14
Contents EXTENSION OF A STRATEGIC ENVIRONMENTAL ASSESSMENT TO FACILITATE THE EFFICIENT AND EFFECTIVE IMPLEMENTATION OF WIND AND SOLAR PHOTOVOLTAIC ENERGY DEVELOPMENT IN SOUTH AFRICA Expert Reference Group and Project Steering Committee Meeting 25 July 2017 Presented by: Abulele Adams (CSIR) Tel: 021 888 2408 - Email: [email protected]

EXTENSION OF A STRATEGIC ENVIRONMENTAL … · June 2018 (TBC) 9 Consultation • Quarterly working group meetings with industry and conservation organisations • Quarterly meetings

Embed Size (px)

Citation preview

Contents

EXTENSION OF A STRATEGIC ENVIRONMENTAL ASSESSMENT TO FACILITATE THE EFFICIENT AND EFFECTIVE IMPLEMENTATION OF WIND AND SOLAR PHOTOVOLTAIC ENERGY DEVELOPMENT IN SOUTH AFRICA

Expert Reference Group and Project Steering Committee

Meeting

25 July 2017

Presented by: Abulele Adams (CSIR)

Tel: 021 888 2408 - Email: [email protected]

2

Presentation outline

• Wind and Solar SEA (Phase 2)

– Introduction • Updated project team and roles

• Multi Author teams

• Timeline and methodology

• Consultation

– Technical Considerations

– Environmental Considerations

– Socio economic Considerations

– Way Forward

3

Project Team and roles

DEA • Dee Fischer, Project

Director • Simon Moganetsi, Project

Coordinator

CSIR • Lydia Cape, Project

Leader • Abulele Adams,

Project Officer

Multi-authors Specialists team

Other key stakeholders eg. Mining, CAA, Defense, Heritage, etc.

SANBI

SEA process development

and implementation

Sensitivity mapping and

specialist studies

• Fahiema Daniels • Kedibone Lamula • Moore Malatji

CSIR: Built Environment

• Mawande Ngidi • Elsona Van Huyssteen

Conservation Working Group

Consultation and experts’ inputs

Industry Working Group

ERG PSC Public

4

Multi-authors specialists team

5

Strategic Issues for consideration

Bats

Birds

Ecology & conservation

• Terrestrial fauna & flora

• Freshwater

Socioeconomic

Heritage and Visual

• Palaeontology

• Archaeology

• Landscape and Flicker

Land Use & Built Environment

• Agriculture

• Mining

• SKA

• CAA

• Radar

• Noise

6

Timeline and methodology: delineation of first

draft focus areas

June-August 2017

7

Timeline and methodology: delineation of second

draft focus areas and multi-authors studies

15 August – 15 September (TBC)

September 2017 (TBC) October 2017 –

February 2018 (TBC)

8

Timeline and methodology: delineation of third

draft focus areas and consultation on REDZs

March 2018 (TBC) April-May 2018 (TBC) June 2018 (TBC)

9

Consultation

• Quarterly working group meetings with industry and

conservation organisations

• Quarterly meetings with ERG and PSC members

• Sector specific meetings with key stakeholders

• Two 30 days review & comments period for the public

and all stakeholders

• Online project website continuously updated and

accessible during the duration of the SEA

10

Technical Considerations

See separate presentation pdf attached

Presentation by Abulele Adams (CSIR) [email protected]

Mapping team: Lydia Cape, Abulele Adams, and Fahiema Daniels

with inputs from the Energy Centre of the CSIR

11

Environmental Considerations

See separate presentation pdf attached

Presentation by Kedibone Lamula (SANBI) [email protected]

Mapping team: Fahiema Daniels, Kedibone Lamula, Moore Malatji, Tsamaelo Malebu, Lydia Cape, and Abulele Adams

12

Socio economic Considerations

See separate presentation pdf attached

Presentation by: Mawande Ngidi (CSIR) [email protected]

Project Team: Mawande Ngidi, Elsona van Huyssteen,

Gerbrand Mans, Dave McKelly, and Sibu Makhanya

13

Way Forward

• ERG and PSC members are invited to provide inputs on :

Additional strategic issues for consideration;

References for the multi-authors specialists team;

Criteria/data to be used for the Technical Considerations;

Criteria/data to be used for the Environmental Considerations;

Criteria/data to be used for the Socio economic Considerations; and

SEA process methodology and consultation.

Please send your inputs to the SEA project manager: Abulele Adams, Tel: (021) 888 2408, Fax: (021) 888 2473

Emali: [email protected]

Project website: http://redzs.csir.co.za

Project email: [email protected]

Please send your inputs to the SEA project manager: Abulele Adams

Tel: (021) 888 2408 Fax: (021) 888 2473

Email: [email protected]

Thank you for your participation to this second ERG/PSC meeting on 25th July 2017