ 40,133 $ - $ - Install Perimeter Fencing [Update Airport Perimeter Fencing]EA NYC NY HWV Brookhaven R 26 $ 353,235 $ 300,000 $ 53,235 $ - Remove Obstructions [Obstructions Removal Phase II]

EA NYC NY 9G0 Buffalo Airfield R 21 $ 892,913 $ 892,913 $ - $ -

Acquire Land for Development [Land Commitment Credit], Rehabilitate Apron

[Construction], Rehabilitate Taxiway [Construction]

Page 14 of 97

Page 15: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY BUF Buffalo Niagara International P 75 $ 463,560 $ 463,560 $ - $ -

Rehabilitate Runway Lighting [Rehabilitate Runway Lighting Vault Electrical Equipment] -

05/23EA NYC NY BUF Buffalo Niagara International P 72 $ 192,365 $ 192,365 $ - $ - Rehabilitate Taxiway [Construction Phase 2]

EA NYC NY BUF Buffalo Niagara International P 71 $ 4,616,639 $ - $ 4,616,639 $ -

Noise Mitigation Measures for Public Buildings [Construction], Noise Mitigation

Measures for Residences within 65 - 69 DNL [Construct 80 homes, Design 75 homes]EA NYC NY BUF Buffalo Niagara International P 70 $ 1,128,105 $ 1,128,105 $ - $ - Update Airport Master Plan StudyEA NYC NY BUF Buffalo Niagara International P 73 $ 117,000 $ 117,000 $ - $ - Rehabilitate Access Road [Design]

EA NYC NY BUF Buffalo Niagara International P 74 $ 59,981 $ - $ 59,981 $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Management Study]EA NYC NY D38 Canandaigua R 26 $ 361,950 $ 361,950 $ - $ - Extend Runway [Land for extension and RPZ (Phase 2)] - 13/31

EA NYC NY OLE Cattaraugus County-Olean GA 14 $ 205,200 $ 205,200 $ - $ -

Acquire Snow Removal Equipment [Acquire Snow Removal Equipment], Install Taxiway

Lighting [Design], Install Weather Reporting Equipment [Design]EA NYC NY OLE Cattaraugus County-Olean GA 13 $ 178,600 $ 178,600 $ - $ - Remove Obstructions [Perform Airport Obstruction Study]

EA NYC NY DKK Chautauqua County/Dunkirk GA 43 $ 302,005 $ 302,005 $ - $ -

Extend Runway [Extend Runway 24 & Parallel Taxiway including NAVAIDS and

Relocation of Newell Road - Design] - 06/24EA NYC NY DKK Chautauqua County/Dunkirk GA 42 $ 115,900 $ 115,900 $ - $ - Acquire Land For Approaches [Land acquisition]

EA NYC NY JHW Chautauqua County/Jamestown CS 38 $ 25,000 $ 25,000 $ - $ -

Acquire Friction Measuring Equipment [Acquire Friction Measuring Equipment], Install

Airfield Guidance Signs [Design]EA NYC NY JHW Chautauqua County/Jamestown CS 39 $ 296,400 $ 296,400 $ - $ - Acquire Snow Removal Equipment [Acquire SRE]

EA NYC NY 1B1 Columbia County GA 28 $ 458,850 $ 458,850 $ - $ - Rehabilitate Apron [South Apron Reconstruction - Phase II - Construction Only]

EA NYC NY 1B1 Columbia County GA 27 $ 454,100 $ 454,100 $ - $ -

Install Weather Reporting Equipment [Install New Windcone at the End of R/W 21],

Rehabilitate Apron [South Apron Reconstruction - Phase I - Construction Only]

EA NYC NY 1B1 Columbia County GA 29 $ 64,600 $ 64,600 $ - $ -

Remove Obstructions [R/W 21 RSA Improvements/Obstructions Removal - Prelim.

Design/Permits (EA) - Phase II]EA NYC NY 7N1 Corning-Painted Post GA 14 $ 35,150 $ 35,150 $ - $ - Construct Snow Removal Equipment Building [Design SRE Building]EA NYC NY 7N1 Corning-Painted Post GA 15 $ 290,605 $ 290,605 $ - $ - Construct Snow Removal Equipment Building [Construct SRE Building]EA NYC NY N03 Cortland County-Chase Field GA 17 $ 75,050 $ 75,050 $ - $ - Remove Obstructions [Design for off-airport obstruction removal]

EA NYC NY N03 Cortland County-Chase Field GA 16 $ 693,500 $ 693,500 $ - $ -

Remove Obstructions [Acquire land/easements for off-airport obstruction removal -

Phase 2]

EA NYC NY DSV Dansville Municipal GA 19 $ 183,350 $ 183,350 $ - $ -

Conduct Environmental Study [Prepare Environmental Assessment, with Preliminary

Engineering and Permitting, for Off-Airport Obstruction Removal]EA NYC NY DSV Dansville Municipal GA 20 $ 189,050 $ 189,050 $ - $ - Rehabilitate Runway [Design] - 18/36, Rehabilitate TaxiwayEA NYC NY POU Dutchess County GA 35 $ 624,150 $ 475,000 $ 149,150 $ - Acquire Aircraft Rescue & Fire Fighting VehicleEA NYC NY POU Dutchess County GA 34 $ 123,500 $ 123,500 $ - $ - Remove Obstructions [Study for Obstruction Removal]

Page 15 of 97

Page 16: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY POU Dutchess County GA 33 $ 147,250 $ 147,250 $ - $ - Rehabilitate Taxiway [Design]

EA NYC NY 0B8 Elizabeth Field GA 18 $ 214,700 $ 214,700 $ - $ -

Rehabilitate Runway [Rehabilitate runway (Filling and Sealing cracks- Design and

Construction)] - 12/30

EA NYC NY ELM Elmira/Corning Regional P 54 $ 3,619,696 $ 931,181 $ 2,688,515 $ -

Extend Runway [Preliminary Design Reimbursable Agreement with FAA] - 06/24,

Rehabilitate Apron [Rehabilitate Commercial Apron - (Construction)]EA NYC NY ELM Elmira/Corning Regional P 55 $ 688,750 $ 688,750 $ - $ - Extend Runway [Design] - 06/24

EA NYC NY 0G7 Finger Lakes Regional GA 20 $ 1,240,808 $ 829,764 $ 411,044 $ -

Rehabilitate Runway [Rehabilitation of Runway 1-19, Approx. 4600' x 75' (Construction)] -

01/19EA NYC NY 0G7 Finger Lakes Regional GA 19 $ 190,000 $ 190,000 $ - $ - Update Airport Master Plan Study

EA NYC NY GFL Floyd Bennett Memorial GA 45 $ 95,000 $ 38,000 $ 57,000 $ -

Improve Runway Safety Area [Runway 1 RSA Wetland Mitigation Site Monitoring] -

01/19, Install Runway Vertical/Visual Guidance System [Runway 12/30 PAPI Installation

(Design)] - 12/30, Runway Incursion Markings [Airfield Pavement Markings]

EA NYC NY GFL Floyd Bennett Memorial GA 46 $ 427,986 $ 427,986 $ - $ -

Acquire Snow Removal Equipment [Acquire Self-Propelled Blower], Expand Aircraft

Rescue & Fire Fighting Building [ARFF Building Expansion], Install Runway Sensors [Install

Runway 1-19 Surface Sensor System - Phase II] - 01/19EA NYC NY GFL Floyd Bennett Memorial GA 44 $ 646,000 $ - $ 646,000 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle]EA NYC NY FOK Francis S Gabreski GA 15 $ 2,965,050 $ 282,944 $ 2,682,106 $ - Rehabilitate Runway [Rehabilitate Runway 6-24 - Phase III] - 06/24

EA NYC NY GVQ Genesee County R 25 $ 608,960 $ 608,960 $ - $ - Acquire Land For Approaches [Land Acquisition R/W 10 RPZ (Phase IV)]

EA NYC NY GVQ Genesee County R 26 $ 89,300 $ 89,300 $ - $ - Construct Apron [Relocate Tie-down Apron (Approx. 60,000sf) - Design]

EA NYC NY GVQ Genesee County R 24 $ 419,900 $ 419,900 $ - $ - Construct Taxiway [Construct Taxiway/Apron (approx. 34,000sf) for T-hangar Access]

EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 60 $ 760,000 $ 760,000 $ - $ -

Improve Runway Safety Area [Improvements to Runway 16-34 Runway Safety Areas

(Design)] - 16/34

EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 59 $ 3,816,350 $ 628,439 $ 3,187,911 $ - Rehabilitate Apron [Rehabilitation of Terminal Apron]EA NYC NY ROC Greater Rochester International P 71 $ 4,273,724 $ 1,978,773 $ 2,294,951 $ - Extend Runway - 10/28EA NYC NY ROC Greater Rochester International P 70 $ 2,670,990 $ - $ 2,670,990 $ - Rehabilitate TaxiwayEA NYC NY ROC Greater Rochester International P 69 $ 2,645,364 $ 2,645,364 $ - $ - Extend Runway Safety Area - 10/28EA NYC NY RME Griffiss International GA 25 $ 95,000 $ - $ 95,000 $ - Rehabilitate Building [Nose Dock Rehabilitation (Design)]EA NYC NY RME Griffiss International GA 27 $ 118,750 $ 118,750 $ - $ - Improve Airport Drainage [Airport Drainage and Deicing Study]EA NYC NY RME Griffiss International GA 24 $ 190,000 $ 99,346 $ 90,654 $ - Rehabilitate Taxiway [Taxiway Rehabilitation (Design)]EA NYC NY RME Griffiss International GA 26 $ 2,302,265 $ - $ 2,302,265 $ - Rehabilitate Building [Nose Dock 783 Rehabilitation (Construction)]EA NYC NY VGC Hamilton Municipal GA 18 $ 47,816 $ 47,816 $ - $ - Expand Apron [Apron Expansion, 7,000 SY (Design Only)]EA NYC NY 4G6 Hornell Municipal GA 18 $ 365,940 $ 365,940 $ - $ - Expand Apron

Page 16 of 97

Page 17: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY ITH Ithaca Tompkins Regional P 53 $ 242,250 $ 242,250 $ - $ -

Expand Apron [Design Apron expansion (Ph2)], Light Obstructions [Obstruction Removal

Phase 4 (Install obstruction light towers)]EA NYC NY ITH Ithaca Tompkins Regional P 54 $ 100,000 $ 100,000 $ - $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Assessment]

EA NYC NY JFK John F Kennedy International P 169 $ 14,800,000 $ - $ 14,800,000 $ -

Construct Taxiway [DRP- High Speed Exit T/W PA, N & L Phase I], Construct Taxiway [DRP-

T/W PC, MB & M Fillet Improvements Phase I], Construct Taxiway [DRP-I-Ia Extension

T/W YA-Phase II], Construct Taxiway [DRP-II Extend T/W K-Phase II], Construct Taxiway

[DRP-IV T/W Access Improvements, R/W 31L-Phase II], Construct Taxiway [DRP-V SW

Quadrant T/W Imp. R/W 13R Phase II], Construct Taxiway [DRP-VI Construct K/KA

(Runway 4L Bypass)-Phase II]

EA NYC NY JFK John F Kennedy International P 171 $ 5,310,447 $ 5,310,447 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiway Y (Between Taxiway J and E)]EA NYC NY JFK John F Kennedy International P 170 $ 4,361,505 $ 4,361,505 $ - $ - Rehabilitate Taxiway [S,SC,SD,SR Phase III]EA NYC NY N89 Joseph Y Resnick GA 28 $ 133,190 $ 133,190 $ - $ - Update Airport Master Plan Study [ALP Update]EA NYC NY N89 Joseph Y Resnick GA 27 $ 54,340 $ 54,340 $ - $ - Construct Apron [Design]

EA NYC NY 20N Kingston-Ulster R 19 $ 62,944 $ 62,944 $ - $ -

Acquire Land for Development [Rehab. Rwy 15/33 (Design)], Rehabilitate Runway

[Design] - 15/33

EA NYC NY 20N Kingston-Ulster R 20 $ 98,873 $ 98,873 $ - $ -

Acquire Land for Development [Rwy. 33 obstruction removal], Remove Obstructions

[Runway end 33]EA NYC NY LGA La Guardia P 132 $ 2,824,698 $ 2,824,698 $ - $ - Security Enhancements [Phase IV]EA NYC NY LGA La Guardia P 134 $ 1,545,300 $ 1,545,300 $ - $ - Security Enhancements

EA NYC NY 5G0 Le Roy R 22 $ 39,364 $ 39,364 $ - $ -

Acquire Land for Development [Land Credit for AWOS & Segmented Circle], Install

Miscellaneous NAVAIDS [Design], Install Weather Reporting Equipment [Design]EA NYC NY ISP Long Island MacArthur P 82 $ 576,443 $ 576,443 $ - $ - Construct Taxiway [Design T/W's B,Dand A]

EA NYC NY ISP Long Island MacArthur P 81 $ 289,465 $ 289,465 $ - $ -

Construct Deicing Containment Facility [Glycol Tratment Plant - Design for the Option

Selected]EA NYC NY ISP Long Island MacArthur P 83 $ 876,913 $ 876,913 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan]EA NYC NY OIC Lt Warren Eaton GA 28 $ 131,100 $ 131,100 $ - $ - Rehabilitate Runway [Rehabilitate Runway - Design] - 01/19

EA NYC NY OIC Lt Warren Eaton GA 29 $ 42,750 $ 42,750 $ - $ - Widen Runway [Environmental Assessment for Runway 1-19 Widening] - 01/19EA NYC NY OIC Lt Warren Eaton GA 27 $ 154,850 $ 154,850 $ - $ - Remove Obstructions [Obstruction Study]EA NYC NY OIC Lt Warren Eaton GA 26 $ 308,750 $ 308,750 $ - $ - Construct Taxiway [Construction]

EA NYC NY MAL Malone-Dufort GA 23 $ 190,000 $ 190,000 $ - $ -

Construct Taxiway [Parallel Taxiway "B" - Phase II (Design Only)], Rehabilitate Runway

[Runway 14-32 Relocate/Displace Threshold (Design Only)] - 14/32

EA NYC NY MAL Malone-Dufort GA 24 $ 59,850 $ 59,850 $ - $ - Construct Runway [Runway 14-32 Relocate/Displace Threshold(Construction)] - 14/32

Page 17 of 97

Page 18: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY MSS Massena International-Richards Field GA 49 $ 87,400 $ 75,000 $ 12,400 $ - Security Enhancements [Security Fence Rehabilitation (Design)]

EA NYC NY MSS Massena International-Richards Field GA 51 $ 147,250 $ 147,250 $ - $ -

Remove Obstructions [Remove Obstructions - Phase I (On-Airport Obstruction Removal

Design & Permitting; Off-Airport Obstruction Removal Appraisals)]

EA NYC NY MSS Massena International-Richards Field GA 50 $ 85,500 $ - $ 85,500 $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Management Study]

EA NYC NY MSS Massena International-Richards Field GA 52 $ 776,000 $ - $ 776,000 $ - Security Enhancements [Security Fence Rehabilitation (Construction)]

EA NYC NY IAG Niagara Falls International R 36 $ 818,399 $ 818,399 $ - $ -

Improve Terminal Building [Acquisition and Installation of a new Passenger Boarding

Bridge]

EA NYC NY IAG Niagara Falls International R 35 $ 214,852 $ 214,852 $ - $ -

Construct Terminal Building [Reimbursement of Eligible Costs for Construction of New

Passenger Terminal (Phase 1)]EA NYC NY IAG Niagara Falls International R 34 $ 76,057 $ 76,057 $ - $ - Remove Obstructions [Phase 2]EA NYC NY IAG Niagara Falls International R 37 $ 14,037,797 $ - $ 14,037,797 $ - Improve Runway Safety Area [Design and Construction] - 06/24

EA NYC NY IAG Niagara Falls International R 33 $ 67,731 $ - $ 67,731 $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Management Study]

EA NYC NY OGS Ogdensburg International GA 38 $ 162,450 $ 162,450 $ - $ -

Remove Obstructions [Perform Environmental Assessment for Off Airport Obstruction

Removal]EA NYC NY OGS Ogdensburg International GA 39 $ 950,000 $ 950,000 $ - $ - Rehabilitate Taxiway [Taxiway A, B & C Rehabilitation (Construction)]EA NYC NY MGJ Orange County GA 33 $ 1,619,370 $ 587,160 $ 1,032,210 $ - Construct Runway [Land Acquisition] - 03/21EA NYC NY FZY Oswego County GA 34 $ 3,579,600 $ 268,457 $ 3,311,143 $ - Rehabilitate Runway [Runway 15-33 Overlay (Construction)] - 15/33

EA NYC NY FZY Oswego County GA 35 $ 49,400 $ 49,400 $ - $ - Remove Obstructions [Obstruction Removal and Lighting On-Airport - Phase I (Design)]EA NYC NY PEO Penn Yan GA 26 $ 40,660 $ 40,660 $ - $ - Construct Snow Removal Equipment Building [Design SRE Building]EA NYC NY PEO Penn Yan GA 27 $ 433,485 $ 433,485 $ - $ - Construct Snow Removal Equipment Building [Construct SRE Building]

EA NYC NY 01G Perry-Warsaw GA 23 $ 84,550 $ 84,550 $ - $ -

Rehabilitate Apron [Design], Rehabilitate Runway [Design] - 10/28, Rehabilitate Taxiway

[Design]EA NYC NY 01G Perry-Warsaw GA 22 $ 161,500 $ 161,500 $ - $ - Update Airport Master Plan Study [Update Master Plan]

EA NYC NY PBG Plattsburgh International P 33 $ 2,460,500 $ - $ 2,460,500 $ - Construct Utilities [MAP] [Fire Protection Water Supply Improvements (Construction)]

EA NYC NY PBG Plattsburgh International P 31 $ 503,500 $ 503,500 $ - $ -

Modify Building [Demolish Former Alert Facility - Phase II], Security Enhancements

[Install Security Fencing (Design)]

EA NYC NY PBG Plattsburgh International P 34 $ 1,189,400 $ - $ 1,189,400 $ - Improve Building [Hangar Renovations - Nose Dock #1 & 2 (Construction) - Phase II]EA NYC NY PBG Plattsburgh International P 32 $ 152,000 $ 20,847 $ 131,153 $ - Conduct Miscellaneous Study [APMS - Taxiways & Taxilanes]EA NYC NY PBG Plattsburgh International P 35 $ 583,300 $ 524,346 $ 58,954 $ - Security Enhancements [Install Security Fencing (Construction)]EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 25 $ 62,700 $ 62,700 $ - $ - Rehabilitate Taxiway [Reconstruct Taxiway "E" (Design)]

Page 18 of 97

Page 19: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 24 $ 194,750 $ 194,750 $ - $ -

Remove Obstructions [Prepare Environmental Assessment, with Preliminary Engineering

and Permitting, for on/off airport obstruction removal.]

EA NYC NY 06N Randall R 26 $ 192,073 $ 192,073 $ - $ -

Acquire Land for Development [RSA Improvements], Improve Runway Safety Area -

08/26EA NYC NY FRG Republic R 41 $ 88,676 $ - $ 88,676 $ - Wildlife Hazard Assessments [WHA Study]

EA NYC NY FRG Republic R 43 $ 545,671 $ - $ 545,671 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF vehicle Index 'B']

EA NYC NY FRG Republic R 42 $ 3,009,128 $ 636,197 $ 2,372,931 $ - Improve Runway Safety Area [Runway 32 EMAS Installation Phase I] - 14/32

EA NYC NY FRG Republic R 40 $ 4,370,000 $ - $ 4,370,000 $ -

Acquire Land For Approaches [Land Acquisition in proximity of Runway 19- Control of

the Runway Protection Zone.]EA NYC NY 5B2 Saratoga County GA 25 $ 659,567 $ 659,567 $ - $ - Remove Obstructions [Off-Airport-Phase II (Construction)]

EA NYC NY SCH Schenectady County R 45 $ 46,182 $ 46,182 $ - $ -

Remove Obstructions [Obstruction Removal - Phase III (Runway 22

Design/Construction)]EA NYC NY 44N Sky Acres R 22 $ 285,281 $ 285,281 $ - $ - Rehabilitate Runway Lighting - 17/35

EA NYC NY 1N2 Spadaro R 13 $ 84,383 $ 84,383 $ - $ - Remove Obstructions [On-Airport Obstructions Removal- Construction]EA NYC NY *NYS State of New York 9 $ 399,631 $ 399,631 $ - $ - Conduct State System Plan Study

EA NYC NY SWF Stewart International P 67 $ 2,857,512 $ - $ 2,857,512 $ - Rehabilitate Taxiway Lighting [Rehabilitate Taxiways Lighting - Phase II]

EA NYC NY SWF Stewart International P 66 $ 2,921,929 $ 2,921,929 $ - $ - Improve Airport Miscellaneous Improvements [Rehabilitate Airport WIP Circuitry]

EA NYC NY MSV Sullivan County International GA 28 $ 1,260,325 $ 1,260,325 $ - $ -

Rehabilitate Apron [Rehabilitate General Aviation Apron and two associated taxilanes -

Construction]EA NYC NY MSV Sullivan County International GA 26 $ 64,030 $ 64,030 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Design]EA NYC NY MSV Sullivan County International GA 27 $ 60,990 $ 48,397 $ 12,593 $ - Wildlife Hazard Assessments [Complete a Wildlife Assessment Study]

EA NYC NY SYR Syracuse Hancock International P 117 $ 116,850 $ 116,850 $ - $ - Remove Obstructions [On & Off Airport Obstruction Removal (Design Only)]EA NYC NY SYR Syracuse Hancock International P 116 $ 289,750 $ 289,750 $ - $ - Rehabilitate Apron [Rehabilitate Deicing Pads (Design Only)]EA NYC NY SYR Syracuse Hancock International P 115 $ 620,000 $ 620,000 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle]

EA NYC NY SYR Syracuse Hancock International P 114 $ 1,581,750 $ 1,581,750 $ - $ -

Security Enhancements [Security Fence (Construction)], Security Enhancements [Service

Road-Phase II(Construction)]

EA NYC NY SYR Syracuse Hancock International P 113 $ 3,975,750 $ 3,527,732 $ 448,018 $ - Rehabilitate Runway [Rehabilitate Runway Intersection - Phase II] - 10/28

EA NYC NY 4B6 Ticonderoga Municipal GA 19 $ 143,038 $ 143,038 $ - $ -

Construct Fuel Farm [Construct Fuel Farm (Design)], Improve Airport Drainage [Improve

Airport Drainage-Repair (Design)], Install Airfield Guidance Signs [Install Airfield

Guidance Signs (Design)], Rehabilitate Access Road [Rehabilitate Airport Access Road

(Design)]

Page 19 of 97

Page 20: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA NYC NY CZG Tri-Cities GA 19 $ 128,250 $ 128,250 $ - $ - Rehabilitate Apron [Apron Rehabilitation - Design]EA NYC NY CZG Tri-Cities GA 18 $ 670,045 $ 670,045 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxilane - Phase2 (Construction)]EA NYC NY ART Watertown International GA 34 $ 191,425 $ 191,425 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiway "B" South (Design)]

EA NYC NY ART Watertown International GA 32 $ 109,962 $ 109,962 $ - $ -

Modify Aircraft Rescue & Fire Fighting Building [Modify SRE/ARFF Building Renovations

(Part 139 Only)-Phase I]EA NYC NY ART Watertown International GA 33 $ 4,885,421 $ - $ 4,885,421 $ - Extend Runway [Extend Runway 10-28 (Construction)] - 10/28

EA NYC NY ELZ

Wellsville Municipal Airport,Tarantine

Field GA 24 $ 166,250 $ 166,250 $ - $ - Update Airport Master Plan Study [Perform Airport Master Plan Update]

EA NYC NY HPN Westchester County P 102 $ 196,632 $ 196,632 $ - $ -

Improve Runway Safety Area [Runway 16-34 Runway Safety Area Improvements (Work

area located adjacent to the south edge of Taxiway 'K' and west of Runway 16-34)] -

16/34

EA NYC NY HPN Westchester County P 101 $ 2,011,646 $ 2,011,646 $ - $ -

Rehabilitate Taxiway [rehabilitate Taxiway "L" from T/W "H" to South End of R/W 16/34 -

Phase II (Construction)]EA NYC NY SDC Williamson-Sodus R 24 $ 111,340 $ 111,340 $ - $ - Update Airport Master Plan Study

EA WAS DC DCA Ronald Reagan Washington National P 25 $ 10,050,000 $ - $ 10,050,000 $ - Improve Runway Safety Area [Phase 2, Construction] - 01/19

EA WAS DC DCA Ronald Reagan Washington National P 26 $ 4,333,723 $ 339,404 $ 3,994,319 $ - Improve Runway Safety Area [Phase 3, Construction] - 01/19EA WAS DC IAD Washington Dulles International P 43 $ 7,534,900 $ 3,534,900 $ 4,000,000 $ - Construct Runway [5/11] - Plan-1EA WAS DC IAD Washington Dulles International P 44 $ 3,127,514 $ 3,127,514 $ - $ - Construct Runway [5/11 - Part C] - Plan-1

EA WAS DC @008 Washington Metropolitan Area 7 $ 396,398 $ 396,398 $ - $ -

Conduct State System Plan Study [Update Ground Access Study Phase 1 / Passenger

Surveys Phase 1]EA WAS MD W29 Bay Bridge GA 20 $ 401,973 $ 401,973 $ - $ - Rehabilitate Runway [Relocate Threshold - Construct] - 11/29

EA WAS MD CGE Cambridge-Dorchester GA 25 $ 44,745 $ 44,745 $ - $ -

Extend Runway [Remove tree obstructions - Runway 34 End (Design & Final Inspection

Only)] - 16/34

EA WAS MD DMW

Carroll County Regional/Jack B Poage

Field R 25 $ 115,525 $ 115,525 $ - $ - Construct Runway [phase 1 property survey (west end)] - Plan-1EA WAS MD W41 Crisfield Municipal GA 8 $ 183,587 $ 183,587 $ - $ - Remove Obstructions [Land Acq Svcs Ph 2]EA WAS MD ESN Easton/Newnam Field GA 37 $ 388,064 $ 388,064 $ - $ - Remove Obstructions [Removal (Phase 1)]EA WAS MD ESN Easton/Newnam Field GA 36 $ 1,072,198 $ 1,072,198 $ - $ - Rehabilitate Apron [Construction Ph 2]

EA WAS MD CBE Greater Cumberland Regional GA 17 $ 190,549 $ 190,549 $ - $ -

Rehabilitate Runway [acquire land parcel 22 easement (white)] - 05/23, Rehabilitate

Runway [acquire land parcel 23 easement (lewis)] - 05/23, Rehabilitate Runway [acquire

land parcel 48 easement (steward)] - 05/23, Rehabilitate Runway [acquire land parcel 7

easement (bittinger)] - 05/23, Rehabilitate Runway [acquire land parcel 74 easement

(hall)] - 05/23, Rehabilitate Runway [acquire land parcel 75 easement (bittinger)] -

05/23, Rehabilitate Runway [acquire land parcel 85 easement (mctaggart)] - 05/23

Page 20 of 97

Page 21: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA WAS MD HGR

Hagerstown Regional-Richard A Henson

Field GA 44 $ 382,703 $ - $ 382,703 $ - Acquire Snow Removal Equipment

EA WAS MD HGR

Hagerstown Regional-Richard A Henson

Field GA 43 $ 925,000 $ 75,000 $ 850,000 $ - Extend Runway [construction phase 8] - 09/27

EA WAS MD HGR

Hagerstown Regional-Richard A Henson

Field GA 45 $ 75,000 $ 75,000 $ - $ - Extend Runway [construction phase 8 part 2] - 09/27

EA WAS MD 2W5 Maryland R 10 $ 432,217 $ 432,217 $ - $ -

Construct Runway [acquire land (fee) viars parcel (0.79 acre)] - Plan-1, Construct Runway

[acquire land (fee) viars parcel (1.12 acres)] - Plan-1

EA WAS MD GAI Montgomery County Airpark R 21 $ 2,651,921 $ 1,554,058 $ 1,097,863 $ -

Remove Obstructions [acquire arcel 23 MVA (appraisal only)], Remove Obstructions

[acquire parcel 11 (webb)]EA WAS MD OXB Ocean City Municipal GA 19 $ 381,284 $ 381,284 $ - $ - Rehabilitate Runway [Design] - 02/20

EA WAS MD SBY Salisbury-Ocean City Wicomico Regional P 44 $ 3,297,795 $ 1,447,608 $ 1,850,187 $ - Extend Runway [Construction Ph 2] - 14/32EA WAS VA MFV Accomack County GA 13 $ 118,750 $ 118,750 $ - $ - Remove Obstructions [(Environmental Assessment)]EA WAS VA MTV Blue Ridge GA 16 $ 88,984 $ 88,984 $ - $ - Expand Apron [Land Acquisition-Preliminary Services]EA WAS VA 0V4 Brookneal/Campbell County GA 4 $ 298,258 $ 298,258 $ - $ - Rehabilitate Apron [Construction]EA WAS VA CHO Charlottesville-Albemarle P 40 $ 3,812,207 $ 3,812,207 $ - $ - Extend Runway [RSA Embankment (Phase 1B)] - 03/21EA WAS VA CPK Chesapeake Regional GA 16 $ 731,500 $ 731,500 $ - $ - Remove Obstructions [Removal (Approach & Transitions)]EA WAS VA CPK Chesapeake Regional GA 15 $ 57,000 $ 57,000 $ - $ - Acquire Land For Approaches [Acqu Svcs]EA WAS VA CJR Culpeper Regional GA 19 $ 382,850 $ 382,850 $ - $ - Conduct Environmental Study

EA WAS VA DAN Danville Regional GA 25 $ 998,794 $ - $ 998,794 $ - Acquire Land For Approaches [Acquire Land - Phase 2 (D. Jones & Relocation)]EA WAS VA EMV Emporia-Greensville Regional GA 9 $ 201,400 $ 201,400 $ - $ - Rehabilitate Runway [ROFA Improvement (Environmental)] - 15/33

EA WAS VA FRR Front Royal-Warren County GA 13 $ 114,000 $ 114,000 $ - $ - Remove Obstructions [South Side-ROFA/Part77 (Land Acquisition Services)]EA WAS VA PVG Hampton Roads Executive R 12 $ 9,983,267 $ 1,359,254 $ 8,624,013 $ - Construct Runway [Construction Ph I] - 10/28

EA WAS VA OFP Hanover County Municipal GA 21 $ 469,300 $ 469,300 $ - $ - Acquire Land For Approaches [(Johnson)], Construct Taxiway [Acquire Land (Haw)]EA WAS VA HSP Ingalls Field GA 9 $ 289,054 $ 289,054 $ - $ - Remove Obstructions [Tree Clearing]EA WAS VA LKU Louisa County/Freeman Field GA 15 $ 201,400 $ 201,400 $ - $ - Rehabilitate Runway [Phase I (Design)] - 09/27

EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 34 $ 819,776 $ 819,776 $ - $ -

Improve Terminal Building [Replace Escalators - Construction Phase Services],

Rehabilitate Terminal Building [HVAC, Security Upgrades]

EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 33 $ 590,935 $ 590,935 $ - $ - Improve Terminal Building [Replace Escalators]

EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 34 $ 484,025 $ 484,025 $ - $ - Extend Taxiway [(Design)], Rehabilitate Taxiway [(Design)]

EA WAS VA HEF Manassas Regional/Harry P. Davis Field R 33 $ 927,062 $ 927,062 $ - $ - Extend Runway [(Design)] - 16L/34R

Page 21 of 97

Page 22: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

EA WAS VA MKJ Mountain Empire GA 19 $ 358,301 $ 358,301 $ - $ - Remove Obstructions [Land Acquisition Services (Part 77)]EA WAS VA PSK New River Valley GA 13 $ 4,738,885 $ 508,142 $ 4,230,743 $ - Rehabilitate Runway [Construction] - 06/24

EA WAS VA PHF

Newport News/Williamsburg

International P 43 $ 750,653 $ 750,653 $ - $ - Rehabilitate Runway [(Construction Reimbursement)] - 07/25

EA WAS VA PHF

Newport News/Williamsburg

International P 40 $ 1,496,937 $ 868,617 $ 628,320 $ -

Collect airport data for Airports Geographic Information System [Collect Airport Survey

Data for AGIS], Identify the airport's environmental footprint [Update Airport Master

Plan with Environmental Sustainability Component and AGIS Survey], Update Airport

Master Plan Study [Update Airport Master Plan]

EA WAS VA PHF

Newport News/Williamsburg

International P 41 $ 403,750 $ 403,750 $ - $ - Rehabilitate Runway Lighting [Design] - 07/25

EA WAS VA PHF

Newport News/Williamsburg

International P 42 $ 65,550 $ 65,550 $ - $ - Wildlife Hazard Assessments

EA WAS VA PHF

Newport News/Williamsburg

International P 39 $ 1,760,261 $ 1,760,261 $ - $ - Acquire Equipment, Expand Terminal Building [Aquisition/Construction]EA WAS VA RIC Richmond International P 58 $ 2,086,030 $ 2,086,030 $ - $ - Rehabilitate Taxiway [TWs H, F, K, R & C (Constr.)]EA WAS VA RIC Richmond International P 57 $ 4,589,755 $ 4,589,755 $ - $ - Rehabilitate Runway Lighting [(Constr.)] - 16/34

EA WAS VA RIC Richmond International P 56 $ 425,527 $ 425,527 $ - $ - Conduct Environmental Study [Environmental Assessment (5 Year Plan)]EA WAS VA ROA Roanoke Regional/Woodrum Field P 49 $ 608,105 $ 608,105 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Design]EA WAS VA ROA Roanoke Regional/Woodrum Field P 48 $ 370,826 $ 370,826 $ - $ - Acquire Snow Removal Equipment [Replacement Snow Broom]

EA WAS VA SHD Shenandoah Valley Regional CS 32 $ 82,092 $ 82,092 $ - $ - Install Runway Lighting [Design] - 05/23, Rehabilitate Parking Lot [Design]

EA WAS VA RMN Stafford Regional R 21 $ 83,784 $ 83,784 $ - $ - Acquire Easement For Approaches [(Horton Easement; Geslois Land Services)]EA WAS VA SFQ Suffolk Executive GA 17 $ 1,676,369 $ 1,676,369 $ - $ - Improve Runway Safety Area [Construction Ph 3 - Earthwork] - 04/22EA WAS VA XSA Tappahannock-Essex County GA 12 $ 181,480 $ 181,480 $ - $ - Improve Fuel Farm [(Construction Reimbursement)]EA WAS VA JFZ Tazewell County GA 14 $ 44,365 $ 44,365 $ - $ - Improve Airport Drainage [Land Acquisition Services]EA WAS VA HLX Twin County GA 11 $ 997,500 $ 997,500 $ - $ - Extend Runway Safety Area [Construction (Phase I)] - 01/19

EA WAS VA BCB Virginia Tech/Montgomery Executive GA 18 $ 5,640,720 $ 201,499 $ 5,439,221 $ - Rehabilitate Runway [Rehabilitate Runway 12/30 (Construction - Phase I)] - 12/30EA WAS VA HWY Warrenton-Fauquier R 15 $ 42,750 $ 42,750 $ - $ - Acquire Easement For Approaches [Part 'A' (Stafford, Midland UMC)]

EA WAS VA HWY Warrenton-Fauquier R 16 $ 95,000 $ 95,000 $ - $ - Acquire Easement For Approaches [Part 'E' (McCarthy)], Remove Obstructions [(Design)]EA WAS VA W78 William M Tuck GA 12 $ 123,500 $ 123,500 $ - $ - Rehabilitate Apron [Design]GL BIS ND BAC Barnes County Municipal GA 11 $ 2,243,000 $ 287,687 $ 1,955,313 $ - Rehabilitate Runway - 13/31, Rehabilitate TaxiwayGL BIS ND 20U Beach GA 7 $ 48,605 $ 48,605 $ - $ - Construct Building [phase 1 - design]

GL BIS ND BIS Bismarck Municipal P 45 $ 510,585 $ 510,585 $ - $ - Environmental Mitigation [Mitigation], Rehabilitate Apron [Phase 2 Design]

Page 22 of 97

Page 23: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL BIS ND BIS Bismarck Municipal P 43 $ 852,813 $ 852,813 $ - $ - Construct TaxiwayGL BIS ND BIS Bismarck Municipal P 44 $ 342,228 $ 342,228 $ - $ - Construct Taxiway [Construction]GL BIS ND BIS Bismarck Municipal P 46 $ 6,042,833 $ - $ 6,042,833 $ - Rehabilitate Apron [Construction Phase 2]GL BIS ND D09 Bottineau Municipal GA 9 $ 190,654 $ 190,654 $ - $ - Construct Building, Construct TaxiwayGL BIS ND 5N8 Casselton Robert Miller Regional GA 18 $ 1,057,500 $ 1,057,500 $ - $ - Construct Access Road, Construct Building, Construct Taxiway

GL BIS ND 2C8 Cavalier Municipal GA 9 $ 221,350 $ 221,350 $ - $ -

Construct Fuel Farm, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate

Taxiway

GL BIS ND DVL Devils Lake Regional CS 28 $ 153,812 $ 153,812 $ - $ -

Construct Terminal Building, Extend Runway - 13/31, Rehabilitate Apron, Rehabilitate

Runway - 13/31, Rehabilitate Taxiway

GL BIS ND DIK Dickinson - Theodore Roosevelt Regional CS 26 $ 217,591 $ 217,591 $ - $ - Expand Terminal Building

GL BIS ND DIK Dickinson - Theodore Roosevelt Regional CS 24 $ 532,409 $ 332,409 $ 200,000 $ - Expand Terminal Building

GL BIS ND 51D Edgeley Municipal GA 10 $ 352,996 $ 352,996 $ - $ -

Acquire Snow Removal Equipment, Construct Fuel Farm, Expand Apron, Rehabilitate

Apron, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL BIS ND 4.00E+07 Ellendale Municipal GA 6 $ 140,600 $ 140,600 $ - $ -

Install Runway Vertical/Visual Guidance System - 13/31, Rehabilitate Apron, Rehabilitate

Runway - 13/31, Rehabilitate Runway - 13/31, Rehabilitate Runway Lighting - 13/31,

Rehabilitate Taxiway, Update Airport Master Plan StudyGL BIS ND D05 Garrison Municipal GA 8 $ 112,425 $ 112,425 $ - $ - Construct Building

GL BIS ND D05 Garrison Municipal GA 7 $ 99,337 $ 99,337 $ - $ -

Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway, Update Airport

Master Plan StudyGL BIS ND GFK Grand Forks International P 40 $ 625,000 $ - $ 625,000 $ - Collect airport data for Airports Geographic Information SystemGL BIS ND GFK Grand Forks International P 38 $ 263,910 $ 263,910 $ - $ - Construct Access Road [Design]

GL BIS ND GFK Grand Forks International P 39 $ 3,133,080 $ 1,133,080 $ 2,000,000 $ -

Construct Access Road [Construction, phase 1], Construct Terminal Building

[Construction Phase 4]

GL BIS ND GWR Gwinner-Roger Melroe Field GA 9 $ 294,999 $ 294,999 $ - $ -

Construct Access Road, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate

TaxiwayGL BIS ND GWR Gwinner-Roger Melroe Field GA 10 $ 80,750 $ 80,750 $ - $ - Rehabilitate Runway [phase 1 design] - 16/34GL BIS ND K74 Hamry Field GA 11 $ 60,000 $ 60,000 $ - $ - Improve Access Road, Rehabilitate Runway - 12/30GL BIS ND BWP Harry Stern GA 15 $ 875,132 $ 300,132 $ 575,000 $ - Improve Airport DrainageGL BIS ND 5H4 Harvey Municipal GA 8 $ 36,000 $ 36,000 $ - $ - Construct Building, Improve Terminal BuildingGL BIS ND FAR Hector International P 37 $ 490,200 $ 490,200 $ - $ - Rehabilitate TaxiwayGL BIS ND FAR Hector International P 38 $ 3,201,922 $ 3,201,922 $ - $ - Rehabilitate Taxiway [South portion]GL BIS ND HEI Hettinger Municipal GA 10 $ 54,384 $ 54,384 $ - $ - Construct Building

GL BIS ND GAF Hutson Field GA 7 $ 108,967 $ 108,967 $ - $ -

Rehabilitate Apron [Phase 1 - design], Rehabilitate Runway [Phase 1 - design] - 17/35,

Rehabilitate Taxiway [phase 1 - design]GL BIS ND JMS Jamestown Regional CS 32 $ 1,142,531 $ 942,531 $ 200,000 $ - Construct Access Road, Expand Terminal Building

Page 23 of 97

Page 24: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL BIS ND JMS Jamestown Regional CS 31 $ 95,000 $ 95,000 $ - $ -

Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway - 04/22,

Rehabilitate Runway - 13/31, Rehabilitate Taxiway

GL BIS ND 7K5 Kenmare Municipal GA 9 $ 81,413 $ 81,413 $ - $ -

Rehabilitate Apron [phase 1 design], Rehabilitate Runway [phase 1 design] - 08/26,

Rehabilitate Taxiway [phase 1 design]

GL BIS ND 7L2 Linton Municipal GA 10 $ 180,008 $ 180,008 $ - $ -

Construct Taxiway [phase 1 - design], Expand Apron [phase 1 design], Improve Access

Road [Phase 1 - deisgn], Improve Fuel Farm, Rehabilitate Apron, Rehabilitate Runway -

09/27, Rehabilitate TaxiwayGL BIS ND 6L3 Lisbon Municipal GA 9 $ 150,000 $ 150,000 $ - $ - Acquire Snow Removal Equipment

GL BIS ND Y19 Mandan Municipal GA 15 $ 190,000 $ 190,000 $ - $ -

Acquire Snow Removal Equipment, Install Runway Vertical/Visual Guidance System

[Phase 2 - construction] - 13/31, Rehabilitate Apron, Rehabilitate Runway - 13/31,

Rehabilitate TaxiwayGL BIS ND Y19 Mandan Municipal GA 16 $ 267,900 $ 267,900 $ - $ - Rehabilitate Runway - 04/22, Rehabilitate Runway - 13/31

GL BIS ND Y19 Mandan Municipal GA 14 $ 44,650 $ 44,650 $ - $ -

Install Runway Vertical/Visual Guidance System - 13/31, Rehabilitate Apron, Rehabilitate

Runway - 13/31, Rehabilitate TaxiwayGL BIS ND HZE Mercer County Regional GA 9 $ 138,400 $ 138,400 $ - $ - Acquire Snow Removal Equipment

GL BIS ND MOT Minot International P 40 $ 250,048 $ 250,048 $ - $ - Improve Terminal Building, Rehabilitate Taxiway [Plans and Specifications]

GL BIS ND MOT Minot International P 41 $ 200,000 $ 200,000 $ - $ -

Construct Snow Removal Equipment Building, Expand Aircraft Rescue & Fire Fighting

Building [Plans and Specifications]

GL BIS ND HBC Mohall Municipal GA 7 $ 1,202,253 $ 1,202,253 $ - $ - Rehabilitate Runway - 13/31, Rehabilitate Runway Lighting - 13/31, Rehabilitate TaxiwayGL BIS ND 3P3 Mott Municipal GA 9 $ 43,089 $ 43,089 $ - $ - Install Runway Vertical/Visual Guidance System - 10/28GL BIS ND +09A New 3 $ 180,000 $ 180,000 $ - $ - Conduct Environmental Study

GL BIS ND 2D5 Oakes Municipal GA 8 $ 85,638 $ 85,638 $ - $ -

Rehabilitate Apron, Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate

Runway - 12/30, Rehabilitate Taxiway, Rehabilitate Taxiway

GL BIS ND Y37 Park River - W C Skjerven Field GA 7 $ 1,157,220 $ 547,713 $ 609,507 $ - Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Taxiway

GL BIS ND Y74 Parshall-Hankins GA 7 $ 222,300 $ 222,300 $ - $ -

Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Install Runway Vertical/Visual

Guidance System - 12/30, Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate

Taxiway

GL BIS ND 06D Rolla Municipal GA 7 $ 64,274 $ 64,274 $ - $ -

Expand Apron, Improve Access Road [phase 1 design], Rehabilitate Apron [phase 1

design], Rehabilitate Runway [phase 1 - design] - 14/32, Rehabilitate Taxiway [Phase 1 -

design]

GL BIS ND ISN Sloulin Field International P 32 $ 1,017,736 $ 1,017,736 $ - $ -

Conduct Environmental Study, Construct Apron, Install Airport Beacons, Install

Miscellaneous NAVAIDS, Rehabilitate Runway - 11/29, Rehabilitate Runway Lighting -

11/29GL BIS ND Y27 Standing Rock GA 7 $ 332,500 $ 332,500 $ - $ - Improve Access Road

Page 24 of 97

Page 25: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL BIS ND 08D Stanley Municipal GA 8 $ 83,600 $ 83,600 $ - $ -

Expand Apron, Rehabilitate Apron, Rehabilitate Runway [Phase 1 - design and pavement

preparation] - 09/27, Rehabilitate Taxiway, Update Airport Master Plan StudyGL BIS ND *NDS State of North Dakota 9 $ 200,000 $ 200,000 $ - $ - Update Miscellaneous Study

GL BIS ND *NDV Various Locations in North Dakota 5 $ 662,779 $ 662,779 $ - $ -

Rehabilitate Runway (Beach - 12/30; Cando Municipal - 16/34; Carrington Municipal -

13/31; Crosby Municipal - 12/30; Lakota Municipal - 15/33; Mercer County Regional -

14/32; Northwood Municipal-Vince Field - 08/26; Walhalla Municipal - 15/33)GL BIS ND 96D Walhalla Municipal GA 5 $ 290,554 $ 290,554 $ - $ - Rehabilitate TaxiwayGL BIS ND 5C8 Washburn Municipal GA 11 $ 266,021 $ 266,021 $ - $ - Construct Terminal Building

GL BIS ND S25 Watford City Municipal GA 11 $ 97,086 $ 97,086 $ - $ -

Construct Taxiway [phase 1 - design], Rehabilitate Apron [phase 1 - design], Rehabilitate

Runway - 12/30, Rehabilitate TaxiwayGL BIS SD ABR Aberdeen Regional P 30 $ 1,000,000 $ 1,000,000 $ - $ - Expand Apron [Construction], Rehabilitate Apron [Construction]GL BIS SD EFC Belle Fourche Municipal GA 9 $ 289,833 $ 289,833 $ - $ - Rehabilitate Runway Lighting - 14/32GL BIS SD 6V5 Bison Municipal GA 6 $ 94,006 $ 94,006 $ - $ - Update Airport Master Plan Study [Update ALP]GL BIS SD SPF Black Hills-Clyde Ice Field GA 18 $ 2,000,000 $ - $ 2,000,000 $ - Construct Taxiway [Construction (Phase II)]GL BIS SD SPF Black Hills-Clyde Ice Field GA 17 $ 1,832,782 $ 20,973 $ 1,811,809 $ - Construct Taxiway [Construction (Phase I)]

GL BIS SD SPF Black Hills-Clyde Ice Field GA 16 $ 543,000 $ 543,000 $ - $ - Construct Taxiway [Design], Extend Runway [Phase 4 construction (Land)] - 12/30

GL BIS SD BTN Britton Municipal GA 9 $ 3,056,755 $ 1,456,755 $ 1,600,000 $ -

Rehabilitate Runway [Rehabilitate Runway] - 13/31, Rehabilitate Runway Lighting

[Install] - 13/31, Rehabilitate Taxiway [Construction]GL BIS SD BKX Brookings Regional GA 23 $ 356,250 $ 356,250 $ - $ - Install Perimeter Fencing [Complete Wildlife Fence]

GL BIS SD 7G9 Canton Municipal GA 3 $ 156,750 $ 156,750 $ - $ -

Rehabilitate Apron [Design], Rehabilitate Runway [Design] - 18/36, Rehabilitate Runway

Lighting [Design] - 18/36, Rehabilitate Taxiway [Design]GL BIS SD 9V9 Chamberlain Municipal GA 5 $ 199,144 $ 199,144 $ - $ - Improve Access Road [Construct]GL BIS SD 9V9 Chamberlain Municipal GA 6 $ 79,325 $ 79,325 $ - $ - Update Airport Master Plan Study [Udate ALP (Phase 2)]

GL BIS SD YKN Chan Gurney Municipal GA 22 $ 617,500 $ 617,500 $ - $ -

Conduct Environmental Study [EA for apron expansion], Conduct Environmental Study

[EA for land], Install Perimeter Fencing [Construct]GL BIS SD 84D Cheyenne Eagle Butte GA 7 $ 36,100 $ 36,100 $ - $ - Install Perimeter Fencing [Design for Wildlife Fence]GL BIS SD 84D Cheyenne Eagle Butte GA 6 $ 69,350 $ 69,350 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan]GL BIS SD CUT Custer County GA 10 $ 385,000 $ 385,000 $ - $ - Construct Taxiway [Construct]GL BIS SD 6V0 Edgemont Municipal GA 3 $ 84,000 $ 84,000 $ - $ - Rehabilitate Runway [Design] - 12/30GL BIS SD 0D8 Gettysburg Municipal GA 7 $ 748,316 $ 748,316 $ - $ - Construct Taxiway [Construction], Expand Apron [Construction]

GL BIS SD 9D1 Gregory Municipal, Flynn Field GA 8 $ 199,500 $ 199,500 $ - $ - Acquire Land For Approaches, Install Perimeter Fencing [10' Wildlife Fence]

GL BIS SD 9F8 Hoven Municipal GA 6 $ 35,150 $ 35,150 $ - $ - Expand Apron [Plans and Specifications - Design], Rehabilitate Taxiway [Design]

Page 25 of 97

Page 26: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL BIS SD 9F8 Hoven Municipal GA 5 $ 71,250 $ 71,250 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan]

GL BIS SD HON Huron Regional GA 28 $ 272,650 $ 272,650 $ - $ -

Improve Service Road [Construction], Install Runway Vertical/Visual Guidance System -

17/35

GL BIS SD FSD Joe Foss Field P 41 $ 2,931,999 $ 2,931,999 $ - $ -

Construct Apron, Improve Runway Safety Area [Environmental (#38-45, 48, 75, 86)] -

03/21, Rehabilitate Runway [Intersection Design] - 03/21GL BIS SD FSD Joe Foss Field P 42 $ 551,894 $ 551,894 $ - $ - Acquire Snow Removal Equipment, Update Airport Master Plan Study

GL BIS SD LEM Lemmon Municipal GA 10 $ 494,950 $ 494,950 $ - $ - Construct Building [Construction], Construct Terminal Building [Construction]GL BIS SD LEM Lemmon Municipal GA 9 $ 25,080 $ 25,080 $ - $ - Construct Terminal Building [Design (Phase II)]

GL BIS SD MDS Madison Municipal GA 9 $ 807,500 $ 807,500 $ - $ -

Construct Taxiway [Conduct Environmental Assessment Phase III], Rehabilitate Taxiway

[Construct]GL BIS SD Y14 Marv Skie-Lincoln County GA 10 $ 2,298,700 $ 498,700 $ 1,800,000 $ - Rehabilitate Runway [Construct] - 16/34

GL BIS SD 5P2 Mc Laughlin Municipal GA 4 $ 57,000 $ 57,000 $ - $ -

Rehabilitate Apron [Design], Rehabilitate Runway [Design] - 13/31, Rehabilitate Taxiway

[Design]GL BIS SD 1D1 Milbank Municipal GA 12 $ 55,100 $ 55,100 $ - $ - Rehabilitate Taxiway [Design]GL BIS SD 1D1 Milbank Municipal GA 11 $ 69,350 $ 69,350 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan]

GL BIS SD 98D Onida Municipal GA 7 $ 85,500 $ 85,500 $ - $ -

Acquire Snow Removal Equipment [SRE Plow (Blade)], Update Airport Master Plan Study

[Airport Layout Plan]GL BIS SD 8V3 Parkston Municipal GA 7 $ 175,750 $ 175,750 $ - $ - Improve Access RoadGL BIS SD PHP Philip GA 7 $ 26,100 $ 26,100 $ - $ - Install Runway Lighting [Design] - 12/30GL BIS SD PIR Pierre Regional P 30 $ 4,451,691 $ 951,691 $ 3,500,000 $ - Construct Terminal Building [Phase 3 (Construct Terminal Building)]GL BIS SD PIR Pierre Regional P 29 $ 48,309 $ 48,309 $ - $ - Improve Runway Safety Area - 07/25

GL BIS SD IEN Pine Ridge GA 11 $ 133,000 $ 133,000 $ - $ -

Rehabilitate Runway [design] - 12/30, Update Airport Master Plan Study [Airport Layout

Plan (Phase 1)]GL BIS SD 1D3 Platte Municipal GA 5 $ 76,000 $ 76,000 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan]GL BIS SD RAP Rapid City Regional P 40 $ 2,759,609 $ 1,259,609 $ 1,500,000 $ - Rehabilitate Taxiway [Taxiway A Reconfiuration]GL BIS SD RAP Rapid City Regional P 41 $ 2,000,000 $ - $ 2,000,000 $ - Rehabilitate Taxiway

GL BIS SD RAP Rapid City Regional P 39 $ 940,776 $ 940,776 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle, Expand Apron [Construction]GL BIS SD 1D8 Redfield Municipal GA 6 $ 54,737 $ 54,737 $ - $ - Extend Runway [EA (Phase II, Wildlife Study)] - 13/31GL BIS SD 49B Sturgis Municipal GA 10 $ 2,394,000 $ 374,067 $ 2,019,933 $ - Rehabilitate Runway [Rehabilitate Runway 11/29] - 11/29

GL BIS SD *SDV Various Locations in South Dakota 15 $ 516,597 $ 516,597 $ - $ -

Rehabilitate Apron (Madison Municipal), Rehabilitate Runway (Chan Gurney Municipal -

01/19; Clark County - 13/31; Eureka Municipal - 12/30; Faulkton Municipal - 13/31;

Flandreau Municipal - 10/28; Gregory Municipal, Flynn Field - 13/31; Hoven Municipal -

13/31; Miller Municipal - 15/33; Murdo Municipal - 14/32; Parkston Municipal - 15/33;

Philip - 12/30; Platte Municipal - 14/32; Sisseton Municipal - 16/34; Springfield Municipal

- 15/33; Wessington Springs - 12/30; Wilder - 15/33)

Page 26 of 97

Page 27: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL BIS SD AGZ Wagner Municipal GA 7 $ 973,750 $ 973,750 $ - $ - Rehabilitate Runway - 08/26GL BIS SD ATY Watertown Regional CS 24 $ 93,575 $ 93,575 $ - $ - Expand Terminal Building [Construction (Phase 2)]

GL BIS SD ATY Watertown Regional CS 23 $ 1,562,024 $ 91,925 $ 1,470,099 $ - Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building]GL BIS SD ATY Watertown Regional CS 22 $ 95,000 $ 95,000 $ - $ - Rehabilitate Runway [design] - 17/35GL BIS SD 4X4 Wessington Springs GA 6 $ 392,697 $ 392,697 $ - $ - Construct Building [Construct Revenue Producing Hangar]GL BIS SD ICR Winner Regional GA 10 $ 69,873 $ 69,873 $ - $ - Update Airport Master Plan Study [Update ALP]GL CHI IL SPI Abraham Lincoln Capital P 56 $ 212,700 $ - $ 212,700 $ - Install Runway Incursion Caution BarsGL CHI IL SPI Abraham Lincoln Capital P 57 $ 500,000 $ 500,000 $ - $ - Acquire Snow Removal Equipment

GL CHI IL SPI Abraham Lincoln Capital P 55 $ 1,579,000 $ 500,000 $ 1,079,000 $ -

Acquire Land For Approaches, Acquire Safety Equipment and/or Fencing [Construct

Phase 1], Acquire Snow Removal Equipment, Rehabilitate Runway [Prelim Design] -

13/31, Security Enhancements [Design]

GL CHI IL BMI

Central IL Regional Airport at

Bloomington-Normal P 55 $ 812,514 $ 812,514 $ - $ - Acquire Snow Removal Equipment

GL CHI IL MDW Chicago Midway International P 78 $ 7,164,676 $ 4,464,676 $ 2,700,000 $ -

Construct Taxiway [Construction of Hi-Speed Taxiway Exit from Runway 4R], Rehabilitate

Runway [Phase 1 of Runway 13L/31R Rehabilitation] - 13L/31RGL CHI IL ORD Chicago O'Hare International P 112 $ 4,000,000 $ - $ 4,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

GL CHI IL ORD Chicago O'Hare International P 110 $ 26,500,000 $ 6,500,000 $ 20,000,000 $ -

Construct Runway - 09L/27R, Extend Runway [Runway 10L Extension (Per FY09 LOI

Application)] - 10/28

GL CHI IL ORD Chicago O'Hare International P 111 $ 4,500,000 $ - $ 4,500,000 $ -

Noise Mitigation Measures for Public Buildings [Roosevelt Elementary School -

Construction]GL CHI IL ORD Chicago O'Hare International P 113 $ 10,227,856 $ 10,227,856 $ - $ - Rehabilitate TaxiwayGL CHI IL RFD Chicago/Rockford International P 58 $ 550,000 $ - $ 550,000 $ - Collect airport data for Airports Geographic Information System

GL CHI IL RFD Chicago/Rockford International P 60 $ 1,331,662 $ 1,331,662 $ - $ -

Construct Apron, Rehabilitate Runway [Phase 1 - Preliminary rehabilitation and

patching] - 01/19GL CHI IL RFD Chicago/Rockford International P 61 $ 5,248,400 $ 649,927 $ 4,598,473 $ - Rehabilitate TaxiwayGL CHI IL RFD Chicago/Rockford International P 59 $ 551,053 $ 551,053 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

GL CHI IL PIA General Downing - Peoria International P 56 $ 1,700,000 $ 25,962 $ 1,674,038 $ - Rehabilitate Runway Lighting - 13/31

GL CHI IL PIA General Downing - Peoria International P 54 $ 2,541,380 $ 2,541,380 $ - $ - Construct Terminal Building [Phase 7]

GL CHI IL PIA General Downing - Peoria International P 53 $ 202,600 $ - $ 202,600 $ - Acquire Safety Equipment and/or Fencing

GL CHI IL PIA General Downing - Peoria International P 55 $ 124,007 $ 124,007 $ - $ - Acquire Land for DevelopmentGL CHI IL *ILB Illinois State Block Grant Program 88 $ 7,034,688 $ 5,138,289 $ 1,896,399 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 93 $ 4,148,800 $ - $ 4,148,800 $ - Non primary development projects in state block grant program

Page 27 of 97

Page 28: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL CHI IL *ILB Illinois State Block Grant Program 87 $ 10,399,500 $ 10,399,500 $ - $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 90 $ 100,000 $ - $ 100,000 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 92 $ 968,775 $ - $ 968,775 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 89 $ 2,559,105 $ - $ 2,559,105 $ - Non primary development projects in state block grant programGL CHI IL *ILB Illinois State Block Grant Program 91 $ 8,216,684 $ 2,427,856 $ 5,788,828 $ - Non primary development projects in state block grant programGL CHI IL MLI Quad City International P 67 $ 7,124,337 $ 3,224,337 $ 3,900,000 $ - Rehabilitate Runway - 09/27GL CHI IL BLV Scott AFB/Midamerica P 28 $ 308,750 $ 308,750 $ - $ - Expand Apron [Phase 1 Planning Design]GL CHI IL *ILS State of Illinois 6 $ 200,000 $ - $ 200,000 $ - Update State System Plan Study

GL CHI IL CMI University of Illinois-Willard P 26 $ 2,147,178 $ 2,147,178 $ - $ -

Improve Runway Safety Area [RSA Study] - 18/36, Install Runway Lighting - 14L/32R,

Install Runway Vertical/Visual Guidance System - 14L/32R, Rehabilitate Apron [U of I

Apron], Rehabilitate Runway - 04/22, Update Airport Master Plan Study, Wildlife Hazard

Assessments [Wildlife Hazard Study]

GL CHI IN AID Anderson Municipal-Darlington Field GA 23 $ 52,204 $ 52,204 $ - $ -

Acquire Easement For Approaches, Acquire Land For Approaches, Rehabilitate Runway

Lighting - 18/36

GL CHI IN AID Anderson Municipal-Darlington Field GA 24 $ 97,796 $ 97,796 $ - $ - Acquire Easement For ApproachesGL CHI IN RWN Arens Field GA 8 $ 536,275 $ 536,275 $ - $ - Rehabilitate Apron

GL CHI IN JVY Clark Regional R 23 $ 800,257 $ 150,000 $ 650,257 $ - Extend Runway [Phase 2b Land Acquisition (Townsend Property)] - 18/36GL CHI IN CFJ Crawfordsville Municipal GA 9 $ 150,000 $ 150,000 $ - $ - Install Weather Reporting Equipment [AWOS-AV]GL CHI IN GWB De Kalb County GA 19 $ 184,924 $ 184,924 $ - $ - Extend Runway [Extend Runway Phase 2 EA Hearings] - 09/27

GL CHI IN MIE Delaware County - Johnson Field GA 22 $ 2,300,000 $ 150,000 $ 2,150,000 $ -

Rehabilitate Runway [Rehab RW 32 sections phase 2, finish design & construction] -

14/32

GL CHI IN MIE Delaware County Regional GA 23 $ 46,620 $ 46,620 $ - $ -

Acquire Land For Approaches [Phase 1 Preliminary Environmental], Install Perimeter

Fencing, Rehabilitate Runway [Environmental Preparation of Subsequent Runway Rehab

Phases.] - 14/32GL CHI IN EYE Eagle Creek Airpark R 16 $ 57,000 $ 57,000 $ - $ - Rehabilitate ApronGL CHI IN EKM Elkhart Municipal GA 25 $ 970,952 $ 75,000 $ 895,952 $ - Rehabilitate Apron [Phase 2, Construct 7,800 SY]

GL CHI IN EVV Evansville Regional P 47 $ 304,950 $ 304,950 $ - $ -

Collect airport data for Airports Geographic Information System, Install Airfield Guidance

Signs, Security Enhancements

GL CHI IN EVV Evansville Regional P 46 $ 1,730,900 $ 1,490,568 $ 240,332 $ -

Improve Runway Safety Area [Relocate Roads & Railroad - Design; Relocate Powerlines -

Construction] - 04/22GL CHI IN FWA Fort Wayne International P 57 $ 4,477,498 $ 2,188,686 $ 2,288,812 $ - Rehabilitate Service Road [NW Perimeter Road Phase 2]

GL CHI IN FWA Fort Wayne International P 56 $ 209,257 $ 209,257 $ - $ - Update Airport Master Plan Study [ALP & Master Plan Update Phase 2 Prior Year]GL CHI IN FKR Frankfort Municipal GA 14 $ 1,142,640 $ 152,439 $ 990,201 $ - Construct Taxiway [Construction]GL CHI IN SER Freeman Municipal GA 12 $ 295,730 $ 150,000 $ 145,730 $ - Strengthen Runway [Phase 1 Design] - 05/23GL CHI IN FRH French Lick Municipal GA 10 $ 1,790,063 $ 150,000 $ 1,640,063 $ - Extend Taxiway [Extend Parallel - Phase 6]

Page 28 of 97

Page 29: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL CHI IN RCR Fulton County GA 9 $ 38,950 $ 38,950 $ - $ - Rehabilitate Taxiway [Phase 1 - Design]GL CHI IN GYY Gary/Chicago International CS 25 $ 5,150,000 $ 150,000 $ 5,000,000 $ - Extend Runway - 12/30GL CHI IN I34 Greensburg Municipal GA 7 $ 150,000 $ 150,000 $ - $ - Conduct Environmental StudyGL CHI IN HFY Greenwood Municipal GA 24 $ 237,381 $ 150,000 $ 87,381 $ - Rehabilitate Runway [Crack Repair] - 01/19GL CHI IN HNB Huntingburg GA 12 $ 117,391 $ 117,391 $ - $ - Rehabilitate Taxiway [Rehabilitate Partial Taxiway (Resurface)]GL CHI IN HHG Huntington Municipal GA 10 $ 337,950 $ 337,950 $ - $ - Rehabilitate TaxiwayGL CHI IN 8A4 Indianapolis Downtown GA 8 $ 274,832 $ 274,832 $ - $ - Rehabilitate Parking LotGL CHI IN 8A4 Indianapolis Downtown GA 9 $ 175,168 $ 175,168 $ - $ - Rehabilitate Terminal BuildingGL CHI IN TYQ Indianapolis Executive R 21 $ 489,013 $ 489,013 $ - $ - Expand ApronGL CHI IN TYQ Indianapolis Executive R 20 $ 1,483,514 $ 1,483,514 $ - $ - Expand ApronGL CHI IN IND Indianapolis International P 114 $ 348,053 $ - $ 348,053 $ - Rehabilitate Aircraft Rescue & Fire Fighting BuildingGL CHI IN IND Indianapolis International P 115 $ 400,000 $ - $ 400,000 $ - Safety Management System (SMS) Program

GL CHI IN IND Indianapolis International P 117 $ 1,034,172 $ 1,034,172 $ - $ -

Acquire Snow Removal Equipment [Single Axle Dump Truck with Attachments], Acquire

Snow Removal Equipment [Two - Tandem Axle Dump Trucks with Attachments], Acquire

Snow Removal Equipment, Rehabilitate Runway - 14/32, Rehabilitate Taxiway

GL CHI IN IND Indianapolis International P 113 $ 6,322,988 $ 3,322,988 $ 3,000,000 $ -

Construct Apron, Construct Service Road, Construct Taxiway, Improve Airport Drainage,

Remove Obstructions [Relocate ATCT]GL CHI IN IND Indianapolis International P 116 $ 1,677,012 $ 1,677,012 $ - $ - Construct ApronGL CHI IN RZL Jasper County GA 7 $ 42,085 $ 42,085 $ - $ - Improve Airport Drainage [Design]

GL CHI IN C62 Kendallville Municipal GA 17 $ 99,560 $ 99,560 $ - $ -

Improve Airport Drainage [Archaeological and Wetland Surveys], Rehabilitate Runway

[Design] - 10/28, Rehabilitate Taxiway [Desugn]

GL CHI IN OKK Kokomo Municipal GA 18 $ 1,377,737 $ 150,000 $ 1,227,737 $ - Extend Runway [Road Relocation Land & Creek Mitigation for Runway Extension] - 05/23GL CHI IN PPO La Porte Municipal GA 17 $ 75,609 $ 75,609 $ - $ - Update Airport Master Plan Study [Phase 2]GL CHI IN PPO La Porte Municipal GA 16 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan Study [Phase 1]

GL CHI IN IMS Madison Municipal GA 14 $ 342,000 $ 186,675 $ 155,325 $ -

Acquire Land For Approaches [Acquire Land], Rehabilitate Runway [Crack Repair, RWY

3/21] - 03/21, Rehabilitate Taxiway

GL CHI IN MZZ Marion Municipal GA 17 $ 57,000 $ 57,000 $ - $ -

Rehabilitate Runway [Design for resurface of Taxiway and RWY 4/22 due to latest PCI

Report] - 04/22, Strengthen Taxiway

GL CHI IN MZZ Marion Municipal GA 18 $ 947,198 $ 492,351 $ 454,847 $ -

Rehabilitate Runway [RW 4/22 provide 2" surface removal;, crack repair and overlay,

including grooving, marking and mulched seeding.] - 04/22, Strengthen Taxiway [On TW

A, A2 & A3, provide removal for 6" of material and replace with 6" of asphalt overlay

and markings.]GL CHI IN CEV Mettel Field GA 16 $ 38,862 $ 38,000 $ 862 $ - Rehabilitate Runway - 18/36

GL CHI IN MGC Michigan City Municipal GA 14 $ 271,410 $ 150,000 $ 121,410 $ -

Light Obstructions [Obstruction Light RW 20 approach], Remove Obstructions [Remove

tres in RW 20 approach]GL CHI IN UWL New Castle-Henry County Municipal GA 9 $ 168,317 $ 168,317 $ - $ - Rehabilitate Taxiway

Page 29 of 97

Page 30: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL CHI IN OVO North Vernon GA 13 $ 479,393 $ 154,141 $ 325,252 $ - Rehabilitate Runway [Phase 1 Design] - 05/23, Rehabilitate Taxiway [Design/Construct]GL CHI IN I42 Paoli Municipal GA 8 $ 49,400 $ 49,400 $ - $ - Construct Taxiway [Taxiway - Preliminary Design]GL CHI IN TEL Perry County Municipal GA 7 $ 60,325 $ 60,325 $ - $ - Expand Apron [Expand Apron (Design) Phase 1]GL CHI IN I76 Peru Municipal GA 14 $ 40,882 $ 40,882 $ - $ - Rehabilitate Runway [Construct Phase 5 (part D)] - 01/19GL CHI IN I76 Peru Municipal GA 12 $ 968,885 $ 120,237 $ 848,648 $ - Rehabilitate Runway [Construct - Phase 3] - 01/19GL CHI IN I76 Peru Municipal GA 13 $ 79,356 $ 79,356 $ - $ - Rehabilitate Runway [Construct Phase 4] - 01/19GL CHI IN C65 Plymouth Municipal GA 14 $ 150,000 $ 150,000 $ - $ - Acquire Land For ApproachesGL CHI IN VPZ Porter County Municipal GA 22 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan Study [Reimburse Phase 1]

GL CHI IN PLD Portland Municipal GA 7 $ 327,750 $ 327,750 $ - $ -

Rehabilitate Taxiway [Provide pavement replacement on TW C and TW TH 1, some full

depth, some partial includes crack repair and surface milling]GL CHI IN LAF Purdue University GA 33 $ 94,566 $ 94,566 $ - $ - Construct Building [Phase 3]GL CHI IN LAF Purdue University GA 32 $ 75,000 $ 75,000 $ - $ - Construct Building [Phase 2]GL CHI IN 4I7 Putnam County GA 12 $ 165,000 $ 165,000 $ - $ - Rehabilitate Runway [Vertical Curve and Overlay Design] - 18/36

GL CHI IN I22 Randolph County GA 11 $ 4,169,731 $ 150,000 $ 4,019,731 $ -

Construct Runway [Construct RW 8/26 - 1st half] - Plan-1, Construct Runway [Construct

RW 8/26 - 1st half (B)] - Plan-1GL CHI IN RID Richmond Municipal GA 13 $ 1,786,239 $ 319,451 $ 1,466,788 $ - Rehabilitate TaxiwayGL CHI IN I83 Salem Municipal GA 10 $ 1,649,319 $ 500,989 $ 1,148,330 $ - Construct Runway [Phase 1: Land and preliminary design] - Plan-1GL CHI IN GEZ Shelbyville Municipal GA 22 $ 171,200 $ 171,200 $ - $ - Update Airport Master Plan StudyGL CHI IN SMD Smith Field GA 11 $ 1,071,618 $ 180,509 $ 891,109 $ - Rehabilitate Runway - 05/23GL CHI IN SBN South Bend Regional P 40 $ 200,000 $ - $ 200,000 $ - Safety Management System (SMS) ProgramGL CHI IN SBN South Bend Regional P 41 $ 2,818,637 $ 1,318,637 $ 1,500,000 $ - Expand Terminal Building [Phase 3]GL CHI IN SBN South Bend Regional P 39 $ 1,318,637 $ 1,318,637 $ - $ - Expand Terminal Building [Phase 2 - approximately 3,750 SF]GL CHI IN OXI Starke County GA 10 $ 109,787 $ 109,787 $ - $ - Conduct Environmental Study [Prepare EA for RW 18/36 extension]GL CHI IN *INS State of Indiana 8 $ 150,205 $ 150,205 $ - $ - Update State System Plan StudyGL CHI IN *INS State of Indiana 7 $ 319,000 $ 119,573 $ 199,427 $ - Update State System Plan Study

GL CHI IN HUF Terre Haute International-Hulman Field GA 38 $ 1,671,909 $ 159,409 $ 1,512,500 $ - Rehabilitate Runway [Airfield Lighting Vault - Construction (Phase 2)] - 05/23

GL CHI IN ANQ Tri-State Steuben County GA 11 $ 610,375 $ 541,083 $ 69,292 $ - Rehabilitate Taxiway [Phase 2 Construction], Wildlife Hazard AssessmentsGL CHI IN BFR Virgil I Grissom Municipal GA 9 $ 1,835,875 $ 150,000 $ 1,685,875 $ - Rehabilitate Runway [Rehab Rwy 6/24 - Phase 2 Construction] - 06/24

GL CHI IN IWH Wabash Municipal GA 11 $ 55,472 $ 55,472 $ - $ -

Rehabilitate Runway [Phase 4 - Construction (Construction and Resident Inspection)] -

18/36, Rehabilitate Taxiway [Phase 4 - Construction (Construction and Resident

Inspection)]

GL CHI IN IWH Wabash Municipal GA 9 $ 1,123,429 $ 163,154 $ 960,275 $ -

Rehabilitate Runway [Phase 2 - Construction] - 18/36, Rehabilitate Taxiway [Phase 2 -

Construction]

Page 30 of 97

Page 31: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL CHI IN IWH Wabash Municipal GA 10 $ 107,681 $ 107,681 $ - $ -

Rehabilitate Runway [Phase 3 - Construction (Construction and resident inspection)] -

18/36, Rehabilitate Taxiway [Phase 3 - Construction (Construction and Inspection)]GL CHI IN ASW Warsaw Municipal GA 9 $ 134,272 $ 134,272 $ - $ - Acquire Land For Approaches [Reimburse parcels 10B]

GL CHI IN MCX White County GA 11 $ 1,342,690 $ 1,342,690 $ - $ -

Rehabilitate Runway [Construct - Phase 1 (included Land as local share)] - 18/36,

Rehabilitate Runway Lighting - 18/36, Widen Runway [Construct] - 18/36

GL DET MI APN Alpena County Regional CS 16 $ 92,150 $ 92,150 $ - $ -

Acquire Friction Measuring Equipment [Decelermeter and Tow Vehicle], Rehabilitate

Taxiway [Design]

GL DET MI APN Alpena County Regional CS 17 $ 494,000 $ 494,000 $ - $ - Rehabilitate Apron [Construction], Rehabilitate Taxiway [Construction]GL DET MI FNT Bishop International P 49 $ 3,415,159 $ 3,415,159 $ - $ - Expand Terminal BuildingGL DET MI LAN Capital City P 46 $ 1,039,386 $ 1,039,386 $ - $ - Improve Terminal Building, Rehabilitate Runway Lighting - 06/24GL DET MI LAN Capital Region International P 48 $ 399,747 $ 399,747 $ - $ - Improve Terminal BuildingGL DET MI LAN Capital Region International P 47 $ 618,535 $ 618,535 $ - $ - Rehabilitate Apron, Rehabilitate Service Road

GL DET MI CVX Charlevoix Municipal P 13 $ 251,370 $ 251,370 $ - $ - Conduct Airport Master Plan Study [Phase 1], Rehabilitate Parking Lot [Design]GL DET MI CVX Charlevoix Municipal P 14 $ 159,134 $ 159,134 $ - $ - Conduct Airport Master Plan Study [Phase 2]

GL DET MI TVC Cherry Capital P 35 $ 1,516,905 $ 1,516,905 $ - $ -

Acquire Snow Removal Equipment, Expand Apron, Improve Airport Miscellaneous

Improvements, Install Airport Beacons, Rehabilitate Apron, Rehabilitate TaxiwayGL DET MI CIU Chippewa County International P 29 $ 1,273,000 $ - $ 1,273,000 $ - Rehabilitate Building [Hangar #151]

GL DET MI CIU Chippewa County International P 31 $ 1,104,850 $ 1,104,850 $ - $ -

Acquire Snow Removal Equipment [Sweeper Truck w/Blower Attachment], Expand Snow

Removal Equipment Building [Construction]

GL DET MI CIU Chippewa County International P 28 $ 272,650 $ 272,650 $ - $ -

Improve Airport Miscellaneous Improvements [Pavement Marking and Crack Sealing],

Install Airfield Guidance Signs [Runway 16/34]

GL DET MI CIU Chippewa County International P 30 $ 2,109,000 $ - $ 2,109,000 $ -

Rehabilitate Building [Existing SRE/ARFF Building #422], Rehabilitate Building [Hangar

#151 Phase II]GL DET MI ESC Delta County CS 33 $ 179,209 $ 179,209 $ - $ - Install Perimeter Fencing [Phase I]

GL DET MI ESC Delta County CS 34 $ 102,600 $ 102,600 $ - $ -

Improve Runway Safety Area [Relocate PAPI Control Boxes] - 18/36, Install Perimeter

Fencing [Phase II]GL DET MI DTW Detroit Metropolitan Wayne County P 101 $ 932,480 $ 932,480 $ - $ - Rehabilitate Runway - 09L/27RGL DET MI DTW Detroit Metropolitan Wayne County P 97 $ 2,839,665 $ 2,839,665 $ - $ - Install Guidance Signs, Rehabilitate Runway - 09L/27RGL DET MI DTW Detroit Metropolitan Wayne County P 99 $ 8,353,065 $ - $ 8,353,065 $ - Noise Mitigation Measures [Ground Run-up Enclosure]

GL DET MI DTW Detroit Metropolitan Wayne County P 98 $ 8,000,000 $ - $ 8,000,000 $ -

Extend Taxiway, Rehabilitate Taxiway [Western Portion], Rehabilitate Taxiway [Western

Portion], Rehabilitate TaxiwayGL DET MI DTW Detroit Metropolitan Wayne County P 100 $ 1,822,781 $ 1,822,781 $ - $ - Rehabilitate Runway - 09L/27RGL DET MI GRR Gerald R. Ford International P 45 $ 2,657,196 $ 2,657,196 $ - $ - Acquire Land for Development, Acquire Snow Removal Equipment

Page 31 of 97

Page 32: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL DET MI GRR Gerald R. Ford International P 44 $ 4,062,562 $ 4,062,562 $ - $ - Acquire Land for Development, Conduct Miscellaneous Study, Rehabilitate TaxiwayGL DET MI GRR Gerald R. Ford International P 46 $ 1,000,220 $ - $ 1,000,220 $ - VALE Infrastructure

GL DET MI CMX Houghton County Memorial P 33 $ 351,002 $ 351,002 $ - $ -

Acquire Land For Approaches [Runway 25], Construct Terminal Building [Pre-Design],

Rehabilitate Taxiway [Design], Wildlife Hazard Assessments [Study]GL DET MI CMX Houghton County Memorial P 34 $ 603,156 $ 603,156 $ - $ - Modify Access Road [Construction Phase 1 and Design Phase 2]

GL DET MI AZO Kalamazoo/Battle Creek International P 36 $ 9,331,631 $ 831,631 $ 8,500,000 $ - Construct Terminal Building

GL DET MI AZO Kalamazoo/Battle Creek International P 37 $ 831,631 $ 831,631 $ - $ - Construct Terminal Building, Rehabilitate Runway - 17/35GL DET MI MBS MBS International P 44 $ 3,397,000 $ - $ - $ 3,397,000 Construct Terminal Building [Phase 7 - Roof, windows, walls, floors]GL DET MI MBS MBS International P 43 $ 1,703,968 $ 1,703,968 $ - $ - Construct Terminal Building [Portion of building systems]GL DET MI *MIB Michigan State Block Grant Program 73 $ 171,000 $ - $ 171,000 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 74 $ 2,688,807 $ 2,688,807 $ - $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 75 $ 2,000,000 $ - $ 2,000,000 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 72 $ 185,250 $ - $ 185,250 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 68 $ 200,000 $ - $ 200,000 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 67 $ 114,950 $ - $ 114,950 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 70 $ 5,655,802 $ 5,655,802 $ - $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 66 $ 11,250,982 $ 11,250,982 $ - $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 71 $ 361,000 $ - $ 361,000 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 69 $ 6,536,000 $ - $ 6,536,000 $ - Non primary development projects in state block grant programGL DET MI *MIB Michigan State Block Grant Program 76 $ 3,966,250 $ - $ 3,966,250 $ - Non primary development projects in state block grant programGL DET MI MKG Muskegon County P 33 $ 912,000 $ 912,000 $ - $ - Acquire Snow Removal EquipmentGL DET MI MKG Muskegon County P 34 $ 163,875 $ 163,875 $ - $ - Acquire Snow Removal Equipment

GL DET MI PLN

Pellston Regional Airport of Emmet

County P 31 $ 7,051,070 $ 2,051,070 $ 5,000,000 $ - Construct Snow Removal Equipment Building [Construction]

GL DET MI PLN

Pellston Regional Airport of Emmet

County P 30 $ 717,250 $ 717,250 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Design], Construct Snow Removal

Equipment Building [Design], Improve Airport Miscellaneous ImprovementsGL DET MI SAW Sawyer International P 33 $ 610,790 $ 610,790 $ - $ - Rehabilitate Runway [Specific Concrete Slab Replacement] - 01/19

GL DET MI SAW Sawyer International P 32 $ 1,384,464 $ 651,332 $ 733,132 $ -

Acquire Snow Removal Equipment [Design Specs], Improve Airport Miscellaneous

Improvements [Design], Rehabilitate Runway [Design] - 01/19, Rehabilitate Runway

Lighting [Design] - 01/19, Rehabilitate Taxiway Lighting [North Half Taxiway A, Taxiway B

and Demo Vault]GL DET MI YIP Willow Run R 36 $ 146,505 $ 146,505 $ - $ - Install Taxiway Lighting [3]GL DET OH CAK Akron-Canton Regional P 52 $ 16,625,000 $ 2,247,772 $ 14,377,228 $ - Extend Runway [Objects #1, 18, 68, 73, 74, 69, 71, 72] - 05/23GL DET OH CAK Akron-Canton Regional P 53 $ 687,828 $ 687,828 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [DESIGN ONLY]

Page 32 of 97

Page 33: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL DET OH CAK Akron-Canton Regional P 54 $ 651,985 $ 651,985 $ - $ - Acquire Snow Removal Equipment, Modify Terminal BuildingGL DET OH 3G4 Ashland County GA 9 $ 41,360 $ 41,360 $ - $ - Rehabilitate Taxiway [repackage bidding documents and bid project]GL DET OH 3G4 Ashland County GA 10 $ 463,412 $ 463,412 $ - $ - Rehabilitate Taxiway

GL DET OH 6G5 Barnesville-Bradfield GA 8 $ 117,877 $ 117,877 $ - $ -

Conduct Miscellaneous Study, Rehabilitate Runway - 09/27, Rehabilitate Runway

Lighting - 09/27GL DET OH 5G7 Bluffton GA 11 $ 66,500 $ 66,500 $ - $ - Acquire Land for DevelopmentGL DET OH TZR Bolton Field R 21 $ 133,150 $ 133,150 $ - $ - Update Airport Master Plan StudyGL DET OH GEO Brown County GA 8 $ 533,521 $ 533,521 $ - $ - Expand Apron, Rehabilitate Runway Lighting - 18/36GL DET OH BKL Burke Lakefront R 7 $ 146,249 $ 146,249 $ - $ - Update Airport Master Plan Study [Phase 1]GL DET OH HAO Butler County Regional R 21 $ 150,000 $ 150,000 $ - $ - Acquire Land for Development, Install Apron Lighting

GL DET OH CDI Cambridge Municipal GA 10 $ 75,064 $ 75,064 $ - $ -

Acquire Snow Removal Equipment, Install Runway Vertical/Visual Guidance System -

04/22, Remove Obstructions

GL DET OH PCW Carl R Keller Field GA 29 $ 83,993 $ 83,993 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

[preliminary engineering]GL DET OH PCW Carl R Keller Field GA 28 $ 66,500 $ 66,500 $ - $ - Acquire Snow Removal EquipmentGL DET OH TSO Carroll County-Tolson GA 8 $ 47,120 $ 47,120 $ - $ - Improve Airport Drainage, Improve Runway Safety Area - 07/25

GL DET OH I67 Cincinnati West GA 10 $ 194,845 $ 194,845 $ - $ -

Install Weather Reporting Equipment [Construction], Rehabilitate Apron, Rehabilitate

TaxiwayGL DET OH CLE Cleveland-Hopkins International P 96 $ 16,696,979 $ - $ 16,696,979 $ - Improve Runway Safety Area [Rwy 28 end and Navaids] - 10/28GL DET OH CLE Cleveland-Hopkins International P 95 $ 1,186,099 $ 1,186,099 $ - $ - Construct Runway - 06L/24RGL DET OH CLE Cleveland-Hopkins International P 94 $ 14,400,991 $ 1,230,991 $ 13,170,000 $ - Construct Runway - 06L/24R, Extend Runway - 06R/24LGL DET OH I66 Clinton Field GA 7 $ 63,821 $ 63,821 $ - $ - Construct Terminal Building, Remove ObstructionsGL DET OH 02G Columbiana County GA 14 $ 827,532 $ 827,532 $ - $ - Rehabilitate Runway - 07/25GL DET OH CGF Cuyahoga County R 22 $ 150,000 $ 150,000 $ - $ - Rehabilitate Apron, Update Airport Master Plan StudyGL DET OH CGF Cuyahoga County R 21 $ 901,962 $ 901,962 $ - $ - Rehabilitate Apron [Design Only], Rehabilitate TaxiwayGL DET OH VES Darke County GA 7 $ 109,762 $ 109,762 $ - $ - Rehabilitate Runway - 09/27

GL DET OH MGY Dayton-Wright Brothers R 12 $ 88,350 $ 88,350 $ - $ - Improve Airport Drainage [Drainage Study], Update Airport Master Plan StudyGL DET OH DFI Defiance Memorial GA 9 $ 644,972 $ 644,972 $ - $ - Construct TaxiwayGL DET OH DLZ Delaware Municipal GA 17 $ 66,101 $ 66,101 $ - $ - Conduct Miscellaneous StudyGL DET OH LHQ Fairfield County GA 20 $ 1,513,045 $ 1,513,045 $ - $ - Acquire Land for Development, Remove ObstructionsGL DET OH I23 Fayette County GA 7 $ 479,373 $ 479,373 $ - $ - Expand Apron, Remove ObstructionsGL DET OH FDY Findlay GA 21 $ 132,877 $ 132,877 $ - $ - Acquire Snow Removal EquipmentGL DET OH FZI Fostoria Metropolitan GA 11 $ 148,075 $ 148,075 $ - $ - Construct Snow Removal Equipment Building, Rehabilitate ApronGL DET OH USE Fulton County GA 9 $ 66,832 $ 66,832 $ - $ - Install Perimeter Fencing, Rehabilitate Runway - 09/27GL DET OH GAS Gallia-Meigs Regional GA 9 $ 103,315 $ 103,315 $ - $ - Improve Fuel Farm, Improve Runway Safety Area - 05/23GL DET OH 7G8 Geauga County GA 14 $ 472,924 $ 472,924 $ - $ - Rehabilitate Runway - 11/29

GL DET OH PMH Greater Portsmouth Regional GA 14 $ 90,658 $ 90,658 $ - $ - Improve Airport Drainage, Improve Terminal Building, Install Airport Beacons

Page 33 of 97

Page 34: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL DET OH I19 Greene County-Lewis A. Jackson Regional GA 16 $ 391,073 $ 391,073 $ - $ - Acquire Snow Removal Equipment, Construct Taxiway, Rehabilitate Taxiway

GL DET OH I74 Grimes Field GA 16 $ 82,175 $ 82,175 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway, Update Airport Master Plan StudyGL DET OH I95 Hardin County GA 9 $ 101,427 $ 101,427 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 04/22GL DET OH 8G6 Harrison County GA 10 $ 23,040 $ 23,040 $ - $ - Acquire Snow Removal EquipmentGL DET OH PHD Harry Clever Field GA 9 $ 257,045 $ 257,045 $ - $ - Rehabilitate ApronGL DET OH 7W5 Henry County GA 8 $ 137,250 $ 137,250 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 10/28

GL DET OH HOC Highland County GA 8 $ 103,115 $ 103,115 $ - $ -

Improve Airport Drainage, Light Obstructions, Rehabilitate Runway - 05/23, Remove

ObstructionsGL DET OH 10G Holmes County GA 7 $ 870,499 $ 870,499 $ - $ - Extend Runway - 09/27GL DET OH 10G Holmes County GA 8 $ 193,752 $ 193,752 $ - $ - Extend Runway - 09/27

GL DET OH DAY James M Cox Dayton International P 73 $ 4,445,307 $ 4,445,307 $ - $ -

Install Guidance Signs, Install Runway Lighting [Elevated Guard Lights] - 18/36,

Rehabilitate Apron [rehab shoulders], Rehabilitate Runway - 18/36, Rehabilitate Runway

Lighting - 18/36, Rehabilitate Taxiway [Taxiway Z], Rehabilitate Taxiway LightingGL DET OH HTW Lawrence County Airpark GA 5 $ 24,225 $ 24,225 $ - $ - Rehabilitate Runway Lighting - 08/26

GL DET OH I68 Lebanon-Warren County GA 12 $ 289,379 $ 289,379 $ - $ - Acquire Land For Approaches, Install Perimeter Fencing, Remove ObstructionsGL DET OH AOH Lima Allen County GA 13 $ 176,122 $ 176,122 $ - $ - Acquire Snow Removal Equipment

GL DET OH UYF Madison County GA 14 $ 63,769 $ 63,769 $ - $ -

Install Apron Lighting, Install Runway Vertical/Visual Guidance System - 09/27,

Rehabilitate Apron, Rehabilitate Runway - 09/27

GL DET OH MFD Mansfield Lahm Regional GA 25 $ 953,397 $ 953,397 $ - $ -

Acquire Safety Equipment and/or Fencing [design], Rehabilitate Taxiway Lighting [A, B, C

& D Construction]GL DET OH TDZ Metcalf Field R 21 $ 1,087,780 $ 1,087,780 $ - $ - Rehabilitate Runway - 14/32GL DET OH OXD Miami University GA 8 $ 59,327 $ 59,327 $ - $ - Extend Taxiway, Install Apron LightingGL DET OH 3T7 Middle Bass Island GA 16 $ 130,500 $ 130,500 $ - $ - Rehabilitate Runway [Crack Seal and Seal Coat] - 10/28GL DET OH MWO Middletown Regional/Hook Field GA 11 $ 318,937 $ 318,937 $ - $ - Improve Utilities

GL DET OH 4G5 Monroe County GA 10 $ 31,035 $ 31,035 $ - $ -

Construct Snow Removal Equipment Building, Improve Airport Miscellaneous

Improvements

GL DET OH 4I9 Morrow County GA 8 $ 89,775 $ 89,775 $ - $ -

Install Runway Vertical/Visual Guidance System - 10/28, Rehabilitate Apron, Rehabilitate

Runway - 10/28, Rehabilitate TaxiwayGL DET OH AXV Neil Armstrong GA 14 $ 96,710 $ 96,710 $ - $ - Install Runway Vertical/Visual Guidance System - 08/26GL DET OH VTA Newark-Heath GA 24 $ 99,104 $ 99,104 $ - $ - Install Perimeter Fencing, Rehabilitate Runway [Design] - 09/27GL DET OH 3X5 North Bass Island GA 11 $ 136,848 $ 136,848 $ - $ - Rehabilitate Runway [Sealcoat] - 01/19GL DET OH OSU Ohio State University R 27 $ 100,000 $ - $ 100,000 $ - Safety Management System (SMS) ProgramGL DET OH UNI Ohio University Snyder Field GA 17 $ 58,173 $ 58,173 $ - $ - Improve Runway Safety Area - 07/25

Page 34 of 97

Page 35: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL DET OH I86 Perry County GA 9 $ 68,000 $ 68,000 $ - $ -

Acquire Miscellaneous Land, Construct Taxiway, Improve Airport Drainage, Rehabilitate

Runway - 08/26, Update Airport Master Plan StudyGL DET OH 17G Port Bucyrus-Crawford County GA 6 $ 235,424 $ 235,424 $ - $ - Rehabilitate Runway - 04/22, Rehabilitate TaxiwayGL DET OH CMH Port Columbus International P 74 $ 1,339,260 $ 1,339,260 $ - $ - Construct Runway [AGL 10-01] - 10R/28LGL DET OH CMH Port Columbus International P 73 $ 11,169,262 $ 1,169,262 $ 10,000,000 $ - Construct Runway [AGL 10-01] - 10R/28L

GL DET OH 29G Portage County GA 24 $ 141,000 $ 141,000 $ - $ -

Acquire Snow Removal Equipment [Tractor with Blower and Blade], Update Airport

Master Plan Study

GL DET OH 3W2 Put-in-Bay GA 17 $ 183,000 $ 183,000 $ - $ -

Rehabilitate Runway [Design, Drainage & RSA Study] - 03/21, Update Airport Master

Plan Study

GL DET OH I40 Richard Downing GA 16 $ 320,600 $ 320,600 $ - $ - Extend Runway - 04/22, Extend Taxiway, Update Airport Master Plan Study

GL DET OH RZT Ross County GA 13 $ 40,470 $ 40,470 $ - $ -

Rehabilitate Runway Lighting [Phase 1 - design] - 05/23, Rehabilitate Taxiway,

Rehabilitate Taxiway Lighting [Phase 1 -design]GL DET OH S24 Sandusky County Regional GA 17 $ 861,341 $ 75,000 $ 786,341 $ - Extend TaxiwayGL DET OH 16G Seneca County GA 8 $ 609,455 $ 609,455 $ - $ - Acquire Land For ApproachesGL DET OH 16G Seneca County GA 7 $ 275,975 $ 275,975 $ - $ - Acquire Land For Approaches [Parcel A]GL DET OH I12 Sidney Municipal GA 14 $ 25,512 $ 25,512 $ - $ - Rehabilitate Runway - 10/28GL DET OH SGH Springfield-Beckley Municipal GA 20 $ 1,075,000 $ 75,000 $ 1,000,000 $ - Acquire Land For ApproachesGL DET OH TOL Toledo Express P 71 $ 3,095,307 $ 3,095,307 $ - $ - Rehabilitate Runway - 16/34GL DET OH TOL Toledo Express P 72 $ 200,000 $ - $ 200,000 $ - Safety Management System (SMS) ProgramGL DET OH MRT Union County GA 18 $ 172,679 $ 172,679 $ - $ - Install Perimeter Fencing, Rehabilitate Access Road

GL DET OH VNW Van Wert County GA 12 $ 98,976 $ 98,976 $ - $ - Construct Taxiway [design], Install Runway Vertical/Visual Guidance System - 09/27GL DET OH 3G3 Wadsworth Municipal GA 14 $ 368,944 $ 368,944 $ - $ - Acquire Land for Development

GL DET OH BJJ Wayne County GA 18 $ 676,941 $ 676,941 $ - $ -

Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway

Vertical/Visual Guidance System - 10/28, Rehabilitate Airport Beacons, Rehabilitate

Runway Lighting - 10/28, Rehabilitate Taxiway LightingGL DET OH 0G6 Williams County GA 7 $ 59,866 $ 59,866 $ - $ - Construct Apron, Rehabilitate Runway [Pavement Marking] - 07/25

GL DET OH 1G0 Wood County GA 22 $ 144,558 $ 144,558 $ - $ - Construct Snow Removal Equipment Building, Construct Terminal Building

GL DET OH YNG Youngstown-Warren Regional P 38 $ 487,350 $ 487,350 $ - $ -

Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment, Expand

Snow Removal Equipment Building

GL DET OH YNG Youngstown-Warren Regional P 39 $ 647,747 $ 647,747 $ - $ -

Construct Taxiway, Expand Snow Removal Equipment Building, Improve Airport

Miscellaneous Improvements, Install Guidance SignsGL MSP MN AEL Albert Lea Municipal GA 12 $ 3,065,632 $ 1,565,632 $ 1,500,000 $ - Construct Runway - 16/34

GL MSP MN ANE Anoka County-Blaine Airport(Janes Field) R 9 $ 441,396 $ 441,396 $ - $ - Install Perimeter Fencing, Rehabilitate Taxiway

Page 35 of 97

Page 36: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL MSP MN BDE Baudette International GA 9 $ 81,225 $ 81,225 $ - $ - Extend Taxiway

GL MSP MN BJI Bemidji Regional P 25 $ 253,983 $ 253,983 $ - $ -

Improve Terminal Building [Terminal Construction - Phase 5 (Terminal sanitary and

storm sewer upgrades)], Rehabilitate Apron [Apron rehab to accommodate terminal

expansion]GL MSP MN BJI Bemidji Regional P 24 $ 433,447 $ 433,447 $ - $ - Improve Terminal Building [Terminal construction - Phase 4]GL MSP MN BJI Bemidji Regional P 23 $ 500,000 $ 500,000 $ - $ - Expand Aircraft Rescue & Fire Fighting BuildingGL MSP MN BBB Benson Municipal GA 7 $ 115,425 $ 115,425 $ - $ - Update Airport Master Plan StudyGL MSP MN SBU Blue Earth Municipal GA 9 $ 2,398,500 $ 398,500 $ 2,000,000 $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate TaxiwayGL MSP MN BRD Brainerd Lakes Regional P 35 $ 7,230,326 $ 65,326 $ 7,165,000 $ - Expand Terminal Building, Rehabilitate Terminal BuildingGL MSP MN BRD Brainerd Lakes Regional P 34 $ 1,417,146 $ 1,417,146 $ - $ - Extend Runway - 16/34, Extend TaxiwayGL MSP MN CFE Buffalo Municipal GA 7 $ 67,402 $ 67,402 $ - $ - Acquire Land For ApproachesGL MSP MN CFE Buffalo Municipal GA 6 $ 3,312,929 $ 76,091 $ 3,236,838 $ - Extend Runway [Construction] - 17/35GL MSP MN AXN Chandler Field GA 10 $ 236,243 $ 236,243 $ - $ - Rehabilitate Terminal Building

GL MSP MN COQ Cloquet Carlton County GA 8 $ 72,675 $ 72,675 $ - $ -

Collect airport data for Airports Geographic Information System, Install Miscellaneous

NAVAIDS, Install Runway Vertical/Visual Guidance System - 17/35

GL MSP MN CQM Cook Municipal GA 5 $ 1,774,160 $ 1,774,160 $ - $ -

Acquire Land for Development, Construct Taxiway, Extend Runway - 13/31, Rehabilitate

Apron, Rehabilitate Taxiway

GL MSP MN CQM Cook Municipal GA 4 $ 83,220 $ 83,220 $ - $ -

Extend Runway [Design] - 13/31, Rehabilitate Apron [Design], Rehabilitate Taxiway

[Design]

GL MSP MN CKN Crookston Municipal Kirkwood Field GA 8 $ 49,128 $ 49,128 $ - $ - Conduct Miscellaneous Study, Improve Airport Drainage, Rehabilitate ApronGL MSP MN DLH Duluth International P 49 $ 3,607,893 $ 323,071 $ 3,284,822 $ - Construct Terminal BuildingGL MSP MN DLH Duluth International P 48 $ 6,590,494 $ 1,590,494 $ 5,000,000 $ - Construct Terminal BuildingGL MSP MN FRM Fairmont Municipal GA 11 $ 1,779,750 $ 1,779,750 $ - $ - Rehabilitate Runway - 02/20, Update Miscellaneous StudyGL MSP MN INL Falls International P 23 $ 674,036 $ 674,036 $ - $ - Acquire Snow Removal Equipment

GL MSP MN FBL Faribault Municipal GA 8 $ 2,540,930 $ 249,949 $ 2,290,981 $ -

Construct Taxiway [wetland mitigation and grading], Construct Taxiway, Rehabilitate

Apron, Rehabilitate Runway - 12/30GL MSP MN FBL Faribault Municipal GA 7 $ 25,382 $ 25,382 $ - $ - Acquire Snow Removal Equipment [plow and wing]

GL MSP MN FFM

Fergus Falls Municipal-Einar Mickelson

Field GA 9 $ 42,085 $ 42,085 $ - $ -

Rehabilitate Runway [Runway rehabilitation (Phase 1-Design)] - 17/35, Rehabilitate

Taxiway [Rehabilitate Taxiway B (Phase 1-design)]GL MSP MN GHW Glenwood Municipal GA 5 $ 45,220 $ 45,220 $ - $ - Construct Snow Removal Equipment Building [Phase 1 - design]

GL MSP MN CKC Grand Marais/Cook County GA 11 $ 76,403 $ 76,403 $ - $ -

Collect airport data for Airports Geographic Information System, Update Miscellaneous

StudyGL MSP MN HCO Hallock Municipal GA 5 $ 51,003 $ 51,003 $ - $ - Conduct Miscellaneous Study, Rehabilitate Taxiway

GL MSP MN 04Y Hawley Municipal GA 6 $ 330,364 $ 330,364 $ - $ -

Rehabilitate Apron [Rehab general aviation apron], Rehabilitate Taxiway [Rehabilitate

taxilane and taxiway]GL MSP MN 1D6 Hector Municipal GA 6 $ 539,372 $ 539,372 $ - $ - Improve Runway Safety Area - 05/23GL MSP MN CHU Houston County GA 3 $ 155,599 $ 155,599 $ - $ - Conduct Miscellaneous Study, Construct Runway [EA] - 13/31

Page 36 of 97

Page 37: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL MSP MN DXX Lac qui Parle County GA 8 $ 20,900 $ 20,900 $ - $ - Construct Building [design]GL MSP MN DXX Lac qui Parle County GA 9 $ 106,962 $ 106,962 $ - $ - Construct Terminal BuildingGL MSP MN 12Y Le Sueur Municipal GA 7 $ 165,000 $ 165,000 $ - $ - Rehabilitate Snow Removal Equipment Building

GL MSP MN LXL

Little Falls/Morrison County-Lindbergh

Field GA 11 $ 32,404 $ 32,404 $ - $ - Conduct Miscellaneous Study, Improve Airport DrainageGL MSP MN 3N8 Mahnomen County GA 9 $ 59,446 $ 59,446 $ - $ - Construct Fuel Farm

GL MSP MN MSP

Minneapolis-St Paul International/Wold-

Chamberlain P 103 $ 953,543 $ 953,543 $ - $ - Rehabilitate Runway - 12L/30R

GL MSP MN MSP

Minneapolis-St Paul International/Wold-

Chamberlain P 100 $ 2,958,682 $ 2,958,682 $ - $ - Rehabilitate Taxiway

GL MSP MN MSP

Minneapolis-St Paul International/Wold-

Chamberlain P 101 $ 5,000,000 $ - $ 5,000,000 $ - Construct Runway - 17/35

GL MSP MN MSP

Minneapolis-St Paul International/Wold-

Chamberlain P 102 $ 1,871,115 $ 1,871,115 $ - $ - Rehabilitate Runway - 12L/30RGL MSP MN MVE Montevideo-Chippewa County GA 10 $ 113,050 $ 113,050 $ - $ - Rehabilitate Runway [Design] - 14/32GL MSP MN JKJ Moorhead Municipal GA 5 $ 163,400 $ 163,400 $ - $ - Construct Building [Acquire revenue generating hangar]

GL MSP MN JKJ Moorhead Municipal GA 6 $ 44,679 $ 44,679 $ - $ -

Construct Building [Construct Revenue Generating Hangar (Phase 1-Design)], Extend

Taxiway [Extend hangar area taxilane (Phase 1 - Design)]

GL MSP MN JMR Mora Municipal GA 8 $ 99,085 $ 99,085 $ - $ -

Collect airport data for Airports Geographic Information System, Construct Runway -

Plan-1, Install Perimeter Fencing

GL MSP MN MOX Morris Municipal - Charlie Schmidt Field GA 4 $ 117,657 $ 117,657 $ - $ - Rehabilitate Apron, Rehabilitate Runway [Crack Repair:Rwy 14/32 & on Apron] - 14/32

GL MSP MN CNB Myers Field GA 8 $ 323,000 $ 323,000 $ - $ -

Construct Fuel Farm, Rehabilitate Apron [Remove old apron, grading of new area,

repaving of smaller apron.]GL MSP MN ULM New Ulm Municipal GA 8 $ 1,738,772 $ 150,000 $ 1,588,772 $ - Extend Runway - 15/33

GL MSP MN ORB Orr Regional GA 6 $ 47,405 $ 47,405 $ - $ -

Improve Access Road, Rehabilitate Apron, Rehabilitate Parking Lot, Rehabilitate Runway -

13/31, Rehabilitate Taxiway

GL MSP MN ORB Orr Regional GA 7 $ 841,821 $ 372,206 $ 469,615 $ - Rehabilitate Apron, Rehabilitate Runway - 13/31, Rehabilitate Taxiway

GL MSP MN VVV Ortonville Municipal-Martinson Field GA 7 $ 37,905 $ 37,905 $ - $ - Conduct Environmental Study, Construct Fuel FarmGL MSP MN OWA Owatonna Degner Regional GA 14 $ 88,566 $ 88,566 $ - $ - Construct Service Road

GL MSP MN PKD Park Rapids Municipal-Konshok Field GA 10 $ 66,500 $ 66,500 $ - $ -

Construct Access Road [Phase 1 - design engineering], Construct Parking Lot [Phase 1 -

Design], Construct Utilities [Phase 1 - Design], Improve Airport Drainage [Phase 1 -

Design], Install Perimeter Fencing [Phase 1 - Design]GL MSP MN PEX Paynesville Municipal GA 4 $ 75,000 $ 75,000 $ - $ - Construct BuildingGL MSP MN PEX Paynesville Municipal GA 5 $ 19,767 $ 19,767 $ - $ - Construct Building

Page 37 of 97

Page 38: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL MSP MN PWC Pine River Regional GA 6 $ 103,077 $ 103,077 $ - $ -

Acquire Land for Development, Conduct Miscellaneous Study, Install Miscellaneous

NAVAIDS, Rehabilitate Runway - 16/34GL MSP MN PQN Pipestone Municipal GA 5 $ 75,888 $ 75,888 $ - $ - Update Airport Master Plan StudyGL MSP MN PQN Pipestone Municipal GA 6 $ 36,624 $ 36,624 $ - $ - Acquire Snow Removal EquipmentGL MSP MN LYV Quentin Aanenson Field GA 8 $ 104,809 $ 104,809 $ - $ - Acquire Snow Removal EquipmentGL MSP MN HIB Range Regional CS 29 $ 304,105 $ 304,105 $ - $ - Construct Taxiway, Install Perimeter FencingGL MSP MN RWF Redwood Falls Municipal GA 10 $ 175,190 $ 175,190 $ - $ - Acquire Snow Removal Equipment, Conduct Miscellaneous StudyGL MSP MN RST Rochester International P 29 $ 1,359,220 $ 1,359,220 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway

GL MSP MN RST Rochester International P 28 $ 412,246 $ 412,246 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Construct Deicing

Containment Facility [design], Improve Airport Miscellaneous Improvements,

Rehabilitate Apron [design], Rehabilitate Taxiway [design]GL MSP MN 55Y Rushford Municipal GA 3 $ 400,943 $ 400,943 $ - $ - Construct BuildingGL MSP MN D39 Sauk Centre Municipal GA 4 $ 46,838 $ 46,838 $ - $ - Construct Building [Construct T-Hangar Phase 3]

GL MSP MN BFW Silver Bay Municipal GA 6 $ 47,500 $ 47,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 07/25, Rehabilitate TaxiwayGL MSP MN DYT Sky Harbor GA 7 $ 69,445 $ 69,445 $ - $ - Update Airport Master Plan Study

GL MSP MN D42 Springfield Municipal GA 8 $ 118,516 $ 118,516 $ - $ -

Acquire Snow Removal Equipment, Conduct Miscellaneous Study [storm water pollution

prevention plan]GL MSP MN JYG St James Municipal GA 8 $ 144,216 $ 144,216 $ - $ - Rehabilitate Runway - 15/33GL MSP MN SAZ Staples Municipal GA 6 $ 309,849 $ 309,849 $ - $ - Construct Snow Removal Equipment Building [Phase 2 - Construction]GL MSP MN *MNS State of Minnesota 7 $ 475,000 $ 475,000 $ - $ - Update State System Plan Study

GL MSP MN TVF Thief River Falls Regional CS 12 $ 440,421 $ 440,421 $ - $ -

Improve Terminal Building, Install Miscellaneous NAVAIDS, Rehabilitate Aircraft Rescue

& Fire Fighting Building, Update Miscellaneous StudyGL MSP MN 12D Tower Municipal GA 7 $ 61,750 $ 61,750 $ - $ - Modify Access Road [Phase 2 - Environmental Assessment]GL MSP MN ADC Wadena Municipal GA 6 $ 90,915 $ 90,915 $ - $ - Conduct Environmental Study

GL MSP MN Y49 Walker Municipal GA 6 $ 180,825 $ 180,825 $ - $ -

Construct Taxiway [Construct taxiway 15/32 Phase 2 construction & Construction

Engineering]GL MSP MN Y49 Walker Municipal GA 5 $ 531,054 $ 180,825 $ 350,229 $ - Construct Taxiway [Construct taxiway 15/33], Remove ObstructionsGL MSP MN RRT Warroad International Memorial GA 11 $ 51,381 $ 51,381 $ - $ - Construct Sand and Chemical Storage BuildingGL MSP MN ACQ Waseca Municipal GA 7 $ 165,790 $ 165,790 $ - $ - Construct Fuel Farm, Rehabilitate Runway - 15/33

GL MSP WI GRB Austin Straubel International P 41 $ 1,237,090 $ 1,237,090 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle w/new, 3,000 gal

unit], Update Airport Master Plan Study [Conduct master plan update]GL MSP WI GRB Austin Straubel International P 40 $ 1,330,000 $ 1,330,000 $ - $ - Rehabilitate Taxiway [Rehab TWY M between M3 and M4]

Page 38 of 97

Page 39: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL MSP WI CWA Central Wisconsin P 39 $ 2,104,250 $ 2,104,250 $ - $ -

Expand Terminal Building [Terminal area expansion (Phase 1 - evaluate terminal

development options)], Rehabilitate Apron [Apron repair (terminal, GA, commercial, and

ARFF building) design and construction]GL MSP WI CWA Central Wisconsin P 40 $ 1,805,000 $ 1,805,000 $ - $ - Expand Terminal Building [Terminal area expansion (Phase 2-design)]GL MSP WI EAU Chippewa Valley Regional P 31 $ 122,396 $ 122,396 $ - $ - Rehabilitate Terminal Building [restroom renovation]GL MSP WI EAU Chippewa Valley Regional P 32 $ 3,428,353 $ 877,604 $ 2,550,749 $ - Improve Terminal Building [Phase 5 multiple area improvements]GL MSP WI MSN Dane County Regional-Truax Field P 45 $ 6,080,000 $ 3,676,498 $ 2,403,502 $ - Rehabilitate TaxiwayGL MSP WI MSN Dane County Regional-Truax Field P 46 $ 725,000 $ - $ 725,000 $ - Collect airport data for Airports Geographic Information System

GL MSP WI MKE General Mitchell International P 61 $ 2,681,247 $ 2,681,247 $ - $ -

Install Guidance Signs, Install Runway Incursion Caution Bars, Modify Service Road,

Rehabilitate Runway [design] - 01L/19R, Rehabilitate Runway - 07L/25R

GL MSP WI MKE General Mitchell International P 60 $ 5,600,000 $ - $ 5,600,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [93 Homes]GL MSP WI MKE General Mitchell International P 62 $ 12,128,437 $ 1,228,437 $ 10,900,000 $ - Construct Runway Safety Area [All Objects] - 07R/25LGL MSP WI LSE La Crosse Municipal P 34 $ 6,650,000 $ 1,673,881 $ 4,976,119 $ - Extend TaxiwayGL MSP WI ATW Outagamie County Regional P 40 $ 190,000 $ 190,000 $ - $ - Construct Sand and Chemical Storage Building [phase 2]

GL MSP WI ATW Outagamie County Regional P 38 $ 731,215 $ 731,215 $ - $ -

Construct Sand and Chemical Storage Building [design], Construct Taxiway [EA], Install

Runway Incursion Caution Bars [design], Rehabilitate Apron [design], Rehabilitate

Taxiway [design]GL MSP WI ATW Outagamie County Regional P 41 $ 250,000 $ - $ 250,000 $ - Identify the airport's environmental footprintGL MSP WI ATW Outagamie County Regional P 39 $ 1,040,795 $ 1,040,795 $ - $ - Construct Sand and Chemical Storage Building

GL MSP WI RHI Rhinelander-Oneida County P 30 $ 636,500 $ 636,500 $ - $ -

Construct Access Road [Construct access road to general aviation expansion area],

Construct Aircraft Rescue & Fire Fighting Building [Construct replacement ARFF buidling

(Phase I - design)], Construct Taxiway [Design and construct Taxilane "H," and Taxilane

"G" extension], Remove Obstructions [remove obstructions from transitional surface

Phase I - environmental assessment]

GL MSP WI *WIB Wisconsin State Block Grant Program 47 $ 4,821,684 $ 4,821,684 $ - $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 46 $ 788,500 $ - $ 788,500 $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 45 $ 2,034,045 $ - $ 2,034,045 $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 50 $ 2,196,040 $ - $ 2,196,040 $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 49 $ 8,390,441 $ 8,390,441 $ - $ - Non primary development projects in state block grant program

Page 39 of 97

Page 40: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

GL MSP WI *WIB Wisconsin State Block Grant Program 44 $ 3,249,406 $ 3,249,406 $ - $ - Non primary development projects in state block grant program

GL MSP WI *WIB Wisconsin State Block Grant Program 48 $ 863,513 $ - $ 863,513 $ - Non primary development projects in state block grant program

NE ANE CT BDL Bradley International P 51 $ 1,737,412 $ 1,737,412 $ - $ - Rehabilitate Runway Lighting [Replace Electrical Vault Phase I] - 15/33NE ANE CT BDL Bradley International P 50 $ 2,500,000 $ - $ 2,500,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLNE ANE CT DXR Danbury Municipal R 35 $ 384,475 $ 384,475 $ - $ - Acquire Snow Removal Equipment

NE ANE CT GON Groton-New London GA 26 $ 6,029,987 $ 2,084,497 $ 3,945,490 $ -

Construct Runway Safety Area [Phase I Construction (Acquisition of EMAS Blocks)] -

05/23

NE ANE CT BDR Igor I Sikorsky Memorial GA 27 $ 570,000 $ 229,976 $ 340,024 $ - Rehabilitate Runway [PH I (Preliminary design and permitting)] - 06/24

NE ANE CT MMK Meriden Markham Municipal GA 13 $ 242,068 $ 242,068 $ - $ -

Construct Snow Removal Equipment Building [Phase I Design], Install Apron Lighting

[Phase II]NE ANE CT 4B8 Robertson Field R 4 $ 73,530 $ - $ 73,530 $ - Update Airport Master Plan Study [ALP Update]NE ANE CT *CTS State of Connecticut 6 $ 152,000 $ 152,000 $ - $ - Wildlife Hazard AssessmentsNE ANE CT *CTS State of Connecticut 5 $ 285,000 $ 285,000 $ - $ - Conduct State System Plan StudyNE ANE CT HVN Tweed-New Haven P 37 $ 412,742 $ - $ 412,742 $ - Conduct Noise Compatibility Plan StudyNE ANE CT HVN Tweed-New Haven P 36 $ 5,745,598 $ 493,908 $ 5,251,690 $ - Rehabilitate Runway - 02/20

NE ANE CT *CTV Various Locations in Connecticut 6 $ 95,000 $ 95,000 $ - $ -

Rehabilitate Runway (Danielson - 13/31; Groton-New London - 05/23; Hartford-Brainard

- 02/20; Waterbury-Oxford - 18/36; Windham - 18/36)NE ANE CT OXC Waterbury-Oxford GA 15 $ 5,000,000 $ 150,000 $ 4,850,000 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE MA BAF Barnes Municipal GA 32 $ 473,515 $ - $ 473,515 $ -

Acquire Land for Noise Compatibility within 70 - 74 DNL, Noise Mitigation Measures for

Residences within 65 - 69 DNL

NE ANE MA BAF Barnes Municipal GA 34 $ 2,500,000 $ - $ 2,500,000 $ -

Acquire Land for Noise Compatibility within 70 - 74 DNL, Noise Mitigation Measures for

Residences within 65 - 69 DNLNE ANE MA BAF Barnes Municipal GA 33 $ 426,835 $ 426,835 $ - $ - Install Taxiway Lighting

NE ANE MA HYA

Barnstable Municipal-

Boardman/Polando Field P 50 $ 70,300 $ 70,300 $ - $ - Runway Incursion Markings [Surface painted hold signs]

NE ANE MA HYA

Barnstable Municipal-

Boardman/Polando Field P 49 $ 38,000 $ 38,000 $ - $ - Collect airport data for Airports Geographic Information SystemNE ANE MA *MAS Commonwealth of Massachusetts 5 $ 564,300 $ 564,300 $ - $ - Conduct State System Plan StudyNE ANE MA GDM Gardner Municipal GA 14 $ 57,000 $ 57,000 $ - $ - Conduct Environmental Study [Rare Species Survey]

NE ANE MA BOS

General Edward Lawrence Logan

International P 102 $ 8,348,935 $ 2,448,935 $ 5,900,000 $ - Construct Runway [Part (A)] - 14/32

NE ANE MA BOS

General Edward Lawrence Logan

International P 105 $ 5,974,017 $ - $ 5,974,017 $ - VALE Vehicle

Page 40 of 97

Page 41: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NE ANE MA BOS

General Edward Lawrence Logan

International P 103 $ 1,331,315 $ 1,331,315 $ - $ - Construct Runway [Part (B)] - 14/32

NE ANE MA BOS

General Edward Lawrence Logan

International P 104 $ 1,000,203 $ 1,000,203 $ - $ - Rehabilitate Taxiway ["N"]NE ANE MA AQW Harriman-And-West GA 21 $ 6,754,500 $ 728,288 $ 6,026,212 $ - Rehabilitate Runway [Includes T/W Safety Area Embankment] - 11/29NE ANE MA BED Laurence G Hanscom Field CS 31 $ 1,540,278 $ 150,000 $ 1,390,278 $ - Rehabilitate Taxiway [Taxiway "S" and West Ramp]

NE ANE MA LWM Lawrence Municipal R 32 $ 1,294,682 $ - $ - $ 1,294,682

Rehabilitate Apron [Terminal, North, South and West Aprons], Rehabilitate Runway -

14/32, Rehabilitate Taxiway [A, B, C, D, E & F]NE ANE MA LWM Lawrence Municipal R 31 $ 43,515 $ 43,515 $ - $ - Update Airport Master Plan Study [RSA Study]NE ANE MA 1B9 Mansfield Municipal GA 23 $ 152,950 $ 152,950 $ - $ - Install Runway Lighting [32] - 14/32

NE ANE MA GHG

Marshfield Municipal - George Harlow

Field GA 18 $ 657,400 $ 657,400 $ - $ - Conduct Environmental StudyNE ANE MA MVY Marthas Vineyard P 36 $ 932,900 $ 932,900 $ - $ - Acquire Snow Removal Equipment

NE ANE MA MVY Marthas Vineyard P 38 $ 10,806,250 $ - $ 10,806,250 $ -

Construct Taxiway [Reconstruct and Re-Align Taxiway A], Rehabilitate Apron,

Rehabilitate Taxiway [reconstruct stub taxiway C and extend to connect to taxiway A]NE ANE MA ACK Nantucket Memorial P 51 $ 1,061,357 $ 1,061,357 $ - $ - Construct Terminal Building [Phase VI (Part B)]NE ANE MA ACK Nantucket Memorial P 50 $ 1,061,356 $ 1,061,356 $ - $ - Construct Terminal Building [Phase VI (Part A)]

NE ANE MA EWB New Bedford Regional P 40 $ 875,745 $ 875,745 $ - $ -

Extend Runway Safety Area [Design] - 05/23, Extend Runway Safety Area [Land

Acquisition - Mitigation] - 05/23, Extend Runway Safety Area [NAVAIDS - Reimburseable

Agreement] - 05/23NE ANE MA OWD Norwood Memorial R 30 $ 572,850 $ 572,850 $ - $ - Improve Runway Safety Area - 10/28NE ANE MA ORE Orange Municipal GA 19 $ 188,100 $ 188,100 $ - $ - Acquire Snow Removal EquipmentNE ANE MA PSF Pittsfield Municipal GA 25 $ 2,000,000 $ - $ 2,000,000 $ - Extend Runway [(Phase V)] - 08/26NE ANE MA PSF Pittsfield Municipal GA 24 $ 2,000,000 $ 1,153,670 $ 846,330 $ - Extend Runway [(Phase IV)] - 08/26

NE ANE MA PYM Plymouth Municipal GA 37 $ 904,400 $ 904,400 $ - $ - Construct Taxiway, Install Runway Lighting [Install Electrical Vault] - 15/33NE ANE MA PVC Provincetown Municipal P 27 $ 47,500 $ 47,500 $ - $ - Acquire Snow Removal EquipmentNE ANE MA PVC Provincetown Municipal P 29 $ 657,400 $ 657,400 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNE ANE MA PVC Provincetown Municipal P 28 $ 285,000 $ 285,000 $ - $ - Conduct Environmental Study [Permitting and Design]NE ANE MA 3B0 Southbridge Municipal GA 20 $ 138,700 $ 138,700 $ - $ - Conduct Airport Master Plan Study [ALP Update]NE ANE MA TAN Taunton Municipal - King Field GA 20 $ 168,150 $ 168,150 $ - $ - Conduct Environmental Study

NE ANE MA CEF Westover ARB/Metropolitan P 22 $ 999,020 $ 915,413 $ 83,607 $ - Expand Apron, Rehabilitate Apron [pavement maintenance], Rehabilitate Taxiway

NE ANE MA ORH Worcester Regional GA 42 $ 5,472,278 $ 150,000 $ 5,322,278 $ - Rehabilitate Runway [4000'] - 11/29, Rehabilitate Taxiway [Taxiway "D" (Part "A")]NE ANE ME LEW Auburn/Lewiston Municipal R 19 $ 409,450 $ 409,450 $ - $ - Acquire Land for DevelopmentNE ANE ME AUG Augusta State CS 23 $ 16,150 $ 16,150 $ - $ - Rehabilitate Runway [EA - Obstructions] - 17/35

Page 41 of 97

Page 42: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NE ANE ME AUG Augusta State CS 22 $ 2,564,050 $ 1,471,090 $ 1,092,960 $ -

Acquire Snow Removal Equipment [EMAS], Rehabilitate Runway [Phase III - (Part A)

EMAS - Blocks] - 17/35NE ANE ME BGR Bangor International P 51 $ 2,174,156 $ 2,174,156 $ - $ - Rehabilitate Apron [Cargo - Phase III (A) Part A]

NE ANE ME BGR Bangor International P 52 $ 807,596 $ 807,596 $ - $ - Rehabilitate Apron [Cargo - Phase III (B) Part B], Rehabilitate Apron [Design of GA Apron]NE ANE ME BST Belfast Municipal GA 8 $ 137,750 $ 137,750 $ - $ - Construct Apron [Preliminary Design and Permitting]NE ANE ME BST Belfast Municipal GA 9 $ 76,000 $ 76,000 $ - $ - Acquire Land for Development [Hangar to become SRE Building]

NE ANE ME OWK Central Maine Airport of Norridgewock GA 12 $ 105,450 $ 105,450 $ - $ - Remove Obstructions [Design and Permitting]

NE ANE ME OWK Central Maine Airport of Norridgewock GA 13 $ 162,491 $ 162,491 $ - $ - Remove Obstructions [EA]NE ANE ME OLD Dewitt Field,Old Town Municipal GA 8 $ 122,075 $ 122,075 $ - $ - Acquire Snow Removal EquipmentNE ANE ME 1B0 Dexter Regional GA 7 $ 380,000 $ 380,000 $ - $ - Construct Fuel FarmNE ANE ME IZG Eastern Slopes Regional GA 15 $ 142,500 $ 142,500 $ - $ - Remove ObstructionsNE ANE ME 3B1 Greenville Municipal GA 13 $ 152,000 $ 152,000 $ - $ - Install Weather Reporting EquipmentNE ANE ME BHB Hancock County-Bar Harbor P 30 $ 161,406 $ 161,406 $ - $ - Update Airport Master Plan StudyNE ANE ME BHB Hancock County-Bar Harbor P 31 $ 770,615 $ 770,615 $ - $ - Construct Runway Safety Area [Runway 22 End] - 04/22NE ANE ME HUL Houlton International GA 13 $ 210,900 $ 210,900 $ - $ - Install Perimeter FencingNE ANE ME RKD Knox County Regional P 33 $ 579,352 $ 579,352 $ - $ - Construct Terminal Building [Phase II (Part B)]NE ANE ME RKD Knox County Regional P 32 $ 150,472 $ - $ 150,472 $ - VALE InfrastructureNE ANE ME RKD Knox County Regional P 34 $ 144,400 $ 144,400 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 13/31NE ANE ME RKD Knox County Regional P 35 $ 182,780 $ 182,780 $ - $ - Construct Runway Safety Area [EA Phase I] - 13/31NE ANE ME RKD Knox County Regional P 31 $ 860,175 $ 860,175 $ - $ - Construct Terminal Building [Phase II (Part A)]NE ANE ME LRG Lincoln Regional GA 7 $ 122,550 $ 122,550 $ - $ - Conduct Environmental Study [Misc. Land and Obstructions]NE ANE ME MLT Millinocket Municipal GA 13 $ 90,820 $ 90,820 $ - $ - Remove Obstructions [Off Airport]NE ANE ME 59B Newton Field GA 11 $ 87,400 $ 87,400 $ - $ - Update Airport Master Plan StudyNE ANE ME FVE Northern Aroostook Regional GA 14 $ 120,687 $ 120,687 $ - $ - Construct Snow Removal Equipment Building [Phase IA]

NE ANE ME FVE Northern Aroostook Regional GA 15 $ 228,000 $ 228,000 $ - $ - Construct Snow Removal Equipment Building [Phase II - Surface Water Treatment]

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 30 $ 296,066 $ 296,066 $ - $ - Acquire Snow Removal Equipment [Part A]

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 33 $ 335,778 $ 335,778 $ - $ - Acquire Snow Removal Equipment [Part B]

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 31 $ 23,622 $ 23,622 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 01/19, Rehabilitate Taxiway [Crack Repair]

NE ANE ME PQI

Northern Maine Regional Airport at

Presque Isle P 32 $ 263,016 $ 263,016 $ - $ - Rehabilitate Apron [GA (Design)]

NE ANE ME 2B7 Pittsfield Municipal GA 11 $ 29,201 $ 29,201 $ - $ -

Install Miscellaneous NAVAIDS [Reimbursable Agreement], Install Perimeter Fencing

[Design], Update Airport Master Plan Study [SwPPP]

Page 42 of 97

Page 43: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NE ANE ME PWM Portland International Jetport P 69 $ 2,092,797 $ - $ 2,092,797 $ - Construct Runway Safety Area [(29)] - 11/29NE ANE ME PWM Portland International Jetport P 70 $ 2,534,460 $ - $ 2,534,460 $ - VALE Infrastructure [Geothermal Heating System]

NE ANE ME PWM Portland International Jetport P 71 $ 4,272,972 $ 4,272,972 $ - $ -

Construct Runway Safety Area [Phase II] - 18/36, Construct Runway Safety Area [Phase II

Reimbursable Agreement] - 18/36NE ANE ME PNN Princeton Municipal GA 4 $ 95,000 $ 95,000 $ - $ - Update Airport Master Plan StudyNE ANE ME SFM Sanford Regional R 26 $ 4,937,964 $ 711,517 $ 4,226,447 $ - Rehabilitate Runway [Phase II] - 07/25NE ANE ME 8B0 Steven A. Bean Municipal GA 11 $ 117,800 $ 117,800 $ - $ - Update Airport Master Plan StudyNE ANE ME B21 Sugarloaf Regional GA 4 $ 325,850 $ 325,850 $ - $ - Construct ApronNE ANE ME WVL Waterville Robert Lafleur GA 18 $ 119,700 $ 119,700 $ - $ - Rehabilitate Runway [Design] - 14/32NE ANE ME WVL Waterville Robert Lafleur GA 17 $ 161,310 $ 161,310 $ - $ - Acquire Snow Removal EquipmentNE ANE ME IWI Wiscasset GA 15 $ 149,910 $ 149,910 $ - $ - Update Airport Master Plan StudyNE ANE NH LEB Lebanon Municipal CS 44 $ 66,500 $ 66,500 $ - $ - Update Miscellaneous Study

NE ANE NH MHT Manchester P 79 $ 1,100,998 $ 1,100,998 $ - $ - Construct Deicing Containment Facility, Install Runway Sensors - 17/35

NE ANE NH MHT Manchester P 83 $ 1,793,413 $ 1,793,413 $ - $ -

Acquire Snow Removal Equipment [Install Snow Melters], Remove Obstructions [RPZ -

Bildor Drive Demolition], Wildlife Hazard AssessmentsNE ANE NH MHT Manchester P 80 $ 647,900 $ 647,900 $ - $ - Conduct Environmental Study

NE ANE NH MHT Manchester P 82 $ 675,000 $ - $ 675,000 $ - Collect airport data for Airports Geographic Information System [Electronic ALP]

NE ANE NH MHT Manchester P 81 $ 2,156,976 $ 2,156,976 $ - $ -

Acquire Snow Removal Equipment [Snow Melters], Modify Aircraft Rescue & Fire

Fighting Building

NE ANE NH *NHB

New Hampshire State Block Grant

Program 8 $ 1,512,446 $ 1,212,446 $ 300,000 $ - Non primary development projects in state block grant program

NE ANE NH *NHB

New Hampshire State Block Grant

Program 10 $ 3,143,085 $ 1,779 $ 3,141,306 $ - Non primary development projects in state block grant program

NE ANE NH *NHB

New Hampshire State Block Grant

Program 9 $ 885,005 $ 885,005 $ - $ - Non primary development projects in state block grant programNE ANE NH PSM Portsmouth International at Pease P 48 $ 576,166 $ 576,166 $ - $ - Install Perimeter Fencing

NE ANE NH PSM Portsmouth International at Pease P 45 $ 30,590 $ 30,590 $ - $ -

Acquire Friction Measuring Equipment [Design and bidding], Acquire Snow Removal

Equipment [Design]NE ANE NH PSM Portsmouth International at Pease P 47 $ 75,430 $ 75,430 $ - $ - Install Perimeter Fencing [Design]NE ANE NH PSM Portsmouth International at Pease P 46 $ 735,300 $ - $ 735,300 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLNE ANE RI BID Block Island State P 14 $ 124,984 $ 124,984 $ - $ - Install Instrument Approach Aid [MALSF Design Only] - 10/28NE ANE RI UUU Newport State GA 18 $ 46,539 $ 46,539 $ - $ - Conduct Airport Master Plan Study [Obstruction Evaluation]NE ANE RI SFZ North Central State R 22 $ 499,859 $ 499,859 $ - $ - Install Perimeter Fencing, Light ObstructionsNE ANE RI SFZ North Central State R 21 $ 216,346 $ 216,346 $ - $ - Conduct Environmental StudyNE ANE RI *RIS State of Rhode Island 1 $ 191,245 $ 191,245 $ - $ - Conduct State System Plan StudyNE ANE RI PVD Theodore Francis Green State P 93 $ 10,000,000 $ - $ 10,000,000 $ - Acquire Land for Noise Compatibility within 70 - 74 DNL

Page 43 of 97

Page 44: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NE ANE RI PVD Theodore Francis Green State P 94 $ 943,711 $ 943,711 $ - $ - Conduct Environmental Study [Reimbursement]NE ANE RI WST Westerly State P 18 $ 79,117 $ 79,117 $ - $ - Update Airport Master Plan Study [Obstruction Evaluation]NE ANE VT BTV Burlington International P 84 $ 2,400,000 $ - $ 2,400,000 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL

NE ANE VT BTV Burlington International P 82 $ 11,987,318 $ 2,147,059 $ 9,840,259 $ - Rehabilitate Runway [Phase 1] - 15/33, Rehabilitate Runway [Stub Taxiway "C"] - 15/33

NE ANE VT BTV Burlington International P 83 $ 8,183,748 $ 1,554,768 $ 6,628,980 $ -

Extend Runway [reimbursable agreement relocate PAPI on rwy end 1] - 01/19, Extend

Runway [rwy end 19 extension] - 01/19, Rehabilitate Runway [Phase 2] - 15/33NE ANE VT BTV Burlington International P 81 $ 4,051,485 $ - $ 4,051,485 $ - Acquire Land for Noise Compatibility within 65 - 69 DNLNE ANE VT BTV Burlington International P 85 $ 447,461 $ - $ - $ 447,461 Rehabilitate Taxiway [Taxiway J]NE ANE VT MPV Edward F Knapp State GA 13 $ 407,341 $ 407,341 $ - $ - Acquire Snow Removal EquipmentNE ANE VT VSF Hartness State (Springfield) GA 6 $ 189,905 $ 189,905 $ - $ - Light Obstructions [Hazard Beacons - Phase I Design]NE ANE VT VSF Hartness State (Springfield) GA 4 $ 118,104 $ 118,104 $ - $ - Acquire Snow Removal EquipmentNE ANE VT VSF Hartness State (Springfield) GA 5 $ 11,769 $ 11,769 $ - $ - Install Perimeter FencingNE ANE VT 6B0 Middlebury State GA 7 $ 298,069 $ 298,069 $ - $ - Construct Snow Removal Equipment BuildingNE ANE VT 6B0 Middlebury State GA 6 $ 90,201 $ 90,201 $ - $ - Install Perimeter FencingNE ANE VT MVL Morrisville-Stowe State GA 9 $ 282,259 $ 282,259 $ - $ - Acquire Land For Approaches [(Clearing)]

NE ANE VT RUT Rutland - Southern Vermont Regional CS 31 $ 11,163 $ 11,163 $ - $ - Remove ObstructionsNE ANE VT *VTS State of Vermont 10 $ 84,790 $ 84,790 $ - $ - Update State System Plan StudyNE ANE VT *VTS State of Vermont 9 $ 54,815 $ 54,815 $ - $ - Update State System Plan Study

NE ANE VT *VTV Various Locations in Vermont 6 $ 134,567 $ 134,567 $ - $ - Conduct aeronautical survey for WAAS approach (Caledonia County; Newport State)NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 42 $ 142,522 $ 142,522 $ - $ - Wildlife Hazard AssessmentsNM DEN CO ASE Aspen-Pitkin County/Sardy Field P 43 $ 1,200,000 $ 1,200,000 $ - $ - Extend Runway [design only] - 15/33NM DEN CO ASE Aspen-Pitkin County/Sardy Field P 44 $ 1,600,000 $ - $ 1,600,000 $ - Extend Runway [Environmental Mitigation] - 15/33NM DEN CO AJZ Blake Field GA 8 $ 225,000 $ 225,000 $ - $ - Expand ApronNM DEN CO AJZ Blake Field GA 9 $ 225,000 $ 225,000 $ - $ - Expand ApronNM DEN CO APA Centennial R 43 $ 150,000 $ 150,000 $ - $ - Acquire Snow Removal EquipmentNM DEN CO COS City of Colorado Springs Municipal P 52 $ 6,500,000 $ - $ 6,500,000 $ - Rehabilitate Runway [construction] - 12/30

NM DEN CO COS City of Colorado Springs Municipal P 51 $ 4,116,359 $ 4,116,359 $ - $ -

Rehabilitate Taxiway [Replacement of remainder of Txy H through intersection with Twy

E]NM DEN CO CEZ Cortez Municipal CS 28 $ 1,475,753 $ 1,475,753 $ - $ - Improve Airport Miscellaneous ImprovementsNM DEN CO CAG Craig-Moffat GA 11 $ 16,625 $ 16,625 $ - $ - Install Taxiway Lighting, Rehabilitate Runway - 07/25NM DEN CO CAG Craig-Moffat GA 12 $ 140,443 $ 140,443 $ - $ - Install Taxiway Lighting, Rehabilitate Runway - 07/25NM DEN CO DEN Denver International P 69 $ 3,414,728 $ - $ 3,414,728 $ - Rehabilitate Runway - 08/26NM DEN CO DEN Denver International P 61 $ 1,609,750 $ 1,609,750 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM DEN CO DEN Denver International P 64 $ 7,000,000 $ - $ 7,000,000 $ - Expand ApronNM DEN CO DEN Denver International P 65 $ 3,000,000 $ - $ 3,000,000 $ - Widen Runway - 07/25

Page 44 of 97

Page 45: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM DEN CO DEN Denver International P 68 $ 600,000 $ - $ 600,000 $ - Identify the airport's environmental footprintNM DEN CO DEN Denver International P 66 $ 1,325,000 $ - $ 1,325,000 $ - Collect airport data for Airports Geographic Information SystemNM DEN CO DEN Denver International P 67 $ 2,279,439 $ 2,279,439 $ - $ - Rehabilitate TaxiwayNM DEN CO DEN Denver International P 62 $ 1,415,250 $ 1,415,250 $ - $ - Construct Deicing Containment FacilityNM DEN CO DEN Denver International P 63 $ 2,234,034 $ 2,234,034 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM DEN CO DRO Durango-La Plata County P 39 $ 258,000 $ 258,000 $ - $ - Conduct Airport Master Plan StudyNM DEN CO DRO Durango-La Plata County P 37 $ 200,000 $ 200,000 $ - $ - Improve Service RoadNM DEN CO DRO Durango-La Plata County P 38 $ 296,000 $ 296,000 $ - $ - Rehabilitate ApronNM DEN CO EGE Eagle County Regional P 46 $ 325,000 $ 325,000 $ - $ - Update Airport Master Plan StudyNM DEN CO EGE Eagle County Regional P 45 $ 943,363 $ 943,363 $ - $ - Rehabilitate Runway - 07/25NM DEN CO EIK Erie Municipal GA 11 $ 241,489 $ 241,489 $ - $ - Construct Taxiway, Rehabilitate ApronNM DEN CO FNL Fort Collins-Loveland Municipal P 28 $ 549,546 $ 549,546 $ - $ - Rehabilitate Runway - 15/33NM DEN CO FNL Fort Collins-Loveland Municipal P 27 $ 500,000 $ 500,000 $ - $ - Rehabilitate Runway - 15/33NM DEN CO FMM Fort Morgan Municipal GA 9 $ 217,094 $ 217,094 $ - $ - Conduct Environmental StudyNM DEN CO 1V6 Fremont County GA 12 $ 51,600 $ 51,600 $ - $ - Rehabilitate Runway - 11/29

NM DEN CO 1V6 Fremont County GA 11 $ 181,619 $ 181,619 $ - $ -

Rehabilitate Runway [(funds include $30,106 NPE08 carryover + $101,307 NPE09

carryover +$150K NPE10)] - 11/29

NM DEN CO RIL Garfield County Regional GA 20 $ 2,227,086 $ - $ 2,227,086 $ - Improve Runway Safety Area [Reimbursable agreement to relocate VOR] - 08/26NM DEN CO GJT Grand Junction Regional P 43 $ 133,314 $ 133,314 $ - $ - Conduct Environmental StudyNM DEN CO GJT Grand Junction Regional P 46 $ 4,150,000 $ - $ 4,150,000 $ - Acquire Safety Equipment and/or FencingNM DEN CO GJT Grand Junction Regional P 44 $ 497,436 $ 497,436 $ - $ - Acquire Safety Equipment and/or Fencing [design]NM DEN CO GJT Grand Junction Regional P 45 $ 3,050,000 $ - $ 3,050,000 $ - Rehabilitate ApronNM DEN CO GJT Grand Junction Regional P 42 $ 946,631 $ 946,631 $ - $ - Rehabilitate ApronNM DEN CO GXY Greeley-Weld County GA 21 $ 75,000 $ 75,000 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM DEN CO GXY Greeley-Weld County GA 22 $ 75,000 $ 75,000 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM DEN CO GUC Gunnison-Crested Butte Regional P 43 $ 573,896 $ 573,896 $ - $ - Rehabilitate TaxiwayNM DEN CO ANK Harriet Alexander Field GA 12 $ 300,000 $ 300,000 $ - $ - Rehabilitate Runway - 06/24NM DEN CO HEQ Holyoke GA 7 $ 169,380 $ 169,380 $ - $ - Expand ApronNM DEN CO HEQ Holyoke GA 8 $ 169,380 $ 169,380 $ - $ - Expand ApronNM DEN CO AIB Hopkins Field GA 6 $ 75,000 $ 75,000 $ - $ - Rehabilitate Runway - 05/23NM DEN CO AIB Hopkins Field GA 7 $ 75,000 $ 75,000 $ - $ - Rehabilitate Runway - 05/23NM DEN CO ITR Kit Carson County GA 10 $ 374,915 $ 374,915 $ - $ - Install Taxiway Lighting, Rehabilitate Runway - 15/33NM DEN CO LHX La Junta Municipal GA 10 $ 150,000 $ 150,000 $ - $ - Rehabilitate TaxiwayNM DEN CO LXV Lake County GA 9 $ 124,412 $ 124,412 $ - $ - Construct Snow Removal Equipment Building

NM DEN CO LIC Limon Municipal GA 10 $ 411,525 $ 411,525 $ - $ - Acquire Snow Removal Equipment, Install Taxiway Lighting, Rehabilitate Taxiway

NM DEN CO LIC Limon Municipal GA 9 $ 38,475 $ 38,475 $ - $ - Acquire Snow Removal Equipment, Install Taxiway Lighting, Rehabilitate Taxiway

Page 45 of 97

Page 46: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM DEN CO 20V Mc Elroy Airfield GA 11 $ 38,000 $ 38,000 $ - $ - Expand ApronNM DEN CO 20V Mc Elroy Airfield GA 12 $ 350,264 $ 350,264 $ - $ - Expand ApronNM DEN CO EEO Meeker GA 8 $ 150,000 $ 150,000 $ - $ - Construct Runway - 03/21NM DEN CO MVI Monte Vista Municipal GA 10 $ 113,667 $ 113,667 $ - $ - Install Miscellaneous NAVAIDS, Install Perimeter FencingNM DEN CO MTJ Montrose Regional P 38 $ 1,056,208 $ 1,056,208 $ - $ - Expand Terminal BuildingNM DEN CO MTJ Montrose Regional P 39 $ 1,600,800 $ - $ 1,600,800 $ - Acquire Safety Equipment and/or FencingNM DEN CO MTJ Montrose Regional P 37 $ 1,017,065 $ 1,017,065 $ - $ - Expand Terminal BuildingNM DEN CO TAD Perry Stokes GA 5 $ 225,000 $ 225,000 $ - $ - Rehabilitate Runway - 03/21NM DEN CO TAD Perry Stokes GA 6 $ 225,000 $ 225,000 $ - $ - Rehabilitate Runway - 03/21NM DEN CO PUB Pueblo Memorial CS 30 $ 8,510,477 $ 1,510,477 $ 7,000,000 $ - Construct Runway - Plan-1, Wildlife Hazard AssessmentsNM DEN CO BJC Rocky Mountain Metropolitan R 49 $ 55,000 $ 55,000 $ - $ - Wildlife Hazard AssessmentsNM DEN CO BJC Rocky Mountain Metropolitan R 48 $ 393,195 $ 393,195 $ - $ - Conduct Environmental StudyNM DEN CO BJC Rocky Mountain Metropolitan R 50 $ 150,000 $ 150,000 $ - $ - Install Runway Vertical/Visual Guidance System - 11L/29RNM DEN CO BJC Rocky Mountain Metropolitan R 47 $ 75,000 $ 75,000 $ - $ - Wildlife Hazard AssessmentsNM DEN CO 4V1 Spanish Peaks Airfield GA 5 $ 23,870 $ 23,870 $ - $ - Remove ObstructionsNM DEN CO *COS State of Colorado 10 $ 250,000 $ 250,000 $ - $ - Update State System Plan StudyNM DEN CO STK Sterling Municipal GA 11 $ 4,200,395 $ 4,200,395 $ - $ - Extend Runway - 15/33, Extend Taxiway, Rehabilitate Runway - 15/33

NM DEN CO TEX Telluride Regional P 26 $ 17,000,000 $ - $ 17,000,000 $ - Improve Runway Safety Area [Construction Phase 3: grade RSA/EMAS] - 09/27NM DEN CO TEX Telluride Regional P 27 $ 3,400,000 $ - $ 3,400,000 $ - Improve Runway Safety Area [Construction Phase 4] - 09/27NM DEN CO LMO Vance Brand GA 12 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyNM DEN CO 2V5 Wray Municipal GA 11 $ 124,627 $ 124,627 $ - $ - Rehabilitate Runway - 17/35, Rehabilitate TaxiwayNM DEN CO 2V5 Wray Municipal GA 12 $ 76,947 $ 76,947 $ - $ - Rehabilitate Runway - 17/35, Rehabilitate TaxiwayNM DEN CO HDN Yampa Valley P 35 $ 437,134 $ 437,134 $ - $ - Modify Terminal Building [design]NM DEN CO HDN Yampa Valley P 37 $ 150,000 $ 150,000 $ - $ - Wildlife Hazard AssessmentsNM DEN CO HDN Yampa Valley P 36 $ 2,456,856 $ 2,456,856 $ - $ - Modify Terminal Building [construction]NM DEN CO 2V6 Yuma Municipal GA 7 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway - 16/34NM DEN UT U52 Beaver Municipal GA 10 $ 300,196 $ 300,196 $ - $ - Construct Snow Removal Equipment BuildingNM DEN UT BDG Blanding Municipal GA 13 $ 484,504 $ 484,504 $ - $ - Rehabilitate ApronNM DEN UT BMC Brigham City GA 22 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan StudyNM DEN UT BMC Brigham City GA 21 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan StudyNM DEN UT CNY Canyonlands Field CS 21 $ 675,000 $ 675,000 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM DEN UT CDC Cedar City Regional CS 25 $ 185,000 $ 185,000 $ - $ - Wildlife Hazard AssessmentsNM DEN UT CDC Cedar City Regional CS 26 $ 308,756 $ 308,756 $ - $ - Environmental Mitigation

NM DEN UT DTA Delta Municipal GA 10 $ 272,353 $ 272,353 $ - $ -

Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway - 17/35, Rehabilitate

TaxiwayNM DEN UT U69 Duchesne Municipal GA 6 $ 225,000 $ 225,000 $ - $ - Rehabilitate Runway - 17/35NM DEN UT 1L7 Escalante Municipal GA 7 $ 684,138 $ 684,138 $ - $ - Rehabilitate Runway - 13/31NM DEN UT 1L8 General Dick Stout Field GA 3 $ 89,300 $ 89,300 $ - $ - Update Airport Master Plan StudyNM DEN UT U34 Green River Municipal GA 8 $ 433,303 $ 433,303 $ - $ - Construct Taxiway

Page 46 of 97

Page 47: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM DEN UT KNB Kanab Municipal GA 10 $ 210,413 $ 210,413 $ - $ - Rehabilitate ApronNM DEN UT KNB Kanab Municipal GA 9 $ 210,414 $ 210,414 $ - $ - Rehabilitate ApronNM DEN UT LGU Logan-Cache GA 21 $ 150,602 $ 150,602 $ - $ - Improve Runway Safety Area - 17/35, Rehabilitate Taxiway

NM DEN UT MLF

Milford Municipal/Ben and Judy Briscoe

Field GA 11 $ 549,390 $ 549,390 $ - $ - Construct TaxiwayNM DEN UT +08S Monticello Municipal Airport 5 $ 1,949,347 $ 1,949,347 $ - $ - Construct New Airport [Paving Phase 1]NM DEN UT +08S Monticello Municipal Airport 6 $ 950,653 $ 950,653 $ - $ - Construct New AirportNM DEN UT +06V New 13 $ 11,000,000 $ 1,000,000 $ 10,000,000 $ - Construct New Airport [Construction, Sch III]NM DEN UT OGD Ogden-Hinckley R 34 $ 148,804 $ 148,804 $ - $ - Rehabilitate Runway [(Design PH3)] - 16/34NM DEN UT U55 Panguitch Municipal GA 8 $ 233,606 $ 233,606 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM DEN UT U55 Panguitch Municipal GA 9 $ 154,180 $ 154,180 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM DEN UT 1L9 Parowan GA 13 $ 300,000 $ 300,000 $ - $ - Environmental MitigationNM DEN UT RIF Richfield Municipal GA 12 $ 397,238 $ 397,238 $ - $ - Construct Runway - 01/19NM DEN UT SLC Salt Lake City International P 95 $ 11,066,676 $ 3,566,676 $ 7,500,000 $ - Construct ApronNM DEN UT U42 South Valley Regional R 14 $ 300,000 $ 300,000 $ - $ - Install Airfield Guidance SignsNM DEN UT *UTS State of Utah 11 $ 135,000 $ 135,000 $ - $ - Conduct State System Plan StudyNM DEN UT VEL Vernal Regional CS 25 $ 250,000 $ 250,000 $ - $ - Conduct Environmental StudyNM DEN UT 38U Wayne Wonderland GA 6 $ 300,000 $ 300,000 $ - $ - Environmental MitigationNM DEN UT ENV Wendover P 21 $ 858,130 $ 858,130 $ - $ - Construct TaxiwayNM DEN UT ENV Wendover P 22 $ 6,000,000 $ - $ 6,000,000 $ - Construct TaxiwayNM DEN WY AFO Afton Municipal GA 18 $ 229,353 $ 229,353 $ - $ - Install Perimeter FencingNM DEN WY AFO Afton Municipal GA 19 $ 155,159 $ 155,159 $ - $ - Install Perimeter Fencing

NM DEN WY CPR Casper/Natrona County International P 48 $ 954,872 $ 954,872 $ - $ - Rehabilitate Taxiway

NM DEN WY CPR Casper/Natrona County International P 49 $ 924,023 $ 924,023 $ - $ - Rehabilitate TaxiwayNM DEN WY CYS Cheyenne Regional/Jerry Olson Field P 45 $ 767,690 $ 767,690 $ - $ - Rehabilitate TaxiwayNM DEN WY CYS Cheyenne Regional/Jerry Olson Field P 46 $ 275,000 $ 75,000 $ 200,000 $ - Rehabilitate Taxiway, Safety Management System (SMS) ProgramNM DEN WY 9U4 Dixon GA 12 $ 150,000 $ 150,000 $ - $ - Conduct Airport Master Plan StudyNM DEN WY FBR Fort Bridger GA 9 $ 75,000 $ 75,000 $ - $ - Construct Snow Removal Equipment BuildingNM DEN WY FBR Fort Bridger GA 8 $ 75,000 $ 75,000 $ - $ - Construct Snow Removal Equipment BuildingNM DEN WY GCC Gillette-Campbell County P 35 $ 425,000 $ 425,000 $ - $ - Expand ApronNM DEN WY GCC Gillette-Campbell County P 34 $ 575,000 $ 575,000 $ - $ - Expand ApronNM DEN WY W43 Hulett Municipal GA 15 $ 55,725 $ 55,725 $ - $ - Update Airport Master Plan StudyNM DEN WY W43 Hulett Municipal GA 14 $ 114,275 $ 114,275 $ - $ - Update Airport Master Plan StudyNM DEN WY JAC Jackson Hole P 44 $ 1,184,472 $ 1,184,472 $ - $ - Expand Terminal BuildingNM DEN WY JAC Jackson Hole P 43 $ 1,184,471 $ 1,184,471 $ - $ - Expand Terminal Building [Construction Phase I]NM DEN WY EMM Kemmerer Municipal GA 16 $ 2,695,163 $ 2,695,163 $ - $ - Rehabilitate Runway - 16/34NM DEN WY LAR Laramie Regional P 27 $ 717,875 $ 717,875 $ - $ - Construct Access Road

Page 47 of 97

Page 48: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM DEN WY LAR Laramie Regional P 26 $ 1,087,690 $ 1,087,690 $ - $ - Construct Access Road

NM DEN WY ECS Mondell Field GA 12 $ 214,750 $ 214,750 $ - $ -

Extend Runway [(Environmental Assessment)] - 13/31, Update Airport Master Plan

StudyNM DEN WY +09F New (Replacement Airport) 1 $ 1,629,519 $ 1,629,519 $ - $ - Construct New AirportNM DEN WY 82V Pine Bluffs Municipal GA 10 $ 194,766 $ 194,766 $ - $ - Acquire Land for DevelopmentNM DEN WY POY Powell Municipal GA 11 $ 75,225 $ 75,225 $ - $ - Construct TaxiwayNM DEN WY PNA Ralph Wenz Field GA 17 $ 281,227 $ 281,227 $ - $ - Construct Taxiway, Expand ApronNM DEN WY PNA Ralph Wenz Field GA 18 $ 168,773 $ 168,773 $ - $ - Construct Taxiway, Expand Apron

NM DEN WY RWL Rawlins Municipal/Harvey Field GA 15 $ 125,153 $ 125,153 $ - $ - Install Airport Beacons, Install Runway Vertical/Visual Guidance System - 04/22NM DEN WY RIW Riverton Regional P 32 $ 351,390 $ 351,390 $ - $ - Conduct Airport Master Plan Study

NM DEN WY RKS Rock Springs-Sweetwater County P 26 $ 500,000 $ 500,000 $ - $ - Acquire Snow Removal Equipment, Construct Taxiway [Environmental Assessment]NM DEN WY SHR Sheridan County P 39 $ 800,000 $ - $ 800,000 $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM DEN WY SHR Sheridan County P 36 $ 624,093 $ 624,093 $ - $ - Rehabilitate Runway - 14/32NM DEN WY SHR Sheridan County P 38 $ 3,100,000 $ - $ 3,100,000 $ - Rehabilitate Runway - 14/32NM DEN WY SAA Shively Field GA 21 $ 176,306 $ 176,306 $ - $ - Construct Taxiway, Rehabilitate ApronNM DEN WY COD Yellowstone Regional P 27 $ 425,387 $ 425,387 $ - $ - Construct Access RoadNM DEN WY COD Yellowstone Regional P 26 $ 575,000 $ 575,000 $ - $ - Construct Access RoadNM HLN MT BHK Baker Municipal GA 12 $ 172,439 $ 172,439 $ - $ - Extend Runway [Phase II - construction] - 13/31

NM HLN MT BTM Bert Mooney P 43 $ 500,000 $ 500,000 $ - $ - Construct Service Road [Phase IV], Rehabilitate Runway [Phase I] - 15/33

NM HLN MT BTM Bert Mooney P 44 $ 500,000 $ 500,000 $ - $ -

Construct Service Road [Phase V], Expand Terminal Building [Phase I - Preliminary

Design], Security Enhancements

NM HLN MT 3U8 Big Sandy GA 4 $ 1,665,000 $ 1,665,000 $ - $ -

Construct Apron, Construct Taxiway, Install Runway Vertical/Visual Guidance System -

06/24, Rehabilitate Runway - 06/24, Rehabilitate Runway Lighting - 06/24NM HLN MT S85 Big Sky Field GA 7 $ 178,000 $ 178,000 $ - $ - Construct Fuel FarmNM HLN MT 6S0 Big Timber GA 7 $ 250,162 $ 250,162 $ - $ - Install Miscellaneous NAVAIDS, Install Weather Reporting Equipment

NM HLN MT BIL Billings Logan International P 39 $ 982,399 $ 982,399 $ - $ -

Acquire Snow Removal Equipment, Construct Taxiway [A (Phase II)], Construct Taxiway

[G (Phase I - design)]NM HLN MT BIL Billings Logan International P 38 $ 1,488,484 $ 1,488,484 $ - $ - Construct Taxiway [Construct a portion of Taxiway A]NM HLN MT 3U3 Bowman Field GA 13 $ 685,000 $ 685,000 $ - $ - Rehabilitate Runway [Phase II] - 04/22

NM HLN MT M46 Colstrip GA 13 $ 341,200 $ 341,200 $ - $ - Install Weather Reporting Equipment, Rehabilitate Runway Lighting - 06/24

NM HLN MT S71 Edgar G Obie GA 10 $ 69,870 $ 69,870 $ - $ - Install Perimeter Fencing [Phase II], Rehabilitate Runway [Phase II] - 08/26

NM HLN MT S71 Edgar G Obie GA 9 $ 321,958 $ 321,958 $ - $ - Install Perimeter Fencing [Phase I], Rehabilitate Runway [Phase I] - 08/26

Page 48 of 97

Page 49: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM HLN MT 97M Ekalaka GA 7 $ 322,600 $ 322,600 $ - $ - Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 13/31

NM HLN MT 88M Eureka GA 11 $ 1,264,454 $ 1,264,454 $ - $ -

Rehabilitate Apron [Phase I], Rehabilitate Runway [Phase I] - 18/36, Rehabilitate Taxiway

[Phase I]NM HLN MT 88M Eureka GA 12 $ 229,585 $ 229,585 $ - $ - Rehabilitate Apron [Phase II], Rehabilitate Taxiway [Phase II]

NM HLN MT MLS Frank Wiley Field GA 12 $ 336,800 $ 336,800 $ - $ -

Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment, Construct

Fuel FarmNM HLN MT BZN Gallatin Field P 36 $ 1,298,830 $ 1,298,830 $ - $ - Expand Terminal Building [Phase III]NM HLN MT BZN Gallatin Field P 35 $ 1,298,830 $ 1,298,830 $ - $ - Expand Access Road [Phase II]

NM HLN MT GPI Glacier Park International P 40 $ 874,770 $ 874,770 $ - $ -

Acquire Snow Removal Equipment [Phase I], Modify Access Road [Phase II - Design],

Modify Terminal Building, Rehabilitate Taxiway [Phase I - Design]NM HLN MT GPI Glacier Park International P 41 $ 874,770 $ 874,770 $ - $ - Acquire Land For Approaches, Security EnhancementsNM HLN MT GTF Great Falls International P 46 $ 837,229 $ 837,229 $ - $ - Install Taxiway Lighting [Phase I]

NM HLN MT GTF Great Falls International P 47 $ 3,500,000 $ - $ 3,500,000 $ - Noise Mitigation Measures for Residences within 70 - 74 DNL [Phase III]NM HLN MT GTF Great Falls International P 48 $ 818,818 $ 818,818 $ - $ - Install Taxiway Lighting [Phase II]NM HLN MT 48S Harlem GA 8 $ 95,871 $ 95,871 $ - $ - Rehabilitate Runway - 11/29

NM HLN MT HVR Havre City-County GA 14 $ 292,192 $ 292,192 $ - $ -

Acquire Snow Removal Equipment [Phase II], Rehabilitate Apron [Phase II], Rehabilitate

Runway [Phase II] - 03/21

NM HLN MT HVR Havre City-County GA 13 $ 951,875 $ 951,875 $ - $ -

Acquire Snow Removal Equipment [Phase I], Rehabilitate Apron [Phase I], Rehabilitate

Runway [Phase I] - 03/21NM HLN MT HLN Helena Regional P 41 $ 589,000 $ - $ 589,000 $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM HLN MT HLN Helena Regional P 40 $ 125,000 $ - $ 125,000 $ - Wildlife Hazard Assessments

NM HLN MT HLN Helena Regional P 39 $ 259,585 $ 259,585 $ - $ -

Expand Aircraft Rescue & Fire Fighting Building [Phase I], Security Enhancements [Phase

I]

NM HLN MT HLN Helena Regional P 42 $ 170,350 $ 170,350 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Security Enhancements [Phase

II]NM HLN MT HLN Helena Regional P 38 $ 315,790 $ 315,790 $ - $ - Update Airport Master Plan StudyNM HLN MT S27 Kalispell City GA 3 $ 92,910 $ 92,910 $ - $ - Update Airport Master Plan Study

NM HLN MT OLF L M Clayton GA 10 $ 601,791 $ 601,791 $ - $ - Acquire Friction Measuring Equipment, Rehabilitate Apron, Rehabilitate TaxiwayNM HLN MT OLF L M Clayton GA 8 $ 4,176,969 $ 376,969 $ 3,800,000 $ - Rehabilitate Runway [Phase II - construction] - 11/29NM HLN MT OLF L M Clayton GA 9 $ 95,000 $ - $ 95,000 $ - Wildlife Hazard AssessmentsNM HLN MT LWT Lewistown Municipal GA 14 $ 2,639,083 $ 169,990 $ 2,469,093 $ - Rehabilitate Runway - 07/25

NM HLN MT LWT Lewistown Municipal GA 13 $ 263,300 $ 263,300 $ - $ - Install Guidance Signs, Install Taxiway Lighting, Runway Incursion MarkingsNM HLN MT LTY Liberty County GA 5 $ 1,053,000 $ 1,053,000 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 07/25NM HLN MT M75 Malta GA 8 $ 578,506 $ 578,506 $ - $ - Rehabilitate Runway [Phase II] - 08/26

Page 49 of 97

Page 50: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM HLN MT M75 Malta GA 7 $ 1,426,111 $ 1,426,111 $ - $ -

Rehabilitate Apron [Phase I], Rehabilitate Runway [Phase I] - 08/26, Rehabilitate Taxiway

[Phase I]NM HLN MT 9S4 Mineral County GA 7 $ 77,425 $ 77,425 $ - $ - Rehabilitate Runway - 12/30NM HLN MT LVM Mission Field GA 5 $ 164,730 $ 164,730 $ - $ - Rehabilitate Runway [Phase I] - 04/22NM HLN MT MSO Missoula International P 51 $ 84,837 $ - $ 84,837 $ - Wildlife Hazard AssessmentsNM HLN MT MSO Missoula International P 52 $ 1,110,310 $ 1,110,310 $ - $ - Rehabilitate Taxiway [Phase II]NM HLN MT MSO Missoula International P 50 $ 1,138,984 $ 1,138,984 $ - $ - Rehabilitate Taxiway [Phase I]NM HLN MT MSO Missoula International P 53 $ 1,802,855 $ 28,675 $ 1,774,180 $ - Rehabilitate Taxiway [A - Phase III], Rehabilitate Taxiway [G]

NM HLN MT +00U New 4 $ 301,150 $ 301,150 $ - $ - Construct New Airport [Phase I - land acquistion and obstruction removal]NM HLN MT PO1 Poplar Municipal GA 8 $ 79,724 $ 79,724 $ - $ - Install Weather Reporting Equipment

NM HLN MT RPX Roundup GA 8 $ 243,100 $ 243,100 $ - $ -

Construct Taxiway [Phase I], Install Runway Lighting - 06/24, Install Runway

Vertical/Visual Guidance System - 06/24, Remove Obstructions [Phase I]NM HLN MT 9S2 Scobey GA 6 $ 187,185 $ 187,185 $ - $ - Rehabilitate Runway - 12/30NM HLN MT PWD Sher-Wood GA 7 $ 94,920 $ 94,920 $ - $ - Install Weather Reporting Equipment

NM HLN MT SDY Sidney-Richland Municipal GA 17 $ 451,726 $ 451,726 $ - $ -

Acquire Friction Measuring Equipment, Rehabilitate Runway [10/28 and] - 01/19,

Rehabilitate Runway Lighting - 01/19

NM HLN MT 1S3 Tillitt Field GA 8 $ 236,000 $ 236,000 $ - $ -

Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 08/26,

Install Weather Reporting EquipmentNM HLN MT 7S1 Twin Bridges GA 8 $ 65,550 $ 65,550 $ - $ - Conduct Environmental Study, Update Airport Master Plan StudyNM HLN MT 6S3 Woltermann Memorial GA 9 $ 30,377 $ 30,377 $ - $ - Acquire Snow Removal Equipment [Ph II]

NM HLN MT 6S3 Woltermann Memorial GA 8 $ 242,571 $ 242,571 $ - $ - Acquire Snow Removal Equipment [Phase I], Rehabilitate Runway [Phase I] - 10/28NM SEA ID U36 Aberdeen Municipal GA 4 $ 57,819 $ 57,819 $ - $ - Update Airport Master Plan StudyNM SEA ID U36 Aberdeen Municipal GA 3 $ 95,903 $ 95,903 $ - $ - Rehabilitate Runway - 06/24NM SEA ID BOI Boise Air Terminal/Gowen Field P 54 $ 5,100,000 $ 5,100,000 $ - $ - Modify Service Road, Rehabilitate Apron, Rehabilitate Taxiway

NM SEA ID BOI Boise Air Terminal/Gowen Field P 55 $ 1,650,000 $ 1,650,000 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal EquipmentNM SEA ID BOI Boise Air Terminal/Gowen Field P 52 $ 768,630 $ - $ 768,630 $ - VALE InfrastructureNM SEA ID BOI Boise Air Terminal/Gowen Field P 53 $ 571,567 $ 571,567 $ - $ - Modify Terminal BuildingNM SEA ID 65S Boundary County GA 10 $ 468,500 $ 468,500 $ - $ - Install Perimeter Fencing, Install Weather Reporting EquipmentNM SEA ID U03 Buhl Municipal GA 10 $ 102,861 $ 102,861 $ - $ - Rehabilitate Runway - 09/27NM SEA ID BYI Burley Municipal GA 8 $ 150,000 $ 150,000 $ - $ - Conduct Miscellaneous StudyNM SEA ID EUL Caldwell Industrial R 22 $ 560,521 $ 560,521 $ - $ - Construct TaxiwayNM SEA ID U70 Cascade GA 11 $ 549,422 $ 549,422 $ - $ - Extend Taxiway [Phase 3 - Construction], Rehabilitate Runway - 12/30NM SEA ID LLJ Challis GA 6 $ 169,138 $ 169,138 $ - $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 32 $ 425,000 $ - $ 425,000 $ - Collect airport data for Airports Geographic Information System

Page 50 of 97

Page 51: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 31 $ 450,500 $ 450,500 $ - $ - Acquire Snow Removal Equipment

NM SEA ID COE Coeur D'Alene - Pappy Boyington Field GA 33 $ 122,100 $ 122,100 $ - $ - Construct Aircraft Rescue & Fire Fighting BuildingNM SEA ID SUN Friedman Memorial P 35 $ 218,200 $ 218,200 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM SEA ID SUN Friedman Memorial P 36 $ 545,500 $ 545,500 $ - $ - Acquire Snow Removal Equipment

NM SEA ID GNG Gooding Municipal GA 7 $ 2,322,461 $ 1,795,351 $ 527,110 $ -

Construct Taxiway [Construction], Rehabilitate Apron [Construction], Rehabilitate

Runway [Construction (Phase 3)] - 07/25NM SEA ID S80 Idaho County GA 12 $ 127,295 $ 127,295 $ - $ - Update Airport Master Plan StudyNM SEA ID S80 Idaho County GA 11 $ 176,170 $ 176,170 $ - $ - Install Weather Reporting EquipmentNM SEA ID IDA Idaho Falls Regional P 35 $ 663,689 $ 663,689 $ - $ - Acquire Aircraft Rescue & Fire Fighting VehicleNM SEA ID IDA Idaho Falls Regional P 34 $ 625,000 $ 625,000 $ - $ - Construct Snow Removal Equipment Building [Phase 4]NM SEA ID JER Jerome County GA 12 $ 231,204 $ 231,204 $ - $ - Install Perimeter FencingNM SEA ID TWF Joslin Field - Magic Valley Regional P 31 $ 319,877 $ 319,877 $ - $ - Update Airport Master Plan Study

NM SEA ID TWF Joslin Field - Magic Valley Regional P 30 $ 466,500 $ 466,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate TaxiwayNM SEA ID TWF Joslin Field - Magic Valley Regional P 29 $ 100,000 $ - $ 100,000 $ - Wildlife Hazard Assessments

NM SEA ID SMN Lemhi County GA 14 $ 184,485 $ 184,485 $ - $ -

Rehabilitate Apron [Crack Seal, Seal Coat], Rehabilitate Runway - 17/35, Rehabilitate

TaxiwayNM SEA ID LWS Lewiston-Nez Perce County P 30 $ 42,750 $ 42,750 $ - $ - Acquire EquipmentNM SEA ID LWS Lewiston-Nez Perce County P 31 $ 150,000 $ 150,000 $ - $ - Wildlife Hazard AssessmentsNM SEA ID MYL McCall Municipal GA 19 $ 2,183,225 $ 150,000 $ 2,033,225 $ - Rehabilitate Runway - 16/34

NM SEA ID MAN Nampa Municipal GA 22 $ 750,000 $ 750,000 $ - $ - Construct Taxiway, Install Airfield Guidance Signs, Rehabilitate Access Road

NM SEA ID 94 New 4 $ 2,500,000 $ 774,876 $ 1,725,124 $ - Construct New Airport [EIS Phase 4 (including Financial Feasibility Study)]NM SEA ID S68 Orofino Municipal GA 3 $ 68,546 $ 68,546 $ - $ - Update Airport Master Plan StudyNM SEA ID PIH Pocatello Regional P 33 $ 656,491 $ 656,491 $ - $ - Acquire Snow Removal EquipmentNM SEA ID PIH Pocatello Regional P 32 $ 343,509 $ 343,509 $ - $ - Update Airport Master Plan StudyNM SEA ID U10 Preston GA 1 $ 75,857 $ 75,857 $ - $ - Conduct Airport Master Plan StudyNM SEA ID 1S6 Priest River Municipal GA 2 $ 115,000 $ 115,000 $ - $ - Construct TaxiwayNM SEA ID S83 Shoshone County GA 6 $ 61,000 $ 61,000 $ - $ - Rehabilitate ApronNM SEA ID S72 St Maries Municipal GA 7 $ 94,975 $ 94,975 $ - $ - Update Airport Master Plan StudyNM SEA ID *IDS State of Idaho 6 $ 200,000 $ 200,000 $ - $ - Update State System Plan StudyNM SEA OR S12 Albany Municipal GA 10 $ 185,682 $ 185,682 $ - $ - Rehabilitate Runway - 16/34NM SEA OR S12 Albany Municipal GA 11 $ 1,304,348 $ 1,304,348 $ - $ - Rehabilitate Runway - 16/34

NM SEA OR S03 Ashland Municipal-Sumner Parker Field GA 9 $ 1,581,949 $ 281,949 $ 1,300,000 $ -

Install Runway Vertical/Visual Guidance System [Phase 2 Construction] - 12/30,

Rehabilitate Runway [Phase 2 construction] - 12/30

Page 51 of 97

Page 52: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM SEA OR AST Astoria Regional GA 18 $ 140,268 $ 140,268 $ - $ - Install Miscellaneous NAVAIDS

NM SEA OR AST Astoria Regional GA 17 $ 140,267 $ 140,267 $ - $ -

Conduct Miscellaneous Study [Drainage Study], Install Miscellaneous NAVAIDS,

Rehabilitate ApronNM SEA OR UAO Aurora State GA 16 $ 64,600 $ 64,600 $ - $ - Update Airport Master Plan StudyNM SEA OR BKE Baker City Municipal GA 10 $ 364,426 $ 364,426 $ - $ - Rehabilitate TaxiwayNM SEA OR S05 Bandon State GA 5 $ 200,000 $ 200,000 $ - $ - Remove ObstructionsNM SEA OR BDN Bend Municipal GA 20 $ 275,400 $ 275,400 $ - $ - Update Airport Master Plan StudyNM SEA OR BOK Brookings GA 10 $ 197,015 $ 197,015 $ - $ - Rehabilitate Taxiway [construction]NM SEA OR BNO Burns Municipal GA 11 $ 1,268,269 $ 1,268,269 $ - $ - Rehabilitate Runway - 12/30NM SEA OR BNO Burns Municipal GA 10 $ 1,121,250 $ 1,121,250 $ - $ - Rehabilitate Runway - 12/30NM SEA OR BNO Burns Municipal GA 12 $ 400,000 $ 400,000 $ - $ - Rehabilitate Apron

NM SEA OR DLS

Columbia Gorge Regional/The Dalles

Municipal GA 8 $ 99,991 $ 99,991 $ - $ - Conduct Miscellaneous StudyNM SEA OR CVO Corvallis Municipal GA 15 $ 80,000 $ 80,000 $ - $ - Install Perimeter Fencing

NM SEA OR PDT Eastern Oregon Regional at Pendleton CS 20 $ 560,862 $ 132,483 $ 428,379 $ - Install Perimeter Fencing, Rehabilitate Runway - 07/25, Runway Incursion Markings

NM SEA OR 6S2 Florence Municipal GA 10 $ 108,783 $ 108,783 $ - $ - Expand Apron [design], Install Perimeter Fencing [Design], Rehabilitate Apron [Design]NM SEA OR GCD Grant County Regional/Ogilvie Field GA 8 $ 198,693 $ 198,693 $ - $ - Expand Apron, Extend Taxiway, Install Perimeter FencingNM SEA OR 3S8 Grants Pass GA 8 $ 1,037,740 $ 1,037,740 $ - $ - Rehabilitate Runway - 12/30NM SEA OR 3S4 Illinois Valley GA 5 $ 475,000 $ 475,000 $ - $ - Install Perimeter FencingNM SEA OR LMT Klamath Falls P 31 $ 500,000 $ 500,000 $ - $ - Environmental MitigationNM SEA OR LMT Klamath Falls P 30 $ 500,000 $ 500,000 $ - $ - Environmental Mitigation, Wildlife Hazard AssessmentsNM SEA OR LGD La Grande/Union County GA 16 $ 125,654 $ 125,654 $ - $ - Improve Runway Safety Area [Final land.] - 12/30NM SEA OR LGD La Grande/Union County GA 17 $ 2,325,653 $ 125,653 $ 2,200,000 $ - Improve Runway Safety Area [Road and slough relocation.] - 12/30NM SEA OR 9S9 Lexington GA 5 $ 153,436 $ 153,436 $ - $ - Rehabilitate Runway [runway rehab design] - 08/26NM SEA OR S33 Madras Municipal GA 6 $ 106,000 $ 106,000 $ - $ - Rehabilitate ApronNM SEA OR EUG Mahlon Sweet Field P 46 $ 873,134 $ 873,134 $ - $ - Rehabilitate Runway - 16R/34LNM SEA OR EUG Mahlon Sweet Field P 45 $ 8,153,119 $ 1,772,725 $ 6,380,394 $ - Rehabilitate Runway - 16R/34LNM SEA OR SLE McNary Field P 17 $ 190,000 $ 190,000 $ - $ - Update Airport Master Plan StudyNM SEA OR ONP Newport Municipal GA 17 $ 175,000 $ 175,000 $ - $ - Install Miscellaneous NAVAIDS

NM SEA OR ONO Ontario Municipal GA 9 $ 168,913 $ 168,913 $ - $ -

Expand Apron, Install Runway Lighting - 14/32, Rehabilitate Apron, Rehabilitate Runway -

14/32, Rehabilitate TaxiwayNM SEA OR PDX Portland International P 62 $ 6,689,101 $ - $ 6,689,101 $ - Extend Runway - 10L/28RNM SEA OR PDX Portland International P 63 $ 8,279,848 $ 1,368,948 $ 6,910,900 $ - Extend Runway - 10L/28R

NM SEA OR HIO Portland-Hillsboro R 22 $ 6,150,000 $ 150,000 $ 6,000,000 $ - Construct Taxiway [including environmental assessment, design and construction]NM SEA OR HIO Portland-Hillsboro R 23 $ 3,500,000 $ - $ 3,500,000 $ - Construct Runway [including final design and construction] - Plan-1NM SEA OR S39 Prineville GA 10 $ 449,500 $ 449,500 $ - $ - Extend Runway - 10/28

Page 52 of 97

Page 53: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM SEA OR RDM Roberts Field P 33 $ 4,112,998 $ 2,002,998 $ 2,110,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [buy truck], Rehabilitate Taxiway [Rehab

taxiway C, G and D]

NM SEA OR MFR Rogue Valley International - Medford P 36 $ 525,000 $ 525,000 $ - $ - Update Airport Master Plan Study

NM SEA OR MFR Rogue Valley International - Medford P 35 $ 1,137,989 $ 1,137,989 $ - $ - Construct Terminal BuildingNM SEA OR RBG Roseburg Regional GA 17 $ 130,169 $ 130,169 $ - $ - Construct Taxiway [Environmental (ph 2)]

NM SEA OR 56S Seaside Municipal GA 3 $ 260,385 $ 260,385 $ - $ -

Acquire Easement For Approaches, Conduct Miscellaneous Study [Drainage Study],

Improve Airport Drainage, Install Perimeter Fencing, Rehabilitate ApronNM SEA OR S45 Siletz Bay State GA 4 $ 50,000 $ 50,000 $ - $ - Remove ObstructionsNM SEA OR OTH Southwest Oregon Regional P 33 $ 500,000 $ 500,000 $ - $ - Construct Terminal Building [Phase 7]NM SEA OR OTH Southwest Oregon Regional P 32 $ 500,000 $ 500,000 $ - $ - Construct Terminal BuildingNM SEA OR *ORS State of Oregon 9 $ 171,250 $ 171,250 $ - $ - Update State System Plan StudyNM SEA OR TMK Tillamook GA 10 $ 120,380 $ 120,380 $ - $ - Improve Airport Drainage, Install Perimeter FencingNM SEA OR TMK Tillamook GA 11 $ 168,226 $ 168,226 $ - $ - Update Airport Master Plan StudyNM SEA WA AWO Arlington Municipal GA 21 $ 150,000 $ 150,000 $ - $ - Acquire Land For ApproachesNM SEA WA S50 Auburn Municipal R 17 $ 175,000 $ 175,000 $ - $ - Rehabilitate Runway Lighting - 16/34NM SEA WA BLI Bellingham International P 45 $ 7,110,930 $ 1,110,930 $ 6,000,000 $ - Rehabilitate Runway - 16/34, Rehabilitate Taxiway

NM SEA WA BLI Bellingham International P 44 $ 20,156,094 $ 1,110,931 $ 19,045,163 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Runway - 16/34,

Rehabilitate Taxiway

NM SEA WA BFI Boeing Field/King County International P 42 $ 8,000,000 $ - $ 8,000,000 $ - Noise Mitigation Measures for Residences within 70 - 74 DNL

NM SEA WA BFI Boeing Field/King County International P 43 $ 18,348,891 $ 2,348,891 $ 16,000,000 $ - Rehabilitate Taxiway [Construction]NM SEA WA ELN Bowers Field GA 10 $ 132,763 $ 132,763 $ - $ - Update Airport Master Plan StudyNM SEA WA PWT Bremerton National GA 24 $ 70,000 $ 70,000 $ - $ - Install Perimeter FencingNM SEA WA CLS Chehalis-Centralia GA 12 $ 35,000 $ 35,000 $ - $ - Rehabilitate Runway - 16/34NM SEA WA S93 Cle Elum Municipal GA 4 $ 90,725 $ 90,725 $ - $ - Install Miscellaneous NAVAIDS, Update Airport Master Plan StudyNM SEA WA DEW Deer Park GA 18 $ 217,075 $ 217,075 $ - $ - Construct Apron, Rehabilitate Apron

NM SEA WA TDO

Ed Carlson Memorial Field - South Lewis

County GA 5 $ 69,410 $ 69,410 $ - $ - Rehabilitate Runway [re-marking] - 05/23NM SEA WA SFF Felts Field R 24 $ 316,130 $ 316,130 $ - $ - Construct Apron, Update Airport Master Plan Study

NM SEA WA FHR Friday Harbor P 25 $ 622,335 $ 622,335 $ - $ -

Expand Apron, Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate Taxiway,

Remove Obstructions, Update Miscellaneous Study [ARC Justification], Update

Miscellaneous Study [drainage]

NM SEA WA 3W7 Grand Coulee Dam GA 4 $ 279,149 $ 279,149 $ - $ -

Install Airfield Guidance Signs, Rehabilitate Apron, Rehabilitate Runway - 03/21,

Rehabilitate Taxiway, Remove ObstructionsNM SEA WA MWH Grant County International GA 36 $ 632,524 $ 632,524 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

Page 53 of 97

Page 54: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM SEA WA S23 Ione Municipal GA 3 $ 150,000 $ 150,000 $ - $ - Install Miscellaneous NAVAIDS, Update Airport Master Plan StudyNM SEA WA 0S9 Jefferson County International GA 11 $ 150,000 $ 150,000 $ - $ - Update Airport Master Plan StudyNM SEA WA S10 Lake Chelan GA 8 $ 150,000 $ 150,000 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayNM SEA WA S31 Lopez Island GA 10 $ 184,227 $ 184,227 $ - $ - Construct Taxiway, Rehabilitate Apron, Rehabilitate TaxiwayNM SEA WA OLM Olympia Regional GA 19 $ 1,975,951 $ 1,975,951 $ - $ - Install Miscellaneous NAVAIDS [beacon], Rehabilitate TaxiwayNM SEA WA OLM Olympia Regional GA 20 $ 189,059 $ 189,059 $ - $ - Update Airport Master Plan Study

NM SEA WA OMK Omak GA 7 $ 597,044 $ 597,044 $ - $ -

Construct Apron [PH2 (construction)], Install Airfield Guidance Signs, Install

Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Taxiway

NM SEA WA ORS Orcas Island CS 8 $ 217,258 $ 217,258 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 16/34, Rehabilitate TaxiwayNM SEA WA S70 Othello Municipal GA 6 $ 99,750 $ 99,750 $ - $ - Construct Runway [ph 3 design] - 07/25NM SEA WA 55S Packwood GA 3 $ 517,804 $ 517,804 $ - $ - Improve Runway Safety Area - 01/19

NM SEA WA EAT Pangborn Memorial P 32 $ 617,770 $ 617,770 $ - $ - Extend Runway - 12/30, Improve Access Road, Rehabilitate Taxiway LightingNM SEA WA PLU Pierce County - Thun Field GA 14 $ 94,024 $ 94,024 $ - $ - Widen Runway - 16/34

NM SEA WA S40 Prosser GA 13 $ 661,612 $ 661,612 $ - $ -

Acquire Land For Approaches, Rehabilitate Apron, Rehabilitate Runway - 07/25,

Rehabilitate Taxiway, Update Airport Master Plan StudyNM SEA WA 33S Pru Field GA 5 $ 87,344 $ 87,344 $ - $ - Update Airport Master Plan StudyNM SEA WA PUW Pullman/Moscow Regional P 36 $ 525,000 $ - $ 525,000 $ - Collect airport data for Airports Geographic Information System

NM SEA WA PUW Pullman/Moscow Regional P 35 $ 1,271,925 $ 1,271,925 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Land For Approaches, Conduct

Miscellaneous Study, Improve Airport Drainage, Security EnhancementsNM SEA WA RNT Renton Municipal R 21 $ 150,000 $ - $ 150,000 $ - Identify the airport's environmental footprintNM SEA WA RNT Renton Municipal R 20 $ 217,762 $ 217,762 $ - $ - Rehabilitate Taxiway

NM SEA WA RLD Richland GA 22 $ 588,014 $ 588,014 $ - $ - Acquire Land For Approaches, Rehabilitate Apron, Rehabilitate TaxiwayNM SEA WA 72S Rosalia Municipal GA 6 $ 33,848 $ 33,848 $ - $ - Rehabilitate ApronNM SEA WA SEA Seattle-Tacoma International P 121 $ 2,000,000 $ - $ 2,000,000 $ - Noise Mitigation Measures for Public BuildingsNM SEA WA SEA Seattle-Tacoma International P 120 $ 26,033,377 $ 5,958,377 $ 20,075,000 $ - Construct Runway [Phase 17] - Plan-1NM SEA WA SEA Seattle-Tacoma International P 122 $ 500,000 $ - $ 500,000 $ - Safety Management System (SMS) ProgramNM SEA WA SEA Seattle-Tacoma International P 123 $ 18,300,000 $ - $ 18,300,000 $ - VALE Infrastructure

NM SEA WA BVS Skagit Regional GA 17 $ 3,033,754 $ 234,444 $ 2,799,310 $ - Install Perimeter Fencing, Rehabilitate Runway [Construction - Phase 1] - 10/28NM SEA WA PAE Snohomish County (Paine Field) R 49 $ 310,242 $ - $ 310,242 $ - Conduct Environmental StudyNM SEA WA GEG Spokane International P 45 $ 4,217,600 $ 4,217,600 $ - $ - Rehabilitate Runway - 03/21NM SEA WA *WAS State of Washington 9 $ 383,743 $ 383,743 $ - $ - Conduct State System Plan StudyNM SEA WA *WAS State of Washington 10 $ 100,000 $ 100,000 $ - $ - Conduct State System Plan Study

Page 54 of 97

Page 55: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

NM SEA WA TIW Tacoma Narrows GA 13 $ 938,656 $ 938,656 $ - $ - Improve Runway Safety Area - 17/35, Rehabilitate Runway - 17/35NM SEA WA PSC Tri-Cities P 36 $ 800,000 $ 800,000 $ - $ - Rehabilitate TaxiwayNM SEA WA 2S1 Vashon Municipal GA 3 $ 82,000 $ 82,000 $ - $ - Remove ObstructionsNM SEA WA ALW Walla Walla Regional P 27 $ 830,000 $ 830,000 $ - $ - Acquire Snow Removal EquipmentNM SEA WA 2S8 Wilbur GA 9 $ 578,578 $ 578,578 $ - $ - Extend Taxiway, Install Miscellaneous NAVAIDSNM SEA WA CLM William R Fairchild International P 28 $ 352,504 $ 352,504 $ - $ - Construct Apron

NM SEA WA YKM Yakima Air Terminal/McAllister Field P 31 $ 2,622,373 $ 2,622,373 $ - $ -

Install Miscellaneous NAVAIDS [Relocate REILS PH-1 (Fed Owned & Airport Owned)

Cconstruction FY2021], Rehabilitate Runway - 09/27SO ATL GA AGS Augusta Regional at Bush Field P 33 $ 13,775,000 $ 2,956,583 $ 10,818,417 $ - Rehabilitate Runway [Construct rehab - Phase II] - 17/35SO ATL GA BQK Brunswick Golden Isles P 30 $ 2,989,714 $ 500,000 $ 2,489,714 $ - Improve Airport Drainage [phase II - A], Rehabilitate Runway - 07/25SO ATL GA BQK Brunswick Golden Isles P 31 $ 499,999 $ 499,999 $ - $ - Improve Airport Drainage [phase II-B]

SO ATL GA CSG Columbus Metropolitan P 34 $ 3,619,935 $ 1,061,284 $ 2,558,651 $ -

Construct Taxiway [Phase 3A - (redesign/ rebid to lesser width)], Construct Taxiway

[Phase 4A - (construct)], Wildlife Hazard Assessments [as required by Cert staff]SO ATL GA *GAB Georgia State Block Grant Program 5 $ 11,397,493 $ 10,747,493 $ 650,000 $ - Non primary development projects in state block grant programSO ATL GA *GAB Georgia State Block Grant Program 6 $ 13,983,491 $ 8,871,491 $ 5,112,000 $ - Non primary development projects in state block grant program

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 98 $ 373,125 $ - $ 373,125 $ - Identify the airport's environmental footprint

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 94 $ 4,819,273 $ 4,359,328 $ 459,945 $ - Rehabilitate Taxiway [Part A grant issued. This grant supplements it with remg funds.]

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 95 $ 2,500,000 $ - $ 2,500,000 $ - Construct Taxiway [8R end around taxiway]

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 97 $ 4,359,328 $ 4,080,783 $ 278,545 $ - Rehabilitate Taxiway [Part D]

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 93 $ 10,000,000 $ - $ 10,000,000 $ - Extend Runway - 10/28

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 99 $ 1,022,305 $ - $ - $ 1,022,305 Construct Apron

SO ATL GA ATL Hartsfield - Jackson Atlanta International P 96 $ 10,000,000 $ - $ 10,000,000 $ -

Noise Mitigation Measures for Public Buildings, Noise Mitigation Measures for

Residences within 65 - 69 DNL

SO ATL GA MCN Middle Georgia Regional P 26 $ 3,017,088 $ 3,017,088 $ - $ -

Improve Runway Safety Area [Remove abandoned pavement Rwy 5/23 SA and improve

width deficiencies] - 05/23, Rehabilitate Runway [Construct] - 05/23, Rehabilitate

Taxiway [Construct]SO ATL GA SAV Savannah/Hilton Head International P 50 $ 2,138,853 $ 2,138,853 $ - $ - Construct Taxiway

SO ATL GA SAV Savannah/Hilton Head International P 51 $ 2,138,852 $ 2,138,852 $ - $ -

Conduct Environmental Study, Construct Taxiway [Phase 2: Reimburse - Construct

Taxiway to North GA Area (includes access rds, utilities, & site development], Update

Airport Master Plan Study [#1]SO ATL GA ABY Southwest Georgia Regional P 37 $ 6,650,611 $ 590,473 $ 6,060,138 $ - Construct Terminal Building [Phase 2B (site prep, bldg constr, etc.)]

Page 55 of 97

Page 56: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ATL GA ABY Southwest Georgia Regional P 36 $ 620,806 $ 620,806 $ - $ -

Conduct Airport Master Plan Study, Construct Terminal Building [Part A], Rehabilitate

Apron [Part A]SO ATL GA *GAS State of Georgia 4 $ 850,000 $ - $ 850,000 $ - Conduct State System Plan StudySO ATL GA VLD Valdosta Regional P 27 $ 1,625,224 $ 500,000 $ 1,125,224 $ - Improve Airport Drainage [phase II-(Part E)]SO ATL GA VLD Valdosta Regional P 26 $ 500,000 $ 500,000 $ - $ - Improve Airport Drainage [phase I-A]

SO ATL NC OAJ Albert J Ellis P 31 $ 1,653,216 $ 1,653,216 $ - $ -

Construct Terminal Building [PHASE 1 - CONCEPTUAL DESIGN], Improve Utilities [PHASE

2 CONST]SO ATL NC AVL Asheville Regional P 37 $ 902,490 $ 902,490 $ - $ - Modify Terminal Building [REHABILITATE GATE A - DESIGN]

SO ATL NC AVL Asheville Regional P 38 $ 1,389,870 $ 1,389,870 $ - $ -

Modify Terminal Building [ALTERNATES 2 (EXPANSION OF HOLDING AREA) ALTERNATE 3

(EXPANSION OF CONCESSIONS AREA ON APRON SIDE)]SO ATL NC CLT Charlotte/Douglas International P 62 $ 5,246,089 $ 5,246,089 $ - $ - Construct Runway [LOI Payment 4 (Part B Entitlements)] - 18R/36LSO ATL NC CLT Charlotte/Douglas International P 61 $ 17,302,493 $ 5,302,493 $ 12,000,000 $ - Construct Runway [LOI Payment 4] - 18R/36LSO ATL NC CLT Charlotte/Douglas International P 63 $ 3,434,194 $ - $ 3,434,194 $ - Extend Taxiway [Phase 1 Construction]

SO ATL NC EWN Coastal Carolina Regional P 32 $ 1,317,131 $ 1,317,131 $ - $ -

Acquire Land for Development [PHASE 5], Improve Airport Miscellaneous

Improvements, Improve Runway Safety Area [PHASE 1 - RUNWAY 4/22 EXTENSION

(DESIGN)] - 04/22, Rehabilitate Runway Lighting - 04/22, Rehabilitate Taxiway

SO ATL NC FAY Fayetteville Regional/Grannis Field P 37 $ 5,936,904 $ 1,863,802 $ 4,073,102 $ -

Rehabilitate Apron [DESIGN - PHASE 1 (BITUMINOUS)], Rehabilitate Taxiway [Phase 2 -

Const]

SO ATL NC *NCB

North Carolina State Block Grant

Program 40 $ 11,079,119 $ 6,023,564 $ 5,055,555 $ - Non primary development projects in state block grant program

SO ATL NC *NCB

North Carolina State Block Grant

Program 39 $ 10,760,950 $ 8,018,450 $ 2,742,500 $ - Non primary development projects in state block grant program

SO ATL NC GSO Piedmont Triad International P 62 $ 2,206,012 $ 2,206,012 $ - $ - Construct Runway [FY10 BALANCE OF SCHEDULED PAYMENT 9 FOR LOI] - Plan-1

SO ATL NC GSO Piedmont Triad International P 61 $ 500,000 $ - $ 500,000 $ -

Acquire Land for Noise Compatibility within 65 - 69 DNL, Install Noise Monitoring

System, Noise Mitigation Measures for Residences within 65 - 69 DNL

SO ATL NC GSO Piedmont Triad International P 60 $ 8,261,293 $ 2,261,293 $ 6,000,000 $ -

Construct Runway [Construct Runway 5L-23R and associated taxiways; Construct

connector taxiway "F"; Extend taxiway "K"; Acquire Land, Phase IX] - Plan-1SO ATL NC PGV Pitt-Greenville P 34 $ 500,000 $ 500,000 $ - $ - Improve Terminal Building

SO ATL NC PGV Pitt-Greenville P 35 $ 500,000 $ 500,000 $ - $ -

Conduct Environmental Study, Improve Airport Drainage, Improve Runway Safety Area

[PHASE 1 - LAND ACQUISITION (APPRAISALS AND SURVEY)] - 02/20, Improve Terminal

Building [PHASE 2 - PC AIR FOR JET BRIDGE]SO ATL NC RDU Raleigh-Durham International P 40 $ 1,206,483 $ 1,206,483 $ - $ - Rehabilitate Runway [PHASE 5 - PAYMENT 5] - 05R/23L

Page 56 of 97

Page 57: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ATL NC ILM Wilmington International P 43 $ 2,838,703 $ 2,838,703 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Improve Airport Drainage [DESIGN &

PERMITTING], Install Guidance Signs, Rehabilitate Access Road, Rehabilitate Taxiway

[DESIGN]SO ATL SC AIK Aiken Municipal GA 13 $ 87,557 $ 87,557 $ - $ - Update Airport Master Plan Study [ALP Update]SO ATL SC AIK Aiken Municipal GA 12 $ 84,683 $ 84,683 $ - $ - Rehabilitate Runway Lighting [Design] - 07/25

SO ATL SC AND Anderson Regional GA 17 $ 4,075,854 $ 300,000 $ 3,775,854 $ -

Conduct Miscellaneous Study [Pavement eval study (reimburse)], Rehabilitate Apron

[PHASE 2 - CONST], Rehabilitate Runway Lighting [design, bid & construct] - 05/23,

Rehabilitate Taxiway [PHASE 2 - CONST], Rehabilitate Taxiway Lighting [design, bid &

construct]SO ATL SC BNL Barnwell Regional GA 8 $ 28,793 $ 28,793 $ - $ - Rehabilitate Runway [Rejuvenation and Crack Sealing] - 17/35

SO ATL SC MKS Berkeley County GA 18 $ 3,583,309 $ 163,143 $ 3,420,166 $ -

Rehabilitate Runway [Runway Rehab - Construction] - 05/23, Rehabilitate Runway

Lighting [Rehab Runway Lighting] - 05/23

SO ATL SC CHS Charleston AFB/International P 33 $ 151,061 $ 151,061 $ - $ -

Acquire Equipment [Automated Fingerprint Identification System], Conduct

Miscellaneous Study [PCI Study], Improve Terminal Building [Flight information Data

System]SO ATL SC CHS Charleston AFB/International P 31 $ 649,773 $ 649,773 $ - $ - Update Airport Master Plan Study [Master Plan Update]SO ATL SC CAE Columbia Metropolitan P 38 $ 9,484,301 $ 3,484,301 $ 6,000,000 $ - Rehabilitate Runway [Construction Ph I] - 11/29SO ATL SC CAE Columbia Metropolitan P 39 $ 3,213,740 $ 3,213,740 $ - $ - Rehabilitate Runway [Construction Ph II] - 11/29SO ATL SC UDG Darlington County Jetport GA 10 $ 479,466 $ 479,466 $ - $ - Rehabilitate Apron

SO ATL SC GYH Donaldson Center GA 17 $ 861,147 $ 380,235 $ 480,912 $ - Extend Taxiway [Phase 2 - Site prep], Rehabilitate Runway Lighting - 05/23SO ATL SC FDW Fairfield County GA 10 $ 403,010 $ 403,010 $ - $ - Acquire Easement For Approaches, Remove Obstructions [Phase II]

SO ATL SC FLO Florence Regional P 28 $ 4,594,861 $ 1,978,466 $ 2,616,395 $ -

Improve Terminal Building [Phase IV Construction], Rehabilitate Apron [Phase II -

Reconstruction of Apron]

SO ATL SC GGE Georgetown County GA 12 $ 395,275 $ 395,275 $ - $ -

Acquire Land For Approaches [Rwy 23 Approach], Environmental Mitigation [Mitigation

Monitoring], Improve Runway Safety Area [RWY 23 RSA - Design and Construction] -

05/23SO ATL SC GMU Greenville Downtown GA 18 $ 442,510 $ 150,000 $ 292,510 $ - Improve Runway Safety Area - 01/19

SO ATL SC GSP Greenville Spartanburg International P 45 $ 1,749,869 $ 1,749,869 $ - $ -

Acquire Land for Development [Ph II reimbursement of 10 acre tract of land], Update

Airport Master Plan Study [terminal plan]

SO ATL SC GSP Greenville Spartanburg International P 44 $ 1,900,534 $ 1,900,534 $ - $ -

Acquire Land for Development [partial reimbursement for 10acre tract of land],

Rehabilitate Access Road

SO ATL SC HXD Hilton Head P 30 $ 1,243,296 $ 1,091,085 $ 152,211 $ -

Acquire Easement For Approaches [Easement Acquisition - Legal Fee Reimbursement],

Install Airfield Guidance Signs [Runway 3/21 Sign Relocation - Design], Remove

Obstructions [On-Airport Obstruction Removal - Construction], Remove Obstructions

[On-Airport Obstruction Removal - Mitigation]SO ATL SC CUB Jim Hamilton L.B. Owens R 16 $ 176,899 $ 176,899 $ - $ - Remove Obstructions [Survey & Design], Security EnhancementsSO ATL SC LKR Lancaster County-Mc Whirter Field GA 14 $ 39,019 $ 39,019 $ - $ - Rehabilitate Taxiway [taxilane design only]

Page 57 of 97

Page 58: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ATL SC LUX Laurens County GA 10 $ 419,712 $ 419,712 $ - $ - Construct Building

SO ATL SC 52J Lee County-Butters Field GA 7 $ 235,360 $ 235,360 $ - $ -

Install Runway Lighting [MIRL] - 06/24, Install Runway Vertical/Visual Guidance System

[PAPI's] - 06/24

SO ATL SC 6J0 Lexington County at Pelion GA 12 $ 507,201 $ 220,257 $ 286,944 $ -

Construct Taxiway [Taxiway Realignment - Construction], Construct Taxiway [Taxiway

Realignment - Design Reimbursement]SO ATL SC RBW Lowcountry Regional GA 11 $ 336,202 $ 336,202 $ - $ - Acquire Land For Approaches, Construct Building [Design]

SO ATL SC LRO Mt Pleasant Regional-Faison Field GA 14 $ 418,960 $ 418,960 $ - $ -

Construct Terminal Building [Reimbursement - Ph III], Improve Utilities [Water Main

Project], Rehabilitate Runway [Design - Reimbursement] - 17/35SO ATL SC MYR Myrtle Beach International P 45 $ 3,826,237 $ 3,826,237 $ - $ - Expand Terminal Building [Phase I]SO ATL SC MYR Myrtle Beach International P 46 $ 4,753,069 $ - $ 4,753,069 $ - Construct Taxiway [Construction - Taxiway A]SO ATL SC OGB Orangeburg Municipal GA 17 $ 111,458 $ 111,458 $ - $ - Update Airport Master Plan Study [ALP Update]

SO ATL SC LQK Pickens County GA 17 $ 166,028 $ 166,028 $ - $ -

Acquire Land For Approaches [partial reimbursement for land acq to clear RW 5

approaches, 8.25 acres]SO ATL SC LQK Pickens County GA 16 $ 412,300 $ 412,300 $ - $ - Widen Taxiway

SO ATL SC UZA Rock Hill/York County/Bryant Field R 21 $ 811,047 $ 228,898 $ 582,149 $ - Rehabilitate Runway Lighting [Airfield Lighting Rehab (including MALSR)] - 02/20SO ATL SC MNI Santee Cooper Regional GA 7 $ 175,750 $ 175,750 $ - $ - Remove Obstructions [Obstruction Removal Design & Construction]

SO ATL SC SPA Spartanburg Downtown Memorial GA 14 $ 701,385 $ 701,385 $ - $ - Construct Parking Lot [design & construct], Construct Utilities [design & construct]SO ATL SC *SCS State of South Carolina 10 $ 500,000 $ - $ 500,000 $ - Update State System Plan Study

SO ATL SC DYB Summerville GA 14 $ 260,223 $ 260,223 $ - $ -

Extend Runway [Environmental Assessment Reimbursement, Preliminary Engineering,

Survey & 404 Permitting] - 06/24

SO ATL SC SMS Sumter GA 14 $ 133,095 $ 133,095 $ - $ - Improve Runway Safety Area [RSA Improvement: Design Reimbursement] - 05/23

SO ATL SC SMS Sumter GA 15 $ 1,326,797 $ 205,665 $ 1,121,132 $ -

Improve Runway Safety Area [RSA Improvement Construction (+RSA Mit Plng Ph2 @

$48,792; Wetland Credits (48.5) @ $129,580; Mit for ~1,563 stream credits by

streambank enhancements @ Shot Creek @ $71,250; & 5-yr annual monitoring of creek

enhancement @ $56,523)] - 05/23

SO ATL SC 35A Union County, Troy Shelton Field GA 5 $ 62,700 $ 62,700 $ - $ - Acquire Easement For Approaches [Ph I - Appraisals, surveys, coordination]

SO ATL SC *SCV Various Locations in South Carolina 14 $ 3,082,618 $ 3,082,618 $ - $ -

Install Perimeter Fencing (Anderson Regional; Berkeley County; Chester Catawba

Regional; Darlington County Jetport; Newberry County; Oconee County Regional;

Sumter)SO ATL SC *SCV Various Locations in South Carolina 13 $ 121,580 $ 121,580 $ - $ - Remove Obstructions (Aiken Municipal; Oconee County Regional)

SO JAN AL 0J0 Abbeville Municipal GA 5 $ 200,055 $ 200,055 $ - $ -

Extend Runway [(Design north runway extension (1,100 feet); construct site prep phase

1 (300 feet))] - 17/35

Page 58 of 97

Page 59: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN AL 8A0

Albertville Regional-Thomas J Brumlik

Field GA 20 $ 1,039,051 $ 1,039,051 $ - $ - Acquire Land for Development, Improve Runway Safety Area - 05/23SO JAN AL ANB Anniston Metropolitan GA 26 $ 96,900 $ 96,900 $ - $ - Conduct Environmental Study, Wildlife Hazard AssessmentsSO JAN AL 26A Ashland/Lineville GA 7 $ 35,617 $ 35,617 $ - $ - Update Airport Master Plan Study

SO JAN AL 0R1 Atmore Municipal GA 7 $ 983,695 $ 393,695 $ 590,000 $ -

Construct Access Road [Acquire property / phase 1 of construction], Install

Miscellaneous NAVAIDS [Replace rotating beacon and lighted wind cone.], Install

Runway Vertical/Visual Guidance System [Install precission approach path indicators] -

18/36, Rehabilitate Runway Lighting - 18/36SO JAN AL AUO Auburn-Opelika Robert G. Pitts GA 25 $ 124,500 $ 124,500 $ - $ - Construct Terminal Building [Utilities and walkways]

SO JAN AL EKY Bessemer R 10 $ 239,518 $ 239,518 $ - $ - Rehabilitate Runway - 05/23, Remove Obstructions, Update Airport Master Plan StudySO JAN AL 0A8 Bibb County GA 8 $ 113,525 $ 113,525 $ - $ - Acquire Land For Approaches, Remove Obstructions

SO JAN AL BHM Birmingham-Shuttlesworth International P 81 $ 429,400 $ 429,400 $ - $ - Acquire Land for Development

SO JAN AL BHM Birmingham-Shuttlesworth International P 80 $ 2,220,561 $ 2,220,561 $ - $ -

Acquire Safety Equipment and/or Fencing, Improve Runway Safety Area - 18/36,

Rehabilitate Runway - 18/36, Rehabilitate Taxiway [Enhanced taxiway marking]

SO JAN AL BHM Birmingham-Shuttlesworth International P 82 $ 1,890,279 $ 1,178,894 $ 711,385 $ - Rehabilitate Taxiway

SO JAN AL BHM Birmingham-Shuttlesworth International P 79 $ 980,000 $ 980,000 $ - $ -

Environmental Mitigation [Final Phase Environmental Mitigation], Improve Runway

Safety Area - 06/24SO JAN AL 71J Blackwell Field GA 11 $ 28,722 $ 28,722 $ - $ - Remove Obstructions [Runway 30 WAAS/GPS Approach (Design Only)]SO JAN AL 12J Brewton Municipal GA 8 $ 188,562 $ 188,562 $ - $ - Construct Fuel Farm [Cosntruct fuel farm (phase 2)]

SO JAN AL 14J Carl Folsom GA 7 $ 257,397 $ 257,397 $ - $ -

Construct Fuel Farm, Expand Apron, Improve Airport Drainage, Install Perimeter

Fencing, Update Airport Master Plan Study

SO JAN AL PYP

Centre-Piedmont-Cherokee County

Regional GA 7 $ 451,250 $ 451,250 $ - $ - Improve Access Road, Rehabilitate Runway - 07/25

SO JAN AL 4R9 Dauphin Island GA 8 $ 606,531 $ 606,531 $ - $ - Acquire Land For Approaches [Acquire runway protection zone land, phase 3]SO JAN AL DYA Demopolis Municipal GA 8 $ 39,900 $ 39,900 $ - $ - Update Airport Master Plan Study

SO JAN AL DHN Dothan Regional P 33 $ 482,110 $ 482,110 $ - $ -

Install Perimeter Fencing, Rehabilitate Apron [Phase 1 of rehabilitate aircraft parking

apron]

SO JAN AL EDN Enterprise Municipal GA 16 $ 127,242 $ 127,242 $ - $ - Rehabilitate Runway [Design Only] - 05/23, Rehabilitate Terminal Building

SO JAN AL 5R4 Foley Municipal GA 8 $ 298,384 $ 298,384 $ - $ -

Construct Taxiway [Construct access taxiways (Phase 1 - 50' x 250')], Update Airport

Master Plan Study [Update layout plan]

SO JAN AL 3A1 Folsom Field GA 17 $ 340,589 $ 340,589 $ - $ - Improve Airport Drainage, Install Runway Vertical/Visual Guidance System - 02/20

Page 59 of 97

Page 60: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN AL 07A Franklin Field GA 4 $ 274,000 $ 274,000 $ - $ -

Conduct Environmental Study [Supplemental Environmental Assessment], Install

Miscellaneous NAVAIDS, Rehabilitate Runway Lighting - 14/32

SO JAN AL 33J Geneva Municipal GA 8 $ 114,314 $ 114,314 $ - $ - Install Perimeter Fencing [Phase 1 - East Side], Update Airport Master Plan StudySO JAN AL AIV George Downer GA 9 $ 190,000 $ 190,000 $ - $ - Improve Runway Safety Area - 06/24

SO JAN AL 02A Gragg-Wade Field GA 7 $ 667,130 $ 667,130 $ - $ - Acquire Land For Approaches, Conduct Miscellaneous Study, Remove Obstructions

SO JAN AL 7A0 Greensboro Municipal GA 1 $ 241,863 $ 241,863 $ - $ - Acquire Land For Approaches, Install Perimeter Fencing, Remove Obstructions

SO JAN AL 8A1 Guntersville Municipal - Joe Starnes Field GA 14 $ 540,012 $ 540,012 $ - $ - Construct Runway [Acquire land for new Runway] - Plan-1

SO JAN AL 4R4 H. L. (Sonny) Callahan GA 12 $ 252,167 $ 252,167 $ - $ -

Construct Access Road [East terminal area access road (design only)], Construct Apron

[East terminal area apron phase 1 (design only)], Construct Taxiway [East terminal area

access taxiway. (design only)], Update Airport Master Plan Study [Update layout drawing

and property map]SO JAN AL 5M0 Hartselle-Morgan County Regional GA 10 $ 121,600 $ 121,600 $ - $ - Rehabilitate Runway - 18/36SO JAN AL 0J6 Headland Municipal GA 10 $ 180,014 $ 180,014 $ - $ - Construct Fuel Farm

SO JAN AL HSV Huntsville International-Carl T Jones Field P 62 $ 1,885,750 $ - $ 1,885,750 $ - Acquire Land for Development

SO JAN AL HSV Huntsville International-Carl T Jones Field P 63 $ 3,842,562 $ 3,842,562 $ - $ -

Acquire Interactive Training System, Rehabilitate Apron, Rehabilitate Terminal Building,

Update Airport Master Plan StudySO JAN AL 4A9 Isbell Field GA 17 $ 139,421 $ 139,421 $ - $ - Rehabilitate Runway - 04/22SO JAN AL JKA Jack Edwards GA 24 $ 2,383,368 $ 306,927 $ 2,076,441 $ - Construct Taxiway [Construct access taxiways]SO JAN AL 4R3 Jackson Municipal GA 7 $ 231,167 $ 231,167 $ - $ - Construct Fuel FarmSO JAN AL 7A3 Lanett Municipal GA 7 $ 170,755 $ 170,755 $ - $ - Conduct Environmental StudySO JAN AL 9A4 Lawrence County GA 10 $ 95,000 $ 95,000 $ - $ - Rehabilitate Runway [Design Only] - 13/31

SO JAN AL MDQ

Madison County Executive/Tom Sharp Jr

Field GA 21 $ 2,000,858 $ 400,858 $ 1,600,000 $ -

Environmental Mitigation, Extend Runway [Land Acquisition; Supplemental

Environmental Assessment; Road Relocation Design; Approach Survey] - 18/36SO JAN AL HAB Marion County-Rankin Fite GA 8 $ 242,250 $ 242,250 $ - $ - Construct Fuel Farm

SO JAN AL SCD Merkel Field Sylacauga Municipal GA 16 $ 160,761 $ 160,761 $ - $ -

Expand Apron [Additional earth work (Phase4)], Rehabilitate Runway - 09/27, Remove

Obstructions

SO JAN AL BFM Mobile Downtown GA 24 $ 327,224 $ 327,224 $ - $ -

Rehabilitate Taxiway [Rehabilitate junction of Taxiway A and Taxiway J/H], Remove

Obstructions [Clear approach to Runway 14.], Wildlife Hazard Assessments [Implement

wildlife program.]

SO JAN AL BFM Mobile Downtown GA 23 $ 1,643,865 $ - $ 1,643,865 $ - Rehabilitate Taxiway [Rehab TW A from RW 18/36 south (construction)]

Page 60 of 97

Page 61: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN AL MOB Mobile Regional P 48 $ 2,785,961 $ 2,228,000 $ 557,961 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire quick response vehicle (develop

specifications)], Improve Airport Drainage [Phase 2 of repair storm drainage (design

only)and engineering study of 12' culvert], Rehabilitate Aircraft Rescue & Fire Fighting

Building [Rehabilitate overhead doors (design only)], Rehabilitate Runway [Mill and

overlay Runway 18/36] - 18/36, Rehabilitate Runway Lighting [Replace Runway 18/36

medium intensity edge lighting.] - 18/36, Rehabilitate Taxiway [Rehabilitate northern

2,300' of Taxiway R.], Rehabilitate Taxiway Lighting [Replace medium intensity taxiway

edge lights.], Update Airport Master Plan Study [update master plan], Wildlife Hazard

Assessments [Implement wildlife program.]

SO JAN AL MVC Monroe County GA 8 $ 377,224 $ 377,224 $ - $ -

Acquire Land For Approaches, Rehabilitate Runway - 03/21, Rehabilitate Runway

Lighting - 03/21, Remove Obstructions

SO JAN AL MGM Montgomery Regional (Dannelly Field) P 41 $ 995,696 $ 995,696 $ - $ -

Expand Apron, Install Guidance Signs, Rehabilitate Airport Beacons, Update Airport

Master Plan Study

SO JAN AL 06A Moton Field Municipal GA 14 $ 323,253 $ 323,253 $ - $ -

Install Runway Vertical/Visual Guidance System [Install windcone] - 13/31, Rehabilitate

Runway - 13/31, Rehabilitate Runway Lighting - 13/31, Rehabilitate Taxiway LightingSO JAN AL 3M8 North Pickens GA 5 $ 536,152 $ 536,152 $ - $ - Construct Taxiway

SO JAN AL GAD Northeast Alabama Regional GA 11 $ 1,313,283 $ 313,622 $ 999,661 $ -

Construct Taxiway [Construct Access taxiway (Phase 1)], Install Emergency Generator,

Install Runway Vertical/Visual Guidance System - 06/24, Rehabilitate Runway Lighting -

06/24, Rehabilitate Taxiway LightingSO JAN AL MSL Northwest Alabama Regional CS 27 $ 209,789 $ 209,789 $ - $ - Update Airport Master Plan StudySO JAN AL 1M4 Posey Field GA 6 $ 268,745 $ 268,745 $ - $ - Acquire Land For Approaches, Remove ObstructionsSO JAN AL 1A9 Prattville - Grouby Field GA 12 $ 529,002 $ 529,002 $ - $ - Expand ApronSO JAN AL DCU Pryor Field Regional GA 19 $ 150,000 $ 150,000 $ - $ - Construct Fuel Farm [MAP]SO JAN AL 7A5 Roanoke Municipal GA 5 $ 223,250 $ 223,250 $ - $ - Install Perimeter Fencing, Install Runway Lighting - 11/29SO JAN AL 20A Robbins Field GA 7 $ 133,026 $ 133,026 $ - $ - Install Runway Vertical/Visual Guidance System - 05/23SO JAN AL M22 Russellville Municipal GA 9 $ 282,730 $ 282,730 $ - $ - Install Perimeter Fencing, Rehabilitate Runway - 02/20

SO JAN AL 4A6 Scottsboro Municipal-Word Field GA 14 $ 71,100 $ 71,100 $ - $ -

Install Runway Lighting [(Install emergency generator)] - 04/22, Remove Obstructions

[Remove obstructions Runway 4]SO JAN AL EET Shelby County GA 14 $ 150,000 $ 150,000 $ - $ - Construct Building

SO JAN AL 79J

South Alabama Regional at Bill Benton

Field GA 15 $ 97,566 $ 97,566 $ - $ -

Install Perimeter Fencing [Design and topographic survey for perimeter fence], Update

Airport Master Plan StudySO JAN AL PLR St Clair County R 12 $ 302,100 $ 302,100 $ - $ - Improve Airport Drainage

SO JAN AL 2R5 St Elmo GA 6 $ 109,118 $ 109,118 $ - $ -

Rehabilitate Runway [Seal cracks and remark pavement.] - 06/24, Update Airport Master

Plan Study [Update airport layout plan.]SO JAN AL ASN Talladega Municipal GA 20 $ 244,129 $ 244,129 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway

Page 61 of 97

Page 62: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN AL ALX Thomas C Russell Field GA 12 $ 161,378 $ 161,378 $ - $ -

Install Runway Vertical/Visual Guidance System [Install REILS] - 18/36, Rehabilitate

Runway Lighting - 18/36SO JAN AL TOI Troy Municipal GA 12 $ 2,870,520 $ 273,693 $ 2,596,827 $ - Extend Runway - 07/25

SO JAN AL TCL Tuscaloosa Regional GA 26 $ 1,018,399 $ 221,063 $ 797,336 $ -

Construct Taxiway [Taxiway "B"; Phase 1 - Site Preparation (Construction) and Phase 2 -

Paving, Marking, Lighting, Signage (Design Only)]SO JAN AL A08 Vaiden Field GA 5 $ 552,740 $ 552,740 $ - $ - Construct TaxiwaySO JAN AL 08A Wetumpka Municipal GA 12 $ 71,623 $ 71,623 $ - $ - Improve Airport DrainageSO JAN MS 9M4 Ackerman Choctaw County GA 6 $ 25,270 $ 25,270 $ - $ - Acquire Land For Approaches

SO JAN MS 1M2 Belzoni Municipal GA 11 $ 152,275 $ 152,275 $ - $ -

Construct Utilities [Construct water and wastewater system], Install Perimeter Fencing,

Install Runway Vertical/Visual Guidance System - 03/21SO JAN MS 8M1 Booneville/Baldwyn GA 12 $ 176,962 $ 176,962 $ - $ - Construct Building

SO JAN MS MBO Bruce Campbell Field GA 19 $ 126,350 $ 126,350 $ - $ -

Install Airfield Guidance Signs [Design Only], Install Perimeter Fencing [Phase 2], Update

Airport Master Plan StudySO JAN MS 19M C. A. Moore GA 11 $ 387,324 $ 387,324 $ - $ - Construct Building [Hangars], Construct Taxiway

SO JAN MS 23M Clarke County GA 10 $ 199,671 $ 199,671 $ - $ - Extend Runway Safety Area [Construct phase 4 of extend safety area] - 16/34SO JAN MS RNV Cleveland Municipal GA 16 $ 774,328 $ 774,328 $ - $ - Extend Runway [Site Prep and Design] - 17/35

SO JAN MS 0R0 Columbia-Marion County GA 8 $ 204,713 $ 204,713 $ - $ -

Construct Taxiway [Taxiway to new hangar area], Install Perimeter Fencing, Install

Runway Vertical/Visual Guidance System [Design Only] - 05/23, Install Weather

Reporting Equipment [Design only]SO JAN MS UBS Columbus-Lowndes County GA 12 $ 220,337 $ 220,337 $ - $ - Rehabilitate Runway - 18/36SO JAN MS M11 Copiah County GA 9 $ 288,686 $ 288,686 $ - $ - Construct Runway [Acquire Land] - 17/35

SO JAN MS M24 Dean Griffin Memorial GA 10 $ 299,963 $ 299,963 $ - $ -

Acquire Land For Approaches [Acquire south runway protection zone], Improve Runway

Safety Area [Conduct environmental assessment for moving runway south 500' and

widening to 75'.] - 17/35SO JAN MS STF George M Bryan GA 15 $ 290,906 $ 290,906 $ - $ - Acquire Land For Approaches, Improve Airport DrainageSO JAN MS GTR Golden Triangle Regional P 45 $ 1,695,920 $ 170,000 $ 1,525,920 $ - Construct Taxiway, Extend Runway - 18/36SO JAN MS GTR Golden Triangle Regional P 44 $ 5,724,000 $ 735,000 $ 4,989,000 $ - Extend Runway - 18/36SO JAN MS GWO Greenwood-Leflore GA 13 $ 444,745 $ 444,745 $ - $ - Improve Airport DrainageSO JAN MS GNF Grenada Municipal GA 7 $ 627,238 $ 627,238 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 13/31

SO JAN MS GPT Gulfport-Biloxi International P 73 $ 6,061,000 $ - $ 6,061,000 $ -

Acquire Easement for Noise Compatibility within 65 - 69 DNL [Phase 6 of acquire

easements], Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire nine

homes.], Noise Mitigation Measures for Residences within 65 - 69 DNL [Sound insulation

Phase 6]

Page 62 of 97

Page 63: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN MS GPT Gulfport-Biloxi International P 75 $ 10,763,990 $ 3,342,540 $ 7,421,450 $ -

Acquire Equipment [Acquire airfield sweeper], Acquire Land For Approaches [Acquire

Runway 18 protection zone land], Construct Service Road [Phase 3B of construct service

road.], Expand Terminal Building [Terminal expansion], Extend Taxiway [Taxiway J

extension (construct phase 2, central leg and design south leg)], Improve Access Road

[Rehabilitate terminal loop road.], Improve Airport Drainage [Rehabilitate airfield

drainage (design only)], Rehabilitate Airport Beacons [Rehabilitate and relocate rotating

beacon], Rehabilitate Runway Lighting [Rehabilitate Runwy 18/36 lighting (design only)] -

18/36

SO JAN MS GPT Gulfport-Biloxi International P 74 $ 544,350 $ - $ 544,350 $ -

Collect airport data for Airports Geographic Information System [Collect/input airport

data for Airports GIS]

SO JAN MS HEZ

Hardy-Anders Field Natchez-Adams

County GA 22 $ 202,572 $ 202,572 $ - $ - Rehabilitate Runway - 13/31

SO JAN MS PIB Hattiesburg-Laurel Regional P 31 $ 537,142 $ 537,142 $ - $ -

Install Emergency Generator, Install Runway Lighting - 18/36, Install Taxiway Lighting,

Rehabilitate Taxiway

SO JAN MS HKS Hawkins Field GA 12 $ 494,784 $ 494,784 $ - $ - Improve Airport Drainage [Phase 2], Install Airfield Guidance Signs [Phase 2]SO JAN MS 14M Hollandale Municipal GA 7 $ 149,909 $ 149,909 $ - $ - Construct Building [Hangar]SO JAN MS M41 Holly Springs-Marshall County GA 13 $ 38,000 $ 38,000 $ - $ - Acquire Miscellaneous Land, Conduct Miscellaneous StudySO JAN MS M44 Houston Municipal GA 10 $ 539,407 $ 539,407 $ - $ - Acquire Land For Approaches, Extend Runway - 03/21

SO JAN MS 4R1 I H Bass Jr Memorial GA 8 $ 168,663 $ 168,663 $ - $ - Acquire Land For Approaches, Improve Access Road, Install Taxiway LightingSO JAN MS IDL Indianola Municipal GA 13 $ 215,984 $ 215,984 $ - $ - Construct Building [Hangar]SO JAN MS JAN Jackson-Evers International P 43 $ 2,481,793 $ 2,481,793 $ - $ - Improve Terminal Building [Acquire Passenger Boarding Bridges]SO JAN MS JAN Jackson-Evers International P 44 $ 8,224,186 $ 8,224,186 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 16L/34R

SO JAN MS M23 James H Easom Field GA 10 $ 127,893 $ 127,893 $ - $ -

Conduct aeronautical survey for WAAS approach [Conduct approach survey.], Install

Miscellaneous NAVAIDS [Rehabilitate rotating beacon], Update Airport Master Plan

Study [Update airport layout drawing and exhibit A property map]SO JAN MS MEI Key Field P 28 $ 3,014,234 $ 595,226 $ 2,419,008 $ - Construct TaxiwaySO JAN MS MEI Key Field P 27 $ 404,774 $ 404,774 $ - $ - Construct ApronSO JAN MS OSX Kosciusko-Attala County GA 10 $ 250,456 $ 250,456 $ - $ - Rehabilitate Runway - 14/32SO JAN MS LMS Louisville Winston County GA 10 $ 25,774 $ 25,774 $ - $ - Rehabilitate Runway - 17/35

SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 19 $ 463,000 $ 463,000 $ - $ - Improve Airport DrainageSO JAN MS GLH Mid Delta Regional CS 28 $ 2,892,933 $ 175,280 $ 2,717,653 $ - Rehabilitate Runway [Phase 2] - 18R/36LSO JAN MS M72 New Albany-Union County GA 13 $ 155,744 $ 155,744 $ - $ - Construct Building

Page 63 of 97

Page 64: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO JAN MS 5A4 Okolona Municipal-Richard Stovall Field GA 12 $ 225,725 $ 225,725 $ - $ - Construct BuildingSO JAN MS MPE Philadelphia Municipal GA 11 $ 109,203 $ 109,203 $ - $ - Improve Fuel FarmSO JAN MS MJD Picayune Municipal GA 16 $ 614,997 $ 330,112 $ 284,885 $ - Rehabilitate Runway - 18/36

SO JAN MS M13 Poplarville-Pearl River County GA 7 $ 347,694 $ 347,694 $ - $ -

Expand Apron, Install Miscellaneous NAVAIDS [Install wind cone.], Install Taxiway

Lighting, Rehabilitate Airport BeaconsSO JAN MS 25M Ripley GA 7 $ 208,814 $ 208,814 $ - $ - Construct Fuel Farm, Rehabilitate Runway - 03/21SO JAN MS CRX Roscoe Turner GA 19 $ 247,808 $ 247,808 $ - $ - Install Weather Reporting Equipment, Rehabilitate TaxiwaySO JAN MS HSA Stennis International GA 24 $ 104,500 $ 104,500 $ - $ - Construct Apron, Wildlife Hazard Assessments

SO JAN MS 00M Thigpen Field GA 6 $ 215,199 $ 215,199 $ - $ - Modify Access Road, Remove Obstructions [Clear and grub south approach zone.]

SO JAN MS 01M Tishomingo County GA 12 $ 86,083 $ 86,083 $ - $ -

Acquire Land For Approaches, Improve Runway Safety Area - 17/35, Rehabilitate Airport

Beacons, Rehabilitate Runway - 17/35

SO JAN MS PQL Trent Lott International GA 26 $ 668,706 $ 668,706 $ - $ -

Rehabilitate Runway Lighting [Replace runway edge lights] - 17/35, Rehabilitate Taxiway

Lighting [Replace taxiway lighting]SO JAN MS UTA Tunica Municipal GA 16 $ 781,524 $ 781,524 $ - $ - Construct Terminal Building [Phase 1A]

SO JAN MS TUP Tupelo Regional P 34 $ 330,746 $ 330,746 $ - $ -

Acquire Interactive Training System, Conduct Environmental Study, Rehabilitate Apron,

Update Airport Master Plan StudySO JAN MS UOX University-Oxford GA 23 $ 82,555 $ 82,555 $ - $ - Install Runway Vertical/Visual Guidance System - 09/27SO JAN MS UOX University-Oxford GA 24 $ 1,575,652 $ 1,575,652 $ - $ - Acquire Land for Development

SO JAN MS VKS Vicksburg Municipal GA 3 $ 55,000 $ 55,000 $ - $ -

Install Runway Vertical/Visual Guidance System - 01/19, Install Weather Reporting

Equipment [Phase 1 - Design Only]SO JAN MS 33M Water Valley Municipal GA 6 $ 227,453 $ 227,453 $ - $ - Rehabilitate Runway - 15/33, Rehabilitate Taxiway

SO JAN MS 2R0 Waynesboro Municipal GA 7 $ 516,894 $ 516,894 $ - $ - Construct Taxiway [Construct phase 1 of parallel taxiway (north partial)]SO JAN MS 5A6 Winona-Montgomery County GA 10 $ 47,686 $ 47,686 $ - $ - Construct TaxiwaySO JAN MS 87I Yazoo County GA 11 $ 139,773 $ 139,773 $ - $ - Install Apron Lighting

SO MEM KY EKX Addington Field GA 15 $ 789,590 $ 763,417 $ 26,173 $ -

Conduct Environmental Study [72716], Improve Runway Safety Area - 05/23, Strengthen

Runway [Design Only] - 05/23

SO MEM KY DWU Ashland Regional GA 14 $ 487,091 $ 487,091 $ - $ -

Construct Taxiway [Part B funding, Phase 2 Fuel Farm Relocation], Construct Taxiway

[Phase 3, Acquire 1 property.]

SO MEM KY DWU Ashland Regional GA 13 $ 60,000 $ 60,000 $ - $ - Construct Taxiway [Part A funding, Phase 1 - Fuel Farm Relocation Design]

SO MEM KY PAH Barkley Regional P 37 $ 511,356 $ 511,356 $ - $ -

Construct Apron [Design and Phase A Construction], Improve Airport Drainage

[Construction], Modify Terminal Building

Page 64 of 97

Page 65: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO MEM KY PAH Barkley Regional P 36 $ 492,236 $ 492,236 $ - $ -

Acquire Friction Measuring Equipment, Improve Airport Drainage, Improve Airport

Erosion Control [Phase 3 of Improvement to RWY 4 RSA], Rehabilitate Terminal Building,

Update Airport Master Plan Study [Airport Layout Plan Update and Aerial Mapping for A-

GIS development per AC 150/5300-16,17 & 18.]

SO MEM KY K22 Big Sandy Regional GA 13 $ 410,239 $ 410,239 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate TaxiwaySO MEM KY LEX Blue Grass P 56 $ 1,954,956 $ 1,268,500 $ 686,456 $ - Rehabilitate Apron [Phase II (Construction)]SO MEM KY LEX Blue Grass P 53 $ 237,500 $ 237,500 $ - $ - Update Airport Master Plan Study, Update Miscellaneous Study

SO MEM KY LEX Blue Grass P 54 $ 1,078,250 $ 1,078,250 $ - $ - Construct Taxiway, Rehabilitate Apron [Phase I (Design)], Rehabilitate Terminal BuildingSO MEM KY LEX Blue Grass P 57 $ 776,947 $ 776,947 $ - $ - Improve Terminal BuildingSO MEM KY I93 Breckinridge County GA 5 $ 110,141 $ 110,141 $ - $ - Acquire Land for Development [Phase 4]SO MEM KY FFT Capital City GA 10 $ 32,000 $ 32,000 $ - $ - Update Airport Master Plan StudySO MEM KY FFT Capital City GA 11 $ 344,055 $ 344,055 $ - $ - Install Perimeter Fencing

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 75 $ 2,000,000 $ - $ 2,000,000 $ - Construct Runway [FY 2010 Scheduled Payment]

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 74 $ 98,513 $ 98,513 $ - $ - Extend Runway [FY 2010 Part A funding] - 09/27

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 76 $ 2,493,427 $ 2,493,427 $ - $ - Expand Terminal Building [FY 2010 Part b & C Funding], Extend Runway - 09/27

SO MEM KY CVG

Cincinnati/Northern Kentucky

International P 73 $ 2,419,650 $ 2,419,650 $ - $ - Expand Terminal Building [FY 2010 Part A funding]SO MEM KY 0I8 Cynthiana-Harrison County GA 8 $ 40,000 $ 40,000 $ - $ - Install Perimeter Fencing [Phase I (Design)]

SO MEM KY 1M7 Fulton GA 8 $ 1,587,385 $ 1,587,385 $ - $ - Extend Runway [Construct 1,318' runway extension and widening] - 09/27SO MEM KY K62 Gene Snyder GA 10 $ 142,975 $ 142,975 $ - $ - Improve Runway Safety Area [Phase I (Design Only)] - 03/21

SO MEM KY 27K

Georgetown Scott County - Marshall

Field GA 17 $ 150,000 $ 150,000 $ - $ - Construct Building

SO MEM KY GLW Glasgow Municipal GA 21 $ 75,000 $ 75,000 $ - $ - Install Perimeter Fencing, Update Airport Master Plan Study [ALP Update]SO MEM KY M20 Grayson County GA 6 $ 13,234 $ 13,234 $ - $ - Rehabilitate Runway Lighting [Phase 2] - 02/20SO MEM KY M20 Grayson County GA 7 $ 168,428 $ 168,428 $ - $ - Construct Fuel Farm [Relocate and construct fuel farm.]SO MEM KY KY8 Hancock Co-Ron Lewis Field GA 8 $ 71,288 $ 71,288 $ - $ - Acquire Easement for DevelopmentSO MEM KY EHR Henderson City-County GA 22 $ 150,000 $ 150,000 $ - $ - Rehabilitate ApronSO MEM KY M34 Kentucky Dam State Park GA 8 $ 106,818 $ 106,818 $ - $ - Install Runway Lighting [Phase 2] - 09/27SO MEM KY CEY Kyle-Oakley Field GA 21 $ 83,097 $ 83,097 $ - $ - Install Weather Reporting EquipmentSO MEM KY 1M9 Lake Barkley State Park GA 2 $ 117,030 $ 117,030 $ - $ - Install Runway Lighting - 02/20SO MEM KY SME Lake Cumberland Regional GA 18 $ 40,000 $ 40,000 $ - $ - Construct Fuel Farm [Phase I (Design Only)]

Page 65 of 97

Page 66: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO MEM KY 6I2 Lebanon-Springfield GA 10 $ 86,196 $ 86,196 $ - $ - Acquire Land for Development [Land Acquisition Phase II]

SO MEM KY LOZ London-Corbin Airport-Magee Field GA 17 $ 237,500 $ 237,500 $ - $ - Conduct Environmental Study, Install Guidance Signs, Update Airport Master Plan Study

SO MEM KY SDF Louisville International-Standiford Field P 87 $ 2,613,553 $ 2,613,553 $ - $ -

Acquire Land for Development, Acquire Snow Removal Equipment, Rehabilitate Apron,

Runway Incursion Markings, Update Miscellaneous Study

SO MEM KY SDF Louisville International-Standiford Field P 89 $ 1,772,439 $ 1,772,439 $ - $ - Acquire Land for Development

SO MEM KY SDF Louisville International-Standiford Field P 88 $ 5,000,000 $ - $ 5,000,000 $ - Acquire Land for Noise Compatibility within 65 - 69 DNLSO MEM KY I39 Madison GA 15 $ 85,934 $ 85,934 $ - $ - Rehabilitate Runway [Rehabilitate Runway (Phase II)] - 18/36SO MEM KY I39 Madison GA 14 $ 828,244 $ 828,244 $ - $ - Rehabilitate Runway - 18/36SO MEM KY 5M9 Marion-Crittenden County GA 9 $ 129,841 $ 129,841 $ - $ - Acquire Land For Approaches

SO MEM KY 18I McCreary County GA 8 $ 96,435 $ 96,435 $ - $ - Construct Fuel Farm [Phase I (Design)], Install Perimeter Fencing [Phase I (Design Only)]SO MEM KY 1A6 Middlesboro-Bell County GA 14 $ 75,000 $ 75,000 $ - $ - Improve Airport Drainage, Install Miscellaneous NAVAIDS

SO MEM KY M97

Morehead-Rowan County Clyde A.

Thomas Regional GA 5 $ 66,064 $ 66,064 $ - $ - Update Airport Master Plan Study

SO MEM KY M21 Muhlenberg County GA 10 $ 85,975 $ 85,975 $ - $ - Rehabilitate Runway [Rehabilitate Runway, Design Only, Phase 1] - 05/23SO MEM KY M21 Muhlenberg County GA 9 $ 61,854 $ 61,854 $ - $ - Install Runway Lighting [Phase 1, Design Only] - 05/23SO MEM KY 7K4 Ohio County GA 10 $ 28,339 $ 28,339 $ - $ - Remove Obstructions [Phase 1, Design]SO MEM KY 7K4 Ohio County GA 11 $ 289,226 $ 289,226 $ - $ - Remove Obstructions [Phase 2 - Construction]

SO MEM KY OWB Owensboro-Daviess County GA 43 $ 410,000 $ 410,000 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Extend Runway [Relocate

Power lines] - 18/36SO MEM KY OWB Owensboro-Daviess County GA 42 $ 23,750 $ 23,750 $ - $ - Security Enhancements [Access Control System]SO MEM KY PBX Pike County-Hatcher Field GA 11 $ 102,353 $ 102,353 $ - $ - Update Airport Master Plan StudySO MEM KY PBX Pike County-Hatcher Field GA 12 $ 190,079 $ 190,079 $ - $ - Construct Taxiway [Phase 1 Design]SO MEM KY K24 Russell County GA 13 $ 36,703 $ 36,703 $ - $ - Update Airport Master Plan StudySO MEM KY 4M7 Russellville-Logan County GA 12 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway Lighting - 06/24SO MEM KY BRY Samuels Field GA 14 $ 151,860 $ 151,860 $ - $ - Expand ApronSO MEM KY I50 Stanton GA 4 $ 152,950 $ 152,950 $ - $ - Construct Taxiway [Phase 1 Design], Install Perimeter FencingSO MEM KY DVK Stuart Powell Field GA 17 $ 75,701 $ 75,701 $ - $ - Expand ApronSO MEM KY TWT Sturgis Municipal GA 11 $ 75,000 $ 75,000 $ - $ - Construct Building [Hangar Construction Phase 4 (Reimbursement)]SO MEM KY AAS Taylor County GA 13 $ 78,000 $ 78,000 $ - $ - Update Airport Master Plan StudySO MEM KY TZV Tompkinsville-Monroe County GA 8 $ 139,026 $ 139,026 $ - $ - Acquire Land for DevelopmentSO MEM KY I35 Tucker-Guthrie Memorial GA 9 $ 133,523 $ 133,523 $ - $ - Install Weather Reporting EquipmentSO MEM KY K20 Wendell H Ford GA 15 $ 40,000 $ 40,000 $ - $ - Rehabilitate Runway [Phase 1 Design.] - 14/32

Page 66 of 97

Page 67: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO MEM KY 9I3 West Liberty GA 7 $ 170,000 $ 170,000 $ - $ -

Construct Runway Safety Area [Land Acquisition] - 07/25, Improve Airport Drainage

[Phase 1 Design]SO MEM KY W38 Williamsburg-Whitley County GA 12 $ 300,000 $ 300,000 $ - $ - Construct BuildingSO MEM TN JWN John C Tune R 14 $ 950,000 $ 950,000 $ - $ - Construct Runway Safety Area [Design Only] - 02/20SO MEM TN CHA Lovell Field P 52 $ 1,738,178 $ 398,503 $ 1,339,675 $ - Construct Taxiway [Part D + Discretionary]

SO MEM TN CHA Lovell Field P 50 $ 1,172,070 $ 1,172,070 $ - $ - Construct Taxiway [Part A funding for design and four TW H tie-ins to runways.]SO MEM TN CHA Lovell Field P 51 $ 773,566 $ 773,566 $ - $ - Construct Taxiway [FY 2010 Part B,C Funding]SO MEM TN TYS McGhee Tyson P 61 $ 105,000 $ 30,000 $ 75,000 $ - Wildlife Hazard Assessments

SO MEM TN TYS McGhee Tyson P 63 $ 5,783,191 $ - $ 5,783,191 $ - Acquire Land For Approaches [Delmar Haynes Property in RW 23R RPZ]SO MEM TN TYS McGhee Tyson P 62 $ 4,077,154 $ 4,077,154 $ - $ - Construct Snow Removal Equipment BuildingSO MEM TN MEM Memphis International P 79 $ 4,823,000 $ - $ 4,823,000 $ - Rehabilitate Runway [FY 2010 Scheduled Payment]

SO MEM TN MEM Memphis International P 80 $ 21,671,780 $ 13,467,953 $ 8,203,827 $ -

Improve Terminal Building [Consolidated Ground Transportation Center], Rehabilitate

Runway [Phase 3 reimbursement] - 09/27, Rehabilitate Taxiway [TWY Alpha

Reconstruction]

SO MEM TN MEM Memphis International P 81 $ 16,741,688 $ 11,141,688 $ 5,600,000 $ -

Acquire Snow Removal Equipment [De-ice truck; four de-ice spreaders; one snow

broom], Collect airport data for Airports Geographic Information System, Construct

Taxiway [TWY Victor Reim], Improve Terminal Building [Consolidated Ground

Transportation Center], Install Perimeter Fencing, Install Runway Lighting - 18C/36C,

Install Runway Sensors - 18L/36R, Rehabilitate Runway [Phase 4 reimbursement] -

09/27, Rehabilitate Taxiway [Taxiway Victor Reconstruction Phase 1], Rehabilitate

Terminal Building [Phase 1], Security Enhancements [Phase 1], Strengthen Runway

[Design] - 18C/36C, Update Airport Master Plan Study [Disadvantaged Business

Enterprise Plan], Widen Taxiway [777 Taxiway Fillet Modifications - Construction]SO MEM TN BNA Nashville International P 87 $ 750,000 $ 750,000 $ - $ - Rehabilitate Taxiway [Design Only]SO MEM TN BNA Nashville International P 89 $ 231,306 $ - $ 231,306 $ - Identify the airport's environmental footprintSO MEM TN BNA Nashville International P 88 $ 10,710,000 $ 2,529,514 $ 8,180,486 $ - Rehabilitate Taxiway [Rehabilitate Taxiway Reconstruct T/W T4 South]

SO MEM TN *TNB Tennessee State Block Grant Program 40 $ 5,603,781 $ 5,603,781 $ - $ - Non primary development projects in state block grant program

SO MEM TN *TNB Tennessee State Block Grant Program 41 $ 4,800,000 $ - $ 4,800,000 $ - Non primary development projects in state block grant program

SO MEM TN *TNB Tennessee State Block Grant Program 38 $ 7,099,801 $ 7,099,801 $ - $ - Non primary development projects in state block grant program

SO MEM TN *TNB Tennessee State Block Grant Program 39 $ 712,500 $ - $ 712,500 $ - Non primary development projects in state block grant program

Page 67 of 97

Page 68: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO MEM TN TRI Tri-Cities Regional TN/VA P 60 $ 1,768,261 $ 1,768,261 $ - $ -

Acquire Snow Removal Equipment, Expand Apron, Improve Airport Erosion Control,

Install Airfield Guidance Signs [Taxiway Guidance Sign at TW A and Y]SO MEM TN TRI Tri-Cities Regional TN/VA P 59 $ 368,600 $ 368,600 $ - $ - Acquire Land For Approaches [Mapleview Farms, 9.7 Acres]SO ORL FL 2IS Airglades GA 5 $ 1,967,888 $ 1,967,888 $ - $ - Rehabilitate Runway [Rehab Runway 13/31] - 13/31

SO ORL FL SPG Albert Whitted R 19 $ 846,769 $ 846,769 $ - $ -

Expand Apron, Extend Taxiway [Taxiway D Extension], Install Runway Vertical/Visual

Guidance System [Install REILs on R/W 6] - 07/25

SO ORL FL AVO Avon Park Executive GA 16 $ 262,589 $ 262,589 $ - $ -

Rehabilitate Taxiway Lighting [Rehabilitate Taxiway E MITLs and Electrical Vault

(Construction)]

SO ORL FL AVO Avon Park Executive GA 15 $ 49,557 $ 49,557 $ - $ -

Rehabilitate Runway [Remarking of Runway Designators] - 04/22, Rehabilitate Taxiway

Lighting [Rehabilitate Taxiway E MITLs and Electrical Vault (Design)]

SO ORL FL BOW Bartow Municipal GA 26 $ 86,693 $ 86,693 $ - $ -

Rehabilitate Taxiway [Rehab Taxiway A, H and Apron Edge (Phase 1 - Design)], Remove

Obstructions [FAR Part 77 Surface Obstruction Clearing (Design)]

SO ORL FL BOW Bartow Municipal GA 27 $ 104,500 $ 104,500 $ - $ - Remove Obstructions [FAR Part 77 Surface Obstruction Clearing (Construction)]SO ORL FL CEW Bob Sikes GA 22 $ 5,140,374 $ 487,853 $ 4,652,521 $ - Rehabilitate Taxiway [Rehab Taxiway A]SO ORL FL F95 Calhoun County GA 3 $ 278,135 $ 278,135 $ - $ - Expand Apron [Expand Apron (Construction)]SO ORL FL F95 Calhoun County GA 2 $ 35,583 $ 35,583 $ - $ - Expand Apron [Expand Apron (Design)]SO ORL FL VQQ Cecil Field GA 14 $ 4,785,415 $ 164,043 $ 4,621,372 $ - Rehabilitate Runway [Rehab Runway 18L/36R (Phase 1)] - 18L/36RSO ORL FL PGD Charlotte County P 30 $ 500,000 $ 500,000 $ - $ - Extend Runway [Extend Runway - Reimbursement (Phase 5)] - 04/22SO ORL FL PGD Charlotte County P 29 $ 500,000 $ 500,000 $ - $ - Extend Runway [Extend Runway - Reimbursement (Phase 4)] - 04/22

SO ORL FL CTY Cross City GA 6 $ 132,720 $ 132,720 $ - $ -

Install Airfield Guidance Signs [Install Lighted Airfield Guidance Signs (Design)], Install

Miscellaneous NAVAIDS [Miscellaneous NAVAIDS], Install Runway Lighting [Install

Electrical Vault (Design)] - 13/31, Install Runway Vertical/Visual Guidance System [Rehab

PAPIs (Design)] - 13/31, Install Taxiway Lighting [Install MITLs on Taxiway A (Design)],

Rehabilitate Runway [Rehab Airfield Pavement Markings (Design)] - 13/31, Rehabilitate

Runway Lighting [Rehab MIRLs (Desing)] - 13/31SO ORL FL DAB Daytona Beach International P 58 $ 64,755 $ - $ 64,755 $ - Runway Incursion Markings [Enhanced Taxiway Centerline Markings]

SO ORL FL DAB Daytona Beach International P 59 $ 11,250,477 $ 2,250,477 $ 9,000,000 $ -

Improve Terminal Building [Bond Repayment for Renovations], Rehabilitate Runway

[Rehab Runway 07L/25R including lighting system (Construction - Phase 1)] - 07L/25R

SO ORL FL X35

Dunnellon/Marion County & Park of

Commerce GA 1 $ 118,750 $ 118,750 $ - $ - Rehabilitate Runway [Rehab Runway 05/23 (Phase 1 - Design)] - 05/23

SO ORL FL VPS Eglin AFB P 23 $ 7,555,868 $ 4,755,868 $ 2,800,000 $ -

Construct Parking Lot [Expand Terminal Public Parking Lot], Modify Terminal Building

[Modify Terminal Building - Extend Concourse]

Page 68 of 97

Page 69: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ORL FL FHB Fernandina Beach Municipal GA 20 $ 1,207,528 $ 584,630 $ 622,898 $ -

Construct Taxiway [Constuct Taxiway E - Phase 1 (+/- 35 ft x 2,300 L.F.)], Rehabilitate

Taxiway [Rehab Taxiway B (+/- 35 ft x 1,900 L.F.); Mark and Light (LED) Taxiway B (+/- 35

ft x 3,800 L.F.)]SO ORL FL FXE Fort Lauderdale Executive R 25 $ 157,653 $ 157,653 $ - $ - Rehabilitate Taxiway [Rehabilitate and Realign Taxiway G - Design]

SO ORL FL FLL Fort Lauderdale/Hollywood International P 63 $ 8,627,982 $ 4,070,822 $ 4,557,160 $ - Construct Taxiway [Construct Taxiway C], Install Guidance Signs [Install Airfield Signage]

SO ORL FL FLL Fort Lauderdale/Hollywood International P 65 $ 5,700,000 $ - $ 5,700,000 $ - Extend Runway - 09R/27L

SO ORL FL FLL Fort Lauderdale/Hollywood International P 64 $ 8,240,000 $ - $ 8,240,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation

Measures (Phase 1)]

SO ORL FL GNV Gainesville Regional P 31 $ 1,427,834 $ 1,298,425 $ 129,409 $ -

Rehabilitate Runway Lighting [Rehabilitate airfield electrical vault] - 11/29, Rehabilitate

Taxiway [Rehab Taxiway C]SO ORL FL BKV Hernando County GA 15 $ 519,657 $ 519,657 $ - $ - Rehabilitate Runway - 09/27, Rehabilitate TaxiwaySO ORL FL 01J Hilliard Airpark GA 6 $ 305,502 $ 305,502 $ - $ - Improve Airport Drainage [Airport Drainage Improvements]

SO ORL FL X40 Inverness GA 4 $ 3,046,703 $ 3,046,703 $ - $ - Extend Runway [Extend and Realign Runway 01/19 to Runway 18/36 (Phase 2)] - 01/19

SO ORL FL JAX Jacksonville International P 47 $ 223,120 $ - $ 223,120 $ - Safety Management System (SMS) Program [Safety Management System (SMS) Study]

SO ORL FL JAX Jacksonville International P 48 $ 1,708,611 $ 1,708,611 $ - $ - Improve Service Road, Rehabilitate Taxiway Lighting [Rehab Taxiway Lighting]

SO ORL FL EYW Key West International P 42 $ 802,393 $ 802,393 $ - $ - Construct Terminal Building [Construct Terminal Building - Reimbursement (Phase 4)]

SO ORL FL EYW Key West International P 43 $ 1,180,570 $ 1,180,570 $ - $ -

Conduct Miscellaneous Study [Conduct Utility Master Plan], Construct Terminal Building

[Construct Terminal Building - Reimbursement (Phase 4b)], Improve Airport Drainage

[Improve Airport Drainage (Phase 1 - Design)], Rehabilitate Apron [Rehabilitate Apron

(Phase 1 - Design)]

SO ORL FL 42J Keystone Airpark GA 19 $ 1,745,413 $ 169,380 $ 1,576,033 $ -

Rehabilitate Runway [Rehab Runway 05/23] - 05/23, Rehabilitate Runway Lighting

[Rehab Airfield Electrical Vault] - 05/23, Rehabilitate Runway Lighting [Rehabilitate

Runway 05/23 MIRLs] - 05/23

SO ORL FL X14 La Belle Municipal GA 5 $ 581,330 $ 581,330 $ - $ -

Construct Access Road [Construct Access Road to T-Hangar Development Area],

Construct Taxiway [Construct Taxiway - T-Hangar Development Area]

SO ORL FL LCQ Lake City Municipal GA 18 $ 600,000 $ 600,000 $ - $ -

Improve Access Road [Improve Airport Access Road], Improve Airport Drainage [Improve

Airport Drainage and Utilities]

SO ORL FL X07 Lake Wales Municipal GA 13 $ 191,008 $ 191,008 $ - $ -

Install Apron Lighting [Install Apron Flood Lighting (Design)], Install Perimeter Fencing

[Install Perimeter Fencing (Construction)]

SO ORL FL LAL Lakeland Linder Regional R 31 $ 2,407,300 $ 2,407,300 $ - $ -

Construct Taxiway [Realign and Construct Taxiway H (+/- 400 LF x 50 ft) and J (+/- 700 LF

x 75 ft)]

Page 69 of 97

Page 70: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ORL FL LAL Lakeland Linder Regional R 32 $ 75,000 $ 75,000 $ - $ - Rehabilitate Runway [Rehabilitate Runway 09/27 Shoulder Markings] - 09/27

SO ORL FL MKY Marco Island GA 8 $ 6,068,990 $ 602,670 $ 5,466,320 $ - Construct Taxiway [Construct Apron], Construct Taxiway [Construct Parallel Taxiway A]

SO ORL FL MAI Marianna Municipal GA 13 $ 146,300 $ 146,300 $ - $ - Rehabilitate Runway Lighting [Rehab Electrical Vault (construction)] - 08/26SO ORL FL MAI Marianna Municipal GA 12 $ 57,086 $ 57,086 $ - $ - Rehabilitate Runway Lighting [Rehab Electrical Vault (Design)] - 08/26

SO ORL FL MLB Melbourne International P 35 $ 81,320 $ 81,320 $ - $ -

Update Airport Master Plan Study [Airport Layout Plan update including aerial

photogrammetry/mapping]SO ORL FL MLB Melbourne International P 36 $ 821,750 $ 821,750 $ - $ - Improve Access Road [Terminal Access Raod Improvements]

SO ORL FL COI Merritt Island GA 16 $ 283,141 $ 283,141 $ - $ -

Conduct Environmental Study [Condunct Environmental Study], Construct Taxiway

[Construct Taxilane], Install Apron Lighting [Install Apron Lighting - South Apron]

SO ORL FL MIA Miami International P 62 $ 8,540,000 $ - $ 8,540,000 $ - Construct Runway [Construct Runway 8/26 (now Runway 8L/26R)] - 08L/26RSO ORL FL MIA Miami International P 63 $ 1,709,337 $ 1,709,337 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiway M & N including Lighting]SO ORL FL APF Naples Municipal CS 32 $ 2,280,000 $ 124,500 $ 2,155,500 $ - Rehabilitate Runway [Rehab Runway 05/23] - 05/23SO ORL FL EVB New Smyrna Beach Municipal R 14 $ 612,750 $ 300,122 $ 312,628 $ - Rehabilitate Taxiway [Rehab Taxiway A and E (South)]

SO ORL FL F45

North Palm Beach County General

Aviation R 14 $ 234,051 $ 234,051 $ - $ - Install Weather Reporting Equipment

SO ORL FL HWO North Perry R 6 $ 237,281 $ 237,281 $ - $ -

Install Runway Lighting [Install Runway Guard Lights for Runways 18R/36L and 09R/27L] -

18R/36L

SO ORL FL OCF Ocala International-Jim Taylor Field GA 22 $ 1,469,690 $ 1,469,690 $ - $ -

Install Miscellaneous NAVAIDS [Rehabilitate Windcones], Install Runway Vertical/Visual

Guidance System [Rehabilitate Runway 18/36 PAPIs] - 18/36, Rehabilitate Runway

Lighting [Rehab HIRLs Runway 18/36] - 18/36, Rehabilitate Taxiway Lighting [Rehab

Taxiway E MITLs]

SO ORL FL OBE Okeechobee County GA 18 $ 2,083,237 $ 540,582 $ 1,542,655 $ -

Rehabilitate Taxiway [Rehabilitate Taxiway C], Rehabilitate Taxiway [Rehabilitate

Taziway A - Construction]SO ORL FL MCO Orlando International P 110 $ 5,490,680 $ 5,490,680 $ - $ - Rehabilitate Taxiway [Rehab Taxiway B (Phase 2)]

SO ORL FL SFB Orlando Sanford International P 65 $ 7,916,017 $ 2,435,345 $ 5,480,672 $ -

Extend Runway [Extend Runway 09L/27R (+/- 11,000 LF) - Land Acquisition (Phase 2)] -

09L/27R

SO ORL FL SFB Orlando Sanford International P 64 $ 1,615,000 $ - $ 1,615,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire Two (2) 1500 Gallon ARFF

Vehicles (FAR Part 139)]

SO ORL FL SFB Orlando Sanford International P 63 $ 1,293,981 $ 1,293,981 $ - $ -

Extend Runway [Extend Runway 09L/27R (+/- 11,000 LF) - Design] - 09L/27R, Runway

Incursion Markings [Install Surface Painted Holding Position Sign Markings (Part 139)],

Wildlife Hazard Assessments [Wildlife Hazard Assessment]SO ORL FL FMY Page Field R 16 $ 169,380 $ 169,380 $ - $ - Construct Terminal Building [Construct General Aviation Terminal]

Page 70 of 97

Page 71: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ORL FL 28J Palatka Municipal - Lt. Kay Larkin Field GA 20 $ 746,070 $ 746,070 $ - $ -

Improve Airport Drainage [Improve Airport Drainage - Taxiway B], Rehabilitate Apron

[Rehab Apron (+/-19,000 SY)]

SO ORL FL LNA Palm Beach County Park R 10 $ 196,612 $ 196,612 $ - $ -

Conduct Miscellaneous Study [Conceptual Environmental Resource Permit], Conduct

Miscellaneous Study [Stormwater Drainage Plan]

SO ORL FL PBI Palm Beach International P 53 $ 4,209,400 $ 1,801,427 $ 2,407,973 $ -

Acquire Equipment [Airfield Lighting Control], Improve Runway Safety Area [Improve

Runway 14/32 RSA - Install EMAS] - 14/32, Improve Terminal Building [Terminal Flooring

Improvements]SO ORL FL PBI Palm Beach International P 52 $ 74,971 $ - $ 74,971 $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Assessment]

SO ORL FL PNS Pensacola Regional P 37 $ 3,733,492 $ 3,733,492 $ - $ - Rehabilitate Terminal Building [Rehabilitate Terminal Building (Phase 2)]SO ORL FL 40J Perry-Foley GA 10 $ 142,375 $ 142,375 $ - $ - Rehabilitate Runway [Rehab Runway 18/36 (Phase 1)] - 18/36SO ORL FL 2R4 Peter Prince Field GA 10 $ 444,591 $ 444,591 $ - $ - Construct Taxiway [Runway 18/36 Hold Bays]SO ORL FL PCM Plant City GA 6 $ 226,100 $ 226,100 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxilanes]SO ORL FL 2J9 Quincy Municipal GA 7 $ 64,929 $ 64,929 $ - $ - Construct Taxiway [Construct T-Hangar Taxilanes (Design)]

SO ORL FL 2J9 Quincy Municipal GA 8 $ 94,241 $ 94,241 $ - $ - Extend Runway [Extend Runway 14/32 - Environmental Assessment] - 14/32

SO ORL FL SRQ Sarasota/Bradenton International P 47 $ 3,709,064 $ 3,709,064 $ - $ -

Construct Runway Safety Area [Runway 14/32 RSA Restoration] - 14/32, Construct

Taxiway [Relocate/Rehab Taxiway B & Connectors - Construction], Construct Taxiway

[Runway 14/32 Exit Taxiways - Design], Improve Terminal Building [Terminal

Improvements (Phase 1)]SO ORL FL SEF Sebring Regional GA 21 $ 330,535 $ 330,535 $ - $ - Rehabilitate Runway [Rehabilitate Runway 18/36 - Design] - 18/36

SO ORL FL RSW Southwest Florida International P 49 $ 55,649 $ 55,649 $ - $ -

Conduct Miscellaneous Study [Wildlife Hazard Implementation and Management Plan],

Noise Mitigation Measures [Flight Tracking System required by Noise Compatibility Plan]

SO ORL FL RSW Southwest Florida International P 48 $ 8,354,381 $ 1,792,515 $ 6,561,866 $ -

Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building (Construction

- Phase 1)]

SO ORL FL TIX Space Coast Regional GA 22 $ 172,900 $ 172,900 $ - $ - Improve Runway Safety Area [Runway End 09 Safety Area Improvements] - 09/27

SO ORL FL SGJ St Augustine P 29 $ 889,066 $ 889,066 $ - $ - Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF Building]

SO ORL FL SGJ St Augustine P 30 $ 4,403,206 $ 100,934 $ 4,302,272 $ -

Construct Runway Safety Area [RSA Improvements to South end of RWY 13/31 (Phase

1)] - 13/31

SO ORL FL SGJ St Augustine P 28 $ 68,252 $ - $ 68,252 $ - Wildlife Hazard Assessments [Wildlife Hazard Assessment Study and Management Plan]

SO ORL FL SGJ St Augustine P 27 $ 6,488,120 $ - $ 6,488,120 $ - Rehabilitate Runway [Rehab Runway 13/31 - Construction Phase] - 13/31SO ORL FL *FLS State of Florida 6 $ 1,500,000 $ 1,500,000 $ - $ - Conduct State System Plan Study

Page 71 of 97

Page 72: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ORL FL 24J Suwannee County GA 8 $ 179,940 $ 179,940 $ - $ - Update Airport Master Plan Study [Update Airport Master Plan and Airport Layout Plan]

SO ORL FL TLH Tallahassee Regional P 35 $ 7,104,144 $ 7,104,144 $ - $ -

Rehabilitate Apron [Rehab North GA Apron], Rehabilitate Apron [Rehabilitate South GA

Apron (Design)], Rehabilitate Runway [Rehab Runway 09/27 (Phase 1 - Design)] - 09/27,

Rehabilitate Terminal Building [Rehabilitate Terminal Building]

SO ORL FL TLH Tallahassee Regional P 34 $ 300,000 $ - $ 300,000 $ - Safety Management System (SMS) Program [Safety Management System (SMS) Study]

SO ORL FL VDF Tampa Executive R 31 $ 525,000 $ - $ 525,000 $ - Collect airport data for Airports Geographic Information System [AGIS Data Collection]SO ORL FL VDF Tampa Executive R 30 $ 119,260 $ 119,260 $ - $ - Remove Obstructions [Obstruction Removal (RPZ Tree Trimming)]

SO ORL FL TPA Tampa International P 54 $ 2,231,292 $ 394,657 $ 1,836,635 $ -

Rehabilitate Runway [Rehab Runway 18L/36R Shoulder] - 18L/36R, Rehabilitate Runway

[Rehab Runway 18R/36L Shoulder] - 18R/36L, Rehabilitate Taxiway [Rehabilitate Taxiway

C and Taxilane A]

SO ORL FL MTH The Florida Keys Marathon GA 28 $ 142,379 $ 142,379 $ - $ -

Improve Utilities [Improve Utilities (water and sewer lines) - Phase 1 - Design],

Rehabilitate Taxiway [Improve Taxiway Markings and Lighting], Wildlife Hazard

Assessments [Wildlife Hazard Assessment]

SO ORL FL X23 Umatilla Municipal GA 6 $ 59,622 $ 59,622 $ - $ -

Construct Apron [Aircraft Parking Apron (Design)], Construct Taxiway [Construct Partial

Parallel Taxiway A (Design)]

SO ORL FL X59 Valkaria GA 2 $ 171,000 $ 171,000 $ - $ -

Construct Taxiway [Construct Taxiway - Phase I EA], Install Runway Vertical/Visual

Guidance System [Installation of Visual Aids] - 14/32

SO ORL FL X59 Valkaria GA 1 $ 129,000 $ 129,000 $ - $ -

Conduct Miscellaneous Study [Airport Exhibit "A" Property Map], Install Runway

Vertical/Visual Guidance System [Installation of Visual Aids (Segmented Circle, Lighted

WS and Beacon)] - 14/32, Rehabilitate Runway [Rehabilitation Airfield Markings (Both

Runways)] - 14/32SO ORL FL VRB Vero Beach Municipal GA 34 $ 767,000 $ 664,448 $ 102,552 $ - Rehabilitate Taxiway [Rehab Taxiway C (Design)]

SO ORL FL X60 Williston Municipal GA 11 $ 95,000 $ 95,000 $ - $ - Construct Taxiway [Construct Parallel Taxiway to Runway 05/23 (Design)]

SO ORL FL SUA Witham Field GA 16 $ 10,116,773 $ 108,297 $ 10,008,476 $ - Improve Runway Safety Area [Improve RSA (Phase II - Construction)] - 12/30

SO ORL PR ABO Antonio/Nery/Juarbe Pol GA 8 $ 1,113,144 $ 1,113,144 $ - $ -

Construct Taxiway [Construct Taxiways for T-Hangars], Construct Taxiway [Parallel

Taxiway - Construct]

SO ORL PR CPX Benjamin Rivera Noriega GA 12 $ 902,563 $ 902,563 $ - $ - Construct Taxiway [Construct Taxiway to T-Hangar Development area (Construction)]

SO ORL PR RVR Jose Aponte De La Torre GA 5 $ 1,056,126 $ 805,624 $ 250,502 $ -

Conduct Miscellaneous Study [Conduct Utility Master Plan], Construct Access Road

[Construct Terminal Access Road (Design)]

Page 72 of 97

Page 73: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SO ORL PR RVR Jose Aponte De La Torre GA 6 $ 5,812,848 $ 2,512,848 $ 3,300,000 $ -

Conduct Environmental Study [Conduct Misc Study (Biological Assesment)], Repair

Utilities [Reconstruct Potable Water Main and Distribution Network - (Phase 2 -

Construction)]SO ORL PR SJU Luis Munoz Marin International P 46 $ 661,582 $ 661,582 $ - $ - Rehabilitate Taxiway [Rehab Taxiway S (Design)]SO ORL PR PSE Mercedita P 18 $ 1,609,760 $ 1,609,760 $ - $ - Improve Terminal Building [Construct Passenger Boarding Bridges]

SO ORL PR BQN Rafael Hernandez P 23 $ 4,031,420 $ 4,031,420 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Construct new ARFF station (Phase 2 -

Construction)]

SO ORL VI STT Cyril E King P 29 $ 819,851 $ 819,851 $ - $ -

Conduct Miscellaneous Study [Conduct Passenger Terminal Study], Conduct

Miscellaneous Study [Conduct Pavement Maintenance Management Plan]SO ORL VI STX Henry E Rohlsen P 31 $ 6,932,597 $ 6,932,597 $ - $ - Rehabilitate Runway [Rehab Runway 10/28 - Phase 1] - 10/28SW AROK AR LIT Adams Field P 75 $ 970,072 $ 970,072 $ - $ - Acquire Land For ApproachesSW AROK AR LIT Adams Field P 73 $ 1,862,023 $ 1,862,023 $ - $ - Construct Service Road [Phase 2 - Construction]

SW AROK AR LIT Adams Field P 74 $ 1,481,969 $ 1,481,969 $ - $ -

Conduct Miscellaneous Study, Improve Airport Drainage [Phase I - Design], Improve

Runway Safety Area [Phase 1 - Design] - 04R/22L, Rehabilitate Aircraft Rescue & Fire

Fighting Building [Phase 1 - Design], Rehabilitate Runway Lighting [Phase I - Design] -

04L/22R, Rehabilitate Taxiway [Phase 1 - Design], Rehabilitate Terminal Building, Update

Airport Master Plan StudySW AROK AR LIT Adams Field P 76 $ 103,951 $ 8,951 $ 95,000 $ - Wildlife Hazard AssessmentsSW AROK AR M73 Almyra Municipal GA 4 $ 81,568 $ 81,568 $ - $ - Widen Runway [Design-only] - 18/36SW AROK AR BYH Arkansas International GA 4 $ 43,700 $ 43,700 $ - $ - Rehabilitate Runway Lighting [Phase 3 - Design only] - 18/36SW AROK AR BVX Batesville Regional GA 10 $ 425,254 $ 425,254 $ - $ - Construct Apron

SW AROK AR 7M3 Bearce GA 8 $ 42,146 $ 42,146 $ - $ -

Rehabilitate Apron [Rehabilitation Apron - Phase 1 (design)], Rehabilitate Taxiway

[Rehabilitation Taxiway - Phase 1 (design)]

SW AROK AR VBT

Bentonville Municipal/Louise M Thaden

Field GA 8 $ 422,973 $ 422,973 $ - $ - Construct Taxiway [Construct taxiwsay for turnaround]

SW AROK AR 0M0 Billy Free Municipal GA 6 $ 244,016 $ 244,016 $ - $ - Construct Taxiway [Phase 4 - Construct Taxiway (860 LF on North End)]SW AROK AR HKA Blytheville Municipal GA 11 $ 75,129 $ 75,129 $ - $ - Acquire Land For ApproachesSW AROK AR HRO Boone County GA 18 $ 958,460 $ 654,511 $ 303,949 $ - Rehabilitate TaxiwaySW AROK AR 37T Calico Rock-Izard County GA 7 $ 206,211 $ 206,211 $ - $ - Improve Runway Safety Area - 15/33SW AROK AR 4M1 Carroll County GA 10 $ 196,942 $ 196,942 $ - $ - Construct ApronSW AROK AR 4M8 Clarendon Municipal GA 5 $ 329,164 $ 329,164 $ - $ - Construct Runway [Phase 4 - Runway Paving] - Plan-1SW AROK AR H35 Clarksville Municipal GA 8 $ 167,578 $ 167,578 $ - $ - Construct Apron, Construct TaxiwaySW AROK AR CCA Clinton Municipal GA 8 $ 211,541 $ 211,541 $ - $ - Rehabilitate Runway - 13/31SW AROK AR 86 Conway Replacement Airport 3 $ 2,364,831 $ 985,711 $ 1,379,120 $ - Construct New Airport [Phase 3]SW AROK AR 4M9 Corning Municipal GA 14 $ 240,792 $ 240,792 $ - $ - Rehabilitate Taxiway [Phase 2 - Construction]

Page 73 of 97

Page 74: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW AROK AR +08B Delta Regional Airport 6 $ 2,732,500 $ 1,157,500 $ 1,575,000 $ -

Collect airport data for Airports Geographic Information System, Construct New Airport

[Construct Stage 2A - Pave RW and Apron & Relocate Transmission Line; and Design

Stage 2B Paving and Lighting]SW AROK AR M89 Dexter B Florence Memorial Field GA 11 $ 175,792 $ 175,792 $ - $ - Install Perimeter FencingSW AROK AR FYV Drake Field GA 39 $ 55,204 $ 55,204 $ - $ - Wildlife Hazard Assessments [Conduct Wildlife Hazard Assessment]SW AROK AR 5M4 Fordyce Municipal GA 7 $ 177,293 $ 177,293 $ - $ - Rehabilitate Apron [Rehabilitate Apron (Phase 4)]

SW AROK AR FSM Fort Smith Regional P 38 $ 1,362,669 $ 840,946 $ 521,723 $ -

Acquire Snow Removal Equipment [Snow Equipment], Rehabilitate Runway Lighting

[Construction] - 07/25, Rehabilitate Taxiway [Phase 1a - Realignment Taxiway A West]SW AROK AR FSM Fort Smith Regional P 39 $ 62,738 $ - $ 62,738 $ - Wildlife Hazard Assessments [Develop Wildlife Hazard Assessment]SW AROK AR M36 Frank Federer Memorial GA 5 $ 162,062 $ 162,062 $ - $ - Rehabilitate Runway - 02/20

SW AROK AR HBZ Heber Springs Municipal GA 9 $ 117,515 $ 117,515 $ - $ - Acquire Land For Approaches [Acquire Runway 23 RPZ (Phase 4 - Tract 8)]

SW AROK AR M18 Hope Municipal GA 6 $ 123,500 $ 123,500 $ - $ - Rehabilitate Runway [Phase 1 - Surveys and preliminary design.] - 16/34SW AROK AR 6M2 Horseshoe Bend GA 3 $ 95,248 $ 95,248 $ - $ - Install Miscellaneous NAVAIDS [Rehabilitate Rotating Beacon]SW AROK AR M77 Howard County GA 5 $ 105,421 $ 105,421 $ - $ - Rehabilitate Runway [Seal Coat] - 01/19SW AROK AR DEQ J Lynn Helms Sevier County GA 8 $ 451,191 $ 451,191 $ - $ - Construct Taxiway [Design & Construction]SW AROK AR JBR Jonesboro Municipal CS 17 $ 292,040 $ - $ - $ 292,040 Rehabilitate TaxiwaySW AROK AR PGR Kirk Field GA 8 $ 39,964 $ 39,964 $ - $ - Install Perimeter FencingSW AROK AR M32 Lake Village Municipal GA 6 $ 250,342 $ 250,342 $ - $ - Construct Taxiway [Phase 3 - Stage 3 construction]SW AROK AR M78 Malvern Municipal GA 3 $ 145,136 $ 145,136 $ - $ - Install Perimeter Fencing [Install Security Fencing]SW AROK AR MXA Manila Municipal GA 7 $ 23,750 $ 23,750 $ - $ - Install Runway Vertical/Visual Guidance System [Design only] - 18/36SW AROK AR FLP Marion County Regional GA 7 $ 38,950 $ 38,950 $ - $ - Rehabilitate Apron [Design-only]SW AROK AR 6M8 Marked Tree Municipal GA 8 $ 124,764 $ 124,764 $ - $ - Install Perimeter Fencing

SW AROK AR 42A

Melbourne Municipal - John E Miller

Field GA 11 $ 204,059 $ 204,059 $ - $ - Install Runway Vertical/Visual Guidance System - 03/21, Rehabilitate Runway - 03/21

SW AROK AR HOT Memorial Field GA 17 $ 1,461,670 $ 508,436 $ 953,234 $ -

Expand Apron [Phase 1- Design and Construction], Rehabilitate Runway [Phase 4 -

Construction, Overlay RW and Remark] - 13/31SW AROK AR HOT Memorial Field GA 18 $ 80,000 $ - $ 80,000 $ - Wildlife Hazard Assessments

SW AROK AR MEZ Mena Intermountain Municipal GA 16 $ 340,000 $ 340,000 $ - $ - Construct Taxiway [Phase 3 - Complete Construction to Runway 35 Approach End]SW AROK AR LLQ Monticello Municipal/Ellis Field GA 11 $ 87,647 $ 87,647 $ - $ - Acquire Land For Approaches [Land acquisition]SW AROK AR BDQ Morrilton Municipal GA 6 $ 199,481 $ 199,481 $ - $ - Construct Taxiway [Construct Parallel Taxiway (Design Only)]

SW AROK AR ORK North Little Rock Municipal R 20 $ 450,000 $ 450,000 $ - $ -

Conduct aeronautical survey for WAAS approach [TERPS/RNAV], Rehabilitate Runway

Lighting [Phase 1 - Design] - 05/23, Update Airport Master Plan StudySW AROK AR XNA Northwest Arkansas Regional P 39 $ 5,091,697 $ 5,091,697 $ - $ - Expand Terminal Building [Phase 3 (Part B-2010)]

Page 74 of 97

Page 75: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW AROK AR XNA Northwest Arkansas Regional P 38 $ 2,082,468 $ - $ 2,082,468 $ - Construct Taxiway [Construct Taxiway A - Phase 7 (Complete Installation of NAVAIDs)]SW AROK AR XNA Northwest Arkansas Regional P 37 $ 5,091,697 $ 5,091,697 $ - $ - Expand Terminal Building [Phase 2 (Part A-2010)]SW AROK AR XNA Northwest Arkansas Regional P 35 $ 944,979 $ - $ - $ 944,979 Construct Runway [Construct Runway (Phase 2)] - Plan-2SW AROK AR XNA Northwest Arkansas Regional P 36 $ 10,000,000 $ - $ 10,000,000 $ - Construct Taxiway [Construct Taxiway A - Phase 6]SW AROK AR 7M4 Osceola Municipal GA 4 $ 87,104 $ 87,104 $ - $ - Rehabilitate Runway - 01/19SW AROK AR 7M5 Ozark-Franklin County GA 3 $ 505,457 $ 505,457 $ - $ - Widen Runway - 04/22SW AROK AR 7M6 Paris Municipal GA 2 $ 258,185 $ 258,185 $ - $ - Rehabilitate Runway Lighting - 03/21

SW AROK AR 7M7 Piggott Municipal GA 6 $ 60,328 $ 60,328 $ - $ - Install Perimeter Fencing, Rehabilitate Runway Lighting [Design-only] - 18/36SW AROK AR M70 Pocahontas Municipal GA 4 $ 222,965 $ 222,965 $ - $ - Rehabilitate Runway [Sealcoat Runway, Taxiways and Apron] - 18/36

SW AROK AR ROG Rogers Municipal-Carter Field GA 28 $ 110,554 $ 110,554 $ - $ -

Install Airfield Guidance Signs [Upgrade airfield signage/marking to Part 139 standards],

Rehabilitate Apron [Phase I: Design only: east side apron rehab], Update Airport Master

Plan Study [Update Airport Layout Drawing with updated airfield signage]SW AROK AR 4A5 Searcy County GA 10 $ 198,170 $ 198,170 $ - $ - Install Runway Lighting - 05/23, Rehabilitate Apron

SW AROK AR CVK Sharp County Regional GA 8 $ 311,600 $ 311,600 $ - $ -

Construct Taxiway [Phase 2 - Construct Taxiway South of Apron; Remove Apron

Pavement]SW AROK AR 9M8 Sheridan Municipal GA 4 $ 167,485 $ 167,485 $ - $ - Install Perimeter Fencing, Rehabilitate TaxiwaySW AROK AR SLG Smith Field GA 10 $ 447,975 $ 447,975 $ - $ - Rehabilitate Apron

SW AROK AR ELD

South Arkansas Regional at Goodwin

Field GA 17 $ 699,157 $ 312,443 $ 386,714 $ - Rehabilitate Runway - 04/22SW AROK AR ASG Springdale Municipal GA 15 $ 108,732 $ 108,732 $ - $ - Update Airport Master Plan StudySW AROK AR *ARS State of Arkansas 9 $ 200,000 $ - $ 200,000 $ - Conduct State System Plan StudySW AROK AR SGT Stuttgart Municipal GA 17 $ 200,706 $ 200,706 $ - $ - Rehabilitate Runway [Sealcoat Runway 9/27 (Phase 2)] - 09/27

SW AROK AR TXK Texarkana Regional-Webb Field P 33 $ 830,656 $ 830,656 $ - $ -

Construct Aircraft Rescue & Fire Fighting Building [Phase 6-Complete Construct ARFF

Facility]

SW AROK AR TXK Texarkana Regional-Webb Field P 30 $ 1,050,214 $ 868,787 $ 181,427 $ -

Construct Aircraft Rescue & Fire Fighting Building [Phase 5-Continue Construct ARFF

Facility]SW AROK AR TXK Texarkana Regional-Webb Field P 31 $ 154,098 $ - $ 154,098 $ - Improve Runway Safety Area - 04/22SW AROK AR TXK Texarkana Regional-Webb Field P 32 $ 101,401 $ - $ 101,401 $ - Wildlife Hazard AssessmentsSW AROK AR HEE Thompson-Robbins GA 8 $ 103,241 $ 103,241 $ - $ - Rehabilitate Runway Lighting [Design-only] - 17/35SW AROK AR M27 Waldron Municipal GA 5 $ 75,000 $ 75,000 $ - $ - Construct Taxiway [Multiyear planned (Design Only)]SW AROK AR AWM West Memphis Municipal R 22 $ 145,562 $ 145,562 $ - $ - Rehabilitate TaxiwaySW AROK AR M60 Woodruff County GA 4 $ 108,569 $ 108,569 $ - $ - Install Runway Vertical/Visual Guidance System - 09/27SW AROK AR CRT Z M Jack Stell Field GA 7 $ 141,840 $ 141,840 $ - $ - Improve Airport Drainage, Install Perimeter Fencing

SW AROK OK ADH Ada Municipal GA 11 $ 71,165 $ 71,165 $ - $ -

Acquire Land For Approaches [engineering study for future land acquisition for approach

protection]SW AROK OK AXS Altus/Quartz Mountain Regional GA 10 $ 34,200 $ 34,200 $ - $ - Acquire Land For Approaches [RWY 35 approach - Phase 1 (design)]

Page 75 of 97

Page 76: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW AROK OK AVK Alva Regional GA 8 $ 1,174,758 $ 486,000 $ 688,758 $ - Construct Runway [Phase 3 b)- Construction; Paving, lighting, parallel taxiway] - 17/35SW AROK OK 80F Antlers Municipal GA 4 $ 371,296 $ 371,296 $ - $ - Rehabilitate Apron, Rehabilitate Runway [Construction] - 17/35SW AROK OK 1F0 Ardmore Downtown Executive GA 10 $ 40,897 $ 40,897 $ - $ - Rehabilitate Apron [Phase 1: Design only]

SW AROK OK ADM Ardmore Municipal GA 12 $ 317,300 $ 317,300 $ - $ - Improve Airport Drainage [Conduct prelim study], Install Taxiway Lighting

SW AROK OK AQR Atoka Municipal GA 7 $ 204,250 $ 204,250 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SW AROK OK K44 Beaver Municipal GA 3 $ 265,227 $ 265,227 $ - $ -

Extend Runway [Partial reimbursement for expenses - Phase 2 continue (Window D)] -

17/35, Install Runway Lighting [Partial reimbursement for expenses - Phase 2 continue

(Window D)] - 17/35, Rehabilitate Runway [Rehabilitate Runway 17/35 - Phase 2

(Window D)] - 17/35

SW AROK OK K44 Beaver Municipal GA 2 $ 300,000 $ 300,000 $ - $ -

Extend Runway [Extend Runway - Phase 2] - 17/35, Install Runway Lighting [Phase 2] -

17/35, Rehabilitate Runway [Continuning rehabilitate Runway 17/35 - Phase 2] - 17/35

SW AROK OK BKN Blackwell-Tonkawa Municipal GA 8 $ 150,660 $ 150,660 $ - $ -

Acquire Land For Approaches [Acquire land adjacent to runway which includes portions

of both RPZs], Install Perimeter Fencing

SW AROK OK BFK Buffalo Municipal GA 5 $ 481,599 $ 481,599 $ - $ -

Construct Heliport/Helipad - -, Construct Runway [Additional runway 17 turnaround] -

17/35SW AROK OK CQB Chandler Regional GA 9 $ 586,100 $ 586,100 $ - $ - Construct Taxiway [Design & Phase 1 Construct Parallel Twy] - -SW AROK OK 4O5 Cherokee Municipal GA 5 $ 246,064 $ 246,064 $ - $ - Rehabilitate Runway [Phase 2 - Construction] - 17/35SW AROK OK CHK Chickasha Municipal GA 9 $ 63,650 $ 63,650 $ - $ - Update Airport Master Plan StudySW AROK OK O65 Christman Airfield GA 6 $ 111,150 $ 111,150 $ - $ - Install Miscellaneous NAVAIDS, Install Miscellaneous NAVAIDSSW AROK OK 95F Cleveland Municipal GA 6 $ 457,154 $ 457,154 $ - $ - Improve Airport Drainage, Rehabilitate Runway - 18/36

SW AROK OK CLK Clinton Regional GA 9 $ 391,617 $ 391,617 $ - $ -

Install Miscellaneous NAVAIDS [Design and install a new rotating beacon with tower],

Install Taxiway LightingSW AROK OK CUH Cushing Municipal GA 11 $ 169,575 $ 169,575 $ - $ - Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS

SW AROK OK MKO Davis Field GA 8 $ 229,795 $ 229,795 $ - $ -

Improve Runway Safety Area [Phase 2 - construction. Note: Phase 1 design paid via OAC

grant] - 04/22

SW AROK OK DUA Eaker Field GA 9 $ 2,173,431 $ 925,000 $ 1,248,431 $ -

Construct Taxiway [Complete construction of: parallel taxiway reconfiguration, Runway

17/35 safety area and lighting improvemets.]SW AROK OK RQO El Reno Regional GA 9 $ 502,268 $ 502,268 $ - $ - Rehabilitate Apron [Phase 2 - Re-construction hangar access apron]SW AROK OK ELK Elk City Regional Business GA 11 $ 127,132 $ 127,132 $ - $ - Acquire Miscellaneous Land [Phase 5 land reimbursement]

SW AROK OK WDG Enid Woodring Regional GA 23 $ 97,375 $ 97,375 $ - $ -

Conduct Airport Master Plan Study [Airport Action Plan], Improve Airport Drainage

[Perform drainage study - Phase 1 design]

SW AROK OK FDR Frederick Regional GA 7 $ 523,227 $ 523,227 $ - $ -

Rehabilitate Runway [construction] - 03/21, Rehabilitate Runway [construction] - 12/30,

Rehabilitate Taxiway [construction] - -SW AROK OK GAG Gage GA 3 $ 557,596 $ 557,596 $ - $ - Rehabilitate Runway [Reconstruct Runway 17/35] - 17/35

Page 76 of 97

Page 77: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW AROK OK 1O1 Grandfield Municipal GA 8 $ 27,075 $ 27,075 $ - $ -

Rehabilitate Runway [Phase 2 - Design] - 17/35, Rehabilitate Runway [Phase 2 - design] -

08/26SW AROK OK GOK Guthrie-Edmond Regional GA 11 $ 100,605 $ 100,605 $ - $ - Acquire Land for Development, Construct TaxiwaySW AROK OK GUY Guymon Municipal GA 13 $ 245,712 $ 245,712 $ - $ - Rehabilitate Runway [Micro-surfacing] - 18/36SW AROK OK DUC Halliburton Field GA 11 $ 124,866 $ 124,866 $ - $ - Construct Terminal Building [Phase 4]SW AROK OK HBR Hobart Regional GA 2 $ 559,398 $ 559,398 $ - $ - Rehabilitate Runway - 03/21SW AROK OK O35 Hollis Municipal GA 1 $ 289,751 $ 289,751 $ - $ - Rehabilitate Runway Lighting - 17/35SW AROK OK H92 Hominy Municipal GA 6 $ 76,950 $ 76,950 $ - $ - Install Runway Lighting - 17/35

SW AROK OK O45 Hooker Municipal GA 4 $ 576,225 $ 576,225 $ - $ - Rehabilitate Apron [Construction], Rehabilitate Taxiway [Construction]SW AROK OK 3F7 Jones Memorial GA 6 $ 149,150 $ 149,150 $ - $ - Rehabilitate ApronSW AROK OK LAW Lawton-Fort Sill Regional P 27 $ 89,965 $ 9,965 $ 80,000 $ - Wildlife Hazard Assessments [Wildlife hazard assessment]

SW AROK OK LAW Lawton-Fort Sill Regional P 25 $ 483,264 $ 483,264 $ - $ - Rehabilitate Terminal Building [Terminal Buidling renovations (roof and A/C)]SW AROK OK LAW Lawton-Fort Sill Regional P 26 $ 616,244 $ 616,244 $ - $ - Acquire Aircraft Rescue & Fire Fighting Vehicle

SW AROK OK 1K2 Lindsay Municipal GA 5 $ 75,810 $ 75,810 $ - $ -

Improve Access Road [Design rehab entrance road.], Install Perimeter Fencing [Design

perimeter fencing.] - -SW AROK OK MLC McAlester Regional GA 10 $ 109,250 $ 109,250 $ - $ - Improve Runway Safety Area [(Design Only)] - 01/19

SW AROK OK O53 Medford Municipal GA 5 $ 13,775 $ 13,775 $ - $ -

Install Miscellaneous NAVAIDS, Rehabilitate Runway [Design Only] - 17/35, Rehabilitate

TaxiwaySW AROK OK MIO Miami Municipal GA 14 $ 170,233 $ 170,233 $ - $ - Rehabilitate Runway [Crack Seal] - 17/35, Rehabilitate Taxiway

SW AROK OK H71 Mid-America Industrial GA 8 $ 258,400 $ 258,400 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 18/36, Rehabilitate Taxiway

SW AROK OK 93F Mignon Laird Municipal GA 4 $ 99,370 $ 99,370 $ - $ - Install Perimeter Fencing [Install perimeter fencing - (Design & Construction)]

SW AROK OK MDF Mooreland Municipal GA 2 $ 600,000 $ 600,000 $ - $ -

Rehabilitate Taxiway [Grading, drainage, pavement, erosion control and turf for future

paved taxiway - Phase 1 (design & construction)]SW AROK OK +08C Okemah Municipal 3 $ 326,813 $ 326,813 $ - $ - Construct New Airport [Phase 4 - Apron Grading & Pavement]SW AROK OK OKM Okmulgee Regional GA 16 $ 340,824 $ 340,824 $ - $ - Rehabilitate Runway - 18/36SW AROK OK O47 Prague Municipal GA 4 $ 285,000 $ 285,000 $ - $ - Extend Runway [Construct Rwy Extension-Phase B paving.] - 17/35

SW AROK OK RVS Richard Lloyd Jones Jr R 23 $ 1,608,054 $ 663,095 $ 944,959 $ -

Rehabilitate Taxiway [TWs B & Z & NE Hangar Area TLs (NOTE: OAC supplementing --

mixed grant)]SW AROK OK JSV Sallisaw Municipal GA 8 $ 600,000 $ 600,000 $ - $ - Rehabilitate Apron, Rehabilitate Taxiway - -SW AROK OK 2K4 Scott Field GA 4 $ 403,076 $ 403,076 $ - $ - Construct Apron [Reconstruct Terminal Apron]SW AROK OK SRE Seminole Municipal GA 12 $ 227,050 $ 227,050 $ - $ - Rehabilitate Runway - 16/34

SW AROK OK SNL Shawnee Regional GA 14 $ 2,867,905 $ 1,167,405 $ 1,700,500 $ -

Rehabilitate Taxiway [Construct-Realign south portion parallel twy (OAC to supplement

$125,000).]SW AROK OK 2F6 Skiatook Municipal GA 6 $ 42,750 $ 42,750 $ - $ - Construct Taxiway - -

Page 77 of 97

Page 78: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW AROK OK 1K8 South Grand Lake Regional GA 2 $ 295,384 $ 295,384 $ - $ -

Install Runway Lighting [Install Medium Intensity Runway Lighting, electrical vault, pilot

controlled lighting.] - 18/36SW AROK OK *OKS State of Oklahoma 10 $ 318,204 $ 200,000 $ 118,204 $ - Update State System Plan Study

SW AROK OK SWO Stillwater Regional GA 19 $ 68,922 $ 68,922 $ - $ -

Acquire Equipment, Install Airfield Guidance Signs, Rehabilitate Apron [Design], Remove

ObstructionsSW AROK OK F30 Sulphur Municipal GA 4 $ 146,612 $ 146,612 $ - $ - Install Runway Lighting [Install lighting to Runway 17/35] - 17/35

SW AROK OK 1O4 Thomas Municipal GA 8 $ 92,536 $ 92,536 $ - $ -

Install Runway Vertical/Visual Guidance System [Install 2-box PAPIs and aerial

photography for obstruction survey.] - 17/35

SW AROK OK OJA Thomas P Stafford GA 8 $ 1,935,531 $ 1,735,531 $ 200,000 $ -

Extend Runway [Phase 1 of Construct/Light Runway Extension(705'north) and

extend/widen/light parallel twy.] - 17/35

SW AROK OK TUL Tulsa International P 78 $ 8,524,008 $ 5,203,519 $ 3,320,489 $ -

Improve Runway Safety Area [Engineering Analysis/Cost Estimates] - 18R/36L,

Rehabilitate Runway [Rehab RW 18L/36R - Phase 3 (construction of South & North

ends). Note: Match paid w/ PFC.] - 18L/36R, Rehabilitate Taxiway [Ph 3 - Capitalization of

TW J Costs in AIP Grants -055 & -056-2005]SW AROK OK TUL Tulsa International P 74 $ 1,096,269 $ 1,096,269 $ - $ - Construct Access Road

SW AROK OK TUL Tulsa International P 75 $ 6,930,000 $ - $ 6,930,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise Mitigation Phase

11. Note: Match PFC funded]SW AROK OK TUL Tulsa International P 77 $ 79,201 $ - $ 79,201 $ - Wildlife Hazard AssessmentsSW AROK OK TUL Tulsa International P 76 $ 602,067 $ 177,067 $ 425,000 $ - Collect airport data for Airports Geographic Information System

SW AROK OK OUN University of Oklahoma Westheimer R 22 $ 182,875 $ 182,875 $ - $ - Rehabilitate Apron [Design only reconstruct south terminal apron], Rehabilitate Taxiway

SW AROK OK H04 Vinita Municipal GA 7 $ 600,000 $ 600,000 $ - $ - Extend Runway [RW Extension Construction] - 17/35, Install Perimeter Fencing

SW AROK OK 3O5 Walters Municipal GA 2 $ 58,292 $ 58,292 $ - $ -

Rehabilitate Apron [Reconstruct the pavement of the apron - Phase 1 (design)] - -,

Rehabilitate Runway [Reconstruct pavement of Runway 16/34 - Phase 1 (design)] -

16/34, Rehabilitate Taxiway [Reconstruct the pavement of connecting taxiway and

terminal apron - Phase 1 (design)]

SW AROK OK 1K5 Waynoka Municipal GA 4 $ 606,198 $ 606,198 $ - $ -

Improve Runway Safety Area [Grading RSA] - 17/35, Install Runway Lighting [Install

runway lighting] - 17/35, Install Runway Vertical/Visual Guidance System [Marking] -

17/35, Rehabilitate Runway [Rehabilitate Runway - Phase 2 (construction)] - 17/35,

Widen Runway [Construction - Overlay, Widening] - 17/35SW AROK OK WWR West Woodward GA 7 $ 121,331 $ 121,331 $ - $ - Install Weather Reporting Equipment [Install AWOS]SW AROK OK WWR West Woodward GA 8 $ 430,730 $ 430,730 $ - $ - Improve Runway Safety Area [construction] - 17/35SW AROK OK PWA Wiley Post R 20 $ 1,200,000 $ 973,760 $ 226,240 $ - Rehabilitate Taxiway [Part 3b Const C & C1.]

SW AROK OK OKC Will Rogers World P 59 $ 1,261,900 $ 1,261,900 $ - $ -

Conduct Environmental Study, Expand Terminal Building [1/3 East Phase 3- Design.],

Rehabilitate Runway - 13/31, Rehabilitate Taxiway

Page 78 of 97

Page 79: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW LANM LA 0R3 Abbeville Chris Crusta Memorial GA 15 $ 261,432 $ 261,432 $ - $ - Expand Apron [Apron Expansion]SW LANM LA ARA Acadiana Regional GA 14 $ 85,500 $ - $ 85,500 $ - Wildlife Hazard AssessmentsSW LANM LA AEX Alexandria International P 47 $ 735,538 $ 648,565 $ 86,973 $ - Rehabilitate Apron [Engineering], Wildlife Hazard AssessmentsSW LANM LA AEX Alexandria International P 46 $ 4,200,000 $ - $ 4,200,000 $ - Construct Fuel Farm [Construction]

SW LANM LA AEX Alexandria International P 45 $ 857,928 $ 857,928 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire ARFF Vehicle], Remove

Obstructions [Phase II (South End)]

SW LANM LA AEX Alexandria International P 44 $ 5,000,000 $ - $ 5,000,000 $ -

Noise Mitigation Measures for Public Buildings [To mitigate noise issues at Renaissance

Home for Youths.], Noise Mitigation Measures for Residences within 70 - 74 DNLSW LANM LA ACP Allen Parish GA 10 $ 2,102,825 $ 2,102,825 $ - $ - Construct Taxiway [south parallel taxiway]

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 90 $ 71,735 $ - $ 71,735 $ - Wildlife Hazard Assessments

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 89 $ 5,040,368 $ 1,540,368 $ 3,500,000 $ -

Rehabilitate Runway [Phase III-A Construction: Rehabilitate and Widen Taxiways L and

Taxiways E and G] - 13/31

SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 91 $ 1,523,471 $ 1,523,471 $ - $ -

Rehabilitate Runway [Phase III-B Construction: Rehabillitation of Runway 13/31,

Reconstruction of Taxiway B, Extend and Reconstruction of Taxiway L, Reconstruction of

Taxiway A and associated SMGS lighting, Reconstruction of Taxiway E and G] - 13/31

SW LANM LA CWF Chennault International GA 10 $ 536,298 $ 150,000 $ 386,298 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acqquire 3,000 gallon watr/foam ARFF

vehicle]

SW LANM LA CWF Chennault International GA 9 $ 66,823 $ 66,823 $ - $ - Rehabilitate Runway [Runway PCI Improvement, Design Phase I] - 15/33SW LANM LA CWF Chennault International GA 11 $ 71,250 $ - $ 71,250 $ - Wildlife Hazard AssessmentsSW LANM LA 0R4 Concordia Parish GA 8 $ 228,000 $ 228,000 $ - $ - Install Perimeter FencingSW LANM LA 5R8 DeQuincy Industrial Airpark GA 13 $ 112,126 $ 112,126 $ - $ - Construct Taxiway [Phase 1 (Design)]SW LANM LA ESF Esler Regional GA 24 $ 163,768 $ 163,768 $ - $ - Rehabilitate Runway [Seal Coat and Mark Runway 9/27] - 09/27SW LANM LA HDC Hammond Northshore Regional GA 17 $ 686,062 $ 686,062 $ - $ - Rehabilitate Taxiway [Taxiway A Rehab]

SW LANM LA 5F4 Homer Municipal GA 4 $ 681,392 $ 681,392 $ - $ -

Rehabilitate Runway Lighting [RW Lights with PAPIs and REILs] - 12/30, Remove

Obstructions [Phase I RPZ Clearing]

SW LANM LA HUM Houma-Terrebonne GA 24 $ 350,000 $ 150,000 $ 200,000 $ - Collect airport data for Airports Geographic Information System [AGIS & eALP Program]SW LANM LA 1R1 Jena GA 5 $ 257,457 $ 257,457 $ - $ - Rehabilitate Apron [Construction]SW LANM LA F88 Jonesboro GA 6 $ 484,500 $ 484,500 $ - $ - Expand Apron, Extend TaxiwaySW LANM LA L32 Jonesville GA 4 $ 211,512 $ 211,512 $ - $ - Rehabilitate TaxiwaySW LANM LA 9M6 Kelly GA 12 $ 335,350 $ 335,350 $ - $ - Install Perimeter Fencing

SW LANM LA LFT Lafayette Regional P 39 $ 3,420,292 $ 981,930 $ 2,438,362 $ -

Improve Runway Safety Area [Runway 4R/22L EMAS Phase I, south end, including

drainage, installation of EMAS blocks and paved bedrunway pavement, lighting, marking

and signage] - 04R/22LSW LANM LA LFT Lafayette Regional P 38 $ 240,096 $ - $ 240,096 $ - Update Miscellaneous Study

Page 79 of 97

Page 80: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW LANM LA LFT Lafayette Regional P 37 $ 1,020,851 $ 1,020,851 $ - $ -

Construct Taxiway [Construct Taxiway J extension and Connector Taxiways J-2 and G to

the New Cargo Apron]SW LANM LA LFT Lafayette Regional P 40 $ 83,000 $ - $ 83,000 $ - Wildlife Hazard Assessments [Conduct Wildlife Assessment]

SW LANM LA LCH Lake Charles Regional P 39 $ 547,200 $ 547,200 $ - $ -

Construct Access Road [Construct Secondary (Helicopter) Access Road Improvements],

Expand Aircraft Rescue & Fire Fighting Building, Improve Airport Drainage [Improve

Drainage Gauthier road (install box culverts)]SW LANM LA LCH Lake Charles Regional P 38 $ 85,000 $ - $ 85,000 $ - Wildlife Hazard Assessments

SW LANM LA MSY

Louis Armstrong New Orleans

International P 88 $ 2,612,354 $ - $ 2,612,354 $ - Rehabilitate Service Road

SW LANM LA MSY

Louis Armstrong New Orleans

International P 87 $ 3,895,913 $ 2,031,606 $ 1,864,307 $ - Rehabilitate Runway Lighting - 10/28

SW LANM LA MSY

Louis Armstrong New Orleans

International P 89 $ 8,127,152 $ - $ 8,127,152 $ - Rehabilitate Apron [Phase III Construction], Rehabilitate Apron [Phase IIIb Construction]SW LANM LA L38 Louisiana Regional GA 11 $ 315,822 $ 315,822 $ - $ - Extend Runway [Phase 1] - 17/35

SW LANM LA MKV Marksville Municipal GA 13 $ 581,354 $ 581,354 $ - $ -

Rehabilitate Runway Lighting [Rehabilitate MIRL Runway 4/22 and Navaid

improvements: including REILs, threshold lights, lighted windcone, emergency

generator, new vault, remove VASI's and install Papi-2s, NDB hookup, construction

management and inspection services] - 04/22SW LANM LA F24 Minden-Webster GA 8 $ 828,288 $ 828,288 $ - $ - Construct Apron [Phase III, Acquire Land]

SW LANM LA MLU Monroe Regional P 28 $ 1,303,366 $ 1,208,366 $ 95,000 $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment [New Proximity Suits],

Construct Terminal Building [Phase III - Continued Construction], Wildlife Hazard

AssessmentsSW LANM LA BQP Morehouse Memorial GA 12 $ 90,746 $ 90,746 $ - $ - Update Airport Master Plan StudySW LANM LA IER Natchitoches Regional GA 16 $ 521,000 $ 521,000 $ - $ - Extend Taxiway [Construction], Rehabilitate Apron [DESIGN]SW LANM LA RSN Ruston Regional GA 14 $ 836,000 $ 836,000 $ - $ - Install Perimeter Fencing, Remove ObstructionsSW LANM LA DTN Shreveport Downtown R 17 $ 103,747 $ 103,747 $ - $ - Rehabilitate Runway [Design Only Grant] - 05/23SW LANM LA SHV Shreveport Regional P 53 $ 692,037 $ - $ 692,037 $ - Security Enhancements [Engineering]

SW LANM LA SHV Shreveport Regional P 51 $ 1,407,778 $ 1,030,704 $ 377,074 $ -

Acquire Aircraft Rescue & Fire Fighting Safety Equipment [Acquire New Proximity Suits],

Collect airport data for Airports Geographic Information System, Update Airport Master

Plan Study, Wildlife Hazard Assessments

SW LANM LA SHV Shreveport Regional P 52 $ 3,479,314 $ 1,479,314 $ 2,000,000 $ -

Acquire Safety Equipment and/or Fencing [Phase II - Construction], Remove

Obstructions [Phase 1 100 acres]SW LANM LA UXL Southland Field GA 13 $ 125,172 $ 125,172 $ - $ - Improve Airport DrainageSW LANM LA SPH Springhill GA 8 $ 72,492 $ 72,492 $ - $ - Expand Apron [Design P&S]SW LANM LA 1L0 St John the Baptist Parish GA 14 $ 161,500 $ 161,500 $ - $ - Conduct Airport Master Plan Study [Prepare Airport Action Plan]SW LANM LA *LAS State of Louisiana 3 $ 300,000 $ - $ 300,000 $ - Update State System Plan Study

Page 80 of 97

Page 81: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW LANM LA 0R7 The Red River GA 4 $ 63,601 $ 63,601 $ - $ - Expand Apron [Design P&S], Install Perimeter Fencing [Design P&S]SW LANM LA F87 Union Parish GA 9 $ 57,000 $ 57,000 $ - $ - Rehabilitate Runway Lighting [Prepare P&S] - 16/34SW LANM LA TVR Vicksburg Tallulah Regional GA 12 $ 135,305 $ 135,305 $ - $ - Update Airport Master Plan Study

SW LANM LA 3F4 Vivian GA 6 $ 377,763 $ 377,763 $ - $ - Improve Runway Safety Area - 09/27, Install Perimeter Fencing, Remove Obstructions

SW LANM LA F89 Winnsboro Municipal GA 4 $ 247,205 $ 247,205 $ - $ -

Expand Apron [Phase I], Install Perimeter Fencing, Rehabilitate Apron [Patch & Sealcoat],

Rehabilitate Runway [Remark Runway] - 18/36SW LANM NM ALM Alamogordo-White Sands Regional GA 18 $ 218,936 $ 218,936 $ - $ - Improve Airport DrainageSW LANM NM ABQ Albuquerque International Sunport P 35 $ 2,745,364 $ 2,745,364 $ - $ - Rehabilitate Taxiway LightingSW LANM NM ABQ Albuquerque International Sunport P 36 $ 81,307 $ 81,307 $ - $ - Wildlife Hazard AssessmentsSW LANM NM ABQ Albuquerque International Sunport P 37 $ 2,441,597 $ - $ 2,441,597 $ - VALE Infrastructure [VALE (SOLAR)]SW LANM NM E80 Alexander Municipal GA 10 $ 84,753 $ 84,753 $ - $ - Rehabilitate Apron

SW LANM NM AXX Angel Fire GA 17 $ 281,634 $ 281,634 $ - $ -

Improve Airport Drainage [Initial surveying], Rehabilitate Apron [Repair failed section of

apron], Rehabilitate Runway - 17/35SW LANM NM ATS Artesia Municipal GA 12 $ 129,736 $ 129,736 $ - $ - Update Airport Master Plan StudySW LANM NM N19 Aztec Municipal GA 3 $ 1,703,616 $ 1,703,616 $ - $ - Rehabilitate Runway - 08/26

SW LANM NM CNM Cavern City Air Terminal GA 20 $ 222,913 $ 222,913 $ - $ - Improve Airport Miscellaneous Improvements, Install Perimeter FencingSW LANM NM CNM Cavern City Air Terminal GA 21 $ 93,389 $ - $ 93,389 $ - Wildlife Hazard Assessments

SW LANM NM CAO Clayton Municipal Airpark GA 13 $ 266,616 $ 256,728 $ 9,888 $ -

Rehabilitate Apron, Rehabilitate Runway - 02/20, Rehabilitate Runway - 12/30,

Rehabilitate TaxiwaySW LANM NM CVN Clovis Municipal GA 25 $ 6,293,736 $ 2,025,500 $ 4,268,236 $ - Extend Runway [Extend RW 22 1800' need 6.5 million total] - 04/22SW LANM NM CVN Clovis Municipal GA 26 $ 94,905 $ - $ 94,905 $ - Wildlife Hazard AssessmentsSW LANM NM E89 Conchas Lake GA 4 $ 113,878 $ 113,878 $ - $ - Rehabilitate Runway [crack seal and sealcoat runway] - 09/27SW LANM NM DMN Deming Municipal GA 14 $ 604,114 $ 604,114 $ - $ - Rehabilitate Runway [sealcoat] - 04/22SW LANM NM 5T6 Dona Ana County at Santa Teresa GA 20 $ 2,522,500 $ 264,556 $ 2,257,944 $ - Extend Runway - 10/28SW LANM NM AEG Double Eagle II R 16 $ 326,936 $ 326,936 $ - $ - Rehabilitate Runway Lighting [replace electrical vault] - 04/22

SW LANM NM FSU Fort Sumner Municipal GA 8 $ 314,084 $ 314,084 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 03/21, Rehabilitate TaxiwaySW LANM NM FMN Four Corners Regional P 32 $ 90,062 $ 90,062 $ - $ - Wildlife Hazard Assessments

SW LANM NM FMN Four Corners Regional P 31 $ 511,000 $ 511,000 $ - $ -

Acquire Equipment, Acquire Snow Removal Equipment, Construct Building [Phase 1-

design], Rehabilitate Runway Lighting [Design-Only] - 05/23SW LANM NM GUP Gallup Municipal CS 22 $ 214,500 $ 214,500 $ - $ - Improve Airport Drainage [Design Only]SW LANM NM SVC Grant County CS 11 $ 84,708 $ - $ 84,708 $ - Wildlife Hazard AssessmentsSW LANM NM SVC Grant County CS 10 $ 137,500 $ 137,500 $ - $ - Install Perimeter FencingSW LANM NM GNT Grants-Milan Municipal GA 12 $ 212,847 $ 212,847 $ - $ - Install Weather Reporting Equipment [AWOS III]SW LANM NM E05 Hatch Municipal GA 6 $ 146,707 $ 146,707 $ - $ - Rehabilitate Runway - 11/29SW LANM NM 24N Jicarilla Apache Nation GA 12 $ 95,000 $ 95,000 $ - $ - Rehabilitate Runway - 17/35

Page 81 of 97

Page 82: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW LANM NM LRU Las Cruces International GA 24 $ 213,648 $ 213,648 $ - $ - Install Weather Reporting EquipmentSW LANM NM LRU Las Cruces International GA 25 $ 79,714 $ - $ 79,714 $ - Wildlife Hazard AssessmentsSW LANM NM LSB Lordsburg Municipal GA 11 $ 204,500 $ 204,500 $ - $ - Install Weather Reporting EquipmentSW LANM NM LAM Los Alamos GA 7 $ 4,419,544 $ 3,047,482 $ 1,372,062 $ - Extend Runway - 09/27, Rehabilitate Runway - 09/27SW LANM NM 0.00E+00 Moriarty GA 10 $ 506,917 $ 506,917 $ - $ - Construct TaxiwaySW LANM NM 83 New Airport 2 $ 247,950 $ 247,950 $ - $ - Construct New Airport [Site Prep - Data Recovery]

SW LANM NM E14 Ohkay Owingeh GA 6 $ 93,197 $ 93,197 $ - $ -

Improve Runway Safety Area [Phase 1-design] - 16/34, Update Airport Master Plan

StudySW LANM NM PRZ Portales Municipal GA 14 $ 482,574 $ 482,574 $ - $ - Rehabilitate Runway Lighting - 01/19

SW LANM NM N24 Questa Municipal Nr 2 GA 7 $ 539,119 $ 539,119 $ - $ -

Install Runway Vertical/Visual Guidance System [PAPI and REIL's] - 17/35, Install Runway

Vertical/Visual Guidance System - 17/35, Install Weather Reporting Equipment

SW LANM NM ROW Roswell International Air Center P 24 $ 851,111 $ 851,111 $ - $ -

Improve Terminal Building, Install Airport Beacons, Rehabilitate Taxiway, Wildlife Hazard

AssessmentsSW LANM NM SAF Santa Fe Municipal GA 33 $ 776,000 $ - $ 776,000 $ - Rehabilitate Apron [Phase II of East Apron]SW LANM NM SAF Santa Fe Municipal GA 35 $ 106,400 $ - $ 106,400 $ - Wildlife Hazard Assessments

SW LANM NM SAF Santa Fe Municipal GA 34 $ 450,000 $ 450,000 $ - $ -

Rehabilitate Runway [Phase 1] - 10/28, Rehabilitate Taxiway [Phase 1-design],

Rehabilitate Taxiway [Phase 1-design], Rehabilitate Taxiway

SW LANM NM SXU Santa Rosa Route 66 GA 9 $ 264,718 $ 264,718 $ - $ -

Install Perimeter Fencing [Animal Control Fencing], Install Runway Vertical/Visual

Guidance System - 01/19, Install Runway Vertical/Visual Guidance System - 08/26,

Update Airport Master Plan StudySW LANM NM SRR Sierra Blanca Regional GA 20 $ 111,076 $ 111,076 $ - $ - Install Airfield Guidance Signs, Wildlife Hazard AssessmentsSW LANM NM S42 Springer Municipal GA 4 $ 53,000 $ 53,000 $ - $ - Install Runway Lighting [Phase 1-design] - 01/19SW LANM NM *NMS State of New Mexico 9 $ 180,000 $ - $ 180,000 $ - Conduct State System Plan StudySW LANM NM TCS Truth Or Consequences Municipal GA 12 $ 76,703 $ 76,703 $ - $ - Expand Apron

SW TEX TX ABI Abilene Regional P 40 $ 1,199,652 $ 1,199,652 $ - $ -

Rehabilitate Airport Beacons [Rehabilitate Beacon, Phase II (Construction Only)],

Rehabilitate Taxiway [Rehabilitate Taxiways C,C1, C2, C3, C4, and EASI, Phase I (Design)]

SW TEX TX ABI Abilene Regional P 39 $ 5,200,000 $ - $ 5,200,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 1500 Gallon ARFF Vehicle],

Rehabilitate Apron [Rehabilitate Air Carrier Ramp, Area E, Phase II (Construction)],

Rehabilitate Taxiway [Rehabilitate Taxilane, Area C, Phase II (Construction)], Wildlife

Hazard Assessments [Conduct Wildlife Hazard Assessment]

SW TEX TX AUS Austin-Bergstrom International P 54 $ 2,237,144 $ - $ 2,237,144 $ -

Rehabilitate Runway [Rehabilitate Runway 17L/35R's Expansion Joints] - 17L/35R,

Rehabilitate Runway [Rehabilitate Runway 17R/35L's Expansion Joints] - 17R/35L,

Wildlife Hazard Assessments [Conduct Wildlife Hazard Assessment]

Page 82 of 97

Page 83: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW TEX TX AUS Austin-Bergstrom International P 55 $ 2,316,089 $ 2,316,089 $ - $ -

Construct Apron [Remain Overnight (RON) Apron, Phase III (Design)], Rehabilitate

Runway Lighting [Rehabilitate Airfield Lighting Control and Monitoring Systems, Phase I

(Design)] - 17L/35R

SW TEX TX BRO

Brownsville/South Padre Island

International P 38 $ 795,110 $ 795,110 $ - $ -

Conduct Miscellaneous Study, Install Airport Beacons, Rehabilitate Taxiway [Design-

Only], Rehabilitate Terminal Building, Wildlife Hazard Assessments

SW TEX TX BRO

Brownsville/South Padre Island

International P 37 $ 3,902,621 $ 795,112 $ 3,107,509 $ -

Rehabilitate Taxiway [Phase 2, Construction], Rehabilitate Taxiway [Phase 2,

Construction Stage 1]SW TEX TX CRP Corpus Christi International P 46 $ 2,802,051 $ 2,802,051 $ - $ - Improve Terminal Building [Improve Terminal Building]SW TEX TX DAL Dallas Love Field P 37 $ 67,509 $ 67,509 $ - $ - Wildlife Hazard AssessmentsSW TEX TX DFW Dallas/Fort Worth International P 93 $ 2,315,000 $ - $ - $ 2,315,000 Rehabilitate Runway - 18R/36L

SW TEX TX DFW Dallas/Fort Worth International P 97 $ 4,398,584 $ 4,398,584 $ - $ -

Improve Service Road, Rehabilitate Runway - 17L/35R, Rehabilitate Runway Lighting -

18L/36R, Rehabilitate TaxiwaySW TEX TX DFW Dallas/Fort Worth International P 94 $ 6,000,000 $ - $ 6,000,000 $ - Extend Runway [LOI Payment #11] - 17C/35CSW TEX TX DFW Dallas/Fort Worth International P 96 $ 500,000 $ - $ 500,000 $ - Safety Management System (SMS) Program

SW TEX TX DFW Dallas/Fort Worth International P 95 $ 4,783,680 $ 4,783,680 $ - $ -

Improve Service Road, Install Airfield Guidance Signs, Rehabilitate Runway - 17L/35R,

Rehabilitate Runway Lighting - 18L/36R, Rehabilitate Taxiway

SW TEX TX DFW Dallas/Fort Worth International P 98 $ 17,228,883 $ - $ 17,228,883 $ -

Construct Aircraft Rescue & Fire Fighting Training Facility, Construct Aircraft Rescue &

Fire Fighting Training Facility

SW TEX TX DRT Del Rio International P 11 $ 1,089,803 $ 1,000,000 $ 89,803 $ -

Construct Building [Construct Airport Lighting and Communication Building], Construct

Taxiway [Construct Taxiway G (GA/Air Cargo), Phase I (Design)], Expand Terminal

Building [Expand Terminal Building, Phase V], Rehabilitate Apron [Rehabilitate GA/Air

Carrier Aprons,Phase I], Update Airport Master Plan Study [Update Airport Master Plan;

and Conduct Pavement Assessment], Wildlife Hazard Assessments [Conduct Wildlife

Hazard Assessment]

SW TEX TX GGG East Texas Regional P 34 $ 571,250 $ 500,000 $ 71,250 $ -

Improve Airport Miscellaneous Improvements [Rehabilitate terminal entrance road and

parking lot.], Wildlife Hazard Assessments

SW TEX TX GGG East Texas Regional P 35 $ 500,000 $ 500,000 $ - $ -

Improve Airport Miscellaneous Improvements [Rehabilitate terminal entrance road and

parking lot.]

SW TEX TX CLL Easterwood Field P 31 $ 1,135,714 $ 1,101,859 $ 33,855 $ -

Conduct Miscellaneous Study, Construct Taxiway [Taxiway G Design & Access Road

Design], Rehabilitate Apron [GA Ramp Rehabilitation Ph.2], Rehabilitate Runway

[Enhanced Hold Markings for RW 4-22] - 04/22, Wildlife Hazard AssessmentsSW TEX TX CLL Easterwood Field P 30 $ 712,500 $ - $ 712,500 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF Vehicle]SW TEX TX ELP El Paso International P 30 $ 7,563,087 $ 7,563,087 $ - $ - Extend Runway [Construction.] - 08R/26LSW TEX TX ELP El Paso International P 29 $ 300,000 $ - $ 300,000 $ - Collect airport data for Airports Geographic Information System

Page 83 of 97

Page 84: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW TEX TX AFW Fort Worth Alliance R 41 $ 896,549 $ 896,549 $ - $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Runway Vertical/Visual Guidance

System - 16R/34L, Rehabilitate Runway - 16L/34R, Rehabilitate Runway Lighting -

16L/34RSW TEX TX AFW Fort Worth Alliance R 42 $ 10,000,000 $ - $ 10,000,000 $ - Extend Runway [Extend Runway - Phase 6] - 16L/34R

SW TEX TX IAH George Bush Intercontinental/Houston P 86 $ 1,452,985 $ 1,452,985 $ - $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 84 $ 2,501,123 $ 2,501,123 $ - $ - Rehabilitate Runway - 08R/26L

SW TEX TX IAH George Bush Intercontinental/Houston P 87 $ 15,708,243 $ - $ 15,708,243 $ - Rehabilitate Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 83 $ 3,878,982 $ 3,878,982 $ - $ - Construct Taxiway

SW TEX TX IAH George Bush Intercontinental/Houston P 88 $ 42,135 $ - $ 42,135 $ - VALE Vehicle [VALE]

SW TEX TX IAH George Bush Intercontinental/Houston P 85 $ 8,739,315 $ 8,739,315 $ - $ - Construct Runway - 08L/26R

SW TEX TX LRD Laredo International P 65 $ 8,843,166 $ 769,059 $ 8,074,107 $ - Extend Runway [Extend Runway 17R/35L and reconfigure Taxiways A & B] - 17R/35LSW TEX TX LRD Laredo International P 64 $ 300,000 $ - $ 300,000 $ - Collect airport data for Airports Geographic Information System

SW TEX TX LRD Laredo International P 62 $ 4,000,000 $ - $ 4,000,000 $ -

Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation in 65

DNL.]

SW TEX TX LRD Laredo International P 61 $ 2,803,152 $ 803,152 $ 2,000,000 $ -

Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Apron [Rehabilitate GA

Apron (Phase 5).]SW TEX TX LRD Laredo International P 63 $ 145,629 $ - $ 145,629 $ - Wildlife Hazard Assessments

SW TEX TX LBB Lubbock Preston Smith International P 34 $ 15,289,277 $ 3,662,897 $ 11,626,380 $ -

Rehabilitate Runway [Phase 2 to rehabilitate runway and shift runway thresholds to the

east.] - 08/26

SW TEX TX MFE McAllen Miller International P 40 $ 973,000 $ 973,000 $ - $ -

Conduct Miscellaneous Study [Develop Airport Master Drainage Plan, including SWPPP

& SPCC], Conduct Miscellaneous Study, Expand Terminal Building [Phase 2, Suplemental

Design], Rehabilitate Runway [Phase 2 of Rehab RW] - 13/31, Wildlife Hazard

Assessments

SW TEX TX MAF Midland International P 50 $ 3,587,733 $ 3,322,433 $ 265,300 $ -

Extend Taxiway [GA Taxilane], Rehabilitate Apron [Rehabilitate Executive Apron, Phase I

(Design)], Rehabilitate Taxiway [Rehabilitate Taxiway Systems, Phase II (Construction)],

Rehabilitate Terminal Building [Phase II], Wildlife Hazard Assessments [Conduct Wildlife

Hazard Assessment]SW TEX TX @00O North Central Texas 5 $ 750,000 $ - $ 750,000 $ - Conduct Metropolitan System Plan Study

SW TEX TX AMA Rick Husband Amarillo International P 36 $ 3,137,987 $ 3,137,987 $ - $ - Improve Terminal Building [Improve Terminal Building]

Page 84 of 97

Page 85: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW TEX TX GRK Robert Gray AAF P 21 $ 2,299,263 $ 1,987,955 $ 311,308 $ -

Construct Taxiway [Phase 2, Construct TW G between RW 35 and TW B], Rehabilitate

Taxiway [Phase 2, TW E Reconstruction]

SW TEX TX SJT San Angelo Regional/Mathis Field P 31 $ 1,390,565 $ 1,390,565 $ - $ -

Improve Building [Improve Terminal Building, Phase I (Design)], Rehabilitate Runway

[Rehabilitate Runway 3/21, Phase I (Design)] - 03/21

SW TEX TX SJT San Angelo Regional/Mathis Field P 30 $ 2,173,604 $ 250,000 $ 1,923,604 $ -

Rehabilitate Runway [Rehabilitate Runway 9/27] - 09/27, Rehabilitate Taxiway

[Rehabilitate Taxiway A, B, D and H, Phase II (Construction)], Wildlife Hazard

Assessments [Conduct Wildlife Hazard Assessment]SW TEX TX SAT San Antonio International P 65 $ 113,700 $ 2,100 $ 111,600 $ - Wildlife Hazard AssessmentsSW TEX TX SAT San Antonio International P 66 $ 8,944,064 $ 1,944,064 $ 7,000,000 $ - Extend Runway [Paving, Phase 1] - 03/21SW TEX TX SAT San Antonio International P 62 $ 300,000 $ - $ 300,000 $ - Collect airport data for Airports Geographic Information System

SW TEX TX SAT San Antonio International P 64 $ 500,000 $ 500,000 $ - $ - Extend Runway [Site Preparation & Utility Relocation (Phase 1A).] - 03/21SW TEX TX SAT San Antonio International P 67 $ 400,000 $ - $ 400,000 $ - Safety Management System (SMS) ProgramSW TEX TX SAT San Antonio International P 63 $ 9,000,000 $ - $ 9,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 8 $ 4,937,217 $ 1,284,717 $ 3,652,500 $ - Rehabilitate Runway [Construction (Phase 1).] - 17/35

SW TEX TX BPT Southeast Texas Regional P 27 $ 1,120,409 $ 1,120,409 $ - $ -

Acquire Equipment [Acquire sweeper for airfield pavement], Conduct Miscellaneous

Study [Airport geometry and reconfiguration alternatives], Improve Airport Drainage

[Environmental for West Ditch improvements], Rehabilitate Apron [Phase 2,

Construction], Wildlife Hazard AssessmentsSW TEX TX *TXS State of Texas 7 $ 500,000 $ - $ 500,000 $ - Update State System Plan StudySW TEX TX *TXB Texas State Block Grant Program 71 $ 4,050,000 $ - $ 4,050,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 70 $ 2,432,040 $ - $ - $ 2,432,040 Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 67 $ 25,776,416 $ 25,776,416 $ - $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 68 $ 5,000,000 $ - $ 5,000,000 $ - Non primary development projects in state block grant programSW TEX TX *TXB Texas State Block Grant Program 69 $ 19,602,967 $ 19,602,967 $ - $ - Non primary development projects in state block grant program

SW TEX TX TYR Tyler Pounds Regional P 31 $ 3,552,147 $ 1,052,147 $ 2,500,000 $ -

Acquire Safety Equipment and/or Fencing, Improve Runway Safety Area [Phase 3.] -

04/22, Wildlife Hazard Assessments

SW TEX TX HRL Valley International P 50 $ 5,517,671 $ 5,517,671 $ - $ -

Conduct Miscellaneous Study [Conduct BCA for Extension of RW 17R], Construct Apron

[Construct GA Apron (East) Phase 1], Expand Apron [East side GA apron (100' North)],

Install Perimeter Fencing, Rehabilitate Apron [Rehab and extend], Rehabilitate Taxiway

[Close and remove TW E pavement], Rehabilitate Taxiway [Mill and overlay TW H],

Rehabilitate Taxiway [Phase 2 - Construction], Rehabilitate Taxiway [Phase 2 -

Construction]SW TEX TX HRL Valley International P 49 $ 124,308 $ 52,777 $ 71,531 $ - Wildlife Hazard Assessments

Page 85 of 97

Page 86: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

SW TEX TX HRL Valley International P 51 $ 1,056,962 $ 1,056,962 $ - $ -

Rehabilitate Apron [Phase II], Rehabilitate Taxiway [Phase 2 (funding for completion of

project)]

SW TEX TX ACT Waco Regional P 31 $ 581,795 $ 500,000 $ 81,795 $ -

Construct Taxiway [Design Only.], Improve Terminal Building, Rehabilitate Apron

[Rehabilitate Apron (Engineering Only).], Wildlife Hazard Assessments

SW TEX TX ACT Waco Regional P 30 $ 500,000 $ 500,000 $ - $ -

Improve Runway Safety Area - 01/19, Improve Terminal Building, Rehabilitate Taxiway

[Engineering design.]WP HNL AS Z08 Ofu GA 9 $ 1,300,000 $ 1,300,000 $ - $ - Construct Apron [Phase II]WP HNL AS Z08 Ofu GA 8 $ 400,000 $ 400,000 $ - $ - Update Airport Master Plan Study

WP HNL AS PPG Pago Pago International P 48 $ 500,000 $ 500,000 $ - $ -

Collect airport data for Airports Geographic Information System, Wildlife Hazard

Assessments

WP HNL AS PPG Pago Pago International P 47 $ 300,000 $ - $ 300,000 $ - Rehabilitate Runway Lighting [Repair/replace airfield lighting, Phase 1 (design)] - 08/26WP HNL AS PPG Pago Pago International P 46 $ 2,000,000 $ - $ 2,000,000 $ - Install Perimeter Fencing [Ph II]WP HNL AS PPG Pago Pago International P 45 $ 500,000 $ 500,000 $ - $ - Improve Terminal Building [Upgrade Departure Area - Ph II]WP HNL AS PPG Pago Pago International P 49 $ 6,000,000 $ - $ 6,000,000 $ - Rehabilitate Taxiway [Twy A]WP HNL FM TTK Kosrae GA 11 $ 20,600,000 $ - $ 20,600,000 $ - Rehabilitate Runway [Phase II] - 05/23WP HNL FM PNI Pohnpei International GA 13 $ 3,000,000 $ - $ 3,000,000 $ - Rehabilitate Runway [Phase VI] - 09/27WP HNL GU GUM Guam International P 78 $ 4,827,638 $ 2,172,363 $ 2,655,275 $ - Install Instrument Approach Aid [Phase II] - 06L/24RWP HNL GU GUM Guam International P 75 $ 2,000,000 $ - $ 2,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP HNL GU GUM Guam International P 73 $ 1,500,000 $ - $ 1,500,000 $ - Rehabilitate Runway [Design only - Ph I] - 06L/24RWP HNL GU GUM Guam International P 77 $ 675,000 $ - $ 675,000 $ - Collect airport data for Airports Geographic Information SystemWP HNL GU GUM Guam International P 74 $ 2,172,362 $ 2,172,362 $ - $ - Install Instrument Approach Aid [Phase I] - 06L/24R

WP HNL GU GUM Guam International P 79 $ 700,000 $ - $ 700,000 $ - Conduct Environmental Study [Environmental Assessment for utilities improvements]WP HNL GU GUM Guam International P 72 $ 4,000,000 $ - $ 4,000,000 $ - Extend Runway - 06L/24RWP HNL GU GUM Guam International P 76 $ 1,550,000 $ - $ 1,550,000 $ - Improve Utilities [MAP] [Sewer and Drainage, Phase I (Design only)]WP HNL HI ITO Hilo International P 37 $ 2,850,161 $ 2,850,161 $ - $ - Improve Terminal Building [Loading Bridges, Phase III]WP HNL HI ITO Hilo International P 36 $ 500,000 $ - $ 500,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [Ph II]

WP HNL HI ITO Hilo International P 38 $ 3,009,367 $ 3,009,367 $ - $ -

Improve Airport Miscellaneous Improvements [Surface paint signs in response to Part

139 inspection], Rehabilitate Runway [Thresholds] - 03/21, Rehabilitate Taxiway [Twys E

and G]WP HNL HI HNL Honolulu International P 99 $ 2,428,502 $ 2,428,502 $ - $ - Improve Terminal BuildingWP HNL HI HNL Honolulu International P 100 $ 6,602,136 $ 6,602,136 $ - $ - Rehabilitate Runway - 04L/22R, Rehabilitate Taxiway [Twy RA]WP HNL HI LNY Lanai P 12 $ 6,465,394 $ 6,465,394 $ - $ - Construct Aircraft Rescue & Fire Fighting BuildingWP HNL HI PAK Port Allen GA 6 $ 235,192 $ 235,192 $ - $ - Improve Access RoadWP HNL HI *HIS State of Hawaii 4 $ 1,500,000 $ 1,500,000 $ - $ - Conduct State System Plan StudyWP HNL MH MAJ Marshall Islands International GA 9 $ 8,000,000 $ - $ 8,000,000 $ - Improve Runway Safety Area [Relocate service road - Ph I] - 07/25

Page 86 of 97

Page 87: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP HNL MP GSN Francisco C. Ada/Saipan International P 64 $ 1,000,000 $ 1,000,000 $ - $ - Rehabilitate Runway [Ph. VIII] - 07/25

WP HNL MP GSN Francisco C. Ada/Saipan International P 69 $ 4,800,000 $ 1,011,826 $ 3,788,174 $ - Construct Aircraft Rescue & Fire Fighting Training Facility [Ph. II]

WP HNL MP GSN Francisco C. Ada/Saipan International P 67 $ 1,266,332 $ 1,266,332 $ - $ - Improve Terminal Building [Ph. III - PA system, restrooms, roof]

WP HNL MP GSN Francisco C. Ada/Saipan International P 66 $ 258,476 $ 258,476 $ - $ - Rehabilitate Taxiway [Ph V]

WP HNL MP GSN Francisco C. Ada/Saipan International P 65 $ 1,536,634 $ 1,536,634 $ - $ - Improve Terminal Building [Ph. II - PA system, restrooms, roof]

WP HNL MP GSN Francisco C. Ada/Saipan International P 68 $ 1,000,000 $ - $ 1,000,000 $ - Construct Aircraft Rescue & Fire Fighting Training Facility [Ph. I]WP HNL PW ROR Babelthuap/Koror GA 14 $ 7,000,000 $ - $ 7,000,000 $ - Construct Apron [Phase III]

WP LAX AZ P20 Avi Suquilla GA 16 $ 372,124 $ 270,687 $ 101,437 $ - Improve Airport Drainage [Improve Airport Drainage and Erosion Control]WP LAX AZ P20 Avi Suquilla GA 17 $ 310,000 $ - $ - $ 310,000 Rehabilitate Taxiway [Phase II]WP LAX AZ P20 Avi Suquilla GA 14 $ 1,800,000 $ - $ - $ 1,800,000 Rehabilitate Taxiway

WP LAX AZ E95 Benson Municipal GA 14 $ 464,550 $ 464,550 $ - $ -

Construct Heliport/Helipad [Phase II], Rehabilitate Runway [Rehabilitate Runway 10/28,

4000 feet X 75 feet, Phase II] - 10/28

WP LAX AZ DUG Bisbee Douglas International GA 6 $ 150,000 $ 150,000 $ - $ - Rehabilitate Taxiway [Rehabilitate Taxiways A1 and A2, Design only, Phase I]WP LAX AZ P04 Bisbee Municipal GA 10 $ 172,900 $ 172,900 $ - $ - Acquire Equipment [Acquire Airport Sweeper]

WP LAX AZ BXK Buckeye Municipal GA 15 $ 446,500 $ 446,500 $ - $ -

Construct Apron [Construct Holding Apron at each runway end on the parallel taxiway.],

Improve Runway Safety Area - 17/35, Rehabilitate Apron [Rehabilitate Apron (crack seal,

approx. 550 linear feet x 300 linear including taxilanes)], Rehabilitate Runway

[Rehabilitate Runway 17-35 (crack seal and marking, approx. 5,500 linear feet x 75 linear

feet)] - 17/35, Rehabilitate Taxiway [Rehabilitate Parallel Taxiway (crack seal and

marking, approx. 5,500 linear feet x 45 linear feet including connecting taxiways)]WP LAX AZ P33 Cochise County GA 3 $ 150,000 $ 150,000 $ - $ - Install Runway Lighting - 03/21WP LAX AZ AZC Colorado City Municipal GA 16 $ 245,575 $ 245,575 $ - $ - Install Runway Vertical/Visual Guidance System - 02/20WP LAX AZ P08 Coolidge Municipal GA 7 $ 192,850 $ 192,850 $ - $ - Install Weather Reporting EquipmentWP LAX AZ E60 Eloy Municipal GA 9 $ 150,000 $ 150,000 $ - $ - Install Miscellaneous NAVAIDS

WP LAX AZ PRC Ernest A. Love Field CS 31 $ 186,405 $ 186,405 $ - $ -

Rehabilitate Taxiway [Rehabilitate Taxiways A, C (crack seal, approx. 7,616 feet x 50 feet

including connecting taxiways), D, E, and F (enhanced taxiway centerline markings,

runway holding position markings, and surface painted hold position signs)]

Page 87 of 97

Page 88: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP LAX AZ FFZ Falcon Field R 19 $ 135,000 $ 135,000 $ - $ -

Construct Taxiway [Taxiway B], Install Airfield Guidance Signs [Install Airfield Signage,

Design Only]WP LAX AZ FFZ Falcon Field R 20 $ 373,569 $ 135,687 $ 237,882 $ - Improve Airport Drainage

WP LAX AZ FLG Flagstaff Pulliam P 34 $ 1,223,613 $ 1,223,613 $ - $ -

Acquire Snow Removal Equipment, Improve Airport Miscellaneous Improvements,

Rehabilitate TaxiwayWP LAX AZ E63 Gila Bend Municipal GA 13 $ 95,000 $ 95,000 $ - $ - Construct Building [Shade hangars]

WP LAX AZ GEU Glendale Municipal R 20 $ 326,307 $ 326,307 $ - $ -

Improve Runway Safety Area - 01/19, Rehabilitate Apron [Rehabilitate apron (pavement

marking improvements)], Remove Obstructions [Remove/Relocate Runway 19 Blast

Fence]WP LAX AZ 1G4 Grand Canyon West P 12 $ 8,116,918 $ 1,706,080 $ 6,410,838 $ - Construct Runway [Phase 4] - 17/35

WP LAX AZ P14 Holbrook Municipal GA 13 $ 35,150 $ 35,150 $ - $ -

Conduct Environmental Study [Conduct an environmental study to assess the impacts of

the relocation of the existing Fuel Farm at the airport]

WP LAX AZ HII Lake Havasu City GA 22 $ 350,200 $ 350,200 $ - $ -

Improve Airport Miscellaneous Improvements [including mobilization, traffic control &

utilities improvements], Install Airfield Guidance Signs, Install Taxiway Lighting,

Rehabilitate Apron [Pavement Improvements, markings]

WP LAX AZ IFP Laughlin/Bullhead International P 37 $ 886,588 $ 886,588 $ - $ -

Acquire Equipment, Construct Aircraft Rescue & Fire Fighting Building [Construct ARFF

Building, Design Only, Phase I], Improve Terminal Building

WP LAX AZ PGA Page Municipal P 23 $ 1,181,488 $ 1,181,488 $ - $ - Expand Apron [Construct North Apron Expansion including T-Hangar relocation]

WP LAX AZ PGA Page Municipal P 24 $ 97,633 $ 97,633 $ - $ -

Expand Apron [North Apron Expansion, including T-Hangar Relocation, Phase 2B],

Strengthen Apron [Phase I, design]

WP LAX AZ PAN Payson GA 16 $ 345,325 $ 345,325 $ - $ -

Acquire Land For Approaches [Reimbursement for approximately 0.1 acres of land

[parcel A)], Acquire Land for Development [Reimbursement for approx. 0.5 acres of

land], Improve Runway Safety Area [Install runway blast pads on each end of Runway] -

06/24, Install Airfield Guidance Signs [and Markings]

WP LAX AZ DVT Phoenix Deer Valley R 27 $ 11,590,000 $ 1,271,750 $ 10,318,250 $ - Improve Runway Safety Area - 07L/25R, Improve Runway Safety Area - 07R/25L

WP LAX AZ GYR Phoenix Goodyear R 16 $ 1,000,000 $ 685,557 $ 314,443 $ -

Widen Taxiway [Widen and strengthen connector Tawiways A5, A6, A7 and replace A4,

Phase I]WP LAX AZ PHX Phoenix Sky Harbor International P 68 $ 3,134,250 $ 3,134,250 $ - $ - Construct Taxiway [Connector G-5]WP LAX AZ PHX Phoenix Sky Harbor International P 69 $ 11,228,933 $ 3,607,691 $ 7,621,242 $ - Improve Runway Safety Area - 07R/25LWP LAX AZ IWA Phoenix-Mesa Gateway P 25 $ 4,401,131 $ 300,808 $ 4,100,323 $ - Construct Parking Lot [Terminal parking expansion, 1700 spaces]

WP LAX AZ IWA Phoenix-Mesa Gateway P 27 $ 625,000 $ - $ 625,000 $ - Collect airport data for Airports Geographic Information System [AGIS]WP LAX AZ IWA Phoenix-Mesa Gateway P 26 $ 5,204,129 $ 1,468,653 $ 3,735,476 $ - Expand Apron, Improve Airport Drainage

Page 88 of 97

Page 89: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP LAX AZ IWA Phoenix-Mesa Gateway P 28 $ 1,368,184 $ - $ 1,368,184 $ - Construct Parking Lot [Terminal parking expansion, phase II, approximately 550 spaces]WP LAX AZ P10 Polacca GA 3 $ 150,000 $ 150,000 $ - $ - Acquire Snow Removal Equipment [Acquire snow removal equipment]

WP LAX AZ RYN Ryan Field R 21 $ 2,535,572 $ 970,343 $ 1,565,229 $ -

Install Runway Lighting [Medium Intensity Runway Lights, Phase 2] - 06L/24R, Install

Runway Vertical/Visual Guidance System - 06L/24R, Install Taxiway Lighting, Rehabilitate

Runway [Rehab Runway 06L/24R and Associated Taxiways] - 06L/24R

WP LAX AZ RYN Ryan Field R 22 $ 75,000 $ 75,000 $ - $ - Acquire Emergency Generator [Acquire Emergency Generators, Design Only, Phase I]WP LAX AZ SAD Safford Regional GA 20 $ 2,533,211 $ 2,533,211 $ - $ - Rehabilitate Runway [Phase IV] - 12/30

WP LAX AZ P13 San Carlos Apache GA 17 $ 35,150 $ 35,150 $ - $ -

Conduct Environmental Study [This project will conduct an environmental study to

assess the impacts of the relocation of the existing Fuel Farm at the airport]WP LAX AZ E77 San Manuel GA 3 $ 695,172 $ 279,927 $ 415,245 $ - Construct TaxiwayWP LAX AZ SDL Scottsdale R 26 $ 273,738 $ 273,738 $ - $ - Conduct Environmental StudyWP LAX AZ SDL Scottsdale R 25 $ 2,000,000 $ 326,307 $ 1,673,693 $ - Rehabilitate ApronWP LAX AZ D68 Springerville Municipal GA 20 $ 3,368,062 $ 75,000 $ 3,293,062 $ - Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 03/21

WP LAX AZ D68 Springerville Municipal GA 21 $ 1,025,000 $ 1,025,000 $ - $ -

Remove Obstructions [Relocate Obstructions (FBO Building, Weather station, T-Hangar,

Outside Runway Visibility Zone, Design, Phase II]WP LAX AZ SJN St Johns Industrial Air Park GA 14 $ 1,882,530 $ 197,509 $ 1,685,021 $ - Construct Taxiway [Construct Parallel Taxiway Phase II]WP LAX AZ *AZS State of Arizona 4 $ 440,000 $ - $ 440,000 $ - Conduct aeronautical survey for WAAS approachWP LAX AZ TYL Taylor GA 19 $ 263,150 $ 263,150 $ - $ - Conduct Environmental StudyWP LAX AZ TUS Tucson International P 60 $ 747,425 $ 688,005 $ 59,420 $ - Rehabilitate Runway - 03/21, Rehabilitate TaxiwayWP LAX AZ TUS Tucson International P 61 $ 778,467 $ 778,467 $ - $ - Update Airport Master Plan StudyWP LAX AZ E25 Wickenburg Municipal GA 19 $ 210,000 $ 210,000 $ - $ - Update Airport Master Plan Study

WP LAX AZ INW Winslow-Lindbergh Regional GA 18 $ 148,542 $ 148,542 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 4/22 (approximately 7,500 Linear Feet X 150

Linear Feet), Design Only, Phase I] - 04/22WP LAX AZ NYL Yuma MCAS/Yuma International P 33 $ 2,169,458 $ 1,891,709 $ 277,749 $ - Rehabilitate ApronWP LAX CA L45 Bakersfield Municipal GA 15 $ 791,897 $ 791,897 $ - $ - Construct Taxiway, Expand Apron, Extend Taxiway

WP LAX CA BNG Banning Municipal GA 10 $ 536,750 $ 536,750 $ - $ -

Install Miscellaneous NAVAIDS [Install Beacon & Tower/Relocate Wind Cone and

Segmented Circle], Install Weather Reporting Equipment

WP LAX CA DAG Barstow-Daggett GA 6 $ 4,358,762 $ 4,358,762 $ - $ -

Extend Taxiway, Rehabilitate Runway Lighting [8/26] - 04/22, Rehabilitate Runway

Lighting - 08/26WP LAX CA BUR Bob Hope P 51 $ 604,425 $ 604,425 $ - $ - Rehabilitate Runway - 08/26WP LAX CA BUR Bob Hope P 52 $ 115,244 $ 115,244 $ - $ - Rehabilitate Runway - 08/26WP LAX CA L08 Borrego Valley GA 16 $ 300,000 $ 300,000 $ - $ - Improve Runway Safety Area - 08/26

WP LAX CA POC Brackett Field R 13 $ 578,063 $ 578,063 $ - $ -

Rehabilitate Runway [Slurry Seal] - 08R/26L, Rehabilitate Taxiway [South Twy and Twy

connectors]

Page 89 of 97

Page 90: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP LAX CA POC Brackett Field R 14 $ 80,200 $ 80,200 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)

Study]WP LAX CA BWC Brawley Municipal GA 13 $ 169,594 $ 169,594 $ - $ - Rehabilitate Apron [Seal & Re-striping]WP LAX CA CCB Cable R 12 $ 232,377 $ 232,377 $ - $ - Conduct Airport Master Plan Study

WP LAX CA CXL Calexico International GA 13 $ 371,386 $ 371,386 $ - $ - Rehabilitate Access Road, Rehabilitate Airport Beacons, Rehabilitate Runway - 08/26

WP LAX CA CXL Calexico International GA 14 $ 513,000 $ 433,193 $ 79,807 $ - Install Airfield Guidance Signs, Install Runway Vertical/Visual Guidance System - 08/26WP LAX CA L71 California City Municipal GA 13 $ 119,580 $ 119,580 $ - $ - Improve Airport DrainageWP LAX CA CMA Camarillo R 30 $ 219,248 $ 219,248 $ - $ - Acquire Equipment [Acquire Airport Sweeper]WP LAX CA 49X Chemehuevi Valley GA 8 $ 3,057,190 $ 1,057,190 $ 2,000,000 $ - Construct Taxiway [Construct Parallel Taxiway, Phase II]

WP LAX CA CPM Compton/Woodley R 10 $ 53,200 $ 53,200 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)

Study]

WP LAX CA EMT El Monte R 13 $ 44,100 $ 44,100 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)

Study]

WP LAX CA EMT El Monte R 12 $ 572,977 $ 572,977 $ - $ -

Rehabilitate Runway [Slurry Seal] - 01/19, Rehabilitate Taxiway [South Twy and

connectors]WP LAX CA FUL Fullerton Municipal R 22 $ 1,615,000 $ 1,615,000 $ - $ - Rehabilitate Taxiway [Rehabilitate Parallel Taxiways A and B]

WP LAX CA WJF General Wm J Fox Airfield GA 14 $ 66,900 $ 66,900 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)

Study]WP LAX CA SEE Gillespie Field R 19 $ 150,000 $ 150,000 $ - $ - Install Perimeter FencingWP LAX CA HMT Hemet-Ryan GA 11 $ 760,000 $ 760,000 $ - $ - Rehabilitate Apron

WP LAX CA IPL Imperial County CS 26 $ 1,158,912 $ 202,608 $ 956,304 $ -

Construct Apron [Construct Cargo Apron], Improve Airport Miscellaneous Improvements

[Design Segmented Circle Relocation], Install Perimeter Fencing [design], Rehabilitate

Runway Lighting - 08/26WP LAX CA IPL Imperial County CS 27 $ 100,000 $ - $ 100,000 $ - Conduct Miscellaneous Study

WP LAX CA IYK Inyokern P 26 $ 1,000,000 $ 1,000,000 $ - $ -

Improve Aircraft Rescue & Fire Fighting Building, Install Runway Vertical/Visual Guidance

System - 02/20, Install Runway Vertical/Visual Guidance System - 15/33, Rehabilitate

Access Road [and apron pavements], Rehabilitate Runway [Rwy 2/20, phase I, design] -

02/20, Rehabilitate Runway - 15/33

WP LAX CA TRM Jacqueline Cochran Regional GA 19 $ 2,660,000 $ 150,000 $ 2,510,000 $ - Rehabilitate Runway [Overlay Runway] - 12/30, Rehabilitate Taxiway [Overlay Taxiway A]

WP LAX CA SNA John Wayne Airport-Orange County P 41 $ 1,873,595 $ 1,873,595 $ - $ -

Expand Terminal Building [Phase 4 Passenger Loading Bridge], Improve Terminal

Building [Phase 4 Passenger Loading Bridge]

WP LAX CA LGB Long Beach /Daugherty Field/ P 35 $ 6,721,626 $ 2,221,626 $ 4,500,000 $ -

Improve Runway Safety Area - 07L/25R, Rehabilitate Apron, Rehabilitate Taxiway

[Taxiway G Phase I]WP LAX CA LGB Long Beach /Daugherty Field/ P 34 $ 2,221,625 $ 2,221,625 $ - $ - Rehabilitate Apron [Rehabilitate Apron]

Page 90 of 97

Page 91: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP LAX CA LAX Los Angeles International P 60 $ 10,000,000 $ - $ 10,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [Inglewood]WP LAX CA LAX Los Angeles International P 61 $ 8,167,975 $ 8,167,975 $ - $ - Construct TaxiwayWP LAX CA LAX Los Angeles International P 63 $ 24,651,107 $ - $ 24,651,107 $ - Construct Taxiway [Relocate Taxiway S, Phase III]WP LAX CA LAX Los Angeles International P 62 $ 15,780,201 $ 7,780,201 $ 8,000,000 $ - Construct Taxiway [Relocate Taxiway S, Phase II]WP LAX CA CRQ McClellan-Palomar P 28 $ 300,000 $ 300,000 $ - $ - Rehabilitate Service RoadWP LAX CA BFL Meadows Field P 35 $ 758,802 $ 758,802 $ - $ - Improve Terminal Building

WP LAX CA BFL Meadows Field P 37 $ 2,276,928 $ - $ 2,276,928 $ -

Acquire Land For Approaches [Approximately 16.03 acres within Transitional Surfaces],

Construct Apron [Construct Cargo Apron, Phase I (land aquisition, approximately 8.85

acres)]WP LAX CA BFL Meadows Field P 36 $ 758,802 $ 758,802 $ - $ - Improve Terminal BuildingWP LAX CA MHV Mojave GA 25 $ 150,000 $ 150,000 $ - $ - Rehabilitate Runway - 12/30WP LAX CA OKB Oceanside Municipal GA 7 $ 141,778 $ 141,778 $ - $ - Update Airport Master Plan StudyWP LAX CA ONT Ontario International P 33 $ 6,000,000 $ - $ 6,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP LAX CA ONT Ontario International P 34 $ 4,500,000 $ - $ 4,500,000 $ - Acquire Land for Noise Compatibility within 65 - 69 DNL

WP LAX CA ONT Ontario International P 35 $ 2,996,373 $ 2,996,373 $ - $ - Security Enhancements [Install Perimeter Fencing/Security Improvements]

WP LAX CA ONT Ontario International P 36 $ 241,278 $ 241,278 $ - $ - Security Enhancements [Install Perimeter Fencing/Security Improvements]

WP LAX CA OXR Oxnard P 32 $ 4,283,090 $ 1,000,000 $ 3,283,090 $ - Acquire Land For Approaches, Rehabilitate Runway [Including Associated Twys] - 07/25WP LAX CA PSP Palm Springs International P 47 $ 195,226 $ 195,226 $ - $ - Security Enhancements [Replace Security Fencing]WP LAX CA PSP Palm Springs International P 46 $ 515,596 $ 515,596 $ - $ - Conduct Environmental StudyWP LAX CA RNM Ramona R 14 $ 150,000 $ 150,000 $ - $ - Improve Airport Miscellaneous ImprovementsWP LAX CA REI Redlands Municipal GA 11 $ 150,000 $ 150,000 $ - $ - Rehabilitate Apron

WP LAX CA SBD San Bernardino International R 24 $ 1,827,729 $ 1,827,729 $ - $ -

Install Runway Vertical/Visual Guidance System - 06/24, Rehabilitate Runway Lighting -

06/24WP LAX CA SAN San Diego International P 62 $ 1,599,969 $ - $ 1,599,969 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP LAX CA SAN San Diego International P 63 $ 8,400,031 $ - $ 8,400,031 $ - Noise Mitigation Measures for Residences within 65 - 69 DNLWP LAX CA SAN San Diego International P 61 $ 10,000,000 $ - $ 10,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

WP LAX CA SAN San Diego International P 60 $ 9,821,551 $ 3,563,545 $ 6,258,006 $ - Construct Apron [West Apron (RON and West Terminal Apron), Phase II]WP LAX CA @01P San Diego Metropolitan Area 2 $ 1,284,780 $ - $ 1,284,780 $ - Conduct Metropolitan System Plan Study [RASP Study]WP LAX CA SBA Santa Barbara Municipal P 41 $ 1,466,216 $ 1,466,216 $ - $ - Acquire Equipment [Acquire Sweeper], Construct Terminal BuildingWP LAX CA SBA Santa Barbara Municipal P 42 $ 1,466,215 $ 1,466,215 $ - $ - Construct Terminal Building

WP LAX CA SMX

Santa Maria Public/Capt G Allan Hancock

Field P 30 $ 4,139,358 $ 3,000,000 $ 1,139,358 $ - Extend Runway [Including Parallel Taxiway] - 12/30, Extend TaxiwayWP LAX CA MIT Shafter-Minter Field GA 17 $ 150,000 $ 150,000 $ - $ - Install Weather Reporting EquipmentWP LAX CA VCV Southern California Logistics R 18 $ 2,617,414 $ 2,617,414 $ - $ - Rehabilitate Taxiway [C], Widen Taxiway

Page 91 of 97

Page 92: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP LAX CA VNY Van Nuys R 10 $ 205,986 $ 205,986 $ - $ - Improve Runway Safety Area - 16L/34R

WP LAX CA VNY Van Nuys R 11 $ 4,610,271 $ 1,546,581 $ 3,063,690 $ -

Improve Runway Safety Area [Phase II] - 16L/34R, Rehabilitate Taxiway [Rehabilitate

Cross Taxiway A2]

WP LAX CA L19 Wasco-Kern County GA 6 $ 883,500 $ 883,500 $ - $ - Rehabilitate Apron, Rehabilitate Runway - 12/30, Rehabilitate Taxiway [Twy A]

WP LAX CA WHP Whiteman R 13 $ 55,600 $ 55,600 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)

Study]

WP SFO CA ACV Arcata P 37 $ 946,775 $ 946,775 $ - $ - Improve Runway Safety Area [Improve grading of RSA for Runway 1/19] - 01/19

WP SFO CA ACV Arcata P 38 $ 387,737 $ 387,737 $ - $ -

Improve Runway Safety Area [Soil Stablization @ Runway 14 End(Design) Phase I] -

14/32

WP SFO CA AUN Auburn Municipal GA 10 $ 568,482 $ 568,482 $ - $ -

Install Taxiway Lighting [Install taxiway edge lighting - Connector taxiway to East Hangar

Area], Rehabilitate Apron [preventative sealcoat], Rehabilitate Runway [preventative

sealcoat including marking] - 07/25, Rehabilitate Taxiway [preventative sealcoat

including marking]

WP SFO CA O85 Benton Field GA 11 $ 1,546,153 $ 415,056 $ 1,131,097 $ -

Improve Runway Safety Area [Improve Runway 15/33 Safety Area - Phase I

(Construction) & Phase II (Design)] - 15/33

WP SFO CA CPU

Calaveras County-Maury Rasmussen

Field GA 8 $ 396,692 $ 396,692 $ - $ - Construct Building [Hangar development]WP SFO CA MER Castle GA 12 $ 1,050,000 $ 1,050,000 $ - $ - Rehabilitate TaxiwayWP SFO CA STS Charles M. Schulz - Sonoma County P 41 $ 332,666 $ - $ - $ 332,666 Rehabilitate Terminal Building [Phase II]WP SFO CA STS Charles M. Schulz - Sonoma County P 40 $ 80,370 $ 80,370 $ - $ - Collect airport data for Airports Geographic Information System

WP SFO CA STS Charles M. Schulz - Sonoma County P 39 $ 1,223,145 $ 1,223,145 $ - $ -

Rehabilitate Taxiway [Rehabilitate Taxiways (sealcoat & enhanced markings)],

Rehabilitate Taxiway [Rehabilitate Taxiways Z & B(reconstruction)]

WP SFO CA CIC Chico Municipal P 30 $ 2,379,529 $ 2,379,529 $ - $ -

Rehabilitate Apron [Rehabilitate aircraft parking apron Phase 2b construction (AC

section 415' x 1,100' & PCC aircraft parking position slabs 2,200 SY)]

WP SFO CA O60 Cloverdale Municipal GA 5 $ 965,426 $ 965,426 $ - $ -

Improve Runway Safety Area [Improve RSA ends] - 14/32, Install Runway Vertical/Visual

Guidance System - 14/32, Rehabilitate Runway [Rehabilitate Runway 14/32(overlay &

improve RSA @ end 32) Phase II] - 14/32

WP SFO CA O08 Colusa County GA 12 $ 62,391 $ 62,391 $ - $ -

Install Miscellaneous NAVAIDS [Rehabilitate rotating beacon and pole - Design], Install

Perimeter Fencing [Install Perimeter Fencing and Gates (Phase 2, Highway Side) -

Design], Install Runway Vertical/Visual Guidance System [Install PAPI for Runway 13/31 -

Design] - 13/31, Install Weather Reporting Equipment [Install AWOS III - Design]

Page 92 of 97

Page 93: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP SFO CA FCH Fresno Chandler Executive R 17 $ 444,752 $ 444,752 $ - $ - Conduct Environmental Study

WP SFO CA FAT Fresno Yosemite International P 61 $ 1,846,329 $ 1,846,329 $ - $ -

Improve Terminal Building [Part B], Rehabilitate Apron [Rehabilitate Commercial

Aviation eastside apron]WP SFO CA FAT Fresno Yosemite International P 59 $ 1,755,318 $ 1,755,318 $ - $ - Improve Terminal Building

WP SFO CA FAT Fresno Yosemite International P 62 $ 150,000 $ - $ 150,000 $ - Identify the airport's environmental footprint [Sustainability chapter of a master plan.]WP SFO CA FAT Fresno Yosemite International P 60 $ 3,000,000 $ - $ 3,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

WP SFO CA 2O1 Gansner Field GA 8 $ 47,472 $ 47,472 $ - $ -

Install Miscellaneous NAVAIDS [Install New Airfield Beacon - Design], Install Runway

Vertical/Visual Guidance System [Install PAPI for RWY 24 - Design] - 06/24, Install

Weather Reporting Equipment [Install AWOS III - Design], Rehabilitate Runway

[Rehabilitate Runway (Including resealing joints for runway, and associated taxiway and

apron) - Design] - 06/24, Rehabilitate Runway Lighting [Relocate threshold lights and

mark new threshold marking for RWY 6 - Design] - 06/24

WP SFO CA O16 Garberville GA 8 $ 217,554 $ 217,554 $ - $ - Install Weather Reporting Equipment [Install & Construction of AWOS, Phase II]

WP SFO CA E36 Georgetown GA 8 $ 96,393 $ 96,393 $ - $ -

Improve Runway Safety Area [RSA improvement - filled and grade drained pond

adjacent to the Runway 16-34] - 16/34WP SFO CA 3O1 Gustine GA 10 $ 200,000 $ 200,000 $ - $ - Conduct Environmental StudyWP SFO CA 3O1 Gustine GA 9 $ 204,104 $ 204,104 $ - $ - Improve Airport Drainage [Construction westside]

WP SFO CA HWD Hayward Executive R 17 $ 95,000 $ 95,000 $ - $ -

Conduct Environmental Study [Conduct EA to culvert channel per RSAT

recommendation]

WP SFO CA HES Healdsburg Municipal GA 6 $ 199,500 $ 199,500 $ - $ - Improve Runway Safety Area - 13/31, Install Weather Reporting Equipment

WP SFO CA CVH Hollister Municipal GA 13 $ 30,000 $ 30,000 $ - $ - Conduct Miscellaneous Study [Pavement Maintenance Management Plan (PMMP)]WP SFO CA O21 Hoopa GA 3 $ 75,000 $ 75,000 $ - $ - Update Airport Master Plan StudyWP SFO CA CEC Jack McNamara Field P 23 $ 134,647 $ 134,647 $ - $ - Conduct Environmental Study [Phase II EA for proposed Terminal]

WP SFO CA CEC Jack McNamara Field P 24 $ 220,000 $ 220,000 $ - $ -

Collect airport data for Airports Geographic Information System, Update Airport Master

Plan Study

WP SFO CA TVL Lake Tahoe GA 31 $ 1,474,234 $ 1,474,234 $ - $ -

Acquire Snow Removal Equipment, Rehabilitate Apron [Reconstruct terminal apron

asphalt concrete portion (approximately 350' X 250') - Phase III Construction]

WP SFO CA 1O2 Lampson Field GA 11 $ 23,750 $ 23,750 $ - $ - Conduct Miscellaneous Study [Pavement Maintenance Management Program (PMMP)]

WP SFO CA LLR Little River GA 9 $ 14,250 $ 14,250 $ - $ -

Conduct Miscellaneous Study [Conduct Pavement Maintenance Management

Plan(PMMP)]WP SFO CA LLR Little River GA 8 $ 72,000 $ 72,000 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan (ALP)]

Page 93 of 97

Page 94: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP SFO CA LVK Livermore Municipal R 20 $ 113,800 $ 113,800 $ - $ - Rehabilitate Runway [Runway 7L/25R Overlay (Including Remarking) - Design] - 07L/25RWP SFO CA MAE Madera Municipal GA 22 $ 424,797 $ 424,797 $ - $ - Construct Apron

WP SFO CA MAE Madera Municipal GA 21 $ 77,900 $ 77,900 $ - $ - Install Runway Vertical/Visual Guidance System - 12/30, Install Taxiway Lighting [Design]WP SFO CA MMH Mammoth Yosemite GA 22 $ 150,000 $ 150,000 $ - $ - Rehabilitate Terminal BuildingWP SFO CA MMH Mammoth Yosemite GA 23 $ 180,000 $ 180,000 $ - $ - Update Airport Master Plan Study

WP SFO CA OAR Marina Municipal GA 9 $ 1,764,236 $ 1,764,236 $ - $ -

Rehabilitate Runway [Runway Overlay and re-marking (Construct)] - 11/29, Rehabilitate

Runway Lighting - 11/29WP SFO CA MPI Mariposa-Yosemite GA 9 $ 395,305 $ 395,305 $ - $ - Rehabilitate Taxiway [Construction]WP SFO CA TLR Mefford Field GA 12 $ 150,000 $ 150,000 $ - $ - Improve Airport Drainage [Design], Rehabilitate Runway - 13/31WP SFO CA MCE Merced Regional//Macready Field GA 18 $ 1,047,500 $ 1,047,500 $ - $ - Expand ApronWP SFO CA KIC Mesa Del Rey GA 10 $ 279,227 $ 279,227 $ - $ - Install Perimeter Fencing [construction]WP SFO CA OAK Metropolitan Oakland International P 54 $ 1,180,644 $ - $ 1,180,644 $ - Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire two vehicles]

WP SFO CA OAK Metropolitan Oakland International P 53 $ 2,507,453 $ - $ 2,507,453 $ -

VALE Infrastructure [Install ground power to support the ground power converter units

on the RON apron]

WP SFO CA OAK Metropolitan Oakland International P 57 $ 805,900 $ 62,020 $ 743,880 $ -

Conduct Environmental Study [Environmental study for Runway Safety Area

Improvements to Runways 11/29, 9L/27R, and 9R/27L]WP SFO CA OAK Metropolitan Oakland International P 55 $ 4,259,424 $ 4,259,424 $ - $ - Rehabilitate Apron, Rehabilitate TaxiwayWP SFO CA OAK Metropolitan Oakland International P 51 $ 5,251,428 $ - $ - $ 5,251,428 Rehabilitate Apron [East Apron Phase D]

WP SFO CA OAK Metropolitan Oakland International P 56 $ 726,922 $ 726,922 $ - $ -

Collect airport data for Airports Geographic Information System, Update Airport Master

Plan StudyWP SFO CA MRY Monterey Peninsula P 56 $ 2,382,995 $ 1,861,413 $ 521,582 $ - Improve Runway Safety Area [RSA (Design)] - 10R/28L

WP SFO CA EKA Murray Field GA 8 $ 150,812 $ 150,812 $ - $ - Install Perimeter Fencing [Install Widelife Peimeter Fencing Fencing/Gates (Design)]

WP SFO CA APC Napa County R 27 $ 967,575 $ 967,575 $ - $ -

Acquire Land For Approaches [Land purchase for approach protection (Borges/Atkins

property - approximately 25.44 acres)]

WP SFO CA O02 Nervino GA 8 $ 209,518 $ 209,518 $ - $ -

Acquire Snow Removal Equipment [Acquire snow removal equipment], Install

Miscellaneous NAVAIDS [Replace existing airport beacon and compass rose - Design],

Install Weather Reporting Equipment [Install AWOS III - Design], Rehabilitate Apron

[Reseal pavement joints as a part of Pavement Maintenance and Management Program

requirements - Design], Rehabilitate Runway [Reseal pavement joints as a part of

Pavement Maintenance and Management Program requirements - Design] - 07/25,

Rehabilitate Taxiway [Reseal pavement joints as a part of Pavement Maintenance and

Management Program requirements - Design]

WP SFO CA GOO Nevada County Air Park GA 14 $ 80,000 $ 80,000 $ - $ -

Rehabilitate Runway [Touchdown area pavement repair and runway pavement

rehabilitation - Design] - 07/25

Page 94 of 97

Page 95: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP SFO CA SJC Norman Y. Mineta San Jose International P 78 $ 6,657,708 $ 1,955,200 $ 4,702,508 $ - Construct Taxiway [W, Phase III (including tie-in to connector Taxiway C)]

WP SFO CA SJC Norman Y. Mineta San Jose International P 79 $ 2,245,529 $ 385,617 $ 1,859,912 $ - Construct Taxiway [Design Phase IV and V]

WP SFO CA VCB Nut Tree GA 16 $ 2,098,493 $ 2,098,493 $ - $ -

Acquire Land For Approaches [Land acquisition reimbursement for Runway 20 approach

protection (approximately 13 acres)]

WP SFO CA O27 Oakdale GA 10 $ 100,000 $ 100,000 $ - $ -

Install Perimeter Fencing [Design], Rehabilitate Taxiway [Parallel and connector taxiways

(approximatley 25' X 4,500') - Design]

WP SFO CA O69 Petaluma Municipal R 21 $ 52,250 $ 52,250 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Program (PMMP)],

Install Miscellaneous NAVAIDS [Install Pilot Controlled Lighting and Install Rotating

Beacon]

WP SFO CA PVF Placerville GA 13 $ 373,426 $ 373,426 $ - $ -

Improve Runway Safety Area [Improve Runway 5 RSA by eliminating in-line taxiway,

install new lighting and marking and construct a new connector taxiway to Runway 5] -

05/23, Install Perimeter Fencing [approximately 19,000 LF including pedistrian, manual

and automatic gates - Design], Rehabilitate Apron [West apron including crack repair

and remarking]WP SFO CA PTV Porterville Municipal GA 11 $ 2,048,286 $ 162,080 $ 1,886,206 $ - Rehabilitate Runway [Part B] - 12/30WP SFO CA PTV Porterville Municipal GA 10 $ 128,886 $ 128,886 $ - $ - Rehabilitate Runway [Part A] - 12/30WP SFO CA RBL Red Bluff Municipal GA 11 $ 83,160 $ 83,160 $ - $ - Collect airport data for Airports Geographic Information SystemWP SFO CA RDD Redding Municipal P 40 $ 237,500 $ 237,500 $ - $ - Expand Terminal Building [Expand Terminal Building - Design]WP SFO CA O32 Reedley Municipal GA 11 $ 723,441 $ 723,441 $ - $ - Rehabilitate Taxiway

WP SFO CA O88 Rio Vista Municipal GA 12 $ 139,981 $ 139,981 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Plan], Install

Perimeter Fencing [Replace existing perimeter fencing (including gates) - Last Phase]

WP SFO CA O05 Rogers Field GA 13 $ 45,923 $ 45,923 $ - $ - Rehabilitate Taxiway [Reconstruct taxilanes (approximately 25' X 1,800') - Design]

WP SFO CA FOT Rohnerville GA 11 $ 275,690 $ 275,690 $ - $ - Install Weather Reporting Equipment [Install and Construction of AWOS, Phase II]WP SFO CA O09 Round Valley GA 5 $ 72,000 $ 72,000 $ - $ - Update Airport Master Plan Study [Update Airport Layout Plan(ALP)]

WP SFO CA O09 Round Valley GA 6 $ 14,250 $ 14,250 $ - $ -

Conduct Miscellaneous Study [Conduct Pavement Maintenance Management

Plan(PMMP)]

WP SFO CA SMF Sacramento International P 45 $ 8,653,770 $ 1,153,770 $ 7,500,000 $ -

Construct Apron [Terminal Modernization Program - Construct terminal apron and

associated taxiways, Remain Over Night (RON) Pad, and partial crossfield taxiway

(Taxiway W)]WP SFO CA SMF Sacramento International P 46 $ 140,442 $ - $ 140,442 $ - Acquire Equipment [Acquire high speed sweeper]

WP SFO CA SMF Sacramento International P 47 $ 1,115,687 $ 1,115,687 $ - $ -

Construct Apron [Terminal Modernization Program - Construct terminal apron and

associated taxiways, Remain Over Night (RON) Pad, and partial crossfield taxiway

(Taxiway W)]

Page 95 of 97

Page 96: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP SFO CA MHR Sacramento Mather R 16 $ 3,041,791 $ 3,041,791 $ - $ - Rehabilitate Apron [Rehabilitate West Cargo Apron (approximately 2,750' X 750')]WP SFO CA SNS Salinas Municipal GA 20 $ 2,115,000 $ 150,000 $ 1,965,000 $ - Rehabilitate Taxiway [Between Txy D and Rwy 13/31]WP SFO CA SFO San Francisco International P 54 $ 1,300,000 $ - $ 1,300,000 $ - Collect airport data for Airports Geographic Information SystemWP SFO CA SFO San Francisco International P 50 $ 1,500,000 $ - $ 1,500,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL

WP SFO CA SFO San Francisco International P 51 $ 600,000 $ 600,000 $ - $ -

Conduct Miscellaneous Study [Pavement Maintenance Management Program (PMMP)],

Rehabilitate Apron [Rehabilitate Boarding Area C and E Apron (Design)], Rehabilitate

Taxiway [Rehabilitate Taxiway S (Reconstruction) design]

WP SFO CA SFO San Francisco International P 55 $ 1,500,000 $ 1,500,000 $ - $ -

Conduct Environmental Study [Improve Runway Safety Areas for Runways

28L,28L,19L,&19R]

WP SFO CA SFO San Francisco International P 53 $ 4,760,000 $ 4,478,837 $ 281,163 $ - Rehabilitate Apron [Rehabilitate Apron Boarding Area F (Reconstruction)]WP SFO CA SBP San Luis County Regional P 38 $ 2,153,650 $ 1,560,463 $ 593,187 $ - Construct Terminal Building [Phase I - Design]WP SFO CA D86 Sequoia Field GA 5 $ 95,000 $ 95,000 $ - $ - Rehabilitate Apron [design]WP SFO CA *CAS State of California 6 $ 600,000 $ 600,000 $ - $ - Conduct State System Plan Study

WP SFO CA SCK Stockton Metropolitan P 29 $ 3,054,199 $ 738,612 $ 2,315,587 $ -

Improve Terminal Building, Modify Aircraft Rescue & Fire Fighting Building [Modify ARFF

building door], Rehabilitate Runway Lighting [Replace electrical regulator] - 11R/29L

WP SFO CA SCK Stockton Metropolitan P 28 $ 2,010,511 $ 839,765 $ 1,170,746 $ -

Rehabilitate Taxiway [Rehabilitate Taxiway J (approximately 35' X 700') including

installation of 2 lighted signs and Taxiway H (approximately 50' X 800')]

WP SFO CA O52 Sutter County GA 6 $ 74,100 $ 74,100 $ - $ -

Install Runway Vertical/Visual Guidance System [Replace Precision Approach Path

Indicators (PAPI) at Runway 17 and airport beacon and rehabilitat segmented circle with

windcone - Design] - 17/35, Rehabilitate Runway Lighting [Rehabilitate exisitng runway

lighting system including lights, signs, taxiway edge reflectors, and new electrical vault -

Design]WP SFO CA O52 Sutter County GA 7 $ 75,900 $ 75,900 $ - $ - Update Airport Master Plan StudyWP SFO CA O86 Trinity Center GA 7 $ 142,500 $ 142,500 $ - $ - Install Weather Reporting Equipment [Install AWOS]

WP SFO CA TRK Truckee-Tahoe GA 25 $ 148,934 $ 148,934 $ - $ -

Rehabilitate Runway [Rehabilitate Runway 10/28 pavement west of Taxiway R

(approximately 100' X 5,100') - Design] - 10/28, Rehabilitate Taxiway [Rehabilitate

Taxiway A including connector taxiways to Runway 10-28 (approximately 35' X 7,500') -

Design]WP SFO CA VIS Visalia Municipal GA 26 $ 153,900 $ 153,900 $ - $ - Update Airport Master Plan StudyWP SFO CA VIS Visalia Municipal GA 27 $ 35,150 $ 35,150 $ - $ - Improve Airport Drainage [design]

WP SFO CA WVI Watsonville Municipal GA 11 $ 52,250 $ 52,250 $ - $ -

Conduct Miscellaneous Study [Conduct Pavement Maintenance Management Plan

(PMMP)]

Page 96 of 97

Page 97: FAA - Office of Airports Report Date: 11/30/2011...Conduct Airport Master Plan Study [Airport Master Plan] AL AAL AK +01G Chefornak (Proposed CM) 2 $ 21,692,300 $ 8,694,932 $ 12,997,368

FAA - Office of Airports Report Date: 11/30/2011

Region ADO State LOCID AirportService

Level

Grant Seq

Number

AIP Federal

Funds Entitlement Discretionary ARRA Brief Description of Work

FY 2010 Grants Awarded

WP SFO CA JAQ Westover Field Amador County GA 15 $ 567,212 $ 567,212 $ - $ -

Improve Runway Safety Area - 01/19, Rehabilitate Runway [Approximately 3,401' X 60'] -

01/19, Rehabilitate Taxiway [parallel and connector taxiways (approximately 4,000' X

30')]

WP SFO CA MYV Yuba County GA 14 $ 968,768 $ 968,768 $ - $ -

Rehabilitate Apron [Approximately 100,000 SF], Rehabilitate Taxiway [Approximately

3500' X 25' including drainage improvements]WP SFO NV L92 Alamo Landing Field GA 4 $ 400,000 $ 400,000 $ - $ - Construct Runway [Design] - 14/32, Construct Taxiway [Design]

WP SFO NV BVU Boulder City Municipal P 17 $ 970,437 $ 970,437 $ - $ -

Improve Runway Safety Area [Construction] - 15/33, Rehabilitate Runway [Construction]

- 15/33WP SFO NV CXP Carson R 19 $ 34,200 $ 34,200 $ - $ - Conduct Environmental StudyWP SFO NV CXP Carson R 20 $ 1,694,338 $ 369,031 $ 1,325,307 $ - Construct Taxiway

WP SFO NV EKO Elko Regional P 38 $ 580,477 $ 580,477 $ - $ -

Improve Runway Safety Area [Improve Runway 5 RSA including regrading the RSA,

realign access road and realign perimeter fencing] - 05/23

WP SFO NV EKO Elko Regional P 39 $ 403,750 $ 403,750 $ - $ -

Rehabilitate Runway [Design (Approximately 7,214' x 150')] - 05/23, Rehabilitate Runway

Lighting [Rehabilitate runway lighting and signage - Design] - 05/23WP SFO NV FLX Fallon Municipal GA 11 $ 1,693,850 $ 1,693,850 $ - $ - Rehabilitate Runway - 03/21, Rehabilitate Runway Lighting - 03/21WP SFO NV HND Henderson Executive R 23 $ 1,434,668 $ 1,434,668 $ - $ - Acquire Land for Development [Phase I]WP SFO NV LAS McCarran International P 73 $ 11,632,903 $ 5,332,235 $ 6,300,668 $ - Rehabilitate ApronWP SFO NV LAS McCarran International P 75 $ 2,812,500 $ - $ 2,812,500 $ - Acquire Land For Approaches [2.99 acres]WP SFO NV LAS McCarran International P 74 $ 1,077,019 $ 1,077,019 $ - $ - Acquire Land For ApproachesWP SFO NV VGT North Las Vegas P 30 $ 1,477,461 $ - $ 1,477,461 $ - Rehabilitate Apron

WP SFO NV VGT North Las Vegas P 29 $ 919,343 $ 919,343 $ - $ -

Install Airfield Guidance Signs [Combine with slurry and remarking project.], Rehabilitate

Taxiway [Pavement repair and remarking per PART 139 requirements]

WP SFO NV 10U Owyhee GA 6 $ 3,646,769 $ 3,646,769 $ - $ -

Construct Access Road [Access Road (approximately 24' X 2,200')], Construct Apron

[Construct aircraft and helicopter parking apron (approximately 150,000 SF)], Construct

Runway [Construct Runway 05/23] - Plan-1, Construct Taxiway [Parallel Taxiway and

connectors]WP SFO NV RTS Reno/Stead R 29 $ 3,494,324 $ 853,367 $ 2,640,957 $ - Improve Runway Safety Area [Phase II Construction] - 08/26

WP SFO NV RNO Reno/Tahoe International P 88 $ 6,000,000 $ - $ 6,000,000 $ - Noise Mitigation Measures for Residences within 65 - 69 DNL [Phase 15]WP SFO NV RNO Reno/Tahoe International P 87 $ 5,838,585 $ 1,684,107 $ 4,154,478 $ - Rehabilitate Apron [Phase 14]WP SFO NV SPZ Silver Springs GA 13 $ 80,750 $ 80,750 $ - $ - Conduct Miscellaneous Study [Airport drainage study]WP SFO NV TPH Tonopah GA 11 $ 95,000 $ 95,000 $ - $ - Update Airport Master Plan Study [ALP Update]

WP SFO NV WMC Winnemucca Municipal GA 15 $ 28,500 $ 28,500 $ - $ -

Conduct Environmental Study [ALP update & revise/supplement EA for proposed land

acquistion], Update Miscellaneous Study [Update Airport Layout Plan]