Expression of interest
[EOI]
For
Construction of Infrastructure Works
at Quaid-e-Azam Apparel Park (QAAP)
District Sheikhupura on M-2, Motorway Lahore
May 2016
PIEDMC Head Office, Commercial Area (North), Sundar Industrial Estates Raiwind Road, Lahore. Phone No. : 92 42 35297203-6, Fax No. : 92 42 35297207
URL:www.pie.com.pk email: [email protected]
(i)
CONSTRUCTION OF INFRASTRUCTURE WORKS FOR QUAID-E-
AZAM APPAREL PARK, M-2, MOTORWAY, DISTRICT
SHEIKHUPURA PRE-QUALIFICATION DOCUMENT
TABLE OF CONTENTS
SR. NO. DESCRIPTION PAGE NO.
1. GENERAL 1
1.1 INTRODUCTION 1
1.2 PURPOSE OF THIS DOCUMENT 3
1.3 PROJECT LOCATION 3
1.4 SPECIFICATIONS & STANDARDS 3
1.4 BRIEF SCOPE OF WORK 3
2. FEE OF THE PRE-QUALIFICATION DOCUMENTS 3
3. INSTRUCTIONS TO APPLICANTS 4
3.1 SUBMISSION OF APPLICATION 4
3.2 QUALIFICATION CRITERIA 4
3.2.1 GENERAL 4
3.2.2 BASIC ELIGIBILITY 5
3.2.3 EXPERIENCE RECORD 5
3.2.4 PERSONAL CAPABILITIES 6
3.2.5 EQUIPMENT CAPABILITIES 7
3.2.6 FINANCIAL POSITION 7
3.2.7 LITIGATION HISTORY 8
3.3 JOINT VENTURE (JV) 8
3.3.1 JOINT VENTURE MUST COMPLY WITH THE
FOLLOWING REQUIREMENTS 8
3.4 CONFLICT OF INTEREST 9
3.5 UPDATING PREQUALIFICATION INFORMATION 9
3.6 OTHER FACTORS 9
4. EVALUATION CRITERIA 10
5. ADDITIONAL CLAUSES 10
LETTER OF APPLICATION 12
A. FORMS
FORM A-1: GENERAL INFORMATION
FORM A-2: GENERAL EXPERIENCE RECORD
(ii)
SR. NO. DESCRIPTION PAGE NO.
FORM A-3: JOINT VENTURE SUMMARY
FORM A-4: PARTICULAR EXPERIENCE RECORD
FORM A-5: DETAILS OF CONTRACTS OF SIMILAR
NATURE AND COMPLEXITY
FORM A-6: CURRENT CONTRACT COMMITMENTS /
WORKS IN PROGRESS
FORM A-7: PERSONNEL CAPABILITIES
FORM A-8: CANDIDATES SUMMARY
FORM A-9: EQUIPMENT CAPABILITIES
FORM A-10: FINANCIAL CAPABILITY
FORM A-11: LITIGATION HISTORY
Annexure-I Evaluation Criteria
Pre-Qualification of Contractors/Firms/ JVs
______________________________________________________________________ Page 1 of 28
PRE-QUALIFICATION OF FOREIGN CONTRACTORS FOR
CONSTRUCTION OF INFRASTRUCTURE WORKS FOR QUAID-E-AZAM
APPAREL PARK, M-2, MOTORWAY, DISTRICT SHEIKHUPURA
(SPECIAL ECONOMIC ZONE-SEZ)
1.1 INTRODUCTION
Punjab Industrial Estates Development & Management Company (PIEDMC) has
been established by Government of Punjab, having its registered office at
Commercial Area (North), Sundar Industrial Estate, Raiwind Road, Lahore, Pakistan,
an association of non-profit organization, within the meaning of Section-42 of the
Companies Ordinance-1984 has been formed as Public Company with the main
objective to develop a chain of new industrial estates in the province Punjab along
with upgrading the existing ones in a dynamic and innovative manner, making
ancillary arrangements related to the development of infrastructure, meeting the new
challenges of WTO regime and providing solutions to the problems of prospective
entrepreneurs.
PIEDMC is led by private sector so that it can be more flexible, responsive to the
changing environment and also be financially sustainable in the long run.
The company consists of a central Board of Directors (BOD) consisting of 21
members, 17 of which are from private sector including Chairman of BOD,
representing different sectors of the economy and four (04) from Ex-Officio
Government Secretaries such as Secretary Industries, Commerce &Investment,
Secretary Labor, Secretary Finance and Chairman TEVTA.
The Government of Punjab (GoP) has initiated a project of “Quaid-e-Azam Apparel
Park (QAAP)“ and PIEDMC has been made responsible for its execution. The
project is located on M-2, motorway near district Sheikupura, in order to facilitate the
textile, garment & apparel sector all over the Pakistan.
Presently, there is neither any organized or planned Garment/Apparel Zone neither
in Punjab nor in the entire Country. Therefore, there is an utmost need for
establishment of state-of-the-art Apparel / Garment Zone to encourage and promote
garment related industrial activity. It can also become a source of foreign investment
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 2 of 28
by projecting to international industrial community; in particular, South Asia, China
and Central Asian States. As a matter of fact, establishment of Garment Zone will
bring prosperity to the entire region at local and national levels.
Since, the focus of Apparel / Garment Zone will be largely on industries like textiles
and garments but allied and other general industries related to textile and garment
will also be given the same importance as these industries will serve a major role in
supporting and supplying to the main industries. There will also be opportunities for
industries producing value additions products, therefore planning and development
be carried out in light of their (all types of textile, garment and related industries)
combined technical and financial parameters.
The Apparel Zone will be developed on minimum 1536 acres which can meet the
requirements to provide maximum possible facilities including infrastructure,
amenities, CETP and grid station etc. to the potential industrialists.
The SALIENT Features of project are as follows:-
i. Approved as Special Economic Zone (SEZ) by the Government of the Punjab.
ii. 1536 acres land is earmarked for the said project (QAAP).
iii. Well located (40 kilometers away from Lahore city and 15 kilometers from District
Sheikhupura).
iv. 1.5 kilometers from existing overhead bridge on Motorway (M-2) which is being
developed as an interchange to link directly with the site.
v. All the utilities (Electricity, Sui Gas, Telephone etc) are within 10 kilometers range.
vi. Plain land with minimal level differences, therefore, no problem for drainage.
vii. Mix of agricultural, sandy land with normal soil strata.
viii. UCC (Upper Chanab Canal) at a distance of 2.5 kilometers of site provides alternate
water source other than the tube wells.
ix. Four kilometers away from Chichookee Mallyan railway station.
x. Also easily accessible from Lahore- Sheikhupura road other than Motorway.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 3 of 28
1.2 PURPOSE OF THIS DOCUMENT
The purpose of this document is to shortlist / pre-qualify eligible, well versed Foreign Firms
in Joint Ventures (JVs) with Pakistani firm, capable of undertaking all required activities
under the subject project including Civil, Mechanical and Electrical works along with all
other allied works and to seek applications for Pre-qualification as per requirements
elaborated in this document.
1.3 PROJECT LOCATION
The proposed project is located on M-2, Motorway, District Sheikhupura, 40 km from the
Lahore, provincial capital of Punjab province of Pakistan. The satellite image showing the
location plan of QAAP project is attached as Annexure-B and approach roads connectivity
details is attached as Annexure-C.
1.4 SPECIFICATIONS STANDARDS
The QAAP project has been designed on the international standards & techniques as per
ASTM, AASHTO, AASHO, ACI and IEC etc.
1.5 BREIF SCOPE OF WORK
The wining contractor will be executed/constructed the works as per the design and standards
provided by the Client as under:
i) Construction of internal road network (flexible pavement) approximately 32 km in
length.
ii) Laying of water supply network (PE pipes), including construction of overhead water
tanks.
iii) Construction of drainage system, RCC drains for effluent and storm water system.
iv) Laying of underground electrification system including HT/LT lines, street lights and
installation and commissioning of pad mounted transformers, RMU’s and other allied
equipments.
v) Laying of main Trunk sewer lines.
vi) Construction of Waste Water Works
vii) All related civil, electrical and mechanical works will be executed
2. FEE OF THE PRE-QUALIFICATION DOCUMENTS
The pre-qualification documents will be issued to the interested foreign firms/JVs on
payment of non-refundable fee in shape of CDR/pay order of $100/- or equivalent Pak
Rupees from the office of “General Manager-Technical, Commercial Area (North), Sundar
Industrial Estate, Rawind Road Lahore”. No application will be entertained without receipt of
the non-refundable application fee.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 4 of 28
3. INSTRUCTIONS TO APPLICANTS
3.1 Submission of Application
The blank forms attached with this document are to be duly filled by the applicants who
apply for Prequalification. One original and two (02) copies should be submitted
separately in sealed envelopes to be delivered by hand or through registered mail to:
General Manager-Technical
Sundar Industrial Estate
Commercial Area (North), Raiwind Road, Lahore, Pakistan
Ph: +92-42-35297203-06, Fax: +92-42-35297207
Email- [email protected]
Not later than 1500 hrs on June 30, 2016 clearly marked “Applications for
Prequalification for Construction of Infrastructure Works for Quaid-e-Azam
Apparel Park, District Sheikhupura.
The applications are to be prepared in English language. The applicants must respond to
all questions and provide complete information along with supporting documents where
required and certified copies of Registration with Pakistan Engineering Council (PEC) as
advised in this document. In case of foreign firm, a certified copy of the respective
country organization duly certified by Pakistan Embassy/ High Commission or PEC shall
be furnished. Any lapses to provide essential information may result in dis-qualification
of the applicant. No column is to be left blank.
Applicants may request to office of General Manager-Technical, Sundar Industrial Estate
Commercial Area (North), Raiwind Road, Lahore, Pakistan, Ph: +92-42-35297203-06,
Fax: +92-42-35297207, (the Employer), for the clarification about the Project or the
Pre-qualification during office hours before the deadline for submission of Pre-
qualification Documents but no document will be received/ considered after the due date
for submission of Pre-qualification Documents.
All documents submitted by the firms should be delivered in one packet/parcel for ease of
handling and to avoid loss of documents.
The bidding process for the project will be based on “Single Stage Two Envelope
Method”. The bidding documents will be released to shortlisted JV contractors only.
Any miss-statement(s)/false information by any applicant will result into his
disqualification at any stage.
3.2 Qualification Criteria
3.2.1 General
Pre-qualification will be based on the criteria given in succeeding paras regarding the
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 5 of 28
Applicant’s Experience Record, Personnel Capabilities, Equipment Capabilities and
Financial Soundness etc. as demonstrated by the Applicant’s responses in the forms
given in this document. The Client “Punjab Industrial Estates Development &
Management Company (PIEDMC)” reserves the right to waive minor deviations, if
these don’t materially affect the capability of an applicant to perform the contract.
Sub-contractor’s experience and resources shall not be taken into account in
determining the Applicant’s compliance with the qualifying criteria. However, Joint
Venture experience & resources shall be considered. The following criteria is evolved
keeping in view the complexity of the project.
Sr.
No.
Category Weightage/Marks
1. Experience Record 40
2. Personnel Capabilities 15
3. Equipment Capabilities 15
4. Financial Soundness 30
Total: 100
a) Pre-qualification status shall be decided on the basis of Pass/Fail criteria.
b) The applicant must secure at least 60% marks in each category and 65% overall
marks.
3.2.2 Basic Eligibility
The firms fulfilling the following basic requirements shall only be considered for
further evaluation (relevant documents to be attached):
a. The foreign contractor shall submit proof of their affiliation from their
respective country (s) Council/ Engineering Services Accreditation Body.
b. Valid Registration with PEC in Category "CA" (No Limit) for their local JV
Partner
c. Certificate of registration of Firm or equivalent.
d. Income Tax registration certificate.
e. Provide last 10-year litigation history, if any, as per form A-11 of the criteria.
f. Judicial Affidavit declaring no blacklisting.
g. Annual Audit Report for the last three years.
h. Foreign Contractor should preferably have experience in construction of
infrastructural works for establishment of International Standards/known
Apparel/Industrial Parks worldwide.
All the members have to fulfill the above mentioned Basic Eligibility criteria. In case
of foreign firms, they have to form a JV with local firms as per provision of
“construction and operation of Engineering Works” Bye-laws, 1987, of PEC, duly
amended. For foreign firms registration with PEC will not be mandatory at the time of
Prequalification. However, they will have to produce license in Category C-A from
PEC of the local partner along with the bid in a separate envelope.
3.2.3 Experience Record
Credit marks for experience shall be awarded on the basis of following qualifications:
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 6 of 28
Sr.
# Description
Max.
Marks
i) Two (02) Projects of similar nature and complexity which involve
construction of road works, water supply distribution, sewerage &
Drainage system and pumping station etc. in industrial estates/apparel
parks and above worth at least USD: 100 Million completed within last
ten (10) years.
20
ii) One (01) On-going Project of similar nature and complexity which
involves construction of road works, water supply distribution, sewerage
& Drainage system and pumping station in industrial estates worldwide
and above worth at least USD: 100 Million.
5
iii) Similar Experience of infrastructure projects worth at least USD: 100
Million completed within last ten (10) years. 7
iv) Similar Experience for laying of underground electrical distribution
system including HT/LT, installation of pad mounted transformers and
other electrical equipment’s etc. in industrial estates worldwide at least
USD: 50 Million completed within last ten (10) years.
8
Total Marks of Working Experience 40
* The Applicant shall attach Acceptance letter/Award letter as well as completion certificate (Showing project
cost) for completed and on-going as given above. The detailed scoring criteria is attached as Annexure-I.
3.2.4 Personnel Capabilities
The applicants must have in their employment suitably qualified personnel with relevant
experience to fill the following key management and specialist positions. The applicant will
supply information on a prime and an alternate candidate for each position (both should meet
the specified experience requirements) in the relevant Annexure-I provided in the document.
Sr. # Description Max.
Marks
i)
Professional Staff (Graduate Engineers Registered with their
respective country council/institute and registered with PEC for local
engineers)
a) Number of Engineers
b) Experience of Engineers in number of years
6
6
ii)
Para-Professional Staff (Associate Engineers employed in the firm) a) Number of Associate Engineers (DAE in Civil, Electrical &
Mechanical Engineering)
b) Experience of Associate Engineers (DAE) in number of years.
2
1
Total Marks Of Personnel Capabilities 15
* The Applicant shall attach evidence of detailed CVs, affidavit of employment of professional staff with the
applicant on judicial stamp paper, valid PEC Registration certificates of the Engineers.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 7 of 28
3.2.5 Equipment Capabilities
Credit Marks shall be granted on the basis of the following criteria for various kinds of
equipment relevant for the Project (brand new models and world known make and type):
Sr. # Description Max.
Marks
i)
Affidavit for use of Computerized Asphalt Plant 100 Ton
Capacity or better i/c allied Paving equipment in last 5-yaers. (2
Nos.) 1
ii)
Affidavit for use of Computerized Concrete Batching Plant 30
Cum/hr. Capacity or better i/c transit mixtures and allied
equipment in last 5-yaers. (2 Nos.) 1
iii) Tandem Road Roller (4 Nos.) 1
iv) Vibratory Road Roller (3 Nos.) 1
v) Motor Grader (2 Nos.) 1
vi)
Electrical Tools & Equipments: Truck Mounted Sky Lift (01
No), Insulation Tester 80 kv (02 No.), Cable laying Trolly (4-
Nos.), Electrician Tool Kit (04 Nos.), Digital Multi Meter Cum
Tong Tester (03 No.), Hydraulic Crimping Tool (02 No), Lux
Meter (02 Nos.) HT/LT Earth Set (01 Nos. each), Earth Tester
(02-No).
5
vii) Excavators (4 Nos.) 1
viii) Generators 1 MW (3 Nos.) 1
ix) Crane (wire rope) / tower crane (2 Nos.) 1
x) Lab equipments for field tests such as Soil test sieve analysis,
crushing strength, compaction test etc. (2 No.) 1
xi) Dumper trucks/ Tractor/ Trolley (8 Nos.) 1
Total Marks Of Equipment Capabilities 15
3.2.6 Financial Position
Credit marks will be awarded on the basis of following:
Sr. # Description Max.
Marks
i) Available Bank Credit Line Limit 10
ii) Annual Turnover (Certified Audit Reports of Last 3 years, financial
year ended on 30-06-2015) 10
iii) Bid Capacity 10
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 8 of 28
Total Marks for Financial Position 30
3.2.7 Litigation History
The applicant and partners of a Joint Venture should provide accurate information on
any litigation or arbitration resulting from contracts completed or under execution
over the last five (10) years. A consistent history of litigations against the applicant or
any partner of a joint venture may result in rejection of the application.
3.3 Joint Venture (JV)
3.3.1 Joint Venture must comply with the following requirements:-
a) Following are the minimum qualification requirements;
i) In accordance with Pakistan Engineering Council Bye-laws, Foreign Firms are
required to form Joint Ventures with local Firms.
ii) The lead partner shall meet not less than 60% of all qualifying criteria given in
paras heretofore.
iii) Local partner shall meet not less than 30% of all the qualifying criteria given
in paras heretofore.
iv) No compromise shall be made on minimum requirements of 60% score in
each category and 65% overall score.
v) The joint venture must collectively satisfy the criteria of paras 3.2, 3.3 and
3.4 heretofore, for which purpose the relevant figures for each of the
partners shall be added together to arrive at the JV’s total capacity.
Individual members must satisfy each of the requirements of paras 3.5 and
3.6 hereafter.
vi) The lead partner shall be foreign firm and local Pakistani firm will act as
associated local partner.
b) Any change in a prequalified JV after prequalification, shall be subject to the
written approval of the Client prior to the deadline for submission of bids.
Such approval may be denied if:-
i) Partner(s) withdraw from a JV and remaining partners do not meet the
qualifying requirements;
ii) The new partners to a JV are not qualified individually or as another
JV; or
iii) In the opinion of the Client, a substantial reduction in competition
would result.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 9 of 28
c) Bid shall be signed by all members in the JV so as to legally bind all partners,
jointly and severally, and any bid shall be submitted with a copy of the JV
agreement providing the joint and several liabilities with respect to the
contract.
3.3.2 The prequalification of a JV does not necessarily prequalify any of its partners
individually or as a partner in any other JV or association. In case of dissolution of a
JV, each one of the constituent firms may prequalify if they meet all the
prequalification requirements and any partner of J.V has requested/shall request for
the same and then his prequalification shall be subject to the written approval of the
Client.
3.4 Conflict of Interest
The Applicant (including all members of a JV) must not be associated, nor have been
associated in the past, with the consultants or any other entity that has prepared the
design, specifications and other prequalification and bidding documents for the
project, or was proposed as Engineer for the contract, over the last five (05) years.
Any such association may result in disqualification of the applicant.
3.5 Updating Prequalification Information
3.5.1 Bidders shall be required to update the financial, personnel and equipment
information used for prequalification at the time of submitting their bids, to confirm
their continued compliance with the qualification criteria and verification of the
information provided at the time of prequalification. A bid shall be rejected if the
Applicant’s qualification thresholds are no longer met at the time of bidding.
3.6 Other Factors
3.6.1 Only firms/contractors/JVs that have been prequalified under this procedure shall be
invited to bid. A qualified firm/contractor/JV may participate only in one bid for the
contract. If a firm submits more than one bid, singly or as a JV, all bids including that
bidder will be rejected. This rule will not apply in respect of bids which include
specialist sub-contractors who are used by more than one bidder.
3.6.2 a) The scope of work mentioned under Section-1.5 is provisional and the Client
reserves the right to amend it in the Bidding Documents.
b) Reject or accept any application; and
c) Cancel the prequalification process and reject all applications.
3.6.3 a) All the applicants will be informed, in due course, of the result of evaluation
of applicants.
b) The Employer shall neither be liable for any such actions nor be under any
obligation to inform the Applicant of the grounds for rejection, however, on
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 10 of 28
the request of firms the result of their applications may be debriefed.
4. EVALUATION CRITERIA
Applicants meeting the minimum requirements mentioned in Para 3.2 besides other factors
shall be considered for pre-qualification. No compromise shall be made on minimum
requirements of 60% score in each category and 65% overall score. The evaluation of the
Foreign Firms/Contractors/ Joint Ventures (JVs) will be carried out as per criteria attached as
Annexure-I.
5. ADDITIONAL CLAUSES
5.1 Answers must be given to all questions in the attached Forms. If necessary, additional
sheets may be attached. Failure to provide complete information may result in
disqualification.
5.2 Each sheet shall be duly signed by the applicant or by the duly authorized
representative of the applicant. Such authorization shall be indicated by a written
power of attorney which shall be attached with the application.
5.3 All the documents submitted by the applicants shall be treated as confidential and
shall not be returned.
5.4 If necessary, additional sheets may be added to the Forms. Each page of each Form
shall be clearly marked in the right top corner as follows: Form I, Page 1 of 2, Form I,
Page 2 of 2 etc.
5.4.1 Each page of documents must be attached by page marking and signing
initials.
5.5 Only those Pakistani Firms/Contractors/JVs can apply or participate in Joint Ventures
for the purpose of pre-qualification who have valid registration in “C-A
CATEGORY” with the Pakistan Engineering Council (PEC).
5.6 All the forms given in the documents shall be completely filled in.
Annex-A: LETTER OF APPLICATION
Application Form A-1. ........................................................ General Information
Application Form A-2. ............................................. General Experience Record
Application Form A-3. ................................................... Joint Venture Summary
Application Form A-4. .......................................... Particular Experience Record
Application Form A-5. Details of Contracts of Similar Nature and Complexity
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 11 of 28
Application Form A-6. ...... Current Contract Commitments/ Works in Progress
Application Form A-7. .................................................... Personnel Capabilities
Application Form A-8. ....................................................... Candidate Summary
Application Form A-9. .................................................. Equipment Capabilities
Application Form A-10. ...................................................... Financial Capability
Application Form A-11. .......................................................... Litigation History
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 12 of 28
Letter of Application Annex-A
[Letterhead paper of the Applicant, or partner
responsible for a joint venture, including full postal
address, telephone no., fax no., cable and e-mail
address]
Date:................................
To: The General Manager-Technical
Sundar Industrial Estate
Commercial Area (North), Raiwind Road, Lahore, Pakistan
Ph: +92-42-35297203-06, Fax: +92-42-35297207
Dear Sir,
1. Being duly authorized to represent and act on behalf of ................................... (hereinafter
“the Applicant”), and having reviewed and fully understood all the prequalification
information provided, the undersigned hereby apply to be prequalified as a bidder for the
“Construction of Infrastructure Works at Quaid-e-Azam Apparel Park (QAAP)”.
2. Attached to this letter are copies of original documents defining1:
(a) The Applicant's legal status;
(b) The principal place of business; and
(c) The place of incorporation (for applicants who are corporations); or
the place of registration and the nationality of the owners (for applicants who are
partnerships or individually-owned firms).
(d) Registration with Pakistan Engineering Council of local contractor.
1 For applications by joint ventures, all the information requested in the prequalification documents is to be provided for the joint venture, if it already exists, and for each party to the joint venture separately. The lead partner should be clearly identified. Each partner in the joint venture shall sign the letter.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 13 of 28
(e) The foreign contractor shall submit proof of their affiliation from their respective
country (s) as a proof of their credibility and recognition.
3. The General Manager-Technical, and its authorized representatives are hereby authorized to
conduct any inquiry or investigation to verify the statements, documents, and information
submitted in connection with this application, and to seek clarification from our bankers and
clients regarding any financial and technical aspects. This Letter of Application will also
serve as authorization to any individual or authorized representative of any institution
referred to in the supporting information, to provide such information deemed necessary and
requested by The General Manager-Technical, , or the authorized representative to verify
statements and information provided in this application, or with regard to the resources,
experience, and competency of the Applicant.
4. The General Manager-Technical, and its authorized representatives may contact the
following persons for further information2, if needed.
General and Managerial Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Personnel Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Technical Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
Financial Inquiries Contact 1
Telephone 1
Contact 2
Telephone 2
5. This application is made with the full understanding that:
2 Application by joint ventures should provide information on a separate sheet information for each party to the application.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 14 of 28
(a) Bids by prequalified applicants will be subject to verification of all information
submitted for prequalification at the time of bidding;
(b) The General Manager-Technical , reserves the right to:
(i) amend the scope and value of any contract under this project; in such event bids
will only be called from prequalified bidders who meet the revised
requirements; and
(ii) reject or accept any application, cancel the prequalification process, and reject
applications; and
(c) The Project Director, shall not be liable for any such actions and shall be under no
obligation to inform the Applicant of the grounds for actions at 5(b) here above.
(d) The Project Director, shall not be liable for consequence of, and shall be under no
obligation to inform the Applicant of the grounds for actions at 5(b) here above.
Applicants who are not joint ventures should delete para 6 &7 and initial the
deletions.
6. Appended to this application, we give details of the participation of each party, including
capital contribution and profit/loss agreements, to the joint venture or association. We also
specify the financial commitment in terms of the percentage of the value of the (each)
contract, and the responsibilities for execution of the (each) contract.
7. We confirm that in the event that we bid, that bid as well as any resulting contract will be.
(a) Signed so as to legally bind all partners, jointly and severally; and
(b) Submitted with a Joint Venture agreement providing the joint and several liability of all partners in the event the contract is awarded to us.
8. The undersigned declare that the statements made and the information provided in the duly
completed application are complete, true, and correct in every detail.
a) ___________________________ a) ___________________________
Signature Signature
b) For and on behalf of b) For and on behalf of
___________________________ ____________________________
(Name of Applicant or Lead Partner (Name of Applicant or other Partner
of a joint venture) of a joint venture)
c) ___________________________ c) _____________________________
Designation Designation
d) ____________________________ d) _____________________________
Seal Seal
Note: In case of joint venture/ other partners, also give their particulars mentioned under 8 (a-d)
above.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 15 of 28
Application Form A-1 Page___ of ____Pages
General Information
All individual firms and each partner of a joint venture applying for prequalification are requested to complete the information in this form. Nationality information is also to be provided for foreign owners or applicants who are forming part of the Joint Ventures as required under the PEC Bye-Laws as a Partnership-Joint Venture. Where the Applicant proposes to use named subcontractors for critical components of the works, or for work contents in excess of 10 percent of the value of the whole works, the following information should also be supplied for the specialist subcontractor(s).
1. Name of Firm 2. Head Office Address
3. Telephone Contact Person: Name: Title:
4. Fax E-mail
5. Place of Incorporation/Registration Year of incorporation/registration
1. Name of Firm
2. Regional Office Address
3. Telephone Contact Person: Name: Title:
4. Fax E-mail
5. Place of Incorporation/Registration Year of incorporation/registration
1. Name of Firm
2. Local Office Address
3. Telephone Contact Person: Name: Title:
4. Fax E-mail
5. Place of Incorporation/ Registration
Year of incorporation/ registration
Nationality of Owners
Name Nationality 1) 2) 3)
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 16 of 28
Application Form A-2 Page___ of ____Pages
General Experience Record
Name of Applicant or Partner of a joint venture
All individual firms and all partners of a joint venture are requested to complete the information in
this form.
JVs Lead Partner
Starting
Month
Year
Ending
Month
Year
Year
Contract Name,
Name & Address of
Employer
Brief Description of
Works Executed
Role of
Applicant
Partner No. 2
Starting
Month
Year
Ending
Month
Year
Year
Contract Name,
Name & Address of
Employer
Brief Description of
Works Executed
Role of
Applicant
Partner No. 3
Starting
Month
Year
Ending
Month
Year
Year
Contract Name,
Name & Address of
Employer
Brief Description of
Role of
Applicant
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 17 of 28
Works Executed
Application Form A-3 Page___ of ____Pages
Joint Venture Summary
Names of all Partners of a Joint Venture 1. Lead Partner
2. Partner
3. Partner
4. Partner
5. Partner
6. Partner
Total value of annual construction turnover, in terms of work billed to clients,
Annual Turnover Data (Construction only; Equivalent in USD, Millions)
Partner
Form A-2 Page No.
Year 1
Year 2
Year 3
Year 4
Year 5
1. Lead Partner
2. Partner
3. Partner
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 18 of 28
4. Partner
5. Partner
6. Partner
Total:
Application Form A-4 Page___ of ____Pages
Particular Experience Record
Name of Applicant or partner of a joint venture
To prequalify, the Applicant shall be required to pass the specified requirements applicable to this
form, as set out in the: Instructions to Applicants”.
On a separate page, using the format of Application Form A-5, each applicant or partner of a Joint
Venture is required to list all contracts of a value equivalent to USD. 150 million, of a similar nature
to the contract for which the Applicant wishes to qualify, undertaken during the last ten years1. The
information is to be summarized, using Application Form A-5, for each contract completed or under
execution by the Applicant or by each partner of a Joint Venture.
Where the Applicant proposes to use named subcontractor(s) for critical components of the works,
or for work contents in excess of 10 percent of the value of the whole works, the information in the
afore-mentioned forms should also be supplied for each specialist subcontractor.
1 Where applications are being invited for a number of contracts, suitable wording should be introduced, to allow applicants to apply for individual contracts or groups of contracts (slice and package contracts).
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 19 of 28
Application Form A-5 Page___ of ____Pages
Details of Contracts of Similar Nature and Complexity
Name of Applicant or partner of a joint venture
Use a separate sheet for each contract.
1. Name of Contract
Country
2.
Name of Employer
3.
Employer Address
....................................................................................................................
4. Nature of works and special features relevant to the contract for which the Applicant wishes to
prequalify
....................................................................................................................
....................................................................................................................
5. Contract Role (Tick One)
(a) Sole Contractor (b) Sub- Contractor (c) Partner in a Joint Venture
6. Value of the total contract (in specified currencies) at completion, or at date of award for current
contract
Currency…………. Currency…………… Currency…………………….
7. Equivalent in Pak/Rs.
8.
Date of Award
9.
Date of Completion
10.
Contract Duration (Years and Months)
_____Years _______Months
11. Specified Requirements1
..............................................................................................................................................................
..............................................................................................................................................................
.................................................................................................................
1
Insert any specific criteria required for particular operations related to project
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 20 of 28
Application Form A-6 Page___ of ____Pages
Summary Sheet: Current Contract Commitments/Works in
Progress
Name of Applicant or partner of a joint venture
Applicants and each partner to an application should provide information on their current
commitments on all contracts that have been awarded, or for which a letter of intent or acceptance
has been received, or for contracts approaching completion, but for which substantial Completion
Certificate has yet to be issued.
Name of Contract
Value of Outstanding
work (Equivalent USD.
Millions)
Estimated
Completion Date
1.
2.
3.
4.
5.
6.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 21 of 28
Application Form A-7 Page___ of ____Pages
Personnel Capabilities
Name of Applicant
For specific positions essential to contract implementation, Applicants should provide the names of
at least two (02) key candidates qualified to meet the specified requirements stated for each position.
The data on their experience should be supplied on separate sheets using one Form for each key
personnel (Application Form A-7).
1. Title of Position
Name of Prime Candidate
Name of Alternate Candidate
2.
Title of Position
Name of Prime Candidate
Name of Alternate Candidate
3 Title of Position
Name of Prime Candidate
Name of Alternate Candidate
4 Title of Position
Name of Prime Candidate
Name of Alternate Candidate
Note:- The key personnel, must include the following
i. Graduate Engineer Staff ii. Associate Engineering Staff iii. Financial and Business Management Staff
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 22 of 28
Application Form A-8 Page___ of ____Pages
Experience Summary of the Key Personnel
Name of Applicant
Position
Candidate [Tick appropriate one] Prime Alternate
Candidate information
1. Name of Candidate
2. Date of Birth
3. Professional Qualification
Present employment
4. Name of employer
Address of employer
Telephone
Contact (manager/personnel officer)
Fax
Job title of candidate
Years with present employer
Summarize professional experience over the last 20 years, in reverse chronological order. Indicate
particular technical and managerial experience relevant to the Project.
Month/
Dates/Years
Company / Project / Position / Relevant technical and management experience
From
To
Note: Provide additional sheets for each key personnel
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 23 of 28
Application Form A-9 Page___ of ____Pages
Equipment Capabilities
Name of Applicant
The Applicant shall provide adequate information to demonstrate clearly that he has the capability
to meet the requirements for each and all items of equipment listed in the instructions of Applicants.
A separate form shall be prepared for each item of equipment listed in para-3.2.5of the instructions
to Applicants, or for alternative equipment proposed by the Applicant.
Item of Equipment Equipment
information
1. Name of manufacturer
2. Model and power rating
3. Capacity
4. Year of manufacture
Current
status
5. Current location
6. Details of current commitments
Source
7. Indicate source of the equipment
Owned Rented Leased
Omit the following information if it is owned by the Applicant or partner.
Owner
8. Name of owner
9. Address of owner
Telephone
Contact name and title
Fax
Agreement
Details of rental/lease specific to the Project.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 24 of 28
Application Form A-10 Page___ of ____Pages
Financial Capability
Name of Applicant or Partner of a Joint Venture
Applicants, including each partner of a joint venture, should provide financial information to
demonstrate that they meet the requirements stated in the Instructions to Applicants. Each applicant
or partner of a joint venture must fill-in this form. If necessary, use separate sheets to provide
complete banker information. A copy of the audited balance sheets should be attached.
Banker
Name of banker
Address of banker
Telephone
Contact name and title
Fax
i) Summarize actual assets and liabilities in Pak Rupees (Equivalent at the current rate of
exchange at the end of each year) for the previous five years, based upon known commitments,
projected assets and liabilities in pak Rupees equivalent for the next two years.
Financial information in
Pak Rs.
or equivalent
Actual: previous three (03) years
Projected:
next two years
2013-14
2014-15 2015-16
4
5
1. Total assets
2. Current assets
3. Total liabilities
4. Current liabilities
5. Working capital
6. Annual Turnover
7. Profits before taxes
8. Profits after taxes
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 25 of 28
Attach audited financial statements for the last three years (for individual applicant or each partner
of joint venture).
Firms owned by individuals, and partnerships, may submit their balance sheets certified by a
registered accountant, and supported by copies of tax returns, if audits are not required by the laws
of their countries of origin in case of foreign firms.
ii) Specific proposed sources of financing to meet the cash flow of the Project, net of current
commitments.
Source of financing
Amount
(USD: or Pak Rs
equivalent) 1.
2.
3.
4.
iii)The information supplied should be the annual turnover of the Applicant (or each member of a
joint venture), in terms of the amounts billed to clients for each year for work in progress or
completed over the past three years.
Bid Capacity
Year
Turnover
(in actual currency)
Equivalent USD in
Millions. 1.
2.
3.
Average
Notes:-
i. Name and Address of Commercial Bank providing credit line
ii. Total amount of credit line
iii.Verification Certificate for line of credit (A certificate from the Scheduled Bank verifying the
line of credit shall be attached to the submission of application for pre-qualification.
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 26 of 28
Application Form A-11 Page___ of ____Pages
Litigation History
Name of Applicant or Partner of a Joint Venture
Applicants, including each of the partners of a joint venture, should provide information on any
history of litigation or arbitration resulting from contracts executed in the last ten years or currently
under execution. A separate sheet should be used for each partner of joint venture.
Year Award FOR
or AGAINST
Applicant
Name of client, cause of litigation, and
matter in dispute
Disputed
amount
(current value
USD.
or equivalent)
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 27 of 28
Annexure-B
LOCATION MAP
Pre-Qualification of Firms/Contractors/JVs
______________________________________________________________________ Page 28 of 28
Annexure-C
APPROACH ROADS-QAAP
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 1 of 7
Evaluation Criteria
The firms / JV will be evaluated on the following criteria:
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
Experience Record
i)
Two (02) Projects of similar
nature and complexity which
involve construction of road
works, water supply
distribution, sewerage &
Drainage system and pumping
station in industrial
estates/Apparel Parks
worldwide and above worth at
least USD: 100 Million
completed within last ten (10)
years.
20
10 marks for each project
of similar nature and
complexity which involve
construction of road
works, water supply
distribution, sewerage &
Drainage system,
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
100 Million completed
within last ten (10) years.
8 marks for each project
of similar nature and
complexity which involve
construction of road
works, water supply
distribution, sewerage &
Drainage system,
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
90 Million completed
within last ten (10) years.
6 marks for each project
of similar nature and
complexity which involve
construction of road
works, water supply
distribution, sewerage &
Drainage system and
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
80 Million completed
within last ten (10) years.
No marks if
Acceptance
letter/Award letter as
well as completion
certificate (Showing
project cost) is not
attached.
No marks if the project
cost is less than USD.
80 Million.
ii)
One (01) On-going Project of
similar nature and complexity
which involves construction of
road works, water supply
distribution, sewerage &
5
5 marks for one (01) on-
going Project of similar
nature and complexity
which involves
construction of road
No marks if
Acceptance
letter/Award letter as
well as completion
certificate (Showing
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 2 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
Drainage system, pumping
station in industrial
estates/apparel parks
worldwide and above worth at
least USD: 100 Million.
works, water supply
distribution, sewerage &
Drainage system,
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
100 Million.
3 marks for one (01) on-
going Project of similar
nature and complexity
which involves
construction of road
works, water supply
distribution, sewerage &
Drainage system,
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
90 Million. 2 marks for one (01) on-
going Project of similar
nature and complexity
which involves
construction of road
works, water supply
distribution, sewerage &
Drainage system,
pumping station in
industrial estates/apparel
parks worldwide and
above worth at least USD:
80 Million.
project cost) is not
attached.
No marks if the project
cost is less than USD.
80 Million.
iii)
Similar Experience of
infrastructure projects worth at
least USD: 100 Millions
completed within last ten (10)
years.
7
7 marks will be given if
the contractor has
completed at least five
(05) nos. of projects of
infrastructure projects
worth at least USD: 100
Millions completed
within last ten (10) years.
1 mark for each project of
infrastructure projects
worth at least USD: 70
Millions completed
within last ten (10) years.
No marks if
Acceptance
letter/Award letter as
well as completion
certificate (Showing
project cost) is not
attached
No marks if the project
cost is less than USD.
70 Million.
iv)
Similar Experience for laying
of underground electrical
distribution system including
HT/LT, installation of pad
8 8 marks will be given if
the contractor has
completed at least three
(03) nos. of projects for
No marks if
Acceptance
letter/Award letter as
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 3 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
mounted transformers and
other electrical equipment’s
etc. in industrial estates
worldwide at least USD: 50
Million completed within last
ten (10) years
laying of underground
electrical distribution
system including HT/LT,
installation of pad
mounted transformers
and other electrical
equipment’s etc. in
industrial estates
worldwide at least USD:
50 Million completed
within last ten (10) years
2 mark for each project of
construction for laying of
underground electrical
distribution system
including HT/LT,
installation of pad
mounted transformers and
other electrical
equipment’s etc. in
industrial estates
worldwide at least USD:
50 Million completed
within last ten (10) years
well as completion
certificate (Showing
project cost) is not
attached.
No marks if the project
cost is less than USD:
50 Million.
Total Marks Of Working
Experience
35
Personnel Capabilities
i) Professional Staff 6 Strength of Engineers
(6 Marks)
6 Marks will be given if
the total no. of B.Sc.
Engineers (Civil-Roads,
Electrical, Mechanical,
Geotechnical,
Environmental &
Public Health)
registered with PEC or
international recognized
bodies are 12 nos. or
above.
At least 2 no. B.Sc.
Engineers from each
category i.e.; Civil-
Roads, Electrical,
Mechanical, Public
health, Geotechnical, &
Environmental
Engineering.
1/2 mark for each
B.Sc. Engineer.
No marks will be
given if no. of
engineers is less than
as specified against
each category.
Add CV’s, affidavit of
professional staff on
judicial stamp paper,
No marks if required
documents are not
attached.
6 Experience (6 Marks)
6 Marks will be given if
No marks for
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 4 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
the individual
experience of at least 06
no. of B.Sc. Engineers
(Civil, Electrical,
Mechanical, Public
Health, Geotechnical &
Environmental)
registered with PEC or
international recognized
bodies is equal to 15
years or above. B.Sc.
Engineers (Civil,
Geotechnical,Electrical)
must have at least five
years’ experience in
roads, sewerage and
electrical related works.
1 Mark for one B.Sc.
Engineer registered
with PEC having
experience of 15 years
or above of each
category i.e.; Civil,
Electrical, Mechanical,
Public Health,
Geotechnical &
Environmental
Engineering.
experience of each
mentioned category is
less than 15 years.
General Note:
At Pre-Qualification
stage, Foreign Firms
may submit
registration proof of
their Engineers from
home country.
ii) Para Professional Staff 2 Strength of Associate
Engineers (2 Marks)
2 Marks will be given if
the total no. of
Associate Engineers
(DAE in Civil,
Electrical and
Mechanical
Engineering) are 20
nos. or above.
For less than 20 no. of
Associate Engineers
marks will be given as
per following formulas:
4 x (A/20)
A = No. of Associate
Engineers
1/10 marks for each
Associate Engineer.
Add CV's, affidavit of
employee on judicial
stamp paper, No marks
if required documents
are not attached.
1 Experience (1 Marks)
1 Marks will be given if
the individual
experience of at least 12
no. of Associates
Engineers (DAE in
No marks for
experience less than 10
years.
Add CV's, affidavit of
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 5 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
Civil, Electrical and
Mechanical
Engineering) is equal to
10 years or above.
employee on judicial
stamp paper, No marks
if required documents
are not attached.
Total Marks Of Personnel
Capabilities
15
Equipment Capabilities
i) Affidavit for use of
Computerized Asphalt Plant
100 Ton Capacity or better i/c
allied Paving equipment in last
5-yaers. (2 Nos.)
1 No marks if the
manufacturing
certificate/Purchase
Certificate/Ownership
Proof is not attached.
For less than specified
nos., relative marks
will be given.
ii) Affidavit for use of
Computerized Concrete
Batching Plant 30 Cum/hr.
Capacity or better i/c transit
mixtures and allied equipment
in last 5-yaers. (2 Nos.)
1
iii) Tandem Road Roller (4 Nos.) 1
iv) Vibratory Road Roller (3
Nos.)
1
v) Motor Grader (2 Nos.) 0.5
Electrical Equipmnets:
Truck Mounted Sky Lift (01
No),
Insulation Tester 80 kv (02
No.),
Cable laying Trolly (4-Nos.),
Electrician Tool Kit (04 Nos.),
Digital Multi Meter Cum Tong
Tester (03 No.),
Hydraulic Crimping Tool (02
No),
Lux Meter (02 Nos.),
HT/LT Earth Set (01 Nos.
each),
Earth Tester (02-No).
0.5
1
0.5
0.5
0.5
0.5
0.5
0.5
0.5
ii) Excavators (4 Nos.) 1
iii) Concrete Batching Plants (2
Nos.)
1
iv) Concrete Pumps (2 Nos.) 0.5
v) Generators 1MW (2 Nos.) 0.5
vi) Crane (wire rope) / Gantry
crane (2 Nos.)
0.5
vii) Lab equipments for field tests
such as Soil test sieve analysis,
crushing strength, compaction
1
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 6 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
test etc. (1 No.)
viii) Dumper trucks/ Tractor/
Trolley (4 Nos.)
1
Total marks equipment
(T&P)
15
Financial Position
i) Available Bank Credit Line
Limit
10 Full Marks will be given in
case of limit is USD: 30
Million or more.
7 Marks will be given if
the limit more than USD:
25 Million but less than
USD. 30 Million.
5 Marks will be given if
the available bank credit
line limit is equal to USD-
20 Million.
A= Available Bank Credit
Line Limit in millions
No marks if bank
credit line certificate
issued by first class
bank is not attached.
No marks if credit line
is less than USD:20
Million.
ii) Annual Turnover (Certified
Audit Reports of Last 3 years,
financial year ended on 30-06-
2015)
10 Full Marks are given in
case of limit is USD. 90
Million or more.
7 Marks will be given if
average annual turnover
more than USD: 80
Million but less than USD.
90 Million.
5 Marks will be given if
the available average
annual turnover for last 3-
years is equal to USD- 75
Million.
A= Average annual
turnover in last three years
in Millions.
No marks if Annual
Audit Report is not
attached.
No marks if Annual
Audit Reports for last
three (3) years are not
attached.
No marks if average
annual turnover is less
than USD: 75 million.
iii) Bid Capacity 10 Full Marks are given if bid
capacity is equal to USD:
100 Million or more.
7 Marks will be given if
bid capacity more than
USD. 90 Million but less
than USD. 100 Million.
5 Marks will be given if
the bid capacity is equal to
USD. 80 Million.
Net Bid Capacity =
Available capital - 20%
of the cost of all balance
works in hand
Available Capital =
Available Bank credit
line + Average working
capital of last three years
as per annual audit report
No marks if bid capacity
is less than USD: 80
Construction of Quaid-Azam Apparel Park Pre-Qualification of Firms/Contractors/JVs
Annexure -I
Page 7 of 7
Sr.
No.
Description Allocated
Marks
Explanation for Marks
Obtained
Remarks
A= Bid Capacity in
Millions
Million.
NOTE: Add cost of
balance works in hand
Total Marks of Financial
Position 30
Total Marks 100
Note:
1. Pre-qualification status shall be decided on the basis of PASS/FAIL Criteria. The applicant must
secure at least 60 % marks in each category and 65 % overall marks.
2. PIEDMC, the Client reserves the right to verify the originality and genuiness of the submitted
documents, in case of defective information the firm/contractor/JV may be disqualified.