Explosive Site Plan OPERATION AND MAINTENANCE OF SAND CREEK BARRIER SYSTEM RAVENNA ARMY AMMUNITION PLANT RAVENNA, OH 44266 MAY 2008 Prepared by engineering-environmental, Management, Inc. 2751 Prosperity Avenue, Suite 200 Fairfax, Virginia 22031 and PIKA International, Inc. 12723 Capricorn Drive, Suite 500 Stafford, Texas 77477

Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Explosive Site Plan

OPERATION AND MAINTENANCE OF SAND CREEK BARRIER SYSTEM

RAVENNA ARMY AMMUNITION PLANT

RAVENNA, OH 44266

MAY 2008

Prepared by

engineering-environmental, Management, Inc. 2751 Prosperity Avenue, Suite 200

Fairfax, Virginia 22031

and

PIKA International, Inc.

12723 Capricorn Drive, Suite 500 Stafford, Texas 77477

Page 2: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page i

Table of Contents

1. Site ................................................................................................................................................. 1

2. Anticipated Dates ......................................................................................................................... 1

3. Purpose.......................................................................................................................................... 1

4. Site Background and Current Conditions................................................................................. 1

5. Executing Agencies ...................................................................................................................... 2

6. Scope of Investigative/Characterization Action........................................................................ 2

7. Safety Criteria .............................................................................................................................. 2

8. Methods of Disposal..................................................................................................................... 3

9. Maps .............................................................................................................................................. 4

Appendices

Appendix A: Figures.....................................................................................................................A-1

Appendix B: Fragmentation Calculation Sheets........................................................................ B-1

Appendix C: Ohio EPA MEC Demolition Notification.............................................................C-1

Page 3: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page 1

1. Site

a. Name: Operation and Maintenance of Sand Creek Barrier System, Rocket Ridge Area of Open Demolition Area #2 (ODA2), Ravenna Army Ammunition Plant (RVAAP), Ravenna, Ohio. Under U.S. Army Corps of Engineers (USACE) Omaha District, see Figure 1.

b. State: Ohio

c. This O&M work is being performed under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and is part of a Time Critical Response Action (TCRA). If subsequent response actions are determined to be necessary, an ESS will be prepared and submitted for review and approval as necessary to support that response.

2. Anticipated Dates

a. Start: May 31, 2008

b. Complete: July 31, 2009

3. Purpose

a. To prevent the downstream movement of munitions and explosives of Concern (MEC) and Munitions Debris (MD) within Sand Creek.

b. Inspection and removal of Munitions and Explosives of Concern (MEC) and Munitions Debris (MD) accumulated on the screens.

c. MEC Storage at Earth Covered Magazine number 1501 located at ODA2, Disposal of MEC by blow in place (BIP), or at the ODA2 demolition site.

4. Site Background and Current Conditions

a. Rocket Ridge is a steep embankment approximately 500 feet long and 25 feet high located adjacent to Sand Creek within ODA2, approximately 2,700 feet upstream of the George Road Bridge.

b. ODA2 was used for munitions demilitarization, including detonation of large caliber munitions and off-specification bulk explosives that could not be deactivated or demilitarized by any other means. The Rocket Ridge slope was used for the disposal of demilitarized munitions, although not all munitions appear to have been completely demilitarized.

c. Munitions were transported from the demolition site to Rocket Ridge and dumped at the top of the slope. Sand Creek flows in an eastward direction along the northern boundary of the Rocket Ridge Area of ODA2, at the toe of the slope. Due to the steep slope of the disposal

Page 4: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page 2

area and the stream bank erosion resulting from high water events, some of the munitions materials have reached Sand Creek.

d. On 18 June 2007, a rifle grenade containing white phosphorus exploded on the slope of Rocket Ridge. A survey conducted on 5-6 November 2007 upstream of the George Road Bridge identified a piece of munitions debris approximately 1,200 feet downstream of Rocket Ridge. Thirteen additional magnetometer anomalies from buried sources were found in the stream between the piece of munitions debris and the location of the barrier system. The sources of these subsurface anomalies have not been investigated.

e. In order to prevent the downstream movement of MEC within Sand Creek, the Army constructed a barrier system. The barrier system will be installed across Sand Creek approximately 2,700 feet downstream of Rocket Ridge and 40 feet upstream of George Road Bridge. The barrier location is downstream of the farthest visible piece of munitions-related material that may have migrated from Rocket Ridge.

5. Executing Agencies

a. U.S. Army Corps of Engineers, Omaha District

6. Scope of Investigative/Characterization Action

a. The O&M phase of the Sand Creek Barrier System is focused on inspecting and removing the debris accumulated on the screen and assessing the integrity of the construction. This will be on a monthly basis.

b. Inspection of any MEC and Material Potentially Presenting an Explosive Hazard (MPPEH) found on the screen.

c. Storage and disposal of MEC and MD found on the screen.

7. Safety Criteria

a. The MEC that has been discovered, or is expected to be on site is 75-millimeter (mm) and 105-mm projectiles, booster cups, three 500-pound bombs, white phosphorus rifle grenades, fuzes, and burster tubes. The MGFD identified is the 500 lb Bomb M64A1. During the course of this investigative action, if MEC with a greater fragmentation distance is encountered, the MSD will be adjusted in accordance with DDESB Technical Paper 16, operations will continue, and an amendment to this ESP submitted for approval expeditiously.

b. See Table 7-1 for Minimum Separation Distances.

Page 5: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page 3

Table 7-1

Minimum Separation Distances (MSD) Area MSD (ft)1

For Unintentional Detonations For Intentional Detonations

MEC Team Separation Distance

(K40)

Hazardous Fragment Distance

(HFD)

Without Engineering

Controls

Using Sandbag

Mitigation

Using Water Mitigation

Carboys/Pool

Rocket Ridge area

of the ODA2

Sand Creek Barrier

RVAAP 500 lb Bomb

M64A12 293 680 2501 NA NA

Notes:

1. See Figure 2 for calculation sheets and documentation of MSD. 2. Denotes MGFD during intrusive operation within the area indicated.

c. Any occupied buildings or public roadways in the MSD areas will be evacuated and/or roadways blocked to prevent non-essential personnel from entering during the conduct of intrusive investigations. There are no occupied buildings or public roadways in the MSD areas, see Figure 2.

d. The accumulated debris will be inspected for MEC/MD. Those items that are unfuzed and safe to move will be collected and placed in Igloo 1501 located at OD-2. If an item is fuzed or otherwise unsafe to move, the item will be BIP.

e. If a smaller MEC item is identified, demolition operations will be conducted using sandbag mitigation in accordance with (IAW) HNC-ED-CS-S-98-7, August 1998 and the DDESB Fragmentation Database if permitted in the publications.

f. Prior to initiating any disposal activities at RVAAP, the Contractor will submit the MEC Demolition/Disposal Notification to the Ohio EPA, as provided in the MEC Notification Procedure dated March 8, 2005 (Appendix C).

8. Methods of Disposal

a. A portable ATF approved Type 2, Class ABC magazine has been previously sited for proper storage of explosives at RVAAP. The magazine is sited inside explosive storage igloo 7-C-1 in the RVAAP C-Block explosives storage area (Figure 3). The portable magazine is provided lightning protection by the existing lightning protection system intended to protect the earth-covered magazine 7-C-1. The portable magazine is approximately 44” tall, with the earth-covered magazine being approximately 10’ tall. The lightning system for 7-C-1 extends approximately 3’ above the earth-covered magazine, and the grounding system for the Type II magazine is connected into the earth-covered magazine.

Page 6: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page 4

b. The portable magazine will be used for the storage of both 1.1 and 1.4 class explosives to be used for demolition operations. All 1.1 and 1.4 explosives stored in the main body of the magazine will be of compatible storage categories. Blasting caps and other initiators used for demolition operations will be stored outside the magazine in the attached 18” x 18” x 18” “cap” box that is welded to the outside of the magazine. The NEW for the demolition material magazine will be a maximum of 100 pounds NEW (Figure 3).

c. An existing Earth Covered Magazine number 1501 located at ODA2 will be used for the storage of MEC that have been inspected by UXO-qualified personnel and determined to be “acceptable to move” (Figure 3). The ODA2 is a restricted explosives storage area within the RVAAP. Access to the ODA2 area is controlled through RVAAP Post 1 Security. The magazine will be afforded a lighting protection system IAW Department of the Army (DA) Pamphlet (PAM) 365-64.

d. The ESQD arc for intentional detonations when conducting BIP or disposal at ODA2 is 2,501 feet and is depicted in Figure 4.

9. Maps

Figure 1 shows the regional location of the Sand Creek Barrier within the Ravenna Army Ammunition Plant. Figure 2 depicts the Hazardous Fragmentation Distance around each investigation area. Figure 3 identifies the Inhabited Building Distance and Public Traffic Route Distance for the explosive storage magazines. Figure 4 identifies the Maximum Fragment Range – Horizontal (MFR-H) distance each area for the munition with the greatest fragmentation distance (MGFD).

Page 7: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page A-1

APPENDIX A

Figures

Page 8: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

pond

2625242320

5321 4

1514181716

876

53

2827313029

464443

35343332383736

494847525150

60595864636261

676665

414039

56555457

706968

HINKLEYCREEK

ߧ

Sand Creek Barrier System

Rocket Ridge

281

770

431

676

711

614

599

752

85

427

683

92

778

747

428

632

186

637

687

763

232

662

110

213

429

430

741

612

432

234

626

713

679

664

650

759

661

266

215

426

722

129

694

425

742

142

12

214

90

267

38

34

670

21

645

139

280

792

791

104

268

436

137

108

789

655

131

787

91

83

269

793

646

187

121

424

140

235

136

790

93

95

100

11

788

776

707

264

211

185

22

96

237

89

94

282

631

435

14

188

138

786

141

433

647

709

98

97

99

270

372

127

126

39

124

123

122

37

128

84

111

373

105

371

118

132

125

117

130

134

146

163

212

165

107

115

119

275

148

151

157

113

153

758

120

273

103 116

112

155

272

160

276278

135

114

133 274

307

277

770

431

676

711

614

599

752

427

683

778

747

428

632

186

637

92

687

763

232

662

110

213

429

430

741

612

432

234

626

713

679

664

650

759

661

266

215

426

281

722

129

694

425

742

142

214

267

670

645

139

12

280

792

90

38

34

791

104

21

268

436

137

108

789

655

131

787

269

793

646

187

121 424

91

83

140

235

136

790

100

788

776

707

264

211

93

95

185

11

237

282

631

435

22

188

138

786

96

141

94

433

647

709

14

98

270

127 126124

123

122

128

99

111

39

105

37

84

118

132

125

130

146

163

212

165

115

119

107

275

148

113

151

157

153

758

120

116

112

155

160

117

134

135

114

273

103

133

274

272

307

277

276

278

PE-1

PE-23

PE-3

51-25

PE-10

PE-24

PE-7

PE-8

PE-6

PE-5

PE-4

10-51

PE-16

PE-15

PE-29

PE-9

PE-28

PE-21

PE-14

PE-19

PE-30

PE-13

PE-18

PE-11

PE-2

PE-20

PE-17

PE-22

PE-12

PE-32

PE-33

PE-31

PE-14A PE-26

PE-25

PE-27

Route 5

South Service Road

Geo

rge

Roa

d

Newton Falls Road

Patrol Road

Green

leaf R

oad

New Newton Falls Road

Sla

gle

Roa

d

Par

is-W

ind h

am R

oad

Smalley Road

Remalia Road

Blo

ckD

Roa

d1

Blo

ckD

Roa

d3

Blo

ckD

Roa

d5

South Patrol Road

Blo

ckD

Roa

d7

LL-1

Road

Ramsdell Road

Load Line 2 Road

LL-2 Road

LL-3 Road

Wilc

ox-W

ayla

nd R

oad

WP Lane E Butts-Kistler Road

Load Line 4 Road

Dor

mito

ry R

oad

FB Stor Road

Load Line 12 Road

Demolition Road

Storag

e Area

6 Roa

d

Geo

rge

Rd

B D Wye Road

Slagle Road

Gre

enle

af R

oadDemolition Road

LL-1 Road

0 2,200 4,400 6,600 8,8001,100Feet

PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477

Figure 1Regional Location of Rocket Ridgeand the Sand Creek Barrier System

Ravenna Army Ammunition PlantRavenna, OH

Drawn On: Drawn By: QX

N

5/21/2008

Legend

Water BodiesBuildingsWalkways

Railroads

Berms

Pond

Proposed Area

Page 9: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

2625242320

5321 4

1514181716

876

53

2827313029

464443

35343332383736

494847525150

60595864636261

676665

414039

56555457

706968

ߧ

61A61

OD-2 Area

Hazardous Fragmentation Distance (HFD) 680 feet

146

163

472

165

466

160

469

146

163

472

165

466

160

469

0 410 820 1,230 1,640205Feet

Figure 2 - Hazardous Fragmentation Distance (HFD) at the Sand Creek Barrier

Ravenna Army Ammunition PlantRavenna, OH

Drawn On: Drawn By: QX

N

5/21/2008

Legend

Water BodiesBuildingsWalkways

Railroads

Berms

Pond

OD-2 Area

HFD 680 feet

PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477

Page 10: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

20

5321 4

1514181716

876

2827313029

464443

35343332

494847

60595864636261

ߧMSD (500 ft Front, 250 ft Side and Rear)

PTRD (300 ft Front, 150 ft Side and Rear)

Igloo 7-C-1

Igloo 1501

MSD (500 ft Front, 250 ft Side and Rear)

PTRD (300 ft Front, 150 ft Side and Rear)

Sand Creek Barrier System

281

85

92

186

110

215

129

142214

90

139

280

104

137

108

131

91

83

187

140 136

93

95

100

185

96

89

94

282

188

138

141

98

97

99

372

127

126124

123

122

128

84

111

373

105

371

118

132

117

134

146

163165

107

115

119

275

148

151

157

113

153

273

103 116

112

155

272

160

276278

135

114

133 274

307

277

186

92

110215

281

129

142

214

139

280

90

104

137

108

131

187

91

83

140

136

100

93

95

185

282

188

138

96

141

94

98

122

128

99

111

105

84

118

132

146

163165

115

119

107

275

148

113

151

157

153

116

112

155

160

117

114

273

103

274

272

307

277

276

278

PE-1

PE-23

PE-3

51-25

PE-24

PE 7PE-6

PE-5

PE-4

PE-16

PE-15

PE-29

PE-28

PE-21

PE-14

PE-19

PE-13

PE-18

PE-2

PE-20

PE-17

PE-12

PE-32

PE-33

PE-31

PE-14A PE-26

PE-25

PE-27

Geo

rge

Roa

d

Newton Falls Road

Slagle R

oad

Green

leaf R

oad

Blo

ckD

Roa

d1

Blo

ckD

Roa

d2

Blo

ckD

Roa

d3

Blo

ckD

Roa

d4

Blo

ckD

Roa

d5

Blo

ckD

Roa

d6

Blo

ckD

Roa

d7

WP Lane A

WP Lane B

WP Lane C

WP

Lane

E

WP Lane D

South D Road

OD

-2 R

oad

Fuze and Booster RoadFu

ze a

nd B

oost

er S

pur R

oad

WS

Roa

d

Det

onat

or S

pur R

oad

Load

Line

9 Roa

d

Load Line 11 Road

Load Line 7 Road

Load Line 9

Pistol Range Road

Load Line 11

Slagle Road

Green

leaf R

oad

Slagle Road

Load Line 9

OD-2 Road

Slagle Road

WS

Roa

d

0 530 1,060 1,590 2,120265Feet

PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477

FIGURE 3 - Location of Storage Igloo1501 at OD-2 and 7-C-1

Ravenna Army Ammunition PlantRavenna, OH

Drawn On: Drawn By: QX

N

5/21/2008

Legend

Water BodiesBuildingsWalkways

Railroads

Berms

Pond

Proposed Area

Page 11: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

2625242320

5321 4

1514181716

876

53

2827313029

464443

35343332383736

494847525150

60595864636261

676665

414039

56555457

706968

ߧ

61A61

OD-2 Area

Hazardous Fragmentation Distance (HFD) 680 feet

MSD 2501 ft

MSD 2501 ft

281

85

92

186

90

280

91

83

187

93

95

100

185

96

94

188

98

97

99

372

84

373

371

146

163

472

165

148

466

160

469

186

92

281

280

90

187

91

83

100

93

95

185

188

96

94

98

99

84

146

163

472

165

148

466

160

469

PE-23

51-25

0 820 1,640 2,460 3,280410Feet

Figure 4 - Minimum Separation Distanceat the Sand Creek Barrier System

Ravenna Army Ammunition PlantRavenna, OH

Drawn On: Drawn By: QX

N

5/21/2008

Legend

Water BodiesBuildingsWalkways

Railroads

Berms

Pond

OD-2 Area

HFD 680 feet

PIKA International, Inc.12723 Capricorn Dr. Ste#500Stafford, TX 77477

Page 12: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page B-1

APPENDIX B

Fragmentation Calculation Sheets

Page 13: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Munition Information and Fragmentation Characteristics

Theoretical Calculated Fragment Range

Minimum Thickness to Prevent PerforationOverpressure Distances

Required Sandbag Thickness Water Containment System and Minimum Separation Distance:

Fragmentation Data Review Form

Close Form

Category: HE Bombs

Munition: 500 lb Bomb M64A1

Primary Database Category: bomb

Secondary Database Category: 500 lb

Munition Case Classification: Non-Robust

DODIC:

Individual Last Updated Record: Crull

Explosive Type: Comp B

Explosive Weight (lb): 274.00000

Diameter (in): 14.2000

Max Fragment Weight (lb): 0.289082

Critical Fragment Velocity (fps): 8116

HFD [Range to No More Than 1 Hazardous Fragmentper 600 Square Feet] (ft): 680

MFR-V [Vertical Range of Max Weight Fragment] (ft): 1991

MFR-H [Horizontal Rangeof Maximum Weight Fragment] (ft): 2501

Inhabited Building Distance (12 psi), K40 Distance: 293

Inhabited Building Distance (09 psi), K50 Distance: 367

Intentional MSD (0065 psi), K328 Distance: 2406

4000 psi Concrete (Prevent Spall): 8.94

Mild Steel: 1.46

Hard Steel: 1.20

Aluminum: 3.05

LEXAN: 6.77

Plexi-glass: 5.12

Bullet Resist Glass: 4.24

Max Fragment Weight (lb)SB: 0.022120

Critical Fragment Velocity (fps)SB: 8116

Kinetic Energy 106 (lb-ft2/s2)SB: 0.7285

Required Wall Roof Sandbag Thickness (in)SB: NA

Expected Maximum Sandbag Throw Distance(ft)SB: NA

Minimum Separation Distance (ft)SB: NA

Max Fragment Weight(lb)W: 0.022120

Critical Fragment Velocity (fps)W: 8116

Kinetic Energy 106 (lb-ft2/s2)W: 0.7285

Water Containment System:

NA

Minimum Separation Distance (ft)W: NA

Date Record Created: 7/30/2004

Last Date Record Updated: 6/25/2007

Date Record Retired:

Print This Form

Database Revision Date 12/31/07

Page 14: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio

Time Critical Response Action (TCRA) Explosive Site Plan (ESP)

Operation and Maintenance of Sand Creek Barrier SystemRavenna Army Ammunition Plant

Ravenna, Ohio

Revision 0, May 21, 2008 Page C-1

APPENDIX C

Ohio EPA MEC Demolition Notification

Page 15: Explosive Site PlanTime Critical Response Action (TCRA) Explosive Site Plan (ESP) Operation and Maintenance of Sand Creek Barrier System Ravenna Army Ammunition Plant Ravenna, Ohio