M2PP-121-D-DWG-8703 POLE HEIGHT POLE SPACING EXTRAPOLATED PROJECT QUANTITY 4.5M 26M 135 5.0M 28M 126 5.5M 30M 117 6.0M 31M 114 6.5M 32M 110 BRIDLEWAY CWB 3.0M 5.5M 1.5M 300mm SETBACK FROM CWB OPTIMUM POLE SPACING - COLUMN HEIGHT RATIO WITH SUGGESTED LUMINR (LEOTEK E-COBRA ECI) 100X100X3 RHS GALVANISED LEOTEK E-COBRA ECI (SHOWN FOR REFERENCE) LUMINAIRE TO BE DIRECTED AWAY FROM RESIDENTIAL SIDE OF CWB TO MINIMISE LIGHT SPILL EXPRESSWAY SIDE OF CWB RESIDENTIAL SIDE OF CWB No. Appd Revision Chk.V Date DO NOT SCALE * Refer to Revision 1 for Original Signature Scale (A1) Scale (A3) Reduced Dwg Check Dsg Verifier Drawn Original Design Date Approved For Project: IF IN DOUBT ASK. Title: Drawing No: Document No. Rev. Drawing Plotted: SH1 MACKAYS TO PEKA PEKA RP 1012/0.00 TO 1023/5.00 Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON DETAIL DESIGN (DET) Construction* By Chk EXPRESSWAY 0mm 30 10 20 40 A3 REPRODUCTION SCALE 50 60 20 40 80 100 0mm A1 REPRODUCTION SCALE VB C 10/11/14 11/10/14 11/10/14 CERTIFIED ISSUE AS SHOWN AS SHOWN LK C VB SSMP 1 [320] - SHEET 13 INDICATIVE LIGHT POLE CONFIGURATION

EXPRESSWAY SIDE OF CWB DETAIL DESIGN (DET · ground level view of cycleway entrance cwb gateway - plan: scale - 1:50 scale - 1:50 scale - 1:100: allowance for ... 2. all dimensions

Embed Size (px)

Citation preview

M2PP-121-D-DWG-8703

POLE HEIGHT POLE SPACING EXTRAPOLATED PROJECT QUANTITY

4.5M 26M 135

5.0M 28M 126

5.5M 30M 117

6.0M 31M 114

6.5M 32M 110

BRIDLEWAY CWB 3.0M

5.5M

1.5M

300mm SETBACK FROM CWB

OPTIMUM POLE SPACING - COLUMN HEIGHT RATIO WITH SUGGESTED LUMINR (LEOTEK E-COBRA ECI)

100X100X3 RHS GALVANISED

LEOTEK E-COBRA ECI(SHOWN FOR REFERENCE)

LUMINAIRE TO BE DIRECTED AWAY FROM RESIDENTIAL SIDE OF CWB TO MINIMISE LIGHT SPILL

EXPRESSWAY SIDE OF CWB

RESIDENTIAL SIDE OF CWB

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

VB

C 10/11/14

11/10/14

11/10/14

CERTIFIED ISSUE

AS SHOWN

AS SHOWN

LK

CVB

SSMP 1 [320] - SHEET 13 INDICATIVE LIGHT POLE

CONFIGURATION

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

VB

C 10/11/14

11/10/14

11/10/14

CERTIFIED ISSUE

AS SHOWN

AS SHOWN

LK

CVB

M2PP-121-D-DWG-8801SSMP 1 [320] - SHEET 14 CWB INTERSECTIONS

1.0m

7.5m

3.0mCYCLEWAY WALKWAY BRIDLEWAY

3.0mCYCLEWAY WALKWAY BRIDLEWAY

0.5mGABION

0.5mGABION

1.0mBRIDLEWAY ON

RESIDENTAIL SIDE OF CWB

LOW PLANTING ADJACENT TO

WALKWAY

GABIONS

CWB LIGHT

PAINTED

SURFACE

LOW PLANTING ADJACENT TO

WALKWAY

WELDED MESH GABION WITH OTAKI RIVER STONE WALL

CS2-

CS1-

CS1 - TYPICAL CYCLEWAY SECTION

CS2 - TYPE 1 CYCLEWAY ENTRANCE

GROUND LEVEL VIEW OF CYCLEWAY ENTRANCE

CWB GATEWAY - PLAN

SCALE - 1:50

SCALE - 1:50

SCALE - 1:100

ALLOWANCE FOR FUTURE SIGNAGE AND INFORMATION BOARDS

INTERSECTION DIRECTION SIGN

SPACE PROVISION FOR FUTURE

INFORMATION BOARDS

THESE SIGNS ARE TO BE ARRANGED ON A SINGLE POLE INTHE ORIENTATION SHOWN. THEY ARE TO BE ORIENTED WITH'PAEKAKARIKI' POINTING SOUTH WEST ALONG THE CWB AND'PARAPARAUMU' POINTING NORTH EAST ALONG THE CWB.

895

672

858

190

190

SINGLE SIDED SINGLE SIDED

DOUBLE SIDED

329

492 437

329

UNDER REVISIONNo. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 10 Sep 2014 01:17 p.m.

M2PP

-32P

-D-S

KT-0

001.D

WG

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

M2PP-32P-D-SKT-0001 APOPLAR AVENUE INTERCHANGE

CWB SIGNAGE LAYOUTSKETCH

1:10

1:20

I. LEASK 26.05.14I. LEASK 26.05.14

NOT FOR CONSTRUCTIONDRAFT ONLY

FOR INFORMATIONNOT FOR CONSTRUCTION

SIGN ARRANGEMENT 1-11:10

SIGN 1-21:10

NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM

THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.

A FOR INFORMATION IL

SIGN 1-31:10

THESE SIGNS ARE TO BE ARRANGED ON A SINGLE POLE INTHE ORIENTATION SHOWN. THEY ARE TO BE ORIENTED WITH'PAEKAKARIKI' POINTING SOUTH WEST ALONG THE CWB AND'PARAPARAUMU' POINTING NORTH EAST ALONG THE CWB.

895

672

858

190

190

SINGLE SIDED SINGLE SIDED

DOUBLE SIDED

329

492 437

329

UNDER REVISIONNo. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 10 Sep 2014 01:17 p.m.

M2PP

-32P

-D-S

KT-0

001.D

WG

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

M2PP-32P-D-SKT-0001 APOPLAR AVENUE INTERCHANGE

CWB SIGNAGE LAYOUTSKETCH

1:10

1:20

I. LEASK 26.05.14I. LEASK 26.05.14

NOT FOR CONSTRUCTIONDRAFT ONLY

FOR INFORMATIONNOT FOR CONSTRUCTION

SIGN ARRANGEMENT 1-11:10

SIGN 1-21:10

NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM

THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.

A FOR INFORMATION IL

SIGN 1-31:10

LEGEND

CYCLWAY WALKWAY BRIDLEWAY

EXISTING NETWORK

LOCAL ROAD

CROSSING POINT

ID2

ID2

CD1

CD2

CD2

CD1

THESE SIGNS ARE TO BE ARRANGED ON A SINGLE POLE INTHE ORIENTATION SHOWN. THEY ARE TO BE ORIENTED WITH'PAEKAKARIKI' POINTING SOUTH WEST ALONG THE CWB AND'PARAPARAUMU' POINTING NORTH EAST ALONG THE CWB.

895

672

858

190

190

SINGLE SIDED SINGLE SIDED

DOUBLE SIDED

329

492 437

329

UNDER REVISIONNo. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 10 Sep 2014 01:17 p.m.

M2PP

-32P

-D-S

KT-0

001.D

WG

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

M2PP-32P-D-SKT-0001 APOPLAR AVENUE INTERCHANGE

CWB SIGNAGE LAYOUTSKETCH

1:10

1:20

I. LEASK 26.05.14I. LEASK 26.05.14

NOT FOR CONSTRUCTIONDRAFT ONLY

FOR INFORMATIONNOT FOR CONSTRUCTION

SIGN ARRANGEMENT 1-11:10

SIGN 1-21:10

NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM

THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.

A FOR INFORMATION IL

SIGN 1-31:10

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

12:34 PM WEDNESDAY 17 DECEMBER 2014

VB

C 10/11/14

11/10/14

11/10/14

CERTIFIED ISSUE

AS SHOWN

AS SHOWN

LK

CVB

SSMP 1 [320] - SHEET 15SIGNAGE LOCATION PLAN

M2PP-121-D-DWG-8902

AI - ADVANCED INFO SIGNS

BE - BEGINNING AND ENDING SIGNS

AD01 - ADVANCED DIRECTION SIGN - ON LOCAL ROAD APPROACHING CWB

AD - ADVANCED DIRECTION - ON CWB

ID - INTERSECTION DIRECTION

CD - CONFIRMATION DIRECTION

LOCAL ROAD INTERSECTION SIGNS

CycleRoute

Kapiti

CycleRoute

KapitiCycleRoute

Kapiti

858 728

905 DOUBLE SIDED

190

190

190

925 728

750

858

DOUBLE SIDED

190

190

150

190

728 924

750

858

DOUBLE SIDED

190

150

190

190

728 905

858

DOUBLE SIDED

190

190

190

492

329

360

328

328

307492

329

433

375

858

190

522

190

190

578

300

550

300

550

300

550

BEGINS ENDS

400400

600

600

125

125

400400

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 27 Nov 2013 09:05 a.m.

M2PP

-47P

-D-S

KT-0

001.D

WG

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

A FOR INFORMATION ILM2PP-47P-D-SKT-0001 A

WAIKANAE RIVER CROSSINGCWB SIGNAGE LAYOUT

SKETCH1:10

1:20

IL 18.11.13IL 18.11.13

NOT FOR CONSTRUCTIONDRAFT ONLY

FOR INFORMATIONNOT FOR CONSTRUCTION

SIGN ARRANGEMENT 2-241:10

SIGN ARRANGEMENT 2-251:10

SIGN ARRANGEMENT 2-261:10

SIGN ARRANGEMENT 2-281:10

SIGNS 2-39, 2-40, 2-41, 2-421:10

SIGN 2-271:10

SIGN 2-291:10

NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM

THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.

SIGN ARRANGEMENT 2-301:10

SIGN 2-341:10

SIGNS 2-43, 2-451:10

SIGNS 2-44, 2-461:10

SIGN 2-311:10

SIGN 2-321:10

SIGN 2-331:10

SIGN 2-231:10

858 728

905 DOUBLE SIDED

190

190

190

925 728

750

858

DOUBLE SIDED

190

190

150

190

728 924

750

858

DOUBLE SIDED

190

150

190

190

728 905

858

DOUBLE SIDED

190

190

190

492

329

360

328

328

307492

329

433

375

858

190

522

190

190

578

300

550

300

550

300

550

BEGINS ENDS

400400

600

600

125

125

400400

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 27 Nov 2013 09:05 a.m.

M2PP

-47P

-D-S

KT-0

001.D

WG

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

A FOR INFORMATION ILM2PP-47P-D-SKT-0001 A

WAIKANAE RIVER CROSSINGCWB SIGNAGE LAYOUT

SKETCH1:10

1:20

IL 18.11.13IL 18.11.13

NOT FOR CONSTRUCTIONDRAFT ONLY

FOR INFORMATIONNOT FOR CONSTRUCTION

SIGN ARRANGEMENT 2-241:10

SIGN ARRANGEMENT 2-251:10

SIGN ARRANGEMENT 2-261:10

SIGN ARRANGEMENT 2-281:10

SIGNS 2-39, 2-40, 2-41, 2-421:10

SIGN 2-271:10

SIGN 2-291:10

NOTES:1. FOR DETAILED DIMENSIONS REFER TO SKETCH M2PP-23P-D-SKT-01002. ALL DIMENSIONS ARE IN MILLIMETRES.3. ALL WHITE AREAS ON SIGNS TO BE REFLECTORISED AS PER SPECIFICATION.4. THIS DRAWING IS INTENDED FOR THE SIGN MANUFACTURER ONLY AND WILL INFORM

THE PRODUCTION OF SHOP DRAWINGS.5. ALL DESTINATION TEXT ON ALL CWB SIGNS TO BE 50mm SERIES D.6. ALL DISTANCES AND 'km' TEXT ON ALL CWB SIGNS TO BE 38mm SERIES D.

SIGN ARRANGEMENT 2-301:10

SIGN 2-341:10

SIGNS 2-43, 2-451:10

SIGNS 2-44, 2-461:10

SIGN 2-311:10

SIGN 2-321:10

SIGN 2-331:10

SIGN 2-231:10

Destination

Destination

Destination

Destination

Destination

Destination

Destination

Destination

AT START OF ROUTE.INCLUDES:• MAP & INFO• LENGTH & DURATION OF RIDE / WALK

BE - Begins/Ends Signs are used to indicate the start and/or end point of a cycle route. They will include route specific information. Route Begins Signs should be installed on the left hand side of the CWB immediately beyond or adjacent to any advance information sign or at a logical starting point for the cycle route.

ID - The Intersection Direction Sign is located at or as near as possible to the actual intersection. Should include both Information about the destination and the distance.

Multiple sighs and destinations to be on one post

CD - The Confirmation Direction Sign is used to confirm the direction/destination of travel after an intersection it is intended to provide assurance to cyclists. The CD sign features a straight ahead arrow and should include both Information about the destination and the distance.

As a general rule of thumb, these signs should be installed; between 20-50m beyond an intersection where an Advance Direction Sign has been used and should generally be visible from that intersection;

Cyclists should see a CD sign at least every 15-30 minutes of typical cyclist travel, or every 5-10 km.

LR + GW - Local road (LR) and Giveway (GW) signs should to be used where the CWB crosses a local road. These are to be located at or as near as possible to the actual intersection. Where possible the LR should be kept to one per intersection and be able to be read by people on either side of the intersection. Both the LR and GW should share the same post and or be incorporateted onto an existing post.

AI - Advance Information Signs are not an essential requirement for public access tracks or cycle routes, nor are they standardised in terms of their design and layout. These signs may, if desired and appropriate, be installed at or near the start point of the route to provide detailed information, such as a map and information about the length and duration to ride etc. These signs should be clearly visible from the road, allowing cyclists and pedestrians a safe place to stop clear of the roadway or cycleway to read the information.

AD - The purpose of the Advance Direction Sign is to give cyclists prior warning, to enable them to make decisions and, if necessary, place themselves in the best position to make any change in direction required before they reach the intersection. These signs should be used in any situation where the cyclist could easily miss making a required turn at an approaching intersection.

To occur 40-60m in advance of an intersection and should only include Information about the destination, not the distance.

AD - The purpose of the Advance Direction Sign is to give cyclists prior warning, to enable them to make decisions and, if necessary, place themselves in the best position to make any change in direction required before they reach the intersection. These signs should be used in any situation where the cyclist could easily miss making a required turn at an approaching intersection.

To occur 40-60m in advance of an intersection and should only include Information about the destination, not the distance.

TYPICAL SIGN TYPES:

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted:

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON

DE

TA

IL D

ES

IGN

(D

ET

)

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E12:34 PM WEDNESDAY 17 DECEMBER 2014

VB

C 10/11/14

11/10/14

11/10/14

CERTIFIED ISSUE

AS SHOWN

AS SHOWN

LK

CVB

SSMP 1 [320] - SHEET 16CWB SIGN TYPE SUMMARY

NTS

NTS

M2PP-121-D-DWG-8901

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 07 Aug 2014 05:01 p.m.

M2PP

-23R

-D-D

WG-

8904

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

1 FOR CONSTRUCTION MP GFB DH DC 07.05.14M2PP-23R-D-DWG-8904 2

STANDARD DETAILSDUNE ROUNDING DETAILNTS

NTS

B FAULKNER 24.04.14V BILLETT 24.04.14B EVANS 05.05.14G F-B 05.05.14

P BRADSHAW

09.05.142 REVISED BASED ON GEOTECHNICAL INPUT MP MP BF DS 07.08.14

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 28 Oct 2014 09:39 a.m.

M2PP

-32R

-D-D

WG-

8701

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

M2PP-32R-D-DWG-8701 4POPLAR AVE INTERCHANGE

VEGETATION TO BE RETAINEDSHEET 1

1:500

1:1000

B FAULKNER 19.09.13M POWELL 19.09.13B EVANS 12.11.13W HOLCROFT 13.11.13

P BRADSHAW

15.11.13

TERRESTRIAL VALUED VEGETATION ( CONSENT CONDITION G.41 c) i) )

WETLAND VALUED VEGETATION ( CONSENT CONDITION G.41 c) ii) )

VEGETATION TO BE RETAINED

LANDFORM TO BE RETAINED

TERRESTRIAL VEGETATION - NATIVE

TERRESTRIAL VEGETATION - EXOTIC

WETLAND VEGETATION - NATIVE

WETLAND VEGETATION - EXOTIC / OPEN WATER

DESIGNATION

320

1 FOR CONSTRUCTION MP WGH DH SW 13.11.13

EXISTING SH1

QUEEN ELIZABETH PARK

VEGETATION REMOVED

NOTES:1. AREAS OF VEGETATION IDENTIFIED TO BE RETAINED ARE SUBJECT TO MARKING ON SITE BY

AN ECOLOGIST OR LANDSCAPE ARCHITECT PRIOR TO TEMPORARY FENCING.2. REMOVAL OF ANY VEGETATION MARKED FOR RETENTION MUST BE APPROVED BY A

LANDSCAPE ARCHITECT OR ECOLOGIST.3. COMPLIANCE WITH THE ABOVE IS A REQUIREMENT OF THE CONSENT CONDITIONS.

RETAIN

RETAIN

2 FOR KCDC CERTIFICATION - REVISED AS NOTED MP GFB DH DC 21.05.143 FOR KCDC CERTIFICATION - REVISED AS NOTED MP GFB DH DC 23.05.14

32R

DWG

8202

320

310

EXPRESSWAY NORTHBOUND

EXPRESSWAY SOUTHBOUND

4 FOR CONSTRUCTION - REVISED AS NOTED MP GFB DH DC 24.10.14

No. AppdRevision Chk.V Date

DO NOT SCALE

* Refer to Revision 1 for Original Signature

Scale (A1)

Scale (A3)Reduced

Dwg Check

Dsg Verifier

Drawn

Original Design

Date

Approved For Project:

IF IN DOUBT ASK.

Title: Drawing No:

Docu

ment

No.

Rev.

Drawing Plotted: 28 Oct 2014 09:41 a.m.

M2PP

-32R

-D-D

WG-

8702

.DW

G

SH1 MACKAYS TO PEKA PEKA

RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, 43 Ihakara Street, PO Box 723, Paraparaumu 5254.

Construction*

By Chk

EXPRESSWAY

0mm

30

10

20

40

A3 R

EPRO

DUCT

ION

SCAL

E

50

60

20

40

80

100

0mm

A1 R

EPRO

DUCT

ION

SCAL

E

M2PP-32R-D-DWG-8702 3POPLAR AVE INTERCHANGE

VEGETATION TO BE RETAINEDSHEET 2

1:500

1:1000

B FAULKNER 19.09.13M POWELL 19.09.13B EVANS 12.11.13W HOLCROFT 13.11.13

P BRADSHAW

15.11.13

TERRESTRIAL VALUED VEGETATION ( CONSENT CONDITION G.41 c) i) )

WETLAND VALUED VEGETATION ( CONSENT CONDITION G.41 c) ii) )

VEGETATION TO BE RETAINED

LANDFORM TO BE RETAINED

TERRESTRIAL VEGETATION - NATIVE

TERRESTRIAL VEGETATION - EXOTIC

WETLAND VEGETATION - NATIVE

WETLAND VEGETATION - EXOTIC / OPEN WATER

DESIGNATION 320

1 FOR CONSTRUCTION MP WGH DH SW 13.11.13

EXPRESSWAY SOUTHBOUND

EXPRESSWAY NORTHBOUND

EXISTING SH1

32R

DWG

8704

ADDITIONAL VEGETATION RETAINED

NOTES:1. AREAS OF VEGETATION IDENTIFIED TO BE RETAINED ARE SUBJECT TO MARKING ON SITE BY

AN ECOLOGIST OR LANDSCAPE ARCHITECT PRIOR TO TEMPORARY FENCING.2. REMOVAL OF ANY VEGETATION MARKED FOR RETENTION MUST BE APPROVED BY A

LANDSCAPE ARCHITECT OR ECOLOGIST.3. COMPLIANCE WITH THE ABOVE IS A REQUIREMENT OF THE CONSENT CONDITIONS.

2 FOR KCDC CERTIFICATION - REVISED AS NOTED MP GFB DH DC 21.05.14

32R DWG 870332

RDW

G87

01 POPLAR AVE

CWB

QUEEN ELIZABETH PARK

RETAIN RETAIN

RETAIN

RETAIN

EXPRESSWAY OFF RAMP

EXPRESSWAY ON RAMP

RETAIN RETAIN RETAIN

3 FOR CONSTRUCTION - REVISED AS NOTED MP GFB DH DC 24.10.14