Extracted Pages From Material Handling Procedure for Sotres

Embed Size (px)

Citation preview

  • 8/18/2019 Extracted Pages From Material Handling Procedure for Sotres

    1/2

     

    PIPING MATERIAL REQUISITIONS

    WORK NO. : __________________ DATE: _________________

    ITEMS TO BE ISSUED UNDER THIS REQUISITION

      PIPE   NIPPLE DRAWING NO LSTKCONTRACTOR:_______________

      FLANGE   STUD END _________________

      GASKET   WELDOLET _________________ REQUESTED BY:_______________

      BOLTS & NUTS   STEAM TRAP _________________

      VALVE   STRAINER _________________ APPROVED BY:_______________

      CAP   SPRAY NOZZLE_________________ (DC)

      COUPLING   GAS MIXER :_______________

      ELBOW   EXPANSION BELLOWS (MC)

      TEE   FLEXIBLE TUBE :_______________  REDUCER   SIGHT GLASS (SO)

      SOCKET   SPRING HANGER : _______________

    UNION   WELDING RODS RECEIVED BY:_______________

    (LSTK CONTRACTOR) AREA CODE : _____________________ DATE REQUIRED: _______________

    ITEMNO.

    DESCRIPTION

    SIZEREQUIRED

    QUANTITY

    DELIVERED

    QUANTITY

    DELIVERY

    DATE

    REMARKS

    REMARKS

    NOTE : This form is included for guidance only. Actualforms to be used at SITE may be self------

  • 8/18/2019 Extracted Pages From Material Handling Procedure for Sotres

    2/2

     

    FORM MC-010

    LOAN / RETURN SLIP FOR SPECIAL TOOL

    DATE :

    JOBNO. :

    SUBLSTKCONTRACTOR /LSTKCONTRACTOR:

    REQUESTED BY :

    RECEIVEDBY :

    ( SUB LSTKCONTRACTOR /LSTKCONTRACTOR )

    AREACODE :

    DATEREQUIRED :

    TIMEREQUIRED :

    NAME OF TOOL

    QUANTITY

    EQUIPMENTCONCERNED

    ITEM NO. (SERIAL NO.)

    PERIOD OF USAGE FROM TO FROM TO

    PREPARED BY CHECKEDBY

     APPROVED BY

    SUBLSTKCONTRACTOR /

    LSTKCONTRACTOR

    CFE MATERIALCONTROLLER

    NOTES