34
Custodianship Clare Grosser Spatial Information Infrastructure Danny Broadbent Datamaxx Technologies Newtech Colac, Nov 2005

F1 Data Shareing & Custodianship program - … · 2011-06-21 · The Custodianship Program Why do anything ? Program v Project approach. ... we need a sustainable program , not individual

Embed Size (px)

Citation preview

Custodianship

Clare GrosserSpatial Information Infrastructure

Danny BroadbentDatamaxx Technologies

NewtechColac, Nov 2005

Agenda

• What is Custodianship

• The Custodianship Program

• Policy & Practice

• Program Status

• Summary

• VSIS

• Primary Role of a Custodian

• How is Custodianship different to data sharing

What is Custodianship

• Purpose of custodianship

“ … establish the preconditions that enable the effective use of spatialinformation to advance Victoria’s social, economic, and environmental

goals...”

VSIS

“ … such information must not only exist, it must be easy to identify whohas it, whether it is fit for the purpose at hand, how it can be accessed, and

whether it can be integrated with other information … “

• Released in May 2005

• VSIS 2004 - 2007

• VGIS

Victorian Spatial Information Strategy

Primary Role of a Custodian

• To Maintain the dataset

– the Custodian decides the standards, quality and currency of the datain consultation with the users

• AND To generate a Product Description

– legal, technical and commercial clarity that allows effective use of thedataset

– This includes:

• Metadata

• Access and Distribution

• Quality

• Pricing and Licensing

• Description of the product

• Technical specifications

Metadata

Access

DistnQuality

Pricing

LicenseDesc

Tech

Spec

• On most occasions, Data Sharing has NO defined, established &maintained pre-conditions for :-

How is Custodianship different toData Sharing

– Metadata

– Access & distribution

– Quality

– Pricing & licensing

– Product description, and

– Tech Specs

The Custodianship Program

Why do anything ?

Program v Project approach

Why do anything?

• Awareness

• what is available

• who has it / where is it

• what is it

• is it fit for my purpose

• how do I gain access

• Awareness

• Cost

• “one to one” v “many to many”

• sustainable processes & infrastructure

• reduced cost to industry

Why do anything?

• Awareness

• Cost

• Value

• authoritative datasource

• Metadata

• standards

• quality in consultation with users

• consistency

• reliability & confidence

• improved strategic & operational decisions

Why do anything?

• Awareness

• Cost

• Value

• EM & CT

• coordination during specific events

• awareness

• strategic & operational needs

• “fit for purpose”

• time constraints

Why do anything?

Program v Project approach

VSIS 2004-2007

“ … It is neither desirable or possible for a single entity to maintain allspatial information - we need custodians & custodianship agreements …”

Therefore, we need a sustainable program, not individual projects

Project

• Often Reactive

• Event driven

• Limited duration of event/project

• Many one to one agreementsbetween organisations/agencies

• Various disclaimers, usage control

• No maintenance program

• Potential risk exposure

• Standards and quality?

• Higher costs

• availability of data?

Program

• Proactive

• Prepared & tested

• Ongoing

• Custodianship agreements,metadata, consistent product

• Clear custodian management

• Maintenance program per Dataset

• Risk managed

• Managed Standards and quality

• Lower Costs

• Awareness of Datasets

Program v Project approach

Project Approach - Topographic Map

New Topo Map

Data

Created every

20 –30 years

Obtain New data

Aerial Photography,

Satellite imagery, etc

Program Based Approach - Topographic Map

Ongoing

Governance &Custodianship

> 40 custodians

Spatial

Data

Library

USERSHardCopy

Map

Digital

Map

Digital Topo

Map

(195 layers)

VARs

DSPs

USERS

Products & Services

Access & Distribution

Admin

Transport

Property

etc

Framework Product

20/30 Products

Program v Project approach

A data-centric view of Custodianship Datasets

Police

Fire

Ambulance

SES

Schools

Hospitals

Aged care

Community

Centres

Key buildings

Sports facilities

CCTV

Agencies

Band 2

Cadastre

Roads

Imagery

Topography

Census

Admin. Bdys.

Core capabilityachievable now basedon an “all-hazards”

approach

Band 1

Fundamental

Electricity

Sub-stations

Gas

Water

Hydrants

Sewerage

Stormwater

Telecoms

Demography

Employment

Valuations

Public transport

schedules

Pedestrians

Floor plans

Hazard models

Utilities

Band 3

Dynamic

Program v Project approach

DSE/DPICustodianshipGuidelines

Government

VGSC

Policy & PracticeAustralian Spatial Framework

VSISCustodianshipGuidelines

Victorian Framework

VSC

SII CUSTODIANSHIPPROGRAM

NationalFramework

ANZLICCustodianshipGuidelines

Mercury 05 Exercise

Policy & PracticeCustodianship Framework

ANZLIC FrameworkPolicies Metadata guidelines Custodianship guidelines

ISO Quality Stds ISO 19115 - metadata ISO 19114/113 - Quality ISO 19131 Product Description

VSIS2004-2007 Strategy Metadata guidelines Custodianship guidelines

Custodianship Agreements Datasets Metadata Product Descriptions

VSDDMetadata directory All datasets in Vic VicMap & Non-VicMap

Access Framework Product Descriptions Access, Licences, Costs, Quality

Custodians Product Description Metadata, Access, Licensing, Quality

Policy & PracticeAwareness Framework

Example Dataset:-

CFA Total Fire Ban DistrictsMetadata, and

Contact detail per ANZLIC guidelines

Policy & PracticeAwareness Framework

Program Status

• Current Plan

• Data demo

• Issues

• Where are we going ?

• Custodianship & OBSD

• Short Term target - Mercury 05 Deliverables

– 5 Government Departments

– 3 Utilities, 1 each in Water, Electricity and Gas

– by October 2005, to meet Mercury 05 schedule

– Brief to VSC December 2005

• Longer Term target -

– All Government Departments and Utilities sharing data under thesearrangements

– Self Driven Program

• Parallel requirements are found

– Commissioner for Environmental Sustainability

– Government Services Directory

– Sustainability Victoria

Current Plan

Custodial arrangements inGovernment - Completed

CU STO D IAN DATA SET NAM E DESCR IPT IO N LO CAT IO N

V icto r ian E le c to ra l

C omm ission

V ic to rian E lec to ra l

B ound arie s

U pp er and L ow er ho u se e le c to ra l

bo und arie s fo r V ic to r ian 1 9 91 and

2001

V icm ap A dm in

A ustra lia P o st P o stcod e B ound arie s T he au tho rita tive , lo ca lity a lign ed

po stco d e bounda rie s .

V icm ap A dm in

D epartm en t fo r

V ic to r ian C omm un itie sLoca l G overnm en t

D iv is io n

Lo ca l G overnm en t A rea

B ound arie s

T he p rop e rty and ro ad s a lig ned

in te rp re ta tio ns o f the G aze tted LG A

desc rip tio ns

V icm ap A dm in

D epartm en t o f J u stic e

P o rtfo lio In fra s tru c tu re

D eve lopm en t

D O J S e rv ices and

F ac ilitie s

T h is is a p o in t d a ta se t d ep ic ting

so m e o f D O J 's se rv ic e s and

fac ilit ie s . T h is inc lud es C om m un ity

C o rre c tio ns , P riso ns , L aw C ourts

e tc…

S II M aste r D a ta

L ib ra ry

D epartm en t o f H um an

Serv icesM etropo litan H ea lth and

A ged C are S erv ice s D iv ision

V ic to rian H osp ita ls T h is is a p o in t d a ta se t d ep ic ting the

H o sp ita ls and 24 hour em ergency

fac ilit ie s fo r V ic to ria

S II M aste r D a ta

L ib ra ry

D epartm en t fo r

V ic to r ian C omm un itie s

Loca l G overnm en t

D iv is io n

W ard B ound arie s T he sta te s w a rd b o und arie s fo r

V ic to r ia a s a t June 2 005 .

V icm ap A dm in

Custodial arrangements inGovernment - being negotiated

CUSTODIAN DATASET NAME LOCATION STATUS

Department of

Education and TrainingChief Information Officer

Vicmap Education DET Agreement Signing

Commenced

Australia Post Red Post Boxes Vicmap Admin On Hold

Department of Justice

Portfolio Infrastructure

Development

Fire and Police Stations MFB, CFA, Vic

POLICE

Negotiations will commence

2006

Department of Human

ServicesMetropolitan Health and

Aged Care Services Division

Victorian Aged Care,

Kindergartens, Public

Housing, Mental Health

DHS Negotiations will commence

2006

Department of

Infrastructure

Critical Infrastructure DOI Negotiations will commence

2006

Department of Industry,

Innovation and

Regional Development

Tourism Information DIIRD Negotiations Commenced,

Agreement signing early 2006

Department of

Infrastructure

Vicmap Public Transport DOI Negotiations Commenced,

Agreement signing early 2006

Custodial arrangements for Utilities

CUSTODIAN DATASET NAME LOCATION STATUS

Citipower Distribution Boundary

Overhead lines

Underground Cables

Citipower Agreement for Mercury05

Access to Emergency Services

only

Powercor Distribution Boundary

Overhead lines

Underground Cables

Powercor Agreement for Mercury05

Access to Emergency Services

only

Alinta NetworkDistribution Boundary -

Gas and Electricity

Overhead lines

Underground Cables

Gas network

United Energy

Multinet

Agreement signing commenced

Coliban Water Water reticulation

Distribution boundaries

Sewerage

Coliban Negotiations commenced

Program Issues

– Education and detail - how theprogram works in practice

– Risk & liability - Mitigation

– Privacy

– Cost

– Value

– Commercial sensitivity

– Benefits to Custodian

Issues

Mercury 05 - Issues

– Awareness

– Value

– Time - meeting time schedule

– Fit for purpose

– Admin Issues - communicationand IT

• VSIS 2004-2007

• Developing Custodianship Implementation plan until 2007

• Extend custodianship across the whole Industry

• Support the Custodianship framework being established throughthis program

– ensure datasets have nominated custodians

– ensure the datasets are managed in accordance with VSIS

• Raise awareness of Custodianship within the SI industry

• identify blockages to success

– privacy, risk, liability, confidentiality, commercial sensitivity

– cost, value, sponsorship

• coordination with other programs, projects & initiatives

Where are we going?

OBSDMaster DataLibrary

OBSD WebInterface

CustodianshipMetadata

12

34

56

DataSetsMetadata

Data DictionaryAccess ControlDisclaimers

Licensing/PricingProduct Description

Tech SpecData Dictionary

AccessMetadata MgtDataset accessUser AccessNew DataSets

Custodians

AccessAwareness

Users

who accessed my dataset?How often?

are they approved?how may total hits?

QA & reporting

Security & Access Controlspatial & text Searching

In Sync

Access

Custodianship & OBSD

Delivery to Usersthru DSPs/VARs

DataSets Supply byCustodians

Summary

• What is Custodianship

• The Custodianship Program

• Policy & Practice

• Program Status

– Current Plan

– Data demo

– Feedback & Issues

– Where are we going

– Custodianship & OBSD

How can you be involved

Contact SII

Elizabeth Thomas, Business and Policy Manager, SII

[email protected]

Clare Grosser, Project Manager, SII

[email protected]

Danny Broadbent, Project Manager, Datamaxx

[email protected]

Custodianship

ACKNOWLEDGEMENTS

• OBSD

– Susan Brown, Manager Service Delivery SII

– Joel Fagan, Manager Information Services, SII

• Mercury 05

– Peter Mosley, Manager Emergency Services Information, SII

– David Williams, Ian Adams, Jacqui Carter, Victorian Police

Thankyou

Questions