Upload
touheed-khalid
View
212
Download
0
Embed Size (px)
Citation preview
8/18/2019 Extracted Pages From Material Handling Procedure for Sotres
1/2
PIPING MATERIAL REQUISITIONS
WORK NO. : __________________ DATE: _________________
ITEMS TO BE ISSUED UNDER THIS REQUISITION
PIPE NIPPLE DRAWING NO LSTKCONTRACTOR:_______________
FLANGE STUD END _________________
GASKET WELDOLET _________________ REQUESTED BY:_______________
BOLTS & NUTS STEAM TRAP _________________
VALVE STRAINER _________________ APPROVED BY:_______________
CAP SPRAY NOZZLE_________________ (DC)
COUPLING GAS MIXER :_______________
ELBOW EXPANSION BELLOWS (MC)
TEE FLEXIBLE TUBE :_______________ REDUCER SIGHT GLASS (SO)
SOCKET SPRING HANGER : _______________
UNION WELDING RODS RECEIVED BY:_______________
(LSTK CONTRACTOR) AREA CODE : _____________________ DATE REQUIRED: _______________
ITEMNO.
DESCRIPTION
SIZEREQUIRED
QUANTITY
DELIVERED
QUANTITY
DELIVERY
DATE
REMARKS
REMARKS
NOTE : This form is included for guidance only. Actualforms to be used at SITE may be self------
8/18/2019 Extracted Pages From Material Handling Procedure for Sotres
2/2
FORM MC-010
LOAN / RETURN SLIP FOR SPECIAL TOOL
DATE :
JOBNO. :
SUBLSTKCONTRACTOR /LSTKCONTRACTOR:
REQUESTED BY :
RECEIVEDBY :
( SUB LSTKCONTRACTOR /LSTKCONTRACTOR )
AREACODE :
DATEREQUIRED :
TIMEREQUIRED :
NAME OF TOOL
QUANTITY
EQUIPMENTCONCERNED
ITEM NO. (SERIAL NO.)
PERIOD OF USAGE FROM TO FROM TO
PREPARED BY CHECKEDBY
APPROVED BY
SUBLSTKCONTRACTOR /
LSTKCONTRACTOR
CFE MATERIALCONTROLLER
NOTES