Jharkhand: Administrative Approval 2011-12 Page 1
F. No.......................................... Government of India
Ministry of Health & Family Welfare Department of Health & Family Welfare
Nirman Bhawan, New Delhi
Dated: 05.05.11 To, The Mission Director, (NRHM) Government of Jharkhand Government Vaccine Institute Campus RCH Namkum Ranchi-834010 Subject: Approval of State Programme Implementation Plan of NRHM for the year
2011-12
Madam/Sir,
This refers to the draft Programme Implementation Plan (PIP) for the year 2011-
12 submitted by the State of Jharkhand and the discussions held on the same in the Pre
Appraisal meeting held on.18.02.2011 at Ranchi and NPCC meeting held on 24.03.2011.
at New Delhi.
2. The administrative approval of the PIP for your State is conveyed for an amount of
Rs 555.35 Cr. (Rupees Five Hundred Fifty-Five crore and Thirty Five lakh only).
(Detail at Table C below) against the resource envelope available comprising of the
following:-
Table A
(Rs. in Crore)
Likely Uncommitted Unspent Balance Available under NRHM as on 1.4.2011
19.92
GOI Resource Envelope for 2011-12 under NRHM 458.88
15% State share ( 2011-12) 80.98
Total 559.78
Jharkhand: Administrative Approval 2011-12 Page 2
Table B
The Resource Pool wise break up of total Resources under NRHM
(Rs. in Crores)
Sl
No.
Likely
Uncommitted
Unspent
balance
available as on
1.4.2011
GoI Resource
Envelope under
NRHM
Total
1 RCH Flexible Pool 5.00 131.31 136.31
2 NRHM Flexible Pool 10.00 153.86 163.86
3 Immunization ( from
RCH Flexible Pool)
4 NIDDCP 0.00 0.24 0.24
5 IDSP 1.23 1.47 2.70
6 NVBDCP 2.25 50.69 52.94
7 NLEP 0.50 1.80 2.30
8 NPCB 0.60 5.93 6.53
9 RNTCP 0.34 10.12 10.46
10 Direction & Admn.
(Treasury route)
0 95.92 95.92
11 PPI Operation Cost 0 7.54 7.54
12 15% State share 0 80.98 80.98
Total Resource
Envelop
19.92 539.86 559.78
Committed Unspent
Balance up to 2010-11
to be Revalidated in
2010-11
136.65
Jharkhand: Administrative Approval 2011-12 Page 3
Table C
SUMMARY OF APPROVAL
(Details provided in respective Annexure)
Scheme/Programme Approved Amount
( In Rs. Crores)
1. RCH Flexible Pool
(Details at Annexure-I)
174.12
2. NRHM Mission Flexible Pool
(Details at Annexure-II)
189.96
3. Immunization ( from the RCH Flexible Pool)
(Details at Annexure-III)
23.77
4. NIDDCP
(Details at Annexure-IV)
0.24
5. IDSP
(Details at Annexure-IV)
1.97
6. NVBDCP
(Details at Annexure-IV)
51.29
7. NLEP
(Details at Annexure-IV)
2.18
8. NPCB
(Details at Annexure-IV)
6.16
9. RNTCP
(Details at Annexure-IV)
9.74
10 PPI Operation Cost
(Details at Annexure-III)
Included in
Immunization
11 Infrastructure Maintenance 95.92
TOTAL
555.35
Jharkhand: Administrative Approval 2011-12 Page 4
3. The approval is subject to the following mandatory requirements. Non
compliance to any of the following requirement may result in withholding of
grant to the State:
A. Release of the first tranche of funds
The first tranche of funds would be released by GOI to States for PIPs 2011-12 on
fulfilment of the following conditions:
1. A full- time Mission Director for NRHM (for States having resource envelop of
more than Rs 50 crores), other than the administrative Secretary.
2. A full- time Director/Joint Director/Deputy Director (Finance) (depending on
resource envelop of State), from the State Finance Services not holding any
additional charge outside the Health Department.
B. Release of Second Tranche of Funds
Action on the following issues would be looked at while considering the release of
second tranche of funds:
3. The State shall ensure that 15% of the State share, based on release of funds by
Government of India is credited to the account of the State Health Society.
4. Increase in State Plan Budget for 2011-12 by at least 10% over and above the 15%
State share under NRHM.
5. State shall articulate policy on entitlements, and ensure rational prescriptions,
timely procurements, smooth distribution to facilities, prescription audits, EDL
in public domain, computerized drugs and logistic MIS System with the
objective of minimizing out-of-pocket expenses.
C. Monitoring Requirements
6. State shall ensure submission of quarterly report on the Measurable
Target/indicators at the end of every quarter as per Attachment A and expected
outputs stated in the Record of Proceeding (RoP) of NPCC in Attachment B. All
approvals are subject to the observations made in the RoP which is inclusive of
Jharkhand: Administrative Approval 2011-12 Page 5
commodity grants under Disease Control Programme in the respective
Annexures.
D. Human Resource
7. All Posts under NRHM shall be on contract and for the Plan period. All such
appointments would be for a particular facility and non transferable in nature.
Priority in contractual recruitments and placements would be for backward
districts, difficult, most difficult and inaccessible health facilities. The contractual
appointments would be need based. Performance must be measured against pre-
determined benchmarks regularly.
8. All States would ensure that there is rational deployment of trained HR and
appropriate skill mix of human resource is made available to ensure provision of
minimum service guarantee to health facilities. All professionals multi skilled
under NRHM shall be placed in facilities where the skills can be utilized.
Irrational deployment would render the expenditure ineligible under NRHM.
9. State shall prepare action plan for recruitment, deployment and training of
human resources within six months and send it to the ministry.
E. Infrastructure
10. All civil works undertaken to achieve IPHS standards, would be based on
expected patient load and priority would be accorded to the backward districts,
inaccessible and remote areas as per prescribed criteria.
11. In all new constructions, care should be taken to ensure that the locations of
these facilities are such that beneficiary households can access them easily. They
should preferably be located in the midst of habitation and definitely not in
agriculture fields, outskirts of villages, or in unhygienic environment under any
circumstances. Any deviation from the above would be treated as ineligible
expenditure under NRHM.
12. All new constructions would require prior approval of GoI if names of facilities
have not been mentioned in the NRHM-PIP, and also if any shift is proposed. No
shift from backward and inaccessible areas would be allowed.
Jharkhand: Administrative Approval 2011-12 Page 6
13. The State shall set up implementation arrangement to monitor all civil works
being undertaken, on a monthly basis, to ensure quality of works and completion
as per schedule.
F. Communitization
14. The State shall ensure that all operational guidelines relating to VH&NDs are
complied with.
15. The State shall ensure timely performance based payments to
ASHAs/Community Link Workers and put in place a supportive supervision
mechanism is put in place within six months.
16. The State shall ensure that RKS meets as frequently as possible and mandatorily
at least once in every quarter to review proper utilisation of allocated funds for
achievement of goals. The proceedings of such meetings should be maintained
for scrutiny.
G. Financial
17. The State shall not make any change in allocation among different components/
activities without approval of GoI. Any proposal for re-appropriation between
activities within activities should be informed to GoI in advance. However, such
re-appropriation should reflect realignment of activities in accordance with
priority to high focus districts/involvement of NGOs etc.
18. The State shall ensure the completion of delegation of administrative and
financial powers during the current financial year. Funding of NRHM to the
State in 2011-2012 will be based on clear delegation as per earlier directions.
19. The State shall follow all the financial management systems under operation
under NRHM and shall submit Audit Reports, Quarterly Summary Concurrent
Audit Report, FMRs, Statement of Fund Position, as and when they are due.
State shall undertake Monthly District Audit and periodic assessment of the
financial system.
20. The accounts of the State/ grantee institution/ organization shall be open to
inspection by the sanctioning authority and audit by the Comptroller and
Auditor General of India under the provisions of CAG (DPC) Act 1971 and
Jharkhand: Administrative Approval 2011-12 Page 7
internal audit by Principal Accounts Office of the Ministry of Health & Family
Welfare.
21. State shall ensure submission of details of unspent balance indicating, inter alia,
funds released in advance and funds available under State Health Societies. The
State shall also intimate the interest amount earned on unspent balance. This
amount can be spent against activities already approved.
H. Outcomes
22. The state shall focus on key NRHM goals of reduction in MMR,IMR & TFR and
overall disease burden. All activities and expenditure must be linked with
outcomes and technical interventions/strategies recommended by MoHFW
implemented in right earnest.
23. The State shall ensure establishment of supportive supervisory structures for
RCH programme, particularly in districts having low institutional delivery.
24. State shall ensure taking appropriate action to monitor the performance of the
cold chain /ILR Points and implementation of supply chain management
systems.
Yours faithfully,
(Dr. Sajjan Singh Yadav) Director NRHM
Copy to:
1. All JSs in the Ministry
1. All Programme Division Heads of NRHM/ RCH/ Disease Control Programmes
2. DS/Director Finance (NRHM)
3. All Under Secretaries concerned
4. IFD
5. PPS to Secretary(H&FW)/PS to SS&MD, NRHM
6. Sanction Folder
7. File of Concerned States.
Jharkhand: Administrative Approval 2011-12 Page 8
Attachment - A
MONITORING TARGETS TO BE ACHIEVED IN 2011-12
Activity / Measurable indicator Achievement in/ up to 2010-11
Target in (Cumulative) up to 2011-2012
Addition during the year
I Monitoring Progress Against Standards:
A Maternal Health
1 Institutional Deliveries 317305 (34%) 528751 (55%) 211446(21%)
2 24x7 Facilities 20 75 55
3 Functional First Referral Units 22 52 30
B Child health
4 Sick New Born Care Units 2 7 5
5 New Born Care Corners 0 203 203
6 Stabilization Units in CHCs/ BPHCs
0 32 32
7 Full Immunization 64% 70% 6%
C Population Stabilization
8 Male Sterilization 13496 30000 16504
9 Female Sterilization 99288 175000 75712
10 No. of IUD Insertions 105693 300000 194307
D Disease Control
11 Annualized New Smear Positive Detection Rate of TB
77 85 8
12 Success Rate of New Smear Positive Treatment initiated on DOTS.
93 (Success Rate) 93 (Cure Rate) 0
13 ABER for Malaria 10.64 % Above 15 % 4.36
14 API for malaria (per 1000 population)
5.07 Less than 4.0 1.07
15 Annual New Case Detection Rate for Leprosy (per 1,00,000 population)
12.74(Feb’2011)- -
16 Cataract Surgeries performed 54694 75000 20306
II Human Resources including Training
17 Appointment of ANMs 5000 5500 500
18 Appointment of staff nurses (contractual)
500 900 400
19 Doctors trained on EmOC 60 84 24
20 Doctors trained on LSAS 60 92 32
21 Doctors trained in NSV/ Conventional vasectomy
135 165 30
Jharkhand: Administrative Approval 2011-12 Page 9
Activity / Measurable indicator Achievement in/ up to 2010-11
Target in (Cumulative) up to 2011-2012
Addition during the year
22 Doctors trained in Abdominal Tubectomy (Minilap)
44 68 24
23 Doctors trained in laparoscopic Tubectomy
2 - -
24 Personnel trained in IMNCI (MO/CDPO/ CDS/ AWW/ ANM/ Supervisor)
13576
17295
ANM + AWW – 3600 (150batch)
Supervisor 120 (5 Batch)
3720
III Communitization Processes
25 Functional VHSCs 30012 32000 1988
26 ASHAs with Drug kits 40964 (Replacement)
41000 (Refilling of Drug Kit)
36
IV Improved Management
27 Tracking of pregnant mothers and children
Till Dec. in all District
All 24 Districts -
28 Evaluation and Assessment of NRHM Activities
3
(Concurrent evaluation of NRHM activities
-Impact of MMU services.
-Impact of untied funds)
3 0
29 Cold Chain Management
(number of functional ILR points) 218 218 0
V Infrastructure
30 Construction of sub-centre buildings
73 (to be completed in June )
238 165
31 Construction of PHC buildings 5(to be completed in June )
15 10
32 Construction of CHC buildings 13(to be completed in June )
23 10
33 Construction of District Hospital buildings
- - -
34 Construction of Other Hospital buildings
- -
Jharkhand: Administrative Approval 2011-12 Page 10
Activity / Measurable indicator Achievement in/ up to 2010-11
Target in (Cumulative) up to 2011-2012
Addition during the year
VI MMU and Referral Transport
35 Functional Mobile Medical Units 65 functional+38 non functional
103 Functional MMUs
38 functional MMUs
36 Emergency and Referral Transport 0 277 (Ambulance on PPP mode)
277
Jharkhand: Administrative Approval 2011-12 Page 11
Attachment B
NATIONAL RURAL HEALTH MISSION
RECORD OF PROCEEDINGS 2011-12
Record of Proceedings of the National Programme Coordination Committee (NPCC)
for Jharkhand held under the Chairmanship of Shri P.K. Pradhan, Special Secretary
and Mission Director, NRHM for approval of NRHM Programme Implementation
Plan (PIP) of States and UTs for the year 2011-12.
I. A meeting of the NPCC of NRHM was held under the Chairmanship of SS & MD,
NRHM, to approve the PIP of Jharkhand on 24.03.2011. The list of members who attended the
meeting is placed at Annex. V. The NPCC meeting was convened after the pre-appraisal
meeting for the State, with written and oral comments provided to the State to modify the
proposal before the NPCC.
II. State Government reported the likely uncommitted unspent balance available under
NRHM as on 1.4.2011, and were apprised of the GOI Resource Envelope for 2011-12 under
NRHM. The Monitorable Indicators is placed at Attachment A for the State were also indicated.
After detailed discussions and subsequent deliberations, the PIP was finalised for amounts
indicated under different components as detailed in the Attachment B (Annexure I to IV).
III. The attention of the State was drawn to the following areas for further action :
A. Planning
1. The State Government shall, within 45 days of the issue of Record of Proceedings by the
Ministry of Health and Family Welfare, issue detailed resource envelop and activities
approved for each district.
B. Human Resource
2. All posts under NRHM on contract and based on local criteria shall be done by the Rogi
Kalyan Samiti /District Health Society. Residence at place of posting must be ensured.
3. Blended payments comprising of a base salary and a performance based component, should
be encouraged.
4. Transparent transfer and career progression systems should be implemented in the State.
Jharkhand: Administrative Approval 2011-12 Page 12
5. The State shall put in place a transparent and effective human resource policy so that
difficult, most difficult and inaccessible areas attract and retain human resources for health.
C. Infrastructure
6. The State shall furnish list of facilities to be upgraded within three months if not already not
specified in the PIP.
7. The State shall furnish information relating to physical and financial status of infrastructure
and building works already taken up every quarter to Infrastructure Division.
8. The State shall under take all construction activities in meeting health infrastructure gaps
with particular focus in backward districts and inaccessible facilities.
D. Communitisation
9. The State shall take up capacity building exercise of Village Health and Sanitation
Committees, Rogi Kalyan Samitis and other community /PRI institutions at all levels,
involving Non Governmental organizations where necessary after a selection process.
10. The State shall ensure regular meetings of all community Organizations /District / State
Mission with public display of financial resources received by all health facilities.
11. The State shall also make contributions to Rogi Kalyan Samitis besides introducing user
charges wherever feasible protecting the interest of the poor.
12. All performance based payments/incentives should be under the supervision of
Community Organizations (PRI)/RKS.
13. The State shall focus on the health entitlements of vulnerable social groups like SCs, STs,
OBCs, minorities, women, disabled friendly, migrants etc.
E. HMIS
14. State shall set up a transparent and credible procurement and logistics system. State agrees
to periodic procurement audit by third party to ascertain progress in this regard.
15. The State shall undertake institution specific monitoring of performance of Sub Centre,
PHCs, CHCs, DHs, etc. in the prescribed format which is to be regularly uploaded as
Monthly, Quarterly and Annual Data on the HMIS.
16. State Specific Conditions/Observations:
a) State should establish a functional Quality Assurance Cell at state level and a
Quality Assurance Committee at district level. This cell will ensure
Jharkhand: Administrative Approval 2011-12 Page 13
adaptation/preparation, dissemination and training on quality technical and
infrastructural protocols at the health facilities. The cell will also ensure the quality
of the different skill based trainings being conducted in the state.
b) All contractual human resource will have job specific ToRs with clearly defined
objective deliverables which should be monitored every quarter.
c) All deliveries and neonatal care up to one month should be free in respect of drugs,
consumables, diagnostics, blood charges, diet and referral transport to the admitted
beneficiaries.
d) Regular Surveillance and Reporting of various diseases should be ensured to catch
early signs of warning for outbreaks.
e) Tracking of every pregnancy and infant for due service delivery and review of all
maternal deaths should be ensured.
f) It was not possible to incorporate all the activity wise deliverables and
conditionalities since some activities have been merged to fit in the RoP format. The
state needs to submit the activity wise deliverables in the excel sheet as per the
discussion during Sub Group and NPCC. The budget details & deliverables need to
be revised in the PIP accordingly.
17. The funds approved under the Monitoring and Evaluation activities in the PIP are subject to
the State reporting facility-wise performance on the HMIS portal of the Ministry. The States
are to also periodically review the quality of data on the HMIS portal at teh District and
Sub-district levels.The funds approved for the Mother abd Child Tracking Systems(MCTS)
are to be utilized such that there is improved coverage of maternal and care services and
immunisation of children and reflected on the MCTS portal of the Ministry.
IV. Based on the State’s PIP and deliberations thereon the Plan for the State is finalised as
per the detail of Annexure I (RCH Flexible Pool), Annexure II (NRHM Flexible Pool), Annexure-
III (Immunization) & Annexure –IV (National Disease Control Programmes) with summary of all
Functional Head at Annexure V.
Jharkhand: Administrative Approval 2011-12 Page 14
Annexure-I
Consolidated Approval under RCH-II for FY 2011-12
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
A. RCH TECHNICAL STRATEGIES & ACTIVITIES (RCH FLEXIBLE POOL)
A.1 MATERNAL HEALTH
A.1.1 Operationalise facilities
A.1.1.1 Operationalise FRUs
10000
52 FRUs to be monitored for quality MH, CH and FP services as per technical protocols
5.20 5.20
A.1.1.2 Operationalise 24x7 PHCs
5000 as above for 75 24X7 PHCs
3.75 3.75
A.1.1.3
MTP services at health facilities (Accreditation of private health facilities & Operational cost of District level committee)
5000
For Ranchi, Hzbg, Dhanbad, Bokaro & E.Singh- 10 PHF per District & for rest 19 Dist. - 2 PHF per District. Total 88 PHFs
4.80 4.80
Accreditation as per GoI guidelines and MTP Act.
A.1.1.4 RTI/STI services at health facilities
A.1.1.5 Operationalise Sub-centres
A.1.2
Referral Transport (@ 20000x4qtr x 24 DH &
5000 x4qtr x 170 CHC )
Approx. 160 PW per district per year will be referred from DH to Medical
53.20 53.20
Assured referral (RT) should be made available.
Jharkhand: Administrative Approval 2011-12 Page 15
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
College and Approx. 40 PW per CHC per year will be referred from CHC to DH 10640 PW (Pregnant women) to be benefitted
A.1.3 Integrated outreach RCH services
A.1.3.1 RCH Outreach Camps/ Others
5000
3492 RCH camps to be held
174.60 174.60
A.1.3.2
Monthly Village Health and Nutrition Days (Monitoring, Micro planning, HSC Meeting & Compilation of Micro Plan at Various level.)
All AWC will conduct comprehensive VHND
63.98 63.98
A.1.4 Janani Suraksha Yojana / JSY
A.1.4.1 Home Deliveries
500 240342 1201.71 500
80,000 rural and 20,000 urban home deliveries will be compensated. Additional requirement of funds can be re-appropriated from savings.
Jharkhand: Administrative Approval 2011-12 Page 16
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
A.1.4.2 Institutional Deliveries
A.1.4.2.a
-Rural
1400/ pregnant women
440096
6161.344
4038.916
288494 rural & 41666 urban institutional deliveries will be compensated. Approvals are based on achievements of previous years. Additional requirement of funds can be re-appropriated from savings.
A.1.4.2.b
Urban
1000/ pregnant women
88655
886.55 416.668
A.1.4.2.c
Caesarean Section
A.1.4.3 -Administrative Expenses
442.70 200
A.1.4.4 Incentive to ASHAs
Rural institutional delivery
600 440096 2640.576 1730.964
288494 deliveries to be incentivised. They will ensure all due ANCs
Urban institutional delivery
200 88655 177.31 83.332 41666 deliveries to be incentivise.
A.1.5 Maternal Death Review/Audit
A.1.6 Other Activities
A.2 CHILD HEALTH
A.2.1 IMNCI
Jharkhand: Administrative Approval 2011-12 Page 17
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Operational cost of district IMNCI cell (24 Dist. IMNCI Cell * 12 Month =288)
2000 per month per district
5.76
5.76 Quality training will be imparted and trained personnel will be monitored for service delivery in all 24 districts
and in 13 medical colleges and ANMTCs
Operational cost of IMNCI activity in 10 ANMTC & 3 Medical College
2000 per month per institute
3.12
3.12
A.2.2 Facility Based Newborn Care/ FBNC
A.2.3 Home Based Newborn Care/HBNC
A.2.4 Infant and Young Child Feeding/IYCF
A.2.5
Care of Sick Children and Severe Malnutrition (Operational Cost of 48 Existing MTC, 20 MTEC & software for MTC)
32400/MTC 52500/MTEC
48 MTC 10 MTEC 10 New MTEC Will be operationalized and provide quality services.
281.24 281.24
Software to be developed within three months and will have all the data related to MTC & MTECs including number of children treated
A.2.6
Management of Diarrhoea, ARI and Micronutrient Malnutrition
Jharkhand: Administrative Approval 2011-12 Page 18
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
A.2.7 Other strategies/activities
1. Referral Transport Block/CHC District
10000 20000
20 children per Block/CHC & 40 Children per DH expected. Maximum of 500 reimbursed
21.20
21.20
Develop assured system of referral in 3 months.
2. Orientation of MCP Card & Bi-annual Round
MCP card will be adopted at all health facilities Biannual round will be conducted for Vit.A
10.29
10.29
Orientation to be completed in 3 months
3. Printing Cost MCP Card, Mother Support Group (MSG)Folder, MTC & MTEC Format, Printing Material of NSSK, IMNCI, NSU)
MCP @ Rs.10, MSG folder @Rs 5,MTC,KTEC format @Rs. 5000, printing format @ Rs.300,printing of material for
MCP Card 11 lakhs MTC and MTEC format 58 NSSK format for printing 1848 etc
149.32 149.32
All printing should be through competitive tendering. Printing & dissemination to be completed in next 3 months.
Jharkhand: Administrative Approval 2011-12 Page 19
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
supportive supervision for IMNCI @Rs200, printing of material for [email protected],printing of material for NSU@Rs250.
A.2.8 Infant Death Audit
A.2.9
Incentive to ASHA under Child Health
Rs. 200 to Sahiyya for admission of SAM Children and 3 follow up to be paid after follow up. Budget included in operational cost of MTC & MTEC (A.2.5.)
A.2.10 Other Activities
A.3 FAMILY PLANNING
A.3.1 Terminal/Limiting Methods
A.3.1.1
Dissemination of manuals on sterilisation standards & QA
Jharkhand: Administrative Approval 2011-12 Page 20
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
of sterilisation services
A.3.1.2 Female Sterilisation camps
10000 1700 Camps 170 170
A.3.1.3 NSV camps 10000 300 Camps 30 30
A.3.1.4 Compensation for female sterilisation
1000 175000 Beneficiary
1750 1150
Approval is Rs.1150 Based on the achievement of previous years. Rs.1000 includes Rs. 150 for motivator. Disbursement of compensation should be as per GoI Norms
A.3.1.5 Compensation for male sterilisation
1500 30000 Beneficiary
450 300
Approval of Rs.300 lakh based on achievement of previous years. Rs.1500 includes Rs.200 for motivator. Disbursement of compensation should be as per GoI Norms
A.3.1.6
Accreditation of private providers for sterilisation services
A.3.1.7
ASHA Incentive under Sterilisation
A.3.2 Spacing Methods
A.3.2.1 IUD camps
A.3.2.2 IUD services at health facilities
20 in Public
300000 Beneficiary
87.50 50.00
Jharkhand: Administrative Approval 2011-12 Page 21
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
(Compensation at Public & Private Facilities)
facility 75 in private facility
A.3.2.3
Accreditation of private providers for IUD insertion services
A.3.2.4 Social Marketing of contraceptives
A.3.2.5 Contraceptive Update seminars
A.3.3 POL for Family Planning
10000
24 district monitoring
1.20 1.20
Regular monitoring & ensuring quality services
A.3.4 Repairs of Laparoscopes
A.3.5
Other Activities Review Workshop at State & Dist. Level
State 50000 and district level 25000
2 State Level & 24 Dist. Level Workshops will be conducted
7.00 7.00
Comprehensive review of all MH, CH, FP activities. Review report after workshop. Action taken report on recommendations.
A.4
ADOLESCENT REPRODUCTIVE AND SEXUAL HEALTH / ARSH
A.4.1
Adolescent services at health facilities. (1.State Level Review Workshop. 2.Setting up of ARSH clinics at DH,BPHC/CHC 3.Operationlising
50000 10000 8000
State Level Review Workshop 194 ARSH Clinics functional &
16.82 16.82
Jharkhand: Administrative Approval 2011-12 Page 22
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
of ARSH Clinics at DH,BPHC/CHC
provide quality health services.
A.4.2 School Health Programme
Printing of Health card for school
1000 10000 100.00 100.00
24 districts Printing of health card and manual orientation of head masters, Nodal teachers Block Resource persons Mobility support etc.
Printing of Manual for school
30 10000 3.00 3.00
Orientation of Head Masters, Principals, Nodal Teacher & Children
250 41000 102.50 102.50
Orientation of Block Resource Person
300 508 1.52 1.52
Orientation cum meeting with missionary and NGO run educational Institutions
10000 24 2.40 2.40
Mobility Support for Block Prog Officer
25000 24 6.00 6.00
A.4.3 Other strategies/activities
Kishori Swasthya Saptah Organising & printing of training manuals,
Will be held in 24 districts & 194 blocks
44.50 44.50
Jharkhand: Administrative Approval 2011-12 Page 23
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
reporting formats.
Menstrual Hygiene
Orientation of all Sahiyya in all selected districts
35.54 35.54
A.5 URBAN RCH
Review Meeting for urban health at state level
30000
2 meetings to be held
0.6 0.6 Utilize both for orientation and then for review
Review Meeting for urban health at district level
10000
14 Review Meetings at districts
1.4 1.4 Utilize both for orientation and then for review
Rent for hiring 50 Urban Health Centres (In case of Non Govt. building) '@ RS. 1500 per month for 50 urban centre
1500 50 UHCs will be functional
9 9 Only for existing centres
Recurring Cost - Office Expenses'@ RS. 1500 per month for 50 urban centre
1500 50 UHCs will be functional
9 9 Only for existing centres
Urban Health Mela (week)
50000 7 UH melas will be held
3.5 3.5
To be organised comprehensively for RCH, AYUSH and disease control programme
A.6 TRIBAL RCH
Orientation of programme managers and service providers at State Level
1,00,000
1Orientation Workshop will be held at state level
1.00 1.00
Jharkhand: Administrative Approval 2011-12 Page 24
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Orientation of programme managers and service providers at District Level
50000
1 workshop in each of the 24 districts will be conducted
12.00 12.00
Orientation should be for comprehensive RCH and Tribal services
Implementation of Integrated RCH activities (Outreach Camp) for Vulnerable Groups / PTG (1500 Hamlet * 1 camp per Qrt)
5000 3000 PTG Camp will be held
150 150
Additional Sahiyya for PVTG
1000
100 Additional Sahiyya for PVTG
1 1
At least 10% increase in the monitorable indicators of MH,CH and FP including institutional delivery
A.7 PNDT
A.7.1 Support to PNDT cell
A.7.2 PNDT other activities
PNDT (Orientation Workshop for Programme Managers)
State @ Rs. 2.5 Lakh & District level @ Rs. 1 Lakh
2 at State & 24 at district level workshops will be conducted
17.00 17.00
PNDT committees will be made functional
A.8
INFRASTRUCTURE(Minor Civil Works) & HUMAN
Jharkhand: Administrative Approval 2011-12 Page 25
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
RESOURCES( Except AYUSH)
A.8.1 Contractual Staff & Services
10076.04
4508.11
Rs.4508.11 lakh approved for A.8.1 Priority should be given to recruitment of HR needed urgently for making the facility functional. HR recruitment should be linked with the availability of necessary infrastructure, equipment & other complementary.
A.8.1.1
ANMs, Staff Nurses, ANMs, Staff Nurses, (ANM-Rs 9000x5000x12) (NewANM-Rs.8000x500x12) (SN-Rs.13000x500x12) (SN-Rs.12000x400x12)
ANM 8000-9000 Staff Nurse 12000-13000
5500 ANM will provide services as per the ToR, 900 Staff Nurse will provide services as per the ToR
ToR& deliverables of first& second ANM to be defined& shared. Also indicate how many HSCs became functional.
A.8.1.2
Laboratory Technicians, ,MPWs, Radiographers, Pharmacist (LT-
LT- 9500
400 LT
Comprehensive order for all LTs doing all diagnostics required in the facility needs to
Jharkhand: Administrative Approval 2011-12 Page 26
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Rs.9500x400x12) (Radiographer-Rs.11000x150x12) (MPW-Rs.8000x500x12) (Pharmacist-Rs.9500x200x12)
Radiographer-11000 MPW-8000 Pharmacist-9500
150 Radiographer 500 MPW 200 Pharmacists Will provide services as per their ToR
be issued To be posted at the functional facility ToR and Deliverables of male health worker need to be communicated.
A.8.1.3
Specialists (Anaesthetists, Paediatricians, Ob/Gynae, Surgeons, Physicians, Dental Surgeons, Radiologist,
65000 150 Specialist
No. of CS done and other monitor able service delivery be defined and monitored for each facility where they are
Jharkhand: Administrative Approval 2011-12 Page 27
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Sonologist, Pathologist, Specialist for CHC ) (Rs.65000x150x12)
posted.
A.8.1.4 PHNs at CHC, PHC level
A.8.1.5 Medical Officers at CHCs / PHCs (Rs.35000x22x12)
35000 22 LMO
A.8.1.6
Additional Allowances/ Incentives to M.O.s of PHCs and CHCs
Mobile Recharge Voucher to 100 MO, 24 DRCHO
All VHND and SC activities to be monitored
A.8.1.7
Others - Computer Assistants/ BCC Co-ordinator etc
A.8.1.8 Incentive/ Awards etc. to SN, ANMs etc.
500
1000 ANM
Subject to conducting at least five deliveries at HSC per month.
Mobile Recharge Voucher to 500 ANM
350
Mobile Recharge Voucher to 500 ANM
All pregnant women and children will be tracked for ANC, PNC, ID, FP and Immunization etc
A.8.1.9
Human Resources Development (Other than above) Cold
Details of the staff
Jharkhand: Administrative Approval 2011-12 Page 28
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Chain & PROMIS Operator
State Cold Chain Officer (Rs.45000x1x12)
45000
Preferably state cold chain officer should be from the state cadre.
Technical Asst. - Cold Chain – State (Rs.27500x1x12)
27500
Technical Asst. - Cold Chain – Regional (Rs.22000x1x12)
22000
Vaccine & Logistic Manager – State (Rs.27500x1x12)
27500
Vaccine & Logistic Manager – Regional (Rs.25000x1x12)
25000
Refrigerator Mechanic -27 (Rs.11000x27x12)
11000
No repair work should be pending once these posts are in place.
proMIS Manager (Rs.15000x1x12)
15000
All appointments under proMIS should lead to functional procurement system
Jharkhand: Administrative Approval 2011-12 Page 29
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
PROMIS Operator/ Store Keeper for Central & Regional Warehouse 9 Store keeper (Rs.14000x9x12)
14000
proMIS Operator/ Store Keeper for District Warehouse 24 Store keeper (Rs.12000x24x12)
12000
Cold Chain Handler 27 Handlers (Rs.10000x27x12)
10000
WIC /WIF Operator - Regional 3 Operator (Rs.10000x3x12)
10000
Regional WIC /WIF cleaning outsource - Deoghar, Ranchi, Giridih (Rs.4000x3x12)
4000
A.8.1.10
Other Incentives Schemes (Pl. Specify)
Jharkhand Lok Swasthya Sewa Vistar Yojna
1000
0.00 Not Approved
Jharkhand: Administrative Approval 2011-12 Page 30
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Result Based Financing
10.75 0.00 Not Approved
A.8.2 Minor civil works
A.8.2.1
Minor civil works for operationalisation of FRUs
1,00,000
52 FRUs will have complete operational infrastructure in terms of LR, OT, Labs, wards etc
52 52 Name of the facilities to be shared with GoI
A.8.2.2
Minor civil works for operationalisation of 24 hour services at PHCs
50000
75 PHCs will have complete operational infrastructure in terms of LR, , Labs, etc
37.50 37.50 Name of the facilities to be shared with GoI
MTC & MTEC (Malnutrition Treatment Centres)
20000
58 MTCs and MTECs will have operational infrastructure including beds
11.60 11.60
A.9 TRAINING
A.9.1 Strengthening of Training Institutions
Strengthening in terms of IPH, RTC Hazaribagh, Training Centre ITKI and will function as per the norms.
Funds for current FY are approved. The institute should be self sufficient in 3 years period. The activity should be implemented in partnership with PHFI &
1.IPH (Setting up library, management expenses, furnishing of hostel, running water & electricity
399.63
399.63
Jharkhand: Administrative Approval 2011-12 Page 31
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
i the hostel, setting up of mess, canteen etc.)
state as per the proposal.
List of deliverables in terms of types of training and training plan to be shared with GoI
2.RTC Hazaribagh
(Setting up library, management expenses, furnishing of hostel, class room, etc. Running water & electricity i the hostel, class room, seminar halls)
20.00
20.00
As above
3.Training Centre at Arogyashala, ITKI
(HR requirements, infrastructure up gradation of class rooms, seminar rooms & hostel, computerization, vehicle hiring etc.)
41.58 41.58
To be made functional in time bound. List of deliverables in terms of types of training and training plan to be shared with GoI
A.9.2 Development of training packages
A.9.3 Maternal Health Training
A.9.3.1 Skilled Attendance at Birth
177780/batch
117870/batch
624
138.67
107.26 245.93
Rational deployment of HR after training.
Jharkhand: Administrative Approval 2011-12 Page 32
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
364 Health workers will be trained
A.9.3.2
Comprehensive EmOC Training (including c-section)
1200000 24 MOs will be trained
36 36 Do as above
A.9.3.3 Life saving Anaesthesia skills training
705870/batch
32 MOs will be trained
59.13 59.13 Do as above
A.9.3.4 MTP training 29900/batch
84 MOs will be trained
12.56 12.56 Do as above
A.9.3.5 RTI / STI Training
A.10.3.6
BEmOC training
75600/batch
32 MOs will be trained
6.05 6.05 Do as above
A.9.3.7
Other MH Training (Training of TBAs as a community resource, any integrated training, etc.)
Core Skill of ANM
103500/ batch
1800 ANM will be trained in Core Skill
62.1
62.1
Do as above
FBMDR
48 person in TOT for FBMDR 600 person at district level
12.39
12.39
Jharkhand: Administrative Approval 2011-12 Page 33
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
HIV Screening
21200/ batch
1170 ANMs/SNs will be trained in HIV Screening
8.27 8.27
A.19.4 IMEP Training
A.9.5 Child Health Training
A.9.5.1 IMNCI
1.HW
100800/ batch
3600 HWs will be trained
151.20
151.20
Do as above
2.Supervisory training
73400/ batch
120 HW for supervision of IMNCI
3.67 3.67 Do as above
A.9.5.2 F-IMNCI
A.9.5.3 Home Based Newborn Care
A.9.5.4
Care of Sick Children and severe malnutrition (Refresher Training for MTC & MTEC)
70300/ batch
300
7.03
7.03
Do as above Refresher training focused on MTC & MTECs.
A.9.5.5 Other CH Training (pl. Specify)
NSSK refresher training State level for MO
70500/ batch
90 MO will be trained
2.12 2.12
Do as above
NSSK training District level for MO
72600/ batch
696 MO will be trained
21.05
21.05
Jharkhand: Administrative Approval 2011-12 Page 34
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
NSSK training District level (ANM,SN)
53000/ batch
1552 ANM,SN will be trained
25.44 25.44
A.9.6 Family Planning Training
A.9.6.1 Laparoscopic Sterilisation Training
A.9.6.2 Minilap Training 72500/ batch
24 MOs will be trained
8.7
8.7 Do as above
A.9.6.3 NSV Training
A.9.6.4 IUD Insertion Training
1. ToT State Level (MO,SN)
190400/ batch District
48 MOs & SNs will be trained
3.81
3.81 Do as above
2. Insertion training (MO)
82300/ batch
240 MOs will be trained
19.75
19.75
3. Insertion training (ANM)
62300/ batch
240 ANMs will be trained
14.95 14.95
A.9.6.5 Contraceptive Update/ISD Training
Contraceptive Technology Update Training TOT (MO)
86000/ batch District
25 MOs will be trained
0.86
0.86
Contraceptive Technology Update Training (MO)
70250 /batch
150 MOs will be trained
4.22 4.22
Jharkhand: Administrative Approval 2011-12 Page 35
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
A.9.6.6 Other FP Training (pl. Specify)
PPIUCD TOT (MO,SN)
TOT 58400/ batch
96 MOs & SNs will be trained
4.67
4.67
Do as above
PPIUCD Training District Level (MO)
District 56600
288 MOs will be trained
13.58 13.58
A.9.7 ARSH Training
1.Refresher Training
93050/ batch
50
1.86
1.86
Do as above
2. Roll Out training at Regional Level (MO)
109600/ batch
120 MOs will be trained
5.48
5.48
3. Roll Out training at District Level (LHV/ Male Supervisor/ ANM/ MPW)
113300/ batch
600 HW will be trained
27.19 27.19
A.9.8 Programme Management Training
A.9.8.1 SPMU Training
Jharkhand: Administrative Approval 2011-12 Page 36
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
A.9.8.2 DPMU Training
A.9.9 Other training (pl. Specify)
Urban Health (Orientation/training for ANM/service provider)
Rs49000 / batch
168 ANMs/ service providers will be trained
3.43 3.43
HMIS
Refresher Course on HMIS (CS,DPM,DAM,DDM)
24000
96 CS, DPM, DAM , DDM will be trained
0.96 0.96
Refresher Course on HMIS (MOICs, Computer, BPM)
30000
768 MOICs, BPMs will be trained
7.2 7.2
Training on PROMIS (CS,DDM, Storekeeper, PROMIS Operator)
35500
96 CS, DDM, Storekeeper, PROMIS Operators will be trained
1.42 1.42
Training on HMS & Untied fund (CS,DPM,DAM,DDM)
23000
72 CS,DPM,DAM,DDM will be trained
0.69 0.69
Jharkhand: Administrative Approval 2011-12 Page 37
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Training on Tally (DAM,BAM)
111400
243 DAM,BAMs will be trained
1.11 1.11
Training on HMIS including Mother & Child Tracking Format
19000 3350 ANMs will be trained
25.46 25.46
CBHI-In service Training Course (One member from each clinical dept. of Medical College)
243300 26 MOs will be trained
2.43 2.43
PG Diploma in Public Health Management
250000 5 MOs will be trained
12.5 12.5
Out Station Training of State & District Officers
25000
20 state & district officers will be trained
5 5
Jharkhand: Administrative Approval 2011-12 Page 38
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Training Review meeting Quarterly
79000 320
6.32 6.32
Orientation of Monitoring for Emoc & LSAs
100000 25 persons will be trained
1 1
Monthly Monitoring for Emoc & LSAA
22000 24 persons will be trained
2.64 2.64
Field Visit Monitoring During & After Training
5000 24 visits 1.2 1.2
A.9.10 Training (Nursing)
A.9.10.1
Strengthening of Existing Training Institutions/Nursing School
A.9.10.2
New Training Institutions/School
A.9.11 Training (Other Health Personnel)
A.9.11.1
Promotional Training of health
Jharkhand: Administrative Approval 2011-12 Page 39
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
workers females to lady health visitor etc.
A.9.11.2
Training of ANMs, Staff nurses, AWW, AWS
A.9.11.3
Other training and capacity building programmes
District level training of AYUSH (ANMs/AWWs)
1000 500 5.00 5.00
District level training of AYUSH (Compounders for medicine preparation)
130000 2 2.60 2.60
State level training of AYUSH (M.O.)
50000 2 1.00 1.00
A.10
PROGRAMME / NRHM MANAGEMENT COSTS
A.10.1
Strengthening of SHS / SPMU (Including HR-state consultants for-M&E, HRD, Training, logistics, NGO, MCH, Information & management, IEC etc. Co-ordinators PC PNDT, FP, AYUSH,
485.30 485.30
Comprehensive operationalization of facilities, quarterly analysis of data & FMR preparing bar charts and graphs should be incorporated in their deliverables up to block level. All programme
Jharkhand: Administrative Approval 2011-12 Page 40
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
Account officer & Computer operator for State Medicinal plant board.etc. Statistical supervisor, computer operator SPM, SFM, SAM, S Data Manager etc. Management Cost-, Mobility Support, field visits )
managers should be given reorientation trainings for comprehensive management of MH, CH and FP activities.
A.10.2
Strengthening of DHS/DPMU (Including HR, Management Cost, Mobility Support, field visits )
24 DPMU functioning as per the guidelines
313.20 313.20
A.10.3
Strengthening of Block PMU (Including HR, Management Cost, Mobility Support, field visits )
194 Block PMU will be functioning as per the guidelines
706.16 706.16
A.10.4 Strengthening (Others)
A.10.5 Audit Fees 10.00 10.00
A.10.6 Concurrent Audit 18.00 18.00
A.10.7 Mobility Support to BMO/MO/Others
A.11 VULNERABLE GROUPS
Jharkhand: Administrative Approval 2011-12 Page 41
FMR Code
Activity
Unit Cost (where-ever applicable)Rs.
Physical target/ Expected output
Amount Proposed (Rs. Lakhs)
Amount Approved (Rs. Lakhs)
Remarks/ Conditionalities
TOTAL 29318.86 17412.37
Jharkhand: Administrative Approval 2011-12 Page 42
Annexure-II
Consolidated Approval under NRHM Flexi Pool for FY 2011-12
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Mission Flexible Pool
B1 ASHA
B.1.1 ASHA Cost
B1.1.1 Selection & Training of ASHA
Sahiyya will go in each village & update as well as facilitate in conducting the health programmes. At least 10 to 15 % increase in the monitorable indicators of MH,CH and FP activities.
State TOT (Including DPC)
800 1216 9.73 9.73
Regional TOT 675 13600 91.8 91.8
SAHIYYA TRAINING
300 328000 984 984
Sahiyya Sathee Training (Sahiyya Sathi no. 2184)
220 4368 9.61 9.61
PTG Sahiyya Training
300 300 0.90 0.90
Travel & Facilitation Service
500 900 4.50 4.50
Sahiyya Sandesh Magazine
8 500000 48.00 48.00
Sahiyya Module 43 126000 54.18 54.18
B1.1.2 Procurement of ASHA Drug Kit
600
41,000 (Refilling
)
246.00 123.00
Drug [email protected] for 41000 refilling is approved. Most of the drugs can be filled from sub centres, only those which are not available can be
Jharkhand: Administrative Approval 2011-12 Page 43
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
purchased
B1.1.3 Other Incentive to ASHAs (if any)
HIV Test During Pregnancy Care of HIV Positive Women
Rs. 500 to be paid to
Sahiyya
1000 HIV positive
pregnant women will be tested
5 5
Rs. 500 incentive to be given only after completion of 4 ANC of identified pregnant woman & after institutions delivery,3 PNC up to 7 days
B1.1.4 Awards to ASHA's/Link workers
Award for Outstanding Sahiyya (ASHA)
3000 520 15.60
15.60
To be given based on pre determined performance indicators
B1.1.5
ASHA Resource Centre/ASHA Mentoring Group (VSRC)
The sahiyya programme in the state will show improvement on selected indicator at the year end.
STATE PROGRAMME CO-ORDINATOR
35000 12 4.2 4.2
Coordinator- Training (New Recruit)
30000 12 3.6 3.6
Content Editor 1000 120 1.2 1.2
Jharkhand: Administrative Approval 2011-12 Page 44
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
consultant(New Recruit)
Administration & Finance Officer
25000 12 3 3
District Programme Co-Ordinator
27000 288 77.76 77.76
3 LAPTOP for State VSRC team for DPC
35000 3 1.05 1.05
Travel support for VSRC
250000 4 10 10
Phone/ Internet/ Data Card for VSRC
65000 4 2.6 2.6
Sahiyya Sammelan at District Level Yearly
60000 24 14.40 14.40
Supportive Support to ASHA at Block Level by BTT for 6 days per month for supporting community meeting 424 BTT*8Days*12Mnth
300 33920 days
101.76 101.76
33920 days will be conducted with proper attendance record.
Supportive supervision to ASHA at State, Dist. & Block Level to STT for 6 days per month for supporting community meeting 24 STT*8 Days*12Mnth
500 1920 9.60 9.60
Operational cost 150 56448 84.67 84.67
Jharkhand: Administrative Approval 2011-12 Page 45
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
(Hono. & Travel) for Sahiyya Help Desk (84 LWE Dist & PHC & 14 non LWE District Hospital) 12s*4d*Rs.150*98*12m
SAHIYYA Sathi honorarium for 2184 sahiyya sathi per month 2184ss*15d*Rs.100/day *12m
100 327600 327.60 327.60
Sahiyya Sathi will conduct cluster meetings, attend HSC meeting and report to MOIC
B2 Untied Funds
B2.1 Untied Fund for CHCs
50000 194 97.00 97.00 Including 6 SDHs
B2.2 Untied Fund for PHCs
25000 330 82.50 82.50
B2.3 Untied Fund for Sub Centres
10000 3958 395.80 395.80
B2.4 Untied fund for VHSC
10000 32615 3261.50 3001.10
Since the number of VHSCs constituted is 30011 (MIS on 31.3.2011)the Approved amount is Rs.3001.10 lakh
B.3 Annual Maintenance Grants
B.3.1 CHCs 100000
188 CHCs to
have basic
facilities for
188.00 188.00
Jharkhand: Administrative Approval 2011-12 Page 46
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
treatment.
100000
6 SDHs to have
basic facilities
for treatment
.
6.00 6.00
B.3.2 PHCs 50000
120 PHCs to having
basic facilities
for treatment
.
60.00 60.00
B.3.3 Sub Centers 10000
1809 Sub centres to
have basic
facilities for
treatment.
180.90 172.40
Approval based on RHS-2010 provisional data. (1724 HSCs in Govt. Building)
B.4 Hospital Strengthening
B.4.1
Up gradation of CHCs, PHCs, Dist. Hospitals to IPHS)
B4.1.1 District Hospitals
400000
21 DHs with
improved
premises with
better electric
supply & water
84.00 84.00
To furnish the list of DH. Ensure quality service delivery for MH, CH & FP.
Jharkhand: Administrative Approval 2011-12 Page 47
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
facilities
B4.1.2 CHCs 200000
52 CHCs with
improved
premises with
better electric
supply & water
facilities
104.00 104.00
To furnish the list of CHC. Ensure quality service delivery for MH, CH & FP.
B4.1.3 PHCs
B4.1.4 Sub Centers
B4.1.5
Others (Ongoing Construction of Regional Vaccine Store Palamau)
1200000 1
establishment
12.00 12.00
B 4.2
Strengthening of Districts, Sub-divisional Hospitals, CHCs, PHCs
B.4.3 Sub Centre Rent and Contingencies
B.4.4 Logistics management/ improvement
Transportation of Drugs, Equipment & Supply from Central Warehouse to the health facilities
200000 12 24.00 24.00
Jharkhand: Administrative Approval 2011-12 Page 48
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Maintenance of Vehicles
100000 4 4.00 4.00
Maintenance of existing depot & office Building
6000 96 5.76 5.76
Office Expenses & Contingencies
25000 12 3.00 3.00
Stock Register 400 5000 20.00 20.00
Inventory Forms 100 5000 5.00 5.00
Indent Forms 100 5000 5.00 5.00
Supply Forms 100 5000 5.00 5.00
Supply Register 400 5000 20.00 20.00
Labour Room Register
400 2500 10.00 10.00 GoI register system to be adopted
B5
New Constructions/ Renovation and Setting up
B5.1 CHCs 318,00,000 10 1590.00 795
Balance Rs 795 lakh to be considered under priority projects fund. Name of the facilities to be submitted.
Jharkhand: Administrative Approval 2011-12 Page 49
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
B5.2 PHCs 129,49,000 10 647.45 323.73
Balance Rs 323.73 lakh to be considered under priority projects fund. Name of the facilities to be submitted.
B5.3 SHCs/Sub Centers
22,49,000 475 10682.75 3710.85
165 sub centres to be constructed @Rs. 22.49 lakh (Rs 6971.9 lakh to be provided under priority projects fund). Name of the facilities to be sent. Based on the progress of work, additional requirement of funds can be re-appropriated from savings.
B5.4
Setting up Infrastructure wing for Civil works
B5.5
Govt. Dispensaries/ others renovations
B5.6
Construction of BHO, Facility improvement, civil work, BemOC and CemOC centers
Jharkhand: Administrative Approval 2011-12 Page 50
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
B.5.7
Major civil works for operationalisation of FRUS
B.5.8
Major civil works for operationalisation of 24 hour services at PHCs
B.5.9
Civil Works for Operationalising Infection Management & Environment Plan at health facilities
200 200
Detailed plan of activities and the name of facilities scheduled for implementation to be submitted to GoI before implementation of the plan.
500 Bedded Hospital at Dumka
500 1 500 00
To be Considered under additional projects.
B.5.10 Infrastructure of Training Institutions
B.5.10.1
Strengthening of Existing Training Institutions/Nursing School( Other than HR) a. GNM Schools 1. Infrastructure 2. Equipment b. ANMTCs 1. Infrastructure 2. Equipment
B.5.10.2
New Training Institutions/Sch
Jharkhand: Administrative Approval 2011-12 Page 51
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
ool(Other than HR)
B.6 Corpus Grants to HMS/RKS
B6.1 District Hospitals
5,00,000 21
District Hospitals
105.00 105.00 All health facilities to provide improved amenities and services
B6.2 CHCs 1,00,000 188
CHCs 188.00 188.00
B6.3 PHCs 1,00,000 330 PHCs 330.00 330.00
B6.4
Other or if not bifurcated as above (SDH)
1,00,000 6 SDHs 6.00 6.00
B7 District Action Plans (Including Block, Village)
SHAP @150,000
DHAP
@20,000
BHAP @5,000
State Plan, 24 DHAPs,
194 BHAPs will be
prepared within
the prescribe
d time.
16 16
B8 Panchayati Raj Initiative
B8.1
Constitution and Orientation of Community leader & of VHSC,SHC,PHC,CHC etc
VHC Members 65
180072 VHC
members will be
oriented
117.05 117.05
Jharkhand: Administrative Approval 2011-12 Page 52
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
VHC Module 45 31000 13.95 13.95
B8.2
Orientation Workshops, Trainings and capacity building of PRI at State/Dist. Health Societies, CHC,PHC
PRI Members 60
84000 members
will be oriented
50.40 50.40
PRI Module 20 85000 17.00 17.00
B8.3
Others (Award for Outstanding VHC)
3000 520 15.60
15.60
B9 Mainstreaming of AYUSH
B9.1
Medical Officers at DH/CHCs/ PHCs (only AYUSH)
B9.2
Other Staff Nurse/ Supervisory Nurses (for AYUSH)
Jharkhand: Administrative Approval 2011-12 Page 53
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
B 9.3 Activities other than HR
Review Meeting 35000
2 review meetings
will be conducte
d
0.70 0.70 Reports after meeting to be communicated
Planning Meeting for Herbal Treatment Hub & Ayurvedic Treatment Center
1,00,000 1 1.00 1.00
Pilot of Herbal Treatment Hub
5,00,000 1 5.00 5.00
Approved in principle. To be taken up after submitting the details to GoI
Ayurvedic Treatment Centre (PPP Mode)
5,00,000 1 5.00 5.00
B10 IEC-BCC NRHM
B.10
Strengthening of BCC/IEC Bureaus (state and district levels)
B.10.1
Development of State BCC/IEC strategy Workshop, Procurement of Camera display board for district, learning visits, Desktop for state IEC cell.
21.13 21.13
Activities of MH, CH & FP to planned collectively and comprehensively.
Jharkhand: Administrative Approval 2011-12 Page 54
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
B.10.2 Implementation of BCC/IEC strategy
B.10.2.1
BCC/IEC activities for MH
21.60 21.60 Poster, Pam let, flip chart etc. will used appropriately
B.10.2.2
BCC/IEC activities for CH
40.80 40.80
B.10.2.3
BCC/IEC activities for FP
30.24 30.24
B.10.2.4
BCC/IEC activities for ARSH
22.10 22.10
B.10.3 Health Mela
AYUSH Health Mela including RCH services
50000 22 11.00 11.00
B.10.4
Creating awareness on declining sex ratio issue Posters on PCPNDT act, Girl Child right & other PCPNDT activities.
30 30
B.10.5 Other activities
IEC for Urban Health
14 14
21000 booklets @ Rs 50for ANM/USHA & their IEC
IEC for Tribal Health
22.60 22.60
AV shows in tribal language on MH, immunization and disease prevention @Rs.90000 per district. Development &
Jharkhand: Administrative Approval 2011-12 Page 55
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Dissemination of IEC material in vernacular scripts@ 25000 x4
IEC/ BCC activities for School Health
1,00,000 24 24.00 24.00
Quarterly News Letter
20 24000 4.8 4.8
Newspaper Advertisements
1,00,000 100 100 100
Job Aid Booklet on RCH for ANMs and Shaiya
25 60000 15 15
Community Radio (training, production and post production) -on selected thematic areas may be included
50000 20 10 10
Local FM Channels at least 20 audio spots per week (Five FM Channels )
200 4800 9.6 9.6
AIR spots for advertisements
1200 3600 43.2 43.2
Private Regional TV Channels (News and Entertainment)- ETV/Sahara/Mahua/etc
1500 1050 15.75 15.75
Cable Scroll Local TV channels( for Family planning, Maternal Health,
1500 432 6.48 6.48
Jharkhand: Administrative Approval 2011-12 Page 56
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Adolescent Health service etc).
Doordarshan, Health Programme Spot (30-60 Sec for Ads(Twice in a week)
12000 360 43.2 43.2
Street plays/ Cultural programs on RCH
3000 1552 46.56 46.56
IEC for celebration of Special campaign /rally/Health Meals/ National Nutrition Week/ World Breastfeeding Week/ Anti TB Day/ Hand washing Day etc
5,00,000 1 5 5
IEC for celebration of Special campaign /rally/Health Meals/ National Nutrition Week/ World Breastfeeding Week/ Anti TB Day/ Hand washing Day etc
25,000 24 6 6
VHC Strengthening
25 60000 15 15
Documentary films on 2
3,50,000 2 7 7
Jharkhand: Administrative Approval 2011-12 Page 57
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
thematic areas
Audio Visual spot development
50,000 20 10 10
IEC Display on Ambulance
30000 60 18 18
AYUSH IEC 20000 24 4.80 4.80
Hoardings - FP and Maternal Health- State level
30000 6 1.8 1.8
Hoardings - FP/Maternal Health/Adolescent Health/ Urban Health - District Level
20,000 374 74.8 74.8
B11
Mobile Medical Units (Including recurring expenditures)
Operational Cost including Maintenance & insurance for ongoing Mobile Medical Unit
22,5000 per month per
MMU
103 MMUs
will provide services
in the remote blocks.
2781.00
2500
All MMUs to be made functional in 3 months. Route plan will be prepared, Service delivery will be monitored by district and block programme managers. Community will certify service delivery on each day in their register.
GPRS (annually) 15000 103 15.45
B12 Referral Transport
Jharkhand: Administrative Approval 2011-12 Page 58
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
B12.1 Ambulance/ EMRI/Other models
Operating Cost (Mamta Wahan)
30 000 per month
277 Ambulan
ces will provide effective referral
transport.
831.00
500
As per discussions during Sub Group 108 Model of emergency services through vehicles with ALS is not approved since the state does not have any Trauma Centre. Hence a simple referral vehicle like proposal under Mamta Vahan is the first requirement of the state and so approved. As discussed to be given on competitive bidding (Avg. 50 case per month per vehicle from Community to CHC)
Mobile Voucher
300 per mobile
8.31
B12.2 Operating Cost (POL)
B13 PPP/ NGOs
B13.1 Nongovernmental providers of health care
Jharkhand: Administrative Approval 2011-12 Page 59
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
RMPs/TBAs
B13.2
Public Private Partnerships
(Outsourcing of 20 PHCs)
26.25 Lakh
To provide quality
services in 20
PHCs within 3 months
including program
me manage
ment.
525.04 525.04
PHC will work 24X7 and should have at least 6 beds Service delivery should be as per technical protocol.
B13.3
NGO Programme/ Grant in Aid to NGO
B14. Innovations( if any)
Call centre for referral transportation (Mamta Wahan and others)
3.86
23 Dist. will have functional referral
transport system
with call centre in
3 months
88.78 88.78
Community Waiting Hall for relatives of Pregnant Woman (Establishment of Waiting Hall/ BASA)
1.00
50 BASA will be
established at
appropriate
locations
50 50
Jharkhand: Administrative Approval 2011-12 Page 60
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Genetic Disorders (Haemoglobinopathies e.g. Sickle Cell Anaemia, Thallasemia & Others): Instruments, Articles, awareness programme, establishment cost
28.79 28.79
identify, estimate and assess the disease load of hemoglobinopathy in identified districts of Jharkhand
Occupational Health Hazards Control Programme (Silicosis & Others) Workshops, Capacity Building, Setting up of ODDC
6 Worksho
ps& Capacity Building, Constitut
ing the Occupati
onal Health
Hazards Control
Cell at State,
Setting up of
ODDC at Jamshed
pur
12.00 12.00
Innovations in Tribal areas Printing of Manuals, Picture cards, Compensation to Sahiyya to attend trainings, Admin cost, Process
12 blocks-
two each from 6
districts 150
women’s groups in
each
35.68 35.68
Jharkhand: Administrative Approval 2011-12 Page 61
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
evaluations block will be
facilitated to go
through a monthly
Participatory
Learning and
Action (PLA)
meeting cycle
Bi-Cycle for Sahiyya
2500
20,000 There
will be 10-15%
improvement in
the outcomes related to
ANC, PNC,
Immunization, FP services
etc.
500 250
Only for the high focus districts for 10000 Sahiyyas. Competitive bidding for procurement to be adopted. The maintenance will be borne by the Sahiyya. All monitorable indicators should improve by 10 to 15%.
B15 Planning, Implementation and Monitoring
B15.1
Community Monitoring (Visioning workshops at state, Dist, Block level)
B15.1. State level State level 1,00,000 1 1 1
Jharkhand: Administrative Approval 2011-12 Page 62
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
1
B15.1.2
District level District
level 25,000 24 6
B15.1.3
Block level Block level 30,000 48 14.4
B15.1.4
Other (Innovative activities for Community programme )
Saas bahu Sammelan in every cluster (2184) (Quarterly)convergence with ICDS - Mother support group
250 8736 21.84 21.84
Flag at Sahiyya House
50 40964 20.48 20.48
Exposure visit of VSRC members/DPC/STT/BTT/Sahiyya sathi/ Sahiyya
3,00,000 1 3.00 3.00
Corpus fund for supporting Sahiyya against Accidents and Deaths (Sahiyya Sahayta Nidhi)
10 41,000 4.10 4.10
B15.2 Quality Assurance
Quality assuranc
e cell will be made
functional in 3
months.
390.79
390.79
Ensure expected quality outcomes of the NRHM/RCH and FP services along with strengthening of the healthcare
Jharkhand: Administrative Approval 2011-12 Page 63
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
delivery centres / facilities.
B15.3 Monitoring and Evaluation
B15.3.1
Monitoring & Evaluation / HMIS/MCTS.
25.68 25.68
Operationalising new MIS formats, Printing of new formats monitoring visits
B15.3.2
Computerization HMIS and e-governance, e-health ((Procurement & installation of inverters in CHCs@)Rs.20000 for 194 facilities. AMC for state, district & block level computer @ Rs.5000, Development & operationalization of server for website.)
56.25 56.25
Procurement of equipments Development of website Printing of new formats for PHCs & SHCs
B15.3.3
Other M & E
Quarterly review meeting at State Level (4 Quarter)
50,000 4 2.00 2.00
Field visit by State M&E cell
50,000 12 6.00 6.00
District level workshop
5000 96 4.80 4.80
Field visit by District M&E cell
3000 288 8.64 8.64
Jharkhand: Administrative Approval 2011-12 Page 64
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Concurrent Evaluation & study
55.00 55.00
Study in PTG areas could be conducted on regional basis based on selecting adequate sample size. Objectives, agencies and expected outcomes to be shared.
Dissemination of SPIP
50,000 1 0.50 0.50
B.16 PROCUREMENT
B16.1 Procurement of Equipment
B16.1.1
Procurement of equipment: MH
a. Establishment for Blood Storage Unit
Establishment of blood
storage facility@ 2,50,000
Blood carry box@ 75000
Establishment of 15 BSUs
& 37 Blood Carry
Box
65.25 65.25 It will be made functional in 3 months.
b. Blood Bank 2.87 Crore
5 Blood Banks
1433.75 00
To be considered under priority project funds
c. MVA / EVA kits
@ Rs. 1650/-
3110 Kits 51.32 51.32
d. Equipment tray for MTP
@ Rs. 2000/-
224 equip.
Tray 4.48 4.48
d. Medical Abortion Kit
@ Rs. 400/- 5760 kits
will be made
23.04 23.04
Jharkhand: Administrative Approval 2011-12 Page 65
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
available
B16.1.2
Procurement of equipment: CH
B16.1.3
Procurement of equipment: FP
Rs. 600/- NSV Kit
Rs. 1000/- IUD
Insertion Kit
550 NSV kit,
4182 IUD Insertion
Kit
45.12 45.12
B16.1.4
Procurement of equipment: IMEP
B16.1.5
Procurement of Others
B.16.2 Procurement of Drugs and supplies
B.16.2.1
Drugs & supplies for MH (Essential Obstetric Care Drug Kit for CHC and FRU, SBA kit for CHC, OPD register, MCH Register)
108.11 108.11
Kit for HIV Screening of pregnant women
30 Rs. Per kit
236000 70.80 70.80
Rapid diagnostic kit will used during ANC
B.16.2.2
Drugs & supplies for CH
Drug Kit for FRU/CHC
2000 191 Kits 3.82 3.82
Zero Diarrhoea death programme (ORS -Zinc Bleaching
50 50
Jharkhand: Administrative Approval 2011-12 Page 66
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Powder, IV set)
Anti-Rabies Vaccine
220 100000 220 220
Drug for IMNCI (Co-trimoxazole, ORS etc.)
500000
5 5
Consumables & Maintenance of NBC
25000
203 NBCs will
provide quality
services
50.75 50.75 Names of the facilities to be provided& made functional in 3 months. Procurement can be through DPs or competitive bidding
Consumables & Maintenance of NSU
1,00,000
32 NSUs will
provide quality
services
32 32
Consumables & Maintenance of SNCU
5,00,000
7 SNCUs will
provide quality
services
35 35
Procurement of Albendazole
0.625 58,00,000 36.25 36.25
B.16.2.3
Drugs & supplies for FP
B.16.2.4
Supplies for IMEP
B.16.2.5
General drugs & supplies for health facilities
Procurement of IFA ARSH
0.1 1020 lakh
IFA 102.00 102.00
Tribal Health 0.10
Snake bite,
Animal bite
drugs
5.00 5.00
Jharkhand: Administrative Approval 2011-12 Page 67
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
SBA Kit for HSC 13000 500 Kit 65.00 65.00
B.17 Regional drugs warehouses
B.18
New Initiatives/ Strategic Interventions (As per State health policy)/ Innovation/ Projects (Telemedicine, Hepatitis, Mental Health, Nutrition Programme for Pregnant Women, Neonatal) NRHM Helpline) as per need (Block/ District Action Plans)
B.19 Health Insurance Scheme
B.20 Research, Studies, Analysis
B.21
State level health resources centre (SHSRC) HR and Institutional Strengthening (Setting up the workstation with computer, Accessories, internet, office
1 Co-ordinator, 1 executive planning & monitoring,
1 executive research
31.35 31.35
SHSRC will provide the technical support to the programmes
Jharkhand: Administrative Approval 2011-12 Page 68
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
equipment, furniture etc. Conveyance Management cost Research and development works
& documentation and 1 account assistant
B.22 Support Services
B22.1 Support Strengthening NPCB
Honorarium of contractual employee cannot be given from two sources as per programme protocol.
Peon 2400 1 0.29 0.29
The Honorarium of all the contractual staff of a particular level should be equal and as per the program guidelines.
Driver 9000 1 1.08 1.08
Eye Donation Counsellor
10000 3 3.60 3.60
B22.2
Support Strengthening Midwifery Services under medical services
B22.3 Support Strengthening NVBDCP
ASHA Incentive (3000 cases)
200 3000
cases 6.00 6.00
Mobile phone recharge voucher
110.11 1.44
Jharkhand: Administrative Approval 2011-12 Page 69
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Rs. 500x12 months
Equipments for Entomological work
6,00,000
6.00 6.00
Diagnostic Goods
58.76 0.00 Not Approved (Since no details provided)
Remuneration for contractual driver
9000
27 drivers
29.16 29.16
Xerox & Fax Machine
90,000
25 22.50 22.50
B22.4 Support Strengthening RNTCP
Uninterrupted electricity supply for IRL
499,000
4.99 4.99
Procurement of Laptop
40,000 3 1.20 1.20
Additional Cost of MDR TB Patient
50,000
0.50 0.00 Not Approved
Continuation of CUG for RNTCP Key Staff
814,000
8.14 8.14
B22.5 Contingency support to Govt. dispensaries
B22.6 Other NDCP Support Programmes
NLEP
2 Desktop (PC) 30,000 2 PCs 0.6 0.6 Better reporting
and smooth functional of district Leprosy
2 Laptop 40,000 2 PCs 0.8 0.8
Jharkhand: Administrative Approval 2011-12 Page 70
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
One PC to Each District with Acc.
40,000 24 PCs 9.6 9.6 cell and State Leprosy Cell
Peon SLO Office 6,200 12 Month 1.488 1.48
Driver for Dist. 9,000 12 Month 5.4 5.4
Driver for State 9,000 12 Month 2.16 2.16
Fund Required for Difference amount of A contractual Service Payable to : BFO-1, DEO-1, Driver-3 for State and 16 Driver for District
Arrear for the staff
12 Months for Year 2010-11
12.04 00 Not approved
B.23
Other Expenditures (Power Backup, Convergence etc)
Support Strengthening RI
Genset 3,00,000 33 99.00 99.00
TA/DA for Mechanic
2,88,000 1 2.88 2.88
Supportive Supervision
50,000 48 24.00 24.00
JMSSPM - District
50,000 48 24.00 24.00
JMSSPM-CHC 20,000 388 77.60 77.60
Jharkhand: Administrative Approval 2011-12 Page 71
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target
Amount Proposed
Amount Approved
Remarks/ Conditionalities
Procurement of Non Electrical Cold Chain Equipment
50,00,000 1 50.00 0.00
Mapping of different Stake Holders
1,00,000 1 1.00 1.00
Resource book on convergence (printing)
150 3000 4.50 4.50
Convergence meeting at state level
50,000
2 meetings
will be conducte
d
1.00 1.00
Convergence meeting at district level
35000
48 meetings
will be conducted i.e. 2 in
each district.
16.80 16.80
Strengthening of Food & Drug Laboratory
1,00,00,000 1.00 100.00 100.00
Progress on the establishment of the laboratory will be shared with GoI
Total
30527.74 18995.74
Jharkhand: Administrative Approval 2011-12 Page 72
Annexure-III
Consolidated Approval under Immunization for FY 2011-12
(Rs. in Lacs)
FMR Code
Activities( As proposed by the State)
Unit Cost (where ever applicable)
Physical Target
Amount Proposed (in lakh)
Amount Approved (in lakh)
Remark/ Conditionalities
C.1
RI Strengthening Project (Review meeting, Mobility Support, Outreach services etc
c.1.a Mobility Support for supervision for district level officers.
Rs.50000/ Year /district level officers.
13.00 13.00
c.1.b Mobility support for supervision at state level
Rs. 100000 per year.
c.1.c Printing and dissemination of Immunization cards, tally sheets, monitoring forms etc.
Rs. 5 beneficiaries
55.00 55.00
c.1.d Support for Quarterly State level review meetings of district officer
3.60 3.60
c.1.e
Quarterly review meetings exclusive for RI at district level with one Block MOs, CDPO, and other stake holders
3.10 3.10
c.1.f Quarterly review meetings exclusive for RI at block level
123.00 123.00
c.1.g
Focus on slum & underserved areas in urban areas/alternative vaccinator for slums
100.80 100.80
c.1.h Mobilization of children through ASHA or other mobilizers
Rs. 150 per session
738.00 738.00
c.1.i Alternative vaccine delivery in hard to reach areas
Rs. 100 per session
96.00 96.00
c.1.j Alternative Vaccine Delivery in other areas
Rs. 50 per session
144.00 144.00
c.1.k To develop micro plan at sub-centre level
@ Rs 100/- per sub centre
6.42 6.42
c.1.l For consolidation of micro plans at block level
Rs. 1000 per block/ PHC and Rs. 2000 per district
Jharkhand: Administrative Approval 2011-12 Page 73
c.1.m POL for vaccine delivery from State to district and from district to PHC/CHCs
Rs100,000/ district/year
24.00 24.00
c.1.n Consumables for computer including provision for internet access for RIMs
@ 400/ - month/ district
2.15 1.15
c.1.o Red/Black plastic bags etc. Rs. 2/bags/session
28.80 28.80
c.1.p Hub Cutter/Bleach/Hypochlorite solution/ Twin bucket
Rs. 900 per PHC/CHC per year
1.17 1.17
0.93 0.93
c.1.q Safety Pits 4.46 4.46
c.1.r State specific requirement 186.99
25.00
C.1-Sub Total 1531.43 1368.44
C.2 Salary of Contractual Staffs -Sub Total
c.2.a Computer Assistants support for State level
Rs.12000-15000 per person per month
1.80
1.80
c.2.b Computer Assistants support for District level
8000-10000 per person per month
28.80
28.80
C.2-Sub Total 30.60
30.60
C.3 Training under Immunization
c.3.a
District level Orientation training including Hep B, Measles & JE(wherever required) for 2 days ANM, Multi Purpose Health Worker (Male), LHV, Health Assistant (Male/Female), Nurse Mid Wives, BEEs & other staff ( as per RCH norms)
114.63 114.63
c.3.b
Three day training including Hep B, Measles & JE(wherever required) of Medical Officers of RI using revised MO training module)
73.62 73.62
c.3.c One day refresher training of district Computer assistants
-
-
Jharkhand: Administrative Approval 2011-12 Page 74
on RIMS/HIMS and immunization formats
c.3.d
One day cold chain handlers training for block level cold chain handlers by State and district cold chain officers
17.77 17.77
c.3.e One day training of block level data handlers by DIOs and District cold chain officer
14.67 14.67
C.3-Sub Total 220.70 220.70
C.4 Cold chain maintenance
Rs.500/PHC/CHCs per year District Rs.10000/year
7.37 3.37
C5 ASHA Incentives
C6 PPI Operation Cost
753.57
TOTAL 1790.08 2376.66
Jharkhand: Administrative Approval 2011-12 Page 75
Annexure-IV
Consolidated Approval under NIDDCP for FY 2011-12
(Rs. in Lacs)
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target/ Expected output
Amount Proposed
Amount Approved
Remarks/ Conditionalities
D.1
Establishment of IDD Control cell
10.00 10.00
D.1.a. Technical Officer
D.1.b. Statistical Officer
D.1.c. LDC Typist
D.2
Establishment of IDD Monitoring Lab
5.00 5.00
D.2.a. Lab Technician
D.2.b. Lab Assistant
D.3
IEC/BCC Health Education & Publicity
7.00 7.00
D.4
IDD Surveys/Re Surveys
2.00 2.00
D.5.
Supply of Salt Testing Kit (form of kind grant)
Total 24 24
Jharkhand: Administrative Approval 2011-12 Page 76
Consolidated Approval under IDSP for FY 2011-12
(Rs. in Lacs)
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target/ Expected output
Amount Proposed
Amount Approved
Remarks/Conditionalities
E IDSP
E.1 Operational Cost
1.2 Lab Consumables
Rs. 2 lakh per district priority lab
2.00 2.00
1.1 Mobility Support Rs 15,000/- per district per month
72.00 41.4
1.3 Review Meetings
1.4 Field Visits
1.5 Formats and Reports
E.2 Human Resources
2.1 Remuneration of Epidemiologists
35,000 23 96.60 75.60
The State has to recruit the vacant contractual positions under IDSP; Remuneration has been calculated accordingly
2.2 Remuneration of Microbiologists
38,000 2 13.68 4.56
2.3 Remuneration of Entomologists
25,000 1 4.20 3.00
E.3 Consultant-Finance 14,000 1 3.00 1.68
3.1 Consultant-Training
28,000 1 3.00 3.00
3.2 Data Managers
14,000 (State) 13500 (District)
23 38.64 37.32
3.3 Data Entry Operators
8,500 23 23.46 23.46
3.4 Others 44.1 0.00
Jharkhand: Administrative Approval 2011-12 Page 77
FMR Code
Activity
Unit Cost (where-ever applicable)
Physical target/ Expected output
Amount Proposed
Amount Approved
Remarks/Conditionalities
E.4 Procurements
4.1 Procurement -Equipments
4.2 Procurement -Drugs & Supplies
E.5 Innovations /PPP/NGOs
E.6 IEC-BCC Activities 14.00 0.00
E.7 Financial Aids to Medical Institutions
E.8 Training 49.90 5.00
One day of training of Health workers & one day training of laboratory technician is not permitted under IDSP. One day training for Medical college/hospital doctors should be conducted and restricted for faculties of medicine pediatrics and microbiology
TOTAL 364.58 197.02
Jharkhand: Administrative Approval 2011-12 Page 78
Consolidated Approval under National Vector Borne Disease Control Program
(Rs. in Lacs) FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
F.1 DBS (Domestic Budgetary Support)
F.1.1 Malaria
F.1.1.a MPW 1590.00 1500.00
F.1.1.b
ASHA Honorarium
67.90 90.00 State needs to strengthen
surveillance and the
amount may also be used for detection
and treatment of kala-azar
cases
F.1.1.c Operational Cost
61.00 0.00 To be met from state resources
F.1.1.d
Monitoring , Evaluation & Supervision & Epidemic Preparedness including mobility
20.00 48.00 Excess may be utilised for
more training and involving
PPP/NGO
F.1.1.e IEC/BCC 30.00 51.00
F.1.1.f PPP / NGO activities
50.00 0.00
F.1.1.g
Training / Capacity Building
12.40 30.00
F.1.2 Dengue & Chikungunya
F.1.2.a Strengthening surveillance (As per GOI approval)
F.1.2. Apex Referral 1 3.00 0.00
Jharkhand: Administrative Approval 2011-12 Page 79
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
b Labs recurrent
F.1.2.c Sentinel surveillance Hospital recurrent
4
F.1.2.d
Test kits (Nos.) to be supplied by GoI (kindly indicate numbers of ELISA based NS1 kit and Mac ELISA Kits required separately)
F.1.2.e Monitoring/Supervision and Rapid Response
2.00 3.00
F.1.2.f Epidemic Preparedness
1.25 6.00
F.1.2.g
IEC/BCC/Social Mobilization
1.50
F.1.2.h
Training/Workshop
1.20 2.00
F.1.3
Acute Encephalitis Syndrome (AES)/ Japanese Encephalitis (JE)
F.1.3.a
Strengthening of Sentinel Sites which will include diagnostics and management. Supply of kits by GoI
0.00 0.00
F.1.3.b
IEC/BCC specific to J.E. in endemic areas
0.50
F.1.3.c Training specific for J.E. prevention and management
0.60
Jharkhand: Administrative Approval 2011-12 Page 80
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
F.1.3.d
Monitoring and supervision
0.50
F.1.3.e
Procurement of insecticides (Technical Malathion)
0.00
Hiring of Storage at District
5000
24
storage sites
14.40 14.40
F.1.4 Lymphatic Filariasis
F.1.4.a
State Task Force, State Technical Advisory Committee meeting, printing of forms/registers, mobility support, district coordination meeting, sensitization of media etc., morbidity management, monitoring & supervision and mobility support for Rapid Response Team
81.06 80.00
F.1.4.b
Microfilaria survey
11.28 7.12
F.1.4.c
Post MDA assessment by medical colleges (Govt. & private)/ ICMR institutions.
1.53 1.35
Jharkhand: Administrative Approval 2011-12 Page 81
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
F.1.4.d.
Training/sensitization of district level officers on ELF and drug distributors including peripheral health workers
23.40 18.00
F.1.4.e.
Specific IEC/BCC at state, district, PHC, sub-centre and village level including VHSC/GKS for community mobilization efforts to realize the desired drug compliance of 85% during MDA
44.60 42.00
F.1.4.f
Honorarium to drug distributors including ASHA and supervisors involved in MDA
159.68 151.53
F.2 Externally aided component (EAC)
F2.1 World Bank Project
F.2.1.a
World Bank support for Malaria (Andhra Pradesh, Chattisgarh, Jharkhand, Madhya Pradesh, Orissa, Gujarat, Karnataka & Maharashtra)
F.2.1. Human Resource
250.34 296.00
Jharkhand: Administrative Approval 2011-12 Page 82
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
b.
F.2.1.c Training /Capacity building
34.08
F.2.2.d
Mobility support for Monitoring Supervision & Evaluation & review meetings, Reporting format (for printing formats)
136.60
F.3 GFATM Project 0.00
Project Management Unit including human resource of N.E. states and erstwhile GFATM states viz., Jharkhand, Orissa and West Bengal
444.00
Kala-azar World Bank assisted Project
F.3.a Human Resource
58.54
F.3.b Training Cost 6.00
F.3.c Plannint & Administration
F.3.d Monitoring & Administration (Mobility)
38.00
F.3.e I.E.C / B.C.C
F.3.f
Operational expenses for treatment of bed nets
F.4 Any Other item (Please Specify)
Jharkhand: Administrative Approval 2011-12 Page 83
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
Case search
3.00
12.00
Lab strenghtening
6.00
Operational cost for spray including spray wages
74.49
Mobility/POL
0.00
Monitoring & Evaluation
4.00
Training for spraying
0.00 00.00
BCC/IEC
3.00 3.00
Incentive to patient for loss of wages (3000 cases * 30 days)
50
3000
cases*30 days
45.00 45.00
F.5
Operational Costs (Mobility,Review Meeting,communication,formats & reports)
F.6 Cash grant for decentralized commodities
F.6.a Chloroquine phosphate tablets
36.00
45.00
F.6.b Primaquine tablets 2.5 mg
12.00
F.6.c Primaquine tablets 7.5 mg
2.00
F.6.d Quinine sulphate tablets
4.00
F.6.e Quinine Injections
F.6.f DEC 100 mg tablets
F.6.g Albendazole 400 mg tablets
F.6.h Dengue NS1 antigen kit
Jharkhand: Administrative Approval 2011-12 Page 84
FMR Code
Activity Unit Cost
where ever
applicable
Physical target/Deliverabl
es
Amount Propose
d
Amount Approv
ed
Remarks/ Conditionalities
F.6.i Temephos, Bti (for polluted & non polluted water)
12.50
F.6.j Pyrethrum extract 2%
55.00
F.6.k. Any Other (Pl. specify)
Total
3342.46 2445.40
Commodity grant
2683.4
Grand Total 3401.86 5128.80
Jharkhand: Administrative Approval 2011-12 Page 85
Consolidated Approval under NLEP for FY 2011-12
S. No.
Activity
Unit Cost /Where ever applicable
Physical Targets/Deliverables
Amount proposed
Amount approved
Remarks/Conditionalities
G.1.
Contractual Services
State - SMO, BFO cum AO, DEO,Administrative Assistant, Driver
12.48 12.48
District - Drivers
SMO 15,000 12 Month 1.8 1.8 The Honorarium of all the contractual staff of a particular level should be equal and as per the program guidelines.
BFO cum AO 15,000 12 Month 1.8 1.8
DEO 4000 12 Month 0.48 0.48
Driver 4,500 12 Month 0.54 0.54
Driver of District 4,500 12 Month 5.94 5.94
Admin. Assistant 4,000 12 Month 0.48 0.48
G.2.
Services through ASHA/USHA
Sensitization of ASHA 5
Improvement of case detection and treatment
15.50
15.50
Honararium to ASHA 10.5
G.3.
Office expenses & Consumables
9.68 9.68
G.4.
Capacity building (Training)
51.54
4 days training of newly appointed MO (rural & urban)
3 days training of
Jharkhand: Administrative Approval 2011-12 Page 86
newly appointed health worker & health supervisor
51.54
2 days refresher training of MO
5 days training of newly appointed Lab. Technician
G.5
Behavioral Change Communication (IEC)
41.89
Quiz,folk show,IPC workshop,Meeting of opinion leaders,Health melas
41.89
Wall painting,Rallies,Hoardings etc
G.6
POL/Vehicle operation & hiring
20.55 2 vehicles at state level & 1 vehicle
20.55
at district level
G.7.
DPMR
17.70
MCR footwear, Aids and appliances, Welfare allowance to BPL patients for RCS, Support to govt. institutions for RCS
17.70
G.8.
Material & Supplies
12.48 12.48 Supportive drugs, lab. reagents &
equipments and printing forms
G.9. Urban Leprosy Control
3.42 3.42
G.10.
NGO - SET Scheme 5 5
G.11.
Supervision, Monitoring & Review
3.9 3.9
Jharkhand: Administrative Approval 2011-12 Page 87
Review meetings and travel expenses
G.12.
Specific-plan for High Endemic
0
Districts 0
G.13 Others (maintenance of Vertical Unit, Training & TA/DA)
13.30 13.30
Total 218.48 218.48
Jharkhand: Administrative Approval 2011-12 Page 88
Consolidated Approval under NPCB for FY 2011-12
(Rs. in Lacs)
FMR Code
ACTIVITY
Unit cost (wherever applicable)
Physical target/expected output
Amount Proposed
Amount Approved
Remarks/ Conditionalities
H1. Recurring Grant-in aid
H.1.1.
For Free Cataract Operation and other Approved schemes as per financial norms@
Rs.750/- per case
24 DBCS 578.36
383.40
H.1.2. Other Eye Diseases@
Rs.1000/-
h.1.3. School Eye Screening Programme@
Rs.200/- per case
H.1.4 Private Practitioners @as per NGO norms
16.76 0.00
H.1.5.
Remuneration/ salary Management of State Health Society and Distt. Health Society- Remuneration/ salary )
Budget & Finance Officer
15000 1 1.80 1.80 The Honorarium of all the contractual staff of a particular level should be equal and as per the program guidelines.
Administrative Assistant / S.A
7000 1 0.84 0.84
Data Entry Operator/Steno/LDC
8000 1 0.96 0.96
Ophthalmic Assistant Surgeon
4000 10 4.80 4.80
Eye Surgeon 15000 8 14.40 14.40
H.1.5.a. Ophthalmic Surgeon@
Rs.25000/- p.m
12.90
12.60
Jharkhand: Administrative Approval 2011-12 Page 89
H.1.5.b. Ophthalmic Assistant @
Rs.8000/- p.m
H.1.5.c. Eye Donation Counsellors @
Rs.10000/- p.m.
H.1.6
Operational Cost Management of State Health Society and Distt. Health Society (review meeting, hiring of vehicle and Other Activities & Contingency)
Rs.14 lakh/ Rs7 lakh
7.00
Total [Honorarium (1.5) + Operational Cost (1.6)] for ROP
H.1.7. Third party assessment (new initiative)
H.1.8. Recurring GIA to Eye Donation Centres@
Rs.1000/- per pair
H.1.9. Eye Ball Collection and
Eye Bank @
Rs.1500/- per pair
H.1.10. Eye Ball Collection
Rs.1500/-
H.1.11.
IEC(Eye Donation Fortnight, World Sight Day & awareness programme in state & districts)
H.1.12 Procurement of Ophthalmic Equipment
H.1.13.
POL and Maintenance of Ophthalmic Equipments and Vehicles
State/Distt. 5.00 5.00
Jharkhand: Administrative Approval 2011-12 Page 90
H.1.14 Grant-in-aid for strengthening of 1 Distt. Hospitals.
2 40.00 20.00
H.1.15
Grant-in-aid for strengthening of 2 Sub Divisional. Hospitals
H.2 Non Recurring Grant -in-Aid
H.2.1. For RIO (new)
H.2.2. For Medical College
Rs.40 lakh
1 Med. College + 1 RIO
80.00 40.00
H.2.4 For vision Centre Rs.50000/-
10 5.00 5.00
H.2.1. For Eye Bank Rs.15 lakh 3 45.00 15.00
H.2.2. For Eye Donation Centre
Rs.1 lakh
0.00 0.00
H.2.4 For NGOs Rs.30 lakh 2 60.00 30.00
H.2.5 For Eye Ward & Eye OTS
Rs.75 lakh 2 150.00 75.00
H.2.6
For Mobile Ophthalmic Units With Tele Network
Rs.60 lakh
H.3 Training
H.4. ASHA Incentive (if any)
H.5. Others
Total 1015.82 615.80
Jharkhand: Administrative Approval 2011-12 Page 91
Consolidated Approval under RNTCP for FY 2011-12
(Rs. in lacs)
FMR Code.
Activity unit cost (wherever applicable)
Physical target/expected output
Amount Proposed
Amount Approved
Remarks/ Conditionalities
I.1 Civil works
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1)Civil work
Up gradation
and
maintenance
completed as
planned;
64.947 61.697
One time cost for up
gradation of one SDS, 19
DDS for SLD, 3 new DP
sites, 2 DTCs, 9TUs, 35
DMCs and maintenance
cost of
STC/SDS/STDC/IRL, 22
DTCs,69 TUs and 296
DMCs approved
I.2
Laboratory materials
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Sputum of
TB Suspects
Examined per
lac population
per quarter;
2) All districts
subjected to
IRL OSE and
Panel Testing
in the year;
3) IRLs
accredited and
functioning
optimally;
45.50 36.40
Approved 80% of the
estimated budget based
on expenditure of last 4
quarters
I.3. Honorar As per 1) All eligible 41.25 40.00 Approved Rs 40.00 lakh
Jharkhand: Administrative Approval 2011-12 Page 92
a ium/Counselling Charges
Revised
Norms and
Basis of
Costing for
RNTCP
Community
DOT Providers
are paid
honorarium in
all districts in
the FY
against the estimated
budget based on
expenditure of last 4
quarters
I.3.b
Incentive to Dot Providers
I.4 IEC/ Publicity
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) All
IEC/ACSM
activities
proposed in
PIP completed;
2) Increase in
case detection
and improved
case holding
62.537 15.00
Approved 34% of the
estimated based on
expenditure of last 4
quarters. More may be
sanctioned in accordance
to expenditure pattern
during initial 2 quarters
of FY
I.5
Equipment maintenance
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Maintenance
of Office
Equipments at
State/Districts
and IRL
equipments
completed as
planned;
2) All BMs are
in functional
condition
19.10
18.00
Approved 75% of the
estimated budget based
on expenditure of last 4
quarters. More may be
sanctioned based on
expenditure during
initial 2 quarters of FY
I.6 Training As per
Revised
1) Induction
training, 51.71 32.82
Approved Rs 32.8 (62%)
lakh of the estimated
Jharkhand: Administrative Approval 2011-12 Page 93
Norms and
Basis of
Costing for
RNTCP
Update and
Re-training of
all cadre of
staff completed
as planned;
budget based on
expenditure of last 4
quarters. More may be
sanctioned in accordance
to expenditure pattern
during initial 2 quarters
of FY
I.7 Vehicle maintenance
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) All 4
wheelers and 2
wheelers in the
state are in
running
condition and
maintained;
47.00 36.00
Approved 76% of the
estimated budget based
on expenditure of last 4
quarters
I.8 Vehicle hiring
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Increase in
supervisory
visit of DTOs
and MOTCs;
2) Increase in
case detection
and improved
case holding;
16.50 4.25
As utilization under 4
wheelers not mentioned
by the state, Approved
Rs 4.25 lakh of the
estimated budget based
on expenditure of last 4
quarters. More may be
sanctioned if expenditure
improves during initial 2
quarters of FY
I.9 NGO/PPP support
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Increase in
number of
NGOs/PPs
involved in
signed schemes
of RNTCP;
65.06 26.00
Approved 17% of the
estimated budget based
on expenditure of last 4
quarters. More may be
sanctioned if expenditure
improves during initial 2
Jharkhand: Administrative Approval 2011-12 Page 94
2) Contribution
of NGOs/PPS
in case
detection and
provision of
DOT
quarters of FY
I.10
Miscellaneous
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) All activities
proposed
under
miscellaneous
head in PIP
completed
50.00 33.00
Approved 70% of the
estimated budget in
accordance to
expenditure pattern last
4 quarters
I.11
Contractual services
As per
Revised
Norms and
Basis of
Costing for
RNTCP
Appointment
of contractual
staff
621.144 621.144
I.12
Printing
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) All printing
activities at
state and
district level
completed as
planned
35.00 20.00
Approved 51% of the
estimated budget in
accordance to
expenditure pattern last
4 quarters
I.13
Research and studies
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Proposed
Research has
been initiated
or completed
in the FY
5.00 5.00
Approved 100% of the
estimated budget in
accordance to
expenditure pattern last
4 quarters
I.1 Medical As per 1) All activities 25.638 9.638 37% of the estimated
Jharkhand: Administrative Approval 2011-12 Page 95
4 Colleges Revised
Norms and
Basis of
Costing for
RNTCP
proposed
under Medical
Colleges
budget under Trainings
and CME approved.
I.15
Procurement –vehicles
As per Revised Norms and Basis of Costing for RNTCP
1) Procurement of vehicles
Approved 25 Two wheelers in accordance to revised financial norms
Four wheeler
Two wheeler
12.50 12.50
I.16
Procurement – equipment
As per
Revised
Norms and
Basis of
Costing for
RNTCP
1) Procurement
of equipments 9.60 2.40
Approved 4 Office
Equipment sets in
accordance to revised
financial norms.
I.17
Tribal Action Plan
Total 1172.486 973.85
Total Funds under Additionality Head
49.31 14.33
Rs 4.99 lakh for POL and
maintenance for IRL
generator, Rs 8.14 lakh
for CUG communication
extension, Rs 1.2 lakh for
three laptops , Rs 0.5 lakh
for additional
investigations &
travelling charges for
MDR TB patients
approved
G.Total 988.18
Jharkhand: Administrative Approval 2011-12 Page 96
In addition to this, a commodity grant of Rs. ____ lacs has been approved for central level procurement of Anti TB Drugs and Laboratory Equipments for sputum culture & drug sensitivity.
A. Additional Approval under Mission Flexible Pool ( if any)
Sr.
No. Activity
unit cost
(wherever
applicable)
Physical
target/expected
output
Amount
Proposed
Amount
Approved
Remarks/
Conditionalities
1
Uninterrupted
Electric Supply
to IRL-POL
4.99 4.99 Approved
2
Communication
Expenses for
RNTCP Key
Staff with
limited
reimbursement
13.57 8.14
Approval for
contractual STS,
STLS&TBHV.
For others the
communication
facilities have
already been
provisioned
under RNTCP.
Purchase of
mobile handsets
Reimbursement
of call charges,
for which
certain
mechanism
needs to be
defined, only
could be
Jharkhand: Administrative Approval 2011-12 Page 97
approved.
3
Remuneration
of additional
contractual
Staffs-Driver
2.16 Not as per
guidelines
4
Contractual
fourth grade
staff
0.89 Not as per
guidelines
5 Procurement of
Laptop 1.20 1.20
6 Procurement of
Bus for STDC 15.00
The state has
been advised to
make it a
exceptional case
with
appropriate
justification.
7
4 wheelers, One
for STCS & One
for STDC
11.00 5.50
For STCs
provision of
vehicle under
RNTCP. For
STDC may be
approved.
8
Additional cost
involving need
based
Pathological
investigations,
consultation &
travelling cost
of specialist for
0.50 0.00
Jharkhand: Administrative Approval 2011-12 Page 99
List of participants of National Programme Coordination Committee of NRHM to consider the state PIP of Jharkhand. held on 24th March,2011
Sr. No.
Name & Designation Email-ID & Mob.No.
1. Mr. P.K. Pradhan, SS & MD [email protected]
2. Mr. A.M. Prasad,JS, NRHM [email protected]
3. Ms Anuradha Gupta, JS, RCH [email protected]
4. Dr. Sajjan Yadav, Director NRHM [email protected] ,23061656
5. Dr. Suresh K. Mohammed, Director (RCH)
[email protected] ,23061333
6. Dr.P. K. Nayar, DC (Training) [email protected] ,9818972922
7. Dr. Sila Deb, AC (CH) [email protected] , 9868843430
8. Dr. S.N. Sharma, UJoint Director [email protected] ,9810538795
9. Dr. Sushma Dureja ,AC (FP) [email protected] ,9811138931
10. Dr. H. Bhushan, AC(MH) [email protected] ,23062930
11. Dr.Parveen Chandra ,Director (Health) [email protected] ,
12. Rajan Kumar (Jharkhand) [email protected] ,
13. Dr. Syed Imran Farooq (RTAP) farooqs@RNTCP-ORG ,9838768555
14. Dr. Rakesh Dyal ,State TB officer (Jharkhand)
[email protected] 9931100664
15. Dr. Himanshu Bhushan Barwar , State Leprosy officer (Jharkhand)
[email protected] ,9470132699
16. A.T.S.Sinha ,Consultant (Training NVBDCP),JRHMS
[email protected] ,08969162790
17. Arvind Kumar ,Consultant (FMG)NVBDCP, Jharkhand
[email protected] ,09431325769
18. Dr.Pradeep Vheswbis, IDSE,NCDC ,(Delhi)
[email protected] ,9868289921
19. Dr. P. Haldhar AC (Imm) [email protected]
20. Dr. A. K. Prasad Deputy Director [email protected] ,
21. N.S. Rawat ,Programme Manager ,Deptt.of AYUSH New Delhi
[email protected] ,9717040123
22. Dr. Megha Khobragale ,Assistant Director (IDSP)
[email protected] ,9013578143
23. S.Vevek ,ADHISH Proffesior(NIHFW) [email protected] ,9868740629
24. Dr. Niraj Kulshrestra ,CMO (SAC) TB [email protected] ,011-23061107
25. Dr.Sengupta M. Consultant (TB) CTD msengupta
26. Mona Gupta TMSA,MSG Strategic Consulting
[email protected] ,09377819831
Jharkhand: Administrative Approval 2011-12 Page 100
27. Dr. Shahab Ali Siddiqui Consultant NRHM
09650318464 [email protected]
28. Dr. Dinesh Jagtap NHSRC [email protected] ,9958988299
29. Dr.Pradeep Tandan Consultant (NRHM-)
[email protected] ,9717283389
30. Rakesh Kumar,PIP Coordinator, Consultant (RCH)
[email protected] ,9911063225
31. Sukhvinder Kaur ,Stats Division [email protected] ,9868250071
32. Sanjeev Gupta, Finance Controller sanjivbcegmail.com, 9871924655