Fact Sheet For EA 2055C TRANSPORTATION ENHANCEMENT LA-002-14.1/14.8 Project Description: Location and Limits: IN THE CITY OF LOS ANGELES, ON GLENDLAE BLVD NEAR THE SR-2 SOUTHERN TERMINUS Background: The Los Angeles County Metropolitan Transportation Authority (LAMTA) initiated a study in cooperation with Caltrans and the City of Los Angeles Department of Transportation (LADOT) for the southern terminus of the Glendale Freeway, also known as State Route 2 (SR2), in the City and County of Los Angeles. SR2 transitions from a freeway facility to a conventional highway (major arterial) at the terminus. Traffic flow at the existing terminus is inefficient and unbalanced with highly congested conditions and extensive delays during peak periods and excessive speeds during off-peak periods. A project change request (PCR) was done in June of 2014 to split the project into two projects: EA 07-2055A and 07-2055C. The reason for the split was for freeway planting, which was deleted during the drought period, and transportation enhancement including an Electronic Message Sign (EMS) to slow traffic at the freeway terminus. ***The project is currently in PS&E phase.*** What The Work Involves: This project involves freeway planting and transportation enhancement including the construction of an Electronic Message Sign (EMS) to slow traffic at the freeway terminus. Benefits: Freeway planting and transportation enhancement will improve aesthetics and safety. Concerned Communities: NA State And Federal Officials: Assembly District(s): Wendy Carrillo (51) Senate District(s): Maria R. Durazo (24) U.S. Congressional District(s): Adam Schiff (28) City/Community: Los Angeles (049) LA County Supervisor: Hilda L. Solis (1) LA Council of Governments : Central Los Angeles (4) Other Interested Parties: NA Schedules: Construction Phase Begins: Summer 2021 Construction Phase Ends: Summer 2023 Total Programmed Project Costs: $ 1.400 Million Project Contacts: Project Manager: John K. Lee, 213-897-8623 Area Manager: Osama Megalla, 213-897-0520 Page 1 of 2 External Factsheet 8/13/2020 http://10.56.12.86/pirs/fs/external.cfm?EA=2055C

External Factsheet Page 1 of 2Aug 13, 2020  · Fact Sheet For EA 2055C TRANSPORTATION ENHANCEMENT LA-002-14.1/14.8 Project Description: • Location and Limits: IN THE CITY OF LOS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: External Factsheet Page 1 of 2Aug 13, 2020  · Fact Sheet For EA 2055C TRANSPORTATION ENHANCEMENT LA-002-14.1/14.8 Project Description: • Location and Limits: IN THE CITY OF LOS

Fact Sheet For EA 2055C

TRANSPORTATION ENHANCEMENT

LA-002-14.1/14.8

Project Description:• Location and Limits:

IN THE CITY OF LOS ANGELES, ON GLENDLAE BLVD NEAR THE SR-2 SOUTHERN TERMINUS• Background:

The Los Angeles County Metropolitan Transportation Authority (LAMTA) initiated a study in cooperation with Caltrans and the City of Los AngelesDepartment of Transportation (LADOT) for the southern terminus of the Glendale Freeway, also known as State Route 2 (SR2), in the City and County ofLos Angeles. SR2 transitions from a freeway facility to a conventional highway (major arterial) at the terminus. Traffic flow at the existing terminus isinefficient and unbalanced with highly congested conditions and extensive delays during peak periods and excessive speeds during off-peak periods. Aproject change request (PCR) was done in June of 2014 to split the project into two projects: EA 07-2055A and 07-2055C. The reason for the split wasfor freeway planting, which was deleted during the drought period, and transportation enhancement including an Electronic Message Sign (EMS) to slow traffic at the freeway terminus. ***The project is currently in PS&E phase.***

• What The Work Involves:This project involves freeway planting and transportation enhancement including the construction of an Electronic Message Sign (EMS) to slow traffic at the freeway terminus.

• Benefits:Freeway planting and transportation enhancement will improve aesthetics and safety.

Concerned Communities:NA

State And Federal Officials:Assembly District(s): Wendy Carrillo (51)Senate District(s): Maria R. Durazo (24)U.S. Congressional District(s): Adam Schiff (28)

City/Community:Los Angeles (049)

LA County Supervisor:Hilda L. Solis (1)

LA Council of Governments :Central Los Angeles (4)

Other Interested Parties:NA

Schedules:Construction Phase Begins: Summer 2021 Construction Phase Ends: Summer 2023

Total Programmed Project Costs: $ 1.400 Million

Project Contacts:Project Manager: John K. Lee, 213-897-8623Area Manager: Osama Megalla, 213-897-0520

Page 1 of 2External Factsheet

8/13/2020http://10.56.12.86/pirs/fs/external.cfm?EA=2055C

s110521
Text Box
Page 2: External Factsheet Page 1 of 2Aug 13, 2020  · Fact Sheet For EA 2055C TRANSPORTATION ENHANCEMENT LA-002-14.1/14.8 Project Description: • Location and Limits: IN THE CITY OF LOS

Map data ©2020

Page 2 of 2External Factsheet

8/13/2020http://10.56.12.86/pirs/fs/external.cfm?EA=2055C

Map: